10 CFR 50.55a Thomas N. Weber Mail Station 7636 Palo Verde Nuclear Department Leader Tel. 623-393-5764 PO Box 52034 Generating Station Regulatory Affairs Fax 623-393-5442 Phoenix, Arizona 85072-2034 102-06420-TNW/CJS October 04, 2011 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, 50-530 Renewed License Nos. NPF-41, NPF-51, NRF-74 Revised Third 10 Year Interval Inservice Inspection Plans Attached please find the revised Inservice Inspection (ISI) Plans for the third 10-year interval at PVNGS, Units 1, 2, and 3. Arizona Public Service Company (APS) is providing these plans pursuant to Paragraph IWA-1 400(c) of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code.

The 10-year intervals, which include 40-month inspection periods, are as follows:

Unit 1 - Commenced July 18, 2008 and will conclude July 17, 2018 Unit 2 - Commenced March 18, 2007 and will conclude March 17, 2017 Unit 3 - Commenced January 11, 2008 and will conclude January 10, 2018 APS is providing these plans for information. The plans contain no new commitments.

By copy of this letter, this submittal is being provided to the NRC Region IV Administrator and the PVNGS Resident Inspector. No commitments are being made to the NRC by this letter.

Should you need further information regarding this submittal, please contact Russell A.

Stroud, Licensing Section Leader, at (623) 393-5111.

Sincerely, vow """

and Resource Sharing) Alliance A member of the STARS (Strategic Teaming Callaway e Comanche Peak a Diablo Canyon 0 Palo Verde 9 San Onofre 0 South Texas

  • Wolf Creek

ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Revised Third 10-Year Interval Inservice Inspection Plans Page 2 TNW/RAS/CJS/gat Attachments:

PVNGS Unit 1 - Revised Third 10-Year Interval, Inservice Inspection Plan PVNGS Unit 2 - Revised Third 10-Year Interval, Inservice Inspection Plan PVNGS Unit 3 - Revised Third 10-Year Interval, Inservice Inspection Plan cc: (with attachments)

E. E. Collins Jr. NRC Region IV Regional Administrator L. K. Gibson NRC NRR Project Manager for PVNGS J. R. Hall NRC NRR Senior Project Manager M. A. Brown NRC Senior Resident Inspector for PVNGS

Attachment 1 PVNGS Unit 1 - Revised Third 10-Year Interval Inservice Inspection Plan

I 3 rd Inspection Interval Inservice Inspection Program Summary Manual PVNGS Unit 1 Arizona Public Service Company PVNGS PO Box 52034 5801 S Wintersburg Road Phoenix, AZ 85072-2034 Tonopah, AZ 85354

  • Digitally signed by Ahistrom, Wiley 7Z994221 Hansen, Doug Digitallysigned by Hansen, Douglas lasBg Z4t530 Ahistrom, WViIey, DN cn=Ahistrom, Wiley J(Z99422)

BZReason:

13 I am the author of this doment JA Reason: I have reviewed this Preparer: B(Z41530) Dt

. 2011.09.0806.4.00 -0a0t' Reviewer: Reieer J 9 /1

'datme:t Date: 2011.09.08 06:311:52-07'00*

i Digitally signed by Pobst, Hogstrom, Digitally signed by Hogstrom, Robert (YH2450)

  • DN: cn=Hogstrom, Robert (YH2450)

Pobst, Donald Donald S(Z75420)

,oDN: cn=Pobst, Donald S(Z75420)

Robert Reason: I have reviewed this S Reason: Iam approving this 4 d-Z7 0ocurnent as Section Leader.

Dat ment .-

( Date: 2011.09.13 03:59:50 -07'00 ANII: (YH2450) Date:2011.09.08 09:09:03 -07'00' Section Leader:

\Digitailysigned byhlele, Carl Thiele, Carl B(Z99692)"DN:cn=Thiele, Carl B(Z996921 Reason: I am approving this document Date: 2011.09.1407:56:13-0700' Department Leader:

Commercial Service Date: 01-28-1986 Program No: 3INT-ISI-1 Rev. 1 1 of 207 31NT-ISI-1 Rev 1

TABLE OFCONTENTS 1.0 Sum mary .................................................................................................... 3 2.0 Code Applicability .................................................................................... 3 3.0 D escription ................................................................................................ 4 3.1 Scope ........... *.................................... 4 3.2 System Boundaries .................................................................................. 5 3.3 A ccessibility ........................................................................................... 5 3.4 Examination Techniques ......................................................................... 6 3.5 Inspection Intervals ................................................................................... 6 3.6 Examination Categories ............................................................................ 7 3.7 Evaluation and Repair .............................................................................. 7 3.8 System Pressure Tests .............................................................................. 7 3.9 Exem ptions ............................................................................................... 7 3.10 Code Cases ................................................. 8 3.11 Outage Plan Table .................................................................................... 8 4.0 A SM E Class 1 Sum m ary ............................................................................ 9 5.0 A SM E Class 2 Summ ary ......................................................................... 33 6.0 A SM E Class 3 Sum mary .......................................................................... 66 7.0 Augm ented Summ ary .............................................................................. 73 8.0 Requests for Relief ................................................................................... 86 9.0 Boundary Draw ing Listing ....................................................................... 88 10.0 Zone Draw ings ......................................................................................... 90 11.0 Term s and D efinitions ................................................................................. 205 2 of 207 31NT-ISI-1 Rev 1

PALO VERDE NUCLEAR GENERATING STATION UNIT 1 INSERVICE INSPECTION - PROGRAM

SUMMARY

1.0

SUMMARY

1.1 This document contains a detailed description of the 3rd 10 Year Interval Inservice Inspection (ISI) Program for Palo Verde Nuclear Generating Station Unit 1. This program conforms to the requirements of IOCFR5O.55a (g), PVNGS Technical Specifications, and the PVNGS UFSAR. Exceptions that are known as of this document preparation date are included in the Requests for Relief Section 8.0.

1.2 The revision is being prepared to update the ISI Program for the 3 rd 10 Year Interval. This includes the utilization of the 2001 Edition including the 2003 Addenda of ASME Section XI with the exceptions noted below:

1.2.1 Requests for relief from ASME Section XI requirements are included in Section 8.0.

These Relief Requests are prepared in a format similar to that documented in the NEI White Paper Revision 1 dated June 2004, entitled: "Standard Format for Requests from Commercial Reactor Licensees Pursuant to 10CFR50.55a".

1.2.2 The 2007 Edition thru the 2008 Addenda was utilized for Category B-L-1 and B-M-1 for pump and body weld requirements.

1.2.3 For clarification, this Interval 3 program was prepared, as was Interval 1 and 2 programs, utilizing 40 month periods.

1.3 This revision does not utilize risk informed inservice inspection methodology at this time.

1.4 The information presented is in a form consistent with the 1st and 2 nd 10 Year Interval ISI Program, the applicable requirements of Standard Review Plan manual and procedures and the recommendations contained in NRC letter dated July 17, 1981, from Mr. R.L. Tedesco, NRC,.to E. E. Van Brunt, Jr., APS, "Guidance for Preparing Preservice and Inservice Inspection Programs and Relief Requests - Palo Verde Nuclear Generating Station Units 1, 2 and 3."

2.0 CODE APPLICABILITY 2.1 Based on paragraph 10 CFR 50.55a(b) (2) that was published 12 months prior to the start of the 3rd 10 Year Interval (7-17-08), the 2001 Edition including the 2003 Addenda of ASME Section XI was referenced as the Code to utilize for preparation of this program. Several exceptions to this code are documented in 10CFR50.55a; each of these exceptions was utilized during the preparation of this program.

" The exemptions of IWB-1220 for Class 1 piping must utilize the 1989 Edition.

  • When qualifying VT-3 personnel per IWA-2317, the proficiency of the training must be demonstrated by initial qualification examination and subsequent examinations on a 3 year interval.

3 of 207 31NT-ISI-1 Rev 1

  • The 1997 Edition must be used for IWA-2240 alternative examination methods, a combination of methods, or newly developed techniques.

" Items B3.120 and B3.140 (nozzle inner radius examinations) of the 1998 Edition must be utilized. An enhanced visual examination with a resolution sensitivity to detect a 1-mil wire or crack may be performed in place of an ultrasonic examination.

" Must utilize the 1995 Edition for examination Item B7.80.

  • IWA-2220, Ultrasonic examination methods are prohibited for surface examinations.
  • The surface examination requirements for HPSI systems, Items B9.20, B9.21 and B9.22 are not required to be performed.

2.2 If a code required examination was considered to be impractical during the preparation of this document because of plant design, geometry, accessibility or other conditions, a Request for Relief from that requirement was prepared and included in Section 8.0. If a code required examination is identified to be impractical during the course of an inspection and the code required percentages are not met, a request for relief will be prepared and submitted after each inspection period, and the final interval closeout no later than 12 months after expiration of the Interval.

2.3 This program will implement Appendix VIII to Section XI in accordance with 10 CFR 50.55a. Appendix VIII examinations will be conducted in accordance with the Performance Demonstration Initiative (PDI). The PDI Code Comparison document explains the complex relationship of regulatory requirements, ASME requirements, code editions, and the PDI program.

3.0 DESCRIPTION

3.1 SCOPE 3.1.1 This Inservice Inspection Program Summary includes all applicable nondestructive examinations required by ASME Section XI as identified below:

1. Examination of ASME Class 1, 2, and 3 pressure retaining components and their supports 3.1.2 This program also includes an augmented section that includes examinations for other items required to be examined as identified below.
1. Examinations of welds in Class 1 components fabricated with Alloy 600/82/182 materials in accordance with 10CFR50.55a and Code Case N-722-1.
2. Examination of the Reactor Vessel Closure Head in accordance with 10CFR50.55a and Code Case N-729-1.
3. Examination of welds in Class 1 piping and vessel nozzle butt welds fabricated with alloy 82/182 in accordance with 10CFR50.55a and Code Case N-770-1.
4. Examination of the Reactor Coolant Pump Flywheels in accordance with PVNGS Technical Specifications Section ITS 5.5.7.
5. USNRC Circulars, Information Notices, Bulletins, or Orders
6. INPO or other industry operating experiences 4 of 207 31NT-ISI-1 Rev 1
7. Combustion Engineering or Westinghouse bulletins or notices
8. Special examinations to satisfy other commitments or concerns that are based on operating experiences, USNRC. These examinations are scheduled throughout this program and reference the applicable notification documents.

3.1.3 Those items that may generally be included in an Inservice Inspection Program, but are not included are identified below:

1. The inservice testing of snubbers will be performed in accordance with 10CFR50.55a.
2. The inservice examination of steam generator tubing will be performed in accordance with the PVNGS Technical Specifications Section T5.5.9.
3. The Examination Program for the ASME Subsections IWE and IWL will be performed in accordance with 10CFR50.55a and the PVNGS Technical Specifications.

3.2 SYSTEM BOUNDARIES 3.2.1 A complete set of P&ID drawings indicating the Inservice Inspection boundary are maintained at the PVNGS site. These drawings illustrate the ASME Class 1, 2, and 3 systems; components; and boundaries scheduled for examinations and pressure testing. A referenced listing of these drawings is documented in Section 9.0.

3.2.2 A set of ISI (Zone) Drawings is included in Section 10.0. These drawings are utilized for the planning and scheduling of specific ASME Class 1 and 2 examinations throughout the 10 Year Interval. These also document the location and number of welds, components, and supports. These Zone drawings are revision controlled in conjunction with this program manual.

3.3 ACCESSIBILITY 3.3.1 The preservice examinations were performed with examination techniques, automated or manual, similar to those planned for use during Inservice Inspections. The examination limitations noted during the preservice examinations were documented in Requests for Relief submitted with the preservice examination program. There has also been a number of additional code limitations noted during the I" and 2 nd 10 Year Intervals and Request for Relief submitted. If included in the required 3 rd Interval examinations they will again be evaluated and relief requested. Note Section 8.0 identifies all the reliefs submitted during the preparation and implementation of the 3rd Interval.

3.3.2 All items that are scheduled for examination will be examined to the extent practical.

In addition, any code limitations that are noted during the examinations will be documented. If relief is required from any of these examinations, a Request for Relief will be submitted after the relief is discovered and prior to 12 months after the interval ends.

5 of 207 31NT-ISI-1 Rev 1

3.4 EXAMINATION TECHNIQUES 3.4.1 The three types of examinations utilized to perform Inservice Inspections, along with the actual nondestructive examination technique, are identified in the legend below:

VT - Visual VT - 1 (General Condition)

VT - 2 (Leakage)

VT - 3 (Mechanical and Structural Condition)

VE (Visual Examination)

S - Surface PT - Liquid Penetrant MT - Magnetic Particle ET - Eddy Current VOL - Volumetric UT - Ultrasonic RT - Radiography 3.4.2 All the above nondestructive examination techniques will be performed using specific techniques and procedures that are identified in ASME Section XI, or alternative

  • examinations that are demonstrated to be equivalent or superior to those identified.

The provision for substitution of these alternative examination methods, combination of methods, or newly developed techniques will utilize the 1997 Addenda for IWA-2240.

3.5 INSPECTION INTERVALS 3.5.1 The Inservice Inspection Program was prepared in accordance with Program B of ASME Section XI. The 1St, 2 nd and 3 rd 10 Year Intervals and corresponding inspection periods are defined below:

First Inspection Interval: 01-28-86 to 07-17-98 Second Inspection Interval: 07-18-98 to 07-17-08 Third Inspection Interval: 07-18-08 to 07-17-18 Period One: 07-18-08 to 11-17-11 Period Two: 11-18-11 to 03-17-15 Period Three: 03-18-15 to 07-17-18 It should be noted that the intervals/periods may change to allow for extended outage durations per IWA-2400 of ASME Section XI.

6 of 207 31NT-ISI-1 Rev 1

3.6 EXAMINATION CATEGORIES 3.6.1 The examination categories of ASME Section XI were utilized to develop this program for all systems, components, and supports. The Subprogram summary tables contained in Sections 4.0 and 5.0 are organized by examination category .for ASME Class 1 and 2 systems, respectively. For each examination category, these tables identify the system or identification, nondestructive examination method, total number of items, required examination amount for each inspection period, and running percentage. For ASME Class 3 systems, the examinations categories are identified in Section 6.0.

3.7 EVALUATION AND REPAIR 3.7.1 The evaluation of all examination results will be performed in accordance with ASME Section XI Articles IWx-3000. In addition, all applicable repairs and replacements will be performed in accordance with ASME Section XI Articles IWX-4000 and 7000. Pressure tests will be performed on welded and mechanical joint repairs or replacements, in accordance with IWx-4000 and 5000 and 10CFR50. Both the evaluations and repair or replacement will be performed in accordance with the 2001 Edition including the 2003 Addenda of ASME Section XI, or later editions and addenda of ASME Section XI referenced in 10CFR50. Later editions and addenda will be documented with the NRC.

3.7.2 It should be noted that a relief was requested (Relief Request 38) to perform repair and replacement of all three PVNGS units to the 2001 Edition including the 2003 Addenda. This request was documented in conjunction with the relief to perform full structural weld metal overlays. (APS letter to the USNRC 102-05641 dated 2-8-2007).

3.7.3 All repairs and replacements will be documented in accordance with the Work Control program, and are maintained at Palo Verde for review.

3.8 SYSTEM PRESSURE TESTS 3.8.1 ASME Class 1, 2, and 3 components will be pressure tested per the requirements of IWB-5000, IWC-5000 and IWD-5000, except where relief has been requested.

3.8.2 Pressure tests will also be performed on repairs and replacements per ASME Section XI, 10CFR50.55a, and the PVNGS Repair and Replacement program.

3.9 EXEMPTIONS 3.9.1 The exemption criteria identified in the 2001 Edition including the 2003 Addenda of ASME Section XI was utilized for all ASME Class 1, 2, and 3 components and systems. The only exception is that required by 10CFR50.55a for the ASME Class 1 piping exemptions. These are in accordance with the 1989 Edition of ASME XI.

3.9.2 A thorough review of all the systems and components was performed in accordance with the above exemptions and a complete set of color coded Inservice Inspection Exemption drawings was prepared. These drawings are maintained at the PVNGS site for review.

7 of 207 31NT-ISI-1 Rev 1

3.10 CODE CASES 3.10.1 The following Code Cases are accepted for use in Regulatory Guide 1.147 and may be utilized during Interval 3 where applicable:

1. N-460 Alternative examination coverage for Class 1 and 2 welds
2. N-526 Alternative requirements for successive inspections of Class 1 and 2 vessels
3. N-532-4 Alternative requirements to repair and replacement documentation
4. N-534 Alternative Requirements for Pneumatic Pressure Testing.
5. N-566-2 Corrective Action for Leakage Identified at Bolted Connections
6. N-613-1 Ultrasonic examination of full penetration nozzles in vessels
7. N-624 Successive inspections
8. N-652-1 Alternative requirements to categories B-G-1, B-G-2, and C-D bolting
9. N-666 Weld Overlay of Class 1, 2, and 3 Socket Welded Connections
10. N-685 Lighting Requirements for Surface Examinations
11. N-695 Alternative for Qualification Requirements for Dissimilar Metal Piping Welds, Appendix VIII Supplement 10
12. N:700 Alternative Rules for Selection of Class 1, 2, and 3 Vessel Welded Attachments for Examination 3.10.2 The following Code Cases are conditionally accepted for use in Regulatory Guide 1.147 may be utilized with the specified conditions during Interval 3 where applicable:
1. N-513-3 Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RG 1.147 documents acceptance condition is that the repair or replacement activity temporarily deferred under the provisions of this Code Case shall be performed during the next scheduled outage.
2. N-648-1 Alternative requirements for inner radius examinations of reactor vessel nozzles RG 1.147 documents acceptance condition is that in place of a UT examination, licensees may perform a visual examination with enhanced magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio. The provisions of Table IWB-2500-1, Examination Category B-D, continue to apply except that, in place of examination volumes, the surfaces to be examined are the external surfaces shown in the figures applicable to this table (the external surface is from point M to point N in the figure).

3.10.3 The following Code Cases are required to be utilized by 10CFR50.55a with additional specified conditions. These are planned to be utilized with the specified conditions during Interval 3:

1. N-722-1 Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated With Alloy 600/82/182 Materials
2. N-729-1 Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds
3. N-770-1 Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated With UNS N06082 or UNS W86182 Weld filler Material With or Without Application of Listed Mitigation Activities 3.11 OUTAGE PLAN TABLE The outage plan table, controlled by procedure 73DP-9XI03 and 73DP-9EE02, identifies the components scheduled for examination including successive examinations from prior periods. The examination procedures and a listing of calibration blocks is also identified.

8 of 207 31NT-ISI-1 Rev 1

SECTION 4.0 ASME CLASS 1 EXAMINATION

SUMMARY

9 of 207 31NT-ISI-1 Rev 1

INDEX EXAM CATEGORIES B-A Pressure Retaining Welds in Reactor Vessel B-B Pressure Retaining Welds in Vessels Other Than Reactor Vessels B-D Full Penetration Welded Nozzles in Vessels B-F Pressure Retaining Dissimilar Metal Welds in Vessel Nozzles B-G-1 Pressure Retaining Bolting, Greater Than 2 Inches in Diameter B-G-2 Pressure Retaining Bolting, 2 Inches and Less in Diameter B-J Pressure Retaining Welds in Piping B-K Welded Attachments for Vessels, Piping, Pumps and Valves B-L-2 & B-M-2 Pump Casings and Valve Bodies B-N-i Interior of Reactor Vessel B-N-2 Welded Core Support Structures and Interior Attachments to Reactor Vessels B-N-3 Removable Core Support Structures B-O Pressure Retaining Welds in Control Rod Housings B-P All Pressure Retaining Components B-Q Steam Generator Tubing F-A Class 1 Supports 10 of 207 31NT-ISI-1 Rev I

RI 10 SHELLI WELDS B1 10 SHRCMELL RELDASIIt 1-Reactor Vessel welds 78173 Vol 3 0 1 0 _ .

0 2 0 3* 3 100 B1.12 LONGITUDINAL _ ___ "__ _

1 -Reactor Vessel welds 78173 Vol 9 0 1 0 0 2 0 9* 3 100 B1.20 HEAD WELDS B1.21 CIRCUMFERENTIAL 131.22 MERIDIONAL 1 -Reactor Vessel Bottom Head weld 78173 Vol 1 0 1 0 0 2 0 1* 3 100 2-Closure Head weld N0565-CHA-02 Vol 0 0 0 0 RVH Replaced R15 81.30 SHELL-TO-FLANGE WELD-1-Reactor Vessel weld 78173 Vol 101 00 .0.

  • 0 2 0 . .. ..

1* 3 100 B1.40 HEAD-TO-FLANGE WELD _

2-Closure Head weld N0565-CHA-02 S & Vol 0 0.0 0 RVH Replaced R15

2 2 55

.. ... 4 3 100 PRESSURIZER .... .

B21.0 SHELL -TO-HEAD WELDS ... ..... ...

B2.11 CIRCUMFERENTIAL ... . . .. ..... .

5- Pressurizer weld 78373 Vol 2 1 1 .

1 3 B2.12 LONGITUDINAL**

5- Pressurizer weld 65373 Vol 4 2 1 *1" of each 0 _ _2 3 intesecting circ 0* exam area STEAM GENERATORS ***_-_.....

B2.30 HEAD WELDS .... _

B2.31 CIRCUMFERENTIAL .

__.___***_Multiple Vessels 3- Steam Generator 1 weld 224 Vol 1 1 2

3- Steam Generator 1 weld 224 Vol 2 1 2

__ 4- Steam Generator 2 weld 225 Vol 2 1 3 *

- 1 1 4 4 4 4 4 1 1- Reactor Vessel Outlets - 2 78173 Vol 6 6* - 3 1 -Auto exam with Inlets - 4 core barrel removed B3.100 NOZZLE INSIDE RADIUS SECTION ..... _ _.....

_ 1- Reactor Vessel Outlets - 2 78173 Vol 6 6* 3 100 *Auto exam with Inlets - 4 core barrel removed

_ PRESSURIZER B3.1 10 NOZZLE-TO-VESSEL WELDS 5- Pressurizer Surge - 1 78373 Vol 6 2 1 33.

.. .. spray-1 S _ _ _ _ _2 2 67_

Safeties - 4 2 3 10 B3.120 NOZZLE INSIDE RADIUS SECTION**

5- Pressurizer Surge - 1 78373 Vol 6 2 1 33

___Spray-- 1 2 2 67 Safeties - 4 2 3 100 I1 _ _ _ _ _ _ I -1I _ i . ..- . I I _ _ _

.1LLL- IIN4ILJifZ F~rLJIU1D QJLA.. I 1I.JPI

  • B3.130 & B3.140 running percent 4 1 30 jper 10CFR50.55a

.. . ..__ __ _ 4 2 60..... .

. . . . 4 3 100...

3- Steam Generator 1 Inlet - 1 224 'Vol 1 1.

Outlet -2 2 2 4- Steam Generator 2 Inlet - 1 225 Vol 3 1 1

  • Outlet - 2 2 3
  • B3.140 NOZZLE INSIDE RADIUS SECTION .. . . ... . . ...

3- Steam Generator I Inlet - 1 224 Vol 31 1 0 ._ Outlet -2 _ . 2 2 "M

4- Steam Generator 2 Inlet - 1 225 Vol 3 1 1 Outlet -_2 2 3

NOMINAL PIPE SIZE > 4 INCH NOZZLE TO SAFEEND BUTT B5.40 WELDS 20- Surge butt welds RC-028-12" S & Vol 6* Mitigated with FSWO 29- Spray butt welds RC-018-4" S &Vol Moved to augmented 31- Safeties (4) butt welds RC-001-6" S & Vol RC-003-6" S & Vol RC-005-6" S & Vol RC-007-6" S & Vol

2- Closure Head nuts 7.237' x 7.91" VT-1 54 18 1 33 18 2 66 18 3 100 B6.20 CLOSURE STUDS 2- Closure Head studs 7.380" x 76.37" Vol 54 18 1 33 18 2 66 18 3 100 0o B6.40 THREADS IN FLANGE 0

0-1- Reactor Vessel Stud Holes 78173 Vol 54 0 0 0 0 0 0 54 3 100 B6.50 CLOSURE WASHERS BUSHINGS 2- Closure Head Washers 7.50" x 1.27" VT-1 54 18 1 33 18 2 66 18 3 100 PUMPS B6.180 BOLTS AND STUDS 16- Reactor Coolant Pump 1A Flange Studs 4.33" x 32.87" Vol 16 16 3 100

    • VT-1 exams on 1 FLANGE SURFACE WHEN pump per interval (with B6.190 CONNECTION DISASSEMBLED B12.XX exams)

17- Reactor Coolant Pumip 1B surface 1109-1B VT-1 1 ** ** **

18- Reactor Coolant Pump 2A surface 1109-2A VT-1 1 ......

19- Reactor Coolant Pump 2B surface 1109-2B VT-1 1 .... **

    • VT-1 exams on 1 pump per interval (with B6.200 NUTS, BUSHINGS, AND WASHERS B12.XX exams) 16- Reactor Coolant Pump IA nuts & ring 1109-1A VT-1 16 ......

17- Reactor Coolant Pump 1B nuts & ring 1109-1B VT-1 16 .... * . .

18- Reactor Coolant Pump 2A nuts & ring 1109-2A VT-1 16 ......

19- Reactor Coolant Pump 2B nuts & ring 1109-2B VT-1 16 ......

5- Pressurizer Manway Studs & Nuts 1.31" x 14.5" VT-1 20 20 *** ***

STEAM GENERATOR __

B7.30 BOLTS, STUDS AND NUTS ....

3- Steam Generator 1 MANWAYS Studs & Nuts 1.31" x 14.5" VT-1 40 40 *** ***

4- Steam Generator 2 MANWAYS Studs & Nuts 1.31" x 14.5" VT-1 40 40 ***

When disassembled and only once per PIPING interval B7.50 BOLTS, STUDS AND NUTS 31- Pressurizer Safeties Flange Bolting RC-001-6" VT-1 8 8 ........

Flange Bolting RC-003-6" VT-1 8 8 ........

Flange Bolting RC-005-6" VT-1 8 8 ........

Flange Bolting RC-007-6" VT-1 8 8 ........

37- Charging Line Flange V435 CH-005-2" VT-1 8 8 ....

PUMPS B7.60 BOLTS, STUDS AND NUTS 16- Reactor Coolant Pump 1A seal cover 1.1" x 8.27" VT-1 16 16 .. .**

VT-1 exams 17- Reactor Coolant Pump 1B seal cover 1.1" x 8.27" VT-1 16 16 .... required once per 18- Reactor Coolant Pump 2A seal cover 1.1" x 8.27" VT-1 16 16 .... interval (B-L-2) 19- Reactor Coolant Pump 2B seal cover 1.1" x 8.27" VT-1 16 16 ....

VALVES.

B7.70 BOLTS, STUDS AND NUTS 131- Pressurizer Safeties PSV-200 RC-001-6" VT-1 12 12 ....... During VENDOR

PSV-203 RC-007-6" VT-1 12 12 I 4 I - I I 4 4 4 When disassembled and only once per CRD HOUSING interval B7.80 BOLTS, STUDS AND NUTS 2-Closure Head RVLMS Locations Grayloc Clamps CEDM 92 VT-1 4 4 ........

I CEDM 96 VT-1 4 4 .... ....

0.

