ML11136A106

From kanterella
Jump to navigation Jump to search

Submittal of Steam Generator Tube Inspection Report
ML11136A106
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/05/2011
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06358-TNW/CJS
Download: ML11136A106 (51)


Text

{{#Wiki_filter:Technical Specification 5.6.8 Thomas N. Weber Mail Station 7636 Palo Verde Nuclear Department Leader Tel. 623-393-5764 PO Box 52034 Generating Station Regulatory Affairs Fax 623-393-5442 Phoenix, Arizona 85072-2034 102-06358-TNW/CJS May 05, 2011 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Unit 3 Docket No. STN 50-530 License No. NPF-74 Steam Generator Tube Inspection Report Attached please find the PVNGS Unit 3 Steam Generator Tube Inspection Report prepared and submitted by Arizona Public Service Company (APS) pursuant to Technical Specification (TS) Reporting Requirement 5.6.8. This report describes steam generator tube inspection and plugging results from the Unit 3 fifteenth refueling outage. By copy of this letter, this submittal is being provided to the NRC Region IV Regional Administrator and the PVNGS Senior Resident Inspector. No commitments are being made to the NRC by this letter. Should you have questions regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111. Sincerely, deý TNW/RAS/CJS/gat Attachment cc: (with attachment) E. E. Collins Jr. NRC Region IV Regional Administrator L. K. Gibson NRC NRR Project Manager for PVNGS J. R. Hall NRC NRR Senior Project Manager M. A. Brown NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Awl! Callaway 0 Comanche Peak 0 Diablo Canyon 0 Palo Verde 0 San Onofre 0 South Texas 0 Wolf Creek

Attachment Unit 3 - 1 5 th Refueling Outage Steam Generator Tube Inspection Report

1 I V / 7 7

                                                                                                '7-
                                                                                                 .4 U=                                                      II I

Palo Verde Nudear Generadfng Station UNIT3 U3RI5 ARIZONA PUBLIC SERVICE P. O. BOX 52034 PHOENIX, AZ 85072 Prepared by: Douglas B Hansen Date: 11-1-10 Digitally signed by Hansen, Douglas Hansen, Douglas 1(Z415301 DN: cn=Hansen, Douglas B(Z41530) B(Z41530) Reason: Iam the author of this document Date: 2011.04.29 15:58:29 -07'00' Reviewed by: S/ ifoII Approved Commercial Service Date: 1-8-88 I

Table of Contents 1.0

SUMMARY

2.0 SCOPE OF EXAMINATIONS PERFORMED 3.0 ACTIVE DEGRADATION MECHANISMS 4.0 NDE TECHNIQUES UTILIZED 5.0 INDICATION

SUMMARY

6.0 TUBES PLUGGED 7.0 PLUG HISTORY 8.0 CONDITION MONITORING APPENDIX A - TUBE SUPPORT DIAGRAM, LEGEND, and ANALYSIS CODES APPENDIX B - SG 31

SUMMARY

DATA SHEETS APPENDIX C - SG 32

SUMMARY

DATA SHEETS APPENDIX D - PLI and PLP DATA SHEETS APPENDIX E - PLUG MAPS APPENDIX F - FORM NIS - 1 2

UNIT 3 STEAM GENERATOR EDDY CURRENT U3 R15 Refueling Outage 1.0 Summary This report is intended to satisfy the requirements of PVNGS Technical Specifications 5.6.8 for the submittal of a Steam Generator Tube Inspection Report. The steam generator (SG) eddy current examination for the 15th refueling outage in Unit 3 (U3R15) was conducted during October 2010. Mode 4 entry of Unit 3 Cycle 16 was entered on November 6, 2010. The initial examination plan for both steam generators is listed in Table 1. This table summarizes the examinations performed for each of the various categories, examination types, extents, and the number of tubes or tube locations completed. This examination was a 100% full length tubing inspection. The examinations resulted in a total of 0 tubes being plugged in SG 31, and 6 tubes being plugged in SG 32. A description of the previous plugging history is noted in Table 2, and Appendix E provides a map of all tubes plugged. 2.0 Scope of Examinations Performed The original examination plan was developed based on the "PVNGS Steam Generator Degradation Assessment" developed per PVNGS Procedure 81DP-9RCO1 as required by NEI 97-06. In addition, possible damage mechanisms were reviewed along with the specific requirements set forth in Procedure 73TI-9RC01 and the PVNGS Technical Specifications. The plan was finalized to include 100% bobbin examinations. This original plan, along with the examinations performed as a result of bobbin indications noted, is summarized in Table 1 of this report. 3.0 Active Degradation Mechanisms The only degradation noted during the examinations was determined to be wear. Section 8.0 contains further discussions relating to this mechanism. Table 2 summarizes the results into categories and sections B and C itemizes all indications reported.

4.0 NDE Techniques Utilized The following table documents the site qualified techniques utilized during this outage: ISOIEDT'H TE72M!10&n001M Dannge Locadora ETSS QUAL ORIENTATION BC BC TECH Comment Mechanism NO STATUS DET SRZE Wear BWs, VSs, 96004.1 SITE NA Y Y Volt DIFF None ECs, Rev. 13 QUALIFIED 1_ 4-2010 Wear Loose Part 27091.2 SITE NA Y N Volt DIFF None Rev. 0 QUALIFIED 8-2007 Damge Locafon ETSS QUAL ORIENTATION RC RC TECH Comment Mechanism NO STATUS DET SIZE BWs, ECs, 96910.1 SITE NA Y Y +POINT None Wear VSs Rev. 10 QUALIFIED 8-2006 The eddy current examinations were performed by Westinghouse Electric Company using the Core Star OMNI 200 eddy current instrument. Westinghouse Anser software was utilized to acquire the data along with the Pegasys robotic manipulator. This robot was configured with a dual guide tube in each of the hot and cold legs. The tubing was examined with Zetec manufactured bobbin coil probes and Zetec rotating coil (RC) style probes. Probe diameters were 0.590" to 0.610". Plus Point RC probes were used for the characterization of non-quantifiable or distorted bobbin indications. Fiber optic cable was used from containment to the data acquisition room located at the PVNGS North Annex. Primary and secondary analysis was all performed on site. The Primary and Secondary Resolution Analysts, Independent Review Analysts, and data management were also located at PVNGS in the North Annex. Westinghouse provided the data acquisition and primary data analysis. Anatec International, Inc. provided the secondary data analysis. Each individual from Westinghouse and Anatec International, Inc. who performed data analysis was required to complete and pass a PVNGS site specific Eddy Current Data Analysis Course as well as an associated performance and written examination. All individuals performing data analysis were also required to have Qualified Data Analyst (QDA) certification. Per 73TI-9RCO1, all certification records are maintained in the Nuclear Information Records Management System. 4

5.0 Indication Summary A detailed listing of the location and measured sizes of all indications recorded is included in Appendix B and C. A summary of these indication results is located in Table 2. In addition, Appendix A contains a reference drawing of steam generator support locations and report legend. There were no indications that were identified as linear during this outage. 6.0 Tubes Plugged A summary of the tubes plugged is located in Table 2. Only 6 tubes were plugged this outage. The damage mechanism was noted as wear. All 6 of the tube locations were in the central cavity area. Appendix E contains a map that details the plugged tube location along with the previously plugged tubes. 7.0 Plug History A summary of the number and percentage of tubes plugged is also located in Table 2. 8.0 Condition Monitoring Per the Steam Generator Program, as defined in PVNGS Procedure 81 DP-9RCO 1, a condition monitoring evaluation was conducted by PVNGS Engineering. The results of the eddy current examinations are provided in Section 5.0. An engineering evaluation of the as-found condition of inservice tubes did not reveal any degradation exceeding the threshold values for structural and leakage integrity. As such, all steam generator performance criteria were satisfied for Unit 3 Cycle

15. No tube pulls or insitu pressure testing were required based on the results of the examinations.

Foreign Object Search and Retrieval (FOSAR) Tubesheet Annulus and Blowdown Lane FOSAR was conducted using a power cart mounted with a remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator Integrity Assessment Guidelines Section 10.5, Secondary Side Visual Inspections, were applied for the FOSAR inspections. The only loose parts observed by FOSAR in SG31 during U3R15 were sludge rocks. 8 sludge rocks were observed on the top of the tubesheet annulus (cold leg side), 3 of which were retrieved. 5 sludge rocks were observed in the blowdown lane (cold leg side), none of these were retrieved. A sludge rock was also observed wedged between tubes R109C24 & R110C25 (SG31 cold leg). An unsuccessful attempt was made to retrieve the wedged sludge rock, but the sludge rock dislodged from between the tubes and dropped further into the bundle. None of the sludge rocks described above was observed during eddy current examinations. The sludge rock that was wedged between tubes R109C24 & RI 10C25 was ECT tested for possible wear indications (bobbin) and none were found. Furthermore, no wear was detected in the top of tubesheet annulus region (hot and cold leg side) or blowdown lane (hot and cold leg side). The only loose parts observed by FOSAR in SG32 during U3R15 were sludge rocks. 7 sludge rocks were observed in the blowdown lane (cold leg side), none of these were retrieved. 2 sludge

rocks were observed in the blowdown lane (hot leg side), none of these were retrieved. None of the sludge rocks described above was observed during eddy current examinations. No wear was detected in the top of tubesheet annulus region (hot and cold leg side) or blowdown lane (hot and cold leg side). Also included in the scope of the FOSAR effort was an inspection of the blowdown patch plate welds that were found to be cracked in Unit 2 during U2R15. The inspections confirmed that all 4 patch plates (2 per SG) were cracked, and that the cracks were similar to those found in the Unit 2 SGs (i.e., the patch plate to lug weld was completely compromised and the patch plate to divider plate welds were completely intact). A previous evaluation concluded that there is a high probability that these cracked welds existed in the Unit 3 SGs. The evaluation concluded that, with the presence of the cracked welds, the patch plates in the Unit 3 SGs will continue to perform their design function and that the probability of loose parts being formed is remote. Thus, there is a very low risk that the cracked welds will affect the structural or leakage integrity of tubes in these steam generators. Potential Loose Parts (PLPs) As noted in Appendix D, there were no PLP locations identified in Steam Generator 31. In Steam Generator 32, one tube (R156C65) was reported to contain a PLP bobbin signal in the vicinity of the Flow Distribution Plate (FDP). Plus point examinations were performed at this tube and the tubes surrounding it. As a result, PLP signals were reported for a total of three tubes (R153C64, R154C65, R156C65) all at the FDP. A review of the U3R14 (Spring, 2009) bobbin data was performed and it indicated similar bobbin signals with no change. PVNGS has historically taken the position that if a loose part is detected by ECT or FOSAR without the presence of wear, it is reasonable to conclude that the required conditions to promote wear do not exist. Per the PVNGS SG Program, trending of these locations will continue in future outages. Finally, PVNGS Procedure 81DP-9RCO0 requires, per the EPRI PWR Steam Generator Examination Guidelines, that a visual inspection of the previously installed steam generator plugs be performed to assess plug integrity. Additionally, the Examination Guidelines Section 6.9.1 states - "Verify the location and presence of existing in-service plugs." The conduct of the plug location and integrity verification was performed in U3R15 per procedure 81CP-9RC40. A review of the inspection results indicated that all plugs were accounted for and no evidence of potential plug leakage was identified.

TABLE I EXAMfENATI©HN

SUMMARY

SCOPE DESCRIPTION SG 31 SG 32 Exam Description Extents Scope Scope COLD LEG TEC-VS3 12290 12288 BOBBIN COLD LEG TEC-BWI 1230 1230 BOBBIN HOT LEG TEH-VS3 12290 12288 BOBBIN HOT LEG TEH-BWI 1230 1230 BOBBIN HOT STRAIGHT VARIOUS 7 16 RC HOT U & SQUARE BEND VARIOUS 155 167 RC COLD STRAIGHT VARIOUS 25 8 RC COLD U & SQUARE BEND VARIOUS 29 44 RC Notes:

1. none 7

7]A~L1E 2 I1N]DCATR1ON SUMMAIRY DAMAGE STEAM GENERATOR STEAM GENERATOR MECHANISM 31 32 WEAR 0%-19% 146 150 20%-29% 6 5 30%-39% 1 1

          > 40%                               0                               1 PLUGGED                              (0)                             (6)

Possible Loose Parts (RC) PLI 0 0 PLP 0 3 PLUGGED (0) (0) Volumetric Indications SVI/MVI 0 0 PLUGGED (0) (0) PREVENTATIVE (0) (0) I I i i i i I I PLUGGED (0) (6) TOTALPLUGGED/% (60 / 0.5%) (68 / 0.5%) NOTES

1. Numbers in (X) are tubes numbers plugged in each category
2. The above represent the numbers of tubes; not indications 8

APPENDIX A TUBE SUPPORT DIAGRAM, LEGEND, and ANALYSIS CODES 9

PVNGS Steam Generator REPLACEMENTS Center of 08H to 08C Row I - 17.415 Row 2 - 19.736 Row 3 - 22.056 Row 4 - 24.377 Row 5 - 26.698 Row 6 - 29.019 I I 10

LEGEND ROW: Indicates the row number of a given tube. COL: Indicates the column number of a given tube. VOLTS: Indicates the peak-to-peak voltage of a given indication response. DEG: The measured phase angle of a given indication response. IND: Indicates the analysis code or PCT for percent PER or PCT: The percent through the tube wall of a given indication CHN: Indicates the channel used to make the call LOCN: Gives indication location at INCH1 to INCH2 relative to known landmarks such as supports, vertical straps, and batwings. Typical location codes are as follows:

                       #1 Vertical Strap ........................... VS1
                       #1 Batwing .................................... BW l
                       #1 Support Plate in Hot Leg ........            OH
                       #7 Support Plate in Cold Leg .............      07C Top Tube Sheet Cold Leg ..................      TSC Tube End Hot Leg .........................      TEH Tube End Cold Leg ............................ TEC CRLEN:   Indicates the flaw length, used to identify the length of a wear indication CRWID:   Indicates the flaw width, typically used for cracks only CEG: Indicates the flaw length, typically used for cracks only BEGT and ENDT:  Indicates the beginning and of the test; together they document the examination extent PDIA: Documents the probe diameter PTYPE:  Documents the probe type CAL: Indicates calibration number L: Indicates the leg the examination was conducted from COM:  This comment field is utilized to document comments 11

