Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 2R24 ML23013A0912023-01-13013 January 2023 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R23 ML22189A1432022-07-0808 July 2022 Fourth 10-Year Interval, First Period Owners Activity Report Number 1R23 ML22018A2022022-01-18018 January 2022 Fourth 10-Year Interval, First Period Owners Activity Report Number 2R23 ML21341A5522021-12-0303 December 2021 Snubber Program for the Fourth 10-Year Testing Interval ML21292A1842021-10-19019 October 2021 Nd Refueling Outage Steam Generator Tube Inspection Report ML21197A2052021-07-16016 July 2021 Fourth 10-Year Interval, First Period Owner'S Activity Report Number 3R22 ML21047A4972021-02-16016 February 2021 Twenty-Second Refueling Outage Owner'S Activity, Report 1R22 ML20288A2982020-10-13013 October 2020 Refueling Outage 22 Steam Generator Inspection Report ML20203M2042020-07-17017 July 2020 Fourth 10-Year Interval, First Period Owner'S Activity Report Number 2R22 ML20054A2692020-02-19019 February 2020 Response to Request for Additional Information - Relief Request 64 - Unit 1 Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML20028D5402020-01-24024 January 2020 Owner'S Activity Report Number U3R21 ML19291F5762019-10-18018 October 2019 Generator (Pvggs), Unit 1 - Steam Generataor Tube Inspection Ruport ML19205A2642019-07-24024 July 2019 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U1R21 ML19198A3402019-07-17017 July 2019 Relief Request 64 - Unit 1 Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML19179A3312019-06-28028 June 2019 Response to Request for Additional Information - Relief Request 63 - Unit 3 Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML19017A3452019-01-17017 January 2019 Fourth 10-Year Interval Pump and Valve Inservice Testing Program ML19010A3072019-01-10010 January 2019 Relief Request 63 -Unit 3 Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML18306A9992018-11-0202 November 2018 Steam Generator Tube Inspection Report ML18277A2972018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 1 of 7 ML18277A3192018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 5 of 7 ML18277A3032018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 ML18277A3102018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update. (Part 3 of 7) ML18277A3122018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 4 of 7 ML18277A3232018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 7 of 7 ML18277A3212018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 6 of 7 ML18102B6842018-04-12012 April 2018 Third 10-Year Interval, Third Period: Owner'S Activity Report Number 1R20 Correction ML18093A3352018-03-30030 March 2018 Palo Verde, Units 1, 2 and 3 - Fourth 10-Year Interval Pump and Valve Inservice Testing Program ML18030B1382018-01-26026 January 2018 Third 10-Year Interval, Third Period: Owner'S Activity Report Number 1R20 ML17270A4242017-09-26026 September 2017 Transmittal of 20th Refueling Outage Steam Generator Tube Inspection Report ML17181A5202017-06-30030 June 2017 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U2R20 ML17248A5232017-05-30030 May 2017 3INT-ISI-1, Revision 5, Third Inspection Interval Inservice Inspection Program Summary Manual, Unit 1, Enclosure 1 to 102-07551-MDD/MSC ML17248A5252017-05-26026 May 2017 3INT-ISI-2, Revision 6, Third Inspection Interval Inservice Inspection Program Summary Manual, Unit 2, Enclosure 2 to 102-07551-MDD/MSC ML17054D6872017-02-23023 February 2017 Fourth 10-Year Interval Pump and Valve Inservice Testing Program Relief Requests GRR-01, GRR-02, PRR-01, PRR-02, PRR-03, PRR-04, PRR-05, and PRR-06 ML16308A2322016-10-26026 October 2016 Steam Generator Tube Inspection Report - Refueling Outage 19 ML16180A4462016-06-24024 June 2016 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U1R19 ML16015A4542016-01-15015 January 2016 Submittal of Owner'S Activity Report (Form OAR-1) Refueling Outage 19 (U2R19) ML15267A2692015-09-23023 September 2015 Steam Generator Tube Inspection Report ML14035A4042013-08-29029 August 2013 3INT-ISI-3, Rev. 3, Palo Verde, Unit 3, 3rd Interval: Inservice Inspection Program Summary Manual ML14035A4022013-08-28028 August 2013 3INT-ISI-2, Rev. 4, Palo Verde, Unit 2, 3rd Interval: Inservice Inspection Program Summary Manual ML14035A4002013-08-22022 August 2013 INT-ISI-1, Rev. 3, 3rd Interval, Inservice Inspection Program Summary Manual ML13182A0152013-06-26026 June 2013 Third 10-Year Interval, Second Period: Owner'S Activity Report Number U1R17 ML14035A3992013-05-31031 May 2013 INT-ISI-1, Rev. 2, 3rd Inspection Interval, Inservice Inspection Program Summary Manual ML14035A4012013-05-31031 May 2013 INT-ISI-2, Rev. 3, 3rd Inspection Interval, Inservice Inspection Program Summary Manual ML14035A4032013-05-31031 May 2013 3INT-ISI-3, Rev. 2, Palo Verde, Unit 3, 3rd Interval: Inservice Inspection Program Summary Manual ML12242A2492012-08-0707 August 2012 Steam Generator Tube Inspection Report ML11287A0142011-10-0404 October 2011 Revised Third 10 Year Interval Inservice Inspection Plans ML11136A1062011-05-0505 May 2011 Submittal of Steam Generator Tube Inspection Report 2024-07-11
[Table view] Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) 2024-09-27
[Table view] |
Text
10 CFR 50.55a Qaps Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail SUtkNi 7636 102-07533-TNW/aS Tel: (623) 393-5764 June 30, 2017 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2, Docket No. STN 50-529 Third 10-Year Interval, Third Period:
Owner's Activity Report Number U2R20 Pursuant to 10 CFR 50.55a and In accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-1) for Unit 2 refueling outage 20 (U2R20). The outage ended on May 8, 2017.