0

I. 4 4 4 4 9 - 4 9 6- RCS Primary Pioina

' HL 1** butt welds RC-032-42" ID S* & Vol 66 6 1 9 ** AUTO EXAM OF

_ HL 2** butt welds RC-063-42" ID 6 2 18 NOZZLE TO EXT AND I CL 1A to RCP butt welds RC-033-30" ID 8 3 30 EXT TO PIPE WELDS I CL 1 B to RCP butt welds RC-030-30" ID *SURFACE EXAMS I CL 2A to RCP butt welds RC-073-30" ID NOT REQUIRED I CL 2B to RCP butt welds RC-084-30" ID _ WITH i CL 1A to RPV** butt welds RC-034-30" ID AUTO EXAMINATIONS CL 1B to RPV** butt welds RC-031-30" ID (EWR-3673722 &

I CL 2A to RPV** butt welds RC-079-30" ID CODE CASE N663)

CL 2B to RPV** butt welds RC-093-30" ID 0

0

'20- Pressurizer Surge Line butt welds RC-028-12" S & Vol 11 1 2 9 DM MOVED TO AUG N) ' 2 3 27 0

'21- Shutdown Cooling Loop 1 butt welds RC-051-16" S & Vol 28 3 1 14 DM MOVED TO AUG SI-240-16" 4 2 28

'22- Shutdown Cooling Loop 2 butt welds RC-068-16" S & Vol 27 2 1 7 DM MOVED TO AUG S1-193-16" 2 2 141

' 3 3 26

'23- Safety Injection 1A butt welds SI-207-14" S & Vol 19 2 1 10 DM MOVED TO AUG

' SI-203-12" 3 3 26

'24- Safety Injection 1B butt welds SI-223-14" S & Vol 18 6 2 33 DM MOVED TO AUG

'_ SI-221-12"

'25- Safety Injection 2A butt welds SI-160-14" S & Vol 22 6 3 27 DM MOVED TO AUG SI-156-12"

'26- Safety Injection 2B butt welds SI-179-14" S & Vol 20 5 3 25 DM MOVED TO AUG SI-175-12"

__ j _____________ I _____ I ______ I ___ I ___ I ___ I - I ___ I-.

128 & 29- Pressurizer Spray butt welds RC-018-4" S &Vol 16 1 1 - .......

I_ 1 2 12 . ... .

2 3 25 31- Pressurizer Safeties butt welds RC-001-6" S & Vol 12 1 1 8 RC-003-6" 1 2 17 RC-005-6" 1 3 25 RC-007-6"

_ 36- Letdown Line (delay coil) butt welds RC-091-16" S &Vol 4 1 3 25 __

B9.20 LESS THAN NPS 4

  • CIRCUMFERENTIAL WELDS B9.21 OTHER THAN PWR HPSI SYSTEMS 27- Pressurizer Spray 1A butt welds RC-062-3" S 40 11 1 - 27 DM MOVED TO AUG RC-0 16-3" 28- Pressurizer Spray 1B butt welds RC-017-3" S 37 10 3 26 DM MOVED TO-AUG RC-018-3" _

" 30- Aux Pressurizer Spray_ butt welds CH-009-2" S 11 3 2 27 " __'_ _

CH-520-2" CH-521-2" 32- Drain Line Loop 1A butt welds RC-060-2" S 5 2 1 40 DM MOVED TO AUG 33- Drain Line Loop 1B butt welds RC-058-2" S 5 2 2 40 DM MOVED TO AUG 34- Drain Line Loop 2A butt welds RC-096-2" S 5 2 3 40 DM MOVED TO AUG 35- Drain Line Loop 2B butt welds RC-089-2" S 5 2 3 40 36- Letdown Line butt welds RC-091-2" S 70 6 1 8 DM MOVED TO AUG CH-001-2" 6 2 16 6 3 25

__"___ 37- Charging Line butt welds CH-005-3" S 63 5 1 8 DM MOVED TO AUG

6 3 25 38- Drain Line Loop 1 butt welds RC-070-2" S 1 1 2 100 CIRCUMFERENTIAL WELDS OF B9.22 PWR HPSI SYSTEMS .....

39- HPSI Long Term Recirculation 1 butt welds SI-248-3" Vol 52 6 *2 11

.. . .. ... 8 3 27 _

_ 40- HPSI Long Term Recirculation 2 butt welds SI-199-3" Vol 27 3 1 11 _

4 2 26 BRANCH PIPE CONNECTION B9.30 WELDS B9.31 NPS 4 OR LARGER

  • 9.31 running percent - - 7 1 1 14 1 3 28 6- RCS Primary Piping '__

Surge branch weld RC-032-42" ID S & Vol 1 _

SD Cooling 1 branch weld RC-032-42" ID S & Vol 1 SD Cooling 2 branch weld RC-063-42" ID S & Vol 1 SI 1A branch weld RC-034-30" ID S &Vol 1 SI 1B branch weld RC-031-30" ID S &Vol 1 _ _

SI 2A branch weld RC-079-30" ID S &Vol 1 SI 2B branch weld RC-093-30" ID S &Vol 1 B9.32 LESS THAN NPS 4 .. ... . .

9.32 running percent - - 14 1 1 7 . .. .

.. . . .. . . ... 1 2 14 2 3 28 6- RCS Primary Piping __.. _____ ..

___ Drain 1A branch weld RC-033-30" ID S 1 .....

PZR Spray 1A branch weld RC-034-30" ID S 1 . ...... .

_____Drain 1B branch weld RC-030-30" ID S 1 ._ _

PZR Spray 1B branch weld RC-031-30" ID S 1 Drain 2A branch weld RC-073-30" ID S 1

F\~.,U~cflJ IL)

Letdown branch weld RC-084-30" ID S 1 21- Shutdown Cooling Loop 1 branch weld RC-051-16" 2 2" Drain & 3" HPSI 22- Shutdown Cooling Loop 2 branch weld RC-068-16" S 1 3" HPSI 36- Letdown Line branch weld RC-091-16" S 4 B9.40 SOCKET WELDS

  • 9.40 running percent - 17 2 1 12 1 2 18 2 3 29 32- Drain Line Loop 1A socket weld RC-060-2" S 3 33- Drain Line Loop 1 B socket weld RC-058-2" S 3 34- Drain Line Loop 2A socket weld RC-096-2" S 3 35- Drain Line Loop 2B socket weld RC-089-2" S 3 38- Drain Line Loop 1 socket weld RC-070-2" S 1 37- Charging Line socket weld CH-005-3" S 4

PRESSURE VESSELS B10.10 WELDED ATTACHMENTS **Accessible Side 3- Steam Generator 1

  • support skirt 224 S** 1 1 2 50
  • Multiple vessels 4 -Steam Generator 2
  • support skirt 225 S** 1 5- Pressurizer support skirt 78373 S** 1 1 3 100 PIPING __

B10.20 WELDED ATTACHMENTS _

    • 10.20 running percent - 13 1 1 8 1 3 15 22- Shutdown Cooling 2 attachment si-193-16" S 1 RC-068-16" S 1 27- PZR Spray 1A attachment RC-062-3" S 1 28- PZR Spray 1B attachment RC-017-3" S 1 29- Combined PZR Spray attachment RC-18-3" S 1 36- Letdown Line attachment RC-091-16" S 4 37- Charging Line attachment CH-005-3" S 3 40- HPSI Long Term 2 attachment S- 99-3" S 1

1:12.2U PUM .UAbIN(_

16- Reactor Coolant Pump 1A casing 1109-1A VT-3 4 1 *

  • Exam required when

_ 17- Reactor Coolant Pump 1B casing 1109-1B VT-3 pPump is disassembled 18- Reactor Coolant Pump 2A casing 1109-2A VT-3 ,__

  • 19- Reactor Coolant Pump2B casing 1109-2B VT-3 B12.50 VALVE BODY, EXCEEDING NPS 4 I 16" Borg Warner Gate Valves ,_.

Utilizing Forged Construction Zone 21 UV-651 RC-051-16" VT-3 4 1 *

  • Exam required when N\)

0 j

UV-653 SI-240-16" VT-3 valve is disassembled 0 Zone 22 UV-652 RC-068-16" VT-3 UV-654 SI-193-16" VT-3 14" Borg Warner Gate Valves ,I Utilizing Forged Construction Zone 23 UV-634 SI-207-14" VT-3 4 1 *

  • Exam required when Zone 24 UV-644 S1-223-14" VT-3 valve is disassembled Zone 25 UV-614 SI-160-14" VT-3 _ __,_. ....

Zone 26 UV-624 SI-179-14" VT-3 12" Borg Warner Check Valves Utilizing Cast Construction Zone 23 V-542 SI-203-12" VT-3 4 1 *

  • Exam required when Zone 24 V-543 SI-221-12" VT-3 valve is disassembled Zone 25 V-540 SI-1 56-12" VT-3 Zone 26 V-541 S1-175-12" VT-3 14" Borg Warner Check Valves ,

Utilizing Cast Construction Zone 23 V-235 SI-207-14" VT-3 8 1 *

  • Exam required when V-237 SI-207-14" VT-3 valve is disassembled Zone 24 V-245 SI-223-14" VT-3

V I-;j Zone 2.5 V-215 SI-160-14" VT-3 V-217 S1-160-14" VT-3 Zone 26 V-225 SI-1-79-14" VT-3 V-227 SI-179-14" VT-3 Dresser PSV _.

Utilizing ForgedConstruction Zone 31 PSV-200 RC-001-6" VT-3 4 1 *

  • Exam required when PSV-201 RC-003-6" VT-3 __ __ valve is disassembled

_PSV-202 RC-005-6" VT-3 _ _

__PSV-203 RC-007-6" VT-3

__ I ___________ I ____ I _____ I___ I ___ i'.I ____ I__ I ______

2 100 3 100 B13.50 INTERIOR ATTACHMENTS WITHIN BELTLINE REGION 1- Reactor Vessel accessible welds 78173 VT-1 1 1 3 100 B13.60 INTERIOR ATTACHMENTS BEYOND BELTLINE REGION 1- Reactor Vessel accessible welds 78173 VT-3 1 1 3 100 B13.70 CORE SUPPORT STRUCTURE 1- Reactor Vessel accessible areas 78173 VT-3 1 1 3 100 R1 9 (note RR 40)

__ 1.___________ I. ____ I I .1

___ 1

___ 1 ____ 1

__ 1

4 1 2 3 R15

... 3 i6 B14.10 WELDS IN CRD HOUSING _ _ _32 peripheral 2- Reactor Vessel Lower Housing 66 thru 97 Vol 32 Closure Head S CEDM Housings . ....

2- Reactor Vessel Upper Housing 66 thru 97 Vol 32 Closure Head

- CEDM Housings 2- Reactor Vessel LowerTube 66-91,93-95,97 Vol 32 Closure Head RVLMS 92 and 96 CEDM Housings 2- Reactor Vessel UpperTube 66-91,93-95,97 Vol 30 _i _ . * "

Closure Head CEDM Housings zW C,)

CD

B15.10 PRESSURE RETAINING Class 1 IWB-5222a VT-2 * *NOTE Pressure Test COMPONENTS Program B15.10 PRESSURE RETAINING Class 1 IWB-5222b VT-2 .. .. ** . **NOTE Pressure Test

__ COMPONENTS Program EXAM CATEGORY B-Q; STEAM - overned by Plant GENERATOR TUBING* hTech Specifications B16.20 STEAM GENERATOR TUBING IN ....... .. .....

  • U-TUBE DESIGN

_______ ____________________________________ ______________ - I .5. 1 .5. 1 1

rLi. u %LtA

[~RESI

  • F-A; A running percent NONE _

F1.10 CLASS 1 PIPING SUPPORTS____ _____________

.RESTR~AINTS

  • F-A; B running percent - 85 7 1 8 8 2 18

._ _ 8 3 28 20- Pressurizer Surge Line supports RC-28-12" VT-3 1 ....

21- Shutdown Cooling 1 supports RC-51-16" VT-3 .. 14 _

SI-240-16" __

22- Shutdown Cooling supports SI-193-16" VT-3 4 60 C),

23- Safety Injection 1A supports SI-207-14" VT-3 1 0

0 25- Safety Injection 2A supports SI-156-12" VT-3 1 26- Safety Injection 2B supports SI-179-14" VT-3 2 SI-175-12" 27- Pressurizer Spray 1A supports RC-62-3" VT-3 8 RC-1 6-3" 28- Pressurizer Spray 1B supports RC-17-3" VT-3 10 RC-1 8-3" . .

RC-1 8-4" 30- Aux Pressurizer Spray supports CH-521-2" VT-3 1 32- Drain Line 1A supports RC-60-2" VT-3 1 33- Drain Line 1B supports RC-58-2" VT-3 1 36- Letdown Line supports RC-91-2" VT-3 15 CH-001-2" .. ..

RC-91-16" 37- Charging Line supports CH-5-3" VT-3 16 39- HPSI Long Term Recirculation 1 supports SI-248-3" VT-3 7

._40-HPSI Long Term Recirculation 2 supports SI-199-3" VT-3 3

4 2 15 5 3 26 20- Pressurizer Surge Line supports RC-28-12" VT-3 3 21- Shutdown Cooling 1 supports SI-240-16" VT-3 3 _

22- Shutdown Cooling supports RC-68-16" VT-3 2 23- Safety Injection 1A supports SI-207-14" VT-3 4 24- Safety Injection 1B supports SI-223-14" VT-3 7 25- Safety Injection 2A supports SI-160-14" VT-3 1 26- Safety Injection 2B supports SI-179-14" VT-3 2 SI-1i 75-12" 27- Pressurizer Spray 1A supports RC-62-3" VT-3 3 28- Pressurizer Spray 1B supports RC-1 7-3" VT-3 3 29- Combined Pressurizer Spray supports RC-18-4" VT-3 3 30- Aux Pressurizer Spray supports CH-521-2" VT-3 1 37- Charging Line supports CH-5-3" VT-3 11 39- HPSI Long Term Recirculation 1 supports SI-248-3" VT-3 3 HPSI Long Term Recirculation 2 supports S1 -199-3" VT-3 1 I- -- I U A. I - a -

4 2 56 multiple components 6 3 100 1 - Reactor Vessel columns 78173 VT-3 4 3 - Steam Generator 1* skirt 224 VT-3 1 *multiple comp 4 - Steam Generator-2* skirt 225 VT-3 1 5 - Pressurizer skirt 78373 VT-3 1 16- Reactor Coolant Pump 1A** columns 1109-1A VT-3 8 **multiple comp 17- Reactor Coolant Pump 1B** columns 1109-11B VT-3 8 18- Reactor Coolant Pump 2A** columns 1109-2A VT-3 8 19- Reactor Coolant Pump 2B** columns 1109-2B VT-3 8 Fl1.40 SUPPOQRTS OTHER THAN _____ _________ ____ ______

___PIPING SUFPPRTS _____ _________ ____ ______

SECTION 5.0 ASME CLASS 2 EXAMINATION

SUMMARY

33 of 207 31NT-ISI-1 Rev 1

INDEX EXAM CATEGORY C-A Pressure Retaining Welds in Pressure Vessels C-B Pressure Retaining Nozzle Welds in Vessels C-C Welded Attachments for Vessels, Piping, Pumps, and Valves C-D Pressure Retaining Bolting Greater than 2 Inch in Diameter C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping C-G Pressure Retaining Welds in Pumps and Valves C-H All Pressure Retaining Components F-A Class 2 Supports 34 of 207, 31NT-ISI-1 Rev 1

8 2 70 1multiple vessels

_ _ _5 3 100 STEAM GENERATORS__

Cl.10 SHELL CIRCUMFERENTIAL WELDS

.... ____ (shell to conical section) _ . _

41- Steam Generator 1 welds 224 Vol 2 2 2

--- 42- Steam Generator 2 welds 225 Vol 2 C1.20 HEAD CIRCUMFERENTIAL WELDS (head to shell) ..

41- Steam Generator 1 welds 224 Vol 1 1 2 42- Steam Generator 2 welds 225 Vol 1 C1.30 TUBESHEET-TO-SHELL WELDS Steam Generator 1 welds 224 Vol 1. 1 2 42- Steam Generator 2 welds 225 Vol 1 REGENERATIVE HEAT EXCHANGER C1.10 SHELL CIRCUMFERENTIAL WELDS .... __.......

68- Regenerative Heat Exchanger welds 79119 Vol 3 3 3 . . _

C1.20 HEAD CIRCUMFERENTIAL WELDS __..

68- Regenerative Heat Exchanger welds 79119 Vol 2 2 3 -_.____... .... ___

C1.30 TUBESHEET-TO-SHELL WELDS ....... ..... . . ....

68- Regenerative Heat Exchanger welds 79119 Vol 4 4 2

____ LETDOWN HEAT EXCHANGER "

C1.10 SHELL CIRCUMFERENTIAL WELDS 169- Letdown Heat Exchanger welds N2370 Vol 1 1 1 .. ... . _

C1.30 TUBESHEET-TO-SHELL WELDS 69- Letdown Heat Exchanger welds N2370 Vol 1 _

SHUTDOWN COOLING HEAT EXCH "

C1.1.0 SHELL CIRCUMFERENTIAL WELDS (shell to flange)

" 84- SDCHX A welds S-18341 Vol 1 87- SDCHX B welds S-18342 Vol 1 C1.30 TUBESHEET-TO-SHELL WELDS 84- SDCHX A welds S-18341 Vol 1 87- SDCHX B welds S-18342 Vol

NOMINAL THICKNESS C2.21 NOZZLE-TO-SHELL (NOZZLE TO HEAD OR NOZZLE TO NOZZLE) _

WELD

  • C2.21 running percent - 20** 2 1 20 ** 20 Total, 10 REQ'D 4 2 60 multiple vessels 4 3 100 41- Steam Generator 1 welds 224 S & Vol 8 4 2 42- Steam Generator 2 welds 225 S & Vol 8 4 3 84- SDCHX A welds S-18341 S & Vol 2 2 1 87- SDCHX B welds S-18342 S & Vol 2 0 _ _

02.22 NOZZLE INSIDE RADIUS SECTION

  • C2.22 running percent 12** 2 1 33
  • 12 Total, 6 REQ'D 2 2 67 multiple vessels

_ 2 3 100 41- Steam Generator 1 welds 224 Vol 4 2 2 42- Steam Generator 2 welds 225 Vol 4 2 3 84- SDCHXA welds S-18341 Vol 2 2 1

,87- SDCHX B welds S-18342 Vol 2

  • C3.10 running percent 2 1 50 1**6 Total; 4 REQD 2 3 100 Multiple Vessels -

_ _Multiple Vessels 41- Steam Generator 1 lugs 224 S 2 2 1 42- Steam Generator 2 lugs 225 S 2 68- Regenerative Heat Exchanger supports 79119 S 2 2 3 PIPING C3.20 WELDED ATTACHMENTS

_ 56- Feedwater SG No. 1 attachment SG-202 S 1 . o 57- Feedwater SG No. 2 attachment SG-205 S 1 58- Aux Feed S/G 1 attachment SG-008 S 1

62- Auxiliary Feedwater SG I attachment AF-018 S 1 1 63- Auxiliary Feedwater SG 1 attachment AF-016 S 1

.64- Blowdown SG 1 attachment SG-039 S 6 SG-053 .__

65- Blowdown SG 2 attachment SG-048 S 8 1 2 SG-052 70- LPSI Pump Room A Suction attachment SI-067 S 3 SI-241 SI-307 oD 0,

71- LPSI Pump Room A Discharge attachment SI-078 S 4 rO SI-087 73- LPSI Pump Room B Suction attachment SI-034 S 2 SI-308 74- LPSI Pump Room B Discharge attachment - SI-129 S 3 76- CS Pump Room A Suction attachment SI-009 S 2 SI-067 77- CS Pump Room A Discharge attachment SI-079 S 6 1 3 SI-082 79- CS Pump Room B Suction attachment SI-033 S 1 SI-034 80- CS Pump Room B Discharge attachment SI-119 S 4 82- SDCHX Room A attachment SI-078 S 3 SI-079

4 1* 1-SI-087 4.~~~~S 087!Z~ 14I .4 4 + ___________ -

SI-089 I 4 I 4 4

- J. 4 1 SI-090

-~ I 4. I - 4 - 4 4.

85- SDCHX Room B attachment SI-119 S 6 1 2 . _"__

SI-123 SDCHX Room B attachment S1-072 S 12 2 3 SI-129 SI-134 .. .. .

___SI-135 88- East Wrap attachment SI-072 S 4 SI-073 89- East Wrap attachment SI-173 S 3 ....

SI-194 90- East Wrap attachment SI-134 S 1 91- West Wrap attachment SI-070 S 4 92- West Wrap attachment SI-002 S 5 1 1 SI-239 SI-241 93- West Wrap attachment Sl-089 S 1.

94- A Train Pipe Chase & 88' attachment SI-070 S 9 .1 2 SI-089 SI-241 95- B Train Pipe Chase & 88' attachment SI-072 S 9 1 3 _ _

___SI-134 SI-194

97- Containment LPSI to 1B attachment SI-220 S 6 _

98- Containment LPSI to 2A attachment SI-155 S 2 99- Containment LPSI to 2B attachment SI-174 S 2 100- Containment LPSI A Suction attachment SI-007 S 2 _

SI-369 101- Containment LPSI B Suction attachment SI-030 S 3 S1-194 SI-368 102- SI Pump Suction A attachment SI-008 S 9 1 1 SI-009 SI-307 103- Refueling Water Suction A attachment CH-142 S 8 1 2 CH-424 104- SI Pump Suction B attachment SI-031 S 4 SI-033 SI-308

  • 105- Refueling Water Suction B attachment CH-149 S 15 3 3 CH-425 106- HPSI Room Discharge A attachment SI-099 S 20 2 1 SI-100 _

SI-105 SI-106 107- HPSI Room Discharge B attachment SI-107 S 13 3 2 SI-112 108- HPSl 88' Pipechase attachment SI-100 S 14 23

"*I *i4C)

  • I-I 10 109- HPSI 88' Pipechase attachment SI-107 s 9 1 1 _.. ._

110- HPSI Discharge West Wrap attachment SI-103 S6 S- 12 .. ...... ..

SI-107 SI-218 SI-236 111- HPSI Discharge West Wrap attachment SI-100 S 2 _ _

112- HPSI Discharge East Wrap attachment SI-100 S 4 . ... . - . . ...

S1-101 SI-102 SI-176 113- HPSI Discharge attachment SI-107 S 4 " , _.. . . ....

SI-157 SI-176 118- HPSiLong Term attachment SI-106 S 18 3 3 .. ..

119- HPSILong Term attachment SI-114 S 12 2 1 PUMPS .. . . ... ..

C3.30 WELDED ATTACHMENTS_ _ ____-

  • C3.30 running percent 20** 1 3 10 **20 Total, 10 REQ'D Multiple Vessels
  • 72- LPSI Pump A lugs 0876-36 S 3 "" _._

____75- LPSI Pump B lugs 0876-37 S 3 .

78- Containment Spray A lugs 0876-38 S 3 .

S81-Containment Spray B lugs 0876-39 S 3

.lb- HI B51A lugs U07b-14 4 117- HPSI B lugs 0776-15 S 4 1 3

    • 10 total 3 required 1 2 6i7 Multiple Items

! 1 3 100

_'PUMPS C4.30 BOLTS AND STUDS .... ____ "___"

_.-

  • 116- HPSIA 16studs 0776-14 VOL 1 .. ...

117- HPSI B 16 studs 0776-15 VOL 1 1 VALVES C4.40 BOLTS AND STUDS

.... 47- Main Steam SG 1 West 20 studs UV-170 VOL 1 12 2 48- Main Steam SG 1 East 20 studs UV-180 VOL 1 . .. ..

..... 49- Main Steam SG 2 East 20 studs UV-171 VOL 1

____ Main Steam SG 2 West 20 studs UV-181 VOL 1 * " _.

______56- Feedwater SG No. 1 20 studs UV-132 VOL 1 1 3 "

_ UV-174 1 .

___57- Feedwater SG No. 2 20 studs UV-137 VOL 1 . " _ _ "

.. .. __ ... _ _ _UV-177 1 .

FIrFllNI3 VVFLLJO' " 310 IIN I"I.JIVIII"II-WALL THICKNESS FOR PIPING C5.10 >NPS 4 C5.11 CIRCUMFERENTIAL WELD

  • C5.11 running percent 511 17 1 2 *1090 WELDS-USED 25 2 4 FOR % DUE TO C-F-1 40 3 8 Note 2 58-Aux Feed S/G 1 6" x 0.562" AF-004 S & Vol 22 4 1 6" x 0.432" SG-008 8" x 0.500 SG-008 59-Aux Feed S/G 2 6" x 0.562" AF-006 S & Vol 33 4 2 6" x 0.432" SG-01 1 8" x 0.500 SG-011 62-Aux Feed S/G 1 6" x 0.562" AF-004 S &Vol 18 3 3 AF-018 63-Aux Feed S/G 2 6" x 0.562" AF-006 S & Vol 16 3 1 AF-016 70-LPSI Pump Room A Suction 20" x 0.375 Sl-307 S & Vol 20 4 1 73-LPSI Pump Room B Suction SI-308 82 & 85 SDC Heat Exch 20" x 0.500" SI-078 S & Vol 8 2 2 Room A & B SI-123 83 & 86 SDC Heat Exch 14" x 0.375" SI-90 S & Vol 54 7 2 Room A & B SI-135 16" x 0.375" SI-70 SI-72 20" x 0.500" Sl-70 SI-72

88 & 91 Safety Injection 12" x 0.375" SI-72 S & Vol 79 12 3 East and West.W raps SI-73 ....... *.. . . .

S I-70 .... ...

SI-71 12"x 1.125" SI-155 ....

SI-174 SI-72 I SI-73 SI-70 SI-71 SI-202 SI-220

_, 20" x 0.500" SI-72 SI-70 90 & 93 Safety Injection 24" x 0.375" SI-30 S & Vol 10 2 1 ___-

East and West Wraps SI-7 ...... ..

24" x 0.562" SI-308 SI-307 94 & 95 Safety Injection A & B 20" x 0.500 SI-70 S& Vol 15 3 2 SI-72 96, 97, 98, 99 Containment LPSI 12" x 1.125" SI-202 S & Vol 108 14 3 Loop lA, 1B, 2A&2B SI-220 2 2 SI-155 SI-174 12" x 1.312" SI-202 ....

SI-220 S1-155 SI-174 100 & 101 Containment LPSI 16" x1.594 SI-241 S & Vol 8 1.2 .. . ..