Analysis CODES: A bsolute Drift .................................................................... ADI Bulge .................................................................................. BLG D ented Buff M ark .............................................................. D BM D eposit ............................................................................... D EP D ent .................................................................................... D NT D ata Quality A cceptance .................................................... DQA Distorted Support Signal With Indication ....................... DSI Distorted Top of Tubesheet With Indication ..................... DTI G eom etric Indication .......................................................... G EO ID Chatter ........................................................................... ID C Indication N ot Found ......................................................... IN F Indication N ot Reportable .................................................. IN R M ultiple A xial Indication ................................................... MA I Manufacturer Burnishing M ark .......................................... M BM M ixed M ode Indication ...................................................... MM I M ultiple Circumferential Indication ................................... M CI M ultiple V olumetric Indication .......................................... MV I N o D etectable D efect ......................................................... N DD N o D iscontinuity Found ..................................................... N DF N on-Q uantifiable Indication .............................................. N QI N o Tube Sheet Expansion .................................................. N TE O bstructed .......................................................................... O BS O ver Expanded ................................................................... O XP Previous Bobbin Call ......................................................... PBC Possible D eposit ................................................................. PD P Positive Identification ........................................................ PID Positive Identification V erified .......................................... PIV Possible Loose Part w ith Indication ................................... PLI Possible Loose Part ............................................................ PLP Previous RC Call ................................................................ PRC Possible Support A nom aly ................................................. PSA Possible Support Indication ............................................... PSI Perm eability V ariation N oise ............................................. PVN Retest Bad D ata .................................................................. RBD Retest Identification Check ................................................ RIC Retest w ith M agnetic Bias RC Probe ................................. RM B Single A xial Indication ................................................. SA I Single Circum ferential Indication ...................................... SCI Single V olum etric Indication ............................................. SV I Senior (Lead) A nalysis Review ..................................... SR Sludge ................................................................................ SLG To Be Plugged .................................................................... TBP V olumetric Indication ........................................................ VO L 12

APPENDIX B STEAM GENERATOR 31

SUMMARY

DATA SHEETS 13

SG - 31 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 11/0112010 11:47:43 +. .- -4 +-

                                                     +---        -----------
                                                              +-----+----+*-----                                                                    ----                           +----+----..+-                +-          -+       -     +--+              -------        +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21 +. .- -......... +------------.-------- -------- +--------+...----+-.....+- + - +--+ ------- 62 9 18 18 PCT 9 P2 VS3 .71 VS3 TEC .610 NBAZ2 14 C 87 24 .26 54 PCT 9 P2 VS2 -1.05 VS3 TEH .610 NBAZ2 47 89 24 .52 82 PCT 15 P2 VS2 -. 96 VS3 TEH .610 NBAZ2 47 89 24 1.06 93 PCT 18 P3 VS2 -. 99 .23 VS2 VS2 .580 NPUFZ 65 109 24 .35 121 PCT 12 P2 VS3 -. 66 VS3 TEC .610 NBAZ2 13 109 24 .81 99 PCT 15 P3 VS3 -1.03 .22 VS3 VS3 .580 NPUFZ 61 81 26 .30 108 PCT 10 P2 VS4 - .87 VS3 TEC .610 NBAZ2 14 81 26 .90 87 PCT 16 P3 VS4 -1.14 .24 VS4 VS4 .580 NPUFZ 70 DOA 82 27 .19 120 PCT 9 P2 VS2 .63 VS3 TEH .610 NBAZ2 48 82 27 .99 93 PCT 17 P3 VS2 .67 .17 VS2 VS2 .580 NPUFZ 65 89 28 .26 41 PCT 10 P2 VS4 .90 VS3 TEC .610 NBAZ2 13 89 28 1.13 86 PCT 19 P3 VS4 .90 .54 VS4 VS4 .580 NPUFZ 70 DQA PCT P2 85 30 .51 122 18 VS2 -. 94 VS3 TEH .610 NBAZ2 46 85 30 1.49 96 PCT 24 P3 VS2 -1.07 .31 VS2 VS2 .580 NPUFZ 65 87 30 .24 91 PCT 8 P2 VS4 .89 VS3 TEC .610 NBAZ2 14 120 33 .64 81 PCT 18 P2 VS4 .90 VS3 TEC .610 NBAZ2 18 120 33 1.06 100 PCT 19 P3 VS4 1.03 .36 VS4 VS4 .580 NPUFZ 70 DOA 132 39 .20 135 PCT 7 P2 1iC -. 44 VS3 TEC .610 NBAZ2 22 124 43 .39 63 PCT 12 P2 VS4 - .75 VS3 TEC .610 NBAZ2 24 124 43 1.36 93 PCT 18 P3 VS4 - .75 .58 VS4 VS4 .580 NPUFZ 69 DQA 127 44 .14 74 PCT 6 P2 VS4 - .32 VS3 TEC .610 NBAZ2 23 127 44 .52 280 PCT 11 P3 VS4 - .32 .28 VS4 VS4 .580 NPUFZ 69 DOA 90 45 .27 142 PCT 11 P2 VS3 .91 VS3 TEC .610 NBAZ2 17 90 45 .81 88 PCT 15 P3 VS3 1.20 .14 VS3 VS3 .580 NPUFZ 65 116 45 23 77 PCT 9 P2 VS3 .70 VS3 TEC .610 NBAZ2 23 C

  - -. -+-     -.-. -               --------               -+---      -+---       -+-         -----            -  +   ----              ,                           -------       +.......----    ---     -      +-+---++-                        -+,+-------

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILI UTIL21 +- -'-44------------+-+--+--+----+---- +"----- -- +--- +----+----+- +-+ - --- +--+,------- 1 ST Max

SG - 31 ST Max Palo Verde 3 U31115 PVNGS3 20101001 1110112010 11:47:43 S.... - - - -- 4- - + --- +- - +- -+ - - - - - I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILI UTIL21

   ....              ------------                    +---+..-----+....----+                            ----
                                                                                                       ....                  -----                --          +---            -----        +---           -+-                 +--          +---+-          --     +---+

115 48 .17 66 PCT 7 P2 VS3 -. 52 VS3 TEC .610 NBAZ2 23 C 132 49 .45 95 PCT 15 P2 VS4 .57 VS3 TEC .610 NBAZ2 23 C 132 49 .38 151 PCT 15 P2 VS2 - .71 VS3 TEH .610 NBAZ2 38 H 132 49 1.17 102 PCT 19 P3 VS2 - .70 .51 VS2 VS2 .580 NPUFZ 61 H 132 49 1.32 92 PCT 22 P3 VS4 .83 .64 VS4 VS4 .580 NPUFZ 70 C DOA 126 51 .29 82 PCT 9 P2 VS3 - .56 VS3 TEC .610 NBAZ2 24 C 126 51 1.46 103 PCT 29 P2 VS3 .71 VS3 TEC .610 NBAZ2 24 C 126 51 .67 101 PCT 12 P3 VS3 - .90 .29 VS3 VS3 .580 NPUFZ 61 H 126 51 1.20 93 PCT 20 P3 VS3 1.07 .42 VS3 VS3 .580 NPUFZ 61 H DQA 126 53 .40 103 PCT 14 P2 VS3 - .27 VS3 TEC .610 NBAZ2 23 C 126 53 .77 105 PCT 21 P2 VS3 1.01 VS3 TEC .610 NBAZ2 23 C 126 53 .88 100 PCT 16 P3 VS3 - .67 .31 VS3 VS3 .580 NPUFZ 61 H 126 53 1.34 99 PCT 22 P3 VS3 .86 .26 VS3 VS3 .580 NPUFZ 61 H 125 54 .28 89 PCT 9 P2 VS3 - .70 VS3 TEC .610 NBAZ2 24 C 126 55 .40 118 PCT 12 P2 VS3 .85 VS3 TEC .610 NBAZ2 24 C 126 55 .35 118 PCT 11 P2 VS4 -1.00 VS3 TEC .610 NBAZ2 24 C 126 55 .57 83 PCT 11 P3 VS3 1.21 .16 VS3 VS3 .580 NPUFZ 61 H 126 55 1.02 100 PCT 14 P3 VS4 -. 94 .13 VS4 VS4 .580 NPUFZ 69 C DOA 56 61 .23 137 PCT 11 P2 BW1 -1.63 VS3 TEH .610 NBAZ2 38 H 56 61 .71 98 PCT 13 P3 BW1 -1.69 .13 08H VS3 .580 NPUFZ 64 H DOA 122 61 .24 85 PCT 8 P2 VS3 .85 VS3 TEC .610 NBAZ2 24 C 126 61 .19 86 PCT 9 P2 VS1 .61 VS3 TEH .610 NBAZ2 34 H 121 62 .46 91 PCT 13 P2 VS3 .77 VS3 TEC .610 NBAZ2 24 C 121 62 .38 118 PCT 13 P2 VS2 .85 VS3 TEH .610 NBAZ2 33 H 121 62 1.07 95 PCT 18 P3 VS2 .87 .61 VS2 VS2 .580 NPUFZ 61 H 121 62 1.27 100 PCT 21 P3 VS3 1.00 .50 VS3 VS3 .580 NPUFZ 61 H 138 63 .22 101 PCT 8 P2 VS1 .99 VS3 TEH .610 NBAZ2 33 H

              -       --------------------------                                                                ----           ------..--------.----..-----------                                                                              -    ----          + ---            +--

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21 4-- - ------------ +----+---------+----+----+----- ..-...- - -- +--- 4-..----.------ ---- +-- ---+------ - - -- + 2 ST Max

SG - 31 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 11/01/2010 11:47:43 +. .- -- +------- + +- +- -+----- +- +--- +- -+-------- I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21 S. --- -------- - - - - - 4---- - ---- - - - - -+- --- +- - - --- +- 109 64 .22 99 PCT 10 P2 VS2 - .91 VS3 TEH .610 NBAZ2 36 H 109 64 1.09 99 PCT 19 P3 VS2 - .83 34 VS2 VS2 .580 NPUFZ 65 H DQA 126 65 .40 107 PCT 14 P2 VS4 - .86 VS3 TEC .610 NBAZ2 23 126 65 .16 99 PCT 8 P2 VS1 .35 VS3 TEH .610 NBAZ2 34 126 65 .93 89 PCT 17 P3 VS4 - .80 1.98 VS4 VS4 580 NPUFZ 70 DOA 46 67 .18 114 PCT 9 P2 VS3 .81 VS3 TEH .610 NBAZ2 8 46 67 .67 84 PCT 12 P3 VS3 1.00 .26 VS3 VS3 580 NPUFZ 64 118 67 .27 66 PCT 9 P2 VS3 - .34 VS3 TEC .610 NBAZ2 24 118 67 .19 148 PCT 7 P2 VS2 1.13 VS3 TEH .610 NBAZ2 33 118 67 .69 99 PCT 13 P3 VS2 1.10 .23 VS2 VS2 580 NPUFZ 64 118 67 .73 92 PCT 13 P3 VS3 - .30 .23 VS3 VS3 580 NPUFZ 64 126 67 .22 77 PCT 8 P2 VS3 - .59 VS3 TEC .610 NBAZ2 24 126 67 .30 126 PCT 10 P2 VS4 -1.00 VS3 TEC .610 NBAZ2 24 126 67 .15 100 PCT 6 P2 VS1 .28 VS3 TEH .610 NBAZ2 33 126 67 .75 91 PCT 14 P3 VS3 -. 96 .24 VS3 VS3 .580 NPUFZ 64 126 67 .72 87 PCT 14 P3 VS4 - .74 .15 VS4 VS4 .580 NPUFZ 70 DQA 128 67 .26 98 PCT 9 P2 VS3 -. 48 VS3 TEC .610 NBAZ2 24 128 67 .24 112 PCT 9 P2 VS2 - .90 VS3 TEH .610 NBAZ2 33 128 67 .78 92 PCT 14 P3 VS2 .73 .36 VS2 VS2 .580 NPUFZ 61 128 67 .74 90 PCT 13 P3 VS3 - .90 .18 VS3 VS3 .580 NPUFZ 61 67 .39 VS3 TEC .610 NBAZ2 130 117 PCT 12 P2 VS4 - .83 24 130 67 1.05 84 PCT 18 P3 VS4 - .43 .30 VS4 VS4 .580 NPUFZ 70 DQA 54 71 .19 137 PCT 9 P2 09H -. 78 VS3 TEH .610 NBAZ2 8 121 72 .27 122 PCT 12 P2 VS2 -1.09 VS3 TEH .610 NBAZ2 32 121 72 .69 85 PCT 13 P3 VS2 -1.03 .26 VS2 VS2 .580 NPUFZ 64 35 76 .21 136 PCT 10 P2 04H .93 VS3 TEH .610 NBAZ2 6 165 76 .19 52 PCT 8 P2 BW2 - .74 VS3 TEC .610 NBAZ1 55 108 77 .22 109 PCT 9 P2 VS3 .13 VS3 TEC .610 NBAZ2 21 C

   - - ------        ---             +4--
                                      -         -+---       -+---    -+---           -+-      - ----- +-            +-             --     ---            +- ---       +-     - -          +-- --.....                          +-   -+       -------

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21


... + ... +..+------------+------+- -- ------------ +- +- - -- ..... +--+---- 4- -- +

3 ST Max

SG - 31 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 11/01/2010 11:47:43


....------ ----.... ---- +---....------- +- +- +-++--++-------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21 4-- -- ----------- +----+----+----+----+----+----- -+---- -------..-- -- 4-+- +----- ------ ++ 128 77 .30 80 PCT 11 P2 VS3 -. 33 VS3 TEC .610 NBAZ1 25 C 128 77 .93 104 PCT 16 P3 VS3 -. 66 .22 VS3 VS3 .580 NPUFZ 64 H DQA 89 78 .23 123 PCT 9 P2 09H .83 VS3 TEH .610 NBAZ2 35 H 103 80 .26 76 PCT 10 P2 VS3 -. 44 VS3 TEC .610 NBAZ2 21 C 103 80 .57 104 PCT 11 P3 VS3 -. 94 .25 VS3 VS3 .580 NPUFZ 64 H 44 81 .29 41 PCT i1 P2 VS3 .80 VS3 TEC .610 NBAZ2 3 C 44 81 .66 98 PCT 12 P3 VS3 .48 .17 VS3 VS3 .580 NPUFZ 64 H 50 83 .42 111 PCT 16 P2 09H -. 10 VS3 TEH .610 NBAZ2 6 H 50 83 1.36 109 PCT 22 P3 09H -. 10 .28 08H VS3 .580 NPUFZ 64 H DQA 118 83 .39 108 PCT 12 P2 VS3 -. 24 VS3 TEC .610 NBAZ2 26 C 118 83 .96 98 PCT 17 P3 VS3 -. 22 .16 VS3 VS3 .580 NPUFZ 64 H 41 84 .19 55 PCT 9 P2 08H - .81 VS3 TEH .610 NBAZ2 6 H 41 84 .77 103 PCT 14 P3 08H -1.00 .19 07H VS3 .580 NPUFZ 64 H DOQA 40 85 .20 255 PCT 8 P2 08H -. 10 VS3 TEH .610 ZBAZC 5 H 40 85 .83 99 PCT 15 P3 08H .76 .20 07H VS3 .580 NPUFZ 64 H DQA 48 85 .38 78 PCT 13 P2 VS3 - .96 VS3 TEH .610 ZBAZC 5 H 48 85 1.21 96 PCT 20 P3 VS3 -. 71 .17 VS3 VS3 .580 NPUFZ 64 H 85 VS3 TEH 32 H 122 .23 51 PCT 10 P2 VS2 .91 .610 NBAZ2 122 85 .59 84 PCT 11 P3 VS2 .95 .14 VS2 VS2 .580 NPUFZ 64 H 65 86 .22 136 PCT 8 P2 09H .72 VS3 TEH .610 NBAZ2 35 H 115 86 .23 144 PCT 8 P2 VS4 - .72 VS3 TEC .610 NBAZ2 26 C 115 86 1.12 92 PCT 16 P3 VS4 -. 62 .22 VS4 VS4 .580 NPUFZ 69 C DQA 118 87 .68 116 PCT 18 P2 VS3 .85 VS3 TEC .610 NBAZ2 26 C 118 87 1.38 101 PCT 22 P3 VS3 1.09 .33 VS3 VS3 .580 NPUFZ 64 H 1 103 88 .20 137 PCT 9 P2 VS2 - .71 VS3 TEH .610 NBAZ2 34 H 4----- -- -- ----- -- - - - -- - - - - I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21 -- - -- ------------------ +----+----+----'4---- ----- +----+- --- +--- - 4------ --- "- -- + 4 ST Max

SG - 31 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 11/0112010 11:47:43

  .       .-                                        --   -----------       --+----+----+                        --------          +          --        +----+----+---+-+-+-                                                 --           +------
                                                                                                                                                                                                                                +---+......

