ML14035A402

From kanterella
Revision as of 15:16, 11 May 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
3INT-ISI-2, Rev. 4, Palo Verde, Unit 2, 3rd Interval: Inservice Inspection Program Summary Manual
ML14035A402
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 08/28/2013
From:
Arizona Public Service Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML14035A409 List:
References
102-06824-TNW/RKR 3INT-ISI-2, Rev. 4
Download: ML14035A402 (210)


Text

3 rd Inspection Interval Inservice Inspection Program Summary Manual PVNGS Unit 2

Arizona Public Service Company PVNGS PO Box 52034 5801 S. Wintersburg Road Phoenix, AZ 85072-2034 Tonopah, AZ 85354

Preparer: ____________________________ ___ Reviewer: __________________________________

Section Leader: _________________________ Department Leader: _

_______________

__________

ANII _______________________

Commercial Service Date: 09-19-1986 Program No: 3INT-ISI-2 Rev. 4 3INT-ISI-2 Rev. 4 1 of 210 Brannin, Michael P(Z08286)Digitally signed by Brannin, Michael P(Z08286)

DN: cn=Brannin, Michael

P(Z08286)

Reason: Program Owner

Date: 2013.08.28 13:45:20 -07'00' Hansen, Douglas

B(Z41530)Digitally signed by Hansen, Douglas B(Z41530)

DN: cn=Hansen, Douglas B(Z41530)

Reason: I have reviewed this

document Date: 2013.08.28 13:49:18 -07'00'

Hogstrom, Robert (YH2450)Digitally signed by

Hogstrom, Robert (YH2450)

DN: cn=Hogstrom, Robert (YH2450) Date: 2013.08.28 14:06:17

-07'00'Schrecker, Kenneth D(Z99981)Digitally signed by Schrecker, Kenneth D(Z99981)

DN: cn=Schrecker, Kenneth

D(Z99981)

Reason: I am approving this document Date: 2013.08.29 06:55:38 -07'00' Dilorenzo, Michael

D(Z99838)Digitally signed by Dilorenzo, Michael D(Z99838)

DN: cn=Dilorenzo, Michael D(Z99838)

Reason: Program Engineering Department

Leader Date: 2013.08.29 07:11:30 -07'00' TABLE OF CONTENTS Summary of Changes------------------------.3 1.0 Summary ......................................................................................................... 4 2.0 Code Applicability .......................................................................................... 4 3.0 Description ...................................................................................................... 5 3.1 Scope ............................................................................................................ 5 3.2 System Boundaries ....................................................................................... 6 3.3 Accessibility ................................................................................................. 6 3.4 Examination Techniques .............................................................................. 7 3.5 Inspection Intervals ...................................................................................... .7 3.6 Examination Categories ............................................................................... .8 3.7 Evaluation and Repair .................................................................................. .8 3.8 System Pressure Tests.................................................................................. .8 3.9 Exemptions .................................................................................................. .8 3.10 Code Cases .............................................................................................. -.9 3.11 Outage Plan Table----------------------9 3.12 References------------------------....10 4.0 ASME Class 1 Summary ............................................................................... 11 5.0 ASME Class 2 Summary ............................................................................... 38 6.0 ASME Class 3 Summary ............................................................................... 69 7.0 Augmented Summary .................................................................................... 76 8.0 Requests for Relief ........................................................................................ 89 9.0 Boundary Drawing Listing ............................................................................ 91 10.0 Zone Drawings .............................................................................................. 93 11.0 Terms and Definitions ................................................................................. 208 3INT-ISI-2 Rev. 4 2 of 210

SUMMARY

OF CHANGES Revision 4 Cover Page revised Table of Contents Updated Section 1.1, added a reference to TRM Section 3.1.3 Added reference to the Pressure Test Program D1.20, Added DG welded attachments and adjusted percentages per CRAI 4420287 F1.30, Added DG supports and adjusted percentages per CRAI 4420287 3INT-ISI-2 Rev. 4 3 of 210 PALO VERDE NUCLEAR GENERATING STATION UNIT 2 INSERVICE INSPECTION - PROGRAM

SUMMARY

1.0

SUMMARY

1.1 This document contains a detailed description of the 3 rd 10 Year Interval Inservice Inspection (ISI) Program for Palo Verde Nuclear Generating Station Unit 1. This program conforms to the requirements of 10CFR50.55a (g), PVNGS Technical Specifications, Technical Requirements Manual, and the PVNGS UFSAR.

Exceptions that are known as of this document preparation date are included in the Requests for Relief Section 8.0.

1.2 The revision is being prepared to update the ISI Program for the 3 rd 10 Year Interval. This includes the utilization of the 2001 Edition including the 2003 Addenda of ASME Section

XI with the exceptions noted below: 1.2.1 Requests for relief from ASME Section XI requirements are included in Section 8.0. These Relief Requests are prepared in a format similar to that documented in the NEI White Paper Revision 1 dated June 2004, entitled: "Standard Format for Requests from Commercial Reactor Licensees Pursuant to 10CFR50.55a". 1.2.2 The 2007 Edition thru the 2008 Addenda was utilized for B-L-1, B-M-1, and C-G for pump and valve body welds requirements. (Ref. Letter 102-06454 and SER dated 09-18-2012). (ACT 4343138) 1.2.3 For clarification, this Interval 3 program was prepared, as was Interval 1 and 2 programs, utilizing 40 month periods. 1.2.4 To support future ISI Programs, reference to the reactor vessel internals aging management program was added (Reference 3.12.3). (CRAI 4353644) 1.3 This revision does not utilize risk informed inservice inspection methodology at this time.

1.4 The information presented is in a form consistent with the 1 st and 2 nd 10 Year Interval ISI Program, the applicable requirements of Standard Review Plan manual and procedures and the recommendations contained in NRC letter dated July 17, 1981, from Mr. R.L. Tedesco, NRC, to E. E. Van Brunt, Jr., APS, "Guidance for Preparing Preservice and Inservice Inspection Programs and Relief Requests - Palo Verde Nuclear Generating Station Units 1, 2 and 3."

2.0 CODE APPLICABILITY 2.1 Based on paragraph 10 CFR 50.55a(b) (2) that was published 12 months prior to the start of the 3 rd 10 Year Interval (3-18-07), the 2001 Edition including the 2003 Addenda of ASME Section XI was referenced as the Code to utilize for preparation of this program. Several exceptions to this code are documented in 10CFR50.55a; each of these exceptions was utilized during the preparation of this program.

  • The exemptions of IWB-1220 for Class 1 piping must utilize the 1989 Edition.

3INT-ISI-2 Rev. 4 4 of 210

  • When qualifying VT-3 personnel per IWA-2317, the proficiency of the training must be demonstrated by initial qualification examination and subsequent examinations on a 3 year interval.
  • The 1997 Edition must be used for IWA-2240 alternative examination methods, a combination of methods, or newly developed techniques.
  • Items B3.120 and B3.140 (nozzle inner radius examinations) of the 1998 Edition must be utilized. An enhanced visual examination with a resolution sensitivity to detect a 1-mil wire or crack may be performed in place of an ultrasonic examination.
  • Must utilize the 1995 Edition for examination Item B7.80 per 50.55a (b)(2)(xxi)(B).
  • IWA-2220, Ultrasonic examination methods are prohibited for surface examinations.
  • The surface examination requirements for HPSI systems, Items B9.20, B9.21 and B9.22 are not required to be performed.

2.2 If a code required examination was considered to be impractical during the preparation of this document because of plant design, geometry, accessibility or other conditions, a Request for Relief from that requirement was prepared and included in Section 8.0. If a code required examination is identified to be impractical during the course of an inspection and the code required percentages are not met, a request for relief will be prepared and submitted after each inspection period, and the final interval closeout no later than 12 months after expiration of the Interval.

2.3 This ISI Program will implement the ASME Section XI 2001 Edition Appendix VIII (Performance Demonstration for Ultrasonic Examination Systems) in accordance with 10 CFR 50.55a. These examinations will be conducted in accordance with the Performance Demonstration Initiative (PDI). The PDI Code Comparison document (Reference 3.12.2) explains the complex relationship of regulatory requirements, ASME requirements, code editions, and the PDI program. (CRAI 4378832

)

3.0 DESCRIPTION

3.1 SCOPE 3.1.1 This Inservice Inspection Program Summary includes all applicable nondestructive examinations required by ASME Section XI as identified below: 1. Examination of ASME Class 1, 2, and 3 pressure retaining components and their supports 3.1.2 This program also includes an augmented section that includes examinations for other items required to be examined as identified below. 1. Examinations of welds in Class 1 components fabricated with Alloy 600/82/182 4materials in accordance with 10CFR50.55a and Code Case N-722-1. 2. Examination of the Reactor Vessel Closure Head in accordance with 10CFR50.55a and Code Case N-729-1. 3. Examination of welds in Class 1 piping and vessel nozzle butt welds fabricated with alloy 82/182 in accordance with 10CFR50.55a and Code Case N-770-1. 3INT-ISI-2 Rev. 4 5 of 210

4. Examination of high energy line piping in accordance with UFSAR 6.6.1(CRAI 4178275). 5. Examination of the Reactor Coolant Pump Flywheels in accordance with PVNGS Technical Specifications Section ITS 5.5.7.
6. USNRC Circulars, Information Notices, Bulletins, or Orders 7. INPO or other industry operating experiences 8. Combustion Engineering or Westinghouse bulletins or notices 9. Special examinations to satisfy other commitments or concerns that are based on operating experiences, USNRC. These examinations are scheduled throughout this program and reference the applicable notification documents.

3.1.3 Those items that may generally be included in an Inservice Inspection Program, but are not included are identified below:

1. Pressure testing of ASME Class 1, 2, and 3 piping will be performed in accordance with the Pressure testing Program
2. The inservice testing of snubbers will be performed in accordance with 10CFR50.55a.
3. The inservice examination of steam generator tubing will be performed in accordance with the PVNGS Technical Specifications Section T5.5.9.
4. The Examination Program for the ASME Subsections IWE and IWL will be performed in accordance with 10CFR50.55a and the PVNGS Technical Specifications.

3.2 SYSTEM BOUNDARIES 3.2.1 A complete set of P&ID drawings indicating the Inservice Inspection boundary are maintained at the PVNGS site. These drawings illustrate the ASME Class 1, 2, and 3 systems; components; and boundaries scheduled for examinations and pressure testing. A referenced listing of these drawings is documented in Section 9.0. 3.2.2 A set of ISI (Zone) Drawings is included in Section 10.0. These drawings are utilized for the planning and scheduling of specific ASME Class 1 and 2 examinations throughout the 10 Year Interval. These also document the location and number of welds, components, and supports. (CRAI4398776) 3.3 ACCESSIBILITY 3.3.1 The preservice examinations were performed with examination techniques, automated or manual, similar to those planned for use during Inservice Inspections. The examination limitations noted during the preservice examinations were documented in Requests for Relief submitted with the preservice examination program. There has also been a number of additional code limitations noted during the 1 st and 2 nd 10 Year Intervals and Request for Relief submitted. If included in the required 3 rd Interval examinations they will again be evaluated and relief requested. Note Section 8.0 identifies all the reliefs submitted during the preparation and implementation of the 3 rd Interval. 3INT-ISI-2 Rev. 4 6 of 210 3.3.2 All items that are scheduled for examination will be examined to the extent practical. In addition, any code limitations that are noted during the examinations will be documented. If relief is required from any of these examinations, a Request for Relief will be submitted after the relief is discovered and prior to 12 months after the interval ends. 3.4 EXAMINATION TECHNIQUES 3.4.1 The three types of examinations utilized to perform Inservice Inspections, along with the actual nondestructive examination technique, are identified in the legend below: VT - Visual VT - 1 (General Condition) VT - 2 (Leakage)

VT - 3 (Mechanical and Structural Condition) VE (Visual Examination)

S - Surface PT - Liquid Penetrant MT - Magnetic Particle ET - Eddy Current VOL - Volumetric UT - Ultrasonic RT - Radiography

3.4.2 All the above nondestructive examination techniques will be performed using specific techniques and procedures that are identified in ASME Section XI, or alternative examinations that are demonstrated to be equivalent or superior to those identified.

The provision for substitution of these alternative examination methods, combination of methods, or newly developed techniques will utilize the 1997 Addenda for IWA-2240.

3.5 INSPECTION INTERVALS 3.5.1 The Inservice Inspection Program was prepared in accordance with Program B of ASME Section XI. The 1 st , 2 nd, and 3 rd 10 Year Intervals and corresponding inspection periods are defined below: First Inspection Interval: 09/19/86 to 03/17/97 Second Inspection Interval: 03/18/97 to 03/17/07 Third Inspection Interval: 03/18/07 to 03/17/17 Period One: 03/18/07 to 07/17/10 Period Two: 07/18/10 to 11/17/13 Period Three: 11/18/13 to 03/17/17 It should be noted that the intervals/periods may change to allow for extended outage durations per IWA-2400 of ASME Section XI.

3INT-ISI-2 Rev. 4 7 of 210 3.6 EXAMINATION CATEGORIES 3.6.1 The examination categories of ASME Section XI were utilized to develop this program for all systems, components, and supports. The Subprogram summary tables contained in Sections 4.0 and 5.0 are organized by examination category for ASME Class 1 and 2 systems, respectively. For each examination category, these tables identify the system or identification, nondestructive examination method, total number of items, required examination amount for each inspection period, and running percentage. For ASME Class 3 systems, the examinations categories are identified in Section 6.0. 3.7 EVALUATION AND REPAIR 3.7.1 The evaluation of all examination results will be performed in accordance with ASME Section XI Articles IWx-3000. In addition, all applicable repairs and replacements will be performed in accordance with ASME Section XI Articles IWX-4000 and 7000. Pressure tests will be performed on welded and mechanical joint repairs or replacements, in accordance with IWx-4000 and 5000 and 10CFR50. Both the evaluations and repair or replacement will be performed in accordance with the 2001 Edition including the 2003 Addenda of ASME Section XI, or later editions and addenda of ASME Section XI referenced in 10CFR50. Later editions and addenda will be documented with the NRC. 3.7.2 It should be noted that a relief was requested (Relief Request 36) to perform repair and replacement of all three PVNGS units to the 2001 Edition including the 2003 Addenda. This request was documented in conjunction with the relief to perform full structural weld metal overlays. (APS letter to the USNRC 102-05641 dated 2-8-2007). 3.7.3 All repairs and replacements will be documented in accordance with the Work Control program, and are maintained at Palo Verde for review.

3.8 SYSTEM PRESSURE TESTS 3.8.1 ASME Class 1, 2, and 3 components will be pressure tested per the requirements of IWB-5000, IWC-5000 and IWD-5000, except where relief has been requested. 3.8.2 Pressure tests will also be performed on repairs and replacements per ASME Section XI, 10CFR50.55a, and the PVNGS Repair and Replacement program.

3.9 EXEMPTIONS 3.9.1 The exemption criteria identified in the 2001 Edition including the 2003 Addenda of ASME Section XI was utilized for all ASME Class 1, 2, and 3 components and systems. The only exception is that required by 10CFR50.55a for the ASME Class 1 piping exemptions. These are in accordance with the 1989 Edition of ASME XI. 3.9.2 A thorough review of all the systems and components was performed in accordance with the above exemptions and a complete set of color coded Inservice Inspection Exemption drawings was prepared. These drawings are maintained at the PVNGS site for review. 3INT-ISI-2 Rev. 4 8 of 210 3.10 CODE CASES 3.10.1 The following Code Cases are accepted for use in Regulatory Guide 1.147 and may be utilized during Interval 3 where applicable (CRAIs 4338597, 4404322, and 4308456):

1. N-460 Alternative examination coverage for Class 1 and 2 welds 2. N-526 Alternative requirements for successive inspections of Class 1 and 2 vessels 3. N-532-4 Alternative requirements to repair and replacement documentation 4. N-534 Alternative Requirements for Pneumatic Pressure Testing. 5. N-537 Location of Ultrasonic Depth-Sizing Flaws (CRAI 4404322) 6. N-566-2 Corrective Action for Leakage Identified at Bolted Connections 7. N-613-1 Ultrasonic examination of full penetration nozzles in vessels 8. N-624 Successive inspections 9. N-652-1 Alternative requirements to categories B-G-1, B-G-2, and C-D bolting 10. N-663 Alternative requirements for Classes 1 and 2 Surface Examinations 11. N-666 Weld Overlay of Class 1, 2, and 3 Socket Welded Connections 12. N-685 Lighting Requirements for Surface Examinations 13. N-695 Alternative for Qualification Requirements for Dissimilar Metal Piping Welds, Appendix VIII Supplement 10 14. N-700 Alternative Rules for Selection of Class 1, 2, and 3 Vessel Welded Attachments for Examination 15 N-705 Evaluation Criteria for Temporary Acceptance of Degradation in Moderate Energy Class 2 or 3 Vessels and Tanks (CRAI 4308456) 3.10.2 The following Code Cases are conditionally accepted for use in Regulatory Guide 1.147 may be utilized with the specified conditions during Interval 3 where

applicable:

1. N-513-3 Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RG 1.147 documents acceptance condition is that the repair or replacement activity temporarily deferred under the provisions of this Code Case shall be performed during the next scheduled outage.
2. N-648-1 Alternative requirements for inner radius examinations of reactor vessel nozzles RG 1.147 documents acceptance condition is that in place of a UT examination, licensees may perform a visual examination with enhanced magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio. The provisions of Table IWB-2500-1, Examination Category B-D, continue to apply except that, in place of examination volumes, the surfaces to be examined are the external surfaces shown in the figures applicable to this table (the external surface is from point M to point N in the figure).

3.10.3 The following Code Cases are required to be utilized by 10CFR50.55a with additional specified conditions. These are planned to be utilized with the specified conditions during Interval 3:

1. N-722-1 Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated With Alloy 600/82/182 Materials 2. N-729-1 Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds 3. N-770-1 Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated With UNS N06082 or UNS W86182 Weld filler Material With or Without Application of Listed Mitigation Activities. (Note Reference 3.12.1).

3.11 OUTAGE PLAN TABLE The outage plan table, controlled by procedure 73DP-9XI03 and 73DP-9EE02, identifies the components scheduled for examination including successive examinations from prior periods. The examination procedures and a listing of calibration blocks are also identified.

3INT-ISI-2 Rev. 4 9 of 210 3.12 REFERENCES 3.12.1 N001-0604-00903, Calculation PV-23Q-405, dated 5-25-11(CRAI 4348769) 3.12.2 EPRI 2012 Technical Report titled "Nondestructive Evaluation: Performance Demonstration Initiative (PDI) Comparisons to ASME Section XI, Appendix VIII 2007 Edition with 2008 Addendum, and 10CFR50.55a, Year 2011" dated November 2012 (CRAI 4378832) 3.12.3 MN755-A00003 titled "PWR Internals Aging Management Program Plan for Palo Verde Nuclear Generating Station Units 1, 2, and 3" dated 9-7-12 (CRAI 4353644) 3.12.4 EPRI 2012 Technical Report 1024994, "Materials Reliability Program: Assessment of Residual Heat Removal Mixing Tee Thermal Fatigue in PWR Plants," dated August 2012. (CRAI 4312834) 3INT-ISI-2 Rev. 4 10 of 210 SECTION 4.0 ASME CLASS 1 EXAMINATION

SUMMARY

3INT-ISI-2 Rev. 4 11 of 210 INDEX EXAM CATEGORIES B-A Pressure Retaining Welds in Reactor Vessel B-B Pressure Retaining Welds in Vessels Other Than Reactor Vessels B-D Full Penetration Welded Nozzles in Vessels B-F Pressure Retaining Dissimilar Metal Welds in Vessel Nozzles B-G-1 Pressure Retaining Bolting, Greater Than 2 Inches in Diameter B-G-2 Pressure Retaining Bolting, 2 Inches and Less in Diameter B-J Pressure Retaining Welds in Piping B-K Welded Attachments for Vessels, Piping, Pumps and Valves B-L-1 & B-M-1 Pressure Retaining Welds in Pump and Valve Bodies B-L-2 & B-M-2 Pump Casings and Valve Bodies B-N-1 Interior of Reactor Vessel B-N-2 Welded Core Support Structures and Interior Attachments to Reactor Vessels B-N-3 Removable Core Support Structures B-O Pressure Retaining Welds in Control Rod Housings B-P All Pressure Retaining Components B-Q Steam Generator Tubing F-A Class 1 Supports 3INT-ISI-2 Rev. 4 12 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-A; PRESSURE RETAINING WELDS IN REACTOR VESSEL

  • Auto exam with core barrel removed
  • RR 40 exam by 2027B1.10SHELL WELDSB1.11CIRCUMFERENTIA L1-Reactor Vesselwelds79173Vol3010 0203*3100 B1.12LONGITUDINAL1-Reactor Vesselwelds79173Vol90100209*3100 B1.20HEAD WELDS B1.21CIRCUMFERENTIA LB1.22MERIDIONAL1-Reactor Vessel Bottom Headweld79173Vol10100201*3100 3INT-ISI-2 Rev. 4 13 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS2-Closure HeadweldN05065-CHA-01Vol0000 RVH Replaced R15B1.30SHELL-TO-FLANGE WELD1-Reactor Vesselweld79173Vol10100201*3100 B1.40HEAD-TO-FLANGE WELD2-Closure HeadweldN05065-CHA-01S & Vol0000 RVH Replaced R15 3INT-ISI-2 Rev. 4 14 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-B; PRESSURE RETAINING WELDS VESSELS OTHER THAN REACTOR VESSELS
  • category running percent----21292257 43100 PRESSURIZERB2.10SHELL -TO-HEAD WELDS B2.11CIRCUMFERENTIAL 5- Pressurize rweld79373Vol211*13*B2.12LONGITUDINAL **

5- Pressurize rweld79373Vol421**

    • 1' of each 23**intesecting circ exam area STEAM GENERATORS ***B2.30HEAD WELDS B2.31CIRCUMFERENTIAL

4- Steam Generator 2weld211Vol1B2.40TUBESHEET TO HEAD3- Steam Generator 1weld212Vol212 4- Steam Generator 2weld211Vol213*

3INT-ISI-2 Rev. 4 15 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-D; FULL PENETRATION WELDED NOZZLES IN VESSELS-INSPECTION PROGRAM B *RR 40 exam by 2027 REACTOR VESSEL B3.90NOZZLE-TO-VESSEL WELDS1- Reactor VesselOutlets - 2 79173Vol66*3100

  • Auto exam with Inlets - 4 core barrel removedB3.100NOZZLE INSIDE RADIUS SECTION1- Reactor VesselOutlets - 2 79173Vol66*3100
  • Auto exam with Inlets - 4 core barrel removed PRESSURIZERB3.110NOZZLE-TO-VESSEL WELDS 5- Pressurize rSurge - 179373Vol61116Spray - 12250Safeties - 433100 B3.120 NOZZLE INSIDE RADIUS SECTION**

5- Pressurize rSurge - 179373Vol61116Spray - 12250Safeties - 433100 3INT-ISI-2 Rev. 4 16 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS STEAM GENERATORS B3.130NOZZLE-TO-VESSEL WELDS

B3.140 NOZZLE INSIDE RADIUS SECTION**

    • added inner radius

B3.140 NOZZLE INSIDE RADIUS SECTION3- Steam Generator 1Inlet - 1212Vol311*Outlet - 222*4- Steam Generator 2Inlet - 1211Vol311*Outlet - 223*

3INT-ISI-2 Rev. 4 17 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-F; PRESSURE RETAINING DISSIMILAR METAL WELDS IN VESSEL NOZZLES PRESSURIZER B5.40NOMINAL PIPE SIZE >

4 INCH NOZZLE TO SAFEEND BUTT WELDS 20- Surgebutt weldsRC-028-12"S & Vol6***

Mitigated with FSWO29- Spraybutt weldsRC-018-4"S & Vol Moved to augmented31- Safeties (4)butt weldsRC-001-6"S & VolRC-003-6"S & Vol RC-005-6"S & Vol RC-007-6"S & Vol 3INT-ISI-2 Rev. 4 18 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-G-1; PRESSURE RETAINING BOLTING GREATER THAN 2 IN. IN DIAMETER REACTOR VESSELB6.10CLOSURE HEAD NUTS2- Closure Headnuts7.237" x 7.91"VT-15418133 18266 183100 B6.20CLOSURE STUDS2- Closure Headstuds7.380" x 76.37"Vol541813318266 183100 B6.40THREADS IN FLANGE1- Reactor VesselStud Holes79173Vol54000000543100B6.50CLOSURE WASHERS BUSHINGS2- Closure HeadWashers7.50" x 1.27"VT-1541813318266 183100 3INT-ISI-2 Rev. 4 19 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS PUMPSB6.180BOLTS AND STUDS16- Reactor Coolant Pump 1AFlange Studs4.33" x 32.87"Vol16163100

18- Reactor Coolant Pump 2AFlange Studs4.33" x 32.87"Vol16**

19- Reactor Coolant Pump 2BFlange Studs4.33" x 32.87"Vol16**

B6.190 FLANGE SURFACE WHEN CONNECTION DISASSEMBLED

    • VT-1 exams on 1 pump per interval (with B12.XX exams)16- Reactor Coolant Pump 1Asurface1110-1AVT-11******17- Reactor Coolant Pump 1Bsurface1110-1BVT-11******

18- Reactor Coolant Pump 2Asurface1110-2AVT-11******

19- Reactor Coolant Pump 2Bsurface1110-2BVT-11******B6.200NUTS, BUSHINGS, AND WASHERS

    • VT-1 exams on 1 pump per interval (with B12.XX exams)16- Reactor Coolant Pump 1Anuts & ring1110-1AVT-116******17- Reactor Coolant Pump 1Bnuts & ring1110-1BVT-116******

18- Reactor Coolant Pump 2Anuts & ring1110-2AVT-116******

19- Reactor Coolant Pump 2Bnuts & ring1110-2BVT-116******

3INT-ISI-2 Rev. 4 20 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-G-2; PRESSURE RETAINING BOLTING 2 IN. AND LESS IN DIAMETER PRESSURIZERB7.20BOLTS, STUDS AND NUTS 5- Pressurizer Manwa yStuds & Nuts1.31" x 14.5"VT-12020******

STEAM GENERATORB7.30BOLTS, STUDS AND NUTS3- Steam Generator 1 MANWAYSStuds & Nuts1.31" x 14.5"VT-14040******

4- Steam Generator 2 MANWAYSStuds & Nuts1.31" x 14.5"VT-14040******

PIPING**** When disassembled and

only once per

interval. One bolted

connection among

a group of similar

bolted connections.B7.50BOLTS, STUDS AND NUTS31- Pressurizer SafetiesFlange BoltingRC-001-6"VT-188********Flange BoltingRC-003-6"VT-188********

Flange BoltingRC-005-6"VT-188********

Flange BoltingRC-007-6"VT-188********37- Charging LineFlange V435CH-005-2"VT-188********