Loop A & B, Suction SI-194 24" x 0.375 SI-7 SI-30

4"t A U.OU 20" x 0.375" SI-307 4 I I I - f 4 4. -~

103-Refueling Water Tank Suction A 20" x 0.375" CH-424 S & Vol 35 6 2 20" x 0.375" CH-142 104-Safety Injection B Suction 24" x 0.562" SI-308 S & Vol 19 4 3 20" x 0.375" SI-308 105-Refueling Water Tank B Suction 20" x 0.375" CH-425 S & Vol 47 7 3 20" x 0.375" CH-149 PIPING WELDS > 1/5 IN NOMINAL WALL THICKNESS FOR PIPING >

C5.20 NPS 2 AND < NPS 4 C5.21 CIRCUMFERENTIAL WELD

  • C5.21 running percent - 584 10 1 2 18 2 5 18 3 8 104 SI B Train Suction 3"X 0.216" CH-150 S &Vol 4 1 34 106 & 107 HPSI Room Discharge 4" x 0.438" SI-100 S & Vol 139 10 1 A and B 4" x 0.337" SI-99 S1-107 3" x 0.438" SI-106 S1-107 2" x 0.344" SI-105 SI-112 108 & 109 HPSI 88' Pipechase 4" x 0.438" SI-100 S & Vol 88 7 2 2" x 0344" SI-118 4" x 0.377" SI-107 110 & 111 HPSI Discharge 4" x 0.337" SI-107 S & Vol 105 8 3 West Wrap 4" x 0.438" SI-218 SI-100 SI-236

01-O10 SI-236 2" x 0.344" S1-103 S1-107 S1-110 SI-218 SI-236 S1-100 112 & 113 HPSI Discharge 4" x 0.337" SI-107 S & Vol 97 8 2 East Wrap 4"x 0.438" SI-100 SI-176 S1-157 3" x 0.438" SI-176 SI-157 2" x 0.344" SI-101 S1-102 S1-108 S1-109 S1-157 S1-176 1l14& 115 HPSI Header 3"x 0.438" SI-218 S & Vol 45 3 2

_ Loop 1A, 1B, 2A & 2B SI-236 S1-157 S1-176 118 & 119 HPSI Long Term 3"x 0.438" SI-106 S & Vol 106 9 3 SI-114 2" x 0.344" SI-319 C5.30 SOCKET WELDS 106 & 107 HPSI Room Discharge 2" x 0.344" SI-105 S 3 1 3 17 Aand B SI-112 S 3 PIPE BRANCH CONNECTIONS OF C5.40 BRANCH PIPING > NPS 2

  • C5.41 running percent 27 1 1 4 1 2 7 1 3 11 82 & 85 SDC Heat Exch 20" x 10" SI-78 S 2 1 1

____Room A&B S1-123 S 2 83 & 86 SDC Heat Exch 20" x 6" SI-70 S 4 1 3 Room A & B 20" x 10" SI-72 S 4 20" x 14" 88 & 91 Safety Injection 20" x 12" SI-70 S 1 East and West Wraps SI-72 S 1 89 & 92 SDC Suction 18" x 12" SI-194 S 1

_ East and West Wraps SI-241 S 1 96, 97, 98, 99 Containment LPSI 12" x 3" SI-202 S 1 1 2 Loop 1A, 1B, 2A & 2B SI-220 S 1 SI-155 S 1 SI-174 S 1 102-Safety Injection A Suction 24" x 10" SI-307 S 3 24" x 18" 24" x 20" 104-Safety Injection B Suction 24" x 10" SI-308 S 4 24" x 18" 24" x 20" 24" x 3"

___ I______________ I_____ I______ I ___ i____ I___ I _____I___ _______

IIIINtU WI-LU) > /5I IN NUMINI-WALL THICKNESS FOR PIPING C5.50 >NPS 4 C5.51 CIRCUMFERENTIAL WELD

  • C5.51 running percent - 329 7 1 2 10 2 5 10 3 8 43- Main Steam SG 1 East Butt Welds SG-36-28" S & Vol 19 1 1 SG-36-32" 44- Main Steam SG 1 West Butt Welds SG-33-28" S & Vol 21 2 2 SG-33-32" 45- Main Steam SG 2 East Butt Welds SG-42-28" S & Vol 19 1 3 SG-42-32" _

46- Main Steam SG 2 West Butt Welds SG-45-28" S & Vol 21 2 1

__ SG-45-32" 47- Main Steam SG 1 West Butt Welds S & Vol 48- Main Steam SG 1 East Butt Welds ** S & Vol **

49- Main Steam SG 2 East Butt Welds ** S & Vol **

50- Main Steam SG 2 West Butt Welds ** S & Vol **

51- Atmospheric Dump No. 1 Butt Welds S & Vol 52- Atmospheric Dump No. 2 Butt Welds ** S & Vol **

53- Steam to Aux Feedwater Butt Welds ** S & Vol **

54- Feedwater SG No. 1 Butt Welds SG-2-24" S & Vol 62 4 3

' - -IV, SG-2-1 4" SG-1 3-16" SG-13-14" 55- Feedwater SG No. 2 Butt Welds SG-5-24" S & Vol 58 5 SG-5-16" SG-5-14" SG-14-16" SG-14-14" 56- Feedwater SG No. 1 Butt Welds SG-201-24" S & Voll SG-202-24" 57- Feedwater SG No. 2 Butt Welds SG-204-24" S & Vol **

SG-205-24" 58- Aux & Downcomer FW SG 1 Butt Welds SG-8-6" S & Vol 19 2 2 SG-8-8" 59- Aux & Downcomer FW SG 2 Butt Welds SG-1 1-6" S & Vol 11 2 3 SG-1 1-8" 60- Downcomer Feedwater SG 1 Butt Welds SG-200-8" S & Vol SG-008-8" 61- Downcomer Feedwater SG 2 Butt Welds SG-203-8" S & Vol SG-1_1-8" 64- Blowdown SG 1 Butt Welds SG-39-6" S & Vol 50 5 2 SG-53-6" SG-522-6" 65- Blowdown SG 2 Butt Welds SG-48-6" S & Vol 49 4 3 SG-52-6" SG-523-6"

,66- Blowdown SG 1 Butt Welds SG-39-6" S & Vol **

67- Blowdown SG 2 Butt Welds SG 6" S & Vol PIPE BRANCH CONNECTIONS OF ** Note exam items are in C5.80 BRANCH PIPING > NPS 2 Aug Summary C5.81 CIRCUMFERENTIAL 47- Main Steam SG 1 West 28" x 12" SG-206-28" S 28" x 6"

_ 48- Main Steam SG 1 East 28" x 12" SG-207-28" S 28" x 6" 49- Main Steam SG 2 East 28" x 12" SG-208-28" S 28" x 6" ci 50- Main Steam SG 2 West 28" x 12" SG-209-28" S 28" x 6"

'-4

116 & 117 HPSI PUMP casing inlet nozzle S 2 2 *BY THE END OF THE Loop A& B outlet nozzle S 2 INTERVAL VALVES C6.20 VALVE BODY WELDS 47- Main Steam SG 1 West 6"x1O" PSV-572 S 5 1 .... . *EXAMINE 1 VALVE PSV-573 BY THE END OF THE PSV-574 INTERVAL PSV-575 PSV-692 48- Main Steam SG 1 East 6"x10" PSV-576 S 5 PSV-577 PSV-578 PSV-579 PSV-691 __ _

49- Main Steam SG 2 East 6"x10" PSV-554 S 5 PSV-555 PSV-556 PSV-557 PSV-695 50- Main Steam SG 2 West 6"x10" PSV-558 S 5 PSV-559 PSV-560 PSV-561 PSV-694 83 & 86 SDC Heat Exch 6" Gate V-460 5 2 1 Room A & B V-464 I I _

89 & 92 SDC Suction 16" Gate UV-655 2 1 **2 East and West Wraps UV-656 106 & 107 HPSI Room Discharge 4" Gate V-476 4 ** **

A and B HV-698 V-478 HV-699 106 & 107 HPSI Room Discharge 4" Check V-404 2 1...

A and B V-405

PRESSURE RETAINING C7.10 COMPONENTS Class 2 IWC-5222 VT-2

  • NOTE Pressure Test Program

4 *O r-M; i* ruiunini percent- - I L o 83- SDCHX Room A supports SI-87 VT-3 1 1 2 106- HPSI Room Discharge A supports SI-100 VT-3 1

" 107- HPSI Room Discharge B supports SI-107 VT-3 1 F1.20 CLASS 2 PIPING SUPO.TS

______RESTRAIN~TS _____________

z 58- Aux & Downcomer FW SG 1 supports SG-8 VT-3 5 1 2

-I C,,

59- Aux & Downcomer FW SG 2 supports SG-1 1 VT-3 6 1 2 CD 62- Auxiliary Feedwater SG 1 supports AF-018 VT-3 1 1 1 163- Auxiliary Feedwater SG 2 supports AF-006 VT-3 3

4.* + *1< I 1 64- Blowdown SG 1 supports SG-39 VT-3 11 SG-53 VT-3 65- Blowdown SG 2 supports SG-48 VT-3 11 1 2 SG-52 VT-3 70- LPSI Pump Room A Suction supports SI-067 VT-3 3 SI-241 SI-307 71- LPSI Pump Room A Discharge supports SI-87 VT-3 5 2 3-SI-78 C,

73- LPSI Pump Room B Suction supports SI-034 VT-3 3 0 SI-308 21 0

74- LPSI Pump Room B Discharge supports SI-129 VT-3 3 76- CS Pump Room A Suction supports SI-9 VT-3 4 SI-67 77- CS Pump Room A Discharge supports SI-79 VT-3 7 2 3 SI-82 79- CS Pump Room B Suction supports SI-033 VT-3 3 1 3 SI-034 80- CS Pump Room B Discharge supports SI-119 VT-3 5 2 3 82- SDCHX Room A supports SI-78 VT-3 2 SI-79 83- SDCHX Room A supports SI-70 VT-3 13 1 1 SI-82 VT-3 SI-87 VT-3 SI-89 VT-3

85- SDCHX Room B supports SI-119 VT-3 8 1 2 S1-123 86- SDCHX Room B supports SI-72 VT-3 10 4 3 SI-129 VT-3 SI-134 VT-3 SI-135 VT-3 SI-147 VT-3 88- East Wrap supports SI-72 VT-3 5 2 3 SI-73 VT-3 89- East Wrap supports SI-38 VT-3 5 1 1 SI-173 VT-3 Si-194 VT-3

_90- East Wrap supports SI-130 VT-3 3 SI-134 91- West Wrap supports SI-70 VT-3 7 1 1 SI-71 VT-3 92- West Wrap supports SI-2 VT-3 8 1 1 SI-241 VT-3 93- West Wrap supports SI-89 VT-3 3 94- A Train Pipe Chase & 88' supports SI-70 VT-3 14 1 2 SI-89 VT-3 SI-241 VT-3 95- B Train Pipe Chase & 88' supports SI-194 VT-3 14 3 3 SI-72 VT-3 SI-134 VT-3 196- Containment LPSI to 1A supports SI-202 VT-3 7 1 2

97- Containment LPSI to 1B supports SI-220 VT-3 13 2 98- Containment LPSI to 2A supports SI-155 VT-3 4 99- Containment LPSI to 2B supports SI-174 VT-3 5 100- Containment LPSI A Suction supports SI-7 VT-3 2 SI-369 VT-3 101- Containment LPSI B Suction supports SI-30 VT-3 4 SI-194 VT-3 SI-368 VT-3 102- SI Pump Suction A supports SI-8 VT-3 15 1 1.

SI-9 VT-3 SI-307 VT-3 103- Refueling Water Suction A supports CH-142 VT-3 14 2 2 CH-424 VT-3 104- SI Pump Suction B supports SI-31 VT-3 12 3 3 SI-33 VT-3 SI-308 VT-3 105- Refueling Water Suction B supports CH-149 VT-3 19 3 3 CH-425 VT-3 106- HPSI Room Discharge A supports SI-100 VT-3 18 1 1 S1-105 SI-106 107- HPSI Room Discharge B supports SI-107 VT-3 13 3 2 S1-112 108- HPSI 88' Pipechase supports SI-100 VT-3 16 2 3 SI-118 _

110- HPSI Discharge West Wrap supports S1-103 -VT-3 13 1 2 SI-107 S1-110 SI-218 SI-236 111- HPSI Discharge West Wrap supports S1-100 VT-3 5 1 3 SI-236 112- HPSI Discharge East Wrap supports Si-1o0 VT-3 10 3 3 S1-101 SI-102 SI-176 O~)

0 0 113- HPSI Discharge supports SI-107 VT-3 10 1 1 SI-108 0

S1-109 SI-157 SI-176 114 HPSI Header supports SI-218 VT-3 2 1 2 Loop 1A & 1B SI-236 115 HPSI Header supports SI-157 VT-3 2 Loop 2A & 2B SI-176 118 - HPSI Long Term supports SI-106 VT-3 22 4 3

_ 119 - HPSI Long Term supports SI-114 VT-3 19 2 1 SI-319 I I .5. 1 & .5.---~ .5. - ___________________

I-r-A; %.running percent 100 0 1 0 11 2 9 13 3 16 43- Main Steam SG 1 East supports SG-36 VT-3 1 1 1 44- Main Steam SG 1 West supports SG-33 VT-3 2 2 1 45- Main Steam SG 2 East supports SG-42 VT-3 2 1 1 46- Main Steam SG 2 West supports SG-45 VT-3 2 1 1 47- Main Steam SG 1 West supports SG-206 VT-3 1 48- Main Steam SG 1 East supports SG-207 VT-3 1 49- Main Steam SG 2 East supports SG-208 VT-3 1 50- Main Steam SG 2 West supports SG-209 VT-3 1 51- Atmospheric Dump No. 1 supports SG-59 VT-3 2 SG-70 52- Atmospheric Dump No. 2 supports SG-84 VT-3 2 SG-103 54- Feedwater SG No. 1 supports SG-002 VT-3 9 SG-013 VT-3 55- Feedwater SG No. 2 supports SG-005 VT-3 10 1 1 SG-014 56- Feedwater SG No. 1 supports SG-202 VT-3 1 157- Feedwater SG No. 2 supports " SG-205 VT-3 1

58- Aux & Downcomer FW SG 1 supports SG-8 VT-3 11 2 3 AF-4 VT-3 59- Aux & Downcomer FW SG 2 supports SG-1 1 VT-3 11 4 2 AF-6 VT-3 60- Downcomer Feedwater SG 1 supports SG-200 VT-3 2 61- Downcomer Feedwater SG 2 supports SG-203 VT-3 2 62- Auxiliary Feedwater SG 1 supports AF-018 VT-3 2 AF-4 VT-3 63- Auxiliary Feedwater SG 2 supports AF-006 VT-3 2 a,

0' 64- Blowdown SG 1 supports SG-39 VT-3 5 0

-.4 65- Blowdown SG 2 supports SG-48 VT-3 4 2 2 71- LPSI Pump Room A Discharge supports SI-78 VT-3 1 74- LPSI Pump Room B Discharge supports SI-129 VT-3 3 1 3 77- CS Pump Room A Discharge supports SI-79 VT-3 2 79- CS Pump Room B Suction supports SI-034 VT-3 1 80- CS Pump Room B Discharge supports SI-119 VT-3 5 1 2 S1-147 82- SDCHX Room A supports SI-78 VT-3 1 83- SDCHX Room A supports SI-70 VT-3 5 SI-87 VT-3

_SI-90 VT-3 85- SDCHX Room B supports S 1-1'19 VT-3 2 -- 4

  • I-12; _ _ __ ___

86- SDCHX Room B

_ supports SI-72 VT-3 15 4 3 S1-129 S1-134 S1-135 88- East Wrap supports SI-72 VT-3 9 1 3 SI-73 89- East Wrap supports Si-i94 VT-3 1 91- West Wrap supports SI-70 VT-3 3 SI-71 92- West Wrap supports SI-239 VT-3 4 SI-241 VT-3 93- West Wrap supports SI-89 VT-3 1.

94- A Train Pipe Chase & 88' supports SI-89 VT-3 1 95- B Train Pipe Chase & 88' supports SI-72 VT-3 4 1 3 S1-194 96- Containment LPSI to 1A supports SI-202 VT-3 11 3 2 97- Containment LPSI to 1B supports SI-220 VT-3 13 3 3 99- Containment LPSI to 2B supports SI-174 VT-3 2 100- Containment LPSI A Suction supports SI-241 VT-3 1 101- Containment LPSI B Suction supports SI-194 VT-3 1 102- SI Pump Suction A supports SI-307 VT-3 1 1104- SI Pump Suction B supports SI-308 VT-3 1

106- HPSI Room Discharge A supports SI-99 VT-3 3 107- HPSI Room Discharge B supports SI-107 VT-3 3 1 2 108- HPSI 88' Pipechase supports SI-100 VT-3 2 SI-118 109- HPSI 88' Pipechase supports SI-107 VT-3 3 110- HPSI Discharge West Wrap supports SI-107 VT-3 4 1 3 SI-218 111- HPSI Discharge West Wrap supports SI-236 VT-3 1 113- HPSI Discharge supports SI-157 VT-3 1 118 - HPSI Long Term supports SI-106 VT-3 2 _ __ __

119 - HPSI Long Term supports SI-114 VT-3 4 SI-319 120- Containment Spray A supports SI-88 VT-3 .1 121- Containment Spray B supports SI-130 VT-3

-3 running percent. z- z L I LzU " oial, -i -. uu 5 2 70 Multiple Items 5 3 100 68- Regenerative Heat Exchanger supports 79119 VT-3 2 2 3 72- LPSI Pump A supports 0876-36 VT-3 3 3 2 75- LPSI Pump B supports 0876-37 VT-3 3 78- CS Pump A supports 0876-38 VT-3 3 81- CS Pump B supports 0876-39 VT-3 3 3 3 116- HPSI Pump A supports 0776-14 VT-3 4 2 1 117- HPSI Pump B supports 0776-15 VT-3 4 2 2 F1.40 SUPPORSTSOTHER THAN__ ___ ____

P___'IPING SUPPORTS ______ ______

  • F-A; C running percent - 4** 1 1 50 **4 Total, 2 REQ'D 1 3 100 Multiple Items

,41- Steam Generator 1 snubbers 224 VT-3 2 1 1 42- Steam Generator 2 snubbers 225 VT-3 2 1 3

SECTION 6.0 ASME CLASS 3 EXAMINATION

SUMMARY

66 of 207 31NT-ISI-1 Rev 1

INDEX EXAM CATEGORY D-A Welded Attachments for Vessels, Piping, Pumps and Valves D-B All Pressure Retaining Components F-A Class 3 Supports 67 of 207 31NT-ISI-1 ,Rev 1

3d Attachments

  • D1.10; running percent 22** 2 1 20 **10 req'd due to 3 2 50 multiple comp 5 3 100 DF System attachments DFA-T02 VT-1 2 1 3 DFB-T02 DG System attachments DGA-E04 VT-1 8 1 1 DGA-E05 1 2 DGB-E04 1 3 DGB-E05 DGA-XO1A DGA-X01 B DGB-XO1A DGB-XO1 B EC System attachments ECA-E-1 VT-1 4 2 3 ECA-T-1 ECB-E-1 ECB-T-1

_ EW System attachments EWA-EO1 VT-1 4 1 1 EWA-TO1 1 2 EWB-EO1 EWB-TO1 PC System attachments PCA-E1 VT-1 2 1 2 PCB-E1 SI System attachments SIA-EO1 VT-1 2 1 3 SIB-EO1 Piping

VVUIUUU tALLCIUIllllt!llLb

  • D1.20; runninq percent 240 9 I 4 12 2 10 12 3 15 AF System attachments piping VT-1 9 1 1 CT System attachments piping VT-1 3 1 1 DG System attachments piping VT-1 10 2 3 EC System attachments piping VT-1 14 1 1 1 3 EW System attachments piping VT-1 37 3 1 2 2 NC System attachments piping VT-i 19 2 1

_1 3 PC System attachments piping VT-1 13 1 1

_1 3 SG System attachments piping VT-1 4 1 2 St System attachments piping VT-i 2 1 2 SP System attachments piping VT-1 129 8 2 1 7 3

D2.10 Pressure retaining components Class 3 IWD-5221 VT-2

  • NOTE Pressure Test Program S EXAM CATEGORY F-A; SUPPORTS

~F1.30 CLAS~S3 PIPING SUPP~ORTS K ___________ __________________

B-MULTIDIRECTIONAL RESTRAINTS_ ____ _

  • F-A; B running percent - 298 11 1 4 14 2 8 15 3 13 AF System supports piping VT-3 18 1 1 2 2 0

0 CT System supports piping VT-3 3 1 2 0

DG System supports piping VT-3 8 2 3 EC System, supports piping VT-3 16 2 3 EW System supports piping VT-3 67 6 1 3 2 NC System supports piping VT-3 35 2 1 3 3 PC System supports piping VT-3 17 1 1 1 3 SG System supports piping VT-3 4 1 1 SI System supports piping VT-3 5 1 2 SP System supports piping VT-3 125 7 2 7 3

_ *F-A; C running percent - - !j1

. 5 2 18

4. 3 25 AF System supports piping VT-3 10 1 2 " " .

DG System supports piping VT-3 4 1 3 _ . .

EC System supports piping VT-3 2 1 3 _ ,.

EW System -supports piping VT-3 9 2 1 __.. _

NC System supports piping VT-3 1 1 1 _ . "

___ PC System supports piping VT-3 13 2 1 .... .. .

_ __ _ __ _1 3 .... .

_ SG System supports piping VT-3 7 2 2 SI System supports piping VT-3 1 1 2

____SP System supports piping VT-3 9 1 3 ,

I-} 'I ,3,'3

_r-M; D running percent . " - I 0U 1 eq U uue LU 3 2 66 multiple comp 5 3 100 DF System supports DFA-T02 VT-3 2 1 3 DFB-T02 DG System supports DGA-E04 VT-3 8 1 1 .

DGB-E04 1 2 DGA-E05 1 3 .

DGB-E05

_DGA-XO1A DGA-X01B DGB-XO1A

_DGB-XO1B EC System attachments ECA-E-1 VT-3 4 2 3 ECB-E-1 ECA-T-1 ECB-T-1

  • EW System attachments EWA-EO1 VT-3 4 1 1 EWB-EO1 1 2 EWA-TO1 EWB-TO1 PC System attachments PCA-E1 VT-3 2 1 2

_ _ _ _ _ _ _PCB-E1 ___

SI System attachments SIA-EO1 VT-3 2 1 3_

SIB-E01

SECTION 7.0 AUGMENTED EXAMINATION

SUMMARY

73 of 207 31NT-ISI-1 Rev 1

INDEX EXAM CATEGORY N-722-1 PWR Components Containing Alloy 600/82/182 N-729-1 PWR Reactor Vessel Upper Head N-770-1 PWR Pressure Retaining Dissimilar Metal Piping and Vessel Nozzle Butt Welds containing Alloy 82/182 B-J Pressure Retaining Welds in Piping B-G-1 Pressure Retaining Bolting, Greater Than 2 Inches in Diameter B-G-2 Pressure Retaining Bolting, 2 Inches and Less in Diameter B-P All Pressure Retaining Components C-F-i Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED HIGH ENERGY C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED FLYWHEEL NA Reactor Coolant Pump Flywheel Examinations 74 of 207 31NT-ISI-1 Rev 1

_KI--LAU I UIK V-tZ51-L .

RPV bottom mounted instrument B15.80 penetrations

  • REQUIRED R16, R18, 1-Reactor 1__ Vessel ICl Penetrations 78173 VE 61 61 ** R20 STEAM GENERATOR B15.135 3- Cold leg instrument connections Penetrations 224 VE 4 4 1Each Interval B15.1 4- Cold leg instrument connections Penetrations 225 VE 4 4 1... .. Each RFO PRESSURIZER B15.140 5- Heater Penetrations Penetrations 78373 EVE 36 36 ___________**Each RFO B15.180 5- Instrument Connections Instruments 78373 VE 7 7...

B15.200 6- Hot Leg Instrument Connections Instruments RCS VE 27 27 .....

B15.205 Cold leg instrument connections 6- RCP Pressure Taps Instrument RCP VE 8 8 2 ***

6- RCS Cold Leg Instrument RCS VE 12 12 3 ***

B15.215 Cold leg full penetration welds 23- Safety Injection 1A butt welds SI-207-14" VE 1 1 ... VE in conjunction

_,, 24- Safety Injection 1B butt welds SI-223-14" VE 1 1 25- Safety Injection 2A butt welds SI-160-14" VE 1 1 26- Safety Injection 2B butt welds SI-179-14" VE 1 1 ......

27- Pzr Spray 1A butt welds RC-062-3" VE 1 28- Pzr Spray 1B buttwelds RC-017-3" VE 1 . *** *** _ .....

_____'32- Drain Line Loop IA butt welds RC-060-2" VE 1 . ......

33- Drain Line Loop 1B butt welds RC-058-2" VE 1 _ *.... _

34- Drain Line Loop 2A butt welds RC-096-2" VE 1 ...... _

36- Letdown Line butt welds RC-091-2" VE 1.....

37- Charging Line butt welds CH-005-3" VE 1

  • __

B4.30 Imaterials t t w I 2-Closure Head weld N0565-CHA-02 VE 97 97

  • 100 *R15 (Head Replaced)

REQUIRED R18, R21 2-Closure Head Vent Nozzle N0565-CHA-02 VE 1 1

  • 100 *R15 (Head Replaced)

REQUIRED R18, R21 Nozzles and partial-penetration welds of B4.40 PWSCC-resistant materials in head 2-Closure Head CEDM Nozzles N0565-CHA-02 S or Vol 97 97

  • 100
  • not to exceed 2020 2-Closure Head Vent Nozzle N0565-CHA-02 S 1 1
  • 100
  • not to exceed 2020

NOMINAL PIPE SIZE > 4 INCH Mitigated with FSWO NOZZLE TO SAFEEND BUTT WELDS During R13; 1st ISI R15 29- Spray butt welds RC-18-4" Vol 6 1 2 16 20-

  • Surge butt welds RC-028-12" Vol 1 3 32 *Design Calc Exam 31- Safeties (4) butt welds RC-001-6" Vol Frequency 3 years; RC-003-6" Vol required R17, R19, R21 RC-005-6" Vol RC-007-6" Vol NPS 4 OR LARGER Mitigated with FSWO
  • CIRCUMFERENTIAL WELDS During R13; 1st ISI R15 20- ** Pressurizer Surge Line butt welds RC-028-12" Vol 3 1 3 33 **Design Calc Exam 21- Shutdown Cooling Loop 1 butt welds RC-051-16" Vol Frequency 6 years; 22- Shutdown Cooling Loop 2 butt welds RC-068-16" Vol required R19 Unmitigated butt weld at Cold Leg operating temperature  ; .

INSPECTION ITEM Bji Examined R15, 23- Safety Injection 1A butt welds SI-207-14" VE & Vol 1 1 100 REQUIRED R19 Examined R15, 24- Safety Injection 1 B butt welds SI-223-14" VE & Vol 1 1 100 REQUIRED R19 Examined R15, 25- Safety Injection 2A butt welds SI-1 60-14" VE & Vol 1 1 100 REQUIRED R19 Examined R15, 126- Safety Injection 2B butt welds SI-1 79-14" VE & Vol 1 1 100 REQUIRED R19

27- Pressurizer Sprav 1A butt welds RC-062-3" VE &Vol 1 1 100 REQUIRED R17, R21 28- Pressurizer Spray 1B butt welds RC-01 7-3" VE & Vol 1 1 100 REQUIRED R17, R21 32- Drain Line Loop 1A butt welds RC-060-2" VE & Vol 1 1 100 REQUIRED R17, R21 33- Drain Line Loop lB butt welds RC-058-2" VE & Vol 1 1 100 REQUIRED R17, R21 34- Drain Line Loop 2A butt welds RC-096-2" VE & Vol 1 1 100 REQUIRED R17, R21 36- Letdown Line butt welds RC-091-2" VE &Vol 1 1 100 REQUIRED R17, R21

_ 37- Charging Line butt welds CH-005-2" VE & Vol 1 1 100 REQUIRED R17, R21

(.0 0

B9.20 LESS THAN NPS 4 CIRCUMFERENTIAL WELDS OTHER B9.21 THAN PWR HPSI SYSTEMS 30- Aux Pressurizer Spray** butt welds CH-009-2" S &VOL 2 2 3 100 ** IEB 88-08 & IN97-19 2 welds and base metal down stream of V431 C) 0 K) 0)

--4

I 4 4 I + 4 4 I 4 REACTOR VESSEL B15.10 CLOSURE HEAD NUTS 2- Closure Head nuts 7.237" x 7.91" VT-2 54 54

  • B15.10 CLOSURE STUDS 2- Closure Head studs 7.380" x 76.37" VT-2 54 54
  • PRESSURIZER B15.10 BOLTS, STUDS AND NUTS 5- Pressurizer Manway Studs & Nuts 1.31" x 14.5" VT-2 20 20 STEAM GENERATOR B15.10 BOLTS, STUDS AND NUTS 3- Steam Generator 1 MANWAYS Studs & Nuts 1.31" x 14.5" VT-2 40 40 4- Steam Generator 2 MANWAYS Studs & Nuts 1.31" x 14.5" VT-2 40 40 PIPING B15.10 BOLTS, STUDS AND NUTS 31- Pressurizer Safeties Flange Bolting RC-001-6" VT-2 8 8 *

C5.11 58- Aux & Downcomer FW SG 1 Butt Welds SG-8-6" S & Vol 1** 1 1 100 IEB 79-13 &SER 83-07

_SG-8-8" , (58-1; 59-1)

C5.11 59- Aux & Downcomer FW SG 2 Butt Welds SG-11-6" S &Vol 1** 1 3 100 SG-11-8" .__

EX(AM CATEGORY C-F.2; PRESSUR RETAINING WELDS IN CARBON OR LOW '*Noteexam itemsrnare in SALLOY STEEL :PIPING Aug Summary C5.51 54-FW SG 1 14" x 0.938" SG-002 S & Vol 2* 2 1 100 *IEB 79-13, SER 83-07

_SG-013 . (54-1 & 15; 55-1 & 15)

C5.51 55-FW SG 2 14" x 0.938" SG-005 S & Vol 2* 2 3 100 i SG-014 _,

PIPING WELDS > 3/8 IN NOMINAL **100% of all intersecting WALL THICKNESS FOR PIPING >NPS longitudinal welds will be AHE5.5 4 examined AHE5.51 CIRCUMFERENTIAL WELD** . _

  • category running percent 207 54 1 27 51 2 51 102 3 100 47- Main Steam SG 1 West Butt Welds SG-206-28" S & Vol 12(1) 13 1 __. "

SG-206-12" SG-206-6" Main Steam SG 1 East Butt Welds SG-207-28" S & Vol 12(1) 13 2 SG-207-12" SG-207-6" _

49- Main Steam SG 2 East Butt Welds SG-208-28" S & Vol 12(1) 13 3 ___"_.

