Fourth 10-Year Interval, First Period Owners Activity Report Number 1R23
ML22189A143
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 07/08/2022
From: Gil K
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-08465-KJG/MSC
Download: ML22189A143 (6)


Text

10 CFR 50.55a A member of the STARS Alliance LLC Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-2488 102-08465-KJG/MSC July 8, 2022 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Palo Verde Nuclear Generating Station Unit 1 Renewed Operating License No. NPF-41 Docket No. STN 50-528 Fourth 10-Year Interval, First Period Owners Activity Report Number 1R23 Enclosed please find the Palo Verde Nuclear Generating Station (PVNGS) Unit 1 Owners Activity Report for the fourth 10-year interval refueling outage 23 (1R23).

Arizona Public Service Company (APS) is submitting this report pursuant to the title 10 of the Code of Federal Regulations (10 CFR) 50.55a and in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-532-5, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1. APS is required to prepare and submit the Form OAR-1 to the Nuclear Regulatory Commission (NRC) within 90 days of the completion of each refueling outage. The 1R23 outage ended on May 13, 2022.

No commitments are being made to the NRC by this letter. Should you have any questions concerning the content of this letter, please contact Matthew S. Cox, Licensing Section Leader, at (623) 393-5753.

Sincerely, Katherine J. Gil Nuclear Regulatory Affairs Director KJG/MSC/mg

Enclosure:

Unit 1 Twenty-Third Refueling Outage Owners Activity Report, Report 1R23 cc:

S. A. Morris NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS L. N. Merker NRC Senior Resident Inspector for PVNGS Digitally signed by Gil, Katherine J(Z05492)

Date: 2022.07.08 09:25:56 -07'00'

ENCLOSURE Unit 1 Twenty-Third Refueling Outage Owners Activity Report Report 1R23

PV-E0796 Ver. 2 FORM OAR-1 OWNERS ACTIVITY REPORT Report Number: ________________________________________________________________________________________________

Plant: ___________________________________________________________________________________________________________

Unit No.: ___________

Commercial service date: ___________________

Refueling Outage No.: ___________________

(if applicable)

Current inspection interval ______________________________________________________________________________________

(1st, 2nd, 3rd, 4th, other)

Current inspection period _______________________________________________________________________________________

(1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________

Date and revision of inspection plans ___________________________________________________________________________

Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____________________________________________________________________________

Code Cases used for inspection and evaluation:

(if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of

_______________ conform to the requirements of Section XI.

(refueling outage number)

Signed _________________________________________________________

Date: _____________________________________

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by _____________________________ of _______________________________ have inspected the items described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions ____________________________________________________

(Inspectors Signature)

National Board, State, Province, and Endorsements Date: _____________________________________

  • The Hartford Steam Boiler Inspection and Insurance Company 1R23 Palo Verde Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 1

Jan 28, 1986 23 IWB,IWC,IWD,IWF=4th / IWE =3rd/ IWL=2nd (8/1/11-5/31/21),3rd (6/1/21-5/31/31) / SPT =4th IWB,IWC,IWD,IWF =1st / IWE =2nd / IWL=2nd (8/1/16-5/31/21),1st (6/1/21-5/31/26) / SPT =1st 2013 Ed. (IWE,IWL [2nd Int] = 2007 Ed.,'08 Ad.)

ISI=4/09/22 R1, SPT=6/21/18 R0, IWE=10/3/18 R0, IWL=8/8/18 R4,6/14/22 R0 2013 Edition N-532-5, N-716-1, N-722-1, N-729-6, N-770-5 U1R23 Folley, Roy C(Z07131)

Digitally signed by Folley, Roy C(Z07131)

Date: 2022.06.28 10:17:33

-07'00' Jun 28, 2022 Hartford, Connecticut

Hogstrom, Robert (YH2450)

Digitally signed by Hogstrom, Robert (YH2450)

Date: 2022.06.28 10:55:38

-07'00' N.B. 9685 "A, N, I, C" Jun 28, 2022

1R23 Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and Item Number Item Description Evaluation Description None None None

1 1R23 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Code Class Component ID Description of Work Date Complete Repair/Replacement Plan number 3

1PSPBL025B Perform base material repairs to Spool-001 of Line SPB-L025B.

4/23/2022 5123121-3 3

1MDGAE01A Weld Repair of Corroded Areas 3/05/2022 5297661-0 3

1MEWBE01 Perform Base Material Repairs to the Heat Exchanger.

4/25/2022 5307476-1 1

1MRCEE01A Install Westinghouse Mechanical Plugs In Steam Generator 1MRCEE01A "Cold" Leg.

4/29/2022 5392240-0 1

1MRCEE01A Install Westinghouse Mechanical Plugs In Steam Generator 1MRCEE01A "Hot" Leg.

4/29/2022 5392241-0 1

1MRCEE01B Install Westinghouse Mechanical Plugs In Steam Generator 1MRCEE01B "Cold" Leg.

4/29/2022 5392242-0 1

1MRCEE01B Install Westinghouse Mechanical Plugs In Steam Generator 1MRCEE01B "Hot" Leg.

4/29/2022 5392243-0 3

1MDGAE01A/B Weld Repair of Corroded Areas 3/05/2022 5297661-0 3

1MDGAE01B Weld Repair of Corroded Areas 3/05/2022 5297661-0 3

1MEWBE01 Weld replace Nozzle # 7 4/26/2022 5436979-0 3

1MDGAE01A Replace DG Intercooler Cross Connect Spools 6 and 8 3/05/2022 5297615-0 3

1MDGAE01B Replace DG Intercooler Cross Connect Spools 5 and 7 3/05/2022 5297616-0 3

00142964 00142965 00142966 00142967 Perform Base Metal Repair to 2B DG AREVA Intercooler Cross Under Spools 5, 6, 7 and 8 10/28/2021 5231422-0 3

00150230 Perform Base Metal Repairs To 2A EDG Intercooler Cross Under Spool 6 10/02/2021 5191007-0 3

00150232 Perform Base Metal Repairs To 2A EDG Intercooler Cross Under Spool 8 1/02/2021 5191007-0 3

00142956 Perform Base Metal Repair To 1A DG Intercooler Cross Under Spool 5.

3/05/2022 5231420-0 3

00142957 Perform Base Metal Repair To 1A DG Intercooler Cross Under Spool 6.

3/05/2022 5231420-0 3

00142958 Perform Base Metal Repair To 1A DG Intercooler Cross Under Spool 7.

3/05/2022 5231420-0

2 1R23 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service 3

00142959 Perform Base Metal Repair To 1A DG Intercooler Cross Under Spool 8.

3/05/2022 5231420-0 1

1PSIBV057 Replaced Valve Due To Seat Leakage 5/11/2022 5280176-0 2

1JSGEPSV0578 Replacement Of S/G #1 Line 2 Main Steam Safety Relief Valve With Reconditioned And Tested Spare.

5/11/2022 5300318-0 2

1JSIBPSV0166 Replaced PSV, per Surveillance Test Results.

5/05/2022 5305487-0 1

1JSIBPSV0169 Replaced PSV, per Surveillance Test Results.

4/24/2022 5308139-0 2

1JSIEPSV0221 Replaced PSV, per Surveillance Test Results.

5/01/2022 5308146-0