3INT-ISI-2 Rev. 4 21 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS PUMPSB7.60BOLTS, STUDS AND NUTS16- Reactor Coolant Pump 1Aseal cover1.1" x 8.27"VT-11616****

required once per18- Reactor Coolant Pump 2Aseal cover1.1" x 8.27"VT-11616****

interval (B-L-2)19- Reactor Coolant Pump 2Bseal cover1.1" x 8.27"VT-11616****

VALVESB7.70BOLTS, STUDS AND NUTS31- Pressurizer Safeties PSV-200RC-001-6"VT-11212*******

During VENDOR (Body Bolts)PSV-201RC-003-6"VT-11212*******

disassembly (B-M-2)PSV-202RC-005-6"VT-11212*******

PSV-203RC-007-6"VT-11212*******30- Aux Pressurizer SprayHV-203CH-521-2"VT-144****

    • VT-1 examsHV-205CH-520-2"VT-144****

required once per interval CRD HOUSING

        • When disassembled and

only once per

intervalB7.80BOLTS, STUDS AND NUTS 2-Closure Head RVLMS Locations Grayloc ClampsCEDM 92VT-144********

CEDM 96VT-144********

3INT-ISI-2 Rev. 4 22 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-J; PRESSURE RETAINING WELDS IN PIPING B9.10NPS 4 OR LARGER B9.11* CIRCUMFERENTIAL WELDS 6- RCS Primary PipingHL 1**butt weldsRC-032-42" IDS* & Vol627111

    • AUTO EXAM OF HL 2**butt weldsRC-063-42" ID6221 NOZZLE TO EXT ANDCL 1A to RCPbutt weldsRC-033-30" ID6331 EXT TO PIPE WELDSCL 1B to RCPbutt weldsRC-030-30" ID
  • SURFACE EXAMS CL 2A to RCPbutt weldsRC-073-30" ID NOT REQUIRED INCL 2B to RCPbutt weldsRC-084-30" ID CONJUNCTION WITHCL 1A to RPV**butt weldsRC-034-30" ID AUTO EXAMINATIONSCL 1B to RPV**butt weldsRC-031-30" ID (EWR-3673722 & CL 2A to RPV**butt weldsRC-079-30" ID CODE CASE N663)CL 2B to RPV**butt weldsRC-093-30" ID20- Pressurizer Surge Linebutt weldsRC-028-12"S & Vol11119 DM MOVED TO AUG232721- Shutdown Cooling Loop 1butt weldsRC-051-16"S & Vol24218 DM MOVED TO AUG SI-240-16"22- Shutdown Cooling Loop 2butt weldsRC-068-16"S & Vol182111 DM MOVED TO AUG SI-193-16" 7238336623- Safety Injection 1Abutt weldsSI-207-14"S & Vol184128 DM MOVED TO AUG SI-203-12"24- Safety Injection 1Bbutt weldsSI-223-14"S & Vol185228 DM MOVED TO AUG SI-221-12"25- Safety Injection 2Abutt weldsSI-160-14"S & Vol226327 DM MOVED TO AUG SI-156-12" 3INT-ISI-2 Rev. 4 23 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS26- Safety Injection 2Bbutt weldsSI-179-14"S & Vol185328 DM MOVED TO AUG SI-175-12"28 & 29- Pressurizer Spraybutt weldsRC-018-4"S & Vol131171214 232931- Pressurizer Safetiesbutt weldsRC-001-6"S & Vol12118RC-003-6"1217 RC-005-6"1325

RC-007-6"36- Letdown Line (delay coil)butt weldsRC-091-16"S & Vol41325B9.20LESS THAN NPS 4 B9.21* CIRCUMFERENTIAL WELDS OTHER THAN PWR HPSI SYSTEMS27- Pressurizer Spray 1Abutt weldsRC-062-3"S389126 DM MOVED TO AUG RC-016-3"28- Pressurizer Spray 1Bbutt weldsRC-017-3"S3610326 DM MOVED TO AUG RC-018-3"30- Aux Pressurizer Spraybutt weldsCH-009-2"S113227 CH-520-2" CH-521-2"32- Drain Line Loop 1Abutt weldsRC-060-2"S51120 DM MOVED TO AUG 33- Drain Line Loop 1Bbutt weldsRC-058-2"S51220 DM MOVED TO AUG34- Drain Line Loop 2Abutt weldsRC-096-2"S52340 DM MOVED TO AUG 3INT-ISI-2 Rev. 4 24 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS35- Drain Line Loop 2Bbutt weldsRC-089-2"S5234036- Letdown Linebutt weldsRC-091-2"S70618 DM MOVED TO AUGCH-001-2"6216632537- Charging Linebutt weldsCH-005-3"S60518 DM MOVED TO AUGCH-005-2"5217632738- Drain Line Loop 1butt weldsRC-070-2"S112100 B9.22 CIRCUMFERENTIAL WELDS OF PWR HPSI SYSTEMS39- HPSI Long Term Recirculation 1butt weldsSI-248-3"Vol52831540- HPSI Long Term Recirculation 2butt weldsSI-199-3"Vol25311210252 B9.30 BRANCH PIPE CONNECTION WELDSB9.31NPS 4 OR LARGER

  • 9.31 running percent---711141328 6- RCS Primary PipingSurgebranch weldRC-032-42" IDS & Vol1SD Cooling 1branch weldRC-032-42" IDS & Vol1 SD Cooling 2branch weldRC-063-42" IDS & Vol1SI 1Abranch weldRC-034-30" IDS & Vol1 SI 1Bbranch weldRC-031-30" IDS & Vol1 SI 2Abranch weldRC-079-30" IDS & Vol1 SI 2Bbranch weldRC-093-30" IDS & Vol1 3INT-ISI-2 Rev. 4 25 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSB9.32LESS THAN NPS 4
  • 9.32 running percent---141171214 2328 6- RCS Primary PipingDrain 1Abranch weldRC-033-30" IDS 1 PZR Spray 1 Abranch weldRC-034-30" IDS 1Drain 1Bbranch weldRC-030-30" IDS 1PZR Spray 1Bbranch weldRC-031-30" IDS 1Drain 2Abranch weldRC-073-30" IDS 1Chargingbranch weldRC-079-30" IDS 1Letdownbranch weldRC-084-30" IDS 121- Shutdown Cooling Loop 1branch weldRC-051-16"S2 2" Drain & 3" HPSI22- Shutdown Cooling Loop 2branch weldRC-068-16"S1 3" HPSI36- Letdown Linebranch weldRC-091-16"S4 3INT-ISI-2 Rev. 4 26 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSB9.40SOCKET WELDS
  • 9.40 running percent---1721122223 233530- Aux PZR Spraysocket weldCH-520-2"S2CH-521-2"S232- Drain Line Loop 1Asocket weldRC-060-2"S3 33- Drain Line Loop 1Bsocket weldRC-058-2"S3 34- Drain Line Loop 2Asocket weldRC-096-2"S335- Drain Line Loop 2Bsocket weldRC-089-2"S338- Drain Line Loop 1socket weldRC-070-2"S1 EXAM CATEGORY B-K; WELDED ATTACHMENTS FOR VESSELS. PIPING, PUMPS AND VALVES PRESSURE VESSELSB10.10WELDED ATTACHMENTS
  • Multiple vessels4 -Steam Generator 2 *support skirt211S**1 5- Pressurize rsupport skirt79373S**11150 3INT-ISI-2 Rev. 4 27 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS PIPINGB10.20WELDED ATTACHMENTS
  • B10.20 running percent---13118131522- Shutdown Cooling 2attachmentSI-193-16"S1RC-068-16"S127- PZR Spray 1AattachmentRC-062-3"S1 28- PZR Spray 1BattachmentRC-017-3"S129- Combined PZR SprayattachmentRC-18-3"S1 36- Letdown LineattachmentRC-091-16"S437- Charging LineattachmentCH-005-3"S3 40- HPSI Long Term 2attachmentSI-199-3"S1 EXAM CATEGORY B-L-1, PRESSURE RETAINING WELDS IN PUMP CASINGS; B-M-1, PRESSURE RETAINING WELDS IN VALVE BODIES; B-L-2, PUMP CASINGS; B-M-2, VALVE BODIES EXAM CATEGORIES B-L

-1 and B-M-1 deleted in the 2007 Ed., 2008 Add.

See letter 102-06454 and SER dated 09/18/2012.B12.20PUMP CASING16- Reactor Coolant Pump 1Acasing1110-1AVT-341**

17- Reactor Coolant Pump 1Bcasing1110-1BVT-3 18- Reactor Coolant Pump 2Acasing1110-2AVT-3 19- Reactor Coolant Pump 2Bcasing1110-2BVT-3 3INT-ISI-2 Rev. 4 28 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSB12.50VALVE BODY, EXCEEDING NPS 4

16" Borg Warner Gate Valves

Utilizing Forged ConstructionZone 21UV-651RC-051-16"VT-341**

Exam required whenUV-653SI-240-16"VT-3 valve is disassembledZone 22UV-652RC-068-16"VT-3UV-654SI-193-16"VT-3 14" Borg Warner Gate Valves Utilizing Forged ConstructionZone 23UV-634SI-207-14"VT-341**

Exam required whenZone 24UV-644SI-223-14"VT-3 valve is disassembledZone 25UV-614SI-160-14"VT-3 Zone 26UV-624SI-179-14"VT-3 12" Borg Warner Check Valves Utilizing Cast ConstructionZone 23V-542SI-203-12"VT-341**

Exam required whenZone 24V-543SI-221-12"VT-3 valve is disassembledZone 25V-540SI-156-12"VT-3Zone 26V-541SI-175-12"VT-3 3INT-ISI-2 Rev. 4 29 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS 14" Borg Warner Check Valves Utilizing Cast ConstructionZone 23V-235SI-207-14"VT-381**

Exam required whenV-237SI-207-14"VT-3 valve is disassembledZone 24V-245SI-223-14"VT-3V-247SI-223-14"VT-3Zone 25V-215SI-160-14"VT-3V-217SI-160-14"VT-3Zone 26V-225SI-179-14"VT-3V-227SI-179-14"VT-3 Dresser PSV Utilizing Forged ConstructionZone 31PSV-200RC-001-6"VT-341**

Exam required whenPSV-201RC-003-6"VT-3 valve is disassembledPSV-202RC-005-6"VT-3 PSV-203RC-007-6"VT-3 3INT-ISI-2 Rev. 4 30 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-N-1, INTERIOR OF REACTOR VESSEL; B-N-2, WELDED CORE SUPPORT STRUCTURES AND INTERIOR ATTACHMENTS TO REACTOR VESSELS; B-N-3, REMOVABLE CORE SUPPORT STRUCTURESB13.10VESSEL INTERIOR At 3 year intervals 1- Reactor Vessel accessible areas 79173VT-3111100 R14, R16, R18, and R202210033100B13.50INTERIOR ATTACHMENTS WITHIN BELTLINE REGION

1- Reactor Vessel accessible welds 79173VT-111*3100

  • RR 44 exam by 2027B13.60INTERIOR ATTACHMENTS BEYOND BELTLINE REGION

1- Reactor Vessel accessible welds 79173VT-311*3100

  • RR 44 exam by 2027B13.70CORE SUPPORT STRUCTURE 1- Reactor Vessel accessible areas 79173VT-311*3100
  • RR 44 exam by 2027 3INT-ISI-2 Rev. 4 31 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS;RETAINING WELDS IN CONTROL ROD
  • exam category running percent---12601**Replaced RV Head10311 R15B14.10WELDS IN CRD HOUSING 32 peripheral 2- Reactor Vessel Lower Housing66 thru 97Vol32 Closure Head CEDM Housings 2- Reactor Vessel Upper Housing66 thru 97Vol32 Closure Head CEDM Housings 2- Reactor Vessel Lower Tube66-91,93-95,97Vol32 Closure Head RVLMS 92 and 96 CEDM Housings 2- Reactor Vessel Upper Tube66-91,93-95,97Vol30 Closure Head CEDM Housings 3INT-ISI-2 Rev. 4 32 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-P; ALL PRESSURE RETAINING COMPONENTS Note Augmented for VT-2 of insulated boltingB15.10PRESSURE RETAININGClass 1IWB-5222aVT-2****
  • NOTE Pressure Test COMPONENTS ProgramB15.10PRESSURE RETAININGClass 1IWB-5222bVT-2****

COMPONENTS

TUBING y SpecificationsB16.20STEAM GENERATOR TUBING IN*******

U-TUBE DESIGN 3INT-ISI-2 Rev. 4 33 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY F-A; SUPPORTS F1.10CLASS 1 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS

  • F-A; A running percentNONE F1.10CLASS 1 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
  • F-A; B running percen t---877188217 832620- Pressurizer Surge LinesupportsRC-28-12"VT-3121- Shutdown Cooling 1supportsRC-51-16"VT-313SI-240-16" 22- Shutdown Cooling supportsSI-193-16"VT-35 RC-068-16"23- Safety Injection 1AsupportsSI-207-14"VT-32 24- Safety Injection 1BsupportsSI-223-14"VT-3125- Safety Injection 2AsupportsSI-156-12"VT-31 26- Safety Injection 2BsupportsSI-179-14"VT-32 SI-175-12"27- Pressurizer Spray 1AsupportsRC-62-3"VT-38 RC-16-3"28- Pressurizer Spray 1BsupportsRC-17-3"VT-310 RC-18-3" RC-18-4"30- Aux Pressurizer SpraysupportsCH-521-2"VT-31 32- Drain Line 1AsupportsRC-60-2"VT-31 33- Drain Line 1BsupportsRC-58-2"VT-31 36- Letdown LinesupportsRC-91-2"VT-315 CH-001-2" RC-91-16"37- Charging LinesupportsCH-5-3"VT-316 39- HPSI Long Term Recirculation 1supportsSI-248-3"VT-37 40- HPSI Long Term Recirculation 2supportsSI-199-3"VT-33 3INT-ISI-2 Rev. 4 34 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS 3INT-ISI-2 Rev. 4 35 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSF1.10CLASS 1 PIPING SUPPORTS C-SUPPORTS THAT ALLOW THERMAL MOVEMENT (SPRING)
  • F-A; C running percen t---3841104221 433220- Pressurizer Surge LinesupportsRC-28-12"VT-3321- Shutdown Cooling 1supportsSI-240-16"VT-32 22- Shutdown Cooling supportsRC-68-16"VT-32 23- Safety Injection 1AsupportsSI-207-14"VT-31 24- Safety Injection 1BsupportsSI-223-14"VT-32 25- Safety Injection 2AsupportsSI-160-14"VT-31 26- Safety Injection 2BsupportsSI-179-14"VT-32 SI-175-12"27- Pressurizer Spray 1AsupportsRC-62-3"VT-33 28- Pressurizer Spray 1BsupportsRC-17-3"VT-33 29- Combined Pressurizer SpraysupportsRC-18-4"VT-3330- Aux Pressurizer SpraysupportsCH-521-2"VT-3137- Charging LinesupportsCH-5-3"VT-311 39- HPSI Long Term Recirculation 1supportsSI-248-3"VT-33 40- HPSI Long Term Recirculation 2supportsSI-199-3"VT-31 3INT-ISI-2 Rev. 4 36 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSF1.40SUPPORTS OTHER THAN PIPING SUPPORTS
  • F-A; B running percen t---394128**14 req'd due to 5256 multiple components631001 - Reactor Vesselcolumns79173VT-34 3 - Steam Generator 1*skirt212VT-31*multiple comp 4 - Steam Generator-2*skirt211VT-31

5 - Pressurize rskirt79373VT-3116- Reactor Coolant Pump 1A**columns1110-1AVT-38**multiple comp 17- Reactor Coolant Pump 1B**columns1110-1BVT-38 18- Reactor Coolant Pump 2A**columns1110-2AVT-38 19- Reactor Coolant Pump 2B**columns1110-2BVT-38F1.40SUPPORTS OTHER THAN PIPING SUPPORTS

  • F-A; C running percen t---8**2150

SECTION 5.0 ASME CLASS 2 EXAMINATION

SUMMARY

3INT-ISI-2 Rev. 4 38 of 210 INDEX EXAM CATEGORY C-A Pressure Retaining Welds in Pressure Vessels C-B Pressure Retaining Nozzle Welds in Vessels C-C Welded Attachments for Vessels, Piping, Pumps, and Valves C-D Pressure Retaining Bolting Greater than 2 Inch in Diameter C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping C-H All Pressure Retaining Components F-A Class 2 Supports 3INT-ISI-2 Rev. 4 39 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS EXAM CATEGORY C-A; PRESSURE RETAINING WELDS IN PRESSURE VESSELS

  • category running percent---23**4123
    • 23 Total, 17 REQ'D8271 multiple vessels53100 STEAM GENERATOR SC1.10SHELL CIRCUMFERENTIAL WELDS (shell to conical section)41- Steam Generator 1welds212Vol222

42- Steam Generator 2welds211Vol2C1.20HEAD CIRCUMFERENTIAL WELDS (head to shell)41- Steam Generator 1welds212Vol11242- Steam Generator 2welds211Vol1C1.30TUBESHEET-TO-SHELL WELDS41- Steam Generator 1welds212Vol11242- Steam Generator 2welds211Vol1 REGENERATIVE HEAT EXCHANGE RC1.10SHELL CIRCUMFERENTIAL WELDS 68- Regenerative Heat Exchangerwelds79313Vol333 C1.20HEAD CIRCUMFERENTIAL WELDS 68- Regenerative Heat Exchangerwelds79313Vol223C1.30TUBESHEET-TO-SHELL WELDS68- Regenerative Heat Exchangerwelds79313Vol442 LETDOWN HEAT EXCHANGERC1.10SHELL CIRCUMFERENTIAL WELDS 69- Letdown Heat ExchangerweldsN2373Vol111 3INT-ISI-2 Rev. 4 40 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS C1.30TUBESHEET-TO-SHELL WELDS69- Letdown Heat ExchangerweldsN2373Vol111 SHUTDOWN COOLING HEAT EXCHC1.10SHELL CIRCUMFERENTIAL WELDS (shell to flange) 84- SDCHX AweldsS-18343Vol111

87- SDCHX BweldsS-18344Vol1C1.30TUBESHEET-TO-SHELL WELDS 84- SDCHX AweldsS-18343Vol111

87- SDCHX BweldsS-18344Vol1 3INT-ISI-2 Rev. 4 41 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS EXAM CATEGORY C-B; PRESSURE RETAINING NOZZLE WELDS IN VESSELS C2.20NOZZLES WITHOUT REINFORCING PLATE IN VESSELS >1/2 IN.

NOMINAL THICKNESS C2.21 NOZZLE-TO-SHELL (NOZZLE TO HEAD OR NOZZLE TO NOZZLE)

WELD*C2.21 running percent---20**2120

    • 20 Total, 10 REQ'D4260 multiple vessels43100 41- Steam Generator 1welds212S & Vol84242- Steam Generator 2welds211S & Vol84384- SDCHX AweldsS-18343S & Vol211 87- SDCHX BweldsS-18344S & Vol211 C2.22NOZZLE INSIDE RADIUS SECTION
  • C2.22 running percent---12**2133
    • 12 Total, 6 REQ'D2267 multiple vessels2310041- Steam Generator 1welds212Vol42242- Steam Generator 2welds211Vol42384- SDCHX AweldsS-18343Vol211 87- SDCHX BweldsS-18344Vol211 3INT-ISI-2 Rev. 4 42 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS EXAM CATEGORY C-C; WELDED ATTACHMENTS FOR VESSELS, PIPING, PUMPS, AND VALVES PRESSURE VESSELSC3.10WELDED ATTACHMENTS
  • C3.10 running percent---6**1125
    • 6 Total; 4 REQD1250 Multiple Vessels23100 Multiple Vessels41- Steam Generator 1lugs 212S211 1242- Steam Generator 2lugs 211 S2 68- Regenerative Heat Exchange r supports 79313S223 PIPING C3.20WELDED ATTACHMENTS
  • C3.20 running percent---2981013 1227 1431243- Main Steam SG 1 East attachmentSG-036S2 44- Main Steam SG 1 WestattachmentSG-033S2 45- Main Steam SG 2 EastattachmentSG-042S2 46- Main Steam SG 2 WestattachmentSG-045S254- Feedwater SG No. 1attachmentSG-002S655- Feedwater SG No. 2attachmentSG-005S611 56- Feedwater SG No. 1attachmentSG-202S1 57- Feedwater SG No. 2attachmentSG-205S1 3INT-ISI-2 Rev. 4 43 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS58- Aux Feed S/G 1attachmentSG-008S159- Aux Feed S/G 2attachmentSG-011S262- Auxiliary Feedwater SG 1attachment AF-018S163- Auxiliary Feedwater SG 1attachment AF-016S164- Blowdown SG 1attachmentSG-039S712 SG-05365- Blowdown SG 2attachmentSG-048S722 SG-05270- LPSI Pump Room A SuctionattachmentSI-067S3 SI-241 SI-30771- LPSI Pump Room A DischargeattachmentSI-078S4 SI-08773- LPSI Pump Room B SuctionattachmentSI-034S2 SI-30874- LPSI Pump Room B DischargeattachmentSI-129S3 76- CS Pump Room A SuctionattachmentSI-009S2 SI-06777- CS Pump Room A DischargeattachmentSI-079S623 SI-08279- CS Pump Room B SuctionattachmentSI-033S1 SI-03480- CS Pump Room B DischargeattachmentSI-119S4 3INT-ISI-2 Rev. 4 44 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS82- SDCHX Room AattachmentSI-078S3 SI-07983- SDCHX Room BattachmentSI-070S1121 SI-082 SI-087 SI-089 SI-09085- SDCHX Room BattachmentSI-119S612 SI-12386- SDCHX Room BattachmentSI-072S1223 SI-129 SI-134 SI-13588- East WrapattachmentSI-072S4 SI-07389- East WrapattachmentSI-173S3 SI-19490- East WrapattachmentSI-134S1 91- West WrapattachmentSI-070S4 92- West WrapattachmentSI-002S411 SI-239 SI-24193- West WrapattachmentSI-089S1 94- A Train Pipe Chase & 88'attachmentSI-070S9 SI-089 SI-241 3INT-ISI-2 Rev. 4 45 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS95- B Train Pipe Chase & 88'attachmentSI-072S912SI-13413 SI-19496- Containment LPSI to 1AattachmentSI-202S197- Containment LPSI to 1BattachmentSI-220S3 98- Containment LPSI to 2AattachmentSI-155S299- Containment LPSI to 2BattachmentSI-174S312 100- Containment LPSI A SuctionattachmentSI-007S2 SI-369101- Containment LPSI B SuctionattachmentSI-030S3 SI-194 SI-368 102- SI Pump Suction AattachmentSI-008S1211 SI-009 SI-307103- Refueling Water Suction AattachmentCH-142S913 CH-424104- SI Pump Suction BattachmentSI-031S1022 SI-033 SI-308105- Refueling Water Suction BattachmentCH-149S1533 CH-425106- HPSI Room Discharge AattachmentSI-099S2021 SI-100 SI-105 SI-106 3INT-ISI-2 Rev. 4 46 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS107- HPSI Room Discharge BattachmentSI-107S1432 SI-112108- HPSI 88' PipechaseattachmentSI-100S1423 SI-118109- HPSI 88' PipechaseattachmentSI-107S911 110- HPSI Discharge West WrapattachmentSI-103S612 SI-107 SI-218 SI-236111- HPSI Discharge West WrapattachmentSI-100S3112- HPSI Discharge East WrapattachmentSI-100S4 SI-101 SI-102 SI-176113- HPSI DischargeattachmentSI-107S4 SI-157 SI-176118- HPSI Long TermattachmentSI-106S1833119- HPSI Long TermattachmentSI-114S1221 121- Containment Spray BattachmentSI-130S1 3INT-ISI-2 Rev. 4 47 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS PUMPSC3.30WELDED ATTACHMENTS
  • C3.30 running percent---20**2210

116- HPSI Alugs0776-16S4117- HPSI Blugs0776-17S422 3INT-ISI-2 Rev. 4 48 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS EXAM CATEGORY C-D; PRESSURE RETAINING BOLTING GREATER THAN 2 in.