SG-208-12" .... ... .. .

SG-208-6" 50- Main Steam SG 2 West Butt Welds SG-209-28" S & Vol 12(1) 13 3 .. ...

SG-209-12" SG-209-6" 51- Atmospheric Dump No. 1 Butt Welds SG-59-12" S & Vol 29 13 1 SG-70-12" 16 2 52- Atmospheric Dump No. 2 Butt Welds SG-84-12" S & Vol 29 29 3 SG-103-12"

_ 53- Steam to Aux Feedwater Butt Welds SG-81-6" S & Vol 28 14 - 1

_ SG-83-6" 14 3

_ 56- Feedwater SG No. 1 Butt Welds SG-201-24" S & Vol 5(2) 7 2 "

_ _SG-202-24" SG-224-24" 57- Feedwater SG No. 2 Butt Welds SG-204-24" S & Vol 5(2) 7 3 SG-205-24" SG-225-24" 60- Downcomer Feedwater SG 1 Butt Welds SG-200-8" S & Vol 6(8) 14 1 SG-008-8" 61- Downcomer Feedwater SG 2 Butt Welds SG-203-8" S & Vol 6(8) 14 3 SG-11-8"

  • 66- Blowdown SG 1 Butt Welds SG-39-6" S & Vol 3(12) 15 2 67- Blowdown SG 2 Butt Welds SG 6" S & Vol 2(10) 12 3 PIPING WELDS >1/5" NOMINAL WALL THICKNESS FOR PIPING > NPS 2 AHE5.60 AND < NPS 4 AHE5.61 CIRCUMFERENTIAL**
  • category running percent 42 10 1 24 11 2 50 21 3 100 51- Atmospheric Dump No. 1 Butt Welds SG-95-4" S & Vol 21 10 1 11 2 52- Atmospheric Dump No. 2 Butt Welds SG-100-4" S & Vol 21 21 3 ......

PIPE BRANCH CONNECTIONS OF AHE5.80 BRANCH PIPING > NPS 2 .........

AHE5.81 CIRCUMFERENTIAL

  • category running percent 32 7 1 22 9 2 50 16 3 100 47- Main Steam SG 1 West 28" x 12" SG-206-28" S 7 7 1 28" x 6" 48- Main Steam SG 1 East 28" x 12" SG-207-28" S 8(1) 9 2 28" x 6" 49- Main Steam SG 2 East 28" x 12" SG-208-28" S 8(1) 9 3 28" x 6" 50- Main Steam SG 2 West 28" x 12" SG-209-28" S 7 7 3 28" x 6"-

EXAM CATEGORY'NA; RCP FLYWNHEEL ir EXAMINATIONSJIPER REG GUIDE 1.14 . . . . . .

NA 16-Reactor Coolant Pump 1A flywheel 1A S&VOL 4 4 3 100 S OF ALL EXPOSED 17 Reactor Coolant Pump 1B flywheel 1B SURFACES and UT OF 18-Reactor Coolant Pump 2A flywheel 2A HIGH STRESS AREAS 19-Reactor Coolant Pump 2B flywheel 2B

__ I I I I 4 4 4 1

- -, -- I a __________________ - - .& - ________ -

SECTION 8.0 REQUESTS FOR RELIEF 86 of 207 31NT-ISI-1 Rev 1

RELIEF REQUESTS INDEX NUMBER DESCRIPTION

34. Included for reference to document that the Interval 2 Reactor Vessel volumetric examinations were extended for 1 fuel cycle.

NRC accepted as documented by SER attached to Letter dated September 20, 2006.

35. Included for reference to document that the Interval 2 Reactor Vessel visual examinations were extended for 1 fuel cycle.

NRC accepted as documented by SER attached to Letter dated October 4, 2006.

36. Full Structural Weld Metal Overlay and for Units 1 and 3 only; Request to use 2001 Edition thru 2003 Addenda for Repair and Replacements NRC accepted as documented by SER attached to Letter dated June 21, 2007
37. Alternative to ASME Code Case N-638-1, Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temperbead Technique.

NRC accepted as documented by SER attached to Letter dated June 21, 2007 38 Included for reference to document the Close out of U2 2 nd Interval 39.' Safety Injection Tank alternative repair method.

Submitted by APS letter 102-05869-DCM/RJR, dated July 11, 2008

40. Extended Reactor Vessel Examinations to meet the PWROG program Submitted by APS letter
41. Request to utilize Appendix 1 of Code Case N-729- 1.

Submitted by APS letter

42. Request to utilize Leak Path Assessments N-729-1 previously qualified Submitted by APS letter
43. Included for reference to document the Closeout of U3 2 nd Interval Submitted by APS letter
44. Extended Reactor Vessel Examinations Submitted by APS letter
45. Included for reference to document the Closeout of U2 RPV 2 nd Interval
46. Included for reference to document the Closeout of Ul 2nd Interval
47. Included for reference to document the Closeout of U3 RPV 2nd Interval 87 of 207 31NT-ISI-1 Rev 1

SECTION 9.0 IsI BOUNDARY DRAWINGS 88 of 207 31NT-ISI-1 Rev 1

BOUNDARY DRAWING INDEX Drawing No. Drawing Title Code Class 01-M-AFP-001 Auxiliary - Feedwater System 2&3 Chemical and Volume Control System l&2 01-M-CHP-001 01-M-CHP-002 Chemical and Volume Control System 2&3 01-M-CHP-003 Chemical and Volume Control System 2 01-M-CLP-001 Containment Integrated and Local Leak Rate Test 2 01-M-CPP-001 Containment Purge System 2 01-M-CTP-001 Condensate Purge System 2 01-M-DFP-001 Diesel Fuel Oil & Transfer System 3 01-M-DGP-001 Diesel Generator System 3 01-M-DWP-002 Demineralized Water System 2 01-M-ECP-001 Essential Chilled Water System 3 01-M-EWP-001 Essential Cooling Water System 3 01-M-FPP-006 Fire Protection System 2 01-M-GAP-001 Service Gas Supply System (N 2 and H 2 ) 2&3 01-N-GRP-001 Gaseous Radwaste System 2 01-M-HCP-001 HVAC Containment Building 2 01-M-HPP-001 Containment Hydrogen Control 2 01-M-IAP-002 Instrument and Service Air System 2 01-M-IAP-003 Instrument and Service Air System 2 01-M-NCP-002 Nuclear Cooling Water System 3 01-M-NCP-003 Nuclear Cooling Water System 2 01-M-PCP-001 Fuel Pool Cooling & Cleanup System 2&3 01-M-RCP-001 Reactor Coolant System 1&2 01-M-RCP-002 Reactor Coolant System l&2 01-M-RDP-001 Radioactive Waste Drain System 2 01-M-SGP-001 Main Steam System 2&3 01-M-SGP-002 Main Steam System 2 01-M-SIP-001 Safety Injection and Shutdown Cooling System 2 01-M-SIP-002 Safety Injection and Shutdown Cooling System 1&2 01-M-SIP-003 Safety Injection and Shutdown Cooling System 2 01-M-SPP-001 Essential Spray Pond System 3 01-M-SPP-002 Essential Spray Pond System 3 01-N-SSP-001 Nuclear Sampling System 2 01-M-WCP-001 Normal Chilled Water System 2 13-M-ZZP-001 Symbols and Legend N/A 13-M-ZZP-002 Symbols and Legend N/A 89 of 207 31NT-ISI-1 Rev 1

SECTION 10.0 ZONE DRAWINGS 90 of 207 31NT-ISI-1 Rev 1

ZONE DRAWING INDEX Drawing No. Drawing Title Code Class Zone 1 Reactor Vessel I Zone 2 Closure Head 1 Zone 3 Steam Generator 1 1 Zone 4 Steam Generator 2 1 Zone 5 Pressurizer I Zone 6 RCS Primary Piping I Zone 16 Reactor Coolant Pump 1A 1 Zone 17 Reactor Coolant Pump lB 1 Zone 18 Reactor Coolant Pump 2A 1 Zone 19 Reactor Coolant Pump 2B 1 Zone 20 Pressurizer Surge Line I Zone 21 Shutdown Cooling Loop 1 1 Zone 22 Shutdown Cooling Loop 2 1 Zone 23 Safety Injection 1A I Zone 24 Safety Injection lB 1 Zone 25 Safety Injection 2A 1 Zone 26 Safety Injection 2B I Zone 27 Pressurizer Spray IA 1 Zone 28 Pressurizer Spray 1B I Zone 29 Combined Pressurizer Spray 1 Zone 30 Aux. Pressurizer Spray I Zone 31 Pressurizer Safeties I Zone 32 Drain Line 1A 1 Zone 33 Drain Line lB 1 Zone 34 Drain Line 2A 1 Zone 35 Drain Line 2B 1 Zone 36 Letdown Line I Zone 37 Charging Line I Zone 38 Drain Line Loop 1 I Zone 39 HPSI Long Term Recirc 1 1 Zone 40 HPSI Long Term Recirc 2 1 Zone 41 Steam Generator 1 2 Zone 42 Steam Generator 2 2 Zone 43 Main Steam SG1 East 2 Zone 44 Main Steam SG1 West 2 Zone 45 Main Steam SG2 East 2 Zone 46 Main Steam SG2 West 2 Zone 47 Main Steam SG I West 2 Zone 48 Main Steam SG1 East 2 Zone 49 Main Steam SG2 East 2 Zone 50 Main Steam SG2 West 2 Zone 51 Atmospheric Dump No. 1 2 Zone 52 Atmospheric Dump No. 2 2 Zone 53 Steam to Aux Feedwater System 2 Zone 54 Feedwater SG No. 1 2 Zone 55 Feedwater SG No. 2 2 Zone 56 Feedwater SG No. 1 2 Zone 57 Feedwater SG No. 2 2 Zone 58 Aux & Downcomer Feedwater SG 1 2 Zone 59 Aux & Downcomer Feedwater SG 2 2 Zone 60 Downcomer Feedwater SG 1 2 Zone 61 Downcomer Feedwater SG 2 2 Zone 62 Aux Feedwater SG 1 2 Zone 63 Aux Feedwater SG 2 2 91 of 207 31NT-ISI-1 Rev 1

ZONE DRAWING INDEX (Continued)

Drawing No. Drawing Title Code Class Zone 64 Blowdown SG 1 2 Zone 65 Blowdown SG 2 2 Zone 66 Blowdown SG 1 2 Zone 67 Blowdown SG 2 2 Zone 68 Regenerative Heat Exchanger 2 Zone 69 Letdown Heat Exchanger 2 Zone 70 LPSI Pump Room A Suction 2 Zone 71 LPSI Pump Room A Discharge 2 Zone 72 LPSI Pump A' 2 Zone 73 LPSI Pump Room B Suction 2 Zone 74 LPSI Pump Room B Discharge 2 Zone 75 LPSI Pump B 2 Zone 76 Containment Spray Pump Room A Suction 2 Zone 77 Containment Spray Pump Room A Discharge 2 Zone 78 Containment Spray Pump A 2 Zone 79 Containment Spray Pump Room B Suction 2 Zone 80 Containment Spray Pump Room B Discharge 2 Zone 81 Containment Spray Pump B 2 Zone 82 Shutdown Cooling Heat Exchange Room A 2 Zone 83 Shutdown Cooling Heat Exchange Room A 2 Zone 84 Shutdown Cooling Heat Exchanger A 2 Zone 85 Shutdown Cooling Heat Exchanger Room B 2 Zone 86 Shutdown Cooling Heat Exchanger Room B 2 Zone 87 Shutdown Cooling Heat Exchanger B 2 Zone 88 East Wrap 2 Zone 89 East Wrap 2 Zone 90 East Wrap 2 Zone 91 West Wrap 2 Zone 92 West Wrap 2 Zone 93 West Wrap 2 Zone 94 A Train Misc. Pipe Chases & 88' Pipe Tunnel 2 Zone 95 B Train Misc. Pipe Chases & 88' Pipe Tunnel 2 Zone 96 Containment LPSI Header to Loop 1A 2 Zone 97 Containment LPSI Header to Loop 1B 2 Zone 98 Containment LPSI Header to Loop 2A 2 Zone 99 Containment LPSI Header to Loop 2B 2 Zone 100 Containment LPSI Train A Suction 2 Zone 101 Containment LPSI Train B Suction 2 Zone 102 SI Pumps Train "A" Suction 2 Zone 103 Refueling Water Suction Train "A" 2 Zone 104 SI Pumps Train "B" Suction 2 Zone 105 Refueling Water Suction Train "B" 2 Zone 106 HPSI Pump Room "A" Discharge 2 Zone 107 HPSI Pump Room "B" Discharge 2 Zone 108 HPSI Discharge 88' Pipe Chase 2 Zone 109 HPSI Discharge 88' Pipe Chase 2 Zone 110 HPSI Discharge West Wrap 2 Zone 111 HPSI Discharge West Wrap 2 Zone 112 HPSI Discharge East Wrap 2 Zone 113 HPSI Discharge East Wrap 2 Zone 114 Containment HPSI Header Loop IA & 1B 2 Zone 115 Containment HPSI Header Loop 2A & 2B 2 Zone 116 HPSI Pump "A" 2 Zone 117 HPSI Pump "B" 2 Zone 118 HPSI Long Term 2 Zone 119 EHPSI Long Term 2 Zone 120 Containment Spray A 2 Zone 121 Containment Spray B 2 92 of 207 31NT-ISI-1 Rev 1

1800 NOTES:

TAG NO. 1MRCEXO1 SERIAL NO. 78173 (C-E)

N.B NO. 22253 900 2700 54 STUD HOLES C(OUNTED CLOCKWISE FRtOM 00 1-30 Tt HIREADS IN FLANGE 00 PLANT NORTH 1-14 SHELL SEGMENT 182 111/4"CROSS 14" SECTION

-LONG SEAMS-OUTLET INLET REFERENCE DWG:

N001-3.01-15 AND 17 N001-3.01-41 AND 61

[* N001-3.01-72 "B"

SUPPORT COLUMNS 40 AT IA 41 AT lB 9 1/16'" 42 AT 2A 43 AT 2B U SHEAR . 12 UNIT 17 KEYS ICI Penetrations 1 thru 61 REACTOR VI

NOTES:

1) Full ITEM ID include "- CEDM or RVLMS NO"
2) TAG NO. IMRCEX03 SERIAL NO. N05065-CHA-02 (Doosan)

N.B. NO. 1699

3) ITEM 71 CONTAINS 4 SINGLE STUDS IN A GRAYLOC CLAMP RVLMS REFERENCE DOCS:

LOCATED 13-MN-740 (Replaced RV HEAD SPEC)

AT 92 & 96 UT Baseline Completed on 2-61 at CEDM locations: R15 WO 3388751 66, 67, 68, 71, 73, 77,79 81, 82, 84, 85, 87, and 89 F2-8 99

'X CEDM Penetrations CLOSURE I

8.6" HEAD STUDS NUTS

  1. 1 THRU #54 nx 1 THRU 18 19 THRU 36 37 THRU 54 WASHERS 1800 1 THRU 18 19 THRU 36 76.37" 37 THRU 54 9Q00 2700 11.5" 11 I) STUD LOCATIONS I THRU 54 UNIT 1 ZONE 2 2 CW FROM 00 CLOSURE HEAD TOP VIEW CLOSURE HEAD

1120 MANWAY NOTES: *

1) Stud Location is #1 TDC Going CW to #20.
2) Tag NO 1MRCEEO1A Serial NO. 224 F3Q-241 N. B. NO. 173 00 MANWAY STUDS & NUTS NOTE 1 REFERENCE DWGS: -

MN725-A700, A701, A702, A703 and A704 00 1800 MN725-A419, A425, A440 and A448 MN725-A605, A622 and A625 3150 LOOKING DOWN

.87 TUBESHEET Leg 202.1" I-Nozzles SKIRT B

CHANNEL HEAD CROSS SECTION MANWAY STUDS

112o MANWAY NOTES:

1) Stud Location is #1 TDC Going CW to #20.
2) Tag NO 1MRCEEO1B Serial NO. 225 N. B. NO. 174 00 MANWAY STUDS & NUTS NOTE 1 REFERENCE DWGS:

MN725-A700, A701, A702, A703 and A704 00 1800 MN725-A419, A425, A440 and A448 MN725-A605, A622 and A625 3150 LOOKING DOWN TUBESHEET

,.4oldLeg 4 Instrument Nozzles CHANNEL HEAD CROSS SECTION MANWAY STUDS H

i r2 UNIT 1 ZONE 4 STEAM GENERATOR #2

ZONE 29

.87 TOP VIEW

.56 2700 900 MANWAY STUDS 0

UPPER SHELL (7)

NOTES:

1) STUD LOCATION IS #1 TDC GOING CW TO #20
2) TAG NO 1MRCEX02 SERIAL NO. 78373 (C-E)

N.B. NO. 22234 B

2700 900 REFERENCE DWGS:

NOO1-6.04-6, 31 AND 90 HEATERS (36)

UNIT 1 ZONE 5 LOWER SHELL I

PRESSURIZER

REFERENCE DWGS:

01-P-ZCC-103 N001-6.07-83 AND 112 N001-6.07-90 THRU 94 N001-6.07-96 THRU 100 MN725-A343, A383 and A' MN725-A419, A609 and A, 1

1 6-99 Cold Leg Instrument Nozzles (12)

RCP Pressure Taps (4 disch & 4 suction)

Hot Leg Instrument Nozzles (27)

NOTES:

1) PIPE LONG SEAMS AT 3:00 AND 9:00 POSITIONS (FOR CE PIPING ONLY)
2) ELBOW LONG SEAMS AT LONG AND SHORT RADIUS (FOR CE PIPING ONLY)
3) ANSALDO PIPING AND ELBOWS ARE SEAMLESS (XX-13, XX-16 and XX-19 only)
4) PIPING WCL STAMPED WITH CENTER PUNCH MARKS. CE WELDS REFERENCED WITH FOOTAGE MARKS. ANSALDO WELDS REFERENCED WITH CENTER PUNCH MARKS EACH 250 mm.
5) FOR REPLACEMENT WELDS, PORTIONS OF THE ORIGINAL WELD MAY REMAIN. THE ORIGINAL WELD CAP IS JOINED TO THE REPLACEMENT WELD

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 1MRCEPO1A SERIAL NO. 1109-1A (C-E)

N.B. NO. 23439 1.1"'

F 7.28" 6.89"f

-U 16 SEAL HOUSING STUDS & NUTS 32.87" T

6.93" REFERENCE DWGS:

L N001-6.02-418 NOO1-6.02-420 THRU 423 NOO1-6.02-107 & 108 16 FLANGE STUDS NUTS & RING UNIT 1 ZONE 16 REACTOR COOLANT PUMP 1A

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 1MRCEPO1B SERIAL NO. 1109-1B (C-E)

N.B. NO. 23440 UPPER HORIZONTAL SNUBBER (2)

SUPPORTS (2) 1-=AND =72 17-18 AND 117-19 C C B B 7.28" 17-31 SEAL HOUSING STUDS & NUTS- NOTE 1 6.89"f 17-33 NUTS- NOTE 1 1~ 16 SEAL HOUSING STUDS & NUTS 32.87" LOWER HORIZONTAL SUPPORTS (2)

B B T 6.93" P-FTHRU REFERENCE DWGS:

11AND 11 B B CW FROM DISC N001-6.02-418 NOZZLE NOO1-6.02-420 THRU 423 N001-6.02-107 & 108 16 FLANGE STUDS NUTS & RING UNIT 1 ZONE 17 REACTOR COOLANT PUMP 1B

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 1MRCEP02A SERIAL NO. 1109-2A (C-E)

N.B. NO. 23441 7.28" 8.27" 6.89" 16 SEAL HOUSING STUDS & NUTS 32.87" T

6.93" REFERENCE DWGS:

N001-6.02-418 NOO1-6.02-420 THRU 423 NOO1-6.02-107 & 108 16 FLANGE STUDS NUTS & RING z

Ti UNIT 1 ZONE 18 REACTOR COOLANT PUMP 2A

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 1MRCEP02B SERIAL NO. 1109-2B (C-E)

N.B. NO. 23442 1.1"

  • 7.28" 8.27" 6.89"f

)

-J

-U 16 SEAL HOUSING STUDS & NUTS 32.87" T

6.93" REFERENCE DWGS:

N001-6.02-418 NOO1-6.02-420 THRU 423 N001-6.02-107 & 108 16 FLANGE STUDS 7

NUTS & RING

-4 0 UNIT 1 ZONE 19 REACTOR COOLANT PUMP 2B

OL = FSW Overlaid (MRP-139)

R13 WO 2967794 & 2967797 N* PLANT NORTH PRESSURIZER ZONE 5 B

C CS C

PRESSURIZER VAULT ZONE 6 REFERENCE DRAWINGS EL 01 -P-RCF- 101

`4ý PLANT NORTH OL = FSW Overlaid (MRP-139)

R14 WO 2967801 REFERENCE DRAWINGS 01-P-SIF-105 B

B B

B B

OL = FSW Overlaid (MRP-139)

R14 WO 2967804 REFERENCE DRAWINGS 01-P-SIF-105 CONT ON ZONE 101 LOOP 2 HOT LEG ZONE 6 A1

-J CONT ON ZONE 40 C

-4 C W

UNIT 1 ZONE 22 SHUTDOWN COOLING LOOP 2

SECONDARY SHIELD WALL SI TANK IA CONT ON ZONE 96 REFERENCE DRAWINGS 01-P-SIF-103

REFERENCE DRAWINGS O1-P-SIF-103 UNIT 1 ZONE 24 SAFETY INJECTION lB

SECONDARY SHIELD WALL LEG ZONE 6 LOOP 2A COLD SI TANK 2A REFERENCE DRAWINGS 01-P-SIF-136 N CONTON ZONE 98

1)

UNIT 1 ZONE 25 SAFETY INJECTION 2A

LOOP 2B COLD LEG ZONE 6 REFERENCE DRAWINGS 01-P-SIF-136 B

-J z

W SI TANK 2B UNIT 1 ZONE 26 SAFETY INJECTION 2B

Y* PLANT NORTH 27RTH *REFERENCE DRAWINGS 01-P-RCF-102 PRESSURIZER VAULT 27-4 ZONE 29 COMBINED PZR SPRAY 127'-9 3/8" EEL EL 119'-6" 7 -122-1 C.B C-662 H-21 27-37 H224 27-3 RC-oo2-BCAA-3' PC-6 27H-28 27-827-EL 161-10"31 27 H237-7328 227-24 k* ~~PRESSURIZER VAULT r*-

COLD LEG 9 UNIT 1 ZONE 27 ZONE 6

ZONE 29 COMBINED REFERENCE DRAWINGS PZR SPRAY 01-P-RCF-102

  • < PLANT NORTH EL 110'-0" VAULT

REFERENCE DRAWINGS 01-P-RCF-102 N* " PLANT NORTH OL = FSW Overlaid (MRP-139)

WP EL 158'-2" R13 WO 2967789 ZONE 30 AUX SPRAY SS CS 158'-1 5/16" PRESSURIZER EL 152'-5 5/8" ZONE 5 C

C ZONE 27 PZR SPRAY 1A 1EL 131'-11 3/8" ZONE 28 PZR SPRAY 1B

EL 153'-8" C

REFERENCE DRAWINGS 01-P-CHF-107 R15 WO 3100394 Replaced V431 ZONE 29 1/

COMBINED PZR SPRAY

OL = FSW Overlaid (MRP-139)

R13 WO 2967764 for RC-00I R13 WO 2967769 for RC-003 R13 WO 2967774 for RC-005 R13 WO 2967779 for RC-007

-( RC-001-BCAA-6" 7L Cs/ss

+ /

REFERENCE DRAWINGS 01-P-RCF- 114 NOTE:

Flange Bolting 8 - 2" X 13 1/2" Studs and 16 - NUTS SPRESSURIZER

-ZONE 5 TOP HEAD UNIT 1 ZONE 31 PRESSURIZER SAFETIES

N COLD LEG ZONE 6 LOOP 1A EL 89' 9 11/16" REFERENCE DRAWINGS 01-P-CHF-110

--t, 2NOTE:

=- SW = SOCKET WELD

,.,q B

WP EL 88'-10 3/16" zI H-UNIT 1 ZONE32 DRAIN LINE lA

EL 89'

'**ý REFERENCE DRAWINGS 01-P-CHF-110 NOTE:

SW = SOCKET WELD Cs 7

-f UNIT I ZONE33 ti DRAIN LINE I B

/ V/

COLD LEG LOOP 2A -* sw 3434-REFERENCE DRAWINGS 34-8 01-P-CHF- 110 SW NOTE:

SW = SOCKET WELD

EL 88' 9 5/8" LETDOWN LINE ZONE 36 N

REFERENCE DRAWINGS 01-P-CHF-110 NOTE:

SW = SOCKET WELD UNIT 1 ZONE35 DRAIN LINE 2B

R9 3REFERENCE DRAWINGS WEL 13-CHF-142 5331 8 RC91 B

    • EL 81 27RC1 EL 94'

B 134 8wH5 ý 7.

65N66H16 sws 13-P-CHF-10 133I 15 H337W ZON FLO 55INEH2 CHAGIN V43001'-5 H95

REFERENCE DRAWINGS 01-P-SIF-105 NOTE:

SW = SOCKET WELD ZONE 21 SHUTDOWN COOLING 7

-l UNIT 1 ZONE 38 DRAIN LINE LOOP 1

REFERENCE DWG 01-P-SIF-105 B (EEL 92' 4" C

"*ý N LEL 87' 5 1/4" SHUTDOWN COOLING ZONE 21

  • EL

~2

'2

'2 CLEL 83' 5"

-J

  • EL 86*

CEL 88' 2"

/

/

/

/

// .CLEL 86' 8 1/4"

/

/

/

/

7

-1 /

/, / UNIT 1 ZONE39 HPSI LONG TERM RECIRC LOOP 1

  • < PLANT NORTH

-' I ~ EL. 93' 9B EL. 89'-391/2" REFERENCE DRAWINGS 01-P-SIF-105 EL.

