ML11287A031

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual (TRM) Revision 55
ML11287A031
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/01/2011
From: Stephenson C
Arizona Public Service Co
To:
Office of Nuclear Reactor Regulation
References
102-06414-TNW/CJS
Download: ML11287A031 (7)


Text

PVNGS Technical Requirements Manual (TRM)

Revision 55 Replacement Pages and Insertion Instructions The following LDCR is included in this change:

LDCR 11-R002 clarifies TRM Section T3.4, Reactor Coolant System, TSR 3.4.104.2 with regard to post-maintenance testing of individual valves in the pressurizer vent paths. The change clarifies that in any Mode, partial surveillance tests can be performed for post-maintenance testing under site procedural controls that ensure the valve being tested is isolated from Reactor Coolant System (RCS) pressure. This change is consistent with approved LDCR 11-B007 for related TS Bases 3.4.12, Pressurizer Vents, Surveillance Requirement (SR) 3.4.12.1.

Instructions Remove Page: Insert New Page:

Cover Page Cover Page List of Effective Pages, List of Effective Pages, Pages 1, 2, 3 and 4 Pages 1, 2, 3 and 4 T3.4.104-2 T3.4.104-2

Technical Requirements Manual Revision 55 September 1, 2011 5t e p hen son I ~i~~a;r8~;gned by Stephenson, Carl DN: cn=Stephenson, Carl J{1057781 Reason:lattesttotheaccuracyand CarI J(Z05778) ~~:;r;6'~~~~~~~~~~3~:~t_07'OO' PALO VERDE UNITS 1. 2. 3

Technical Requirements Manual LIST OF EFFECTIVE PAGES Page No. Revision No. Page No. Revision No.

TOe page i 33 T3.3.103-1 51 Toe page ii 48 T3.3.103-2 54 TOe page iii 33 T3.3.103-3 13 TOC page iv 52 T3.3.103-4 13 Tl.1.100-1 0 T3.3.104-1 46 Tl.2.100-1 0 T3.3.104-2 0 Tl.3.100-1 0 T3.3.105-1 46 Tl.4.100-1 0 T3.3.105-2 48 T2.0.100-1 0 T3.3.105-3 48 13.0.100-1 47 T3.3.106-1 46 T3.0.100-2 40 T3.3.106-2 14 T3.0.100-3 23 T3.3.107-1 0 T3.0.100-4 47 T3.3.107-2 46 T3.1.100-1 0 T3.3.108-1 0 T3.1.100-2 0 T3.3.108-2 0 13.1.101-1 0 13.3.200-1 46 13.1.101-2 54 13.3.200-2 31 13.1.101-3 0 13.3.201-1 0 T3.1.102-1 0 T3.4.100-1 28 T3.1.103-1 1 T3.4.101-1 0 T3.1.104-1 0 T3.4.101-2 0 T3.1.104-2 0 T3.4.101-3 0 13.1.105-1 46 T3.4.101-4 0 13 .1.105-2 0 T3.4.102-1 0 13 .1.105-3 50 T3.4.102-2 0 13.1. 200-1 46 13.4.103-1 53 13.1. 200-2 24 13.4.104-1 28 T3.1.201-1 0 13.4.104-2 55 13.l. 202-1 53 13.4.200-1 52 13.l. 202-2 46 T3.4.201-1 46 T3.1.203-1 29 T3.4.202-1 46 13.1.204-1 33 T3.4.203-1 46 13.1.205-1 33 T3.4.204-1 46 13.2.200-1 53 T3.5.200-1 46 13.3.100-1 46 13.5.200-2 0 13.3.100-2 10 13.5.200-3 0 13.3.101-1 40 13.5.201-1 16 13.3.101-2 46 T3.5.201-2 47 13.3.101-3 18 13.5.202-1 46 13.3.101-4 18 13.5.202-2 39 13.3.101-5 52 13.5.202-3 47 13.3.102-1 21 T3.5.202-4 0 13.3.102-2 40 13.5.203-1 46 PALO VERDE UNITS 1. 2. 3 1 Rev 55 9/1/11

Technical Requirements Manual LIST OF EFFECTIVE PAGES Page No. Revision No. Page No. Revision No.