IN DIAMETER

  • category running percent---10**1133
    • 10 total 3 required1267 Multiple Items13100 PUMPSC4.30BOLTS AND STUDS116- HPSI A16 studs0776-14VOL1117- HPSI B16 studs0776-15VOL111 VALVESC4.40BOLTS AND STUDS47- Main Steam SG 1 West 20 studsUV-170VOL11148- Main Steam SG 1 East20 studsUV-180VOL112 49- Main Steam SG 2 East20 studsUV-171VOL150- Main Steam SG 2 West20 studsUV-181VOL156- Feedwater SG No. 120 studsUV-132VOL113UV-174157- Feedwater SG No. 220 studsUV-137VOL1UV-1771 3INT-ISI-2 Rev. 4 49 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS EXAM CATEGORY C-F-1; PRESSURE RETAINING WELDS IN AUSTENITIC STAINLESS STEEL OR HIGH ALLOY PIPING C5.10PIPING WELDS >

3/8 IN NOMINAL WALL THICKNESS FOR PIPING

>NPS 4C5.11CIRCUMFERENTIAL WELD

  • C5.11 running percent---5172212
  • 1101 WELDS USED2524 FOR % DUE TO C-F-14138 See note 2 in code54- Feedwater SG No. 1Butt WeldsSG-2-14"S & Vol1022 SG-13-14"55- Feedwater SG No. 2Butt WeldsSG-5-14"S & Vol1013 SG-14-14"58-Aux Feed S/G 16" x 0.562" AF-004S & Vol19416" x 0.432"SG-0088" x 0.500SG-00859-Aux Feed S/G 26" x 0.562" AF-006S & Vol27426" x 0.432"SG-0118" x 0.500SG-01162-Aux Feed S/G 16" x 0.562" AF-004S & Vol2033 A F-01863-Aux Feed S/G 26" x 0.562" AF-006S & Vol1641 A F-01670-LPSI Pump Room A Suction20" x 0.375SI-307S & Vol204173-LPSI Pump Room B SuctionSI-30882 & 85 SDC Heat Exch20" x 0.500"SI-078S & Vol822Room A & BSI-123 3INT-ISI-2 Rev. 4 50 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS83 & 86 SDC Heat Exch14" x 0.375"SI-90S & Vol5672Room A & BSI-13516" x 0.375"SI-70 SI-7220" x 0.500"SI-70 SI-7288 & 91 Safety Injection12" x 0.375"SI-72S & Vol77133East and West WrapsSI-73 SI-70 SI-7112" x 1.125"SI-155 SI-174 SI-72 SI-73 SI-70 SI-71 SI-202 SI-22020" x 0.500"SI-72 SI-70 90 & 93 Safety Injection24" x 0.375"SI-30S & Vol1021East and West WrapsSI-724" x 0.562"SI-308 SI-307 94 & 95 Safety Injection A &

B20" x 0.500SI-70S & Vol1541SI-7212 3INT-ISI-2 Rev. 4 51 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS96, 97, 98, 99 Containment LPSI12" x 1.125"SI-202S & Vol105143Loop 1A, 1B, 2A & 2BSI-22022 SI-155 SI-17412" x 1.312"SI-202 SI-220 SI-155 SI-174100 & 101 Containment LPSI16" x 1.594SI-241S & Vol812Loop A & B, SuctionSI-19424" x 0.375SI-7 SI-30102-Safety Injection A Suction24" x 0.562" SI-307S & Vol184120" x 0.375"SI-307103-Refueling Water Tank Suction A20" x 0.375"CH-424S & Vol3320" x 0.375"CH-142104-Safety Injection B Suction24" x 0.562"SI-308S & Vol194320" x 0.375"SI-308105-Refueling Water Tank B Suction20" x 0.375"CH-425S & Vol467320" x 0.375"CH-149132 3INT-ISI-2 Rev. 4 52 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS C5.20 PIPING WELDS > 1/5 IN NOMINAL WALL THICKNESS FOR PIPING > NPS 2 AND <

NPS 4C5.21CIRCUMFERENTIAL WELD

  • C5.21 running percent---5801012 1425 1838104 SI B Train Suction3" X 0.216"CH-150S & Vol413 106 & 107 HPSI Room Discharge4" x 0.438"SI-100S & Vol137101 A and B4" x 0.337"SI-99 SI-1073" x 0.438"SI-106 SI-1072" x 0.344"SI-105 SI-112 108 & 109 HPSI 88' Pipechas e4" x 0.438"SI-100S & Vol86722" x 0344"SI-1184" x 0.377"SI-107110 & 111 HPSI Discharge4" x 0.337"SI-107S & Vol10683West Wrap4" x 0.438"SI-218 SI-100 SI-2363" x 0.438"SI-218 SI-2362" x 0.344"SI-103 SI-107 SI-110 SI-218 SI-236 SI-100 3INT-ISI-2 Rev. 4 53 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS112 & 113 HPSI Discharge4" x 0.337"SI-107S & Vol9782East Wrap4" x 0.438"SI-100 SI-176 SI-1573" x 0.438"SI-176 SI-1572" x 0.344"SI-101 SI-102 SI-108 SI-109 SI-157 SI-176 114 & 115 HPSI Heade r3" x 0.438"SI-218S & Vol4432Loop 1A, 1B, 2A & 2BSI-236 SI-157 SI-176118 & 119 HPSI Long Term3" x 0.438"SI-106S & Vol10693 SI-1142" x 0.344"SI-319C5.30SOCKET WELDS106 & 107 HPSI Room Discharge2" x 0.344"SI-105S31317 A and BSI-112S3 3INT-ISI-2 Rev. 4 54 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS C5.40 PIPE BRANCH CONNECTIONS OF BRANCH PIPING >

NPS 2C5.41CIRCUMFERENTIAL

  • C5.41 running percent---27114 127 131182 & 85 SDC Heat Exch20" x 10"SI-78S211Room A & BSI-123S283 & 86 SDC Heat Exch20" x 6"SI-70S413Room A & B20" x 10"SI-72S4 20" x 14"88 & 91 Safety Injection20" x 12"SI-70S1East and West WrapsSI-72S189 & 92 SDC Suction18" x 12"SI-194S1East and West WrapsSI-241S196, 97, 98, 99 Containment LPSI12" x 3"SI-202S112Loop 1A, 1B, 2A & 2BSI-220S1SI-155S1 SI-174S1102-Safety Injection A Suction24" x 10"SI-307S3 24" x 18"24" x 20"104-Safety Injection B Suction24" x 10"SI-308S4 24" x 18" 24" x 20"24" x 3" 3INT-ISI-2 Rev. 4 55 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS EXAM CATEGORY C-F-2; PRESSURE RETAINING WELDS IN CARBON OR LOW ALLOY STEEL PIPING
    • Note exam items are in Aug Summary C5.50PIPING WELDS >

3/8 IN NOMINAL WALL THICKNESS FOR PIPING

>NPS 4C5.51CIRCUMFERENTIAL WELD

  • C5.51 running percent---3709121025 163843- Main Steam SG 1 East Butt WeldsSG-36-28"S & Vol1921 SG-36-32"44- Main Steam SG 1 WestButt WeldsSG-33-28"S & Vol2122 SG-33-32"45- Main Steam SG 2 EastButt WeldsSG-42-28"S & Vol1923 SG-42-32"46- Main Steam SG 2 WestButt WeldsSG-45-28"S & Vol2121SG-45-32"1347- Main Steam SG 1 West Butt Welds**S & Vol**48- Main Steam SG 1 EastButt Welds**S & Vol**

49- Main Steam SG 2 EastButt Welds**S & Vol**

50- Main Steam SG 2 WestButt Welds**S & Vol**

51- Atmospheric Dump No. 1Butt Welds**S & Vol**52- Atmospheric Dump No. 2Butt Welds**S & Vol**

53- Steam to Aux Feedwate rButt Welds**S & Vol**

3INT-ISI-2 Rev. 4 56 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS54- Feedwater SG No. 1Butt WeldsSG-2-24"S & Vol4543 SG-2-16"SG-2-14"SG-13-16" SG-13-14"55- Feedwater SG No. 2Butt WeldsSG-5-24"S & Vol4451SG-5-16"23 SG-5-14"SG-14-16"SG-14-14"56- Feedwater SG No. 1Butt WeldsSG-201-24"S & Vol**

SG-202-24"57- Feedwater SG No. 2Butt WeldsSG-204-24"S & Vol**

SG-205-24"58- Aux & Downcomer FW SG 1Butt WeldsSG-8-6"S & Vol2322 SG-8-8"59- Aux & Downcomer FW SG 2Butt WeldsSG-11-6"S & Vol1823 SG-11-8"60- Downcomer Feedwater SG 1Butt WeldsSG-200-8"S & Vol**

SG-008-8"61- Downcomer Feedwater SG 2Butt WeldsSG-203-8"S & Vol**

SG-11-8"64- Blowdown SG 1Butt WeldsSG-39-6"S & Vol7562 SG-53-6"SG-522-6"65- Blowdown SG 2Butt WeldsSG-48-6"S & Vol8553 SG-52-6"SG-523-6"3INT-ISI-2 Rev. 4 57 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS66- Blowdown SG 1Butt WeldsSG-39-6"S & Vol**67- Blowdown SG 2Butt WeldsSG 6"S & Vol**

C5.80 PIPE BRANCH CONNECTIONS OF BRANCH PIPING >

NPS 2 Scope from AHE5.81 moved to C5.81. (CRAI

4178275)C5.81CIRCUMFERENTIAL47- Main Steam SG 1 West 28" x 12"SG-206-28"S771 28" x 6"48- Main Steam SG 1 East28" x 12"SG-207-28"S8(1)93 28" x 6"49- Main Steam SG 2 East28" x 12"SG-208-28"S8(1)93 28" x 6"50- Main Steam SG 2 West28" x 12"SG-209-28"S773 28" x 6"EXAM CATEGORY C-H; ALL PRESSURE RETAINING COMPONENTS EXAM CATEGORY C-G deleted in the 2007 Ed.,

2008 Add. See letter 102

-06454 and SER dated

09/18/2012. (ACT

4343138)C7.10 PRESSURE RETAINING COMPONENTSClass 2IWC-5222VT-2****

3INT-ISI-2 Rev. 4 58 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS EXAM CATEGORY F-A; SUPPORTS F1.20CLASS 2 PIPING SUPPORTS A-ONE DIRECTIONAL (RODS)

  • F-A; A running percen t---3123383- SDCHX Room AsupportsSI-87VT-3112106- HPSI Room Discharge AsupportsSI-100VT-31107- HPSI Room Discharge BsupportsSI-107VT-31F1.20CLASS 2 PIPING SUPPORTS RESTRAINTS
  • F-A; B running percen t---419181423210 3031643- Main Steam SG 1 East supportsSG-36VT-3211 44- Main Steam SG 1 WestsupportsSG-33VT-3145- Main Steam SG 2 EastsupportsSG-42VT-3213 46- Main Steam SG 2 WestsupportsSG-45VT-31 54- Feedwater SG No. 1supportsSG-002VT-3511 55- Feedwater SG No. 2supportsSG-005VT-3511 58- Aux & Downcomer FW SG 1supportsSG-8VT-3512 59- Aux & Downcomer FW SG 2supportsSG-11VT-3612 62- Auxiliary Feedwater SG 1supports AF-018VT-3111 3INT-ISI-2 Rev. 4 59 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS 63- Auxiliary Feedwater SG 2 supports AF-006VT-33 A F-01664- Blowdown SG 1supportsSG-39VT-31111SG-53VT-3 1265- Blowdown SG 2supportsSG-48VT-31232SG-52VT-370- LPSI Pump Room A SuctionsupportsSI-067VT-33 SI-241 SI-30771- LPSI Pump Room A DischargesupportsSI-87VT-3523 SI-7873- LPSI Pump Room B SuctionsupportsSI-034VT-33 SI-30874- LPSI Pump Room B DischargesupportsSI-129VT-331376- CS Pump Room A SuctionsupportsSI-9VT-34 SI-6777- CS Pump Room A DischargesupportsSI-79VT-3823 SI-8279- CS Pump Room B SuctionsupportsSI-033VT-3333 SI-03480- CS Pump Room B DischargesupportsSI-119VT-351282- SDCHX Room AsupportsSI-78VT-32 SI-7983- SDCHX Room AsupportsSI-70VT-31311SI-82VT-3SI-87VT-3 3INT-ISI-2 Rev. 4 60 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKSSI-89VT-3SI-90VT-385- SDCHX Room BsupportsSI-119VT-3812 SI-12386- SDCHX Room BsupportsSI-72VT-31023SI-129VT-3SI-134VT-3 SI-135VT-3SI-147VT-388- East WrapsupportsSI-72VT-35SI-73VT-389- East WrapsupportsSI-38VT-3411SI-173VT-3SI-194VT-390- East WrapsupportsSI-130VT-33 SI-13491- West WrapsupportsSI-70VT-3711SI-71VT-392- West WrapsupportsSI-2VT-3511SI-241VT-393- West WrapsupportsSI-89VT-3311 94- A Train Pipe Chase & 88'supportsSI-70VT-314SI-89VT-3SI-241VT-395- B Train Pipe Chase & 88'supportsSI-194VT-31433SI-72VT-322SI-134VT-3 3INT-ISI-2 Rev. 4 61 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS96- Containment LPSI to 1AsupportsSI-202VT-3101297- Containment LPSI to 1BsupportsSI-220VT-31642 98- Containment LPSI to 2AsupportsSI-155VT-34 99- Containment LPSI to 2BsupportsSI-174VT-35100- Containment LPSI A SuctionsupportsSI-7VT-32SI-369VT-3101- Containment LPSI B SuctionsupportsSI-30VT-34SI-194VT-3SI-368VT-3 102- SI Pump Suction AsupportsSI-8VT-31421SI-9VT-3SI-307VT-3103- Refueling Water Suction AsupportsCH-142VT-314CH-424VT-3104- SI Pump Suction BsupportsSI-31VT-31212SI-33VT-313SI-308VT-3105- Refueling Water Suction BsupportsCH-149VT-31963CH-425VT-322106- HPSI Room Discharge AsupportsSI-100VT-31821 SI-105 SI-106107- HPSI Room Discharge BsupportsSI-107VT-31432 SI-112 3INT-ISI-2 Rev. 4 62 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS108- HPSI 88' PipechasesupportsSI-100VT-31643 SI-118109- HPSI 88' PipechasesupportsSI-107VT-31111 110- HPSI Discharge West WrapsupportsSI-103VT-31312 SI-107 SI-110 SI-218 SI-236111- HPSI Discharge West WrapsupportsSI-100VT-3613 SI-236112- HPSI Discharge East WrapsupportsSI-100VT-31013 SI-101 SI-102 SI-176113- HPSI DischargesupportsSI-107VT-31011 SI-108 SI-109 SI-157 SI-176 114 HPSI Heade rsupportsSI-218VT-3212Loop 1A & 1BSI-236 115 HPSI Heade rsupportsSI-157VT-32Loop 2A & 2BSI-176118 - HPSI Long TermsupportsSI-106VT-32233 119 - HPSI Long TermsupportsSI-114VT-31921 SI-319 3INT-ISI-2 Rev. 4 63 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKSF1.20CLASS 2 PIPING SUPPORTS C-SUPPORTS THAT ALLOW THERMAL MOVEMENT (SPRING)
  • F-A; C running percen t---16791511212 1031743- Main Steam SG 1 East supportsSG-36VT-3144- Main Steam SG 1 WestsupportsSG-33VT-32 45- Main Steam SG 2 EastsupportsSG-42VT-31 46- Main Steam SG 2 WestsupportsSG-45VT-3247- Main Steam SG 1 West supportsSG-206VT-3148- Main Steam SG 1 EastsupportsSG-207VT-31 49- Main Steam SG 2 EastsupportsSG-208VT-31 50- Main Steam SG 2 WestsupportsSG-209VT-31 51- Atmospheric Dump No. 1supportsSG-59VT-32 SG-7052- Atmospheric Dump No. 2supportsSG-84VT-32 SG-10354- Feedwater SG No. 1supportsSG-002VT-3921SG-013VT-355- Feedwater SG No. 2supportsSG-005VT-31011 SG-01456- Feedwater SG No. 1supportsSG-202VT-31 3INT-ISI-2 Rev. 4 64 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS57- Feedwater SG No. 2supportsSG-205VT-3158- Aux & Downcomer FW SG 1supportsSG-8VT-31123 AF-4VT-359- Aux & Downcomer FW SG 2supportsSG-11VT-31122 AF-6VT-360- Downcomer Feedwater SG 1supportsSG-200VT-32 61- Downcomer Feedwater SG 2supportsSG-203VT-3213 62- Auxiliary Feedwater SG 1supports AF-018VT-3222 AF-4VT-3 63- Auxiliary Feedwater SG 2 supports AF-006VT-3264- Blowdown SG 1supportsSG-39VT-3611 1265- Blowdown SG 2supportsSG-48VT-3522 71- LPSI Pump Room A DischargesupportsSI-78VT-31 74- LPSI Pump Room B DischargesupportsSI-129VT-3313 77- CS Pump Room A DischargesupportsSI-79VT-32 79- CS Pump Room B SuctionsupportsSI-034VT-31 80- CS Pump Room B DischargesupportsSI-119VT-3512 SI-14782- SDCHX Room AsupportsSI-78VT-31 3INT-ISI-2 Rev. 4 65 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS83- SDCHX Room AsupportsSI-70VT-3511SI-87VT-3SI-90VT-385- SDCHX Room BsupportsSI-119VT-32 SI-12386- SDCHX Room BsupportsSI-72VT-31523 SI-129 SI-134 SI-13588- East WrapsupportsSI-72VT-3913 SI-7389- East WrapsupportsSI-194VT-3191- West WrapsupportsSI-70VT-33 SI-7192- West WrapsupportsSI-239VT-3411SI-241VT-393- West WrapsupportsSI-89VT-31 94- A Train Pipe Chase & 88'supportsSI-89VT-3195- B Train Pipe Chase & 88'supportsSI-72VT-3413 SI-19496- Containment LPSI to 1AsupportsSI-202VT-3199- Containment LPSI to 2BsupportsSI-174VT-3212 13100- Containment LPSI A SuctionsupportsSI-241VT-31 3INT-ISI-2 Rev. 4 66 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS101- Containment LPSI B SuctionsupportsSI-194VT-31 102- SI Pump Suction AsupportsSI-307VT-3111104- SI Pump Suction BsupportsSI-308VT-3112106- HPSI Room Discharge AsupportsSI-99VT-3311 SI-100107- HPSI Room Discharge BsupportsSI-107VT-3312108- HPSI 88' PipechasesupportsSI-100VT-32 SI-118109- HPSI 88' PipechasesupportsSI-107VT-33 110- HPSI Discharge West WrapsupportsSI-107VT-3413 SI-218111- HPSI Discharge West WrapsupportsSI-236VT-31 113- HPSI DischargesupportsSI-157VT-31 118 - HPSI Long TermsupportsSI-106VT-32119 - HPSI Long TermsupportsSI-114VT-3411 SI-319 120- Containment Spray AsupportsSI-88VT-31121- Containment Spray BsupportsSI-130VT-32 3INT-ISI-2 Rev. 4 67 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKSF1.40SUPPORTS OTHER THAN PIPING SUPPORTS
  • F-A; B running percen t---22**2117
    • 22 Total, 12 REQ'D5258 Multiple Items53100 68- Regenerative Heat Exchange r supports 79313VT-3223 72- LPSI Pump Asupports0876-41VT-33 75- LPSI Pump Bsupports 0876-42VT-333278- CS Pump Asupports 0876-43VT-33 81- CS Pump Bsupports 0876-44VT-3333 116- HPSI Pump A supports 0776-16VT-3421 117- HPSI Pump Bsupports 0776-17VT-3422F1.40SUPPORTS OTHER THAN PIPING SUPPORTS
  • F-A; C running percen t---4**1150

SECTION 6.0 ASME CLASS 3 EXAMINATION

SUMMARY

3INT-ISI-2 Rev. 4 69 of 210 INDEX EXAM CATEGORY D-A Welded Attachments for Vessels, Piping, Pumps and Valves D-B All Pressure Retaining Components F-A Class 3 Supports 3INT-ISI-2 Rev. 4 70 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY D-A; WELDED ATTACHMENTS FOR VESSELS, PIPING, PUMPS, AND VALVES Pressure Vessels

  • D1.10 Welded Attachments
  • D1.10; running percent---22**3133
    • 10 req'd due to 3266 multiple comp43100 DF System attachments DFA-T02VT-1221 DFB-T02 DG System attachments DGA-E04VT-1811 DGA-E05 22 DGB-E04 DGB-E05 DGA-X01A DGA-X01B DGB-X01A DGB-X01B EC System attachments ECA-E-1VT-1423 ECA-T-1 ECB-E-1 ECB-T-1 EW System attachments EWA-E01VT-1411 EWA-T01 13 EWB-E01 EWB-T01 PC System attachments PCA-E1VT-1212 PCB-E1 SI System attachments SIA-E01VT-1213 SIB-E01 3INT-ISI-2 Rev. 4 71 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS Piping D1.20 Welded Attachments
  • D1.20; running percent---24311141129 11313 AF System attachments pipingVT-1911CT SystemattachmentspipingVT-1311 DG System attachments pipingVT-11423 EC System attachmentspipingVT-11413 EW System attachmentspipingVT-13741 22 NC System attachmentspipingVT-11921 13 PC System attachmentspipingVT-11311SG SystemattachmentspipingVT-1311 12SI SystemattachmentspipingVT-1211 SP SystemattachmentspipingVT-112982 73 3INT-ISI-2 Rev. 4 72 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY D-B; ALL PRESSURE RETAINING COMPONENTS D2.10Pressure retaining componentsClass 3IWD-5221VT-2****
  • Note Pressure Test Program EXAM CATEGORY F-A; SUPPORTS F1.30CLASS 3 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
  • F-A; B running percen t---3191615112817313 AF System supports pipingVT-318 21 12 43CT SystemsupportspipingVT-3311 DG System supports pipingVT-33023 EC System supportspipingVT-31623 EW System supportspipingVT-36761 22 NC System supportspipingVT-33541 23 PC System supportspipingVT-31711 SG System supportspipingVT-3411 12 SI System supportspipingVT-3411 SP System supportspipingVT-312572 73 3INT-ISI-2 Rev. 4 73 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSF1.30CLASS 3 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
  • F-A; C running percent---57711252214328 AF System supports pipingVT-310 11 12 DG System supports pipingVT-3413 EC System supportspipingVT-3213 EW System supportspipingVT-31021 NC System supportspipingVT-3111 PC System supportspipingVT-31321 23 SG System supportspipingVT-3722 SI System supportspipingVT-3112 SP System supportspipingVT-3911 12 3INT-ISI-2 Rev. 4 74 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSF1.40SUPPORTS OTHER THAN PIPING SUPPORTS
  • F-A; B running percent---223130**10 req'd due to 3260 multiple comp43100DF Systemsupports DFA-T02VT-3211 DFB-T02DG Systemsupports DGA-E04VT-3811 DGB-E04 12 DGA-E05 13 DGB-E05 DGA-X01A DGA-X01B DGB-X01A DGB-X01B EC System attachments ECA-E-1VT-3411 ECB-E-1 12 ECA-T-1 ECB-T-1 EW System attachments EWA-E01VT-3423 EWB-E01 EWA-T01 EWB-T01 PC System attachments PCA-E1VT-3212 PCB-E1SI Systemattachments SIA-E01VT-3213 SIB-E01 3INT-ISI-2 Rev. 4 75 of 210

SECTION 7.0 AUGMENTED EXAMINATION

SUMMARY

3INT-ISI-2 Rev. 4 76 of 210 INDEX EXAM CATEGORY N-722-1 PWR Components Containing Alloy 600/82/182 N-729-1 PWR Reactor Vessel Upper Head N-770-1 PWR Pressure Retaining Dissimilar Metal Piping and Vessel Nozzle Butt Welds containing Alloy 82/182 B-J Pressure Retaining Welds in Piping B-P All Pressure Retaining Components C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED HIGH ENERGY C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED FLYWHEEL NA Reactor Coolant Pump Flywheel Examinations 3INT-ISI-2 Rev. 4 77 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY CC722-1; PWR COMPONENTS CONTAINING ALLOY 600/82/182 REACTOR VESSEL B15.80 RPV bottom mounted instrument penetrations1-Reactor Vessel (1-31)ICI Penetrations78173VE6161**

  • Required R16, R18, R20 STEAM GENERATOR B15.1353- Cold leg instrument connectionsPenetrations224VE44******
      • Prorated over inverval per Footnote 6

of Code Case.

4- Cold leg instrument connectionsPenetrations225VE44******

PRESSURIZE R B15.1405- Heater PenetrationsPenetrations 78373VE3636****

    • Each RFO (5-36)B15.1805- Instrument ConnectionsInstruments78373VE77****

(5-37, 1 through 7)

PIPING B15.2006- Hot Leg Instrument ConnectionsInstrumentsRCSVE2727****

(6-101)B15.205 Cold leg instrument connections6- RCP Pressure Taps (6-100)Instrument RCPVE441256- Cold Leg Instrumentation (6-99)Instrument RCsVE126263 63100 3INT-ISI-2 Rev. 4 78 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS B15.215 Cold leg full penetration weld s23- Safety Injection 1A (9-10)butt weldsSI-207-14"VE11********* VE in conjunction with N-770-1 VOL

,24- Safety Injection 1B (11-10)butt weldsSI-223-14"VE11******prorated over inverval per Footnote 6 of 25- Safety Injection 2A (13-10)butt weldsSI-160-14"VE11******Code Case 26- Safety Injection 2B (15-9)butt weldsSI-179-14"VE11******27- Pzr Spray 1A (9-11

)butt weldsRC-062-3"VE11******28- Pzr Spray 1B (11-11

)butt weldsRC-017-3"VE11******32- Drain Line Loop 1A (8-18)butt weldsRC-060-2"VE11****** 33- Drain Line Loop 1B (10-18)butt weldsRC-058-2"VE11******34- Drain Line Loop 2A (12-18)butt weldsRC-096-2"VE11******36- Letdown Line (14-18)butt weldsRC-091-2"VE11******37- Charging Line (13-11)butt weldsCH-005-3"VE11******3INT-ISI-2 Rev. 4 79 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS CODE CASE N-729-1; PWR REACTOR VESSEL UPPER HEAD REACTOR VESSEL UPPER HEAD B4.30 Head with nozzles and partial

-penetration welds of PWSCC-resistant materials 2-Closure Head CEDM Penetrations Head SurfaceN05065-CHA-01VE9797*100

  • R15 (Head Replaced)

(2-89)REQUIRED R18, R212-Closure Head Vent PenetrationVent NozzleN05065-CHA-01VE11*100

  • R15 (Head Replaced)

(2-88)REQUIRED R18, R21 B4.40 Nozzles and partial-penetration welds of PWSCC-resistant materials in head2-Closure Head CEDM Nozzles & J-WeldCEDM NozzleN05065-CHA-01S or Vol9797*100

  • not to exceed 2020 (2-89)2-Closure Head Vent Nozzle & J-WeldVent NozzleN05065-CHA-01S or Vol11*100
  • not to exceed 2020 (2-88)3INT-ISI-2 Rev. 4 80 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS CODE CASE N-770-1; PWR PRESSURE RETAINING DISSIMILAR METAL PIPING AND VESSEL NOZZLE BUTT WELDS CONTAINING ALLOY 82/182 Cracked butt weld reinforced by full structural weld overlay of Alloy 52/152 material INSPECTION ITEM F NOMINAL PIPE SIZE >

4 INCH NOZZLE TO SAFEEND BUTT WELDS Mitigated with FSWO During R14; 1st ISI R16 29- Spra ybutt weldsRC-18-4"Vol61214

  • Design Calc Exam 20- Surge*butt weldsRC-028-12"Vol 1328 Freq. every 3 years.31- Safeties (4)butt weldsRC-001-6"Vol R18, R20, R22.RC-003-6"Vol (CRAI 4348769)RC-005-6"Vol RC-007-6"Vol NPS 4 OR LARGER Mitigated with FSWO
  • CIRCUMFERENTIAL WELDS During R13; 1st ISI R1520- Pressurizer Surge Line**butt weldsRC-028-12"Vol31333
    • Design Calc Frequency every 6

years, R2021- Shutdown Cooling Loop 1butt weldsRC-051-16"Vol (CRAI 4348769) 22- Shutdown Cooling Loop 2butt weldsRC-068-16"Vol 3INT-ISI-2 Rev. 4 81 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS Unmitigated butt weld at cold leg operating temperature INSPECTION ITEM B23- Safety Injection 1Abutt weldsSI-207-14"VE & Vol11100 Examined R15, REQUIRED R1924- Safety Injection 1Bbutt weldsSI-223-14"VE & Vol11100 Examined R15, REQUIRED R1925- Safety Injection 2Abutt weldsSI-160-14"VE & Vol11100 Examined R15, REQUIRED R1926- Safety Injection 2Bbutt weldsSI-179-14"VE & Vol11100 Examined R15, REQUIRED R1927- Pressurizer Spray 1Abutt weldsRC-062-3"VE & Vol11100 REQUIRED R17, R2128- Pressurizer Spray 1Bbutt weldsRC-017-3"VE & Vol11100 REQUIRED R17, R2132- Drain Line Loop 1Abutt weldsRC-060-2"VE & Vol11100 REQUIRED R17, R2133- Drain Line Loop 1Bbutt weldsRC-058-2"VE & Vol11100 REQUIRED R17, R2134- Drain Line Loop 2Abutt weldsRC-096-2"VE & Vol11100 REQUIRED R17, R2136- Letdown Linebutt weldsRC-091-2"VE & Vol11100 REQUIRED R17, R2137- Charging Linebutt weldsCH-005-2"VE & Vol11100 REQUIRED R17, R21 EXAM CATEGORY B-P; ALL PRESSURE RETAINING COMPONENTS

  • 100% each outage UNINSULATED (SUPPORTS PRESSURE TEST PROGRAM)REACTOR VESSELB15.10CLOSURE HEAD NUTS2- Closure Headnuts7.237" x 7.91"VT-2540**0B15.10CLOSURE STUDS2- Closure Headstuds7.380" x 76.37"VT-25454**

3INT-ISI-2 Rev. 4 82 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS PRESSURIZE RB15.10BOLTS, STUDS AND NUTS 5- Pressurizer Manwa yStuds & Nuts1.31" x 14.5"VT-22020**

STEAM GENERATORB15.10BOLTS, STUDS AND NUTS3- Steam Generator 1 MANWAYSStuds & Nuts1.31" x 14.5"VT-24040**

4- Steam Generator 2 MANWAYSStuds & Nuts1.31" x 14.5"VT-24040**

PIPINGB15.10BOLTS, STUDS AND NUTS31- Pressurizer SafetiesFlange BoltingRC-001-6"VT-288**Flange BoltingRC-003-6"VT-288**

Flange BoltingRC-005-6"VT-288**

Flange BoltingRC-007-6"VT-288**37- Charging LineFlange V435CH-005-2"VT-288**

3INT-ISI-2 Rev. 4 83 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-J; PRESSURE RETAINING WELDS IN PIPING B9.20LESS THAN NPS 4 B9.21 CIRCUMFERENTIAL WELDS OTHER THAN PWR HPSI SYSTEMS 30- Aux Pressurizer Spray**butt weldsCH-009-2"S223100

    • IEB 88-08 & IN 97-19 2 welds and base metal down stream of V431 Removed AUG B-G-1 per CRAI 4052305.PIPING WELDS >

3/8 IN NOMINAL WALL THICKNESS FOR PIPING >NPS 4 CIRCUMFERENTIAL WELDC5.1154-FW SG 114" x 0.938"SG-002S & Vol2*22100

  • Examination REQD bySG-013 IEB 79-13 & SER 83-07 (54-1 & 15; 55-1 & 15)C5.1155-FW SG 214" x 0.938"SG-005S & Vol2*23100 SG-014C5.1158- Aux & Downcomer FW SG 1Butt WeldsSG-8-6"S & Vol1**12100
    • Examination REQD by SG-8-8"IEB 79-13 & SER 83-07 (58-1; 59-1)C5.1159- Aux & Downcomer FW SG 2Butt WeldsSG-11-6"S & Vol1**13100 SG-11-8"3INT-ISI-2 Rev. 4 84 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY C-F-2; PRESSURE RETAINING WELDS IN CARBON OR LOW ALLOY STEEL PIPING

(*) Identifies the number of welds that are not in

the ASME CL 2 boundary AHE5.50PIPING WELDS >

3/8 IN NOMINAL WALL THICKNESS FOR PIPING >NPS 4**100% of all intersecting longitudinal

welds will be examined AHE5.51 CIRCUMFERENTIAL WELD**

Except scope in parenthesis (outside

class boundary), surface and volumetric exam to meet C-F-2

requirements.