UNIT 1 ZONE 40 HPSI LONG TERM RECIRCULATION 2

NOTES:

1) 00 IS AT CENTER OF PRI COLD LEG MANWAY
2) STUDS ARE 16 - 1.5" X 9"
3) STUDS ARE 16 - 1" X 6"
4) TAG NO. 1MRCEE01A SERIAL NO. 224 N.B. NO. 173

@g90 REFERENCE DWGS:

MN725-A18, A19, A26, A28 and A29 MN725-A30, A38, A54 and A55 MN725-A243, A390 and A395 DOWNCOMER RECIRC @ 450 4 IN ZONE 58 DOWNCOMER @ 00 0

, SECONDARY HANDHOLES AT °AND 2700

-NOTE 3-

NOTES:

1) 00 IS AT CENTER OF PRI COLD LEG MANWAY
2) STUDS ARE 16 - 1.5" X 9"
3) STUDS ARE 16- " X 6"
4) TAG NO. 1MRCEEO1B SERIAL NO. 225 N.B. NO. 174

@ 900 ZONE 46 ZONE 45 REFERENCE DWGS:

@ 2700 MN725-A18, A19, A26, A28 and A29 MN725-A30, A38, A54 and A55 MN725-A243, A390 and A395 SECONDARY 9 00 MANWAYS

-NOTE 2- 2700 DOWNCOMER RECIRC @ 450 4 IN C

ZONE 59 DOWNCOMER @ 0° C

DOWNCOMER BLOWDOWN 6" ZONE 64

@ 1800 AT 450 SECONDARY lAT 3150 HAND HOLES AT 270'

LINE # DIA/SCH FROM TO Y " PLANT SG-36 SG-36 32" x 2.00":

28" x 1.25" 43-1 43-2 43-25 NORTH

, t EL. 157'-101/8" B

t. EL-t32' t EL.

-t EL. 171' 48 C

ZONE 41 REFERENCE DRAWINGS 01-P-SGF-118 ZONE 43 MAIN STEAM (EAST)

STEAM GENERATOR 1

LINE # DIA/SCH FROM TO

  • < PLANT SG-33 32" x 2.00" 44-1 -

NORTH SG-33 28" x 1.25" 44-2 44-30

, EL. 157'-93/4"

{..EL. 132'-33/8" , t EL. 132' Z;ONE 44-26 C

-4 C ZONE 41 REFERENCE DRAWINGS 01-P-SGF-118

.-o UNIT 1 ZONE 44 MAIN STEAM (WEST)

STEAM GENERATOR 1

LINE # DIA/SCH FROM TO N* PLANT SG-42 32" x 2.00' 45-1 -

NORTH SG-42 28" x 1.25' 45-2 45-25

, t_ EL. 132' t EL. 171'-Ill/16"__ ZONE 49 SEL. 157'-101/8"

"- t EL. 171' N)

ZONE

",4 42

"- EL. 132'-31/16"

/C REFERENCE DRAWINGS 01-P-SGF-118

-I J

UNIT 1 ZONE 45 MAIN STEAM (EAST)

STEAM GENERATOR 2

LINE # DIA!SCH FROM TO Y* PLANT SG-45 32" x 2.00" 46-1 -

NORTH SG-45 28" x 1.25" 46-2 46-2ý _- t EL. 132' ZONE 50 t EL. 171'--

t EL. 158' t EL. REFERENCE DRAWINGS 01-P-SGF-118 MAIN STEAM (WEST)

STEAM GENERATOR 2

  • < PLANT NORTH ZONE 51 TURBINE BUILDING EL. 120'-0" REFERENCE DRAWINGS 01-P-SGF-155 01-P-SGF-401 EL. 132'-0"-

ZONE 44 NOTE:

1 - MAIN STEAM RELIEF VALVE 12-1 1/4"DIA. FLANGE BOLTS PER VALVE 2 - MSIV, 20-2 1/4"DIA. BODY TO MAIN STEAM (WEST)

BONNET BOLTS STEAM GENERATOR 1

N* PLANT NORTH ZONE 51 ZONE 51 TURBINE BUILDING REFERENCE DRAWINGS 01-P-SGF-155 01-P-SGF-401 EL. 132'-0' ZONE 43 MAIN STEAM S/G #1 90- (EAST) INSIDE CONTAINMENT NOTE:

1 - MAIN STEAM RELIEF VALVE 12-1 1/4"DIA. FLANGE BOLTS PER VALVE MAIN STEAM (EAST) 2 - MSIV, 20-2 1/4"DIA. BODY TO STEAM GENERATOR 1 BONNET BOLTS

  • < PLANT NORTH ZONE 52 TURBINE BUILDING REFERENCE DRAWINGS 01-P-SGF-155 01-P-SGF-401 EL. 132'-0"---

ZONE 45 7

-I NOTE:

I, I - MAIN STEAM RELIEF VALVE UNIT 1 ZONE 49 12-1 1/4"DIA. FLANGE BOLTS 1 PER VALVE 2 - MSIV, 20-2 1/4"DIA. BODY TO MAIN STEAM (EAST)

BONNET BOLTS STEAM GENERATOR 2

N* PLANT NORTH TURBINE BUILDING C

REFERENCE DRAWINGS 01-P-SGF-155 01-P-SGF-401 EL. 132'-0"-

ZONE 46 NOTE:

1 - MAIN STEAM RELIEF VALVE 12-1 1/4"DIA. FLANGE BOLTS PER VALVE 2 - MSIV, 20-2 1/4"DIA. BODY TO MAIN STEAM (WEST)

BONNET BOLTS STEAM GENERATOR 2

LINE # DIA/SCH FROM TO

  • < PLANT SG-59 12"x 0.844" 51-1 51-51 NORTH SG-70 12"x 0.844" 51-37 51-49 SG-95 4" x 0.337 51-101 51-120 z_,,

=-

,,q

-I REFERENCE DRAWINGS UNIT 1 ZONE 51 01-P-SGF-158 ATMOSPHERIC DUMP 1

LINE # DIA/SCH FROM TO

  • < PLANT SG- 103 12"x 0.844" 52-1 52-50 NORTH SG-84 12"x 0.844" 52-38 52-52 SG-100 4" x 0.337 52-101 52-120 ZONE 49 i2 REFERENCE DRAWINGS z.
I 01-P-SGF-158 UNIT 1 ZONE 52 ATMOSPHERIC DUMP 2

Y " PLANT NORTH 122'-5" REFERENCE DRAWINGS 01-P-AFF-131

-I 7__ UNIT 1 ZONE 53 STEAM TO AUXILIARY FEEDWATER SYSTEM

LINE # DIA/SCH FROM TO Y* PLANT SG-2 14"x 0.938' 54-15 54-24 NORTH SG-2 16"x 0.844'54-25A 54-26 SG-2 16"x 1.75"54-107 -

SG-2 24"x 1.218' 54-13, 54-60 54-27 SG-13 14"x 0.938' 54-1 54-10 SG-13 16"x 0.844'54-11A 54-12 SG-13 16"x 1.75"54-100 -

EL.

C4 REFERENCE DRAWINGS 01-P-SGF-119 MN725-A425, A615, and A622 EL. 93' FEEDWATER STEAM GENERATOR 1

LINE # DIA/SCH FROM TO ZONE 556 57 SG-5 14"x 0.938' 55-15 55-24 PLANT NORTH SG-5 16"x 0.844' 55-25 55-26 SG-5 16"x 1.75" 55-107 -

SG-5 24"x 1.218' 55-13, 55-60 55-27 EL. 115'-

SG-14 14"x 0.938' 55-1 55-10 SG-14 16"x0.844" 55-11 55-12 ZONE 5 SG-14 16"x 1.75" 55-100 55i0 42 55-107 55- 42 ZONE55 55-185552

-5D 1*

55-5 55-5 55 G-5 .D B -4 ) -'" " _. . 55-22*[ 55-53 s*3 ** .c*REFE*RENCE 1:- DRAWINGS UNIT 1 ZONE 5

  • / ~01-P-SGF-119 . .

-MN725-A425, A61, and A622 FEED WATER STEAM GENERATOR 2

LINE# DIA/SCH FROM TO

  • < PLANT SG-202 24"x 1.531" 56-1 56-4 NORTH SG-201 24"x 1.812" 56-6 56-7 SG-224 24"x 1.812" 56-9 56-11 115'-6" 0

-4. NOTE:

0 FWIV, 20-21/2" DIA BODY TO BONNET BOLTS PER VALVE REFERENCE DRAWINGS 01-P-SGF-119 01 -P-FWF-403 EL. 115'-6".

ZONE 54 zLi I UNIT 1 ZONE56 FEEDWATER STEAM GENERATOR 1

LINE # DIA/SCH FROM TO

  • < PLANT SG-205 24"x 1.531" 57-1 57-4 NORTH SG-204 24"x 1.812" 57-6 57-7 SG-225 24"x 1.812" 57-9 57-11 EL. 115'-6" C

NOTE:

-4 FWIV, 20-21/2" DIA BODY TO BONNET BOLTS PER VALVE REFERENCE DRAWINGS 01-P-SGF-119 01-P-FWF-403 EL.

ZONE 55 WI UNIT 1 ZONE57 FEEDWATER STEAM GENERATOR 2

LINE # DIA/SCH FROM TO Line Number Material Data PLANT SG-8 6"x 0.432" 58-1 58-3 DLBB = CS NORTH SG-8 8"x 0.500" 58-4 58-25 DCBA = SS AF-4 6"x 0.562" 58-19 58-34 EL. 143'-45/16" SG-8 6"x 1.800"41-111 -

C C B ZONE 60 EL.

EL. 131'-0" REFERENCE DRAWINGS 01-P-SGF-120 MN725-A420 and A622 AUXILIARY & DOWNCOMER FEEDWATER SG # 1

LINE # DIA/SCH FROM TO Line Number Material Data

  • < PLANT SG-11 6"x 0.432" 59-1 59-3 DLBB = CS NORTH SG-11 8"x 0.500" 59-4 59-25 DCBA = SS AF-6 6"x 0.562"59-16C 59-34 SG-11 6"x 1.800"42-111 -

C C

EL. 120'-0" C

ZONE

> 61 ZONE 42 EL. 13 1'-0" REFERENCE DRAWINGS 01-P-SGF-120 EDC-2001-561, 562, 563 MN725-A420 and A622 AUXILIARY & DOWNCOMER FEEDWATER SG # 2

LINE # DIA/SCH FROM TO

  • < PLANT TURBINE SG-200 8"x 0.719" 60-2 60-12 BUILDING NORTH SG-008 8"x 0.719" 60-14 60-17 EL.

D C

C REFERENCE DRAWINGS 01-P-SGF-156 R14 WO 3035948 Replaced V642

.j UNIT 1 ZONE 60 t_ EL. 104'-0" DOWNCOMER FEEDWATER STEAM GENERATOR # 1

LINE # DIA/SCH

  • < PLANT TURBINE SG-203 8"x 0.719' 'BUILDING NORTH SG-011 8"x 0.719'
t. EL.

",4 C

C.

REFERENCE DRAWINGS 01-P-SGF-156

-I

n. UNIT I ZONE 61 I EL. 104'-0" - - -

ZONE DOWNCOMER FEEDWATER 59 STEAM GENERATOR # 2 I. -

LINE # DIA/SCH FROM TO Y* PLANT AF-18 6"x 0.562" 62-4 62-14 NORTH AF-4 6"x 0.562" 62-15 62-24 t_ EL. 94'-5"'- -

EL. 94'-5" REFERENCE DRAWINGS 01-P-AFF-132 01-P-AFF-133 ZONE 58

?-

UNIT 1 ZONE 62 AUXILIARY FEEDWATER STEAM GENERATOR # 1

  • < PLANT NORTH C

ZONE 59 REFERENCE DRAWINGS 01-P-AFF- 132 01-P-AFF-133 B

C AUXILIARY FEEDWATER STEAM GENERATOR # 2

LINE # DIA/SCH FROM TO Y* ' PLANT SG-53 6"x 0.562" 64-1 64-14 NORTH 64-31 SG-39 6"x 0.562" 64-30 SG-39 6"x 0.562" 64-15 64-53 SG-522 6"x 0.562" 64-90 ----

EL. 109'-*

ZONE 66

..-EL. 104'

.J)

ZONE 64 BLOWDOWN STEAM GENERATOR # 1

LINE # DIA/SCH FROM TO PLANT SG-48 6"x 0.562" 65-1 65-14 NORTH SG-48 6"x 0.562" 65-29 65-52 SG-52 6"x 0.562" 65-15 65-28 SG-523 6"x 0.562" 65-90 ----

ZONE 67 REFERENCE DRAWINGS 01-P-SGF-140 EL. 122'

-I j) UNIT 1 ZONE 65 BLOWDOWN STEAM GENERATOR # 2 J.

LINE # DIA/SCH I FROM TO SG-39 6"x 0.562" 66-1 66-15

< PLANT NORTH TURBINE BUILDING

  • ~ *t EL. 108' - 8" d_ EL. 108'-

0.

REFERENCE DRAWINGS 01-P-SGF-157 It EL. 106'-0" 7- UNIT 1 ZONE 66 ZONE 64 BLOWDOWN STEAM GENERATOR # 1

LINE# DIA/SCH FROM TO Y* PLANT SG-48 6"x 0.562" 67-1 67-12 NORTH 108' - 8"

  • t EL. 108' - 8" REFERENCE DRAWINGS 01-P-SGF-157 ZONE 65 BLOWDOWN STEAM GENERATOR # 2

NOTES:

Tag No. 1MCHEEO1 Serial No. 79119 (AMETEK)

N.B. No. 437 Reference Drawings:

N001-7.03-1 N001-7.03-48 thru 50 B B 11 10

) 'INLET u 0

"* TOP E-Z NG SEAMS NEAR & FAR SIDE TOUTLET

<O 8" SCH 160 PIPE AND FITTINGS UNIT 1 ZONE68 REGENERATIVE HEAT EX-CHANGER A.

Tubesheet NOTES:

Tag No. 1MCHNE02 Serial No. N2370 (Richmond Engr)

N.B. No. 76129 32 Studs 1" x 9 3/4" Reference Drawings:

N001-7.03-26 Channelhead Cross Section N001-7.03-27 N001-7.03-28 N001-7.03-29 EA N)

.J UNIT 1 ZONE 69 LETDOWN HEAT EXCHANGER

B EL. 47' 10" LINE # DIA X SCH FROM TO ZONE 76 SI-67 16" X 0.312"70-103 70-109 SI-241 18" X 0.312" 70-44 70-47 SI-307 14"X0.312" 70-63 70-69 SI-307 20" X 0.375" 70-49 70-61 B

REFERENCE DRAWINGS 01-P-SIF-201 ZN1

~. ZONE 102 EL. 41' 10" 70-5 8 LPSI PUMP A SUCTION ZONE 94 UNIT 1 ZONE 70 LPSI PUMP ROOM "A" SUCTION

LINE # DIA X SCH FROM TO SI-78 10" X 0.365" 72-29 72-32 SI-87 8" X 0.322" 72-5 72-6 SI-87 10" X 0.365" 72-8 72-57 REFERENCE DRAWINGS 01-P-SIF-207 B

46'-9" B

LPSI PUMP ROOM "A" DISCHARGE

B NOTES:

1) TAG NUMBER: 1MSIAPO1
2) SERIAL NUMBER: 0876-36 INGERSOL RAND
3) NATIONAL BOARD NUMBER: 523 72-3A " WELDED SUPPORT FEET AND SUPPORT COLUMNS B VIEW LOOKING DOWN B 3'

3~

'3 f ] TWENTY-FOUR 2" DIAMETER STUDS (21 @ 9.5" LONG AND 3 @ 8.88" LONG)

__w _Lj_

DISCHARGE ZONE 71 REFERENCE DRAWINGS N001-11.01-36 N001-11.01-50 H

SUCTION 31 ZONE 70 UNIT 1 ZONE 72 7

r ýFF LPSI PUMP "A"

LINE # DIA X SCH FROM TO REFERENCE DRAWINGS 01-P-SIF-202 SI-308 14" X 0.312" 71-63 71-69 SI-308 20" X 0.375" 71-49 71-61 SI-194 18" X 0.312" 71-44 71-47 SI-34 16" X 0.312"71-105 71-111 LPSI PUMP B SUCTION ZONE 95 0,,

-1

.1 UNIT I ZO NE 73 C/L EL. 41' 10" LPSI PUMP ROOM "B" SUCTION F

ZONE 86 LINE # DIA X SCH FROM TO SI-129 8" X 0.322" 73-5 73-6 SI-129 10" X 0.365" 73-8 75-51 SI-123 10" X 0.365" 73-27 73-30 REFERENCE DRAWINGS 01-P-SIF-208

-1,

-4

-I

.0 UNIT 1 ZONE 74 LPSI PUMP ROOM "B" DISCHARGE

NOTES:

1) TAG NUMBER: 1MSIBPOI
2) SERIAL NUMBER: 0876-37 INGERSOL RAND
3) NATIONAL BOARD NUMBER: 524 WELDED SUPPORT FEET AND SUPPORT COLUMNS B

.J TWENTY-FOUR 2" DIAMETER STUDS (21 @ 9.5" LONG AND 3 @ 8.88" LONG)

F-\ ýý

-- I "L_

DISCHARGE ZONE 74 REFERENCE DRAWINGS N001-11.01-36 N001-11.01-50 z

SUCTION ZONE 73 F ~1

_1

ZONE 71 EL. 47' ZONE 70 REFERENCE DRAWINGS 01-P-SIF-201 41' 10" 01-P-SIF-207 LINE # DIA X SCH FROM TO ZONE 102 SI-067 16" X 0.312"70-110 70-111 SI-067 14" X O.312"70-113 80-16 CONTAINMENT SPRAY PUMP A SI-009 14" X 0.312" 80-1 80-4 SUCTION SI-009 18" X 0.312" 80-5 80-13 B

SI-078 10" X 0.365" 72-33 72-35 CONTAINMENT SPRAY PUMP ROOM "A" SUCTION

LINE # DIA X SCH FROM TO SI-079 8" X 0.322" 82-IA -

SI-079 10" X 0.365" 82-1 82-27 SI-082 10"X0.365" 82-31 82-35 REFERENCE DRAWINGS EL 53'-6". 01-P-SIF-207 B

CONTAINMENT SPRAY PUMP A ZONE 82 DISCHARGE B

CONTAINMENT SPRAY PUMP "A" DISCHARGE

B NOTES:

1) TAG NUMBER: 1MSIAP03
2) SERIAL NUMBER: 0876-38 INGERSOL RAND
3) NATIONAL BOARD NUMBER: 521 WELDED SUPPORT FEET AND SUPPORT COLUMNS B

TWENTY-FOUR 2" DIAMETER STUDS f-

,4 (21 @ 9.5" LONG AND 3 @ 8.88" LONG)

F-\ I 1 L

DISCHARGE ZONE 77 REFERENCE DRAWINGS N001-11.01-36

-I SUCTION ZONE 76 UNIT 1 ZONE 78 F E_

CONTAINMENT SPRAY PUMP "A"

LINE # DIA X SCH FROM TO C SI-033 14" X 0.312" 81-1 81-4 SI-033 18" X 0.312" 81-5 81-12 SI-034 14" X 0.312" 81-15 71-101 SI-034 16" X 0.312"71-103 71-104 SI-123 10" X 0.365" 73-31 73-33 REFERENCE DRAWINGS 01-P-SIF-202 EL 41'-10" ZONE 1 04 01-P-SIF-208 11 J CONTAINMENT SPRAY PUMP B SUCTION B

B B

CONTAINMENT SPRAY PUMP B SUCTION

ZONE 86 LINE # DIA X SCH FROM TO SI-119 8" X 0.322" 83-1A -

SI-119 10" X 0.365" 83-1 83-26 SI-147 10" X 0.365" 83-30 83-34 C REFERENCE DRAWINGS 01-P-SIF-208 EL 53'-6" ZONE 85 C

B EL 63'-0" H

E EL 40'-2" B

UNIT 1 ZONE80 CONTAINMENT SPRAY PUMP B DISCHARGE

NOTES:

1) TAG NUMBER: 1MSIBPO3
2) SERIAL NUMBER: 0876-39 INGERSOL RAND
3) NATIONAL BOARD NUMBER: 522 WELDED SUPPORT FEET AND SUPPORT COLUMNS TWENTY-FOUR 2" DIAMETER STUDS (21 @ 9.5" LONG AND 3 @ 8.88" LONG)

I w Lý_

DISCHARGE ZONE 80 REFERENCE DRAWINGS N001-11.01-36 I ]0 SUCTION ZONE 79

_1

LINE # DIA X SCH FROM TO SI-078 10" X 0.365" 72-36 72-48 SI-078 20" X 0.500" 72-49 72-52 SI-079 10"X 0.365" 82-28 72-61 REFERENCE DRAWINGS 01-P-SIF-207 B

SDCHX A INLET NOZZLE ZONE 76 C

_T, UNIT 1 ZONE 82 SHUTDOWN COOLING HEAT EXCHANGER ROOM "A"

£ -

LINE # DIA X SCH FROM TO B REFERENCE DRAWINGS SI-070 20" X 0.500" 74-1 74-19 01 -P-PCF-201 SI-070 16" X 0.375" 74-21 74-25 01-P-SIF-203 01-P-SIF-207 SI-070 20" X 0.500" 74-27 74-27 SI-082 10" X 0.365" 82-36 82-38 C SI-087 10"X 0.365" 74-58 74-74 SI-089 10" X 0.365" 74-77 74-87 B SI-089 10" X 0.365" 82-39 82-44 SI-090 14" X 0.375"74-105 74-118 SI-131 6" X 0.280" 74-97 74-100 A

SDCHX A OUTLET C

SHUTDOWN COOLING HEAT EXCHANGER ROOM "A"

NOTES:

1) TAG NUMBER: 1MSIAEO1
2) SERIAL NUMBER: S-18341 TUBE SHEET (ENGR & FABRICATORS) 1/8" C1-7/16" 3) NATIONAL BOARD NUMBER 1708
4) ZERO DEGREE FOR GIRTH WELDS IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.

64 STUDS 1.5" X 17" REFERENCE DRAWINGS:

N001-7.03-020 N001-7.03-25 N001-11.01-209 CHANNEL HEAD CROSS SECTION 74-121 475-122 DETAIL 74-123

-4 74-124 30 deg.

Inconel Weld 30eg "'SA-105 deg.

Clad J)UNIT *~~ý41ý INLET NOZZLE - ZONE 82 UI1ZN 1 ZONE 884

~OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 83 SHUTDOWN COOLING HEAT EXCHANGER "A"

EL 75' EL 80'-2" B EL 75' ZONE 80 B

SDCH4X B INLET NOZZLE REFERENCE DRAWINGS 01-P-SIF-208 LINE # DIA X SCH FROM TO SI-119 10" X 0.365" 83-27 73-63 SHUTDOWN COOLING HEAT SI-123 10" X 0.365" 73-34 73-46 EXCHANGER ROOM "B" SI-123 20" X 0.500" 73-48 73-54

LINE # DIA X SCH FROM TO SI-072 20" X 0.500" 75-1 75-17 SI-072 .16"X 0.375" 75-19 75-23 SI-072 20" X 0.500" 75-25 75-25 SI-129 10" X 0.365" 75-53 75-61 C ZONE 95 B SI-131 6" X 0.280" 75-81 75-84 SI-134 10" X 0.365" 75-62 83-43 C

SI-135 14" X 0.375" 75-87 75-100 SI-147 10" X 0.365" 83-35 83-39 ZONE 95 C

B ZONE 74

-I REFERENCE DRAWINGS UNIT 1 ZONE86 01-P-PCF-201 01-P-SIF-204

'B 01-P-SIF-208 SHUTDOWN COOLING HEAT EXCHANGER ROOM "B"

'C NOZZLE

NOTES:

1) TAG NUMBER: IlMSIBE0 I
2) SERIAL NUMBER: S-18342 TUBE SHEET (ENGR & FABRICATORS) 1 D1-7/16" 3) NATIONAL BOARD NUMBER 1709
4) ZERO DEGREE FOR GIRTH WELDS IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.

64 STUDS 1.5" X 17" REFERENCE DRAWINGS:

N001-7.03-020 N001-7.03-25 N001-11.01-209 CHANNEL HEAD CROSS SECTION 75-76

-4 75-77 DDETAIL 75-78 30deg.

75-79 nInconel Weld 7n7

  • INLET NOZZLE- ZONE 85 UNIT 1 ZONE 87 OUTLET NOZZLE (OPPOSITE SIDE)

- ZONE 86 SHUTDOWN COOLING HEAT EXCHANGER "B'

LINE # DIA X SCH FROM TO REFERENCE DRAWINGS SI-072 12" X 0.375" 78-2 78-11 01-P-SIF-208 SI-072 12"X 1.125" 78-13 78-14 SI-072 20" X 0.500" 75-35 75-38 SI-073 12" X 0.375". 79-1 79-11 SI-073 12"X 1.125" 79-13 79-14 SI-155 12"X 1.125" 78-16 78-21 SI-172 10" X 0.365" 78-IOC 78-IOD ZONE 99 SI-174 12"X 1.125" 79-16 79-21 ZONE 95 H

UNIT 1 ZONE88 D

EAST WRAP B C B

C

REFERENCE DRAWINGS 01-P-SIF-202 01-P-SIF-208

-J LINE #

SI-38 SI-173 7

-I SI-173

/2 ZONE 89 SI-173 SI-194 SI-194 18" X 0.312" 71-13 71-18

LINE # DIA X SCH FROM TO SI-030 24" X 0.375" 85-6 85-8R ZONE 121 SI-134 10" X 0.365" 83-53 83-57 SI-134 8" X 0.322" 83-58 83-59 SI-308 24" X 0.562" 85-9 85-11 SI-130 10" X 0.365" 90-42 90-46 SI-130 8" X 0.322" 90-40 90-41 B

EL 95'

-J

-J ZONE 101 B

REFERENCE DRAWINGS 01-P-SIF-202 01-P-SIF-208 R14 WO 3136723 90-50 & 85-8R UNIT 1 ZONE 90 ZONE 104 " EL 73'-7" EAST WRAP

LINE # DIA X SCH IFROMI TO ZONE 97

'.3

-0 7

UNIT 1 ZONE 91 WEST WRAP

ZONE 100 REFERENCE DRAWINGS 01-P-SIF-201 01-P-SIF-207

-4 4~

-4 ZONE 91 EL 78'-9" ZONE 94 C

LINE # DIA X SCH FROM TO W

SI-002 12" X 0.250" 70-85 70-98 UNIT 1 ZONE 92 SI-239 10" X 0.250" 70-70 70-82A SI-239 10" X 0.365" 70-83 WEST WRAP SI-241 16"X0.312" 70-1 70-14 SI-241 18" X 0.312" 70-16 70-22

ZONE 120 REFERENCE DRAWINGS 01-P-SIF-201 01-P-SIF-207 R14 WO 3136754 93-50 & 84-8R

-J

'ýEL 92'-6"

-4 ZONE 100 B ZONE 94

'EL 84'

11 UNIT 1I ZONE 93 ZONE 102 EL73'-7" WEST WRAP

ZONE 91 EL 92'-6" ZONE 92 ZONE 93 B

B B

B EL 72' EL41'-10" ZONE 83 70 LINE # DIA X SCH FROM TO SI-070 20" X 0.500" 74-28 74-41 'A" TRAIN MISC. PIPE CHASES REFERENCE DRAWINGS:

AND 88' PIPE TUNNEL SI-089 10" X 0.365" 82-45 82-54 01-P-SIF-201 01-P-SIF-207 SI-241 18" X 0.312" 70-23 70-43

C C

-- I EL 72' ZONE 86

,B REFERENCE DRAWINGS, 01-P-SIF-202 01-P-SIF-208 EL 88' ZONE 86 LINE # DIA X SCH FROM TO SI-072 20" X 0.500" 75-27 75-33 I "B" TRAIN MISC. PIPE CHASES AND 88' PIPE TUNNEL SI-134 10" X 0.365" 83-44 83-52 SI-194 18"X0.312" 71-19 71-43

C ZONE 23 EL B

100' B

114 C

C REFERENCE DRAWINGS 01-P-SIF-103 I

LINE # DIA X SCH FROM TO SI-202 12"X 1.125" 76-22 76-25 CONTAINMENT LPSI SI-202 12" X 1.312" 76-27 76-47 HEADER TO LOOP IA

ZONE 24 C

C C

B C

B C

LINE # DIA X SCH FROM TO EL SI-220 12" X 1.125" 77-22 77-25 SI-220 12" X 1.312" 77-27 77-47 REFERENCE DRAWINGS 01-P-SIF-103 UNIT 1 ZONE97 CONTAINMENT LPSI ZONE 91 HEADER TO LOOP 1B

LINE # DIA X SCH FROM TO SI-155 12" X 1.125" 78-22 78-25 SI-155 12" X 1.312" 78-27 78-47 EL89'-9" SI-E155C B -2 783 - 783 82 H-7E BRFRNEONAWI88 Z5"_***@

HD TLP UNITB1 ZONE988 SI-IAh4MEN LPS FLNI ZONE119-11 1L<

78NAIN40 100I 78-28T LOP2

LINE # DIA X SCH FROM TO SI-174 12" X 1.125" 79-23 79-25 SI-174 12" X 1.312" 79-27 79-47 C

B B

115

-J ZONE 26 EL 93'-5" ZONE 88 REFERENCE DRAWINGS

I 01-P-SIF-136 UNIT 1 ZONE 99 CONTAINMENT LPSI HEADER TO LOOP 2B

LINE # DIA X SCH FROM TO SI-007 24" X 0.375" 84-2 84-3 REFERENCE DRAWINGS 01-P-SIF-105 SI-241 16" X 0.312"70-116 70-119 01-P-SIF-151 13-P-ZCG-I 12 SI-241 16" X 1.594"70-120 70-121 ePSV-179 SI-369 10" X 0.250"70-122 70-132 ZONE 21

-J 7

ZONE 100 B CONTAINMENT LPSI TRAIN "A" SUCTION

ZONE 90 LINE # DIA X SCH FROM TO ZONE 89 SI-030 24" X 0.375" 85-2 85-3 SI-194 16" X 0.312"71-112 71-121 SI-194 16" X 1.594"71-122 71-123 SI-368 10" X 0.250"70-124 71-143 SI-368 6" X 0.280"71-145 -

W REFERENCE DRAWINGS 01-P-SIF-105 UNIT 1 ZONE 101 01-P-SIF-151 13-P-ZCG- 112 CONTAINMENT LPSI TRAIN "B" SUCTION

LINE# DIA/SCH FROM TO SI-307 24" x 0.562" 84-12 84-37 CONT. ON ZONE 93 SI-307 20" x 0.375" 84-39 84-46 WEST WRAP SI-9 18" x 0.312" 80-14 84-87 SI-8 10" x 0.250" 84-51 84-84

- EL72' REFERENCE DWG'S B 01-P-SIF-201 B

CONT. ON ZONE 70 LPSI "A" SUCTION C

B SAFETY INJECTION PUMPS TRAIN "A" SUCTION

ESSENTIAL 88' PIPE TUNNEL AU.