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21

    ..         -        -+÷-------------+-........                                                     +        -----          -+--------+----+---+-+-                                   -            -+......÷--++------

103 88 .94 105 PCT 17 P3 VS2 - .78 .24 VS2 VS2 .580 NPUFZ 64 H 44 89 .27 89 PCT 10 P2 BW2 -. 97 VS3 TEC .610 NBAZ2 3 44 89 1.17 101 PCT 27 P2 VS3 - .82 VS3 TEH .610 ZBAZC 5 44 89 1.59 113 PCT 25 P3 VS3 -. 60 .38 07C VS3 .580 NPUFZ 70 44 89 .58 96 PCT 12 P3 BW2 - .82 .17 07C VS3 .580 NPUFZ 70 DOA 48 89 .17 115 PCT 7 P2 09H -1.32 VS3 TEH .610 ZBAZC 5 64 89 .20 129 PCT 9 P2 09H .57 VS3 TEH .610 NBAZ2 34 130 89 .17 136 PCT 8 P2 VS1 .77 VS3 TEH .610 NBAZ2 32 130 89 .68 92 PCT 13 P3 VS1 .38 .19 VS1 VS1 .580 NPUFZ 64 51 90 .29 58 PCT 11 P2 VS3 .46 VS3 TEC .610 NBAZ2 3 75 90 .18 104 PCT 7 P2 09H 1.04 VS3 TEH .610 NBAZ2 33 89 90 .37 92 PCT 12 P2 VS2 -. 68 VS3 TEH .610 NBAZ2 33 89 90 1.15 108 PCT 19 P3 VS2 -1.09 .16 VS2 VS2 .580 NPUFZ 64 111 90 .15 137 PCT 5 P2 VS3 - .32 VS3 TEC .610 NBAZ2 26 44 91 .35 92 PCT 13 P2 VS3 -. 49 VS3 TEC .610 NBAZ2 3 44 91 .35 98 PCT 13 P2 BW2 - .91 VS3 TEC .610 NBAZ2 3 44 91 .96 97 PCT 17 P3 VS3 -. 58 .31 07C VS3 .580 NPUFZ 70 44 91 .77 102 PCT 15 P3 BW2 - .62 .25 070 VS3 .580 NPUFZ 70 45 92 .23 95 PCT 8 P2 08H -. 88 VS3 TEH .610 ZBAZC 5 45 92 .30 139 PCT 11 P2 BW1 -1.12 VS3 TEH .610 ZBAZC 5 45 92 .60 109 PCT 11 P3 08H - .83 .15 07H VS3 . 580 NPUFZ 64 DQA 45 92 .65 120 PCT 12 P3 BW1 -1.25 .18 07H VS3 .580 NPUFZ 64 53 92 .26 75 PCT 10 P2 VS3 .42 VS3 TEH .610 ZBAZC 5 53 92 .93 88 PCT 16 P3 VS3 1.07 .29 VS3 VS3 .580 NPUFZ 63 48 93 .53 106 PCT 17 P2 BW2 .86 VS3 TEC .610 NBAZ2 3 48 93 .88 129 PCT 13 P3 BW2 .85 .09 08C VS3 .580 NPUFZ 69 DOA

-+                                 -----       +----+---+----+----                ...    +----+----+----+                              ---             +....           +--+      ----                   +-+-+-----                                  +---        +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21 +-- -...-...-... +.... ...------------ +--- ----....------- +----+-- -+-.. .+....---+- -- +--- + 5 ST Max

SG - 31 ST Max qi-, Palo Verde 3 U3R15 PVNGS3 20101001 11/0112010 11:47:43 S.... - -- .... --- - -- --- .... -- - - - - - - - -- -- --- ----

                                                                                                                                                                    +            +-

I ROW COL VOLTS DEG IND PER CHN LOON INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILI UTIL21 + i -- - +-----------++-...+-....+....+. ----. +---- --- +---- --- -+- +- +----+--+,--- --- 90 93 .26 92 PCT 12 P2 1OH -1.15 VS3 TEH .610 NBAZ2 34 H 90 93 .63 97 PCT 12 P3 1OH -1.15 .12 09H VS2 .580 NPUFZ 64 DOA 111 94 .24 131 PCT 8 P2 VS3 .75 VS3 TEC .610 NBAZ2 26 94 .88 95 PCT 16 P3 VS3 .72 1.22 VS3 VS3 .580 NPUFZ 64 48 95 .35 55 PCT 13 P2 BW2 .86 VS3 TEC .610 NBAZ2 3 48 95 .31 102 PCT 11 P2 VS3 .68 VS3 TEH .610 ZBAZC 5 48 95 .85 109 PCT 12 P3 VS3 .79 .15 08C VS3 .580 NPUFZ 69 48 95 .86 119 PCT 12 P3 BW2 .81 .19 08C VS3 .580 NPUFZ 69 DOA 70 95 .25 104 PCT 9 P2 08H -. 15 VS3 TEH .610 NBAZ2 33 70 95 .71 287 PCT 13 P3 08H -. 05 .53 08H 08H .600 NPAHZ 60 99 96 .23 149 PCT 8 P2 VS3 -. 90 VS3 TEC .610 NBAZ2 28 99 96 .61 92 PCT 11 P3 VS3 -1.08 .11 VS3 VS3 .580 NPUFZ 64 48 97 .25 74 PCT 11 P2 VS3 .62 VS3 TEH .610 NBAZ2 6 48 97 1.22 98 PCT 20 P3 VS3 .96 .47 VS3 VS3 .580 NPUFZ 63 90 97 .24 94 PCT 11 P2 10H -1.00 VS3 TEH .610 NBAZ2 34 90 97 .63 105 PCT 12 P3 10H -1.13 .14 09H VS2 .580 NPUFZ 64 DOA

                                     .42       70         PCT                                                 .98                                                                     .610      NBAZ1                 27 89           98                                                     14           P2    VS4                                                            VS3           TEC 89           98           1.24        92         PCT                17           P3    VS4           .79                               .15            VS4           VS4      .580      NPUFZ                 69                              DQA 50           99             .29      109         PCT                11           P2    BW2       -1.04                                                VS3           TEC      .610      NBAZ2                    1 126             99             .27      141         PCT                   9         P2    VS3         -. 60                                              VS3           TEC      .610      NBAZ2                 28 126             99             .62      271         PCT                12           P3    VS3         -. 75                               .13            VS3           VS3      .580      NPUFZ                 66 74      101                .17       129         PCT                   8         P2    09H         -. 25                                              VS3           TEH      .610      NBAZ2                 24 74      101                .21       142         PCT                10           P2    09H           .84                                              VS3           TEH      .610      NBAZ2                 24 76      101                .44       118        PCT                 17           P2    09H           .77                                              VS3           TEH      .610      NBAZ2                 24 76      101                .70       115        PCT                 13           P3    09H         1.12                                .19            08H           VS2      .580      NPUFZ                 64 84      101                .19       150        PCT                    9         P2    09H           .74                                              VS3           TEH      .610      NBAZ2                 24 1 84              101                .57        92        PCT                 11           P3    09H           .64                               .17            08H           VS2      .580      NPUFZ                 64         H                    DOA
 - -- -+-          --                     +-        +-                                ...  -+..     --                               "-----      -----------                          --   +---                        -+--+.-------                      +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21 + .... + --- +-4 - - ----------

                                                                            ------                                    ÷         --   ÷
                                                                                                                                     +---               +- -------       ....+     ÷-      +-     +       --        -         --    +  -------

6 ST Max

SG - 31 ST Max' Palo Verde 3 U3R15 PVNGS3 20101001 1110112010 11:47:43

  .      .-    -+------------+....+....+....+-                                                              -+-----------                                           +----+----+--              -+-.....-                        +------             +---              +

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21 ÷. .- -÷------------.... --- ----

                                                                                  ....         +.... ....                 -   -    - ÷----+-
                                                                                                                                         -   -   -   - -   -    -         --                     ÷.
                                                                                                                                                                                                 +-       ..- -  .----- -÷--                      -      -   -  -

92 101 .18 90 PCT 9 P2 10H -. 18 VS3 TEH .610 NBAZ2 24 H i111 102 .15 115 PCT 6 P2 VS2 - .99 VS3 TEH .610 NBAZ2 25 H 165 102 .17 61 PCT 7 P2 11H .25 VS3 TEH .610 NBAZ2 25 H 48 103 .35 112 PCT 13 P2 BW2 .89 VS3 TEC .610 NBAZ2 3 C 48 103 .71 114 PCT 20 P2 VS3 .77 VS3 TEH .610 ZBAZC 5 H 48 103 1.92 102 PCT 24 P3 VS3 .80 .20 08C VS3 .580 NPUFZ 69 C 72 103 .18 123 PCT 8 P2 09H - .37 VS3 TEH .610 ZBAZC 23 H 54 105 .45 137 PCT 17 P2 VS3 .61 VS3 TEH .610 NBAZ2 6 H 54 105 1.06 115 PCT 18 P3 VS3 .98 .29 VS3 VS3 580 NPUFZ 63 H 76 105 .23 146 PCT 11 P2 09H .85 VS3 TEH .610 NBAZ2 24 H 116 105 .22 103 PCT 10 P2 VS2 .99 VS3 TEH .610 NBAZ2 28 H 95 106 .24 121 PCT 9 P2 BW1 -1.14 VS3 TEH .610 ZBAZC 23 H 92 107 .17 49 PCT 7 P2 BW1 -1.00 VS3 TEH .610 ZBAZC 23 H 94 107 .18 110 PCT 7 P2 BW1 -1.09 VS3 TEH .610 ZBAZC 23 H 98 107 .16 94 PCT 6 P2 BW1 .83 VS3 TEH .610 ZBAZC 23 H 105 108 .33 138 PCT 14 P2 VS2 74 VS3 TEH .610 NBAZ2 24 H 105 108 .32 133 PCT 13 P2 VS3 - .65 VS3 TEH .610 NBAZ2 24 H 105 108 .33 110 PCT 14 P2 VS3 .73 VS3 TEH .610 NBAZ2 24 H 105 108 1.12 117 PCT 19 P3 VS2 .82 .66 VS2 VS2 .580 NPUFZ 63 H 105 108 .94 108 PCT 17 P3 VS3 -. 90 .54 VS3 VS3 .580 NPUFZ 63 H 105 108 1.10 82 PCT 19 P3 VS3 .94 .24 VS3 VS3 .580 NPUFZ 63 H 107 108 .29 139 PCT 10 P2 VS4 - .61 VS3 TEC .610 NBAZ2 30 C 107 108 1.25 98 PCT 17 P3 VS4 - .67 .39 VS4 VS4 .580 NPUFZ 69 C DOA 48 109 1.39 110 PCT 32 P2 VS3 .73 VS3 TEH .610 NBAZ2 6 H

       -- ÷-          +    --                    - - - -   - --  -           - - -.         - --              . - -.. -
                                                                                                         - - -÷                                                                                                                                        -------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21

            ÷            -÷-                                        ..
                                                         +------------+        ÷  ....---.----      ....       +.                    +-      -       - - -     -+--        ---        ---  -     ++             ---                     +.---            ---          +

7 ST Max

SG - 31 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 11/01/2010 11:47:43 +. .- - -+ ------------ ---------- + ---- +----- ------- +----+-- -+ - +......--- +--+------- I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21 +. .- -4 + 4------------ ---------- + ---- +----- ------- +---- -+- - - . ..--- +- -+4------- 48 109 1.57 118 PCT 24 P3 VS3 1.04 .18 VS3 VS3 .580 NPUFZ 61 H 58 109 .26 59 PCT 9 P2 VS3 .76 VS3 TEC .610 NBAZ2 30 82 109 .23 159 PCT 11 P2 09H .84 VS3 TEH .610 NBAZ2 24 92 109 .25 113 PCT 8 P2 VS3 - .63 VS3 TEC .610 NBAZ2 30 118 109 .15 113 PCT 6 P2 VS4 . 58 VS3 TEC .610 NBAZ1 53 132 109 .20 57 PCT 8 P2 VS3 .87 VS3 TEC .610 NBAZI 53 83 110 .20 143 PCT 8 P2 08H .57 VS3 TEH .610 ZBAZC 23 87 110 .27 144 POT 10 P2 09H .85 VS3 TEH .610 ZBAZC 23 95 110 .18 119 PCT 8 P2 10H .83 VS3 TEH .610 ZBAZC 23 103 110 .22 139 POT 9 P2 VS2 -1.11 VS3 TEH .610 ZBAZC 23 103 110 .82 101 POT 15 P3 VS2 - .92 .33 VS2 VS2 .580 NPUFZ 63 109 110 .16 104 PCT 7 P2 VS3 .03 VS3 TEH .610 ZBAZC 23 98 111 .17 63 PCT 7 P2 BW1 .93 VS3 TEH .610 ZBAZC 23 102 .17 137 PCT 7 P2 VS2 .78 VS3 TEH .610 ZBAZC 23 95 112 .16 118 PCT 8 P2 10H - .19 VS3 TEH .610 NBAZ2 24 103 112 .17 82 POT 8 P2 BW1 - .71 VS3 TEH .610 NBAZ1 22 93 114 .19 56 PCT 8 P2 BW1 -1.16 VS3 TEH .610 ZBAZC 23 117 114 .22 63 PCT 8 P2 VS2 -1.67 VS3 TEH .610 NBAZ2 27 42 115 .54 99 POT 17 P2 VS3 .45 VS3 TEH .610 ZBAZC 5 42 115 1.10 110 PCT 19 P3 VS3 .82 .42 VS3 VS3 .580 NPUFZ 63 42 117 20 140 PCT 7 P2 08C - .18 VS3 TEC .610 NBAZ2 6 C