Volumetric exams of AHE required per UFSAR 6.6.1. (CRAI

4178275)*category running percent19953127 1463100 47- Main Steam SG 1 West Butt WeldsSG-206-28"S & Vol11(1)121 SG-206-12" SG-206-6"48- Main Steam SG 1 EastButt WeldsSG-207-28"S & Vol11(1)123 SG-207-12" SG-207-6"49- Main Steam SG 2 EastButt WeldsSG-208-28"S & Vol11(1)123 SG-208-12" SG-208-6"50- Main Steam SG 2 WestButt WeldsSG-209-28"S & Vol11(1)123 SG-209-12" SG-209-6"3INT-ISI-2 Rev. 4 85 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS51- Atmospheric Dump No. 1Butt WeldsSG-59-12"S & Vol27131SG-70-12"14352- Atmospheric Dump No. 2Butt WeldsSG-84-12"S & Vol27273 SG-103-12" 53- Steam to Aux Feedwate rButt WeldsSG-81-6"S & Vol29141SG-83-6"15356- Feedwater SG No. 1Butt WeldsSG-201-24"S & Vol4(2)63 SG-202-24" SG-224-24"57- Feedwater SG No. 2Butt WeldsSG-204-24"S & Vol4(2)63 SG-205-24" SG-225-24"60- Downcomer Feedwater SG 1Butt WeldsSG-200-8"S & Vol6(8)141 SG-008-8"61- Downcomer Feedwater SG 2Butt WeldsSG-203-8"S & Vol6(8)143 SG-11-8"66- Blowdown SG 1Butt WeldsSG-39-6"S & Vol2(14)163 67- Blowdown SG 2Butt WeldsSG 6"S & Vol2(10)123 AHE5.60 PIPING WELDS >1/5" NOMINAL WALL THICKNESS FOR PIPING >

NPS 2 AND < NPS 4 AHE5.61 CIRCUMFERENTIAL**

Volumetric exams of AHE required per UFSAR 6.6.1. (CRAI 4178275)*category running percent4111124 3INT-ISI-2 Rev. 4 86 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS303100 51- Atmospheric Dump No. 1Butt WeldsSG-95-4"S & Vol20111 9352- Atmospheric Dump No. 2Butt WeldsSG-100-4"S & Vol21213 AHE5.80 PIPE BRANCH CONNECTIONS OF BRANCH PIPING >

NPS 2 AHE5.81 CIRCUMFERENTIAL Category deleted, scope moved to C5.81. (CRAI

4178275) EXAM CATEGORY NA; RCP FLYWHEEL EXAMINATIONS PER REG GUIDE 1.14 N A 16-Reactor Coolant Pump 1 Aflywheel1 AS&VOL443100 S OF ALL EXPOSED17 Reactor Coolant Pump 1Bflywheel1B SURFACES and UT OF 3INT-ISI-2 Rev. 4 87 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS 18-Reactor Coolant Pump 2 Aflywheel2 A HIGH STRESS AREAS19-Reactor Coolant Pump 2Bflywheel2B 3INT-ISI-2 Rev. 4 88 of 210

SECTION 8.0 REQUESTS FOR RELIEF 3INT-ISI-2 Rev. 4 89 of 210 RELIEF REQUESTS INDEX NUMBER DESCRIPTION

31. Reactor Coolant System Hot Leg Alloy 600 Small-Bore Nozzles 34. Included for reference to document that the Interval 2 Reactor Vessel volumetric examinations were extended for 1 fuel cycle. NRC accepted as documented by SER attached to Letter dated September 20, 2006.
35. Included for reference to document that the Interval 2 Reactor Vessel visual examinations were extended for 1 fuel cycle. 36. Full Structural Weld Metal Overlay and for Units 1 and 3 only; Request to use 2001 Edition thru 2003 Addenda for Repair and Replacements NRC accepted as documented by SER attached to Letter dated June 21, 2007 37. Alternative to ASME Code Case N-638-1, Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temperbead Technique. NRC accepted as documented by SER attached to Letter dated June 21, 2007 38 Included for reference to document the Close out of U2 2 nd Interval 39. Safety Injection Tank alternative repair method.

Submitted by APS letter 102-05869-DCM/RJR, dated July 11, 2008 40. Extended Reactor Vessel Examinations to meet the PWROG program Submitted by APS letter

41. Request to utilize Appendix 1 of Code Case N-729-1. Submitted by APS letter 42. Request to utilize Leak Path Assessments N-729-1 previously qualified Submitted by APS letter 43. Included for reference to document the Closeout of U3 2 nd Interval Submitted by APS letter
44. Extended Reactor Vessel Examinations Submitted by APS letter 45. Included for reference to document the Closeout of U2 RPV 2 nd Interval 46. Included for reference to document the Closeout of U1 2 nd Interval 47. Included for reference to document the Closeout of U3 RPV 2 nd Interval 48. Request for Relief to use UT in Lieu of RT 49. Request to use Alternate Inspection method for Reactor Vessel Leak-off line 3INT-ISI-2 Rev. 4 90 of 210

SECTION 9.0 ISI BOUNDARY DRAWINGS 3INT-ISI-2 Rev. 4 91 of 210 BOUNDARY DRAWING INDEX Drawing No. Drawing Title Code Class 02-M-AFP-001 Auxiliary - Feedwater System 2 & 3 02-M-CHP-001 Chemical and Volume Control System 1 & 2 02-M-CHP-002 Chemical and Volume Control System 2 & 3 02-M-CHP-003 Chemical and Volume Control System 2 02-M-CLP-001 Containment Integrated and Local Leak Rate Test 2 02-M-CPP-001 Containment Purge System 2 02-M-CTP-001 Condensate Purge System 2 02-M-DFP-001 Diesel Fuel Oil & Transfer System 3 02-M-DGP-001 Diesel Generator System 3 02-M-DWP-002 Demineralized Water System 2 02-M-ECP-001 Essential Chilled Water System 3 02-M-EWP-001 Essential Cooling Water System 3 02-M-FPP-006 Fire Protection System 2 02-M-GAP-001 Service Gas Supply System (N 2 and H 2) 2 & 3 02-N-GRP-001 Gaseous Radwaste System 2 02-M-HCP-001 HVAC Containment Building 2 02-M-HPP-001 Containment Hydrogen Control 2 02-M-IAP-002 Instrument and Service Air System 2 02-M-IAP-003 Instrument and Service Air System 2 02-M-NCP-002 Nuclear Cooling Water System 3 02-M-NCP-003 Nuclear Cooling Water System 2 02-M-PCP-001 Fuel Pool Cooling & Cleanup System 2 & 3 02-M-RCP-001 Reactor Coolant System 1 & 2 02-M-RCP-002 Reactor Coolant System 1 & 2 02-M-RDP-001 Radioactive Waste Drain System 2 02-M-SGP-001 Main Steam System 2 & 3 02-M-SGP-002 Main Steam System 2 02-M-SIP-001 Safety Injection and Shutdown Cooling System 2 02-M-SIP-002 Safety Injection and Shutdown Cooling System 1 & 2 02-M-SIP-003 Safety Injection and Shutdown Cooling System 2 02-M-SPP-001 Essential Spray Pond System 3 02-M-SPP-002 Essential Spray Pond System 3 02-N-SSP-001 Nuclear Sampling System 2 02-M-WCP-001 Normal Chilled Water System 2 13-M-ZZP-001 Symbols and Legend N/A 13-M-ZZP-002 Symbols and Legend N/A 3INT-ISI-2 Rev. 4 92 of 210

SECTION 10.0 ZONE DRAWINGS 3INT-ISI-2 Rev. 4 93 of 210 ZONE DRAWING INDEX Drawing No. Drawing Title Code Class Zone 1 Reactor Vessel 1 Zone 2 Closure Head 1 Zone 3 Steam Generator 1 1 Zone 4 Steam Generator 2 1 Zone 5 Pressurizer 1 Zone 6 RCS Primary Piping 1 Zone 16 Reactor Coolant Pump 1A 1 Zone 17 Reactor Coolant Pump 1B 1 Zone 18 Reactor Coolant Pump 2A 1 Zone 19 Reactor Coolant Pump 2B 1 Zone 20 Pressurizer Surge Line 1 Zone 21 Shutdown Cooling Loop 1 1 Zone 22 Shutdown Cooling Loop 2 1 Zone 23 Safety Injection 1A 1 Zone 24 Safety Injection 1B 1 Zone 25 Safety Injection 2A 1 Zone 26 Safety Injection 2B 1 Zone 27 Pressurizer Spray 1A 1 Zone 28 Pressurizer Spray 1B 1 Zone 29 Combined Pressurizer Spray 1 Zone 30 Aux. Pressurizer Spray 1 Zone 31 Pressurizer Safeties 1 Zone 32 Drain Line 1A 1 Zone 33 Drain Line 1B 1 Zone 34 Drain Line 2A 1 Zone 35 Drain Line 2B 1 Zone 36 Letdown Line 1 Zone 37 Charging Line 1 Zone 38 Drain Line Loop 1 1 Zone 39 HPSI Long Term Recirc 1 1 Zone 40 HPSI Long Term Recirc 2 1 Zone 41 Steam Generator 1 2 Zone 42 Steam Generator 2 2 Zone 43 Main Steam SG1 East 2 Zone 44 Main Steam SG1 West 2 Zone 45 Main Steam SG2 East 2 Zone 46 Main Steam SG2 West 2 Zone 47 Main Steam SG1 West 2 Zone 48 Main Steam SG1 East 2 Zone 49 Main Steam SG2 East 2 Zone 50 Main Steam SG2 West 2 Zone 51 Atmospheric Dump No. 1 2 Zone 52 Atmospheric Dump No. 2 2 Zone 53 Steam to Aux Feedwater System 2 Zone 54 Feedwater SG No. 1 2 Zone 55 Feedwater SG No. 2 2 Zone 56 Feedwater SG No. 1 2 Zone 57 Feedwater SG No. 2 2 Zone 58 Aux & Downcomer Feedwater SG 1 2 Zone 59 Aux & Downcomer Feedwater SG 2 2 Zone 60 Downcomer Feedwater SG 1 2 Zone 61 Downcomer Feedwater SG 2 2 Zone 62 Aux Feedwater SG 1 2 Zone 63 Aux Feedwater SG 2 2 3INT-ISI-2 Rev. 4 94 of 210 ZONE DRAWING INDEX (Continued)

Drawing No. Drawing Title Code Class Zone 64 Blowdown SG 1 2 Zone 65 Blowdown SG 2 2 Zone 66 Blowdown SG 1 2 Zone 67 Blowdown SG 2 2 Zone 68 Regenerative Heat Exchanger 2 Zone 69 Letdown Heat Exchanger 2 Zone 70 LPSI Pump Room A Suction 2 Zone 71 LPSI Pump Room A Discharge 2 Zone 72 LPSI Pump A 2 Zone 73 LPSI Pump Room B Suction 2 Zone 74 LPSI Pump Room B Discharge 2 Zone 75 LPSI Pump B 2 Zone 76 Containment Spray Pump Room A Suction 2 Zone 77 Containment Spray Pump Room A Discharge 2 Zone 78 Containment Spray Pump A 2 Zone 79 Containment Spray Pump Room B Suction 2 Zone 80 Containment Spray Pump Room B Discharge 2 Zone 81 Containment Spray Pump B 2 Zone 82 Shutdown Cooling Heat Exchange Room A 2 Zone 83 Shutdown Cooling Heat Exchange Room A 2 Zone 84 Shutdown Cooling Heat Exchanger A 2 Zone 85 Shutdown Cooling Heat Exchanger Room B 2 Zone 86 Shutdown Cooling Heat Exchanger Room B 2 Zone 87 Shutdown Cooling Heat Exchanger B 2 Zone 88 East Wrap 2 Zone 89 East Wrap 2 Zone 90 East Wrap 2 Zone 91 West Wrap 2 Zone 92 West Wrap 2 Zone 93 West Wrap 2 Zone 94 A Train Misc. Pipe Chases & 88' Pipe Tunnel 2 Zone 95 B Train Misc. Pipe Chases & 88' Pipe Tunnel 2 Zone 96 Containment LPSI Header to Loop 1A 2 Zone 97 Containment LPSI Header to Loop 1B 2 Zone 98 Containment LPSI Header to Loop 2A 2 Zone 99 Containment LPSI Header to Loop 2B 2 Zone 100 Containment LPSI Train A Suction 2 Zone 101 Containment LPSI Train B Suction 2 Zone 102 SI Pumps Train "A" Suction 2 Zone 103 Refueling Water Suction Train "A" 2 Zone 104 SI Pumps Train "B" Suction 2 Zone 105 Refueling Water Suction Train "B" 2 Zone 106 HPSI Pump Room "A" Discharge 2 Zone 107 HPSI Pump Room "B" Discharge 2 Zone 108 HPSI Discharge 88' Pipe Chase 2 Zone 109 HPSI Discharge 88' Pipe Chase 2 Zone 110 HPSI Discharge West Wrap 2 Zone 111 HPSI Discharge West Wrap 2 Zone 112 HPSI Discharge East Wrap 2 Zone 113 HPSI Discharge East Wrap 2 Zone 114 Containment HPSI Header Loop 1A & 1B 2 Zone 115 Containment HPSI Header Loop 2A & 2B 2 Zone 116 HPSI Pump "A" 2 Zone 117 HPSI Pump "B" 2 Zone 118 HPSI Long Term 2 Zone 119 HPSI Long Term 2 Zone 120 Containment Spray A 2 Zone 121 Containment Spray B 2 3INT-ISI-2 Rev. 4 95 of 210 UNIT 2 6 1/29 1/16SUPPORT COLUMNS INLET OUTLET100% LIGAMENTS54 STUD HOLES

COUNTED CLOCKWISE

FROM 0° 11 1/4182 1/4SHEAR KEYS40 AT 1A B41 AT 1B B42 AT 2A B43 AT 2B B 0° PLANT NORTH 180° 270° 90° 1-19 0° 180° 270° 90° SHELL SEGMENT CROSS SECTION -LONG SEAMS-REFERENCE DWG:

N001-3.01-15 AND 17 N001-3.01-41 AND 61

N001-3.01-72 NOTES:TAG NO. SERIAL NO.

N.B NO.2MRCEX01 79173 (C-E)

22513 ZONE 1 REACTOR VESSEL 1-11-151-18 1-161-11 1-17 1-20 1-141-7 1-5 1-3 1-9 1-10 1-13 1-21-6 1-12 1-8 1-4ICI Penetrations 1 thru 61 1-31 1-30 RX INTERIOR RX INTERIOR RX INTERIOR3INT-ISI-2 Rev. 4 96 of 210 UNIT 2 83 91 75 67 86 66 74908297 81 73 89 72 80 96 85 95 92 79 71 88 70 78 94 84 93 77 69 87 68 76 7.388.611.576.37NOTES:1) Full ITEM ID include -CEDM or RVLMS NO2) TAG NO. 2MRCEX01 SERIAL NO. N05065-CHA-01 (Doosan)

N.B. NO. 1685

3) ITEM 71 CONTAINS 4 SINGLE STUDS IN A GRAYLOC CLAMP REFERENCE DWGS:13-MN-740 (Replaced RV HEAD SPEC)R15 WO 3377051WASHERS CLOSURE HEAD STUDS270° 90° 0° 180°CLOSURE HEAD TOP VIEWSTUD LOCATIONS 1 THRU 54 CW FROM 0°#1 THRU #54 ZONE 2 CLOSURE HEAD NOTE 3 RVLMS LOCATED AT 92 & 96UT Baseline Completed on 2-61 2-602-58 2-71 2-70 2-59VENT LINE2-881 THRU 18 19 THRU 36 37 THRU 54 1 THRU 18 19 THRU 36 37 THRU 542-61 at CEDM locations:54, 59, 65, 69, 71, 73, 7779, 81, 82, 84, 85, 87, 88, 89 NUTS 1 THRU 1819 THRU 3637 THRU 543INT-ISI-2 Rev. 4 97 of 210 UNIT 2 ZONE 3 STEAM GENERATOR #1 315°14.50 2.75 6.37.87.56 1.310 MANWAY STUDS (20 EA)LOOKING DOWN 90° 180° 0° 45°0° MANWAYSTUDS & NUTSNOTE 1-112° MANWAYSTUDS & NUTS-NOTE 1-CHANNEL HEAD CROSS SECTION NOTES: 1) Stud Location is #1 TDC Going CW to #20.

Serial NO. 212 REFERENCE DWGS:MN725-A16, A17, A19 and A20

2) Tag NO 2MRCEE01AMN725-A31, A32, A36, A52 and A72 N. B. NO. 161 1402531279.3TUBESHEETSKIRT B 315° 45°107 106 101102 105104 100 6.7202.13717.34.63MN725-A243 and A390 326 3243INT-ISI-2 Rev. 4 98 of 210 UNIT 2 ZONE 4 STEAM GENERATOR #2 315°14.50 2.75 6.37.87.56 1.310MANWAY STUDS (20 EA)LOOKING DOWN 90° 180° 0° 45°0° MANWAYSTUDS & NUTSNOTE 1-112° MANWAYSTUDS & NUTS-NOTE 1-CHANNEL HEAD CROSS SECTION NOTES:1) Stud Location is #1 TDC Going CW to #20. Serial NO. 211 REFERENCE DWGS:MN725-A16, A17, A19 and A20
2) Tag NO 2MRCEE01BMN725-A31, A32, A36, A52 and A72 N. B. NO. 160 2531279.3TUBESHEET 315° 45°107 106 101 102 105104100 6.7202.13717.3140SKIRT B4.63MN725-A243 and A390 426 4243INT-ISI-2 Rev. 4 99 of 210 UNIT 2 ZONE 5 PRESSURIZERNOTES:1) STUD LOCATION IS #1 TDC GOING CW TO #20

SERIAL NO. 79373 (C-E)REFERENCE DWGS:N001-6.04-6, 31 AND 902) TAG NO 2MRCEX02 N.B. NO. 22252 14.502.756.37.87.56 1.310MANWAY STUDS 90° 270° 0°STUDS & NUTSNOTE 1- 90° 270° 0°96 1/45ID UPPER SHELL LOWER SHELL 90° 270° 0°MANWAYTOP VIEWSKIRT B 48.7ID(TYP)4ZONE 20 ZONE 29368.5510 57 514 511 513 512 56 54 53 51 540 59 52 55 58 5213INT-ISI-2 Rev. 4 100 of 210 UNIT 2 12-1012-1912-1312-16 ZONE 6 RCS PRIMARY PIPINGNOTES:REFERENCE DWGS:**13-P-ZCG-103N001-6.07-83 AND 112 N001-6.07-90 THRU 94 N001-6.07-96 THRU 1001) PIPE LONG SEAMS AT 3:00 AND 9:00 POSITIONS (FOR CE PIPING ONLY)2) ELBOW LONG SEAMS AT LONG AND SHORT RADIUS (FOR CE PIPING ONLY)11-9 11-8 11-4 17-111-1 11-7 1-281-29 13-7 13-4 13-8 13-9 13-118-1RCP 2A ZONE 18 RCP 1B ZONE 17 REACTORVESSEL ZONE 1 SG 2 ZONE 4SG 1 ZONE 3 RCP 1A ZONE 16 RCP 2B ZONE 199-9 9-8 9-4 16-19-1 9-7 1-321-31 15-7 15-415-8 15-119-1 1-307-7 7-8 7-4 7-1RC-631-27 6-7 6-9 6-46-1 6-818-212-112-4 12-17 12-717-2 10-110-4 10-17 10-716-2 8-1 8-4 8-17 8-7 19-2 14-114-414-17 14-7 1A1B2A 2B RC-32RC-79 RC-31RC-34RC-93 RC-30 RC-33 RC-84 RC-733) ANSALDO PIPING AND ELBOWS ARE SEAMLESS (XX-13, XX-16 and XX-19 only)4) PIPING WCL STAMPED WITH CENTER PUNCH MARKS. CE WELDS REFERENCED WITH FOOTAGEMARKS. ANSALDO WELDS REFERENCED WITH CENTER PUNCH MARKS EACH 250 mm.10-13 10-1610-19 10-10 4-1033-103 8-108-138-16 8-19 14-1014-19 14-1314-16 5) FOR REPLACEMENT WELDS, PORTIONS OF THE ORIGINAL WELD MAY REMAIN. THE ORIGINAL WELD CAP IS JOINED TO THE REPLACEMENT WELD.