WATER TANK CONT ON ZONE 102 SI PUMP SUCT.

B Reference DWG'S.

LINE# DIA/SCH FROM TO UNIT 1 ZONE 103 01-P-SIF-201 CH- 424 20" x 0.375" 86-1 86-20 13-P-ZYA-925 REFUELING WATER CH- 142 20" x 0.375" 86-21 86-59 TRAIN "A" SUCTION

LINE# DIA/SCH FROM TO CONT. ON SI-308 24" x 0.562" 85-12 85-37 ZONE 90 EAST WRAP IPCA 01-008 SI-308 20" x 0.375" 85-38 85-49 SI-33 18" x 0.312" 85-50 81-13 SI-31 10" x 0.250" 85-59 85-80 CH-150 3" x 0.216" 104-2 104-5 REFERENCE DWG'S 01-P-SIF-202 C 01-P-CHF-206 IPCA 04-009 B

-J B

B CONT. ON

2 ZONE 79 CONT. SPRAY 7 PUMP "B" SUCT. CONT. ON ZONE 73 LPSI PUMP UNIT 1 ZONE 104 "B" SUCT.

SAFETY INJECTION PUMPS TRAIN "B" SUCTION HPSI PUMP #2

B B

SI-PUMP/ I SUCTION CONT. ON UNIT 1 ZONE 105 ZONE 104 REFUELING WATER TRAIN "B" SUCTION

B LINE # DIA X SCH FROM TO SI-099 4" X 0.337" 106-1 106-6 ZONE 108 SI-100 4" X 0.438" 106-7 106-44 SI-100 4" X 0.438" 106-24 106-28 SI-105 2" X 0.344" 106-49 106-72 SI-105 2" X 0.344" 106-63 106-68 SI-106 3" X 0.438" - 106-45 106-48 B

B B

.0 EL 41'-2" HPSI A PUMP

-i SW denotes Socket Weld UNIT 1 ZONE 106 B

REFERENCE DRAWINGS HPSI PUMP ROOM "A" 01-P-SIF-203 DISCHARGE

LINE # DIA X SCH FROM TO SI-107 4" X 0.337" 107-1 107-41 B SI-107 4" X 0.337" 107-23 107-27 SI-107 3" X 0.438" 107-68 107-71 B SI-112 2" X 0.344" 107-42 107-65 C ZONE 109 SI-112 2" X 0.344" 107-56 107-60 B SI-112 2" X 0.344" 107-66 107-67 EL 51'-6" REFERENCE DRAWINGS B 01-P-SIF-204 B Note: SW denotes a socket weld 0

POINT A N) CONTINUED THISDRAWING

-I z

UNIT 1 ZONE 107 HPSI PUMP ROOM "B" DISCHARGE

LINE # DIA X SCH FROM TO REFERENCE DRAWINGS SI-100 4" X 0.438" 108-1 108-34 01-P-SIF-203 SI-118 2" X 0.344" 108-35 108-45 01-P-SIF-204 01-P-CHF-207 CHARGING PUMP A B

B ZONE 112 10" EL.

B

'3 ZONE C

B

-I 53 EL. UNIT 1 ZONE 108 B HPSI DISCHARGE 88' PIPE CHASE ZONE 106

LINE # DIA X SCH FROM TO SI-107 I 4" X 0.337" 109-1 109-43 REFERENCE DRAWINGS I 01-P-SIF-203 B 01-P-SIF-204 ZONE 113 93' 10" C

ZONE 110 EL. 92' 2" EL.

EL. 51' 8" FROM HPSI B 40' ZONE 107 HPSI DISCHARGE 88' PIPE CHASE

LINE # DIA X SCH FROM TO SI-103 2" X 0.344" 110-40 110-52 SI-107 2" X 0.344" 110-53 110-59 SI-107 4" X 0.337" 110-1 110-10 SI-110 2" X 0.344" 110-11 110-17 SI-218 2" X 0.344" 110-18 110-22 SI-218 3" X 0.438" 110-38 110-39 SI-218 4" X 0.438" 110-23 110-37 SI-236 2" X 0.344" 110-60 110-64 B D37 \

110-44 110-43

)-454 110-41 ZONE 111 u

UNIT I ZONEll0 9

HPSI DISCHARGE WEST WRAP

LINE # DIA X SCH FROM TO ZONE 114 SI-100 2" X 0.344" 111-9 111-25 SI-100 4" X 0.438" 111-1 111-8 SI-236 3" X 0.438" 111-40 111-41 SI-236 4" X 0.438" 111-26 111-39 REFERENCE DRAWINGS 01-P-SIF-203 B

8'6" 11 @

EL. 85' ZONE 108

2 UNIT 1 ZONE 111 HPSI DISCHARGE WEST-WRAP

LINE # DIA X SCH FROM TO SI-100 4" X 0.438" 112-1 112-6 ZONE 113 SI-10l 2" X 0.344" 112-7 112-20 SI-102 2" X 0.344" 112-21 112-32 SI-176 4" X 0.438" 112-33 112-44 SI-176 3" X 0.438" 112-45 112-46 B

,n 7

-I UNIT 1 ZONE 112 HPSI DISCHARGE EAST WRAP

LINE # DIA X SCH FROM TO SI-108 2" X 0.344" 113-7 113-15 REFERENCE DRAWINGS B SI-107 4" X 0.337" 113-1 113-6 01-P-SIF-204 SI-109 2" X 0.344" 113-21 113-27 SI-157 4" X 0.438" 113-33 113-49 SI-157 3" X 0.438" 113-50 113-51 SI-157 2" X 0.344" 113-16 113-20 SI-176 2" X 0.344" 113-28 113-32 ZONE 115 86' ZONE 112 7

-I ZONE 109 UNIT I ZONE 113 HPSI DISCHARGE EAST WRAP

REFERENCE DRAWINGS 01-P-SIF-103 B

/EL 93'-5" ZONE 96 ZONE 97 ZONE 111 ZONE 110 CONTAINMENT HPSI HEADER LOOP IA & 1B

LINE # DIA X SCH FROM TO SI-157 3" X 0.438" 115-1 115-12 SI-176 3" X 0.438" 115-13 115-22 REFERENCE DRAWINGS 01-P-SIF-136 ZONE 113 ZONE 112 EL 91'-4".

EL 89'-9" EL ZONE 98 ZONE 99 CONTAINMENT HPSI HEADER LOOP 2A & 2B

1) TAG NUMBER: IMSIAP02
2) SERIAL NUMBER: INGERSOL RAND B S/N 0776-14 B 3) DISCHARGE HEAD STUDS 16@ 2.25" DIA. X 10.88" REFERENCE DRAWINGS 01-P-SIF-201 01-P-SIF-203 B B DISCHARGE ZONE 106 SUCTION DISCHARGE HEAD STUDSS ..

H UNIT 1 ZONE 116 HPSI PUMP "A"

N.-w 1) TAG NUMBER: 1MSIBPO2

2) SERIAL NUMBER: INGERSOL RAND S/N 0776-15
3) DISCHARGE HEAD STUDS 16@ 2.25" DIA. X 10.88" REFERENCE DRAWINGS 01-P-SIF-201 01-P-SIF-203 B B "D DISCHARGE ZONE 104 ZONE 107 SUCTION DISCHARGE HEAD STUDS L L

] UNIT 1 ZONE 117 HPSI PUMP "B'

I UNE # I DIA X SCH I FROM I TO SI-106 3" X 0.438" 118-1 118-49 REFERENCE DRAWINGS B ZONE 39 01-P-SIF-203 01-P-SIF-105 POINTA CONTINUED THISDRAWING B

6" B

B B

-4 B

B ZONE 106 UNIT 1 ZONE 118 HPSI "A" LONG TERM B RECIRCULATION C

B B

EL 87'-3" B 40 REFERENCE DRAWINGS 01-P-SIF-105 HPSI "B" LONG TERM 01-P-SIF-204 RECIRCULATION 01 -P-CHF-207 107

I I

EL 116'-4" C

CONT ZONE 93 REFERENCE DRAWINGS 13-P-ZCG- 105

LINE # DIA X SCH FROM ITO SI-130 10" X 0.250" 121-1 121-21 EL 116'-4" 0_,

C CONT ZONE 90

-I UNIT 1 ZONE 121 CONTAINMENT REFERENCE DRAWINGS SPRAY B 13-P-ZCG- 105

SECTION 11.0 Terms and Definitions 205 of 207 31NT-ISI-1 fRev 1

AHE: Augmented High Energy ANII: Authorized Nuclear Inservice Inspector APS: Arizona Public Service Company, et al ASME: American Society of Mechanical Engineers Aux: Auxiliary BWR: Boiling Water Reactor CE: Combustion Engineering CEDM: Control Element Drive Mechanism CFR: Code of Federal Regulations CH: Charging CHR: Containment Heat Removal Circ: Circumferential CL: Cold Leg CRD: Control Rod Drive CS: Containment Spray CSP: Containment Spray Pump DWG: Drawing ECCS: Emergency Core Cooling System FW: Feedwater HL: Hot Leg HPSI: High Pressure Safety Injection HV: Hand Control Valve Hx: Heat Exchanger ICI: In Core Instrumentation IEB: Inspection and Enforcement Bulletin IEIN: Inspection and Enforcement Information Notice Inj: Injection INPO: Institute for Nuclear Power Operations ISI: Inservice Inspection LPSI: Low Pressure Safety Injection MSSS: Main Steam Support Structure NDE: Nondestructive Examination NRC: Nuclear Regulatory Commission PDV: Pressure Differential Valve PSV: Pressure Relief or Safety Valve PWR: Pressurized Water Reactor PVNGS: Palo Verde Nuclear Generating Station PZR: Pressurizer RC: Reactor Coolant RCP: Reactor Coolant Pump REV: Revision RHR: Reactor Residual Heat Removal Recirc: Recirculation 206 of 207 31NT-ISI-1 Rev 1

RCS: Reactor Coolant System RPV: Reactor Pressure Vessel RVLMS: Reactor Vitssel Level Monitoring System REM: Roentgen Equivalent Man SDCHX: Shutdown Cooling Heat Exchanger SD: Shutdown SER: Significant Event Report SG: Steam Generator SI: Safety Injection SN: Serial Number T: Thickness Tech. Spec: Technical Specification UFSAR: Updated Final Safety Analysis Report USNRC: United States Nuclear Regulatory Commission UV: Multivariable Control Valve V: Valve 207 of 207 31NT-ISI-1 Rev 1

Attachment 2 PVNGS Unit 2- Revised Third 10-Year Interval Inservice Inspection Plan

V.

I4 3 rd Inspection Interval Inservice Inspection Program Summary Manual PVNGS Unit 2 Arizona Public Service Company PVNGS PO Box 52034 5801 S Wintersburg Road Phoenix, AZ 85072-2034 Tonopah, AZ 85354 Digitally signed by Hansen, Browning, Digitally signed by Browning, Robert L(Z17343)

Ha nsen, Douglas B(Z41530)

DN: cn=Hansen, Douglas DN: cn=Browning, Robert Robert L{Z17343) DouglsIB(Z41530)

Reason: Lhave reviewed this Date: 2011.09.09 06:59:49 D I7 1 *") O ,;/" "document L(Z1 7343)

Preparer

-07'00' Reviewe.,(Z l4 530), Date: 2011.09.09 04:55:52 -0700' Digitally signed by Pabst, Hogstrom, Digitally signed by Hogstron, Robert (YH24Sa0 P obst,st Donn Po Do n a I Dld DonaldS(Z75420) d- DN:cn=Pobst, Donald 5(Z75420)

O)N:cn=Hogstror., Robert (YH2450)

Robert Reason: I have reviewed this SReason: Iaw approving this S.(Z75420) "doc:mntasSection Leader.

(YH2450) Date: 2011 .09.09 07:27:08 -07'00' Date: 2011.09.13 03:49:07 -07'00' ANII: Section Leader:

Thiel, Ca Car I B(Z99692) by Thiele.

y signedCarl gital KDi cn=Thiele, Carl B(Zg9692)

(Z 99692 R-a1.on lam approvingthis Department Leader: Oate:2011.09.14 w9:55:01 .07'W Commercial Service Date: 09-19-1986 Program No: 3INT-ISI-2 Rev. 2 I of 208 31NT-ISI-2 Rev 2

TABLE OF CONTENTS 1.0 Summ ary ......................................................................................................... 3 2.0 Code Applicability ..................................................................................... 3 3.0 D escription ................................................ ................................................ 4 3.1 Scope ....................................................................................................... 4 3.2 System Boundaries .................................................................................. 5 3.3 A ccessibility ....................................................... 7......................................... 5 3.4 Exam ination Techniques ......................................................................... 6 3.5 Inspection Intervals ................................................................................... 6 3.6 Examination Categories ................................... 7 3.7 Evaluation and Repair .............................................................................. 7 3.8 System Pressure Tests .............................................................................. 7 3.9 Exem ptions .............................................................................................. 7 3.10 Code Cases ............................................................................................. 8 3.11 Outage Plan Table .................................................................................... 8 4.0 A SM E Class 1 Sum mary ............................................................................ 9 5.0 A SM E Class 2 Sum mary .......................................................................... 34 6.0 A SM E Class 3 Sum mary .......................................................................... 67 7.0 Augm ented Sum m ary .............................................................................. 74 8.0 Requests for Relief ................................................................................... 87 9.0 Boundary Draw ing Listing ............................................................................ 89 10.0 Zone Draw ings ......................................................................................... 91 11.0 Term s and D efinitions ................................................................................. 206 2 of 208 31NT-ISI-2 Rev 2

PALO VERDE NUCLEAR GENERATING STATION UNIT 2 INSERVICE INSPECTION - PROGRAM

SUMMARY

1.0

SUMMARY

1.1 This document contains a detailed description of the 3rd 10 Year Interval Inservice.

Inspection (ISI) Program for Palo Verde Nuclear Generating Station Unit 2. This program conforms to the requirements of 10CFR50.55a (g), PVNGS Technical Specifications, and the PVNGS UFSAR. Exceptions that are known as of this document preparation date are included in the Requests for Relief Section 8.0.

1.2 The revision is being prepared to update the ISI Program for the 3 rd 10 Year Interval. This includes the utilization of the 2001 Edition including the 2003 Addenda of ASME Section XI with the exceptions noted below:

1.2.1 Requests for relief from ASME Section XI requirements are included in Section 8.0.

These Relief Requests are prepared in a format similar to that documented in the NEI White Paper Revision 1 dated June 2004, entitled: "Standard Format for Requests from Commercial Reactor Licensees Pursuant to 10CFR50.55a".

1.2.2 The 2007 Edition thru the 2008 Addenda was utilized for Category B-L-1 and B-M-1 for pump and body weld requirements.

1,2.3 For clarification, this Interval 3 program was prepared, as was Interval 1 and 2 programs, utilizing 40 month periods.

1.3 This revision does not utilize risk informed inservice inspection methodology at this time.

1.4 The information presented is in a form consistent with the 1St and 2 nd 10 Year Interval ISI Program, the applicable requirements of Standard Review Plan manual and procedures and the recommendations contained in NRC letter dated July 17, 1981, from Mr. R.L. Tedesco, NRC, to E. E. Van Brunt, Jr., APS, "Guidance for Preparing Preservice and Inservice Inspection Programs and Relief Requests - Palo Verde Nuclear Generating Station Units 1, 2 and 3."

2.0 CODE APPLICABILITY 2.1 Based on paragraph 10 CFR 50.55a(b) (2) that was published 12 months prior to the start of the 3 rd 10 Year Interval (3-18-07), the 2001 Edition including the 2003 Addenda of ASME Section XI was referenced as the Code to utilize for preparation of this program. Several exceptions to this code are documented in 10CFR50.55a; each of these exceptions was utilized during the preparation of this program.

  • The exemptions of IWB-1220 for Class 1 piping must utilize the 1989 Edition.
  • When qualifying VT-3 personnel per IWA-2317, the proficiency of the training must be demonstrated by initial qualification examination and subsequent examinations on a 3 year interval.

3 of 208 31NT-ISI-2 Rev 2

  • The 1997 Edition must be used for IWA-2240 alternative examination methods, a combination of methods, or newly developed techniques.

" Items B3.120 and B3.140 (nozzle inner radius examinations) of the 1998 Edition must be utilized. An enhanced visual examination with a resolution sensitivity to detect a 1-mil wire or crack may be performed in place of an ultrasonic examination.

  • Must utilize the 1995 Edition for examination Item B7.80.
  • IWA-2220, Ultrasonic examination methods are prohibited for surface examinations.

" The surface examination requirements for HPSI systems, Items B9.20, B9.21 and B9.22 are not required to be performed.

2.2 If a code required examination was considered to be impractical during the preparation of this document because of plant design, geometry, accessibility or other conditions, a Request for Relief from that requirement was prepared and included in Section 8.0. If a code required examination is identified to be impractical during the course of an inspection and the code required percentages are not met, a request for relief will be prepared and submitted after each inspection period, and the final interval closeout no later than 12 months after expiration of the Interval.

2.3 This program will implement Appendix VIII to Section XI in accordance with 10 CFR 50.55a. Appendix VIII examinations will be conducted in accordance with the Performance Demonstration Initiative (PDI). The PDI Code Comparison document explains the complex relationship of regulatory requirements, ASME requirements, code editions, and the PDI program.

3.0 DESCRIPTION

3.1 SCOPE 3.1.1 This Inservice Inspection Program Summary includes all applicable nondestructive examinations required by ASME Section XI as identified below:

1. Examination of ASME Class 1, 2, and 3 pressure retaining components and their supports 3.1.2 This program also includes an augmented section that includes examinations for other items required to be examined as identified below.
1. Examinations of welds in Class 1 components fabricated with Alloy 600/82/182 materials in accordance with 10CFR50.55a and Code Case N-722-1.
2. Examination of the Reactor Vessel Closure Head in accordance with 10CFR50.55a and Code Case N-729-1.
3. Examination of welds in Class 1 piping and vessel nozzle butt welds fabricated with alloy 82/182 in accordance with 10CFR50.55a and Code Case N-770-1.
4. Examination of the Reactor Coolant Pump Flywheels in accordance with PVNGS Technical Specifications Section ITS 5.5.7.
5. USNRC Circulars, Information Notices, Bulletins, or Orders
6. INPO or other industry operating experiences 4 of 208 431NT-ISI-2 Rev 2
7. Combustion Engineering or Westinghouse bulletins or notices
8. Special examinations to satisfy other commitments or concerns that are based on operating experiences, USNRC. These examinations are scheduled throughout this program and reference the applicable notification documents.

3.1.3 Those items that may generally be included in an Inservice Inspection Program, but are not included are identified below:

1. The inservice testing of snubbers will be performed in accordance with 10CFR50.55a.
2. The inservice examination of steam generator tubing will be performed in accordance with the PVNGS Technical Specifications Section T5.5.9.
3. The Examination Program for the ASME Subsections IWE and IWL will be performed in accordance with 10CFR50.55a and the PVNGS Technical Specifications.

3.2 SYSTEM BOUNDARIES 3.2.1 A complete set of P&ID drawings indicating the Inservice Inspection boundary are maintained at the PVNGS site. These drawings illustrate the ASME Class 1, 2, and 3 systems; components; and boundaries scheduled for examinations and pressure testing. A referenced listing of these drawings is documented in Section 9.0.

3.2.2 A set of ISI (Zone) Drawings is included in Section 10.0. These drawings are utilized for the planning and scheduling of specific ASME Class 1 and 2 examinations throughout the 10 Year Interval. These also document the location and number of welds, components, and supports. These Zone drawings are revision controlled in conjunction with this program manual.

3.3 ACCESSIBILITY 3.3.1 The preservice examinations were performed with examination techniques, automated or manual, similar to those planned for use during Inservice Inspections. The examination limitations noted during the preservice examinations were documented in Requests for Relief submitted with the preservice examination program. There has also been a number of additional code limitations noted during the I"sand 2 nd 10 Year Intervals and Request for Relief submitted. If included in the required 3 rd Interval examinations they will again be evaluated and relief requested. Note Section 8.0 identifies all the reliefs submitted during the preparation and implementation of the 3 rd Interval.

3.3.2 All items that are scheduled for examination will be examined to the extent practical.

In addition, any code limitations that are noted during the examinations will be documented. If relief is required from any of these examinations, a Request for Relief will be submitted after the relief is discovered and prior to 12 months after the interval ends.

5 of 208 31NT-ISI-2 Rev 2

3.4 EXAMINATION TECHNIQUES 3.4.1 The three types of examinations utilized to perform Inservice Inspections, along with the actual nondestructive examination technique, are identified in the legend below:

VT - Visual VT - 1 (General Condition)

VT - 2 (Leakage)

VT - 3 (Mechanical and Structural Condition)

VE (Visual Examination)

S - Surface PT - Liquid Penetrant MT - Magnetic Particle ET - Eddy Current VOL - Volumetric UT - Ultrasonic RT - Radiography 3.4.2 All the above nondestructive examination techniques will be performed using specific techniques and procedures that are identified in ASME Section XI, or alternative examinations that are demonstrated to be equivalent or superior to those identified.

The provision for substitution of these alternative examination methods, combination of methods, or newly developed techniques will utilize the 1997 Addenda for IWA-2240.

3.5 INSPECTION INTERVALS 3.5.1 The Inservice Inspection Program was prepared in accordance with Program B of ASME Section XI. The 1st, 2 nd , and 3rd 10 Year Intervals and corresponding inspection periods are defined below:

First Inspection Interval: 09/19/86 to 03/17/97 Second Inspection Interval: 03/18/97 to 03/17/07 Third Inspection Interval: 03/18/07 to 03/17/17 Period One: 03/18/07 to 07/17/10 Period Two: 07/18/10 to 11/17/13 Period Three: 11/18/13 to 03/17/17 It should be noted that the intervals/periods may change to allow for extended outage durations per IWA-2400 of ASME Section XI.

6 of 208 31NT-ISI-2 Rev 2

3.6 EXAMINATION CATEGORIES 3.6.1 The examination categories of ASME Section XI were utilized to develop this program for all systems, components, and supports. The Subprogram summary tables contained in Sections 4.0 and 5.0 are organized by examination category for ASME Class 1 and 2 systems, respectively. For each examination category, these tables identify the system or identification, nondestructive examination method, total number of items, required examination amount for each inspection period, and running percentage. For ASME Class 3 systems, the examinations categories are identified in Section 6.0.

3.7 EVALUATION AND REPAIR 3.7.1 The evaluation of all examination results will be performed in accordance with ASME Section XI Articles IWx-3000. In addition, all applicable repairs and replacements will be performed in accordance with ASME Section XI Articles IWX-4000 and 7000. Pressure tests will be performed on welded and mechanical joint repairs or replacements, in accordance with IWx-4000 and 5000 and 10CFR50. Both the evaluations and repair or replacement will be performed in accordance with the 2001 Edition including the 2003 Addenda of ASME Section XI, or later editions and addenda of ASME Section XI referenced in 10CFR50. Later editions and addenda will be documented with the NRC.

3.7.2 It should be noted that a relief was requested (Relief Request 38) to perform repair and replacement of all three PVNGS units to the 2001 Edition including the 2003 Addenda. This request was documented in conjunction with the relief to perform full structural weld metal overlays. (APS letter to the USNRC 102-05641 dated 2-8-2007).

3.7.3 All repairs and replacements will be documented in accordance with the Work Control program, and are maintained at Palo Verde for review.

3.8 SYSTEM PRESSURE TESTS 3.8.1 ASME Class 1, 2, and 3 components will be pressure tested per the requirements of IWB-5000, IWC-5000 and IWD-5000, except where relief has been requested.

3.8.2 Pressure tests will also be performed on repairs and replacements per ASME Section XI, 10CFR50.55a, and the PVNGS Repair and Replacement program.

3.9 EXEMPTIONS 3.9.1 The exemption criteria identified in the 2001 Edition including the 2003 Addenda of ASME Section XI was utilized for all ASME Class 1, 2, and 3 components and systems. The only exception is that required by 10CFR50.55a for the ASME Class 1 piping exemptions. These are in accordance with the 1989 Edition of ASME XI.

3.9.2 A thorough review of all the systems and components was performed in accordance with the above exemptions and a complete set of color coded Inservice Inspection Exemption drawings was prepared. These drawings are maintained at the PVNGS site for review.