  - - -+-   -+--------
              -4                       -+---     -+---  -+-     ---      +- - -+
                                                                              -                -----                   -------             +-  -   ----- +-          +   -   +..---             +-    -+        -------        +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21

   .     .-    -4+                    -------------+----+----+                          ----         +----+-------+----..+-                                           -+-        + ....---.         +--+            -------        +

8 ST Max

r* SG - 31 ST Max Palo Verde 3 U13R15 PVNGS3 20101001 1110112010 11:47:43

   ..-               --                          -----    -+--------+----+                              ----
                                                                                                      +--------+4---                                                                "----+--------                                  --.-                                     +       --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21

       ..      4-       -----------            +----4-+                  -----------                 +----+                           ----           ---      +---+-          ----------                  --      --......                         +-+       4+ -         --         --

42 117 73 104 PCT 11 P3 08C .29 .14 07C VS3 .580 NPUFZ 69 C DOA 44 117 .25 114 PCT 11 P2 BW1 -1.27 VS3 TEH .610 NBAZ2 6 44 117 .87 110 PCT 16 P3 BW1 -. 82 .30 07H VS3 .580 NPUFZ 63 DQA 41 118 .17 124 PCT 7 P2 08H .77 VS3 TEH .610 ZBAZC 3 38 119 .19 71 PCT 8 P2 VS3 1.00 VS3 TEC .610 NBAZ2 5 44 119 .17 50 PCT 7 P2 BW1 -1.12 VS3 TEH .610 ZBAZC 3 44 119 .14 118 PCT 6 P2 VS3 - .93 VS3 TEC .610 NBAZ2 5 44 119 .69 114 PCT 13 P3 BW1 -1.13 .21 07H VS3 .580 NPUFZ 63 44 119 .60 107 PCT 11 P3 VS3 -1.05 .30 07H VS3 .580 NPUFZ 63 98 119 .15 122 PCT 6 P2 10H .50 VS3 TEH .610 ZBAZC 21 91 120 .18 131 PCT 9 P2 BW1 -. 67 VS3 TEH .610 NBAZ1 22 91 120 .68 108 PCT 12 P3 BW1 - .57 .35 09H VS2 580 NPUFZ 62 64 121 .17 148 PCT 8 P2 09H .58 VS3 TEH .610 NBAZ1 22 39 122 .36 141 PCT 12 P2 08H .70 VS3 TEH .610 ZBAZC 3 39 122 .81 107 PCT 15 P3 08H .33 .18 07H VS3 580 NPUFZ 63 DOA 122 71 .26 120 PCT 10 P2 VS2 -. 60 VS3 TEH .610 ZBAZC 21 71 122 .76 91 PCT 14 P3 VS2 -. 62 .32 VS2 VS2 .580 NPUFZ 63 52 123 .17 56 PCT 7 P2 VS3 - .79 VS3 TEC .610 NBAZ2 5 126 123 .37 123 PCT 12 P2 VS3 - .54 VS3 TEH .610 NBAZ2 27 126 123 .83 91 PCT 15 P3 VS3 -. 60 .61 VS3 VS3 580 NPUFZ 61 31 124 .26 138 PCT 10 P2 BW2 -. 93 VS3 TEC .610 NBAZ2 5 31 124 .92 81 PCT 13 P3 BW2 -. 68 .35 07C VS3 .580 NPUFZ 69 DQA 126 129 .22 142 PCT 10 P2 VS3 - .50 VS3 TEH .610 NBAZ2 26 126 129 .83 107 PCT 15 P3 VS3 - .67 .29 VS3 VS3 .580 NPUFZ 61 133 130 .27 122 PCT 10 P2 VS1 - .71 VS3 TEH .610 NBAZ2 25 H

  - - - - -         --  .                    -  - - -      + .- -                            - +-         - - -'----+"----------                                                                      +-             +-             +-+-....-----                   --      ---          +-

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21 -- -.-. 4--- "- ----------- --- ------- +---- - - -{----- -- ------ -+- - - - - +-+-+....-- -+4------- + 9 ST Max

SG - 31 ST Max *' M. Palo Verde 3 U3R15 PVNGS3 20101001 11/0112010 11:47:43

      --  ---    .........--....-                         ...--....                               -+-+                      --------                           --       +- +            -     ---                          +--+--                   +---          +

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILI UTIL21

      +-  ---                                    ------------
                                        ++-...----.....+                                       --      + ----               -------                +---+----+-                             +---             +-                    +--+---+---             ---     +

133 130 .66 92 PCT 12 P3 VS1 -. 69 .21 VS1 VS1 .580 NPUFZ 61 H 74 131 .15 107 PCT 6 P2 08H .61 VS3 TEH .610 ZBAZC 19 H 43 132 .26 142 PCT 11 P2 08H .79 VS3 TEH .610 NBAZ2 4 H 65 134. .16 132 PCT 6 P2 09H 1.04 VS3 TEH .610 ZBAZC 19 H 89 134 .22 100 PCT 8 P2 VS2 -1.29 VS3 TEH .610 ZBAZC 19 H 89 134 .66 88 PCT 12 P3 VS2 -. 67 .25 VS2 VS2 .580 NPUFZ 61 H 97 134 .21 130 PCT 8 P2 10H .84 VS3 TEH .610 ZBAZC 19 H 1 107 138 .17 134 PCT 7 P2 09H .90 VS3 TEH .610 ZBAZC 19 H 120 143 .29 125 PCT 10 P2 VS2 -1.56 VS3 TEH .610 ZBAZC 17 H 120 143 .85 99 PCT 15 P3 VS2 -. 73 .45 VS2 VS2 .580 NPUFZ 61 H 94 145 .43 143 PCT 17 P2 VS2 .60 VS3 TEH .610 NBAZ1 12 H 94 145 1.26 103 PCT 21 P3 VS2 .73 .73 VS2 VS2 .580 NPUFZ 61 H 105 146 .29 94 PCT 10 P2 VS2 1.13 VS3 TEH .610 ZBAZC 17 H 105 146 .85 93 PCT 15 P3 VS2 .80 .62 VS2 VS2 .580 NPUFZ 61 H 105 148 .51 114 PCT 19 P2 VS3 -. 64 VS3 TEH .610 NBAZ1 18 H 105 148 1.58 86 PCT 24 P3 VS3 -. 90 .63 VS3 VS3 .580 NPUFZ 61 H 114 149 .48 109 PCT 15 P2 VS2 1.04 VS3 TEH .610 ZBAZC 17 H 114 149 1.31 103 PCT 21 P3 VS2 .83 .50 VS2 VS2 .580 NPUFZ 61 H 107 154 .24 139 PCT 9 P2 10H .35 VS3 TEH .610 ZBAZC 15 H 107 154 .62 93 PCT 12 P3 10H .13 .15 09H VS2 .580 NPUFZ 61 H DQAI 56 157 .22 146 PCT 10 P2 VS3 .46 VS3 TEH .610 NBAZ1 14 H 56 157 .80 91 PCT 14 P3 VS3 .80 .38 VS3 VS3 .580 NPUFZ 62 H 91 158 .22 75 PCT 8 P2 VS2 .40 VS3 TEH .610 ZBAZC 13 H 82 159 .39 115 PCT 13 P2 VS2 1.00 VS3 TEH .610 ZBAZC 13 H +- -4 - ------------ +. +------------

                                                                     +         .                  +            +       ----     ----     -----                   ----
                                                                                                                                                                  +              ------    +                  -.               --       +----       +----

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILI UTIL21 + --------------- +. +------------.+----++---- ----- ----

                                                                                                                                                                  +          ---           +-      --...... +-.-....+----                           +----

10 ST Max

SG - 31 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 11/0112010 11:47:43 S....-- +-... ... -+---- + ---- -+ ----+- ------- +----- + - -- +--- + I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21

 ..-..                             ...           ...------------..-----------           -----         +÷----                +-  ---     +----+----+--                         -+-                +-  ----            +-   --       +---

82 159 1.29 103 PCT 21 P3 VS2 1.15 .36 VS2 VS2 .580 NPUFZ 62 H 100 159 .28 104 POT 13 VS3 - .35 VS3 TEH .610 NBAZ1 16 100 159 .66 105 POT 12 VS3 - .34 .25 VS3 VS3 .580 NPUFZ 62 112 159 .38 97 POT 16 VS3 - .73 VS3 TEH .610 NBAZ1 16 112 159 1.31 97 POT 21 VS3 - .97 .32 VS3 VS3 .580 NPUFZ 62 96 116 159 .64 PCT 22 VS3 - .75 VS3 TEH .610 NBAZ1 16 116 159 2.01 95 POT 29 VS3 - .97 .37 VS3 VS3 .580 NPUFZ 62 128 159 .15 145 PCT 8 VS1 .80 VS3 TEH .610 NBAZ1 16 99 160 .33 98 POT 14 VS3 - .84 VS3 TEH .610 NBAZ1 16 99 160 .82 88 POT 15 VS3 -1.05 .25 VS3 VS3 .580 NPUFZ 62 124 161 .27 106 POT 10 VS3 -. 68 VS3 TEH .610 ZBAZC 15 124 161 .83 91 PCT 15 VS3 -1.11 .27 VS3 VS3 .580 NPUFZ 62 DOA 69 162 .15 136 POT 6 VS2 - .54 VS3 TEH .610 ZBAZC 13 98 163 .27 130 POT 13 VS3 - .58 VS3 TEH .610 NBAZ1 16 98 163 1.13 104 POT 19 VS3 - .71 .61 VS3 VS3 .580 NPUFZ 62 130 165 .19 133 POT 7 BW1 -. 26 VS3 TEH .610 ZBAZC 15 23 168 .16 135 PCT 8 08H - .32 VS3 TEH .610 NBAZ1 12 66 169 .22 107 POT 10 VS2 -1.00 VS3 TEH .610 NBAZ1 14 128 169 .28 130 PCT 11 VS3 - .79 VS3 TEC .610 NBAZ1 49 128 169 .57 91 POT 11 VS3 -. 99 .25 VS3 VS3 .580 NPUFZ 62 93 172 .17 143 POT 8 10H .77 VS3 TEH .610 NBAZ1 14 99 172 .46 127 POT 17 VS2 -. 99 VS3 TEH .610 NBAZ1 14 99 172 1.04 115 POT 28 VS3 - .91 VS3 TEH .610 NBAZ1 14 99 172 1.24 97 POT 20 VS2 -1.02 .30 09H VS2 .580 NPUFZ 62 99 172 2.08 99 PCT 30 P3 VS3 -1.16 .36 VS3 VS3 .580 NPUFZ 62 H

                              - +......
                           - --                               ....              ..---------------     +---------                                                                 +--+---                      +--+--       ..----- +               + ----

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21

                                                                                                    -      - -+--   -------                           - - -        - ---
                                                                                                                                                                      - ----                  --  --  -- - - - - - --          --  +    ---        +

11 ST Max

SG - 31 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 11/0112010 11:47:43 + .... + --- +--+-+- ÷ -----------

                                                                    ÷                                                       ----                      +---------+-  +-----            -+-+
                                                                                                                                                                                         +                      ....       +--++---        ---         +

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21

   .     .-       --------------        +-+--+----                                          +           -----         --        +----+---------                                  -     -+-+....+--+....----.---
                                                                                                                                                                                         +

96 173 .32 114 PCT 13 P2 VS3 .34 VS3 TEH .610 NBAZ1 14 H 63 174 .23 92 PCT 7 P2 VS3 .83 VS3 TEC .610 NBAZ1 34 99 174 .22 122 PCT 7 P2 VS3 -1.63 VS3 TEC .610 NBAZI 36 115 174 .22 122 PCT 8 P2 VS1 .67 VS3 TEH .610 ZBAZC 13 82 175 .34 123 PCT 12 P2 VS2 .68 VS3 TEH .610 ZBAZC 13 82 175 1.06 98 PCT 18 P3 VS2 .61 .23 VS2 VS2 .580 NPUFZ 62 103 180 .18 119 PCT 9 P2 VS3 -. 94 VS3 TEH .610 NBAZ1 18 103 180 .59 111 PCT 11 P3 VS3 -. 91 .28 VS3 VS3 .580 NPUFZ 62 105 180 .21 129 PCT 10 P2 VS3 -. 82 VS3 TEH .610 NBAZ1 18 105 180 .80 120 PCT 14 P3 VS3 -. 96 .19 VS3 VS3 .580 NPUFZ 62 12 -. 84 VS3 TEH 107 180 .27 111 PCT P2 VS3 .610 NBAZ1 18 107 180 .85 86 PCT 15 P3 VS3 -. 97 .33 VS3 VS3 .580 NPUFZ 62 98 181 .26 133 PCT 11 P2 VS3 -. 60 VS3 TEH .610 NBAZ1 20 100 181 .21 115 PCT 10 P2 VS3 -. 79 VS3 TEH .610 NBAZ1 20 100 181 .59 81 PCT 11 P3 VS3 -1.03 .14 VS3 VS3 .580 NPUFZ 62 VS3 TEC 106 181 .27 138 PCT 10 P2 VS3 -1.00 .610 NBAZ1 35 106 181 .63 94 PCT 12 P3 VS3 -. 89 .25 VS3 VS3 .580 NPUFZ 62 49 184 .17 55 PCT 7 P2 BW2 -. 93 VS3 TEC .610 NBAZ1 43 81 186 .32 44 PCT 12 P2 VS4 -. 64 VS3 TEC .610 NBAZ1 33 81 186 1.00 91 PCT 14 P3 VS4 -. 51 .31 VS4 VS4 .580 NPUFZ 69 DOAI

                                                                                                  -. 76 79        188                .25         77         PCT            11          P2 VS3                                                               VS3            TEH      .610         NBAZ1                   20 79        188                .87      101           PCT            15          P3 VS3      -. 92                                         .19        VS3            VS3      .580         NPUFZ                   61 81        188                .21      102           PCT            10          P2 VS2    -1.34                                                      VS3            TEH      .610         NBAZ1                   20
..--                                                ----           +- - -+-   -------         -    ------                     -+       --           ----
                                                                                                                                                     +             ----
                                                                                                                                                                    +         +-       -           +---              -  -"

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21

   ..         .-----------              +--------+----+----+---------                                          ----                  ---             +---+---+-                          +-             -+           -     +--+"---         ---        +

12 ST Max

SG - 31 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 1110112010 11:47:43 S- --- - -- - - - - - - - --------- -+ - - - - ------ -- - -+ ---- +-- ---------- - - - - -- - +- -- I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL2I

  .     .-   --                  ------------.            ----.     --------....       ...-----                                --         ---                +----+----                   ------                             ---
                                                                                                                                                                                                                  +....------+-4---                                                +

1 58 189 .22 71 PCT 9 P2 VS3 -. 58 VS3 TEC .610 NBAZ1 33 C 1 58 189 .70 100 PCT 13 P3 VS3 -. 92 .38 VS3 VS3 .580 NPUFZ 61 H

                                  +-----+ +..               ...                                      -   ---            +----          +*           ---      +----+----..+                   ---.-.-.-                                     -+---       --       +....---           +.