T3.5.203-2 35 T3.9.200-2 29 T3.6.100-1 48 T3.9.201-1 46 T3.6.100-2 0 T3.10.200-1 40 T3.6.200-1 22 T3.10.201-1 0 T3.6.200-2 22 T3.10.201-2 0 T3.6.201-1 47 T3.10.202-1 40 T3.6.300-1 48 T3.10.202-2 0 T3.6.300-2 48 T3.11.100-1 40 T3.7.100-1 27 T3.11.100-2 38 T3.7.100-2 27 T3.11.100-3 38 T3.7.101-1 46 T3.11.100-4 38 T3.7.101-2 46 T3.11.100-5 38 T3.7.102-1 0 T3.11.100-6 38 T3.7.102-2 0 T3.11.100-7 38 T3.7.102-3 0 T3.11.100-8 38 T3.7.200-1 42 T3.11.100-9 38 T3.7.200-2 53 T3.11.101-1 40 T3.7.201-1 46 T3.11.101-2 46 T3.7.202-1 46 T3.11.101-3 46 T3.7.203-1 46 T3 . 11 . 101-4 39 T3.7.204-1 46 T3 . 11 . 101- 5 46 T3.7.205-1 46 T3.11.102-1 46 T3.7.205-2 46 T3 .11.102-2 4 T3.7.206-1 0 T3 .11.102-3 4 T3.7.207-1 46 T3.11.102-4 4 T3.8.100-1 46 T3 .11.102-5 18 T3.8.100-2 0 T3.11.103-1 46 T3.8.101-1 46 T3.11.103-2 49 T3.8.101-2 40 T3.11.104-1 44 T3.8.101-3 12 T3.11.104-2 4 T3.8.101-4 0 T3 .11.104-3 4 T3.8.102-1 0 T3 .11.104-4 18 T3.8.102-2 0 T3.11.105-1 46 T3.8.200-1 0 T3.11.105-2 4 T3.9.100-1 0 T3.11.105-3 18 T3.9.101-1 0 T3.11.106-1 40 CORRECTED T3.9.102-1 0 T3.11.106-2 49 T3.9.102-2 0 T3.11.107-1 40 CORRECTED T3.9.103-1 0 T3.11.107-2 4 T3.9.104-1 0 T3.11.107-3 4 T3.9.104-2 0 T4.0.100-1 0 T3.9.104-3 0 T5.0.100-1 0 T3.9.200-1 46 T5.0.200-1 0 PALO VERDE UNITS 1. 2. 3 2 Rev 55 9/1/11

Technical Requirements Manual LIST OF EFFECTIVE PAGES Page No. Revision No. Page No. Revision No.

T5.0.300-1 0 T6.0.100-21 53 T5.0.400-1 0 T6.0.100-22 53 T5.0.500-1 53 T6.0.100-23 53 T5.0.500-2 24 T6.0.100-24 53 T5.0.500-3 0 T6.0.100-25 53 T5.0.500-4 53 T6.0.100-26 53 T5.0.500-5 0 T6.0.100-27 53 T5.0.500-6 0 T6.0.100-28 53 T5.0.500-7 0 T6.0.100-29 53 T5.0.500-8 22 T6.0.100-30 53 T5.0.500-9 0 T6.0.100-31 53 T5.0.500-10 0 T6.0.100-32 53 T5.0.500-11 54 T6.0.100-33 53 T5.0.500-12 54 T6.0.100-34 53 T5.0.500-13 11 T6.0.100-35 *53 T5.0.500-14 20 T6.0.100-36 53 T5.0.500-15 53 T6.0.100-37 53 T5.0.500-16 53 Tl.0.100-1 52 T5.0.500-17 8 Tl.0.100-2 52 T5.0.500-18 8 Tl.0.100-3 0 T5.0.600-1 37 Tl.0.200-1 52 T5.0.600-2 37 Tl.0.200-2 52 T5.0.700-1 34 Tl.0.200-3 0 T6.0.100-1 40 Tl.0.300-1 50 T6.0.100-2 40 Tl.0.300-2 41 T6.0.100-3 40 Tl.0.300-3 32 T6.0.100-4 40 Tl.0.300-4 43 T6.0.100-5 46 Tl.0.300-5 32 T6.0.100-6 40 Tl.0.300-6 32 T6.0.100-7 54 Tl.0.300-7 32 T6.0.100-8 46 Tl.0.300-8 32 T6.0.100-9 40 Tl.0.400-1 0 T6.0.100-10 40 Tl.0.400-2 0 T6.0.100-11 40 Tl.0.400-3 0 T6.0.100-12 40 Tl.0.400-4 51 T6.0.100-13 46 17.0.400-5 0 T6.0.100-14 46 Tl.0.500-1 0 T6.0.100-15 53 TA- i 52 T6.0.100-16 53 TA-i i 52 T6.0.100-17 53 TA-iii 52 T6.0.100-18 53 TA-1 52 T6.0.100-19 53 TA-2 52 T6.0.100-20 53 TA-3 52 PALO VERDE UNITS 1, 2, 3 3 Rev 55 911/11

Technical Requirements Manual LIST OF EFFECTIVE PAGES Page No. Revision No. Page No. Revision No.

TA-4 52 TA-5 52 TA-6 52 TA-7 52 TA-8 52 TA-9 52 TA-10 52 TA-11 52 TA-12 52 TA-13 52 TA-14 52 TA-15 52 TA-16 52 PALO VERDE UNITS 1. 2. 3 4 Rev 55 9/1/11

RCS Vents (Reactor Head Vents)

TRM 3.4.104 SURVEILLANCE REQUIREMENTS


NOTE-------------------------------------

Perform TSR 3.4.104.1. TSR 3.4.104.2 and TSR 3.4.104.3 when in MODE 5 or 6.

SURVEILLANCE FREQUENCY TSR 3.4.104.1 Verify all manual isolation valves in each 18 months vent path are locked in the open position.

TSR 3.4.104.2 Cycle each vent valve through at least one 18 months complete cycle from the control room. In any Mode. partial surveillance tests can be performed for post-maintenance testing under site procedural controls that ensure the valve being tested is isolated from RCS pressure.

TSR 3.4.104.3 Verify flow through the reactor coolant 18 months system vent paths during venting.

PALO VERDE UNITS 1. 2. 3 T3.4.104-2 Rev 55 9/1/11