7 of 208 31NT-ISI-2 Rev 2

3.10 CODE CASES 3.10.1 The following Code Cases are accepted for use in Regulatory Guide 1.147 and may be utilized during Interval 3 where applicable:

1. N-460 Alternative examination coverage for Class I and 2 welds
2. N-526 Alternative requirements for successive inspections of Class 1 and 2 vessels
3. N-532-4 Alternative requirements to repair and replacement documentation
4. N-534 Alternative Requirements for Pneumatic Pressure Testing.
5. N-566-2 Corrective Action for Leakage Identified at Bolted Connections
6. N-613-1 Ultrasonic examination of full penetration nozzles in vessels
7. N-624 Successive inspections
8. N-652-1 Alternative requirements to categories B-G-l, B-G-2, and C-D bolting
9. N-666 Weld Overlay of Class 1, 2, and 3 Socket Welded Connections
10. N-685 Lighting Requirements for Surface Examinations
11. N-695 Alternative for Qualification Requirements for Dissimilar Metal Piping Welds, Appendix VIII Supplement 10
12. N-700 Alternative Rules for Selection of Class 1, 2, and 3 Vessel Welded Attachments for Examination 3.10.2 The following Code Cases are conditionally accepted for use in Regulatory Guide 1.147 may be utilized with the specified conditions during Interval 3 where applicable:

N-513-3 Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RG 1.147 documents acceptance condition is that the repair or replacement activity temporarily deferred under the provisions of this Code Case shall be performed during the next scheduled outage.

2. N-648-1 Alternative requirements for inner radius examinations of reactor vessel nozzles RG 1.147 documents acceptance condition is that in place of a UT examination, licensees may perform a visual examination with enhanced magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio. The provisions of Table IWB-2500-1, Examination Category B-D, continue to apply except that, in place of examination volumes, the surfaces to be examined are the external surfaces shown in the figures applicable to this table (the external surface is from point M to point N in the figure).

3.10.3 The following Code Cases are required to be utilized by 10CFR50.55a with additional specified conditions. These are planned to be utilized with the specified conditions during Interval 3:

1. N-722-1 Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated With Alloy 600/82/182 Materials
2. N-729-1 Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds
3. N-770-1 Alternative Examination Requirements and Acceptance Standards for Class I PWR Piping and Vessel Nozzle Butt Welds Fabricated With UNS N06082 or UNS W86182 Weld filler Material With or Without Application of Listed Mitigation Activities 3.11 OUTAGE PLAN TABLE The outage plan table, controlled by procedure 73DP-9XI03 and 73DP-9EE02, identifies the components scheduled for examination including successive examinations from prior periods. The examination procedures and a listing of calibration blocks is also identified.

8 of 208 31NT-ISI-2 ,Rev 2

SECTION 4.0 ASME CLASS 1 EXAMINATION

SUMMARY

9 of 208 31NT-ISI-2 Rev 2

INDEX EXAM CATEGORIES B-A Pressure Retaining Welds in Reactor Vessel B-B Pressure Retaining Welds in Vessels Other Than Reactor Vessels B-D Full Penetration Welded Nozzles in Vessels B-F Pressure Retaining Dissimilar Metal Welds in Vessel Nozzles B-G-1 Pressure Retaining Bolting, Greater Than 2 Inches in Diameter B-G-2 Pressure Retaining Bolting, 2 Inches and Less in Diameter B-J Pressure Retaining Welds in Piping B-K Welded Attachments for Vessels, Piping, Pumps and Valves B-L-2 & B-M-2 Pump Casings and Valve Bodies B-N-i Interior of Reactor Vessel B-N-2 Welded Core Support Structures and Interior Attachments to Reactor Vessels B-N-3 Removable Core Support Structures B-O Pressure Retaining Welds in Control Rod Housings B-P All Pressure Retaining Components B-Q Steam Generator Tubing F-A Class 1 Supports 10 of 208 31NT-ISI-2 Rev 2

B1.10 SHELL WELDS B1.11 CIRCUMFERENTIAL 1-Reactor Vessel welds 79173 3 Vol o

0 0

3*

1 2

3 0

0 100 B1.12 LONGITUDINAL -__

1-Reactor Vessel welds 79173 Vol 9 0 1 0 0 2 0 9* 3 100 B1.20 HEAD WELDS _

B1.21 CIRCUMFERENTIAL B1.22 MERIDIONAL 1-Reactor Vessel Bottom Head weld 79173 Vol 1 0 1 0 0 2 0 1* 3 100

___ 1 ______________ 1 _____*1 ______ I____ I ___ ___ I _____ I___ I _______

B1.30 SHELL-TO-FLANGE WELD 1-Reactor Vessel - weld 79173 Vol 1 0 1 0 0 2 0 1* 3 100 B1.40 HEAD-TO-FLANGE WELD 2-Closure Head weld N05065-CHA-01 S & Vol 0 0 0 0 RVH Replaced R15

2 2 %Jf 4 3 100 PRESSURIZER B2.10 SHELL -TO-HEAD WELDS B2.11 CIRCUMFERENTIAL 5- Pressurizer weld 79373 Vol 21 1

  • _1 3
  • B2.12 LONGITUDINAL **

5- Pressurizer weld 79373 Vol 4 2 1 . . 1 of each 2 3 ** intesecting circ exam area exam area STEAM GENERATORS B2.30 HEAD WELDS B2.31 CIRCUMFERENTIAL ***Multiple Vessels 3- Steam Generator 1 weld 212 Vol 1 1 2 4- Steam Generator 2 weld 211 Vol 1 B2.40 TUBESHEET TO HEAD 3- Steam Generator 1 weld 212 Vol 2 1 2

_4- Steam Generator 2 weld 211 Vol 2 1 3

______ I _________________________________ I_____________ I_______________ I ________ I________ I ________ I____________ _______ I _________________

I t t 1 REACTOR VESSEL B3.90 NOZZLE-TO-VESSEL WELDS 1- Reactor Vessel Outlets - 2 79173 Vol 6 6* 3 100 *Auto exam with Inlets - 4 core barrel removed B3.100 NOZZLE INSIDE RADIUS SECTION 1- Reactor Vessel Outlets - 2 79173 Vol 6 6* 3 100 *Auto exam with Inlets - 4 core barrel removed PRESSURIZER B3.110 NOZZLE-TO-VESSEL WELDS 5- Pressurizer Surge - 1 79373 Vol 6 1 1 16 Spray- 1 2 2 50 Safeties - 4 3 3 100 B3.120 NOZZLE INSIDE RADIUS SECTION**

5- Pressurizer Surge - 1 79373 Vol 6 1 1 16 Spray--1 2 2 50 Safeties - 4 3 3 100 STEAM GENERATORS B3.130 NOZZLE-TO-VESSEL WELDS B3.140 NOZZLE INSIDE RADIUS SECTION"... added inner radius

  • Outlet 2 2
  • B3.140 NOZZLE INSIDE RADIUS SECTION I 3- Steam Generator 1 Inlet - 1 212 Vol 3 1 1
  • __._Outlet-2 _- 2 2 4- Steam Generator 2 Inlet - 1 211 Vol 3 1 1 Outlet - 2 2 3 co 0

N)

PRESSURIZER NOMINAL PIPE SIZE > 4 INCH NOZZLE TO SAFEEND BUTT B5.40 WELDS 20- Surge butt welds RC-028-12" S & Vol 6 Mitigated with FSWO 29- Spray butt welds RC-018-4" S & Vol Moved to augmented 31- Safeties (4) butt welds RC-001-6" S & Vol RC-003-6" S & Vol RC-005-6" S & Vol RC-007-6" S &Vol

____I I I I I V I i I__________

4. 4 + 1 4 I 4 - ~1 I REACTOR VESSEL B6.10 CLOSURE HEAD NUTS 2- Closure Head nuts 7.237" x 7.91" VT-I 54 18 1 33 18 2 66 18 3 100 B6.20 CLOSURE STUDS 2- Closure Head studs 7.380" x 76.37" Vol 54 18 1 33 18 2 66 18 3 100 B6.40 THREADS IN FLANGE 1- Reactor Vessel Stud Holes 79173 Vol 54 0 0 0 0 0 0 54 3 100 B6.50 CLOSURE WASHERS BUSHINGS 2- Closure Head Washers 7.50" x 1.27" VT-1 54 18 1 33 18 2 66 i 18 3 100

B6.180 BOLTS AND STUDS 16- Reactor Coolant Pump 1A Flange Studs 4.33" x 32.87" Vol 16 16 3 100

  • Multiple pumps 17- Reactor Coolant Pump 1B Flange Studs 4.33" x 32.87" Vol 16 *
  • 18- Reactor Coolant Pump 2A Flange Studs 4.33" x 32.87" Vol 16 *
  • 19- Reactor Coolant Pump 2B Flange Studs 4.33" x 32.87" Vol 16 * *
    • VT-1 exams on 1 FLANGE SURFACE WHEN pump per interval (with B6.190 CONNECTION DISASSEMBLED B12.XX exams) 16- Reactor Coolant Pump 1A surface 1110-1A VT-1 1 ......

17- Reactor Coolant Pump 1B surface 1110-1B VT-1 1 ......

18- Reactor Coolant Pump 2A surface 11 10-2A VT-1 1 ** ...

19- Reactor Coolant Pump 2B surface 1110-2B VT-1 1 ......

  • VT-i exams on 1 pump per interval (with B6.200 NUTS, BUSHINGS, AND WASHERS B12.XX exams) 16- Reactor Coolant Pump 1A nuts & ring 1110-1A VT-1 16 .. .

17- Reactor Coolant Pump 1B nuts & ring 1110-1 B VT-1 16 ......

18- Reactor Coolant Pump 2A nuts & ring 11 10-2A VT-1 16 ......

19- Reactor Coolant Pump 2B nuts & ring 11 10-2B VT-1 16

__ 1 ____________ ____ .1

_____ j ___ I___ I ___ I____ i __ I ______

PRESSURIZER _

B7.20 BOLTS, STUDS AND NUTS _ _ _"_ _

5- Pressurizer Manway Studs & Nuts 1.31" x 14.5" VT-1 20 20 *** I

__"_STEAM GENERATOR B7.30 BOLTS, STUDS AND NUTS _ _"

3- Steam Generator 1 MANWAYS Studs & Nuts 1.31" x 14.5" VT-1 40 40 ***

4- Steam Generator 2 MANWAYS Studs & Nuts 1.31" x 14.5" VT-1 40 40 ***

When disassembled and only once per PIPING interval B7.50 BOLTS, STUDS AND NUTS 31- Pressurizer Safeties Flange Bolting RC-001-6" VT-1 8 8 .... _ _

Flange Bolting RC-003-6" VT-1 8 8 .**** I Flange Bolting RC-005-6" VT-1 8 8 . ****

Flange Bolting RC-007-6" VT-1 8 8 ....

37- Charging Line Flange V435 CH-005-2" VT-1 8 8 ....

17- Reactor Coolant Pump 1B seal cover 1.1" x 8.27" VT-1 16 16 ..... required once per 18- Reactor Coolant Pump 2A seal cover 1.1" x 8.27" VT-1 16 16 .... interval (B-L-2) 19- Reactor Coolant Pump 2B seal cover 1.1" x 8.27" VT-1 16 16 ....

VALVES " _

B7.70 BOLTS, STUDS AND NUTS 31- Pressurizer Safeties PSV-200 RC-001-6" VT-1i 12 12 ....... During VENDOR (Body Bolts) PSV-201 RC-003-6" VT-1 12 12 ....... disassembly (B-M-2)

PSV-202 RC-005-6" VT-1 12 12 .......

PSV-203 RC-007-6" VT-1 12 12 When 0

disassembled and 0

C) only once per N0 CRD HOUSING interval B7.80 BOLTS, STUDS AND NUTS 2-Closure Head RVLMS Locations Grayloc Clamps CEDM 92 VT-1 4 4 ........

CEDM 96 VT-1 4 4 .... ....

B9.10 NPS4 OR LARGER B9.11

  • CIRCUMFERENTIAL WELDS 6- RCS Primary Piping, HL 1"* butt welds RC-032-42" ID S* &Vol 62 7 1 11 **AUTO EXAM OF HL 2** butt welds RC-063-42" ID 6 2 21 NOZZLE TO EXT AND CL 1A to RCP butt welds RC-033-30" ID 6 3 31 EXT TO PIPE WELDS CL 1B to RCP butt welds RC-030-30" ID *SURFACE EXAMS CL 2A to RCP butt welds RC-073-30" ID NOT REQUIRED IN CL 2B to RCP butt welds RC-084-30" ID CONJUNCTION WITH CL 1A to RPV** butt welds RC-034-30" ID AUTO EXAMINATIONS CL 1B to RPV** butt welds RC-031-30" ID (EWR-3673722 &

CL 2A to RPV** butt welds RC-079-30" ID _CODE CASE N663)

CL 2B to RPV** butt welds RC-093-30" ID 20- Pressurizer Surge Line butt welds RC-028-12" S & Vol 11 1 1 9 DM MOVED TO AUG 2 3 27 21- Shutdown Cooling Loop 1 butt welds RC-051-16" S & Vol 24 2 1 8 DM MOVED TO AUG SI-240-16" 4 2 25 22- Shutdown Cooling Loop 2 butt welds RC-068-16" S & Vol 18 2 1 11 DM MOVED TO AUG SI-193-16" 3 2 28 3 3 44 23- Safety Injection 1A butt welds SI-207-14" S & Vol 18 4 1 28 DM MOVED TO AUG S1-203-12" 24- Safety Injection 1 B butt welds SI-223-14" S &Vol 18 5 2 28 DM MOVED TO AUG SI-221-12" 25- Safety Injection 2A butt welds SI-160-14" S & Vol 22 6 3 27 DM MOVED TO AUG S1-156-12"

.26- Safety Injection 2B butt welds SI-179-14" S &Vol 18 5 3 28 DM MOVED TO AUG S1-175-12"

28 & 29- Pressurizer Spray butt welds RC-018-4" S & Vol 13 1 1 7 1 2 14 2 3 29 31- Pressurizer Safeties butt welds RC-001-6" S & Vol 12 1 1 8 RC-003-6" 1 2 17 RC-005-6" 1 3 25

.__*_RC-007-6" 36- Letdown Line (delay coil) butt welds RC-091-16" S & Vol 4 1 3 25 B9.20 LESS THAN NPS 4

  • CIRCUMFERENTIAL WELDS B9.21 OTHER THAN PWR HPSI SYSTEMS 27- Pressurizer Spray 1A butt welds RC-062-3" S 38 9 1 26 DM MOVED TO AUG RC-0 16-3" 28- Pressurizer Spray 1B butt welds RC-017-3" S 36 10 3 26 DM MOVED TO AUG RC-0 18-3" 30- Aux Pressurizer Spray butt welds CH-009-2" S 11 3 2 27 CH-520-2" CH-521-2" 32- Drain Line Loop 1A butt welds RC-060-2" S 5 1 1 20 DM MOVED TO AUG S33- Drain Line Loop 1B butt welds RC-058-2" 5 5 1 2 20 DM MOVED TO AUG 34- Drain Line Loop 2A butt welds RC-096-2" S 5 2 3 40 DM MOVED TO AUG 35- Drain Line Loop 2B butt welds RC-089-2" S 5 2 3 40

_ 36- Letdown Line butt welds RC-091-2" S .70 6 1 8 DM MOVED TO AUG CH-001-2" 6 2 16

., _6 3 25 I L_________ I A. L ______ L A. - A. L

6 3 27 38- Drain Line Loop 1 butt welds RC-070-2" S 1 1 2 100 CIRCUMFERENTIAL WELDS OF B9.22 PWR HPSI SYSTEMS 39- HPSI Long Term Recirculation 1 butt welds SI-248-3" Vol 52 6 2 11 8 3 27 40- HPSI Long Term Recirculation 2 butt welds SI-199-3" Vol 25 3 1 12 4 2 28 BRANCH PIPE CONNECTION B9.30 WELDS B9.31 NPS 4 OR LARGER

  • 9.31 running percent 7 1 1 14 1 3 28 6- RCS Primary Piping Surge branch weld RC-032-42" ID S & Vol 1 SD Cooling 1 branch weld RC-032-42" ID S & Vol 1 SD Cooling 2 branch weld RC-063-42" ID S & Vol 1 SI 1A branch weld RC-034-30" ID S &Vol 1 SI 1B branch weld RC-031-30" ID S & Vol 1 SI 2A branch weld RC-079-30" ID S & Vol 1 SI 2B branch weld RC-093-30" ID S, & Vol 1 B9.32 LESS THAN NPS 4
  • 9.32 running percent 14 1 1 7 1 2 14 2 3 28 6- RCS Primary Piping Drain 1A branch weld RC-033-30" ID S 1" PZR Spray 1A branch weld RC-034-30" ID S 1

Charai na branch weld RC-079-30" ID S 1 Letdown branch weld RC-084-30" ID S 1 21- Shutdown Cooling Loop 1 branch weld RC-051-16" S 2 2" Drain & 3" HPSI 22- Shutdown Cooling Loop 2 branch weld RC-068-16" S 1 3" HPSI 36- Letdown Line branch weld RC-091-16" S 4 B9.40 SOCKET WELDS

  • 9.40 running percent 17 2 1 12 2 2 23 2 3 35 30- Aux PZR Spray socket weld CH-520-2" S 2 CH-521-2" S 2 32- Drain Line Loop 1A socket weld RC-060-2" S 3 33- Drain Line Loop 1 B socket weld RC-058-2" S 3 34- Drain Line Loop 2A socket weld RC-096-2" S 3 35- Drain Line Loop 2B socket weld RC-089-2" S 3 38- Drain Line Loop 1 socket weld RC-070-2" S 1 1 1 1 1 1

PRESSURE VESSELS B10.10 WELDED ATTACHMENTS **Accessible Side 3- Steam Generator 1

  • support skirt 212 S** 1 1 2 100
  • Multiple vessels 4 -Steam Generator 2
  • support skirt 211 S** 1 5- Pressurizer support skirt 79373 S** 1 50 PIPING _

B10.20 WELDED ATTACHMENTS B10.20

  • _ running percent 13 1 1 8 1 3 15 22- Shutdown Cooling 2 attachment SI-1 93-16" S 1 .... .

RC-068-16" S 1 27- PZR Spray 1A attachment RC-062-3" 5 1 28- PZR Spray 1B attachment RC-017-3" S 1 29- Combined PZR Spray attachment RC-18-3" S 1 36- Letdown Line attachment RC-091-16" S 4 37- Charging Line attachment CH-005-3" S 3 140- HPSI Long Term 2 attachment SI-199-3" S 1

B12.20 PUMP CASING .__

16- Reactor Coolant Pump 1A casing 1110-1A VT-3 4 1

  • Exam required when 17- Reactor Coolant Pump 1B casing 1110-11B VT-3 pump is disassembled 18- Reactor Coolant Pump 2A casing 1110-2A VT-3 19- Reactor Coolant Pump 2B casing 1110-2B VT-3 B12.50 VALVE BODY, EXCEEDING NPS 4 16" Borg Warner Gate Valves Utilizing Forged Construction Zone 21 UV-651 RC-051-16" VT-3 4* Exam required when UV-653 S1-240-16" VT-3 valve is disassembled Zone 22 UV-652 RC-068-16" VT-3 UV-654 SI-193-16" VT-3 14" Borg Warner Gate Valves Utilizing Forged Construction Zone 23 UV-634 SI-207-14" VT-3 4* Exam required when Zone 24 UV-644 SI-223-14" VT-3 valve is disassembled Zone 25 UV-614 SI-160-14" VT-3 Zone 26 UV-624 SI-179-14" VT-3 12" Borg Warner Check Valves Utilizing Cast Construction Zone 23 V-542 SI-203-12" VT-3 4 1 Exam required when Zone 24 V-543 $1-221-12" VT-3 valve is disassembled Zone 25 V-540 SI-1 56-12" VT-3 Zone 26 V-541 SI-175-12" VT-3

Zone 23 V-235 SI-207-14" VT-3 8 1 Exam required when V-237 Sl-207-14" VT-3 valve is disassembled Zone 24 V-245 Sl-223-14" VT-3 V-247 SI-223-14" VT-3 Zone 25 V-215 SI-160-14" VT-3 V-217 SI-160-14" VT-3 Zone 26 V-225 SI-179-14" VT-3 V-227 SI-179-14" VT-3 Dresser PSV Utilizing Forged Construction Zone 31 PSV-200 RC-001-6" VT-3 4 1* Exam required when PSV-201 RC-003-6" vm-3 valve is disassembled PSV-202 RC-005-6" VT-3 PSV-203 RC-007-6" VT-3

B13.10 VESSEL INTERIOR At 3 year intervals 1- Reactor Vessel accessible areas 79173 VT-3 1 1 1 100 R17, R19, and R21 2 100 3 100 B13.50 INTERIOR ATTACHMENTS _ __, _

WITHIN BELTLINE REGION 1- Reactor Vessel accessible welds 79173 VT-1 1" 3 100 *RR 44 exam by 2027 B13.60 INTERIOR ATTACHMENTS BEYOND BELTLINE REGION "

1- Reactor Vessel accessible welds 79173 VT-3 1 1* 3 100 *RR 44 exam by 2027 B13.70 CORE SUPPORT STRUCTURE 1- Reactor Vessel accessible areas 79173 VT-3 11 3 100 *RR 44 exam by 2027

4 2 3 R15 I_ I I_ 6 3 8 B14.10 WELDS IN CRD HOUSING _ 32 peripheral 2- Reactor Vessel Lower Housing 66 thru 97 Vol 32 Closure Head CEDM Housings 2- Reactor Vessel Upper Housing 66 thru 97 Vol 32 Closure Head CEDM Housings 2- Reactor Vessel LowerTube 66-91,93-95,97 Vol 32 (C

Closure Head RVLMS 92 and 96 C CEDM Housings ....

o 03

.2- Reactor Vessel UpperTube 66-91,93-95,97 Vol 30 Closure Head CEDM Housings _ _

B15.10 PRESSURE RETAINING Class 1 IWB-5222a VT-2 .... NOTE Pressure Test COMPONENTS Program B15.10OPRESSURE RETAINING Class 1 IWB-5222b VT-2 .. ...... NOTE Pressure Test COMPONENTS ______ __________Program SEXAM CATEGORkY B-Q; STEAM b by2Plarit 2GENERATOR TUBING~ 3/4 > ch Specificatiow, B16.20 STEAM GENERATOR TUBING IN

  • U-TUBE DESIGN

F1.10; CLASS 1 PIPING SUPPORTS ___________ ______________

~2 RESTRAINTS ______ ______ ____

. *- ; A running percent NONE F1.10 CLASSA1 PIPIN{G SUPPORTS______ _____ ______________

___RESTRAINTS ______ ______ ____ ______

  • F-A; B running percent 87 7 1 8 8 2 17 8 3 26 20- Pressurizer Surge Line supports RC-28-12" VT-3 -1 21- Shutdown Cooling 1 supports RC-51-16" VT-3 13 Sl-240-16" 22- Shutdown Cooling supports SI-193-16" VT-3 5 RC-068-16" 23- Safety Injection 1A supports SI-207-14" VT-3 2 24- Safety Injection 1B supports SI-223-14" VT-3 1 25- Safety Injection 2A supports SI-1 56-12" VT-3 1 26- Safety Injection 2B supports SI-179-14" VT-3 2 SI-175-12" 27- Pressurizer Spray 1A supports RC-62-3" VT-3 8 RC-16-3" 28- Pressurizer Spray 1 B supports RC-1 7-3" VT-3 10 RC-1 8-3" RC-1 8-4" 30- Aux Pressurizer Spray supports CH-521-2" VT-3 1 32- Drain Line 1A supports RC-60-2" VT-3 1 33- Drain Line 1 B supports RC-58-2" VT-3 1 36- Letdown Line supports RC-91-2" VT-3 15 CH-001-2" RC-91-16" 37- Charging Line supports CH-5-3" VT-3 16 . .

39- HPSI Long Term Recirculation 1 supports SI-248-3" VT-3 7 40- HPSI Long Term Recirculation 2 supports SI-199-3" VT-3 3

,4 1) 031 4 3 32 20- Pressurizer Surge Line supports RC-28-12" VT-3 3 . '

21- Shutdown Cooling 1 supports SI-240-16" VT-3 2 ,

22- Shutdown Cooling supports RC-68-16" VT-3 2 23- Safety Injection 1A supports SI-207-14" VT-3 1 24- Safety Injection 1B supports SI-223-14" VT-3 2 25- Safety Injection 2A supports SI-160-14" VT-3 1 '

26- Safety Injection 2B supports S1-179-14" VT-3 2 I SI1-175-12" 27- Pressurizer Spray 1A supports RC-62-3" VT-3 3 I 28- Pressurizer Spray 1B supports RC-1 7-3" VT-3 3 _

29- Combined Pressurizer Spray supports RC-18-4" VT-3 3 I 30- Aux Pressurizer Spray supports CH-521-2" VT-3 1 _

37- Charging Line supports CH-5-3" VT-3 11  !

39- HPSI Long Term Recirculation 1 supports SI-248-3" VT-3 3 _

40- HPSI Long Term Recirculation 2 supports SI-199-3" VT-3 1 I

t- 1) rz a I; I 0= IMU IUlUlJl* LAJI IpUI I;I ILo 6 3 100 1 - Reactor Vessel columns 79173 VT-3 4

_ 3 - Steam Generator 1* skirt 212 VT-3 1 *multiple comp 4 - Steam Generator-2* skirt 211 VT-3 1 5 - Pressurizer skirt 79373 VT-3 16- Reactor Coolant Pump 1A** columns 1110-1A VT-3 8 . **multiple comp 17- Reactor Coolant Pump 1B** columns 1110-11B VT-3 8 18- Reactor Coolant Pump 2A** columns 1110-2A VT-3 8 19- Reactor Coolant Pump 2B** columns 1110-2B VT-3 8

~F1.40 SUPPORTS OTHER THAN____ __________

___PIPING: SUPPORTS ~_________ ______________

SECTION 5.0 ASME CLASS 2 EXAMINATION

SUMMARY

34 of 208 31NT-ISI-2 Rev 2

INDEX EXAM CATEGORY C-A Pressure Retaining Welds in Pressure Vessels C-B Pressure Retaining Nozzle Welds in Vessels C-C Welded Attachments for Vessels, Piping, Pumps, and Valves C-D Pressure Retaining Bolting Greater than 2 Inch in Diameter C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping C-G Pressure Retaining Welds in Pumps and Valves C-H All Pressure Retaining-Components F-A Class 2 Supports 35 of 208 31NT-ISI-2 Rev 2

7r 1. m lt ip , Is Ie L 8 2 71 _ multiple vessels 5 3 100 STEAM GENERATORS C1.10 SHELL CIRCUMFERENTIAL WELDS (shell to conical section) 41- Steam Generator 1 welds 212 Vol 2 2 2 42- Steam Generator 2 welds 211 Vol 2 C1.20 HEAD CIRCUMFERENTIAL WELDS (head to shell) 41- Steam Generator 1 welds 212 Vol 1 1 2 42- Steam Generator 2 welds 211 Vol 1 CL) 0 M C1.30 TUBESHEET-TO-SHELL WELDS 41- Steam Generator 1 welds 212 Vol 1 1 2 42- Steam Generator 2 welds 211 Vol 1 REGENERATIVE HEAT EXCHANGER C1.10 SHELL CIRCUMFERENTIAL WELDS 68- Regenerative Heat Exchanger welds 79313 Vol 3 3 C1.20 HEAD CIRCUMFERENTIAL WELDS 68- Regenerative Heat Exchanger welds 79313 Vol 2 2 3 C1.30 TUBESHEET-TO-SHELL WELDS 68- Regenerative Heat Exchanger welds 79313 Vol 4 4 2 LETDOWN HEAT EXCHANGER C1.10 SHELL CIRCUMFERENTIAL WELDS 69- Letdown Heat Exchanger welds N2373 Vol 1_-

C1.30 TUBESHEET-TO-SHELL WELDS . ... ...... ..... .....

69- Letdown Heat Exchanger welds N2373 Vol 1 1" "

SHUTDOWN COOLING HEAT EXCH C1.10 SHELL CIRCUMFERENTIAL WELDS "___"_.

_(shell to flange) 84- SDCHX A welds S-18343 Vol 1 1 1 87- SDCHX B welds S-18344 Vol 1 ....