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL2I ÷. .- -- - - ------------

                                  +---------                                      +            ---
                                                                                              ---  +               ------                  --------                        +----+         ----            ---                    -  +..  --.   +--     --            ---           +

Tubes: 169 Records: 302 13 ST Max

APPENDIX C STEAM GENERATOR 32

SUMMARY

DATA SHEETS 14

SG - 32 ST Max M. Palo Verde 3 U3R15 PVNGS3 20101001 11/01/2010 13:51:23 +- - -- +------------+-+--+-....+...+. . ------.--- +.----.----.-+-4 +- + - -- +-+ -- --- + I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21

  ................-                               -------------                       -------              --------                           ------                      +....+......-----        +  -. .    ---....        .+--      +---              ---

1 62 15 18 74 PCT 7 P2 09H VS3 TEH .610 NBAZ1 42 H 82 15 .21 141 PCT 8 P2 VS3 .59 VS3 TEH .610 NBAZ1 49 86 15 .18 124 PCT 7 P2 09H .63 VS3 TEH .610 NBAZ1 49 69 18 .21 108 PCT 8 P2 VS3 -. 63 VS3 TEC .610 NBAZ2 12 69 18 .61 90 PCT 11 P3 VS3 -1.00 .27 VS3 VS3 .580 NPUFZ 65 100 21 .28 131 PCT 10 P2 VS3 -. 40 VS3 TEH .610 NBAZ1 41 VS3 NBAZ2 15 102 21 .52 136 PCT 13 P2 -. 78 VS3 TEC .610 102 21 .80 96 PCT 14 P3 VS3 -.78 .32 VS3 VS3 .580 NPUFZ 65 72 25 .18 103 PCT 7 P2 07C .22 VS3 TEC .610 NBAZ2 12 113 26 .21 134 PCT 8 P2 VS3 .27 VS3 TEH .610 NBAZ1 37 111 32 .30 104 PCT P2 VS3 VS3 TEC .610 NBAZ2 15 9 .42 111 32 PCT .52 .26 VS3 VS3 .580 NPUFZ

                                      .85    100                              14       P3          VS3                                                                                                                    65 123                 32           .31    124           PCT                   9     P2          VS3              .32                                           VS3            TEC          .610    NBAZ2               15 114                 33           .20    125           PCT                  8      P2          10H          -   .35                                           VS3            TEH          .610    NBAZ1               37 99              34           .20    120           PCT                  8      P2          VS3          - .87                                             VS3            TEC          .610    NBAZ2               16 99              34           .59     95           PCT               11        P3          VS3       -1.21                                      .26       VS3            VS3           580    NPUFZ               65 113                 38           .25    106           PCT                  9      P2          VS3          -. 72                                             VS3            TEC          .610    NBAZ2               16 PCT 99              44           .41 133                                11        P2          VS3          -. 89                                             VS3            TEC          .610    NBAZ1               17 99              44           .84 108              PCT               15        P3          VS3       -1.09                                      .25       VS3            VS3           580    NPUFZ               64 63              46           .18     74           PCT                   7     P2          BW1          -   .81                                           VS3            TEH          .610    NBAZ1               39 121                 46           .40    109           PCT                13       P2          VS2          -   .97                                           VS3            TEH          .610    NBAZ1               37 121                 46          1.15    103           PCT               20        P3          VS2          -. 90                                   .37       VS2            VS2           580    NPUFZ               64 132                 49           .39    126           PCT                13       P2          VS3              .69                                           VS3            TEC          .610    NBAZ2               16         C
  -               --     -+
                          - -   --             ------               +-                                 --                   ----  --        -      --        -- --       ----
                                                                                                                                                                          +                +-      +-      -             -+-    --+           -    -----

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21 + .... + .... + + +------------+ 4--- - ------- +- ------ +--------+-+- 4--- +--+ ------ - + I ST Max

SG - 32 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 11/01/2010 13:51:23 +------- - - -- - --- -- ----------- - ------ - + --------- --- --- --- . -- +- - - -- - .-.---- I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21

  -       -    -. - - -      -. -----           --       - --- -        -                                                                                                                     -    --- -+--  -- .        --       --         -       --         -     --

1 132 49 1.01 104 PCT 18 P3 VS3 .84 .46 VS3 VS3 .580 NPUFZ 64 H 140 49 .20 117 PCT 7 P2 11H - .27 VS3 TEH .610 NBAZI 28 H 68 53 .19 112 PCT 7 P2 09H .61 VS3 TEH .610 NBAZ1 37 H 118 53 .29 135 PCT 10 P2 VS2 -. 40 VS3 TEH .610 NBAZ1 36 H 118 53 .74 87 PCT 14 P3 VS2 - .75 .31 VS2 VS2 .580 NPUFZ 64 H 120 53 .39 147 PCT 13 P2 VS2 - .96 VS3 TEH .610 NBAZI 36 H 120 53 .81 111 PCT 15 P3 VS2 - .59 .37 VS2 VS2 .580 NPUFZ 64 H 125 54 .49 30 PCT 15 P2 VS1 - .79 VS3 TEH .610 NBAZI 35 H 125 54 1.16 108 PCT 20 P3 VS1 - .72 .34 VS1 VS1 .580 NPUFZ 64 H 118 55 .19 25 PCT 7 P2 VS2 - .71 VS3 TEH .610 NBAZ1 35 H 118 55 .67 87 PCT 13 P3 VS2 -. 74 .26 VS2 VS2 .580 NPUFZ 64 H DOA 128 55 .71 114 PCT 20 P2 VS3 .82 VS3 TEC .610 NBAZ2 20 C 128 55 .37 95 PCT 12 P2 VS2 .77 VS3 TEH .610 NBAZ1 35 H 128 55 .82 84 PCT 15 P3 VS2 .81 .54 VS2 VS2 .580 NPUFZ 64 H 128 55 1.15 91 PCT 20 P3 VS3 1.05 .30 VS3 VS3 .580 NPUFZ 64 H DQA 138 55 .31 110 PCT 10 P2 VS1 .48 VS3 TEH .610 NBAZ1 38 H 138 55 .83 97 PCT 15 P3 VS1 1.10 .20 VS1 VS1 .580 NPUFZ 64 H 140 55 .33 149 PCT 11 P2 VS1 .41 VS3 TEH .610 NBAZ1 38 H 140 55 .98 99 PCT 17 P3 VS1 1.22 .23 VS1 VS1 .580 NPUFZ 64 H 103 56 .27 127 PCT 8 P2 VS3 .81 VS3 TEC .610 NBAZ1 19 C 103 56 .92 110 PCT 17 P3 VS3 .74 .43 VS3 VS3 .580 NPUFZ 64 H DOA 106 61 .27 96 PCT 10 P2 VS3 .65 VS3 TEH .610 NBAZ1 33 H 106 61 .69 95 PCT 13 P3 VS3 .82 .32 VS3 VS3 .580 NPUFZ 64 H DOA 129 64 .51 119 PCT 13 P2 VS3 .77 VS3 TEC .610 NBAZ1 19 C 129 64 1.17 115 PCT 23 P2 VS4 - .73 VS3 TEC .610 NBAZ1 19 C 129 64 .38 126 PCT 12 P2 VS1 -. 99 VS3 TEH .610 NBAZ1 36 H 129 64 .49 131 PCT 15 P2 VS2 -1.00 VS3 TEH .610 NBAZ1 36 H - - - - - -------- + -- ---------- - ------ -- - +- I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21 --......--------------- +----+----+--------+------- +--- +---------+--- . .-- --- +- --- -------- 2 ST Max

SG - 32 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 11/01/2010 13:51:23 + .... +--- +- .. .. ..------------ ---- - ---- +----+----+-- -+ - + ......-- 4+---- I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21

                                                      +....+....+                             +----+----+---                           ----                 +----+-------                      +-......+...--+--                                .---.    .  ---

1 129 64 .72 108 PCT 14 P3 VS1 - .91 .20 VS1 VS1 .580 NPUFZ 64 H DOA 129 64 .85 97 PCT 16 P3 VS2 - .67 .36 VS2 VS2 .580 NPUFZ 64 H 129 64 1.41 89 PCT 23 P3 VS3 .77 .36 VS3 VS3 .580 NPUFZ 64 129 64 2.64 106 PCT 31 P3 VS4 - .67 .43 VS4 VS4 .580 NPUFZ 69 DQA 156 65 .17 134 PCT 6 P2 11H - .33 VS3 TEH .610 NBAZ1 28 117 68 .36 130 PCT 12 P2 VS2 -1.00 VS3 TEH .610 NBAZ1 36 117 68 .74 109 PCT 14 P3 VS2 -. 98 .30 VS2 VS2 .580 NPUFZ 64 138 69 .29 79 PCT 10 P2 VS1 - .21 VS3 TEH .610 NBAZ1 38 118 71 .64 118 PCT 18 P2 VS4 .48 VS3 TEC .610 NBAZ2 20 118 71 2.13 112 PCT 26 P3 VS4 .49 .42 VS4 VS4 .580 NPUFZ 69 DOA 120 71 .22 156 PCT 8 P2 VS3 .69 VS3 TEH .610 NBAZ1 35 120 71 .53 104 PCT 11 P3 VS3 .85 .38 VS3 VS3 .580 NPUFZ 64 45 72 .56 125 PCT 17 P2 08H .70 VS3 TEH .610 NBAZ2 1 45 72 .95 99 PCT 17 P3 08H .28 .20 07H VS3 .580 NPUFZ 64 DOA 124 73 .27 59 PCT 8 P2 VS3 .73 VS3 TEC .610 NBAZ1 19 124 73 .61 119 PCT 12 P3 VS3 .93 .16 VS3 VS3 .580 NPUFZ 64 DOA 164 73 .18 123 PCT 7 P2 10H .72 VS3 TEH .610 NBAZ1 25 147 74 .20 45 PCT 8 P2 VS3 .58 VS3 TEH .610 NBAZ1 27 147 74 .70 106 PCT 13 P3 VS3 .70 .24 VS3 VS3 .580 NPUFZ 64 157 74 .27 157 PCT 9 P2 VS1 .79 VS3 TEH .610 NBAZ1 26 157 74 .43 84 PCT 13 P2 VS3 .45 VS3 TEH .610 NBAZ1 26 157 74 .77 100 PCT 14 P3 VS1 .39 .14 VS1 VS1 .580 NPUFZ 64 157 74 .73 97 PCT 14 P3 VS3 .74 .27 VS3 VS3 .580 NPUFZ 64 NBAZI 120 75 .59 60 PCT 17 P2 VS2 -. 92 VS3 TEH .610 35 120 75 1.43 106 PCT 23 P3 VS2 - .87 .24 VS2 VS2 .580 NPUFZ 64 117 76 .22 138 PCT 8 P2 VS3 - .83 VS3 TEC .610 NBAZ1 28 97 PCT 13 P3 VS3 -1.11 24 VS3 VS3 .580 NPUFZ 64 H DQA 117 76 .66

 .........-----                                       +--------+------+.........                                         .----    --        +---                  .----   +-----+-                             -+              -     +--+---                 ---

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21

   - -. -+-          -.-.-       ----       +- --    -+---      -+-    ---          +-    --- +--.-. -+          -----            --        +---            +----         +-       --- +-      +-              -+            -       +-    -+÷---            ----        +

3 ST Max

SG - 32 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 11/0112010 13:51:23

            +-     -----------      +-     ------.----.--------         .+            .          +                       +÷-----         ----              +--       -+----+           -          +--            - -       +   -  4+  ---             ---

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21

            ÷-  -4            -       ------------
                                             + .                 ----.----.----       .          +                  ---- +--             ----------                    +      -----               +-----+-    .--.            +--         --          ---        +

165 76 .26 137 PCT 10 P2 10H .71 VS3 TEH .610 NBAZ1 25 H 88 77 .20 146 PCT 7 P2 VS3 .60 VS3 TEC .610 NBAZ2 14 112 77 .22 86 PCT 7 P2 VS3 .96 VS3 TEC .610 NBAZ1 28 118 77 .19 116 PCT 6 P2 VS3 - .34 VS3 TEC .610 NBAZ1 28 118 77 .65 124 PCT 18 P2 VS3 .73 VS3 TEC .610 NBAZ1 28 118 77 .60 104 PCT 12 P3 VS3 - .26 .27 VS3 VS3 .580 NPUFZ 64 118 77 1.50 99 PCT 24 P3 VS3 .93 .68 VS3 VS3 .580 NPUFZ 64 51 78 .21 144 PCT 8 P2 08H .51 VS3 TEH .610 NBAZ2 4 149 78 .47 101 PCT 15 P2 VS3 .31 VS3 TEH .610 NBAZ1 25 149 78 1.05 102 PCT 18 P3 VS3 .66 .64 VS3 VS3 .580 NPUFZ 63 DOA 158 79 .19 54 PCT 7 P2 VS1 1.66 VS3 TEH .610 NBAZ1 25 167 80 .22 116 PCT 8 P2 VS3 .70 VS3 TEH .610 NBAZ1 25 50 81 .18 97 PCT 7 P2 08H - .33 VS3 TEH .610 NBAZ2 3 114 81 .55 134 PCT 16 P2 VS3 -. 54 VS3 TEC .610 NBAZ1 28 114 81 1.52 105 PCT 24 P3 VS3 -. 43 .32 VS3 VS3 .580 NPUFZ 63 DOA TEH NBAZ1 36 118 85 .39 97 PCT 13 P2 VS2 - .62 VS3 .610 118 85 1.02 106 PCT 18 P3 VS2 - .30 .39 VS2 VS2 .580 NPUFZ 63 126 85 .14 96 PCT 5 P2 VS1 - .87 VS3 TEH .610 NBAZ1 36 158 85 .29 149 PCT 10 P2 VS1 .84 VS3 TEH .610 NBAZ1 26 158 85 .89 96 PCT 16 P3 VS1 .57 .23 VS1 VS1 .580 NPUFZ 63 DOA 41 86 .36 150 PCT 12 P2 VS3 .58 VS3 TEH .610 NBAZ2 4 41 86 1.08 102 PCT 19 P3 VS3 .84 .43 VS3 VS3 .580 NPUFZ 64 46 87 .84 119 PCT 21 P2 VS3 - .65 VS3 TEC .610 NBAZ2 4 46 87 1.24 103 PCT 21 P3 VS3 - .87 .19 VS3 VS3 .580 NPUFZ 64 H

     - -+--        - ---   -            - - -+-      - - -+-    - - ---           - -   --    -+   ----  --              +         -----                   -     - - ---                 --+        - -+         --      +     - -+---          +----

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21 -.... --- ------------- .--------. ---- +---- -------- +---- +-------- -- -+- -- ---- +-- -- +--- 4 ST Max

SG - 32 ST Max 39 Palo Verde 3 U3R15 PVNGS3 20101001 11/01/2010 13:51:23 S - - - --- ----

                                                   +              +----         +----         +- ---     +----              -     -------                                  -  -  --       -                 +--    ---                             +----

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21 +.. ..----------- +-----------+....