MN725-A343 and A383 Cold Leg Instrument Nozzles 6-99 RCP Pressure Taps 6-100 Hot Leg Instrument Nozzles (27) 6-101** Note Reference Drawings for Locations3INT-ISI-2 Rev. 4 101 of 210 UNIT 2 ZONE 16 REACTOR COOLANT PUMP 1A NOTES:1) STUD LOCATIONS CW FROM REFERENCE DWGS:N001-6.02-418 DISCHARGE C 2) TAG NO. 2MRCEP01A L SERIAL NO. 1110-1A (C-E) N.B. NO. 23457N001-6.02-420 THRU 423N001-6.02-107 & 1088.271.1SEAL HOUSING STUDS FLANGE STUDS 32.876.936.897.284.5284.33SNUBBER (2)

C16-17 AND 16-1816-31 SEAL HOUSING STUDS & NUTS- NOTE 116-32 FLANGE STUDS & 16-33 NUTS- NOTE 116-12 THRU 16-15

CW FROM DISCNOZZLE COLUMNSUPPORTS(4)LOWER HORIZONTALSUPPORTS (2)

B UPPER HORIZONTAL SUPPORTS (2)

B16-19 AND 16-20MOTOR SUPPORTSTAND163 16416-21 AND 16-22 NUTS & RINGS16-30FLANGE SURFACE 16-34CASING INTERNAL SURFACE B3INT-ISI-2 Rev. 4 102 of 210 UNIT 2 ZONE 17 REACTOR COOLANT PUMP 1B NOTES:1) STUD LOCATIONS CW FROM REFERENCE DWGS:N001-6.02-418 DISCHARGE C 2) TAG NO. 2MRCEP01B L SERIAL NO. 1110-1B (C-E) N.B. NO. 23458N001-6.02-420 THRU 423N001-6.02-107 & 1088.271.1SEAL HOUSING STUDS FLANGE STUDS 32.876.936.897.284.5284.33SNUBBER (2)

C17-31 SEAL HOUSING STUDS & NUTS- NOTE 117-32 FLANGE STUDS & 17-33 NUTS- NOTE 1 CW FROM DISCNOZZLE COLUMNSUPPORTS(4)LOWER HORIZONTALSUPPORTS (2)

BMOTOR SUPPORTSTAND17-12 THRU 17-1517-17 AND 17-18UPPER HORIZONTAL

SUPPORTS (2)

B17-19 AND 17-2017-21 AND 17-22173 174 NUTS & RINGS17-30FLANGE SURFACE 17-34CASING INTERNAL SURFACE B3INT-ISI-2 Rev. 4 103 of 210 UNIT 2 NOTES:1) STUD LOCATIONS CW FROM REFERENCE DWGS:N001-6.02-418 DISCHARGE C 2) TAG NO. 2MRCEP01C L SERIAL NO. 1110-2A (C-E) N.B. NO. 23459N001-6.02-420 THRU 423N001-6.02-107 & 1088.271.1SEAL HOUSING STUDS FLANGE STUDS 32.876.936.897.284.5284.33SNUBBER (2)

C18-31 SEAL HOUSING STUDS & NUTS- NOTE 118-32 FLANGE STUDS & 18-33 NUTS- NOTE 1 CW FROM DISCNOZZLE COLUMNSUPPORTS(4)LOWER HORIZONTALSUPPORTS (2)

BMOTOR SUPPORTSTAND ZONE 18 REACTOR COOLANT PUMP 2A18-12 THRU 18-1518-17 AND 18-18 UPPER HORIZONTALSUPPORTS (2)

B18-19 AND 18-2018-21 AND 18-22183184 NUTS & RINGS18-30FLANGE SURFACE 18-34CASING INTERNAL SURFACE B3INT-ISI-2 Rev. 4 104 of 210 UNIT 2 ZONE 19 REACTOR COOLANT PUMP 2B NOTES:1) STUD LOCATIONS CW FROM REFERENCE DWGS:N001-6.02-418 DISCHARGE C 2) TAG NO. 2MRCEP01D L SERIAL NO. 1110-2B (C-E) N.B. NO. 23460N001-6.02-420 THRU 423N001-6.02-107 & 1088.271.1SEAL HOUSING STUDS FLANGE STUDS 32.876.936.897.284.5284.33SNUBBER (2)

C19-31 SEAL HOUSING STUDS & NUTS- NOTE 119-32 FLANGE STUDS & 19-33 NUTS- NOTE 1 CW FROM DISCNOZZLE COLUMNSUPPORTS(4)LOWER HORIZONTALSUPPORTS (2)

BMOTOR SUPPORTSTAND 19-12 THRU 19-1519-17 AND 19-18UPPER HORIZONTALSUPPORTS (2)

B19-19 AND 19-2019-21 AND 19-22193194NUTS & RINGS19-30FLANGE SURFACE 19-34CASING INTERNAL SURFACE B3INT-ISI-2 Rev. 4 105 of 210 UNIT 2 ZONE 20 PRESSURIZER SURGERC028 H-1 PRESSURIZER ZONE 5 HOT LEG ZONE 6 PRESSURIZERVAULTRC-E-028-BCAA-12EL 108-1 3/4EL 108-5EL 110-5PLANTNORTHRC-E-028-BCAA-12REFERENCE DRAWINGS02-P-RCF-101 20-2 20-3 20-4 20-520-6 20-7 20-820-9 20-10 SS CS 5-34 OL CS SS RC028 H-2RC028 H-3RC028 H-4 20-1 OL20-11 OL6-10 OL C C C BOVERLAY R14WO 2967833 29678373INT-ISI-2 Rev. 4 106 of 210 UNIT 2 ZONE 21 SHUTDOWN COOLING LOOP 1PLANTNORTHREFERENCE DRAWINGS02-P-SIF-105SI-240H-10 21-1221-13B 21-14 21-1521-18 21-19 21-1121-9 21-8 21-6 21-421-2121-1721-1021-7 21-521-2221-13 21-16SI-240 H-13SI-240 H-4SI-240 H-9SI-240H-7SI-240 H-5SI-240H-15SI-240 H-3SI-240H-16SI-240H-11 UV-653 CONT ONZONE 100 UV-651SI-A-240-BCAA-16SECONDARY SHIELD WALLEL 89-9CONT ON ZONE 38LOOP 1 HOT LEG ZONE 6 21-1ACONT ON ZONE 3921-20 OL6-11 OLCS/SSRC-A-051-BCAA-16 21-3 21-2421-25 21-26SI-240 H-2SI-240H-14SI-240 H-17 21-1RC-051H-2RC-051 H-3 B B B C B C B B B B B B B B BOVERLAY R14WO 29678443INT-ISI-2 Rev. 4 107 of 210 UNIT 2 ZONE 22 SHUTDOWN COOLING LOOP 2REFERENCE DRAWINGS 02-P-SIF-10522-7AUV-652RC-B-068-BCAA-16RC68 H-4 RC68H-1 SI-193 H-23SI193 H-17 SI193 H-20 22-2622-17 22-31 22-15 22-1122-1422-9 22-7 22-422-622-5 22-37-9 22-222-122-23 22-22 22-1822-21CS/SS CONT ONZONE 40 T-WALLCONT ONZONE 101 UV-654 SECONDARYSHIELD WALLLOOP 2 HOTLEG ZONE 6 WSI-B-193-BCAA-16 SI193 H-8 W OL OL B B B C C BOVERLAYR14 WO 2967848RC68 H-4 CRC68 H-4 CRC68 H-4RC68 H-4RC68 H-4 B RC68H-33INT-ISI-2 Rev. 4 108 of 210 UNIT 2 ZONE 23 SAFETY INJECTION 1AREFERENCE DRAWINGS02-P-SIF-103 9-1023-26CS/SSV-237SI-E-207-BCAA-14SI-207 H-11 SI-207H-7 SI-207H-323-2323-2423-1623-1723-19 23-2023-12 23-1523-22 23-1423-923-823-623-7 23-423-223-1 UV-634 V-542CONT ON ZONE 96 LOOP 1 COLDLEG ZONE 6 SECONDARY SHIELD WALLSI TANK 1AV-235SI-E-203-BCAA-12 C C B3INT-ISI-2 Rev. 4 109 of 210 UNIT 2 ZONE 24 SAFETY INJECTION 1BREFERENCE DRAWINGS02-P-SIF-103 11-10CS/SSSI-E-221-BCAA-12 V-247 LOOP 1B COLDLEG ZONE 6 SECONDARY SHIELD WALL UV-644 V-543CONT ON ZONE 97SI TANK 1BSI-E-223-BCAA-1424-18 24-1624-1724-14 24-1 24-11 24-9 24-224-21 24-2224-324-4 24-23 24-2524-6 24-8 24-7 24-19 SI-223H-8SI-223 H-3 SI-223 H-1V-245 B C C3INT-ISI-2 Rev. 4 110 of 210 UNIT 2 ZONE 25 SAFETY INJECTION 2AREFERENCE DRAWINGS 02-P-SIF-136SI-E-156-BCAA-12LOOP 2A COLDLEG ZONE 6UV-614 V-540 CONT ON ZONE 98 SI TANK 2A25-22 SI-160 H-1SI-E-160-BCAA-14 V-215SECONDARYSHIELD WALL V-217SI-156 H-925-37 25-23 25-825-26 25-2025-19 25-725-9 25-29 25-1825-2725-625-2 25-425-125-10 25-1625-1125-1325-14 25-15 13-10CS/SS C B3INT-ISI-2 Rev. 4 111 of 210 UNIT 2 ZONE 26 SAFETY INJECTION 2BREFERENCE DRAWINGS02-P-SIF-136 LOOP 2B COLDLEG ZONE 6 UV-624 V-227 CONT ON ZONE 99SI-E-179-BCAA-14SECONDARY SHIELD WALL 15-9CS/SSSI TANK 2BSI-179 H-11SI-179 H-8SI-175 H-21SI-175 H-23 V-225 V-54126-22 26-1526-8 26-25 26-14 26-19 26-6 26-1726-12 26-426-23 26-11 26-9 26-2 26-1626-3126-7 26-1FLOOREL - 100SI-E-175-BCAA-12 C B B C3INT-ISI-2 Rev. 4 112 of 210 UNIT 2 ZONE 27 PRESSURIZER SPRAY 1APLANTNORTHREFERENCE DRAWINGS 02-P-RCF-10227-2427-2 27-327-427-527-6 27-8 27-1027-12 27-13 27-14 27-1527-1627-1827-2027-2127-22 27-2327-2527-26 27-127-2727-2827-29 27-3027-3227-3127-3427-33 27-36 27-3727-3927-38 27-4027-4127-4227-43 27-44 9-11 SS CSEL 101-4EL 123-10EL 116-10EL 111-0EL 119-6EL 127-9 3/8EL 131 11 3/8RC-16 H-7RC-62H-38RC-62H-37RC-62H-33RC-62 H-32RC-62H-28RC-62H-30RC-62H-26RC-62 H-24RC-62 H-21RC-62H-39PRESSURIZER VAULTPRESSURIZER VAULTZONE 29 COMBINEDPZR SPRAY PV100EV-243RC-E-016-BCAA-3 RC-E-062-BCAA-3V-240RC-E-062-BCAA-3 COLD LEG LOOP 1A ZONE 6 W C C B B B B B B C C B B3INT-ISI-2 Rev. 4 113 of 210 UNIT 2 ZONE 28 PRESSURIZER SPRAY 1BPLANTNORTHREFERENCE DRAWINGS02-P-RCF-102RC-18H-1228-2 28-128-328-4 28-5 28-628-7 28-928-11 28-1328-14 28-15 28-17 28-1828-20 28-22 28-23 28-24 28-2528-2628-2728-2828-29 28-3028-3128-3228-33 28-3428-3528-36 28-37 28-46 28-3928-40 28-41 28-4211-1128-4528-44 28-43 SS CSRC-18 H-9RC-17H-46RC-17H-43RC-17H-42RC-17H-40RC-17H-38RC-17H-34RC-17 H-33RC-17H-31RC-17 H-30RC-17 H-26RC-17H-24ZONE 29 COMBINED PZR SPRAY PRESSURIZERVAULT PRESSURIZER VAULT 1A & 1B CUBICLE COLD LEGLOOP 1B ZONE 6EL 102-1/4EL 114-6 EL 110-0EL 123-10EL 116-10EL 127 9 3/8RC-E-018-BCAA-4V-242V-241 PV100FRC-E-017-BCAA-3RC-E-018-BCAA-3 W B B C B B B C B B B B B B C B3INT-ISI-2 Rev. 4 114 of 210 UNIT 2 ZONE 29 COMBINED PZR SPRAYPLANTNORTHREFERENCE DRAWINGS02-P-RCF-102RC-18H-17RC-18H-16RC-18H-18 29-135-33 PRESSURIZER ZONE 5 ZONE 27PZR SPRAY 1A ZONE 28PZR SPRAY 1BC EL 130-11 3/8 L158-1 5/16WP EL 158-2 ZONE 30AUX SPRAY NOZZLEEL 152-5 5/8 SS CSRC-018-BCAA-429-11 29-1229-1429-11A 29-5 29-10 29-4 29-329-129-2 W OL OL C C COVERLAY R14 WO 29678273INT-ISI-2 Rev. 4 115 of 210 UNIT 2 ZONE 30 AUX. PZR SPRAYREFERENCE DRAWINGS 02-P-CHF-107HV-205CH-B-521-BCAA-2 CH-521H-A V-431 HV-203 30-11 30-10 30-930-1 30-2 30-430-13 30-5 30-6 30-7A30-12A CH-521 H-BEL 153-8 ZONE 29 COMBINED PZR SPRAYCH-A-520-BCAA-2CH-E-009-BCAA-230-15A 30-14A SW SW 30-1630-17 SW SW B C SW SWWO 3376259 30-20 30-213INT-ISI-2 Rev. 4 116 of 210 UNIT 2 ZONE 31 PRESSURIZER SAFETIESREFERENCE DRAWINGS02-P-RCF-114 5-31 PRESSURIZERZONE 5TOP HEADRC-E-001-BCAA-6RC-E-005-BCAA-6RC-E-003-BCAA-6RC-E-007-BCAA-6 5-30 5-29 5-32 31-1131-7 31-1531-9 31-1031-631-5 31-1331-1431-331-231-1 PSV 200PSV203PSV202PSV201NOTE: 8 - 2 X 13 1/2 STUDFLANGE BOLTINGFLANGE BOLTINGFLANGE BOLTINGFLANGE BOLTING CS SS CS SS CS SS CS SS 16 - NUTS OL OL OL OLOVERLAYS R14 WO 2967812 2967813 2967816 29678253INT-ISI-2 Rev. 4 117 of 210 UNIT 2 ZONE 32 DRAIN LINE 1AREFERENCE DRAWINGS02-P-CHF-110RC-60 H-A V-334RC-E-060-BCAA-2COLD LEGZONE 6 LOOP 1A V-234WP EL 88-10 3/16EL 89 9 11/1632-132-3 8-1832-5 32-832-2 32-632-4 32-9 CS SS NOTE: SW = SOCKET WELD SW SW SW N B3INT-ISI-2 Rev. 4 118 of 210 UNIT 2 ZONE 33 DRAIN LINE 1BREFERENCE DRAWINGS02-P-CHF-110RC-58H-A V-335RC-E-058-BCAA-2COLD LEGZONE 6 LOOP 1B V-235 33-1 10-18 33-8 33-9 CS SSNOTE: SW = SOCKET WELD SW SW N33-6 SW33-5 33-4 33-3 33-2 EL 89B3INT-ISI-2 Rev. 4 119 of 210 UNIT 2 ZONE 34 DRAIN LINE 2AREFERENCE DRAWINGS02-P-CHF-110 V-233 RC-E-096-BCAA-2 V-33312-18 34-834-9 CS SS NOTE: SW = SOCKET WELD SW SW N 34-6 SW34-1 34-234-3 34-4 34-5 COLD LEG LOOP 2A ZONE 63INT-ISI-2 Rev. 4 120 of 210 UNIT 2 ZONE 35 DRAIN LINE 2BREFERENCE DRAWINGS02-P-CHF-110 V-232RC-E-089-BCAA-2 V-332 35-8 35-9 NOTE: SW = SOCKET WELD SW SW N35-6 SW35-1 35-335-2 35-4 35-5EL 88 9 5/8LETDOWN LINE ZONE 363INT-ISI-2 Rev. 4 121 of 210 UNIT 2 ZONE 36 LETDOWN LINEREFERENCE DRAWINGS02-CHF-142CH-E-001-BCAA-2 UV-515ZONE 6ZONE 35 EL102EL 94EL119EL131EL 12153 56 54 55 59 63 57 61 60 67 58 62 68 69 64 65 70 82 77 40 75 1 17 83 6 2 38 81 3 18 5 7 4 19 13 12 20 27 11 25 15 21 10 9 85 28 8 26 22 29 14 30 31 84 33 48 23 32 16 34 35 42 49 46 50 43 47 45 52 80 44 51 24 79 41 76 39 78RC91 HTRC91HAKRC91 HAC RC91 HJRC91 HAD RC91 HP RC91 HAPRC91 HAQRC91 H5RC91 H6RC91 HAJRC91 HQRC91 HURC91 HW CH1 HA W W 14-18 UV-516RC-E-091-BCAA-2 SS CS W W B B B B B B B B B B B B B B B3INT-ISI-2 Rev. 4 122 of 210 UNIT 2 ZONE 37 CHARGING LINECHE-005-BCAA-3 V433 ZONE 6 EL101EL112EL134EL134EL110EL11536 43 42 19 41 18B 18A 40 17 15 14 39 13 12 11 10 38 9 8 7 6 5 37 4 3 2 1 47 45 44 27 25 24 23 21 20 26 22 33 32 31 30 29 28 34 57 58 59 60 61 62 54 53 52 55 51 56 49 48 50CH-5 H36CH-5 H28CH-5 H27CH-5 H19CH-5 H17CH-5 H42CH-5 H18CH-5 H20CH-5 H13CH-5 H14CH-5 H38CH-5 H33CH-5H39CH-5 H9CH-5 H8CH-5 H7CH-5 H4CH-5 H3CH-5 H44CH-5 H34CH-5 H35CH-5 H21CH-5 H22CH-5 H32CH-5 H3713-11 V434 V435 PDV240REFERENCE DWG.

02-P-CHF-109 SS CSFLANGE BOLTING W WCH-5 H6CH-5 H10 W C B C B C B B C C C C B B B B B C C C B B B C B B B B3INT-ISI-2 Rev. 4 123 of 210 UNIT 2 ZONE 38 DRAIN LINE LOOP 1REFERENCE DRAWINGS 02-P-SIF-105 38-1 ZONE 21SHUTDOWN COOLING NOTE: SW = SOCKET WELDRC-E-070-BCAA-2 38-1SW3INT-ISI-2 Rev. 4 124 of 210 UNIT 2 ZONE 39 HPSI LONG TERM RECIRC LOOP 1 SI-A-248-BCAA-3REFERENCE DWG.

02-P-SIF-105C EL 86 8 1/4 LC EL 88 2 LC EL 86 8 1/4 LC EL 86 8 1/4 LC EL 83 5 L 39-52 SI248 H28 SI248 H25 SI248H19 SI248 H29SI248 H20SHUTDOWN COOLING ZONE 21SI-A-248-BCAA-3SI-A-248-BCAA-3 V-522 V-957V-523 N39-17 39-24 39-1239-25 39-15 39-9 39-1439-1639-1339-17A 39-2039-5139-2139-1939-2239-1839-2339-26 39-55 39-53 39-2739-28 39-34 39-2939-1039-1139-5939-5639-539-739-6 39-1 39-239-3 POINT ACONT POINT A 39-5439-6039-6139-6239-6339-64 39-6539-66 39-67 39-68 39-6939-70 39-7139-72 SI248 H32 39-5839-57SI248 H34 SI248 H35 SI248 H18 39-73 SI248 H36 B C B B C C B B B B B3INT-ISI-2 Rev. 4 125 of 210 UNIT 2 ZONE 40 HPSI LONG TERM RECIRCULATION 2PLANTNORTHREFERENCE DRAWINGS02-P-SIF-105 V 533 40-1840-3740-2040-7 40-8 40-21 40-23 40-22 40-19 40-3840-1040-1340-1240-6EL. 9340-16 ZONE 2240-1540-1440-1 40-25 40-5 40-9 40-2 40-340-4 SI-B-199-BCAA-3 V958 V532SI199 H15SI199 H18 SI199H17SI199 H22 40-17 EL. 84EL. 89-3 C 91/2W C B B B3INT-ISI-2 Rev. 4 126 of 210 UNIT 2 NOTES: 1) 0° IS AT CENTER OF COLD LEG MANWAY REFERENCE DWGS: 2) STUDS ARE 16 - 1.5 X 93) STUDS ARE 16-1 X 64) TAG NO. 2MRCEE01A SERIAL NO. 212 (ANSALDO) ZONE 41 STEAM GENERATOR 1 N. B. NO. 161MN725-A18, A19, A26, A28 and A29 MN725-A30, A38, A54 and A55 107 41 42 270° 90° 270° 90°SECONDARY MANWAYS-NOTE 2-SECONDARYAT 0°,90°-NOTE 3- 31TUBE SHEET193 ID4.885.83232 ID3.414.3ZONE 58ZONE 54ZONE 64AT 270°AT 90°AT 45°AT 315°SECONDARY HANDHOLES AT 0°AND 270°-NOTE 3-ZONE 44ZONE 43116 109 114 115106 105104 103 110 101 100 102FEEDWATERDOWNCOMER

@ 0°BLOWDOWNAT 12°180°,270°HAND HOLESDOWNCOMER RECIRC @ 45°ZONE 64 DOWNCOMER BLOWDOWN@ 27 0°@ 9 0°@ 18 0°6.54113 112 90° 270°SNUBBER LUGSMN725-A243, A390 and A395 C C3INT-ISI-2 Rev. 4 127 of 210 UNIT 2 ZONE 42 STEAM GENERATOR 2 NOTES: 1) 0° IS AT CENTER OF COLD LEG MANWAY REFERENCE DWGS: 2) STUDS ARE 16 - 1.5 X 93) STUDS ARE 16-1 X 6

4) TAG NO. 2MRCEE01B SERIAL NO. 211 (ANSALDO) N.B. NO. 160MN725-A18, A19, A26, A28 and A29 MN725-A30, A38, A54 and A55 107 41 42 270° 90°SNUBBER LUGS 270° 90°SECONDARYAT 0°,90°-NOTE 3- 31TUBE SHEET193 ID4.885.83232 ID3.414.3ZONE 59ZONE 55ZONE 65AT 270°AT 90°AT 45°AT 315°SECONDARY HANDHOLES AT 0°AND 270°-NOTE 3-ZONE 45ZONE 46116 109 114 115 105104 103 110 101 100 102FEEDWATER BLOWDOWNAT 12°180°,270°HAND HOLESDOWNCOMER RECIRC @ 45°ZONE 65 DOWNCOMER BLOWDOWN@ 27 0°@ 9 0°@ 18 0°1066.54113 112 90° 270°SECONDARY MANWAYS-NOTE 2-MN725-A243, A390 and A395 C C3INT-ISI-2 Rev. 4 128 of 210 UNIT 2 ZONE 43 MAIN STEAM (EAST)

STEAM GENERATOR 1 2PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-11843-5LINE #DIA/SCHFROMTOSG-3632x 243-1 -SG36 H17SG-E-036-DLBB-28 43-2543-2SG-3628x 1.25 SG36H1143-4 43-743-1843-2543-21 43-24 43-1743-1543-1243-22 W SG36H16 ZONE 48 EL. 132C43-843-1443-1043-11 EL. 132-3 C1/16EL. 157-10 C 1/8EL. 171C ZONE 4143-243-1 43-20 W EL. 158C 43-26 B B C3INT-ISI-2 Rev. 4 129 of 210 UNIT 2 ZONE 44 MAIN STEAM (WEST)

STEAM GENERATOR 1 PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-118ZONE 41 44-5LINE #DIA/SCHFROMTOSG-3332x 244-1 -

SG33 H1744-3044-2SG-3328x 1.25 SG33H11 44-444-744-244-144-2144-30 44-28 44-2044-17 44-12 44-23 44-26 W SG33H16 ZONE 47 EL. 132C44-15 44-844-14 44-1044-11 44-18 EL. 132-3 C 3/8EL. 157-9 C 3/4EL. 171C 144-24 SG-E-033-DLBB-2844-31 W B C C3INT-ISI-2 Rev. 4 130 of 210 UNIT 2 ZONE 45 MAIN STEAM (EAST)PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-118 ZONE 42 45-5LINE #DIA/SCHFROMTOSG-4232x 245-1 -

45-2545-2SG-4228x 1.25 WSG42 H17 SG42H11 45-745-8 45-10 45-4 45-2 45-1 45-1845-1445-1245-1145-2545-1545-2445-1745-20 45-2245-21 W SG42H16 EL. 157-10 C ZONE 49 EL. 132C1/8EL. 171C EL. 132-3 C1/16EL. 171-1 C11/16STEAM GENERATOR 2 3 SG-E-042-DLBB-2845-26 B B C3INT-ISI-2 Rev. 4 131 of 210 UNIT 2 ZONE 46 MAIN STEAM (WEST)