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5764.
Sincerely, Weber, Digitally signed by Weber, Thomas N{Z00499)
Thomas DN: cn=Weber, Thomas N(Z00499)
Reason: I am approving this document N(Z00499) Date: 2017.06.30 15:53:36 -0700' Thomas N. Weber Department Leader, Regulatory Affairs TNW/as/msa
Enclosure:
Unit 2 Twentieth Refueling Outage Owner's Activity Report, Report U2R20 cc: K. M. Kennedy NRC Region IV Regional Administrator S. P. Ungam NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS A member of the STARS Alliance LLC Callaway
ENCLOSURE Unit 2 Twentieth Refueiing Outage Owner's Activity Report Report U2R20
FORM OAR-1 OWNERS ACTIVITY REPORT Report Number: 2R20 Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: 2 Commercial service date: Sep 19, 1986 Refueling Outage No.: 20 (if applicable)
Current inspection interval IWB, IWC, IWD, IWF = 3rd, IWE, IWL = 2nd (1. 2", 3', 4*. Other)
Current Inspection period IWB, IWC, IWD, IWE, IWF = 3rd, IWL = 2nd (1*. 2", 3")
Edition and Addenda of Section XI applicable to the inspection plans 2001 Ed., 2003 Ad., IWL = 2007 Ed. 2008 Ad.
Date and revision of inspection plans ISI - 11/4/15 R5, Press Test - 3/19/14 R4, IWE - 9/22/15 R1, IWL - 8/26/15 R3 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans 2001 Ed. 2003 Ad.__________________
Code Cases used: n-532-4 (if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U2R20____ conform to the requirements of Section XI, (refueling outage number)
Lpnrnsn, Wil ism DigitallysignedbyLehm3n,WilliamT{Z60076)
^ ON: cn=Lehman, William T(Z60076)
V / ^^\ Reason: I am the author of this document T(Z60076) Date: 2017.06.15 08:12:23 -OrOtt Signed. Date:
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of_____ Arizonaand employed by The Hartford Steam Boiler *of Hartford. Connecticuthave inspected the items described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI, By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Inspection and Insurance Company Commissions nb 9685 "a,n,i,C" Az 264 (Inspectors Signature) National Board, State, Province, and Endorsements Date:
PV-E0796Ver. 1
Palo Verde Nuclear Generating Station Owners Activity Report - Unit 2 Refueling Outage 20 Table 1 Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service Examination Category Item Number Description of Work Evaluation Description None None None None
Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Code Item Description of Work Date Repafr/Replacement Class Description Completed Plan Number 1 2MRCEE01A Plug tubes in SG 1 Hot Leg side 5/2/2017 4737753 1 2MRCEE01A Plug tubes in SG 1 Cold Leg side 5/2/2017 4737754 1 2MRCEE01B Plug tubes in SG 2 Hot Leg side 5/2/2017 4737755 1 2MRCEE01B Plug tubes in SG 2 Cold Leg side 5/2/2017 4737756 1 2CH005H022 Cotter pin missing on strut to hanger 4/29/2017 4881924 welded attachment 2 2SI067H003 Lock nut found loose during visual 4/25/2017 4880175 inspection 3 2SP104H009 Spring Can was found out of 4/1/2016 4748775 acceptable setting range 3 2PSPAL079 Fabricate and install new spool, orifice 4/25/2017 3824468 and bypass lines.
3 2MDGBE01A Perform weld repairs due to corrosion 3/25/2016 4712015 on intercooler A 3 2MDGBE01A/B Perform weld repairs due to corrosion 3/25/2016 4712015 on the intercooler cross connect spools 3 2MDGBE01B Perform weld repairs due to corrosion 3/25/2016 4712015 on intercooler B 3 2MDGBE04 Perform weld repairs due to corrosion 3/25/2016 4712015 on lube oil heat exchanger 3 2MDGBE05 Perform weld repairs due to corrosion 3/25/2016 4712015 on jacket water heat exchanger 3 2PC005H015 Snubber failed functional test 2/15/2017 4713370 3 2MEWAE01 Weld repairs required due to 4/24/2017 4730997 corrosion