                                                   +---------------------                                             ----                   ---                                                   +------+                  --              -     +-    --       +-

52 87 .33 133 PCT 11 P2 08H -. 30 VS3 TEH .610 NBAZ2 4 118 87 .51 115 PCT 13 P2 VS3 1.21 VS3 TEC .610 NBAZ1 27 118 87 .75 112 PCT 17 P2 VS4 .96 VS3 TEC .610 NBAZ1 27 118 87 1.30 95 PCT 21 P3 VS3 .83 .55 VS3 VS3 .580 NPUFZ 63 118 87 1.80 105 PCT 23 P3 VS4 .74 .35 VS4 VS4 .580 NPUFZ 69 DOA 120 .31 111 PCT 8 VS3 TEC .610 NBAZ1 87 P2 1.21 VS3 27 120 87 .56 106 PCT 11 P3 VS3 .76 .18 VS3 VS3 .580 NPUFZ 63 124 87 .17 69 PCT 6 P2 VS3 .73 VS3 TEH .610 NBAZ1 35 42 89 .34 152 PCT 11 P2 BW1 .81 VS3 TEH .610 NBAZ2 3 42 89 .72 122 PCT 14 P3 BW1 .72 .20 07H VS3 .580 NPUFZ 64 DOA 88 89 .32 127 PCT 11 P2 09H .78 VS3 TEH .610 NBAZ1 30 120 89 .27 85 PCT 10 P2 VS3 .80 VS3 TEC .610 NBAZ1 28 120 89 .60 94 PCT 12 P3 VS3 .93 .31 VS3 VS3 .580 NPUFZ 63 157 90 .26 121 PCT 10 P2 VS1 .43 VS3 TEH .610 NBAZ1 25 157 90 .86 89 PCT 16 P3 VS1 .73 .24 VS1 VS1 .580 NPUFZ 63 48 91 .30 151 PCT 10 P2 VS3 .60 VS3 TEC .610 NBAZ2 4 48 91 .86 100 PCT 16 P3 VS3 .90 .17 VS3 VS3 .580 NPUFZ 64 102 91 .21 114 PCT 6 P2 VS3 1.24 VS3 TEC .610 NBAZ1 27 102 91 .61 88 PCT 12 P3 VS3 .87 .24 VS3 VS3 .580 NPUFZ 63

                                              .26           54          PCT                 9                                                                                VS3         TEH      .610          NBAZ1      29 110                 91                                                                          P2       VS3                .64 110                 91                  .73        107            PCT              14           P3       VS3                .94                                   .23  VS3         VS3      .580          NPUFZ      63 134                 91                  .45        111            PCT              15           P2       11H              1.14                                         VS3         TEH      .610          NBAZ1      25 45              92                  .64        132            PCT              18           P2       BW1              -. 86                                        VS3         TEH      .610          NBAZ2       3 45              92                1.06            93          PCT              19           P3       BW1              -. 61                                   .26  07H         VS3      .580          NPUFZ      64                                 DQA 49              92                   48        129            PCT              15           P2       BW1              -. 93                                        VS3         TEH      .610          NBAZ2       3       H S      -     .
              --     .         -----               +---- - - - - - +                -  ------------                                                         --------              +--- -    . -+-
                                                                                                                                                                                                +                      +-    -+           -    ----

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21

   ....----------------                                           +----+---+---------                                  ----              .+---+----+-
                                                                                                                                           +----               ---..                               +          -        +      -+--+      ---        +---          +

5 ST Max

SG -32 ST Max Hq" - Palo Verde 3 U3R15 PVNGS3 20101001 11/01/2010 13:51:23 +-- -----------.... +.. --.----.......------ +--- +----+..----+.----...+- +-+ --- +-+--- I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21

             -+-                       -         ----------....--------                         +-----              +-----        +----+----+----+---+-+-+..-------....----                                                                 +

49 92 .81 123 PCT 15 P3 BW1 -. 82 .32 08H VS3 .580 NPUFZ 64 H DOA 103 92 .29 133 PCT 10 P2 VS3 .58 VS3 TEH .610 NBAZ1 30 103 92 .92 102 PCT 16 P3 VS3 .61 .25 VS3 VS3 .580 NPUFZ 63 48 93 .22 138 PCT 8 P2 VS3 -. 57 VS3 TEC .610 NBAZ2 4 48 93 .96 85 PCT 17 P3 VS3 -. 63 .46 VS3 VS3 .580 NPUFZ 64

                       .23                                                                                   .83 102    93                     96          PCT                      8  P2          VS3                                                                    VS3            TEC .610 NBAZ1            28 102    93         .69       104           PCT                   13    P3          VS3                   .83                                 .28          VS3            VS3 .580 NPUFZ            63 91    94         .14         26          PCT                      6  P2          BW1                   .85                                              VS3            TEH .610 NBAZ1            29 118    95         .27       127           PCT                   10    P2          VS4                 -. 64                                              VS3            TEC .610 NBAZ1            28 118    95         .91       101           PCT                   13    P3          VS4                 -. 59                                 .27           VS4           VS4 .580 NPUFZ            69                               DQA 120    95         .38       121           PCT                   12    P2          VS3                 -. 58                                               VS3           TEC .610 NBAZ1            28 120    95         .56       120           PCT                   16    P2          VS3                   .75                                               VS3           TEC .610 NBAZ1            28 120    95        1.36       103           PCT                   22    P3          VS3                 -. 91                                 .48           VS3           VS3 .580 NPUFZ            63 120    95        1.26         96          PCT                   21    P3          VS3                   .77                                 .30           VS3           VS3 .580 NPUFZ            63 134    95         .29       134           PCT                   10    P2           11H               1.00                                                 VS3           TEH .610 NBAZ1            23 48    97         .24       112           PCT                      9  P2          VS3                 -. 69                                               VS3           TEC .610 NBAZ2             4 48    97         .89       102           PCT                   16    P3          VS3                 -. 50                                 .37           VS3           VS3 .580 NPUFZ            64                               DOA 92    97         .26       145           PCT                      9  P2           10H                  .98                                               VS3           TEH .610 NBAZ1            30 49    98         .44       126           PCT                   13    P2          VS3                   .63                                               VS3           TEH .610 NBAZ2             4 49    98         .80       118           PCT                   15    P3          VS3                   .91                                 .28           VS3           VS3 .580 NPUFZ            64 89    98         .26         93          PCT                      7  P2          VS4                   .98                                               VS3           TEC .610 NBAZ1            23 103    98         .36       128           PCT                   10    P2          VS3                   .89                                               VS3           TEC .610 NBAZ1            27 103    98         .96         97          PCT                   17    P3          VS3                   .52                                 .26           VS3           VS3 .580 NPUFZ            63 127    98         .22         87          PCT                      8  P2          06H                   .73                                               VS3           TEH .610 NBAZ1            33 94    99         .29       147             PCT                 10    P2          VS2                 -. 73                                               VS3           TEH .610 NBAZ1            29      H
         +                 --+----+----+----+-       .-                         +              -----   -   -    -+                +-          -      --                ----
                                                                                                                                                          +......+-+......-                               -   -+    ----        +---

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21 +---- ... ... +-----------+-+ ---- +- -- --- +----+----+- -+ - + ......- -- t +- 6 ST Max

SG - 32 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 11/01/2010 13:51:23 + ....------- -- .... .... ÷

                                                                                                                        +-....      -------                        --     -+.----+-----                           - - + ......            +--+-     ...---.....----

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21 4.... ------------ ----...---------- +-----.. +÷----- -+---+----+----+---+----- - --.. 4 ...-- + +- -- +--- + 94 99 .60 108 PCT 12 P3 VS2 - .75 .48 VS2 VS2 .580 NPUFZ 63 H 98 99 .32 126 PCT 11 P2 VS2 -. 93 VS3 TEH .610 NBAZ1 29 H 98 99 .70 103 PCT 13 P3 VS2 - .71 .50 VS2 VS2 .580 NPUFZ 63 H 49 100 1.64 95 PCT 31 P2 BW1 .97 VS3 TEH .610 NBAZ2 3 H 49 100 .40 98 PCT 13 P2 BW2 .87 VS3 TEC .610 NBAZ2 4 C 49 100 2.31 110 PCT 32 P3 BW1 1.13 .20 08H VS3 .580 NPUFZ 64 H 49 100 .96 117 PCT 14 P3 BW2 .79 .13 08C VS3 .580 NPUFZ 69 C 103 100 .25 127 PCT 8 P2 BW1 - .94 VS3 TEH .610 NBAZ1 30 H 48 101 2.95 103 PCT 40 P2 BW1 - .71 VS3 TEH .610 NBAZ2 4 H 48 101 3.06 94 PCT 40 P2 VS3 -'.60 VS3 TEH .610 NBAZ2 4 H 48 101 2.51 94 PCT 33 P3 BW1 -. 90 .23 08H VS3 .580 NPUFZ 64 H DQA 48 101 4.60 85 PCT 47 P3 VS3 -. 84 .40 08H VS3 .580 NPUFZ 64 H 52 101 .30 128 PCT 10 P2 VS3 -. 54 VS3 TEC .610 NBAZ2 4 C 52 101 1.06 104 PCT 18 P3 VS3 - .55 .56 VS3 VS3 .580 NPUFZ 64 H 144 101 .31 131 PCT 10 P2 VS1 -. 93 VS3 TEH .610 NBAZ1 24 H 144 101 .87 98 PCT 16 P3 VS1 -. 99 .43 VS1 VS1 .580 NPUFZ 62 H 49 102 .47 103 PCT 14 P2 BW1 -. 94 VS3 TEH .610 NBAZ2 4 H 49 102 1.03 113 PCT 18 P3 BW1 - .80 .17 08H VS3 .580 NPUFZ 64 H DOA 69 102 .39 101 PCT 10 P2 VS3 - .61 VS3 TEC .610 NBAZ1 23 C 69 102 1.15 106 PCT 20 P3 VS3 - .91 .63 VS3 VS3 .580 NPUFZ 62 H 79 102 .42 140 PCT 14 P2 09H .55 VS3 TEH .610 NBAZ1 29 H 79 102 .59 108 PCT 12 P3 09H .55 .29 08H VS2 .580 NPUFZ 62 H 93 .58 VS3 TEH .610 NBAZ1 29 H 102 .56 121 PCT. 17 P2 VS2 93 102 .90 94 PCT 16 P3 VS2 .69 .35 VS2 VS2 .580 NPUFZ 62 H 113 102 .17 122 PCT 7 P2 10H .15 VS3 TEH .610 NBAZ1 33 H 48 103 .75 101 PCT 17 P2- VS3 - .75 VS3 TEC .610 NBAZ2 1 C 48 103 1.73 100 PCT 26 P3 VS3 - .82 .42 VS3 VS3 .580 NPUFZ 64 H

      - --    -.   - - -----         +- - - ---      - - ---          - - ---  - - - - - --                                                                      -
                                                                                                                                                                    - -   - -           -  - ---  - ---- -    -+-    -            ---  -        ---              -    -    ----

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21 7 ST Max

SG - 32 ST Max Palo Verde 3 U3RI5 PVNGS3 20101001 11/01/2010 13:51:23 +------ ------------

                                                         +..                   -------       -+...----+----.-+                                       ----            -+..----+-                        +-         +-          +--+-+           --       ---          +

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILI UTIL21

 - - -+---       -+----+-           --     +-      - --  +- .---      +- ----           -- -+                       -----              ----#                 +---     -+--    -. -+-.+-                         -+-          +--+---                    ---