STEAM GENERATOR 2 4PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-118 EL. 171ZONE 4246-5 CLINE #DIA/SCHFROMTOSG-4532x 246-1 -SG45 H17 46-2846-2SG-4528x 1.25 SG45H1146-746-8 46-10 46-446-246-146-1146-21 46-1246-18 46-2546-14 46-2446-1546-2046-17 46-2746-23 46-28 WSG45 H16 EL. 158C EL. 132CZONE 50 EL. 132CSG-E-045-DLBB-2846-29 W C C B3INT-ISI-2 Rev. 4 132 of 210 UNIT 2 ZONE 47 MAIN STEAM (WEST)PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-155LINE #DIA/SCHFROMTOSG-2066x 1.50047-447-20 SG206 H-147-3047-29 47-1 47-2828x 1.75012x 0.844 SG-206 SG-206 EL. 132-0 TURBINE 47-25PSV 572 02-P-SGF-401 NOTE:1 - MAIN STEAM RELIEF VALVE47-1947-12 47-2447-1147-20 47-30 47-15 47-27 47-28 47-2347-29 47-16 UV 170 PSV 573PSV692 PSV 575 PSV 574 47-7 47-447-3 47-2 47-147-8 ZONE 44 1 BUILDINGSG-E-206-DLBB-12 SG-E-206-DLBB-28 ZONE 5112-1 1/4DIA. FLANGE BOLTSPER VALVE2 - MSIV, 20-2 1/4DIA. BODY TOBONNET BOLTS EL. 120-0 STEAM GENERATOR 1 C3INT-ISI-2 Rev. 4 133 of 210 UNIT 2 ZONE 48 MAIN STEAM (EAST)PLANTNORTHREFERENCE DRAWINGS02-P-SGF-155 LINE #DIA/SCHFROMTOSG-2076x 1.50048-448-20 SG207 H-148-3048-2948-148-2828x 1.75012x 0.844 SG-207 SG-207 EL. 132-0 TURBINE 48-25PSV 579 02-P-SGF-401 REV 548-19 48-1248-2448-11 48-20 48-30 48-1548-2748-2848-23 48-29 48-16 UV 180PSV578PSV691 PSV 576PSV577 48-7 48-448-3 48-2 48-148-8 ZONE 43 2 BUILDING SG-E-207-DLBB-12 SG-E-207-DLBB-28 ZONE 51ZONE 5348-3548-34MAIN STEAM S/G #1 90° (EAST) INSIDECONTAINMENTZONE 51 STEAM GENERATOR 1 NOTE:1 - MAIN STEAM RELIEF VALVE12-1 1/4DIA. FLANGE BOLTSPER VALVE2 - MSIV, 20-2 1/4DIA. BODY TOBONNET BOLTS C3INT-ISI-2 Rev. 4 134 of 210 UNIT 2 ZONE 49 MAIN STEAM (EAST)PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-155LINE #DIA/SCHFROMTOSG-2086x 1.50049-449-20SG208H-149-3049-29 49-1 49-2828x 1.75012x 0.844 SG-208 SG-208 EL. 132-0 TURBINE 49-25PSV 554 02-P-SGF-40149-19 49-12 49-2449-11 49-20 49-30 49-1549-2749-2849-23 49-29 49-16 UV 171PSV555PSV695 PSV 557PSV556 49-7 49-449-3 49-2 49-149-8 ZONE 45 3 BUILDING SG-E-208-DLBB-12 SG-E-208-DLBB-28ZONE 52ZONE 5349-35 ZONE 5249-34 STEAM GENERATOR 2 NOTE:1 - MAIN STEAM RELIEF VALVE12-1 1/4DIA. FLANGE BOLTSPER VALVE2 - MSIV, 20-2 1/4DIA. BODY TOBONNET BOLTS C3INT-ISI-2 Rev. 4 135 of 210 UNIT 2 ZONE 50 MAIN STEAM (WEST)PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-155LINE #DIA/SCHFROMTOSG-2096x 1.50050-450-20 SG209 H-150-3050-29 50-1 50-2828x 1.75012x 0.844 SG-209 SG-209 EL. 132-0 TURBINE 50-25PSV 561 02-P-SGF-40150-1950-12 50-2450-1150-20 50-3050-15 50-27 50-28 50-23 50-29 50-16 UV 181 PSV 560PSV694 PSV 558 PSV 559 50-7 50-450-3 50-2 50-150-8 ZONE 46 4 BUILDINGSG-E-209-DLBB-12 SG-E-209-DLBB-28 ZONE 52S/G #2 ADV STEAM GENERATOR 2 NOTE:1 - MAIN STEAM RELIEF VALVE12-1 1/4DIA. FLANGE BOLTS PER VALVE2 - MSIV, 20-2 1/4DIA. BODY TOBONNET BOLTS C3INT-ISI-2 Rev. 4 136 of 210 UNIT 2 ZONE 51 ATMOSPHERIC DUMP 1 PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-158LINE #DIA/SCHFROMTOSG-5912x 0.84451-151-4051-6551-351-28 51-33 51-1 51-31 51-2651-651-4051-8551-27 51-86 SG70 H-6SG-7012x 0.844 51-3951-37 51-3051-32ZONE 47 SG-E-70-DLBB-12 SG-E-59-DLBB-12SG59 H-6 V955 ZONE 48 51-251-751-29 51-5 51-8B 51-4 51-9 51-8A 51-37 51-34 51-39 HV178V48 V949 HV 184 UV169 SG-E-95-DLBB-4SG-954 x 0.33751-6551-76 ZONE 4851-88 51-87 51-8951-8051-79 51-7851-71 51-7051-6851-8451-6751-77 51-6651-82 51-8351-69 51-8151-7651-75 51-7351-7451-72 C C3INT-ISI-2 Rev. 4 137 of 210 UNIT 2 ZONE 52 ATMOSPHERIC DUMP 2 PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-158LINE #DIA/SCHFROMTOSG-10312x 0.84452-152-40 52-85 52-3452-352-10 52-3152-4152-87 52-952-8 52-8852-1 SG103H-6SG-8412x 0.84452-4152-3852-652-7 52-452-5 ZONE 49 SG-E-100-DLBB-4 SG-E-84-DLBB-12ZONE 49 SG84 H-6 V958 ZONE 5052-3552-30 52-3852-89 52-32 52-2852-33 52-27 52-2952-8652-40 HV 179 V 84 V 952 HV185 UV183SG-E-103-DLBB-12SG-1004 x 0.33752-6552-7652-252-83 52-68A52-8452-80 52-7952-8252-7352-72 52-7452-7652-7052-71 52-69A52-75 52-7752-78 52-81 52-66 52-65 52-6752-90 C CWO 3779477REPLACED WELDS52-68 AND 52-693INT-ISI-2 Rev. 4 138 of 210 UNIT 2 ZONE 53 STEAM TO AUXILARYPLANTNORTHREFERENCE DRAWINGS 02-P-AFF-131LINE #DIA/SCHFROMTOSG-816x 0.43253-153-1553-3553-2653-2753-23 53-2153-11 53-253-1253-34 53-2853-29 53-31 53-32 53-22 53-30 53-2453-2553-13 53-15 53-14 53-9 53-8 53-1053-1 EL. 122-5 EL. 122-5SG-836x 0.432 53-35 53-21MAIN STEAM 53-6 53-753-4 53-5 ZONE 48 SG-E-83-DLBB-6 SG-E-81-DLBB-6MAIN STEAM ZONE 49 UV134 UV 138 FEEDWATER SYSTEM 53-163INT-ISI-2 Rev. 4 139 of 210 UNIT 2 54-100 ZONE 54 FEEDWATERPLANTNORTHREFERENCE DRAWINGS 02-P-SGF-119 ZONE 56 8 V007LINE #DIA/SCHFROMTOSG-214x 0.93854-1554-2454-4554-53 54-55 54-51 54-12A54-7A54-8A54-3154-38 54-60 54-50 54-59 54-57 54-5654-52 54-5454-25B 54-3454-25A 54-47 54-32 54-3554-2454-3354-11C54-16 54-1554-6A54-2154-1754-14 54-1354-2754-26 54-49 54-43EL. 93SG-2 H15SG-13 H1SG-2 H-9 SG-2H12SG-2 H-2 SG-2 H14 SG-2 H13 SG-2 H-5 SG-2 H-4 W SG-2H-1EL. 115SG-2 SG-216x 0.84416x 1.7554-26-54-25A54-107 V 00354-36 54-37 54-20 54-1954-3954-4154-18 ZONE 4154-2254-2354-6054-10A54-12A-54-13,54-154-11B54-10024x 1.21814x 0.93816x 0.84416x 1.75 SG-2 SG-13 SG-13 SG-13 54-154-2954-554-10A 5 4-9A 54-28 54-254-3 54-4SG-E-2-DCBA-14SG-E-2-DLBB-24SG-E-13-DCBA-14 54-30 SG-2 H10 SG-2H11 SG-2 H-6 SG-2 H-8 STEAM GENERATOR 1 54-27 EL. 93SG-E-13-DLBB-14 SS CS SS CS54-107 SS CS SS CSSG-E-2-DLBB-16MN725-A256 W W W W W C B C C C C B C B B C B C C SG-2 H-3 CSG-E-2-DLBB-14SG-E-13-DLBB-16 PSE 2R17WO 3821198 REPLACED WELDS54-6, 7, 8, 9, 10, 11B, 123INT-ISI-2 Rev. 4 140 of 210 UNIT 2 ZONE 55 FEEDWATER STEAM GENERATOR 2 PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-119 ZONE 57 10 V 005LINE #DIA/SCHFROMTOSG-514x 0.93855-15 55-24 55-47 55-5355-5455-52 55-5055-43 55-1255-7 55-955-855-3755-2055-28 55-32 55-6055-51 55-5955-57 55-56 55-4955-5555-38 55-39 55-4155-45 55-3355-3655-3555-34 55-2955-1055-1155-31 55-30 55-3 55-4 55-555-6 55-1 55-255-13 55-14 55-2755-2655-2255-23 EL. 105EL. 94SG-5 H-6SG-5H14SG-5H11SG-5H10 SG-5 H-8 SG14H-1 SG-5H12 WSG-5 H-9 SG-5 H-3SG-5 H-2 SG-5 H13 SG-5 H-7SG-5 H-5 SG-5 H-4 W SG-5 H-1EL. 115SG-5 SG-516x 0.84416x 1.75 55-26-55-25 55-107 V006 55-1555-1755-1855-16 55-10755-21 55-19 55-100ZONE 4255-2555-24 55-60 55-10 55-12-55-13, 55-155-11 55-10024x 1.21814x 0.93816x 0.84416x 1.75 SG-5 SG-14 SG-14 SG-14SG-5-DLBB-14 SG-5-DLBB-24SG-14-DCBA-14 55-27 SS CS SS CS SS CS SS CSSG-14-DLBB-16 MN725-A256 W W W W B B B C C C C C C C B C B C CSG-5-DCBA-143INT-ISI-2 Rev. 4 141 of 210 UNIT 2 ZONE 56PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-119 UV132LINE #DIA/SCHFROMTOSG-20124x 1.81267SG202H-1SG-E-202-DLBB-24 4 11 1 924x 1.53124x 1.812 SG-202 SG-224EL. 115-6EL. 115-656-11SG-E-201-DLBB-24 SG-224-DLBB-24 UV 174 02-P-FWF-403 NOTE:FWIV, 20-2BODY TO BONNET BOLTS PER VALVE 1/2 DIA ZONE 54 8 FEEDWATER STEAM GENERATOR 1 56-9 56-7 56-456-156-6 W C3INT-ISI-2 Rev. 4 142 of 210 UNIT 2 ZONE 57 FEEDWATER STEAM GENERATOR 2PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-119 UV137LINE #DIA/SCHFROMTOSG-20424x 1.81257-657-7SG205H-2 SG-E-205-DLBB-24 57-457-11 57-1 57-924x 1.53124x 1.812 SG-205 SG-225EL. 115-6EL. 115-657-11SG-E-204-DLBB-24 SG-225-DLBB-24 UV 177 02-P-FWF-403 NOTE:FWIV, 20-2BODY TO BONNET BOLTS PER VALVE 1/2 DIA 10 57-657-957-7 57-4 57-1 ZONE 55 W C3INT-ISI-2 Rev. 4 143 of 210 UNIT 2 ZONE 58 AUXILIARY & DOWNCOMER FEEDWATER SG #1 11PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-120ZONE 62 V 652LINE #DIA/SCHFROMTOSG-8 8x 0.50058-458-25 58-2058-16B 58-2858-7 58-9 58-8 58-16A58-16 58-2258-2158-1758-1858-2358-14A58-19 58-2958-2658-14 58-15 58-1058-11 58-1258-358-458-558-6 58-158-241-11158-13 EL. 131-0 SG-8 H18 SG-8H-9SG-8 H-7SG-8H11 AF-4 H-1SG-8 H19SG-8 H-4 SG-8 H14SG-8 H-3 SG-8 H10SG-8 H-2 SG-8 H-6 7558-3358-25 58-32 58-34 V 079 58-24SG-E-008-DCBA-6AF-A-004-DCBA-6ZONE 60 ZONE 41 58-3 58-34-58-158-1941-1116x 0.5626x 0.5626x 1.800 SG-8 AF-4 SG-8 EL. 131-0 EL. 120-0 CSEL. 89 9 1/2 EL. 143-4 58-3058-31 58-2758-27A EL. 100-0 EL. 104-0 EL. 131-0 SS5/16SG-8H-8 SG-8 H15SG-8 H-5SG-8 H20 58-3658-37 SG-E-008-DLBB-8 CS SS CS SS 58-38MN725-A254 W B B B B B C C C C C C C C C C C3INT-ISI-2 Rev. 4 144 of 210 UNIT 2 ZONE 59PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-120ZONE 63 V653LINE #DIA/SCHFROMTOSG-118x 0.50059-4 59-25 59-20 59-16B 59-3159-28 59-759-959-8 59-16A59-1659-22 59-21 59-30 59-1759-18 59-23 59-16C59-1959-20A59-29 59-2659-1459-1559-1059-12 59-359-459-5 59-659-1 59-242-11159-13 EL. 131-0SG11 H-3SG11 H16SG11 H14SG11 H-2AF-6 H-1SG11H20SG11H-17SG11H-5SG11H-7SG11H-4SG11H18SG11H-8SG11 H13SG11H11SG11 H10SG11 H-6SG11 H-9 12 76 59-33 59-2559-32 59-34 V 08059-24SG-E-011-DCBA-6AF-B-006-DCBA-6SG-E-011-DLBB-8 ZONE 61 ZONE 4259-3 59-34-59-1 59-206x 0.5626x0.562SG-11AF-6 EL. 143-4 EL. 131-0 EL. 104-0 EL. 89-9 5/81/2EL. 100-0 EL. 120-0 AUXILIARY & DOWNCOMER FEEDWATER SG #2 59-3559-1159-36 CS SSSG-E-011-DLBB-8SG-E-011-DCBA-8 SS CS CS SS59-38AF-6 6x0.432 59-16CSG-11 6x 1.800 42-111

-MN725-A254 CS SS*59-39 SS CS 59-4059-42 59-41 W W B B B C C C C C C C C B B C C3INT-ISI-2 Rev. 4 145 of 210 UNIT 2 ZONE 60 DOWNCOMER FEEDWATERPLANTNORTHREFERENCE DRAWINGS 02-P-SGF-156SG-E-200-DLBB-8EL. 114-10 ZONE 5860-11 11 CLINE #DIA/SCHFROMTOSG-2008x 0.71960-260-12 EL. 104-0 C SG200H-13 SG200 H-14 UV172SG-0088x 0.71960-1460-17 UV1305/16V642 SG-E-008-DLBB-8 TURBINE BUILDING STEAM GENERATOR #1 60-1460-860-12 60-960-6 60-16 60-15 60-7 60-4 60-5 60-3 60-260-17 C C3INT-ISI-2 Rev. 4 146 of 210 UNIT 2 ZONE 61PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-156SG-E-203-DLBB-8EL. 114-10 ZONE 59 12 CLINE #DIA/SCHFROMTOSG-2038x 0.71961-261-12 EL. 104-0 C SG203H-14 SG203 H-13 UV175SG-0118x 0.71961-1461-17 UV1355/16V693SG-E-011-DLBB-8 TURBINE BUILDING DOWNCOMER FEEDWATER STEAM GENERATOR #2 61-361-461-661-261-5 61-7 61-16 61-1761-8 61-961-11 61-15 61-1461-12 C C3INT-ISI-2 Rev. 4 147 of 210 UNIT 2 ZONE 62PLANTNORTHREFERENCE DRAWINGS 02-P-AFF-132 AF-B-018-DCBA-6 EL. 94-5 ZONE 58 75 CLINE #DIA/SCHFROMTOAF-186x 0.56262-462-14AF-E-004-DCBA-6 EL. 94-5 C62-22AF-18 H1 AF-4 H3 AF-18 H2 W UV 36 UV 34AF-46x 0.56262-1862-24 02-P-AFF-133 AUXILIARY FEEDWATER STEAM GENERATOR #1 62-7 62-8 62-562-18 62-23 62-1262-14 62-20 62-24 62-1962-2162-662-1362-11 62-9 62-1062-4 62-13A 62-25 C B C3INT-ISI-2 Rev. 4 148 of 210 UNIT 2 ZONE 63 AUXILARY FEEDWATER STEAM GENERATOR #2 PLANTNORTHREFERENCE DRAWINGS 02-P-AFF-132AF-A-016-DCBA-6 EL. 82 -4 ZONE 59 UV 37 CLINE #DIA/SCHFROMTOAF-166x 0.56263-1863-19AF16 H1 AF6 H2AF6 H4 AF6 H3 AF6 H5AF-B-006-DCBA-6 UV 35 76 63-30 63-4AF-66x 0.562 02-P-AFF-133 63-25 63-2163-28 63-23 63-2263-29 63-2663-24 63-30 63-2763-18A63-463-14 63-1963-20 63-18 W B B C B C3INT-ISI-2 Rev. 4 149 of 210 UNIT 2 ZONE 64 BLOWDOWN STEAM GENERATOR #1 46PLANTNORTH ZONE 66 V28964-44 64-3664-14 64-49 64-54 64-3864-39 64-2264-764-8 64-3164-15 64-2364-3264-53 64-52 64-50 64-5564-2664-5164-4164-4064-4264-46 64-4364-4564-3564-3364-1964-11 64-37 64-9 64-1864-12 64-16 64-364-564-664-164-2064-24 64-2564-2164-10EL. 97EL. 109HV 43 HV 41 SG39H22SG39 H31SG39H36 SG39 H-5 SG39H12 SG39 H24SG39H25SG39 H29SG39H30 W SG39 H15 SG39 H18SG39H16 SG39 H-9EL. 89-3 UV500P ZONE 41 SG39 H10 EL. 104SG-E-53-DABA-6 SG-E-39-DABA-6SG-E-039-DABA-6LINE #DIA/SCHFROMTOSG-536x 0.56264-164-14SG-39SG-39 6x 0.562 6x 0.562 64-3064-1564-5364-57 W SG53H-5 W 64-2 64-7864-7964-6464-63 64-7064-71 ZONE 41 64-65 64-6164-62 SG-E-522-DABA-6 HV 4764-77 64-7264-7564-76 64-7464-6664-6764-73 64-6864-69 APOINT A CONTINUED64-80EL. 112EL. 105EL. 122EL. 116SG522 H-2 64-29 64-27 64-30SG-5226x 0.56264-6064-80 APOINT A CONTINUEDTHIS DRAWING64-58 64-59 64-60REFERENCE DRAWINGS02-P-SGF-12202-P-SGF-177 64-3164-81 64-8264-87 W W WSG39H38 W B B C B B C B B C B B C B C B B C3INT-ISI-2 Rev. 4 150 of 210 UNIT 2 ZONE 65 BLOWDOWN STEAM GENERATOR #2 PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-140ZONE 67 47 V290 65-35 65-4465-4365-4265-4165-4065-3865-6 A65-765-965-865-2165-2065-1965-53 65-52 65-51 65-4965-48 65-5065-45 65-3765-36 65-34 65-33 65-3165-30 65-1865-1765-15 65-1465-1065-11 65-13 65-2965-3 65-565-6 65-165-22 65-24 65-23 65-28EL. 97EL. 109HV 44 HV 42 SG48H11 SG48 H5SG48 H10 SG48 H27SG48 H29 SG48H31 SG48H30 WSG52 H5 WSG48 H14 WSG48 H16 SG48H18 SG48 H21 SG48 H24 SG48 H23 EL. 109UV500R ZONE SG-E-48-DABA-6SG-E-52-DABA-6SG-E-48-DABA-665-2 4265-2765-25 APOINT A CONTINUEDTHIS DRAWING 65-5465-55 65-5865-71 65-72 65-7365-7065-60 65-68 HV 4865-8165-7865-7765-80 65-74 65-7965-75 65-6265-6465-6565-63 65-5965-5765-61 65-5665-6765-76 65-69 65-66 A POINT ACONTINUED 65-87 65-8865-83 65-8665-85 65-89 65-82 65-84ZONE 42EL. 112EL. 116EL. 122EL. 100SG-E-523-DABA-6SG523 H-1SG523 H-2 SG523 H-3EL. 116LINE #DIA/SCHFROMTOSG-486x 0.56265-165-14 SG-48 SG-526x 0.5626x 0.56265-2965-1565-5265-2865-8965-566x 0.652 SG523 02-P-SGF-17765-9165-9265-90 W W W W B B A B C B B C B B C B B C B B C3INT-ISI-2 Rev. 4 151 of 210 UNIT 2 ZONE 66 BLOWDOWN STEAM GENERATOR #1 PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-157SG-E-039-DABA-6EL. 108 - 8 ZONE 64 46 UV500Q CLINE #DIA/SCHFROMTOSG-396x 0.56266-166-15 66-15SG-E-039-DABA-6EL. 108 - 8 CEL. 106-0 C TURBINE BUILDING 66-1466-1366-10 66-966-766-2866-11 66-1266-566-866-3 66-166-2 66-4 66-253INT-ISI-2 Rev. 4 152 of 210 UNIT 2 ZONE 67 BLOWDOWN STEAM GENERATOR #2 PLANTNORTHREFERENCE DRAWINGS 02-P-SGF-157EL. 108 - 8SG-E-48-DABA-6 EL. 108 - 8 ZONE 65 47 UV500S C CLINE #DIA/SCHFROMTOSG-486x 0.56267-167-1267-12 67-1067-1167-2267-5 67-8 67-6 67-967-7 67-267-3 67-13INT-ISI-2 Rev. 4 153 of 210 UNIT 2 ZONE 68 REGENERATIVE HEAT EXCHANGER NOTES: Tag No. 2MCHEE01 Serial No. 79313 (AMETEK)

N.B. No. 547 Reference Drawings:

N001-7.03-1 N001-7.03-48 thru 501110 WW TOP LONG SEAMSNEAR & FAR SIDE 8 SCH 160 PIPEAND FITTINGSINLETOUTLETVIEW FACING HEAT EXCHANGERLOOKING PLANT SOUTH 68-468-3 68-768-868-5 68-6 68-268-968-1 B B3INT-ISI-2 Rev. 4 154 of 210 UNIT 2 ZONE 69 LETDOWN HEAT EXCHANGER NOTES: Tag No. 2MCHNE02 Serial No. N2373 (Richmond Engr)

N.B. No. 77334 Reference Drawings:

N001-7.03-26 N001-7.03-27

N001-7.03-28 N001-7.03-29 TubesheetChannelheadCross Section 32 Studs 1 x 9 3/4 3/469-1 69-23INT-ISI-2 Rev. 4 155 of 210 UNIT 2 ZONE 70 LPSI PUMP ROOM A SUCTION REFERENCE DRAWINGS02-P-SIF-201SI-241 H-20 V-201 SI-307H-16 SI-67 H-4 70-56 70-58 70-59 70-60 70-6170-63 70-64 70-66 70-65 70-68 70-69 70-4670-44 70-47 70-55 70-53 70-103 70-52 70-5070-4970-10470-106 70-107 70-109 ZONE 76EL. 47 10 EL. 41 10 LPSIPUMP A SUCTION ZONE 94SI-A-307-GCBC-20SI-A-307-GCBC-14SI-A-067-GCBC-16LINE #DIA X SCHFROMTO SI-67SI-241SI-307SI-307 16 X 0.312 18 X 0.312 14 X 0.312 20 X 0.37570-10370-4470-6370-49 70-10970-4770-6970-61SI-A-241-GCBC-18ZONE 102 W W W B B B3INT-ISI-2 Rev. 4 156 of 210 UNIT 2 ZONE 71 LPSI PUMP ROOM AREFERENCE DRAWINGS02-P-SIF-207 V-435SI-87H-3ZONE 76SI-A-087-FCBA-10LINE #DIA X SCHFROMTO SI-78 SI-87 SI-87 10 X 0.365 8 X 0.322 10 X 0.36572-29 72-5 72-872-3272-672-5772-32 72-3074-4572-2972-2772-2672-2372-2472-2172-2072-18 72-1572-1772-1472-1272-11 72-9 72-8 72-6 72-574-5274-5474-45A74-5174-4974-4874-46 74-5774-55 ZONE 83 V-434 HV-306SI-87 H-2SI-78H-1SI-87 H-1 SI-87 H-11SI-A-078-FCBA-10SI-A-087-FCBA-10LPSIPUMP ADISCHARGEEL 46-9TOG EL.51-6EL 62-9EL 62-9W DISCHARGE SI-78 H-3 W W W B B C B B B3INT-ISI-2 Rev. 4 157 of 210 UNIT 2 ZONE 72 LPSI PUMP A REFERENCE DRAWINGSN001-11.01-3672-3A W 72-3C W 72-3B WVIEW LOOKING DOWNWELDED SUPPORT FEETAND SUPPORT COLUMNSTWENTY-FOUR 2 DIAMETER STUDS(21 @ 9.5 LONG AND 3 @ 8.88 LONG)

DISCHARGEZONE 71 SUCTIONZONE 70N001-11.01-50 NOTES:1) TAG NUMBER: 2MSIAP012) SERIAL NUMBER: 0876-40 INGERSOL RAND B B B3INT-ISI-2 Rev. 4 158 of 210 UNIT 2 ZONE 73 LPSI PUMP ROOM B SUCTION REFERENCE DRAWINGS 02-P-SIF-202 V-200C/L EL. 41 10LPSIPUMP B SUCTIONSI-B-308-GCBC-20LINE #DIA X SCHFROMTOSI-308SI-308SI-194 SI-34 14 X 0.312 20 X 0.375 18 X 0.312 16 X 0.31271-6371-4971-44 71-105 71-69 71-61 71-4771-111SI-308 H-12 SI-308 H-1371-50 71-10571-10771-49 71-108 71-11071-4671-44 71-5271-111 71-4771-53 71-55 71-5671-5871-59 71-60 71-6171-64 71-65 71-63 71-66 71-6871-69SI-B-308-GCBC-14SI-B-194-GCBC-18 SI-34 H-4SI-B-034-GCBC-16 ZONE 95 ZONE 79 ZONE 104 W W B B B3INT-ISI-2 Rev. 4 159 of 210 UNIT 2 ZONE 74 LPSI PUMP ROOM BREFERENCE DRAWINGS02-P-SIF-208 V-447LINE #DIA X SCHFROMTOSI-129SI-129SI-123 8 X 0.322 10 X 0.365 10 X 0.365 73-5 73-873-2773-675-5173-30 73-28 75-39 73-27 73-25 73-24 73-21 73-22 73-19 73-17 73-15 73-1273-14 75-48 75-4075-51 75-49 ZONE 86 V-446 HV-307 SI-129 H-5 SI-129H-6SI-129 H-1SI-B-123-FCBA-10SI-B-129-FCBA-10 LPSI PUMP B DISCHARGE EL 46-9EL 62-9SI-129 H-4 73-9 73-8EL 62-9ZONE 79 75-46 75-45 75-43 75-42 73-673-5SI-129 H-2 SI-129H-3 73-30 DISCHARGE 73-8573-11 W W W B C C B B C3INT-ISI-2 Rev. 4 160 of 210 UNIT 2 ZONE 75 LPSI PUMP B REFERENCE DRAWINGSN001-11.01-3673-3A W 73-3C W 73-3B WVIEW LOOKING DOWNWELDED SUPPORT FEETAND SUPPORT COLUMNSTWENTY-FOUR 2 DIAMETER STUDS(21 @ 9.5 LONG AND 3 @ 8.88 LONG)

DISCHARGEZONE 74 SUCTIONZONE 73N001-11.01-50 NOTES:1) TAG NUMBER: 2MSIBP012) SERIAL NUMBER: 0876-41 INGERSOL RAND B B B3INT-ISI-2 Rev. 4 161 of 210 UNIT 2 ZONE 76 CONTAINMENT SPRAY PUMP ROOM A SUCTION REFERENCE DRAWINGS 02-P-SIF-201 V-157SI-9 H-4EL. 41 10 CONTAINMENTSPRAY PUMP A SUCTIONLINE #DIA X SCHFROMTOSI-067SI-067SI-009SI-009 16 X 0.312 14 X 0.312 14 X 0.312 18 X 0.31270-11070-113 80-1 80-570-11180-1680-480-13 02-P-SIF-207 V-18470-111 72-35 72-33 70-11470-110 70-113 80-19 80-18 80-1780-1680-1080-2080-980-11 80-8 80-7 80-2 80-1SI-67 H-3 SI-67 H-2SI-67 H-1 ZONE 70 ZONE 71 ZONE 82 EL. 70EL. 47 10SI-A-009-GCBC-18SI-A-078-FCBA-10SI-07810 X 0.36572-3372-35SI-A-067-GCBC-14 W80-1380-12 80-6 80-5 80-4 80-3ZONE 102 W B B B B3INT-ISI-2 Rev. 4 162 of 210 UNIT 2 ZONE 77 CONTAINMENT SPRAY PUMP ROOM A DISCHARGE REFERENCE DRAWINGS 02-P-SIF-207LINE #DIA X SCHFROMTOSI-079SI-079SI-082 8 X 0.322 10 X 0.365 10 X 0.365 82-1A 82-182-31-82-2782-35 HV-684SI-A-082-FCBA-10 V-485 82-27 82-2482-22 82-20 82-2182-1982-18 82-1782-13 82-682-2382-31 82-16 82-12 82-1482-11 82-10 82-582-9 82-8 82-7 82-4 82-3SI-79 H-9 SI-79 H-5SI-79 H-8 SI-79 H-6 SI-79 H-7SI-79 H-3SI-79 H-2 SI-79 H-1SI-79 H-4SI-A-079-FCBA-10SI-A-079-FCBA-10SI-82 H-282-33 82-34 82-32 82-35CONTAINMENTSPRAY PUMP ADISCHARGE ZONE 82 ZONE 83TOGEL 51-6EL 70W EL 70EL 53-6EL 58-682-15 82-1A 82-1 82-2 82-2682-2582-28 82-29 W W W W W B B C B B B B B B C3INT-ISI-2 Rev. 4 163 of 210 UNIT 2 ZONE 78 CONTAINMENT SPRAY PUMP A REFERENCE DRAWINGSN001-11.01-3680-3A W 80-3C W 80-3B WVIEW LOOKING DOWNWELDED SUPPORT FEETAND SUPPORT COLUMNSTWENTY-FOUR 2 DIAMETER STUDS(21 @ 9.5 LONG AND 3 @ 8.88 LONG)