102 103 .25 100 PCT 10 P2 VS3 .79 VS3 TEC .610 NBAZ1 26 102 103 .96 77 PCT 17 P3 VS3 .90 .35 VS3 VS3 .580 NPUFZ 62 47 104 .23 90 PCT 9 P2 BW2 .79 VS3 TEC .610 NBAZ2 2 47 104 .75 102 PCT 11 P3 BW2 .66 .14 07C VS3 .580 NPUFZ 69 DOA 49 104 .46 108 PCT 14 P2 BW1 - .79 VS3 TEH .610 NBAZ2 3 49 104 1.11 115 PCT 19 P3 BW1 -. 89 .37 08H VS3 .580 NPUFZ 64 DQA 55 104 .29 113 PCT 10 P2 BW1 1.56 VS3 TEH .610 NBAZ2 3 48 105 .63 125 PCT 18 P2 VS3 .80 VS3 TEC .610 NBAZ2 2 48 105 .73 87 PCT 20 P2 BW2 .73 VS3 TEC .610 NBAZ2 2 48 105 1.39 94 PCT 19 P3 VS3 .56 .13 08C VS3 .580 NPUFZ 69 48 105 1.47 109 PCT 20 P3 BW2 .68 .16 08C VS3 .580 NPUFZ 69 DOA 47 106 1.27 114 PCT 24 P2 VS3 .42 VS3 TEC .610 NBAZ2 1 47 106 1.40 113 PCT 28 P2 BW1 - .79 VS3 TEH .610 NBAZ2 3 47 106 .19 116 PCT 7 P2 VS3 - .77 VS3 TEH .610 NBAZ2 3 47 106 2.18 102 PCT 30 P3 BW1 -. 70 .23 07H VS3 .580 NPUFZ 63 DOA 47 106 2.82 98 PCT 36 P3 VS3 .67 .61 07H VS3 .580 NPUFZ 63 89 106 .26 141 PCT 8 P2 VS3 -. 60 VS3 TEC .610 NBAZ1 23 89 106 .81 74 PCT 15 P3 VS3 -. 89 .35 VS3 VS3 .580 NPUFZ 62 103 106 .23 135 PCT 7 P2 VS3 .89 VS3 TEC .610 NBAZ1 25 103 106 .85 95 PCT 16 P3 VS3 .67 .49 VS3 VS3 .580 NPUFZ 62 47 108 .54 124 PCT 15 P2 BW1 - .52 VS3 TEH .610 NBAZ2 4 47 108 1.34 122 PCT 22 P3 BW1 - .79 .19 07H VS3 .580 NPUFZ 63 47 108 .78 93 PCT 14 P3 VS3 .00 .21 07H VS3 .580 NPUFZ 63 P2 BW1 .610 NBAZ2 51 108 .57 129 PCT 16 -. 84 VS3 TEH 4 51 108 1.03 107 PCT 18 P3 BW1 -. 66 .24 08H VS3 .580 NPUFZ 63 81 108 .40 149 PCT 12 P2 09H .88 VS3 TEH .610 NBAZ1 30 48 109 .92 72 PCT 22 P2 BW1 1.00 VS3 TEH .610 NBAZ2 3 H

 -. - -   +- ---                  - -     -+- ---        +-    - --   +-    -.-    -+-      -+----+-                          ---       +--                --      -'--           -+-.....+-                   4--  -+-          -+4---                ---

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21 - - - - --- - -- - -+ . .- - - - - -+- -- - ----- - - - -- -- - -+- - - -+- -+----+--- 8 ST Max

SG - 32 ST Max a Palo Verde 3 U3R15 PVNGS3 20101001 11/01/2010 13:51:23

--..--               ----------                 -        +----+----+----+--------+*
                                                                    --                ...---------..                                                                      +----+-           ----.           -                +......---+----         +----

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21 48 109 1.20 95 PCT 20 P3 BW1 .85 .21 08H VS3 .580 NPUFZ 63 H 47 110 .60 104 PCT 15 P2 VS3 .45 VS3 TEC .610 NBAZ2 1 C 47 110 1.53 109 PCT 24 P3 VS3 .75 .71 VS3 VS3 .580 NPUFZ 63 H 49 110 .38 117 PCT 11 P2 BW2 .68 VS3 TEC .610 NBAZ2 1 C 49 110 .79 126 PCT 12 P3 BW2 .38 .11 08C VS3 .580 NPUFZ 69 C 95 110 .25 124 PCT 7 P2 VS3 - .47 VS3 TEC .610 NBAZ1 25 C 95 110 .72 102 PCT 14 P3 VS3 -. 69 .29 VS3 VS3 .580 NPUFZ 62 H 129 110 .42 130 PCT 14 P2 VS1 .70 VS3 TEH .610 NBAZ1 21 H 129 110 1.01 99 PCT 18 P3 VS1 .42 .67 VSI VS1 .580 NPUFZ 62 H 56 111 .24 71 PCT 9 P2 VS3 - .70 VS3 TEH .610 NBAZ2 17 H 56 111 .66 95 PCT 13 P3 VS3 - .71 .37 VS3 VS3 .580 NPUFZ 63 H 111 .25 131 PCT 9 P2 09H .75 VS3 TEH .610 NBAZ1 21 H 90 44 113 .34 137 PCT 11 P2 BW1 - .88 VS3 TEH .610 NBAZ2 3 H 44 113 .82 98 PCT 15 P3 08H .17 .'20 07H VS3 .580 NPUFZ 63 H DOA 44 113 1.11 104 PCT 19 P3 BW1 - . 92 .39 07H VS3 .580 NPUFZ 63 H 15 P2 BW1 43 114 .54 116 PCT - .57 VS3 TEH .610 NBAZ2 4 H 43 114 1.05 108 PCT 18 P3 BW1 - .85 .38 07H VS3 .580 NPUFZ 63 H 67 114 .24 30 PCT 9 P2 09H .86 VS3 TEH .610 NBAZ2 17 H 113 114 .27 113 PCT 10 P2 VS2 .65 VS3 TEH .610 NBAZ1 19 H 41 116 .86 109 PCT 21 P2 BWI 1.10 VS3 TEH .610 NBAZ2 6 H 41 116 .94 109 PCT 17 P3 BW1 - .80 .42 07H VS3 .580 NPUFZ 63 H DQA 47 116 .68 138 PCT 18 P2 BWI VS3 TEH .610 NBAZ2 6 H 47 116 .68 133 PCT 13 P3 BWl .23 07H VS3 .580 NPUFZ 62 H 116 .53 120 PCT 16 P2 VS1 .83 VS3 TEH .610 NBAZI 23 H 155 - 116 1.27 104 PCT 21 P3 VS1 - .77 .53 VS1 VS1 .580 NPUFZ 62 H 155 -- -- ------------------ +- - - +- - -- ------- ----

                                                                                                                                                             +           ----
                                                                                                                                                                          +        +- --          ---
                                                                                                                                                                                                  +       - +                +-       --------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21

    .      .--   ----------------            +....+-                                +      -         -      -
                                                                                                           +----+   --                   ----    +---          +----+----+---                      +-  --    +-+-...--+---                      --   +---

9 ST Max

SG - 32 ST Max qT Palo Verde 3 U3R15 PVNGS3 20101001 11/01/2010 13:51:23 + +---÷ F----- ----------------- ."4- +----+- -- --- +---------+-+-----. - - "+ I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21 + - - ------------- +....--- .... 4-. ----.---- +----.--- +---.-+.---..+-.... +- -- + - +--+......------- - 1 40 117 .30 86 PCT 10 P2 BW1 -1.12 VS3 TEH .610 NBAZ2 6 H

                                   .59       124             PCT                12       P3           BW1               - .86                                .38       07H            VS3     .580       NPUFZ         62        H 40         117 44         117               .22       112             PCT                  7      P2           BW1             -1.31                                            VS3            TEH     .610       NBAZ2          6        H 96         117               .26       131             PCT                  9      P2           09H                  .77                                         VS3            TEH     .610       NBAZ1         20        H 41         118               .33       124             PCT                11       P2           08H                  .69                                         VS3            TEH     .610       NBAZ2          5        H 41         118               .64       281             PCT                12       P3           08H                  .88                               .60       07H            VS3     .580       NPUFZ         62        H
                                   .64                       PCT                                                                                                       VS3            TEH     .610 45         120                         131                                18       P2           BW1             -1.08                                                                              NBAZ2          6        H 45         120             1.17        121             PCT                20       P3           BW1             -1.11                                  .32       07H            VS3     .580       NPUFZ         62        H 51         120               .21       126             PCT                  7      P2           09H               - .76                                          VS3            TEH     .610       NBAZ2          6        H 135         120               .27       138             PCT                10       P2           VS1                  .65                                         VS3            TEH     .610       NBAZ1         21        H 153         120               .19          65           PCT                  7      P2           VS1               -. 89                                          VS3            TEH     .610       NBAZ1         21        H 36         121               .36          72           PCT                12       P2           BW1             -1.10                                            VS3            TEH     .610       NBAZ2          6        H 36         121               .83       125             PCT                15       P3           BW1               -. 99                                .54       07H            VS3     .580       NPUFZ         62        H 66         121               .23          82           PCT                  8      P2           09H               - .17                                          VS3            TEH     .610       NBAZ1         16        H 100         121               .40        142            PCT                13       P2            VS2                 .63                                         VS3            TEH     .610       NBAZ1         20        H 100         121             1 .04          92           PCT                18       P3            VS2                 .85                                .44      VS2            VS2     .580       NPUFZ         62        H 127         122               .24        115            PCT                  9      P2            VS1                 .21                                         VS3            TEH     .610       NBAZ1         19        H 127         122               .62          77           PCT                12       P3            VS1                 .44                                .23      VS1            VS1     .580       NPUFZ         62        H 34         123               .23        127            PCT                  9      P2            07H            -1.22                                            VS3            TEH     .610       NBAZ2          5        H 34         123               .72        116            PCT                12       P3            07H            -1.13                                   .35      07H            07H     .600       NPAHZ         60        H 140         123               .21        141            PCT                  8      P2            06H                 .72                                         VS3            TEH     .610       NBAZ1         22        H 168         123               .29        140            PCT                10       P2            BW2              -. 40                                          VS3            TEC     .610       NBAZ1         50        C 168         123             1.02         102            PCT                15       P3            BW2              -. 60                                 .14      10C            VS5     .580       NPUFZ         69        C 136         125                 18         58           PCT                  7      P2            11H              - . 18                                         VS3            TEH     .610       NBAZ1         21        H
  --   --.   -     +    ----          +--    ----        -.       .        - - -+ --  ---                --+-----                        --    +-.-----              -- -+---         -+--      -+---          4- -        -   --            ---        +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILI UTIL21 -- ---- -------- ---- +----------------+....- - - ---- + -- --- ------ +-- - +- -- +- +--+ --- +--- + 10 ST Max

SG - 32 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 11/01/2010 13:51:23 +.... --- ------------

                                                                        +....+...+....+----+-------+---------                                                             +           -+...+......---+---                                   +---          +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21

  - -. -+-         - -                                    *1-----+...+..                                      .+---                       -----  --     -------    +-  -+-++..                     ...           +-    -- +"---                  -  --    +-

69 126 .26 134 PCT 10 P2 VS3 - .43 VS3 TEH .610 NBAZ2 15 H 69 126 .78 106 PCT 15 P3 VS3 -. 69 .21 VS3 VS3 .580 NPUFZ 62 H 24 127 .56 115 PCT 17 P2 BW1 .96 VS3 TEH .610 NBAZ2 5 H 24 127 1.05 114 PCT 18 P3 BW1 .88 .32 07H VS3 .580 NPUFZ 62 H 165 128 .65 108 PCT 16 P2 BW2 .39 VS3 TEC .610 NBAZ1 45 C 165 128 1.41 120 PCT 19 P3 BW2 .53 .13 10C VS5 .580 NPUFZ 69 C 45 132 .35 136 PCT 11 P2 08H .61 VS3 TEH .610 NBAZ2 6 H 45 132 .57 91 PCT 11 P3 08H .85 .27 07H VS3 .580 NPUFZ 62 H 50 133 .57 126 PCT 16 P2 09H 1.27 VS3 TEH .610 NBAZ2 6 H 50 133 .67 94 PCT 13 P3 09H 1.24 .26 08H VS3 .580 NPUFZ 62 H 116 133 .27 136 PCT 9 P2 VS2 .50 VS3 TEH .610 NBAZl 20 H 116 133 .74 91 PCT 14 P3 VS2 .91 .33 VS2 VS2 .580 NPUFZ 61 H 50 115 PCT P2 09H 1.37 VS3 TEH 5 H 135 .40 13 .610 NBAZ2 50 135 .59 108 PCT 12 P3 09H 1.23 .31 08H VS3 .580 NPUFZ 61 H 128 137 .22 137 PCT 8 P2 VS2 1.34 VS3 TEH .610 NBAZ1 20 H I111 138 .23 99 PCT 9 P2 10H .67 VS3 TEH .610 NBAZl 19 H 68 145 .23 140 PCT 8 P2 09H .48 VS3 TEH .610 NBAZ1 16 H 107 146 .24 85 PCT 9 P2 VS2 - .83 VS3 TEH .610 NBAZ2 13 H 107 146 .75 73 PCT 14 P3 VS2 - . 93 .72 VS2 VS2 .580 NPUFZ 61 H 152 147 .17 95 PCT 7 P2 03C .00 VS3 TEC .610 NBAZl 45 C 80 153 .20 127 PCT 7 P2 VS2 - .78 VS3 TEH .610 NBAZ2 11 H 80 153 .70 85 PCT 13 P3 VS2 - .61 .51 VS2 VS2 .580 NPUFZ 61 H 100 153 .15 135 PCT 6 P2 09H .76 VS3 TEH .610 NBAZ2 13 H 102 153 .18 131 PCT 7 P2 VS2 .77 VS3 TEH .610 NBAZ2 13 H - .. .- - - --- - - - - - - - - - - -- -- - --- ----- - ------- +- - - +--- I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21 + +------------------------+--------+----+----+---+----+----+ ---- ------ +----+--- 11 ST Max

SG - 32 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 11/0112010 13:51:23

 .... 4.       4.     -----                    --  -       4----  --        -------- 4                 -,                                                     -------            ----------
                                                                                                                                                                                         .          .       .        --   4--+-----                            4 I ROW           COL                 VOLTS              DEG          IND        PER               CHN LOCN                          INCHI        INCH2             CRLEN BEGT ENDT                         PDIA       PTYPE           CAL      L        UTIL1                 UTIL21
 .      .          4...---------------------+----.                                       ----.----                +.----+-                  --      -+-----                        -          -.......            -       +----                 ---            +--------

102 153 .73 87 PCT 14 P3 VS2 .79 .53 VS2 VS2 .580 NPUFZ 61 H 89 154 .25 137 PCT 9 P2 VS3 - .77 VS3 TEH .610 NBAZ2 12 H 89 154 .82 89 PCT 15 P3 VS3 -. 94 .26 VS3 VS3 .580 NPUFZ 61 H DQA 78 155 .26 105 PCT 9 P2 VS2 1.00 VS3 TEH .610 NBAZ2 12 H 71 156 .19 137 PCT 7 P2 VS2 .91 VS3 TEH .610 NBAZ2 11 H 87 156 .20 99 PCT 7 P2 VS3 -. 76 VS3 TEH .610 NBAZ2 11 H 87 156 .75 93 PCT 14 P3 VS3 -1.03 .18 VS3 VS3 .580 NPUFZ 61 H 142 157 .18 148 PCT 7 P2 11H .77 VS3 TEH .610 NBAZ2 13 H 117 160 .25 119 PCT 9 P2 VS3 -. 88 VS3 TEH .610 NBAZ2 14 H 117 160 .53 105 PCT 11 P3 VS3 -1.03 .28 VS3 VS3 .580 NPUFZ 61 H 118 161 .15 133 PCT 6 P2 10H .86 VS3 TEH .610 NBAZ2 13 H 89 166 .53 119 PCT 15 P2 VS3 -. 78 VS3 TEH .610 NBAZ2 12 H 89 166 .26 149 PCT 9 P2 VS3 .68 VS3 TEH .610 NBAZ2 12 H 89 166 1.14 110 PCT 20 P3 VS3 -. 98 .30 VS3 VS3 .580 NPUFZ 61 H 109 166 .21 69 PCT 7 P2 VS3 - .88 VS3 TEH .610 NBAZ2 13 H 109 166 .70 75 PCT 13 P3 VS3 -1.22 .29 VS3 VS3 .580 NPUFZ 61 H 87 170 .24 89 PCT 9 P2 VS3 - .75 VS3 TEH .610 NBAZ2 10 H 87 170 .58 79 PCT 12 P3 VS3 -1.19 .21 VS3 VS3 .580 NPUFZ 61 H 56 175 -1.00 VS3 TEH

                                           .37        139          PCT            12                P2        BW1                                                                                        .610       NBAZ2              10    H 56       175                         .95        119          PCT            17                P3        BW1                 -1.10                                .48      08H        VS3           .580       NPUFZ             61     H                                DQA 58       175                         .28        121          PCT            10                P2        BW1                    .88                                        VS3        TEH           .610       NBAZ2             10     H 67       176                         .18          62         PCT               7              P2        VS3                  -. 68                                        VS3        TEH           .610       NBAZ2                9   H 67       176                         .55        106          PCT            11                P3        VS3                  -. 78                               .18      VS3        VS3           .580       NPUFZ             61     H 33       178                         .19          98         PCT               7              P2        VS3                    .30                                        VS3        TEH           .610       NBAZ2                8   H I ROW           COL                 VOLTS              DEG          IND        PER               CHN LOCN                          INCHI        INCH2             CRLEN BEGT ENDT                         PDIA       PTYPE           CAL      L        UTIL1                 UTIL21
-- - --        - -                                       ------.-"+ .-------------...        ...-...------                                                  ----           +----4                     --      -            -        --------    ---            4-        --       +

12 ST Max

SG - 32 ST Max Palo Verde 3 U3RI5 PVNGS3 20101001 11/01/2010 13:51:23 +.. - ----... +- -- ++-÷-++-----

                                                           ..        +-               -------------                   ----                   +----+----+---                         -  +   -              --    ----- +---        +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21 +- ---..--...----+------------+--- --------- -+--- ----- ----

                                                                                                                                                          +       ---       +-+-                    +--+---           +---

1 49 178 .23 153 PCT 7 P2 09H -1.22 VS3 TEH .610 NBAZ2 8 H 113 178 .23 132 PCT 8 P2 VS3 -1.00 VS3 TEH .610 NBAZ2 11 H 113 178 .57 88 PCT 12 P3 VS3 -1.00 .16 VS3 VS3 .580 NPUFZ 61 H 76 179 .15 95 PCT 6 P2 VS2 .86 VS3 TEH .610 NBAZ2 9 H 96 179 .29 125 PCT 10 P2 VS2 .92 VS3 TEH .610 NBAZ2 12 H 69 180 .58 103 PCT 17 P2 VS3 -. 84 VS3 TEH .610 NBAZ2 9 H 69 180 1.22 100 PCT 21 P3 VS3 -. 72 .38 VS3 VS3 .580 NPUFZ 61 H 97 180 .23 95 PCT 8 P2 VS3 -. 83 VS3 TEH .610 NBAZ2 12 H 97 180 .90 79 PCT 17 P3 VS3 -. 99 .31 VS3 VS3 .580 NPUFZ 61 H 72 181 .25 118 PCT 9 P2 VS3 .94 VS3 TEH .610 NBAZ2 10 H 72 181 .66 74 PCT 13 P3 VS3 .97 .36 VS3 VS3 .580 NPUFZ 61 H 84 183 .22 115 PCT 8 P2 VS3 .37 VS3 TEH .610 NBAZ2 9 H 84 183 .60 118 PCT 12 P3 VS3 .49 .26 VS3 VS3 .580 NPUFZ 61 H 102 183 .25 106 PCT 9 P2 VS3 -. 91 VS3 TEH .610 NBAZ2 11 H 102 183 .85 102 PCT 16 P3 VS3 -. 83 .19 VS3 VS3 .580 NPUFZ 61 H 78 189 .17 119 PCT 7 P2 VS3 -. 44 VS3 TEC .610 NBAZ1 40 C

...     -  -4          -        -------------
                                       +------------+-----                                   +                        ----                       -
                                                                                                                                              +----+----      +        ---- +-        ---     -+--+---                +---        +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21

...     -  ---                         ++-....  ------------        +-+-        +----       +*-----                   -+--------+-------                                    +-    -    +  -         +--+---           +---

Tubes: 176 Records: 318 13 ST Max

APPENDIX D PLI & PLP DATA SHEETS 15

SG - 31 ST Max ax Palo Verde 3 U3R15 PVNGS3 20101001 11/01/2010 16:04:15

                                                                       ......---------- ---------                       ----        +----+----+-+.......         ---........-                    ---+--     - -     -     ---        +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL2I + ÷ ÷ -- -----------

                                        +-----+----+----+----                                     ------                -+---      ----
                                                                                                                                    +         -+------+--                      -                   +-----4+               ---
    ----------------------------        +----+-----+-----+-----+-----+-----+----+---+----+-----+-                                                              +         -    +---+--+                          ---    +----         +-

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21 +- ---- ------------

                                        +---+----+----+-----                                                            ----        +----+----+--÷----                -       +----+--+...---.....---

Tubes: 0 Records: 0 1 ST Max

SG - 32 ST Max Palo Verde 3 U3R15 PVNGS3 20101001 1110112010 16:05:21 S- -- - - 4------ ---- ----- + --- --- -------- - --- + -- -- -- - - - ------ -- - - - -- I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL2I

                           -----------        +----+----+-----                          -------------...------                                                     ------        +-------------------                                                     -   ----

I 153 64 1.24 86 PLP 8 FDP .88 FDP FDP .600 NPAHZ 67 C SRI I .I I 154 65 1.31 88 PLP 8 FDP .64 FDP FDP .600 NPAHZ 67 C SRI S156 65 1.02 79 PLP 8 FDP .99 FDP FDP .600 NPAHZ 67 C SRI -.. ...----------- +-------- -

                                                                      +----  ...      -
                                                                                     +----+----+-----------                             +------..---+.                           +---                          +---               +--+------------                    +-4 I ROW                COL                VOLTS       DEG        IND           PER             CHN LOCN                           INCH1                  INCH2      CRLEN BEGT ENDT                       PDIA        PTYPE     CAL       L          UTIL1     UTIL2I

- ....-----------..-------- +----.---------..--..----4-----------+--....+- --- + - -- +------- +- Tubes: 3 Records: 3 1 ST Max

APPENDIX E PLUG MAPS 16

SG-31 No Tubes Plugged in tli SG1in*WU3FRd15." 'qgod in this SGin U3RI;,, ,., ,i" Palo Verde U3R15 PVNGS3 3RSG /err,,) .. a 60 Plugged Tube

  • 53 Stay Rod 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 170 170 165  :.:: :::: ..

165 160 160 155 155 150 - ..~. -- ------ - - 150 145 145 140 -- ------- -- - --

                                                                                                                                                                           ,      . .. . .                                   140 135                                                                                                                                                                                                                     135 130                                                                                                                                                                                                                     130 125                     _IK~..                      _.                                             ...._._ ._..                                                                                                         125 120                                                                                                                                                                                                                     120 115                                                                                                                                                                                                                     115 110   i       i     i                                                                                                                                                                                  1- 1      -T--   110 105                                                                                                                                                                                                                     110 105 100                                                                                                                                                                                                                     100 95                                                                                                                                                                                                                     95 90 85
                                                                                     -- --- ---             ----   - ----                                         -------   --                     ---- 1 1---   21 1 1      90 85 80                                                                                                                                                                                                                     80 75                                                                                    .~.   .   . .  . .

75 70 70 65 65 60 ___________________ 7 60 55 55 50 50 0 _ __ __t 45 45 40 _ _ _.. ........I .._ _ _ 40 35 35 30 30 25 25 20 20 15 15 10 10 5 5 5.. 5 10 15 2025

                             .    .0 3035           4845 5055 6065         7075     8085        9095      100105

[ 10 115 120 .25 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 Westinghouse ElectriGCom~pany LLC - ST Max 10/2112010 21:57:37

SG - 32 Tubes Plugged in U3R15 Palo Verde U3R15 PVNGS3 3RSG a 62 Plugged Tube

  • 53 Stay Rod
  • 6 Tube Plugged in U3R15 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 170 170 165 i i i iF r 165 160 160 155 155 150 150 145 -M, .. . ... . . . . 145
                                                                                                          . . . . . . . . . . . . .                                                                                                               140 140
                                                                                                            . . . . . . . . . . . .                                                                                                               135 135                                                                                                                              . . . .

130 130

                                                                                                            .. ... .. .. .. .                                                                                                                     125 125                                                                                                                                                        .. .. . .. .. .              .. .

120

                                                                                                                                                                .. .. .. .. .. .                   .                                              120
                                                                                                                                                                .  . . . . .  . .  . .  .    . .  ..                                              115 115 110 105 110 105 100                                                                                                                                                                                                                                          100 95                                            - T                i    T      ;      i          t    I        t      ;       "
  • I l 95 90 . . . 90 85 85 80 75
                                                                                                          -=-.-v-7 t

80 75 70 .... 70 1 . . . ...... . . ..... . . . .......... .. .. . 65

                                                                                                                                    .                         ....        ....  ....         ...................                                  65 60 55
                                                                                                          --        7-1       7ý.
                                                                                                                                                                                                ...........                                       60 55 50                                                                                                                                                                                                                                          50 45
                                                                                                                                                                                                              ..........                          45 40                                                                                                                                                                                                        .. .. .. .. .. .. .. .. .. .. 40 35                                                                                                                                                                                                                                          35 30                                                                                                                                          .4                                                                                              30 25                                                                                                                                                                                                                                          25 20 -L i- L                                                                                                                                                                                                                                  20 15 10                                                                              +       v~t                                              +    +

HKH I 15 10 5 5 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 Westinghouse Elect- Company LLC- STMax 1012112010215913

APPENDIX F FORM NIS-1 17

APS NIS -1 FOR OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS

1. OWNER ARIZONA PUBLIC SERVICE COMPANY, et al la. ADDRESS P.O. BOX 52034; PHOENIX, ARIZONA 85072
2. PLANT PALO VERDE NUCLEAR GENERATING STATION 2a. ADDRESS 5801 SOUTH WINTERSBURG ROAD, TONOPAH, ARIZONA 85354
3. UNIT NUMBER 3
4. OWNERS CERTIFICATE OF AUTHORIZATION NONE
5. COMMERCIAL SERVICE DATE 1-8-88
6. COMPONENTS INSPECTED:

COMPONENT OR MANUFACTURER NATIONAL APPURTENANCE OR INSTALLER BOARD NO 3MRCEEO1A Ansaldo 191 STEAM GENERATOR 31 3MRCEEO1B Ansaldo 192 STEAM GENERATOR 32 18

APS INIS- 1 BACK OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS

7. EXAM DATES October 2010
8. INSPECTION INTERVAL 1-11-08 to 1-10-18
9. ABSTRACT OF EXAMINATIONS. INCLUDE A LIST OF EXAMINATIONS AND A STATEMENT CONCERNING STATUS OF WORK REQUIRED FOR CURRENT INTERVAL.

Table I in the report summary section documents the number and type of each examination performed. A summary of the tubes with indications of degradation is listed in Appendix B and C of this report for SG 31 and 32 respectively. The tubes identified below were plugged as a result of this examination. The number of tubes plugged are as follows: SG 31 = 0 tubes (no tubes were plugged) SG 32 = 6 tubes Row 49 Line 100 Row 48 Line 101 Row 48 Line 105 Row 47 Line 106 Row 48 Line 109 Row 41 Line 116 WE CERTIFY THAT THE STATEMENTS MADE IN THIS REPORT ARE CORRECT AND THE EXAMINATIONS AND CORRECTIVE MEASURES TAKEN CONFORM TO THE RULES OFAliksE CODE- $"*QNyX,eoDouglas B(Z41530) DNDacn=Ha.en, Douglas B(Z41530) Dougilas Reason: Iam the author of this DATE SIGNED: ARIZONA PUBLIC SERVICE COMPANY BXZ4 t docomest W 41 VJ530)V Date:2 11.04.29 16:02:11 -0T/0 CERTIFICATE OF INSERVICE INSPECTION I, THE UNDERSIGNED, HOLDING A VALID COMMISSION ISSUED BY THE NATIONAL BOARD OF BOILER AND PRESSURE VESSEL INSPECTORS AND THE STATE OF PROVINCE OF ARIZONA EMPLOYED BY HSB CT OF HARTFORD, CONNECTICUT HAVE INSPECTED THE COMPONENTS DESCRIBED IN THIS OWNERS REPORT DURING THE PERIOD ,o-i-'o TO ,--s. , AND STATE THAT TO THE BEST OF MY KNOWLEDGE AND BELIEF, THE OWNER HAS PERFORMED EXAMINATIONS AND TAKEN CORRECTIVE MEASURES DESCRIBED IN THIS OWNERS REPORT IN ACCORDANCE WITH THE REQUIREMENTS OF THE ASME CODE, SECTION XI. BY SIGNING THIS CERTIFICATE NEITHER THE INSPECTOR NOR HIS EMPLOYER MAKES ANY WARRANTY, EXPRESSED OR IMPLIED, CONCERNING THE EXAMINATIONS AND CORRECTIVE MEASURES DESCRIBED IN THIS OWNERS REPORT. FURTHERMORE, NEITHER THE INSPECTOR NOR HIS EMPLOYER SHALL BE LIABLE IN ANY MANNER FOR ANY PERSONAL INJURY OR PROPERTY DAMAGE OR A LOSS OF ANY KIND ARISING FROM OR CONNECTED WITH THIS INSPECTION. INSPECTOR 1"6 'z' "/I COMMISSIONS '-o cs "A. NATL' BOARD, STATE, PROVINCE t, Cc-' z&-' DATE "*,-2't-n}}