DISCHARGEZONE 77 SUCTIONZONE 76 NOTES:1) TAG NUMBER: 2MSIAP032) SERIAL NUMBER: 0876-42 INGERSOL RAND B B B3INT-ISI-2 Rev. 4 164 of 210 UNIT 2 ZONE 79 CONTAINMENT SPRAY PUMP ROOM B SUCTION REFERENCE DRAWINGS 02-P-SIF-202 V-185CONTAINMENTSPRAY PUMP B SUCTIONLINE #DIA X SCHFROMTOSI-033SI-033SI-034SI-034 14 X 0.312 18 X 0.312 14 X 0.312 16 X 0.312 81-1 81-581-1571-10381-4 81-12 71-101 71-104 02-P-SIF-208 71-104SI-B-033-GCBC-18SI-12310 X 0.36573-3173-33 V-158 73-3381-19 81-1881-17 81-16 81-981-8 81-15 81-3 81-171-103 71-10171-10073-31SI-33 H-4SI-34H-3SI-34H-1 SI-34 H-6SI-B-034-GCBC-14SI-B-033-GCBC-14SI-B-034-GCBC-16SI-B-123-FCBA-10 ZONE 73ZONE 74 ZONE 85 EL 70EL 41-10EL 47-10 81-5 81-281-481-6 81-7 81-1281-1081-11 ZONE 104 W B B B C3INT-ISI-2 Rev. 4 165 of 210 UNIT 2 ZONE 80 CONTAINMENT SPRAY PUMP ROOM B DISCHARGE REFERENCE DRAWINGS 02-P-SIF-208LINE #DIA X SCHFROMTOSI-119SI-119SI-147 8 X 0.322 10 X 0.365 10 X 0.365 83-1A 83-183-30-83-26 83-34 V-484SI-119 H-7SI-B-119-FCBA-10 HV-689SI-B-147-FCBA-10SI-B-119-FCBA-10 83-183-1183-2 83-1A 83-3 83-5 83-12 83-4 83-6 83-7 83-1383-9 83-14 83-34 83-3283-8 83-10 83-3383-31 83-15 83-30 83-16 83-18 83-1783-19 83-2083-2283-2383-2483-2583-26CONTAINMENTSPRAY PUMP BDISCHARGE ZONE 86 ZONE 85 EL 58-6TOG EL 51 6EL 70EL 7083-21EL 63-0EL 53-6EL 49-2SI-119 H-9SI-119 H-8 SI-119 H-6 SI-119H-2 SI-119 H-1 SI-119H-3 SI-119 H-4 SI-119 H-5 WSI-147 H-183-60 W W W B B C C C B B C B C3INT-ISI-2 Rev. 4 166 of 210 UNIT 2 ZONE 81 CONTAINMENT SPRAY PUMP B REFERENCE DRAWINGSN001-11.01-3681-3A W 81-3C W 81-3B WVIEW LOOKING DOWNWELDED SUPPORT FEETAND SUPPORT COLUMNSTWENTY-FOUR 2 DIAMETER STUDS(21 @ 9.5 LONG AND 3 @ 8.88 LONG)

DISCHARGEZONE 80 SUCTIONZONE 79 NOTES:1) TAG NUMBER: 2MSIBP032) SERIAL NUMBER: 0876-43 INGERSOL RAND B B B3INT-ISI-2 Rev. 4 167 of 210 UNIT 2 ZONE 82 SHUTDOWN COOLING HEAT EXCHANGER ROOM AREFERENCE DRAWINGS 02-P-SIF-207 HV-685LINE #DIA X SCHFROMTOSI-078SI-078SI-079 10 X 0.365 20 X 0.500 10 X 0.36572-3672-4982-28 72-48 72-52 72-61 HV-678SI-A-078-FCBA-20SI-78 H-5 72-52 72-4972-49A72-4872-4772-4572-44 72-42 72-41 72-3972-38 72-3672-5072-49B72-6072-61 72-5872-5772-55 72-5482-3082-2982-28SI-79 H-10 CS/SSSI-A-078-FCBA-10SI-A-079-FCBA-10 ZONE 77 ZONE 76 SDCHX A INLETNOZZLESI-78 H-4 W W W B B C3INT-ISI-2 Rev. 4 168 of 210 UNIT 2 ZONE 83 SHUTDOWN COOLING HEAT EXCHANGER ROOM AREFERENCE DRAWINGS 02-P-PCF-201LINE #DIA X SCHFROMTOSI-070SI-070SI-070 20 X 0.500 16 X 0.375 20 X 0.500 74-174-2174-27 74-19 74-25 74-27 V-458SI-89 H-574-98SI-A-090-FCBA-14 02-P-SIF-203 02-P-SIF-207SI-082SI-087SI-089 10 X 0.365 10 X 0.365 10 X 0.36582-3674-5874-77 82-38 74-74 82-44SI-08910 X 0.36582-3982-40SDCHX A OUTLET NOZZLEZONE 77ZONE 94 ZONE 94ZONE 71SI-89 H-3SI-87H-4SI-87 H-5SI-87H-8SI-87H-7SI-87H-6SI-87 H-9SI-82 H-1SI-89 H-2SI-89H-1 WSI-90 H-1 W SI-90 H-2SI-90H-4SI-70 H-6SI-70 H-7 SI-70 H-2SI-70 H-3 WSI-70H-1 W74-2774-7574-2574-2474-2274-1974-104A74-2174-1874-1674-1574-9674-1374-1074-7674-1274-974-774-674-474-374-174-9774-5874-6374-6174-6774-11874-11774-11274-11474-11574-10974-11174-10874-10674-10574-6474-6074-6674-6974-7074-7174-7374-7482-3982-4282-3682-3882-3774-7774-10074-9974-8674-8074-7874-8374-8474-8182-4382-4482-4182-4074-87 HV-657 HV-687 HV-686 HV-688 V-460SI-A-070-FCBA-20SI-A-087-FCBA-10 SI-E-131-FCBA-6SI-A-089-FCBA-10SI-A-082-FCBA-10 CS/SSSI-09014 X 0.37574-10574-118SI-131 6 X 0.28074-9774-10074-157 W W W W W W W B B A B B C B B C B B C B B C B B C B3INT-ISI-2 Rev. 4 169 of 210 UNIT 2 ZONE 84 SHUTDOWN COOLING HEAT EXCHANGER A 74-121 74-122 74-12474-123INLET NOZZLE - ZONE 82OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 83NOTES:1) TAG NUMBER: 2MSIAE012) SERIAL NUMBER: S-18343 (ENGR & FABRICATORS)3) NATIONAL BOARD NUMBER 17104) ZERO DEGREE FOR GIRTH WELDS IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.

REFERENCE DRAWINGS:N001-7.03-020 N001-7.03-25 30 deg.30 deg.Inconel Weld SA-105 Clad 74-121 75-122DETAILN001-11.01-209 TUBE SHEETCHANNEL HEAD CROSS SECTION 1/8 CLAD 1-7/1664 STUDS1.5 X 173INT-ISI-2 Rev. 4 170 of 210 UNIT 2 ZONE 85REFERENCE DRAWINGS 02-P-SIF-208 HV-694LINE #DIA X SCHFROMTOSI-119SI-123SI-123 10 X 0.365 10 X 0.365 20 X 0.50083-2773-3473-48 73-63 73-46 73-54 HV-679SI-119 H-14SI-B-123-FCBA-10SI-119H-13SI-119 H-11SI-119 H-10 SI-123 H-2SI-123 H-8SI-123 H-5SI-123 H-6SI-123 H-7 73-62 73-63 73-60 73-5973-57 73-56 83-2983-2873-34 83-2773-36 73-37 73-4073-39 73-42 73-45 73-45A 73-43 73-46 73-48 73-4773-64 73-49 73-51 73-52SI-B-123-FCBA-20SI-B-119-FCBA-1073-54 CS/SSZONE 80 ZONE 79SDCHX BINLET NOZZLET OF EL 70T OF EL 70 EL 75EL 75EL 80-2EL 80-2SHUTDOWN COOLING HEAT EXCHANGER ROOM BSI-123 H-1 W W W W W W B B B B C B B C B B3INT-ISI-2 Rev. 4 171 of 210 UNIT 2 ZONE 86 SHUTDOWN COOLING HEATREFERENCE DRAWINGS 02-P-PCF-201LINE #DIA X SCHFROMTOSI-072SI-072SI-072 20 X 0.500 16 X 0.375 20 X 0.500 75-175-1975-25 75-17 75-23 75-26 HV-696SI-B-147-FCBA-10SI-129SI-131SI-134 10 X 0.365 6 X 0.280 10 X 0.36575-5375-8175-62 75-61 75-84 75-72SI-134SI-135 10 X 0.365 14 X 0.37583-3875-87 83-43 75-100SI-72 H-3SI-72 H-4SI-72 H-2SI-72 H-1 WSI-72 H-12 W SI-72 H-5 SI-72 H-6 SI-147 H-2SI-134 H-8SI-134 H-3SI-134 H-2SI-134 H-1 SI-134H-6 SI-134 H-5 SI-134 H-7SI-135 H-1SI-135 H-3 SI-135 H-2SI-129 H-11SI-129 H-10 SI-129 H-12 SI-129H-9 SI-129H-8 SI-129H-7 SI-129H-1375-5875-6075-1475-2675-2575-2375-9075-5575-2275-2075-8875-1975-9175-9975-5675-1775-1675-8775-9675-10075-1375-9375-8175-8275-1275-8375-11A75-1175-875-9775-8475-975-7275-7175-6975-6875-775-6675-6575-6375-575-6275-275-475-175-5483-3675-5375-6175-9483-3783-3883-3983-4283-4383-3583-4083-41 ZONE 80 SDCHX BOULLETNOZZLE ZONE 74 ZONE 95ZONE 95SI-B-129-FCBA-10SI-B-135-FCBA-14SI-B-072-FCBA-20 HV-695 HV-693 V-464 V-455 HV-658SI-B-134-FCBA-1002-P-SIF-20402-P-SIF-208 EXCHANGER ROOM B75-94ASI-14710 X 0.36583-3583-37SI-E-131-FCBA-6 W W W W W W W W W W B B C B C B C C B C B B C C C C C C C C B C B B CSI-B-134-FCBA-103INT-ISI-2 Rev. 4 172 of 210 UNIT 2 ZONE 87 SHUTDOWN COOLING HEAT EXCHANGER B75-7675-7775-79 75-78INLET NOZZLE - ZONE 85OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 86NOTES:1) TAG NUMBER: 2MSIBE012) SERIAL NUMBER: S-18344 (ENGR & FABRICATORS)

REFERENCE DRAWINGS:N001-7.03-020 N001-7.03-253) NATIONAL BOARD NUMBER 17114) ZERO DEGREE FOR GIRTH WELDS IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.

30 deg.30 deg.Inconel Weld SA-105 Clad 75-76 75-77DETAILN001-11.01-209 TUBE SHEETCHANNEL HEAD CROSS SECTION 1/8 CLAD 1-7/1664 STUDS1.5 X 173INT-ISI-2 Rev. 4 173 of 210 UNIT 2 ZONE 88 EAST WRAPREFERENCE DRAWINGSLINE #DIA X SCHFROMTO SI-072 SI-072 SI-072 12 X 0.375 12 X 1.125 20 X 0.50078-2 78-13 75-3578-1178-1475-38SI-E-174-CCBA-12 SI-073 SI-073 SI-155 12 X 0.375 12 X 1.125 12 X 1.12579-1 79-13 78-1679-1179-1478-21 SI-172 SI-174 10 X 0.365 12 X 1.12578-10C 79-16 78-10D79-21 02-P-SIF-208 17 1879-179-779-679-879-1079-1379-1179-1479-1679-1779-1879-1979-2079-2175-3875-3675-3775-3578-1178-10K78-10J78-1378-10C78-2078-10B78-1978-10A78-9J78-878-2178-1878-1778-10D78-1678-9G78-9F78-778-1478-9K78-9C78-678-978-578-378-2 ZONE 89 ZONE 98ZONE 99 SI-73 H-1SI-72 H-16SI-72 H-17SI-72 H-15SI-72 H-11SI-72 H-14SI-72 H-13 SI-72 H-18SI-72H-22SI-72 H-21 SI-72 H-20 w SI-73 H-3 SI-73 H-2 UV-615 HV-690 UV-625SI-B-073-FCBA-12SI-B-072-FCBA-20SI-E-155-CCBA-12SI-E-172-FCBA-10SI-72H-19ZONE 95 W W W C C B B C B B C C C C B C C3INT-ISI-2 Rev. 4 174 of 210 UNIT 2 ZONE 89 EAST WRAPREFERENCE DRAWINGS02-P-SIF-202 SI-173 H-1 w HV-690SI-E-173-GCBC-16 2602-P-SIF-208 SI-194 H-13 SI-194H-12SI-194 H-14SI-194 H-2371-8171-8471-8571-87A71-9471-771-7171-9371-7371-7571-9171-7871-9071-1871-7071-7671-7971-8271-1671-8871-571-1471-1171-871-471-271-1ZONE 88TOG87-3SI-B-038-GCBC-12SI-B-194-GCBC-18SI-B-194-GCBC-16 ZONE 101 ZONE 95 UV-656 V-442LINE #DIA X SCHFROMTOSI-38 SI-173 SI-173 12 X 0.250 16 X 0.312 10 X 0.250 71-90 71-70 71-7371-9471-7171-87A SI-173 SI-194 10 X 0.365 16 X 0.312 71-8871-1 11SI-19418 X 0.31271-1371-1871-21071-1371-1071-208 W W B B B B C3INT-ISI-2 Rev. 4 175 of 210 UNIT 2 ZONE 90 EAST WRAP REFERENCE DRAWINGS 02-P-SIF-202 24 02-P-SIF-208 ZONE 101 V-206UV-67685-1185-985-690-51SI-B-308-GCBC-24SI-B-030-HCBA-24EL 73-7ZONE 104LINE #DIA X SCHFROMTO SI-030 SI-134 SI-13424 X 0.37510 X 0.3658 X 0.32285-6 83-53 83-58 85-8 83-57 83-59SI-30824 X 0.56285-985-11 SI-134 H-10 UV-671 ZONE 95 SI-134H-983-5983-5383-5483-5883-5583-5683-57SI-B-134-FCBA-10EL 95W 22 ZONE 121SI-B-130-GCBC-1090-4190-4290-4390-4490-4590-4690-40SI-130 H-2SI-13010 X 0.36590-4290-46SI-1308 X 0.32290-4090-41 B B B90-503INT-ISI-2 Rev. 4 176 of 210 UNIT 2REFERENCE DRAWINGS 02-P-SIF-207 UV-645LINE #DIA X SCHFROMTOSI-070SI-070SI-070SI-07120 X 0.50012 X 0.37512 X 1.12512 X 0.375 74-42 76-2 76-1374-10374-4476-1176-1477-11SI-71 H-3SI-A-070-FCBA-12SI-07112 X 1.12577-1377-14SI-07110 X 0.36577-10C77-10DSI-20212 X 1.12576-1676-21 SI-22012 X 1.12577-1677-21 UV-635 HV-69176-1176-2 76-3 76-5 76-6 76-7 76-876-1376-1076-1476-1676-1776-1876-1976-2076-21SI-E-202-CCBA-12SI-A-071-FCBA-12SI-E-220-CCBA-12SI-A-070-FCBA-2074-4277-7 74-43 74-10374-104 74-102 77-8 77-16 77-13 77-1177-2177-10C 77-20 77-10D 77-19 77-10B77-1877-10A 77-14 77-10 77-17 SI-70 H-10SI-71 H-2SI-70 H-13SI-70 H-11 W SI-70 H-16 WSI-70 H-14SI-70 H-9 W SI-70 H-15 74-44ZONE 94 ZONE 97 ZONE 96TOGEL 87-3TOGEL 87-3TOGEL 87-3TOGEL 87-3ZONE 92SI-70 H-12 W 19 20 ZONE 91WEST WRAP B B B B C C B B B C B3INT-ISI-2 Rev. 4 177 of 210 UNIT 2 ZONE 92 WEST WRAP REFERENCE DRAWINGSLINE #DIA X SCHFROMTO SI-002 SI-239 SI-23912 X 0.25010 X 0.25010 X 0.365 70-85 70-70 70-8370-98 70-82A-SI-241 SI-24116 X 0.31218 X 0.31270-1 70-1670-1470-22 02-P-SIF-201 2770-97 SI-239 H-1SI-241 H-12SI-241 H-21 wHV-691SI-A-002-GCBC-12 02-P-SIF-20770-9570-9470-8970-9270-8870-8670-1370-9170-2070-1970-1470-1770-1170-1070-7370-2270-8570-16A70-870-1670-770-7070-7770-570-7170-7470-7970-7670-8070-82A70-8370-470-270-9870-1B70-1A70-1 SI-239 H-2SI-239 H-3 wSI-241 H-14SI-241 H-15 SI-241 H-11 SI-241H-9EL. 84-3EL 78-9EL 87-3EL 87-3ZONE 100ZONE 94UV-655 V-256EL 70SI-E-239-GCBC-10SI-A-241-GCBC-16 ZONE 91 W W C B C B B C B B C3INT-ISI-2 Rev. 4 178 of 210 UNIT 2 ZONE 93 WEST WRAP 23 ZONE 100V-205 UV-67484-1184-984-693-51SI-A-307-GCBC-24EL 73-7SI-A-007-HCBA-24 ZONE 102REFERENCE DRAWINGS 02-P-SIF-201 02-P-SIF-207LINE #DIA X SCHFROMTOSI-089SI-089SI-007 8 X 0.322 10 X 0.365 24 X 0.37582-6682-55 84-682-6782-6584-8SI-30724 X 0.56284-984-11 UV-672ZONE 94SI-89 H-1182-5582-5682-5782-5882-5982-6182-6282-6082-6382-6482-6582-6682-67SI-89H-10 SI-89 H-13SI-89H-12 WEL 92-6EL 84-8TOGEL 87-3TOGEL 87-3SI-A-089-FCBA-10 21ZONE 12093-4393-4193-4093-42SI-A-088-GCBC-10SI-08810 X 0.36593-4293-43SI-0888 X 0.32293-4093-41 B C B BEL 89-993-503INT-ISI-2 Rev. 4 179 of 210 UNIT 2 ZONE 94 A TRAIN MISC. PIPE CHASES AND 88 PIPE TUNNELREFERENCE DRAWINGS; 02-P-SIF-201 02-P-SIF-207LINE #DIA X SCHFROMTO SI-070 SI-089 SI-24120 X 0.50010 X 0.36518 X 0.312 74-28 82-45 70-2374-4182-5470-43 SI-89 H-7SI-A-241-GCBC-18SI-70H-8 W82-4582-4682-4982-4782-4882-5082-5182-5282-5382-54SI-89 H-8SI-89 H-9SI-89H-670-3470-3370-3070-3170-2870-2570-2770-2470-2370-4070-4170-4370-3670-3770-39SI-241 H-8 SI-241H-17SI-241 H-7 SI-241 H-4SI-241 H-3SI-241 H-2SI-241 H-5SI-241 H-674-3074-2874-3174-3274-3474-3574-3774-3874-40SI-70 H-5 W SI-70 H-474-41SI-A-089-GCBC-10SI-A-070-FCBA-20EL 72EL 89-4EL 92-6EL 64EL 41-10EL 90-2ZONE 83ZONE 91 ZONE 93ZONE 92 ZONE 70EL 88ZONE 83 W W W W W W W B B B B B B B B C B B B B B B3INT-ISI-2 Rev. 4 180 of 210 UNIT 2 ZONE 95 B TRAIN MISC. PIPE CHASES AND 88 PIPE TUNNELREFERENCE DRAWINGS; 02-P-SIF-202 02-P-SIF-208LINE #DIA X SCHFROMTOSI-072SI-134SI-194 20 X 0.500 10 X 0.365 18 X 0.31275-2783-4471-19 75-33 83-52 71-43 SI-194 H-6 WSI-134 H-12SI-B-134-FCBA-1071-4071-3971-3771-3671-2671-3471-4371-3371-3271-2571-4171-3071-2971-2371-2771-2271-2071-19 SI-194 H-7 SI-194H-2 SI-194 H-8SI-194 H-15SI-194 H-4 SI-194 H-10SI-194 H-21 SI-194 H-9 SI-194 H-11SI-194 H-583-4783-4483-4583-4683-4983-4883-5083-5183-52 SI-134H-1175-3375-3175-3075-2975-27SI-72H-8SI-72 H-10SI-72H-9SI-72 H-7EL 92-6ZONE 88EL 72ZONE 86EL 88ZONE 86 ZONE 90EL 95EL 92-1ZONE 73EL 41-10EL 89-9ZONE 89SI-B-072-FCBA-20SI-B-194-GCBC-18 SI-134H-4 W W W W W W W W B B C B B C B B B B B B B B B B C C3INT-ISI-2 Rev. 4 181 of 210 UNIT 2 ZONE 96CONTAINMENT LPSI HEADER TO LOOP 1A V-542 ZONE 91LINE #DIA X SCHFROMTO SI-202 SI-20212 X 1.12512 X 1.312 76-22 76-2776-2576-4776-25SI-202 H-17 SI-202 H-12 WSI-E-202-CCBA-12 19REFERENCE DRAWINGS 02-P-SIF-103 A A SI-202 H-7 SI-202H-676-2876-3976-4076-4176-4276-4476-4376-4576-4676-47SI-202 H-18 SI-202 H-2 SI-202H-3 SI-202 H-4SI-202 H-16SI-202 H-176-3076-3176-2776-3276-3476-2976-3576-3776-3376-3876-3676-2376-2276-24SI-E-202-CCBA-12 ZONE 23FL EL 100EL 89-9V-134ZONE 11476-79SI-202 H-15 B C B B B B B B B B B3INT-ISI-2 Rev. 4 182 of 210 UNIT 2 ZONE 97CONTAINMENT LPSI HEADER TO LOOP 1B V-144 ZONE 91LINE #DIA X SCHFROMTOSI-220SI-220 12 X 1.125 12 X 1.31277-2277-27 77-25 77-47SI-E-220-CCBA-12REFERENCE DRAWINGS 02-P-SIF-103 A77-28C 20 A ZONE 24EL 89-9SI-220 H-18 SI-220 H-15SI-220 H-20 SI-220 H-17 SI-220 H-13SI-220 H-12SI-220 H-1077-28B77-3877-3977-3177-3477-3077-2877-28A77-2977-28D77-3777-3577-3677-3277-3377-4077-5277-2377-2277-38A77-2577-2477-2777-4677-4577-46B77-46A77-4277-4177-4477-4377-4777-46F77-46D77-46C77-46G77-46ESI-220 H-24 SI-220 H-8SI-220 H-7SI-220 H-23SI-220 H-5SI-220 H-27SI-220 H-9 SI-220H-19 V-543SI-E-220-CCBA-12 SI-220 H-1ZONE 11477-83 W W W B B B B B B B B B B B B B B B B3INT-ISI-2 Rev. 4 183 of 210 UNIT 2 ZONE 98CONTAINMENT LPSI HEADER TO LOOP 2AV-114 ZONE 88LINE #DIA X SCHFROMTO SI-155 SI-15512 X 1.12512 X 1.312 78-22 78-2778-2578-47SI-E-155-CCBA-12REFERENCE DRAWINGS02-P-SIF-13678-32 17SI-155 H-7 SI-155H-2SI-155 H-6 SI-155 H-578-3378-3578-3478-3878-3978-3778-4278-3678-4078-4178-4478-4378-4578-4678-4778-3078-2978-2878-2578-2778-2478-2378-2278-31 ZONE 25V-540 FL EL100EL 89-9ZONE 11578-78 W W B B B B3INT-ISI-2 Rev. 4 184 of 210 UNIT 2 ZONE 99CONTAINMENT LPSI HEADER TO LOOP 2B ZONE 88LINE #DIA X SCHFROMTO SI-174 SI-17412 X 1.12512 X 1.312 79-23 79-2779-2579-47REFERENCE DRAWINGS 02-P-SIF-136 18SI-174 H-12V-541 ZONE 26SI-174 H-11 SI-174 H-5SI-174 H-4SI-174H-10 SI-174 H-13 SI-174 H-8 W79-2379-2579-4179-2779-3579-3479-3679-3779-4279-3879-3979-4079-4479-4379-4579-4679-47 V-124EL 93-5SI-E-174-CCBA-12ZONE 11579-70 W W B C B B C B B3INT-ISI-2 Rev. 4 185 of 210 UNIT 2 ZONE 100CONTAINMENT LPSI TRAIN A SUCTION ZONELINE #DIA X SCHFROMTO SI-007 SI-24124 X 0.37516 X 0.31284-270-116 84-370-119 27V-673SI-241H-1984-5 W84-3SI-A-007-HCBA-24 23 SI-369H-1 W84-270-13470-13270-13170-12870-12270-12970-12670-12570-11770-12370-119 70-12070-121 V-653PSV-17970-116 92ZONE 93SI-A-241-GCBC-16SI-A-369-GCBC-10SI-24116 X 1.59470-12070-121SI-36910 X 0.25070-12270-132 SI-3696 X 0.28070-134-REFERENCE DRAWINGS 02-P-SIF-105 02-P-SIF-15113-P-ZCG-112 ZONE 21 B B C3INT-ISI-2 Rev. 4 186 of 210 UNIT 2 ZONE 101CONTAINMENT LPSI TRAIN B SUCTIONLINE #DIA X SCHFROMTO SI-030 SI-19424 X 0.37516 X 0.31285-271-112 85-371-121 26 V-675 SI-194 H-2285-5 W85-3SI-A-030-HCBA-24 24PSV-189 ZONE 90SI-A-194-GCBC-16SI-A-368-GCBC-10SI-19416 X 1.59471-12271-123SI-36810 X 0.25070-12471-143SI-3686 X 0.28071-145-REFERENCE DRAWINGS 02-P-SIF-105 02-P-SIF-151 13-P-ZCG-112 ZONE 89 SI-194H-16SI-194 H-26SI-368 H-271-11271-12371-12471-12171-11971-12571-11871-12771-14871-13671-12271-11671-11571-14971-11371-15171-13171-13771-13071-13371-13471-14071-13971-14271-14371-145 ZONE 22UV-65485-2 W W B B C B B3INT-ISI-2 Rev. 4 187 of 210 UNIT 2LINE#DIA/SCHFROMTOSI-30724" x 0.562"84-1284-37SI-30720" x 0.375"84-3984-46 SI-918" x 0.312"80-1484-87SI-810" x 0.250"84-5184-84 REFERENCE DWG'S 02-P-SIF-201 ZONE 93 WEST WRAP84-12V-205EL72'84-14 84-16 H2SI-A-307-GCBC-24" 84-18 84-20 84-22 84-26 84-24 84-5184-2884-2984-31 84-53SI-A-008-GCBC-10"84-55 84-57 84-59 84-61 84-63 84-65 84-67 84-6984-7184-72V-470 84-74 84-75 84-7784-7984-80 84-82 84-84HPSI PUMP #1 84-33 84-87 84-86 SI-A-009-GCBC-18" 84-35 84-37 84-39 84-50V-105 80-15 80-14V-157 ZONE 76CSP SUCTIONSI-A-307-GCBC-20" 84-85 84-41 84-43HV-68384-44 84-46V-201 ZONE 70LPSI "A" SUCTIONCONT. ONCONT. ONCONT. ONSI-307 W 84-34CONT. ON ZONE 103 RWT SUCTION H6 H7 H8 H1 H2 H5 H4 H3 H1 H5SI-008 SI-008 SI-008SI-008SI-009SI-009SI-009SI-307 SI-307 SI-30784-48H15 SI-307 W H3SI-307 W H10 SI-307 H5SI-307ZONE 116 ZONE 102 SAFETY INJECTION PUMPS A TRAIN SUCTION W W W W W W W W W B B B B B B B B B B B B B BSI-008-H002REMOVED PER EDC 94-004663INT-ISI-2 Rev. 4 188 of 210 UNIT 2 86-20 86-14 86-12 86-18 86-16 25 86-27 86-29 86-31V-306 86-5 86-86-23 CH-A-142-HCBA-20" 86-33 86-1 86-35 86 86-10 8 86-86-7 86-3 86-5SI PUMP SUCT.

CH-A-424-GCBC-20"HV531ZONE 102 REFUELINGWATERTANK 86-59 86-57 CH-A-142-HCBA-20" 86-51 86-49 86-47 86-62 86-45 86-4386-41 86-60 86-55 86-53 86-37 ESSENTIAL PIPE TUNNEL 88'AUX BLDG 86-39LINE#DIA/SCHFROMTOCH- 42420" x 0.375"86-186-20CH- 14220" x 0.375"86-2186-59 Reference DWG'S.

02-P-SIF-20102-P-ZYA-925

-21 CONT ON88' PIPE CHASEH20 CH-14270El. 51 6" H14CH-142 H22CH-142 H13 CH-142 H2 CH-424 H3 CH-424 H6CH-424 H8CH-142 H1 CH-424 H4 CH-142 H6 CH-142 H1 CH-142 H3CH-142 H2CH-142 W W ZONE 103 REFUELING WATER SUCTION A TRAIN W W W W W W W B B B B B B B B B B B B B B3INT-ISI-2 Rev. 4 189 of 210 UNIT 2LINE#DIA/SCHFROMTOSI-30824" x 0.562"85-1285-37SI-30820" x 0.375"85-3885-49SI-3318" x 0.312"85-5081-13SI-3110" x 0.250"85-5985-80 CH-1503 X 0.216104-1104-5 REFERENCE DWG'S 02-P-SIF -202 ZONE 90EAST WRAP 85-12 85-1485-1885-20 85-22 85-24 85-26 85-2885-59 85-6185-6985-6385-6585-67 85-7185-72V-206V-402 85-7485-7585-77 85-78SI-B-031-GCBC-10" 85-80 85-29 85-3185-3885-3785-50SI-B-033-GCBC-18"V-15881-14V-104 81-13 85-58 85-56 85-5485-52ZONE 79CONT. SPRAYPUMP "B" SUCT.V-200 85-49 85-47 85-46HV-69285-44 85-42SI-B-308-GCBC-20" SI-B-308-GCBC-24" 85-40 85-33 85-3485-36ZONE 105RWT SUCT.T.O.G. EL. 70'6" HPSI PUMP #2 LPSI PUMP"B" SUCT.CONT. ON W H3 H1 H4CONT. ONCONT. ONZONE 73CONT. ON H3H15SI-308 H1 H4 H2H11 H5 H8 H9 H5 SI-308 SI-308SI-308 SI-308 SI-308SI-31 SI-31SI-31 SI-033SI-308SI-308 SI-308ZONE 117 ZONE 104 SAFETY INJECTION PUMPS B TRAIN SUCTIONV-327 104-4 104-5 104-3CH-B-150-GCBC-3104-2104-1 85-16 02-P-CHF-206 W W W W W W W W W W B B B B B B B B B B B B C3INT-ISI-2 Rev. 4 190 of 210 UNIT 2 87-75CH-B-149-HCBA-20"LINE#DIA/SCHFROMTOCH-42520" x 0.375"87-187-18CH-14920" x 0.375"87-1987-75 87-73 87-71 87-69 87-67 87-65 87-63 87-6187-5987-57 87-55 87-53 87-5187-49 87-8887-47 87-86 87-4587-8487-43 87-82 87-41 87-8087-39 87-78 87-37 87-35 87-33 87-31 87-29 EL. 88'70'87-27CH-B-149-HCBA-20" 87-25 87-23 87-2187-76 87-19HV53087-18 87-1487-16 EL 51'6" 87-12CH-B-425-GCBC-20" 87-10 87-8V-305 87-7 87-5 87-3 87-1 ZONE 104 SI-PUMP SUCTIONAUX. BLDG.

88'ESSENTIAL PIPE TUNNEL REFUELINGWATER TANKCONT. ON Reference DWG'S.

02-P-SIF-20202-P-ZYA-925 W W WH21 CH-149 H13CH-149H10 CH-149H12 CH-149 H27CH-149H25 CH-149 H26 CH-149 H2CH-149 H6CH-149 H4CH-149 H5CH-149 H8CH-149 H14CH-149 H3CH-149 H1CH-149 H1CH-425 H6CH-425 H9CH-149 ZONE 105 REFUELING WATER SUCTION B TRAIN W W W W W W W W W W W H7 CH-149 W B B B B B B B B B B B B B B B B B B B3INT-ISI-2 Rev. 4 191 of 210 UNIT 2REFERENCE DRAWINGSLINE #DIA X SCHFROMTOSI-099SI-100SI-100 4 X 0.337 4 X 0.438 4 X 0.438106-1106-7106-24 106-6106-44106-28 HV-604 SI-A-100-CCBA-4 SI-105 H-BSI-100 H-2SI-99 H-1SI-100 H-9SI-100 H-10SI-100 H-1SI-100 H-8SI-100 H-6 SI-100 H-5 SI-105H-DSI-105 H-C SI-100 H-3 SI-106 H-1 SI-99 H-2106-68106-69106-17106-44106-65106-72106-6106-24106-20106-4106-70106-71106-66106-49106-18106-25106-59106-32106-29106-1106-33106-21106-50106-30106-67106-12106-7106-42106-40106-51106-10106-23106-48106-22106-8106-41106-9106-16106-31106-38106-36106-47106-35106-3106-39106-2106-5106-46106-19106-45106-27106-43106-61106-37106-60106-62ZONE 108 SI-A-105-CCBB-2SI-A-106-CCBA-3 V424 V-404 V-218 UV-666 02-P-SIF-203 SI-100H-15 SI-100H-7106-14106-13106-15106-11 V-476 HV-698106-54106-52106-56106-57106-58106-63106-55106-53106-64 A APOINT A CONTINUEDTHIS DRAWING POINT ACONTINUEDTHIS DRAWING SI-100 H-34106-26EL 41-2EL 46-3EL 41-2EL 48-10SI-A-105-CCBB-2SI-A-100-CCBA-4SI-100 H-11SI-A-99-CCBB-4SI-1052 X 0.344106-49106-72EL 88SI-1052 X 0.344106-63106-68SI-1063 X 0.438106-45106-48 ZONE 106 HPSI PUMP ROOM A DISCHARGE HPSI A PUMP106-34 EL 51-6106-28SI-100 H-4SI-100 H-16SI-100 H-36 NOTE: SW = SOCKET WELD SW SW SWZONE 118 SI-105 H-J W W W W W W W W W W W W W W W W W W W W A B C B C B B B B B B C B B C B B B B B B B B3INT-ISI-2 Rev. 4 192 of 210 UNIT 2 ZONE 107 HPSI PUMP ROOM B DISCHARGEREFERENCE DRAWINGSLINE #DIA X SCHFROMTOSI-107SI-107SI-107 4 X 0.337 4 X 0.337 3 X 0.438107-1107-23107-68107-41107-27107-71 SI-112 H-DSI-107 H-8 SI-107 H-5SI-107 H-46 SI-107 H-3 SI-107 H-48 SI-107 H-12 SI-107 H-2107-15107-11107-41107-8107-45107-38107-37107-35107-24107-44107-71107-3107-6107-1107-26107-33107-36107-25107-34107-2107-14107-39107-31107-16107-23107-4107-5107-42107-47107-46 ZONE 109SI-B-107-CCBB-4SI-B-107-CCBB-4 V405 HV-609 HV-69902-P-SIF-204 SI-107 H-4107-12107-40107-32107-7107-10107-43107-21107-9POINT A CONTINUEDTHIS DRAWING EL 47-3EL 41-2EL 46-9SI-B-107-CCBA-3SI-B-112-CCBB-2 HPSI B PUMPSI-1122 X 0.344107-42107-65SI-1122 X 0.344107-56107-60SI-1122 X 0.344107-66107-67 DISCHARGE SI-107H-11 SI-107 H-7SI-107 H-6SI-107 H-9SI-107 H-10 V-478107-28107-20107-18107-19107-17107-69107-70107-48107-13107-30107-29107-22107-27107-68SI-112 H-H SI-112 H-G SI-112H-C107-57107-63107-61107-62107-58107-52107-59107-54107-53107-55SI-B-112-CCBB-2 V426 V-219 UV667107-64107-67107-49107-50107-51107-56107-65107-66107-60 APOINT A CONTINUEDTHIS DRAWINGEL 41-2 V400 A EL 44SI-107 H-1EL 46-3EL 48-10EL 51-6NOTE: SW = SOCKET WELD SW SW SWZONE 119 W W W W W W W W W W W W W W B B B B B B B B C A C C B B B B B B3INT-ISI-2 Rev. 4 193 of 210 UNIT 2 ZONE 108 HPSI DISCHARGE 88 PIPE CHASEREFERENCE DRAWINGSSI-A-100-CCBA-402-P-SIF-203SI-100 H-18108-702-P-SIF-204 02-P-CHF-207EL. 89 4SI-100 H-21SI-100 H-26 SI-100H-29SI-100 H-13SI-100H-12SI-100 H-19 SI-100 H-32SI-100 H-35 SI-100 H-31SI-118 H-S SI-118H-R SI-118 H-P SI-118 H-NSI-118 H-E SI-118H-HSI-118 H-A108-17108-8108-16108-13108-12108-9108-11108-2108-18108-4108-14108-5108-19108-6108-15108-27108-26108-33108-35108-31108-25108-39108-22108-40108-41108-38108-32108-28108-29108-37108-34108-36108-24108-23108-20108-21108-30108-43108-44108-42108-45SI-A-100-CCBA-4 SI-E-118-CCBA-2EL. 89 EL. 922 EL. 92EL. 922 EL. 93 10 V508ZONE 112ZONE 106 CHARGING PUMP AZONE 111108-3108-1108-10 SI-100 H-20LINE #DIA X SCHFROMTOSI-100SI-118 4 X 0.438 2 X 0.344 108-1108-35 108-34 108-45 W W W W W W W W W W W W W W B B C B B B B B B C B B B B B B B B3INT-ISI-2 Rev. 4 194 of 210 UNIT 2 ZONE 109 HPSI DISCHARGE 88 PIPE CHASEREFERENCE DRAWINGS SI-B-107-CCBB-4 02-P-SIF-203SI-107 H-25 SI-107H-26 SI-107 H-35SI-107 H-21 SI-107H-20SI-107 H-14SI-107H-13SI-107H-47SI-107H-16 SI-107H-19SI-107H-15 SI-107 H-34SI-107 H-37 SI-107 H-36109-37109-35109-34109-36109-33109-32109-31109-30109-9109-8109-5109-6109-4109-7109-3109-1109-2109-29109-26109-28109-24109-27109-25109-23109-22109-20109-21109-16109-14109-19109-15109-18109-13109-17109-12109-11109-10109-40109-41109-42109-43 02-P-SIF-204 SI-B-107-CCBB-4EL. 88 6EL. 51 8FROMHPSI B 40EL. 89 4EL. 91EL. 89 4EL. 92 2ZONE 107ZONE 113EL. 93 10LINE #DIA X SCHFROMTOSI-1074 X 0.337109-1109-43ZONE 110 W W W W W W W W W B B C B B C B B C B B B B B3INT-ISI-2 Rev. 4 195 of 210 UNIT 2REFERENCE DRAWINGSSI-B-107-CCBB-4 02-P-SIF-203110-24EL. 88 6ZONE 109 SI-236 H-BSI-107 H-ASI-218 H-1SI-218 H-3SI-218 H-2SI-218 H-B SI-110H-ASI-107 H-42 SI-107H-45SI-107 H-41 SI-107 H-39 SI-103H-DSI-103 H-BSI-103H-E110-15110-29110-30110-31110-22110-28110-65110-17110-21110-66110-25110-12110-16110-23110-19110-10110-14110-20110-18110-5110-9110-13110-11110-3110-8110-53110-7110-1110-4110-6110-2110-35110-36110-37110-39110-32110-34110-38110-33110-57110-56110-60110-62110-59110-58110-61110-63110-47110-45110-46110-50110-49110-48110-64110-51110-42110-41110-40110-44110-43 UV636 UV646UV637ZONE 111ZONE 114ZONE 111EL. 85EL. 93 5EL. 86 9EL. 88 6EL. 85 9/16SI-107 H-44SI-107 H-43SI-E-218-CCBA-2 SI-E-218-CCBA-4SI-B-110-CCBB-2SI-E-218-CCBA-3SI-A-103-CCBA-2SI-E-236-CCBA-2SI-B-107-CCBB-2 SI-103H-A110-55110-54110-52 ZONE 110 HPSI DISCHARGEWEST WRAPLINE #DIA X SCHFROMTOSI-1032 X 0.344110-40110-52SI-1074 X 0.337110-1110-10SI-1102 X 0.344110-11110-17SI-2182 X 0.344110-18110-22SI-2183 X 0.438110-38110-39SI-1072 X 0.344110-53110-59SI-2184 X 0.438110-23110-37SI-2362 X 0.344110-60110-64 W W W W W W B B B B C B B B B C B B C B B B C 153INT-ISI-2 Rev. 4 196 of 210 UNIT 2REFERENCE DRAWINGS 02-P-SIF-203 SI-100 H-37111-29 UV647 16EL. 85SI-A-100-CCBA-4ZONE 110ZONE 110111-30111-33111-31111-34111-37111-32111-35111-38111-36111-39111-40111-22111-28111-26111-27111-25111-24111-17111-18111-20111-19111-21111-23111-8111-12111-15111-13111-16111-14111-11111-5111-6111-9111-7111-10111-4111-2111-1111-3SI-100 H-B SI-236 H-2 SI-236H-1 SI-236H-3 SI-100 H-30 SI-100H-ASI-A-100-CCBA-2SI-E-236-CCBA-4SI-E-236-CCBA-3EL. 88 6EL. 85EL. 93 5ZONE 108111-41 ZONE 111 HPSI DISCHARGEWEST WRAPLINE #DIA X SCHFROMTO SI-1002 X 0.344111-9111-25SI-2363 X 0.438111-40111-41SI-2364 X 0.438111-26111-39SI-1004 X 0.438111-1111-8ZONE 114111-42 W W W B C B B B B B3INT-ISI-2 Rev. 4 197 of 210 UNIT 2SI-176 H-2 SI-101 H-ASI-176 H-3112-3112-25112-8112-42112-46112-45112-35112-44SI-176 H-1112-43SI-102 H-BSI-102 H-A SI-100 H-17SI-101 H-D112-17112-21112-26SI-A-100-CCBA-4 14112-40112-18112-38112-39112-32112-41112-30112-33112-31112-37112-29112-36112-24112-34112-20112-28 UV-617112-4112-12112-9112-23112-5112-14112-16112-27112-6112-13112-7112-2112-1112-15112-22112-10112-11SI-E-176-CCBA-3SI-E-176-CCBA-4SI-A-101-CCBA-2 ZONE 108ZONE 115SI-A-102-CCBA-2 SI-101 H-B112-19 UV-627 ZONE 113 ZONE 113LINE #DIA X SCHFROMTOSI-100SI-101SI-1024 X 0.4382 X 0.3442 X 0.344112-1112-7112-21112-6112-20112-32SI-1764 X 0.438112-33112-44SI-1763 X 0.438112-45112-46REFERENCE DRAWINGS 02-P-SIF-204 ZONE 112 HPSI DISCHARGE EAST WRAPEL 88-9EL 92-6EL 93-5SI-101 H-C W W W W B B B B B B B B B B3INT-ISI-2 Rev. 4 198 of 210 UNIT 2 SI-107H-22 SI-109H-A SI-157 H-4 SI-157 H-6SI-107 H-24113-38113-37113-51113-7113-2113-1113-41113-49 SI-176 H-A A POINT ACONTINUEDTHIS DRAWING SI-108H-A SI-157H-5113-3SI-B-107-CCBB-4 13113-30113-31113-20 UV-626113-9113-36113-43113-39113-25113-42113-28113-14113-12113-11113-10113-17113-18113-16113-13113-19113-8113-15113-4113-21113-23113-26113-6113-22113-5113-24113-40113-27113-35113-33113-34113-48113-47113-45113-44 UV-616 SI-157H-9SI-E-157-CCBA-4SI-E-157-CCBA-4SI-B-108-CCBB-2SI-B-109-CCBB-2 A POINT ACONTINUEDTHIS DRAWING ZONE 109 ZONE 115REFERENCE DRAWINGSLINE #DIA X SCHFROMTO 02-P-SIF-204 SI-1082 X 0.344113-7113-15SI-1092 X 0.344113-21113-27SI-1574 X 0.438113-33113-49SI-1573 X 0.438113-50113-51SI-1572 X 0.344113-16113-20SI-157 H-A SI-157H-1SI-1074 X 0.337113-1113-6113-50 ZONE 112 ZONE 112113-29 ZONE 113 HPSI DISCHARGE EAST WRAPSI-E-176-CCBA-2SI-E-157-CCBA-2EL 86EL 92-6EL 88-9EL 84-6113-46113-32SI-1762 X 0.344113-28113-32 W W W W B B C B B B B B B B B3INT-ISI-2 Rev. 4 199 of 210 UNIT 2 ZONE 114 CONTAINMENT HPSI HEADER LOOP 1A & 1BSI-218 H5 SI-236H-5114-16114-9 15 16114-20114-5114-7114-11114-1114-3114-4114-2114-21114-19114-8114-17114-6114-15114-22114-18SI-E-218-CCBA-3SI-E-236-CCBA-3 ZONE 97 ZONE 111REFERENCE DRAWINGSLINE #DIA X SCHFROMTOSI-218SI-236 3 X 0.438 3 X 0.438114-1114-12114-11114-23 02-P-SIF-103 ZONE 96EL 93-5 V-133EL 93-5114-12114-14 V-143114-23114-13 EL 93-5ZONE 110 B B3INT-ISI-2 Rev. 4 200 of 210 UNIT 2 ZONE 115 CONTAINMENT HPSI HEADER LOOP 2A & 2B SI-157 H-11115-17115-20115-19115-7115-5 13 14115-8115-9115-6115-11115-12115-10115-1115-3115-14115-21115-15115-22115-16115-18115-2115-4115-13SI-176 H-4SI-E-157-CCBA-3SI-E-176-CCBA-3 ZONE 99ZONE 112ZONE 113REFERENCE DRAWINGSLINE #DIA X SCHFROMTOSI-157SI-176 3 X 0.438 3 X 0.438115-1115-13115-12115-22 02-P-SIF-136 ZONE 98EL 91-4EL 93-5 V-113 V-123EL 89-9EL 93-5B B3INT-ISI-2 Rev. 4 201 of 210 UNIT 2 ZONE 116 HPSI PUMP AREFERENCE DRAWINGS1) TAG NUMBER: 2MSIAP022) SERIAL NUMBER: INGERSOL RANDDISCHARGE SUCTIONZONE 102 ZONE 106116-1D W116-1A W 116-1C W 116-1B W N116-1116-2S/N 0776-16 02-P-SIF-201 02-P-SIF-2033) DISCHARGE HEAD STUDS 16@ 2.25 DIA. X 10.88 DISCHARGE HEAD STUDS B B B B3INT-ISI-2 Rev. 4 202 of 210 UNIT 2 ZONE 117 HPSI PUMP BREFERENCE DRAWINGSDISCHARGE SUCTION1) TAG NUMBER: 2MSIBP022) SERIAL NUMBER: INGERSOL RANDZONE 104 ZONE 107117-1D W 117-1B W117-1A W 117-1C W N117-1117-2S/N 0776-173) DISCHARGE HEAD STUDS 16@ 2.25 DIA. X 10.88 DISCHARGE HEAD STUDS02-P-SIF-201 02-P-SIF-203 B B B B3INT-ISI-2 Rev. 4 203 of 210 UNIT 2REFERENCE DRAWINGSLINE #DIA X SCHFROMTO SI-1063 X 0.438118-1118-49 HV-604 SI-106H-18SI-106 H-24 SI-106H-3SI-106H-11 SI-106 H-10SI-106 H-9 SI-106 H-7SI-106 H-14SI-106 H-15 SI-106H-13SI-106H-16118-31118-48118-32118-34118-3118-36118-4118-20118-22118-25118-49118-5118-27118-43118-47118-14118-33118-26118-13118-28118-29118-19118-10118-8118-37118-7118-1118-35118-2118-39118-38118-17118-15118-9ZONE 39SI-A-106-CCBA-302-P-SIF-203 SI-106 H-6SI-106 H-8118-42118-45 V-523 HV-321 APOINT A CONTINUEDTHIS DRAWINGSI-106 H-23118-18EL 46-3EL 85SI-106 H-12EL 92 6ZONE 118 HPSI A LONG TERM RECIRCULATION118-6EL 51-6118-21SI-106 H-4SI-106 H-5 SI-106H-21 SI-106 H-22SI-106 H-2 77118-44SI-106 H-25 SI-106 H-20 SI-106 H-19118-41118-40118-46 A POINT ACONTINUEDTHIS DRAWING118-23118-16118-24118-11118-1202-P-SIF-105SI-A-106-CCBA-3 ZONE 106 SI-106 H-26118-30 W W W W W W W W W W W W W W W W W W B B B B B B B B B B B B B B B B B B B B C B B C3INT-ISI-2 Rev. 4 204 of 210 UNIT 2LINE #DIA X SCHFROMTOSI-114 SI-3193 X 0.4382 X 0.344119-1119-53119-52119-57 ZONE 119 HPSI B LONG TERM RECIRCULATIONREFERENCE DRAWINGSSI-114 H-8SI-114 H-4SI-114 H-1 SI-114H-10SI-114 H-22SI-114 H-9 SI-114H-26119-54119-52119-14119-24119-49119-11119-10119-8119-23119-30119-2119-26119-32119-41119-57119-6119-9119-7119-47119-12119-4119-56119-55119-21119-53119-35119-15119-17 ZONE 40SI-E-319-CCBA-2SI-B-114-CCBA-3 HV331 HV-609 V-509 02-P-SIF-105 SI-114H-27119-43119-13119-5119-16119-19119-31119-20119-25EL 46-3EL 87-3EL 46-8SI-B-114-CCBA-3SI-114 H-7SI-114 H-3 SI-114 H-2 SI-114 H-5SI-114 H-6119-3119-44119-33119-50119-18119-22119-42119-36119-1119-34119-40SI-B-114-CCBA-3 V-533119-46119-51119-45EL 87-3AEL 88SI-114 H-21EL 85-4EL 92-6EL 51-6SI-319 H-ASI-319 H-G 67 A ZONE 107 SI-319 H-J119-29119-28119-27SI-114H-17SI-114H-15SI-114 H-16119-37119-38119-39 02-P-SIF-20402-P-CHF-207 SI-114 H-13SI-114 H-12 SI-319H-B POINT ACONTINUEDTHIS DRAWING POINT ACONTINUEDTHIS DRAWING119-48 W W W W W W W W W W W W B B B B C B B B B C B B C B B B B B B C B B B3INT-ISI-2 Rev. 4 205 of 210 UNIT 2 ZONE 120CONTAINMENT SPRAY A CONT ZONE 93LINE #DIA X SCHFROMTOSI-08810 X 0.250120-1120-19REFERENCE DRAWINGS 13-P-ZCG-105 21120-9120-12120-6120-11120-10120-7120-5120-8120-2120-1 V-164SI-A-088-GCBC-10120-13120-4120-3EL 116-4120-14120-15120-16120-19120-18120-17SI-88H-2 C EL 89-9EL 91-5EL 95-5EL 1123INT-ISI-2 Rev. 4 206 of 210 UNIT 2 ZONE 121CONTAINMENT SPRAY BCONT ZONE 90LINE #DIA X SCHFROMTOSI-13010 X 0.250121-1121-21REFERENCE DRAWINGS 13-P-ZCG-105 22SI-130H-7121-13121-6121-14121-07121-5121-18 V-165SI-A-130-GCBC-10121-08121-4121-19EL 116-4121-15121-16121-17121-20121-21121-3121-1121-2121-9121-11121-12121-10 W SI-130 H-3 C CEL 112EL 93-5EL 90-5EL 95-53INT-ISI-2 Rev. 4 207 of 210

SECTION 11.0 Terms and Definitions 3INT-ISI-2 Rev. 4 208 of 210 AHE: Augmented High Energy ANII: Authorized Nuclear Inservice Inspector APS: Arizona Public Service Company, et al ASME: American Society of Mechanical Engineers Aux: Auxiliary BWR: Boiling Water Reactor CE: Combustion Engineering CEDM: Control Element Drive Mechanism CFR: Code of Federal Regulations CH: Charging CHR: Containment Heat Removal Circ: Circumferential CL: Cold Leg CRD: Control Rod Drive CS: Containment Spray CSP: Containment Spray Pump DWG: Drawing DR: Disregard ECCS: Emergency Core Cooling System FW: Feedwater HL: Hot Leg HPSI: High Pressure Safety Injection HV: Hand Control Valve Hx: Heat Exchanger ICI: In Core Instrumentation IEB: Inspection and Enforcement Bulletin IEIN: Inspection and Enforcement Information Notice Inj: Injection INPO: Institute for Nuclear Power Operations ISI: Inservice Inspection LPSI: Low Pressure Safety Injection MSSS: Main Steam Support Structure NDE: Nondestructive Examination NRC: Nuclear Regulatory Commission PDV: Pressure Differential Valve PSV: Pressure Relief or Safety Valve PWR: Pressurized Water Reactor PVNGS: Palo Verde Nuclear Generating Station PZR: Pressurizer RC: Reactor Coolant RCP: Reactor Coolant Pump REV: Revision RHR: Reactor Residual Heat Removal 3INT-ISI-2 Rev. 4 209 of 210 Recirc: Recirculation RCS: Reactor Coolant System RPV: Reactor Pressure Vessel RVLMS: Reactor Vessel Level Monitoring System REM: Roentgen Equivalent Man SDCHX: Shutdown Cooling Heat Exchanger SD: Shutdown SER: Significant Event Report SG: Steam Generator SI: Safety Injection SN: Serial Number T: Thickness TL: Prolonged Tech. Spec: Technical Specification UFSAR: Updated Final Safety Analysis Report USNRC: United States Nuclear Regulatory Commission UV: Multivariable Control Valve V: Valve

3INT-ISI-2 Rev. 4 210 of 210