C1.30 TUBESHEET-TO-SHELL WELDS

_84- SDCHXA welds S-18343 Vol 1 1

_187- SDCHX B welds S-18344 Vol 1

C2.20 NOZZLES WITHOUT REINFORCING PLATE IN VESSELS >1/2 IN.

NOMINAL THICKNESS C2.21 NOZZLE-TO-SHELL (NOZZLE TO HEAD OR NOZZLE TO NOZZLE)

WELD _

  • C2.21 running percent 20** 2 .1 20 ** 20 Total, 10 REQ'D 4 2 60 multiple vessels 4 3 100 41- Steam Generator 1 welds 212 S & Vol 8 4 2 42- Steam Generator 2 welds 211 S & Vol 8 4 3 00 co) 84- SDCHX A welds S-18343 S & Vol 2 1 1 co N,

0 87- SDCHX B welds S-18344 S & Vol 2 1 1 C2.22 NOZZLE INSIDE RADIUS SECTION_

  • C2.22 running percent 12** 2 1 33 12 Total, 6 REQ'D 2 2 67 multiple vessels 2 3 100 41- Steam Generator 1 welds 212 Vol 4 2 2 42- Steam Generator 2 welds 211 Vol 4 2 3 84- SDCHX A welds S-18343 Vol 2 1 1 87- SDCHX B welds S-18344 Vol 2 1

- r-r3- ,,,OU .%'-VA C H M ENrL-O

  • C3.10 running percent - - 6** 1 1 25 **6 Total; 4 REQD 1 2 50 Multiple Vessels 2 3 100 Multiple Vessels 41- Steam Generator 1 lugs 212 S 2 1 1

_1 2 42- Steam Generator 2 lugs 211 S 2 68- Regenerative Heat Exchanger supports 79313 S 2 2 3 PIPING -_

C3.20 WELDED ATTACHMENTS "

__ I___________ I____ I _____ t~I ___ I ___ I____ I__ I______

_ 59- Aux Feed S/G 2 attachment SG-01 1 S 2 62- Auxiliary Feedwater SG 1 attachment AF-018 S 1 63- Auxiliary Feedwater SG 1 attachment AF-016 S 1 ....

64- Blowdown SG 1 attachment SG-039 S 7 1 2 SG-053 _ _

65- Blowdown SG 2 attachment SG-048 S 7 2 2 "

  • SG-052 70- LPSI Pump Room A Suction attachment SI-067 S 3 I SI-241 0

0 SI-307 00 71- LPSI Pump Room A Discharge attachment SI-078 S 4

_SI-087 73- LPSI Pump Room B Suction attachment SI-034 5 2 SI-308 74- LPSI Pump Room B Discharge attachment SI-129 S 3 76- CS Pump Room A Suction attachment SI-009 S 2 SI-067 i77- CS Pump Room A Discharge attachment SI-079 5 6 2 3 SI-082 79- CS Pump Room B Suction attachment SI-033 S 1 SI-034 80- CS Pump Room B Discharge attachment SI-119 S 4 82- SDCHX Room A attachment SI-078 S 3

83- SDCHX Room B attachment SI-070 S 11 2 1 SI-082 SI-087 SI-089 SI-090 85- SDCFIX Room B attachment S1-119 S 6 1 2 SI-123 86- SDCHX Room B attachment SI-072 S 12 2 3 SI-129 SI-134 SI-135 88- East Wrap attachment SI-072 S. 4 SI-073 89- East Wrap attachment S1--173 S3 SI-194 90- East Wrap. attachment SI-134 S1 91- West Wrap attachment SI-070 S4 92- West Wrap attachment SI-002 4S SI-239 SI-241 93- West Wrap attachment SI-089 S 1 94- A Train Pipe Chase & 88' attachment SI-070 S 9 12 "

SI-089 SI-241 95- B Train Pipe Chase & 88' attachment SI-072 S 913 SI-134

S1-194 96- Containment LPSI to 1A attachment SI-202 S 1 97- Containment LPSI to 1B attachment SI-220 S 5 98- Containment LPSI to 2A attachment SI-155 S 2 99- Containment LPSI to 2B attachment SI-174 S 3 1 2 100- Containment LPSI A Suction attachment SI-007 S 2 SI-369 101- Containment LPSI B Suction attachment SI-030 S 3 SI-194 SI-368 102- SI Pump Suction A attachment SI-008 S 12 1 1 SI-009 SI-307 103- Refueling Water Suction A attachment CH-142 S 9 1 2 CH-424 104- SI Pump Suction B attachment SI-031 S 10 1 2

,_ SI-033 1 3 SI-308 105- Refueling Water Suction B attachment CH-149 S 15 3 3 CH-425 106- HPSI Room Discharge A attachment SI-099 S 20 2 1 SI-100 S1-105 SI-106 107- HPSI Room Discharge B attachment SI-107 S 14 32 .....

I SI-112

108- HPSI 88' Pipechase attachment SI- 00 S 14 2 23 3 S1-118 I II

_109- HPSI 88' Pipechase attachment SI-107 S 9 1 1 110- HPSI Discharge West Wrap attachment SI-103 S 6 1 2 SI-107 SI-218 SI-236 111- HPSI Discharge West Wrap attachment SI-100 S 3 112- HPSI Discharge East Wrap attachment SI-100 S 4 S1-101 SI-102 SI-176 113- HPSI Discharge attachment SI-107 S 4 SI-157 SI-176 118- HPSI Long Term attachment SI-106 S 18 3 3 119- HPSI Long Term attachment SI-114 S 12 2 1

+ I. t I I I

.3. A. .3. .3. - - I A. 3 -

PUMPS_

C3.30 WELDED ATTACHMENTS

  • C3.30 running percent 20** 2 2 10 **20 Total, 10 REQ'D Multiple Vessels 72- LPSI Pump A lugs 0876-40 S 3 75- LPSI Pump B lugs 0876-41 S 3 78- Containment Spray A lugs 0876-42 S 3 81- Containment Spray B lugs 0876-43 S 3 116- HPSI A lugs 0776-16 S 4 117- HPSI B lugs 0776-17 S 4 1 2

4 4 4 - 9 1 t 9 PU MPS C4.30 BOLTS AND STUDS 116- HPSI A 16 studs 0776-14 VOL 1 117- HPSI B 16 studs 0776-15 VOL 1 VALVES C4.40 BOLTS AND STUDS 47- Main Steam SG 1 West 20 studs UV-170 VOL 1 1 1 48- Main Steam SG 1 East 20 studs UV-180 VOL 1 1 2 49- Main Steam SG 2 East 20 studs UV-171 VOL 1 50- Main Steam SG 2 West 20 studs UV-181 VOL 1 56- Feedwater SG No. 1 20 studs UV-132 VOL 1 1 3 UV-174 1 57- Feedwater SG No. 2 20 studs UV-137 VOL 1 "

UV-177 1

I"IP'INIU VVIrLUO -f ,010 IN* INIUIVIII*It WALL THICKNESS FOR PIPING C5.10 >NPS 4 C5.11 CIRCUMFERENTIAL WELD

  • C5.11 running percent 7 517 22 1 2 *1101 WELDS USED 25 2 4 FOR % DUE TO C-F-1 42 3 8 See note 2 in code 54- Feedwater SG No. 1 Butt Welds SG-2-14" S & Vol 10 2 2 _

SG-13-14" 55- Feedwater SG No. 2 Butt Welds SG-5-14" S & Vol 10 1 3 SG-14-14" 58-Aux Feed S/G 1 6" x 0.562" AF-004 S & Vol 19 4 1 6" x 0.432" SG-008 8" x 0.500 SG-008 59-Aux Feed S/G 2 6" x 0.562" AF-006 S &Vol 27 4 2 6" x 0.432" SG-01 1 8" x 0.500 SG-01 1 62-Aux Feed S/G 1 6" x 0.562" AF-004 S & Vol 20 3 3 AF-018 63-Aux Feed S/G 2 6" x 0.562" AF-006 S & Vol 16 4 1 AF-016 70-LPSI Pump Room A Suction 20" x 0.375 SI-307 S & Vol 20 4 1 73-LPSI Pump Room B Suction SI-308 _

82 & 85 SDC Heat Exch 20" x 0.500" SI-078 S & Vol 8 2 2 Room A & B SI-123 I I

___ I_________________ i_______ I________ I ____ V I ____ I______ I ___ V

16" x 0.375" SI-70 SI-72

_ ___ 20" x 0.500" SI-70 SI-72 88 & 91 Safety Injection 12" x 0.375" SI-72 S & Vol 77 12 3

__ East and West Wraps SI-73 .

SI-70 SI-71 12" x 1.125" SI-155 SI-174 SI-72 SI-73 SI-70 SI-71 SI-202 SI-220 20" x 0.500" SI-72 SI-70 90 & 93 Safety Injection 24" x 0.375" SI-30 S & Vol 102 East and West Wraps SI-7 24" x 0.562" SI-308 SI-307 94 & 95 Safety Injection A & B 20" x 0.500 SI-70 S & Vol 15 41 SI-72 1 2

SI-155 S1-174

'12" x 1.312" SI-202

_ _SI-220

__ SI-155

__ SI-174

'100 & 101 Containment LPSI 16" x 1.594 SI-241 S & Vol 8 1 2

, Loop A & B, Suction SI-194 I 24" x 0.375 SI-7

_ _SI-30 102-Safety Injection A Suction 24" x 0.562" SI-307 S & Vol 18 4 1 20" x 0.375" SI-307 103-Refueling Water Tank Suction A 20" x 0.375" CH-424 S & Vol 33 6 2 20" x 0.375" CH-142 I104-Safety Injection B Suction 24" x 0.562" SI-308 S & Vol 19 4 3 20" x 0.375" SI-308

_ 105-Refueling Water Tank B Suction 20" x 0.375" CH-425 S & Vol 46 7 3 - - i

, 20" x 0.375" CH-149

-1A 1) r-18 3 8 104 SI B Train Suction 3" X 0.216" CH-150 S &Vol 4 1 3 106 & 107 HPSI Room Discharge 4" x 0.438" SI-100 S & Vol 137 10 1 A and B 4".x 0.337" SI-99 SI-107 3" x 0.438" SI-106 SI-107 2" x 0.344" SI-105 SI-112 108 & 109 HPSI 88' Pipechase 4" x 0.438" Si-100 S & Vol 86 7 2 2"x 0344" SI-118 4" x 0.377" SI-107 110& 111 HPSI Discharge 4" x 0.337" SI-107 S&Vol 106 8 3 West Wrap 4" x 0.438" SI-218 S1-100 SI-236 3" x 0.438" SI-218 SI-236 2" x 0.344" SI-103 SI-107 S1-110 SI-218 SI-236 S1-100

S1-176 4 I I I I I I SI-157 3" x 0.438" S1-176 SI-157 2" x 0.344" S1-1011 S1-102 S1-108 S1-109 SI-157 SI-176 114 & 115 HPSI Header 3" x 0.438" SI-218 S & Vol 44 3 2 Loop 1A, 1B, 2A & 2B SI-236 SI-157 0

S1-176 0

0 118 & 119 HPSI Long Term 3" x 0.438" SI-106 S & Vol 106 9 3

_S SI-114 2" x 0.344" SI-319 05.30 SOCKET WELDS

,106 & 107 HPSI Room Discharge 2" x 0.344" S1-105 S 3 1 3 17

, Aand B SI-112 S 3

rI rL E l'L- ' ll l JI, Ill l- I I C5.40 BRANCH PIPING > NPS 2 C5.41 CIRCUMFERENTIAL _ _

  • C5.41 running percent - 27 1 1 4 1 2 7 1 3 11 82 & 85 SoC Heat Exch 20" x 10" SI-78 S 2 1 1 -

Room A & B SI-123 S 2 . ...

83 & 86 SDC Heat Exch 20" x 6" SI-70 S 4 1 3 Room A & B 20" x 10" SI-72 S 4 20" x 14" 88 & 91 Safety Injection 20" x 12" SI-70 S 1 East and West Wraps SI-72 S 1 89 & 92 SDC Suction 18" x 12" SI-194 S 1 East and West Wraps SI-241 S 1 96, 97, 98, 99 Containment LPSI 12" x 3" SI-202 S 1 1 2 Loop 1A, 1B, 2A & 2B SI-220 S 1 S1-155 S 1 SI-174 S 1 102-Safety Injection A Suction 24" x 10" SI-307 S 3 24" x 18"

___24" x 20" 104-Safety Injection B Suction 24" x 10" SI-308 S 4 24" x 18" 24" x 20" 24" x 3"

Fi'IHNU VV-LU:5 > 3/d IN NUMINt WALL THICKNESS FOR PIPING C5.50 >NPS 4 C5.51 CIRCUMFERENTIAL WELD

  • C5.51 running percent - 345 9 1 2 10 2 5 16 3 8 43- Main Steam SG 1 East Butt Welds SG-36-28" S & Vol 19 2 1 SG-36-32" 44- Main Steam SG 1 West Butt Welds SG-33-28" S & Vol 21 2 2 SG-33-32" 45- Main Steam SG 2 East Butt Welds SG-42-28" S & Vol 19 2 3 SG-42-32" 46- Main Steam SG 2 West Butt Welds SG-45-28" S & Vol 21 2 1 SG-45-32" 1 3 47- Main Steam SG 1 West Butt Welds S & Vol **

48- Main Steam SG 1 East Butt Welds ** S & Vol **

49- Main Steam SG 2 East Butt Welds ** S & Vol **

50- Main Steam SG 2 West Butt Welds ** S & Vol **

51- Atmospheric Dump No. 1 Butt Welds ** S & Vol **

52- Atmospheric Dump No. 2 Butt Welds ** S & Vol **

53- Steam to Aux Feedwater Butt Welds ** S & Vol **

SG-2-16" 1 4 4 4 4. I I 1 .1 .4 SG-2-14" 4. 4 4 I SG-13-16" 1 4 4 4 4. 1 1 1 4 4 SG-13-14" 4. 4. I I r 55- Feedwater SG No. 2 Butt Welds SG-5-24" S &Vol 32 5 1

__SG-5-16" 2 3 SG-5-14" SG-14-16" SG-14-14" 56- Feedwater SG No. 1 Butt Welds SG-201-24" S & Vol **

SG-202-24" 57- Feedwater SG No. 2 Butt Welds SG-204-24" S & Vol **

SG-205-24" 58- Aux & Downcomer FW SG 1 Butt Welds SG-8-6" S & Vol 23 2 2 SG-8-8" 59- Aux & Downcomer FW SG 2 Butt Welds SG-1 1-6" S & Vol 18 2 3 SG-1 1-8" 60- Downcomer Feedwater SG 1 Butt Welds SG-200-8" S & Vol **

SG-008-8" 61- Downcomer Feedwater SG 2 Butt Welds SG-203-8" S & Vol **

SG-1_1-8" 64- Blowdown SG 1 Butt Welds SG-39-6" S & Vol 75 6 2 SG-53-6" SG-522-6" 65- Blowdown SG 2 Butt Welds SG-48-6" S & Vol 85 5 3 SG-52-6" SG-523-6"

67- Blowdown SG 2 Butt Welds SG 6" S & Vol **

PIPE BRANCH CONNECTIONS OF ** Note exam items are in C5.80 BRANCH PIPING > NPS 2 Aug Summary C5.81 CIRCUMFERENTIAL 47- Main Steam SG 1 West 28" x 12" SG-206-28" S **

28" x 6" 48- Main Steam SG 1 East 28" x 12" SG-207-28" S 28" x 6" 49- Main Steam SG 2 East 28" x 12" SG-208-28" S **

28" x 6" 50- Main Steam SG 2 West 28" x 12" SG-209-28" S **

28" x 6"

t 1 1 1 116 & 117 HPSI PUMP casing inlet nozzle S 2 2 * *BY THE END OF THE Loop A &B outlet nozzle S 2 INTERVAL VALVES C6.20 VALVE BODY WELDS 47- Main Steam SG 1 West 6"xl0" PSV-572 S 5 1 .... EXAMINE 1 VALVE PSV-573 ._ BY THE END OF THE PSV-574 INTERVAL PSV-575 PSV-692 48- Main Steam SG 1 East 6"x10" PSV-576 S 5 PSV-577 PSV-578 PSV-579 PSV-691 49- Main Steam SG 2 East 6"x10" PSV-554 S 5 PSV-555 PSV-556 PSV-557 PSV-695

PSV-560 PSV-561 PSV-694 __

83 & 86 SDC Heat Exch 6" Gate V-460 S 2 1 ....

Room A & B V-464 89 & 92 SDC Suction 16" Gate UV-655 S 2 1 ....

East and West Wraps UV-656 106 & 107 HPSI Room Discharge 4" Gate V-476 S 4 1 ** **

A and B HV-698 V-478 HV-699 106 & 107 HPSI Room Discharge 4" Check V-404 S 2 1 A and B V-405 EXAM CATEGORY C-H; ALL PRESSURE RETAINING COMP~ONENTS I I PRESSURE RETAINING NOTE Pressure Test C7.10 COMPONENTS Class 2 IWC-5222 VT-2 .... Program

83- SDCHX Room A supports SI-87 VT-3 1 1 2 106- HPSI Room Discharge A supports SI-100 VT-3 1 107- HPSI Room Discharge B supports SI-107 VT-3 1

,F1.20, CLA$S'S2 PIPING SUPPORTS,~___ ____ ______

1 R~ESTRAINTS_______ _____________

__  :*F-A; B running percentq 420 18 1 4 23 2 10 30 3 16 43- Main Steam SG 1 East supports SG-36 VT-3 2 1 1 44- Main Steam SG 1 West supports SG-33 VT-3 1 45- Main Steam SG 2 East supports SG-42 VT-3 2 1 3 46- Main Steam SG 2 West supports SG-45 VT-3 1L 54- Feedwater SG No. 1 supports SG-002 VT-3 5 1 1 55- Feedwater SG No. 2 supports SG-005 VT-3 5 1 1 58- Aux & Downcomer FW SG 1 supports SG-8 VT-3 5 1 2 59- Aux & Downcomer FW SG 2 supports SG-1 1 VT-3 6 1 2 62- Auxiliary Feedwater SG 1 supports AF-018 VT-3 1 1 1 i63- Auxiliary Feedwater SG 2 supports AF-006 VT-3 3

64- Blowdown SG 1 supports SG-39 VT-3 11 1 1 SG-53 VT-3 1 2 65- Blowdown SG 2 supports SG-48 VT-3 12 3 2 SG-52 VT-3 70- LPSI Pump Room A Suction supports SI-067 VT-3 3 SI-241 SI-307 71- LPSI Pump Room A Discharge supports SI-87 VT-3 5 2 3 SI-78 73- LPSI Pump Room B Suction supports SI-034 VT-3 3 SI-308 74- LPSI Pump Room B Discharge supports SI-129 VT-3 3 1 3 76- CS Pump Room A Suction supports SI-9 VT-3 4 SI-67 _

77- CS Pump Room A Discharge supports SI-79 VT-3 8 2 3 SI-82 79- CS Pump Room B Suction supports SI-033 VT-3 3 3 3 SI-034

  • 80- CS Pump Room B Discharge supports SI-119 VT-3 5 1 2 82- SDCHX Room A supports SI-78 VT-3 2 Sl-79

_ 83- SDCHX Room A supports SI-70 VT-3 13 1 1 SI-82 VT-3 SI-87 VT-3 SI-89 VT-3

85- SDCHX Room B supports SI-119 VT-3 8 1 2 S1-123 86- SDCHX Room B supports SI-72 VT-3 10 2 3 SI-129 VT-3 SI-134 VT-3 SI-135 VT-3 SI-147 VT-3 88- East Wrap supports SI-72 VT-3 5 SI-73 VT-3 89- East Wrap supports SI-38 VT-3 4 1 1 SI-173 VT-3 SI-194 VT-3 90- East Wrap supports SI-130 VT-3 3 SI-134 91- West Wrap supports SI-70 VT-3 7 1 SI-71 VT-3 92- West Wrap supports SI-2 VT-3 5 1 SI-241 VT-3 93- West Wrap supports SI-89 VT-3 3 1 1 94- A Train Pipe Chase & 88' supports SI-70 VT-3 14 2 2 SI-89 VT-3 SI-241 VT-3 95- B Train Pipe Chase & 88' supports SI-194 VT-3 14 3 3 SI-72 VT-3 SI-134 VT-3 196- Containment LPSI to 1A supports SI-202 VT-3 10 1 2

97- Containment LPSI to 1B supports SI-220 VT-3 16 4 2 98- Containment LPSI to 2A supports SI-155 VT-3 4 99- Containment LPSI to 2B supports SI-174 VT-3 5 100- Containment LPSI A Suction supports SI-7 VT-3 2 SI-369 VT-3 101- Containment LPSI B Suction supports SI-30 VT-3 4 SI-194 VT-3 SI-368 VT-3 102- SI Pump Suction A supports SI-8 VT-3 .14 2 1 SI-9 VT-3 SI-307 VT-3 103- Refueling Water Suction A supports CH-142 VT-3 14 2 2 CH-424 VT-3 104- SI Pump Suction B supports SI-31 VT-3 12 1 2 SI-33 VT-3 1 3 SI-308 VT-3 105- Refueling Water Suction B supports CH-149 VT-3 19 6 3 CH-425 VT-3 106- HPSI Room Discharge A supports SI-100 VT-3 18 2 1 S1-105 S1-106 1107- HPSI Room Discharge B supports SI-107 VT-3 14 3 2 S1-112 108- HPSI 88' Pipechase supports SI-100 VT-3 16 4 3 SI-118

i110- HPSI Discharge West Wrap supports SI-103 VT-3 13 1 2 S1-107 S1-110 SI-218 SI-236 111 - HPSI Discharge West Wrap supports S1-100 VT-3 6 1 3-SI-236 112- HPSI Discharge East Wrap supports S1-100 VT-3 1013 S1-101 SI-102 S1-176 113- HPSI Discharge supports S1-107 VT-3 1011 SI-108 S1-109 SI-157 SI-176 11__4 HPSI Header supports_ SI-218 VT-3 2 1 2 Loop 1A & 1B SI-236 115 HPSI Header supports SI-157 VT-3 2

  • Loop 2A & 2B SI-176 118 - HPSI Long Term supports SI-106 VT-3 22 3 3 119 - HPSI Long Term supports SI-114 VT-3 19 2 1 SI-319 I -- J -- I - - A. I - A. - .5.

44 .4"'*

_ 10 3 17 43- Main Steam SG 1 East supports SG-36 VT-3 1 44- Main Steam SG 1 West supports SG-33 VT-3 2 45- Main Steam SG 2 East supports SG-42 VT-3 1 46- Main Steam SG 2 West supports SG-45 VT-3 2 47- Main Steam SG 1 West supports SG-206 VT-3 1 00 48- Main Steam SG 1 East supports SG-207 VT-3 1 49- Main Steam SG 2 East supports SG-208 VT-3 1 50- Main Steam SG 2 West supports SG-209 VT-3 1 51- Atmospheric Dump No. 1 supports SG-59 VT-3 2 SG-70 52- Atmospheric Dump No. 2 supports SG-84 VT-3 2 SG-103 54- Feedwater SG No. 1 supports SG-002 VT-3 9 2 1 SG-013 VT-3 55- Feedwater SG No. 2 supports SG-005 VT-3 10 1 1 SG-014 56- Feedwater SG No. 1 supports SG-202 VT-3 1

!57- Feedwater SG No. 2 supports SG-205 VT-3 1

58- Aux &Downcomer FW SG 1 supports SG-8 VT-3 11 2 .3 AF-4 VT-3 59- Aux & Downcomer FW SG 2 supports SG-1 1 VT-3 11 2 2 AF-6 VT 60- Downcomer Feedwater SG I supports SG-200 VT-3 2 61- Downcomer Feedwater SG 2 supports SG-203 VT-3 2 1 3 62- Auxiliary Feedwater SG 1 supports AF-018 VT-3 2 2 2 AF-4 VT-3 63- Auxiliary Feedwater SG 2 supports AF-006 VT-3 2 64- Blowdown SG 1 supports SG-39 VT-3 6 1 1 1 2 165- Blowdown SG 2 supports SG-48 VT-3 5 2 2 71- LPSI Pump Room A Discharge supports SI-78 VT-3 1 74- LPSI Pump Room B Discharge supports SI-129 VT-3 3 1 3 77- CS Pump Room A Discharge supports SI-79 VT-3 2 79- CS Pump Room B Suction supports SI-034 VT-3 1 80- CS Pump Room B Discharge supports S1-119 VT-3 5 1 2 SI-147 82- SDCHX Room A supports SI-78 VT-3 1 83- SDCHX Room A supports SI-70 VT-3 5 1 1 SI-87 VT-3 SI-90 VT-3

tb- 'SUUHX Koomb supports 51-11 V I___:

I-. 2 S1-123

  • 86- SDCHX Room B supports SI-72 VT-3 15 2 3 SI-129 S_-134 SI-135 88- East Wrap supports SI-72 VT-3 9 1 3 SI-73 89- East Wrap supports SI-194 VT-3 1 91- West Wrap supports SI-70 VT-3 3 SI-71 C~)

92- West Wrap supports SI-239 VT-3 4 1 1 0

00 SI-241 VT-3 93- West Wrap supports SI-89 VT-3 1 94- A Train Pipe Chase & 88' supports SI-89 VT-3 1 95- B Train Pipe Chase & 88' supports SI-72 VT-3 4 1. 3 S1-194 96- Containment LPSI to 1A supports SI-202 VT-3 1 97- Containment LPSI to 1B supports SI-220 VT-3 2

_ 99- Containment LPSI to 2B supports SI-174 VT-3 2 1 2 1 3 100- Containment LPSI A Suction supports SI-241 VT-3 1 101- Containment LPSI B Suction supports S1-i94 VT-3 1" 102- SI Pump Suction A supports SI-307 VT-3 2 1

104- Sl Pump Suction B supports SI-308 VT-3 1 1 2 106- HPSI Room Discharge A supports SI-99 VT-3 3 1 1 S1-100 107- HPSI Room Discharge B supports Si-i07 VT-3 3 1 2 108- HPSI 88' Pipechase supports SI-100 VT-3 2 SI-118 109- HPSI 88' Pipechase supports Si-i07 VT-3 3 .

110- HPSI Discharge West Wrap supports Si-107 VT-3 4 1 3 SI-218 111- HPSI Discharge West Wrap supports SI-236 VT-3 1 113- HPSI Discharge supports SI-157 VT-3 1 118 - HPSI Long Term supports SI-106 VT-3 2 119 - HPSI Long Term supports SI-114 VT-3 4 1 1 SI-319 120- Containment Spray A supports SI-88 VT-3 2 1121- Containment Spray B supports SI-130 VT-3 2 "

5 2 58 IMultiple Items 5 3 100 68- Regenerative Heat Exchanger supports 79313 VT-3 2 2 3

_72- LPSI Pump A supports 0876-41 VT-3 3 3 2 75- LPSI Pump B supports 0876-42 VT-3 3 78- CS Pump A supports 0876-43 VT-3 3 81- CS Pump B supports 0876-44 VT-3 3 3 3 116- HPSI Pump A supports 0776-16 VT-3 4 2 1 117- HPSI Pump B supports 0776-17 VT-3 4 2 2

'171.0 SUPPORTS OTHER THAN ______ ___ ________ __________

PIPING SUPPORTS ______ ______ ____ __ ______

__ .1____________ I____ I _____ j ___ I___ I. ___ I____ i __ I ______

SECTION 6.0 ASME CLASS 3 EXAMINATION

SUMMARY

67 of 208 31NT-ISI-2 Rev 2

INDEX EXAM CATEGORY D-A Welded Attachments for Vessels, Piping, Pumps and Valves D-B All Pressure Retaining Components F-A Class 3 Supports 68 of 208 31NT-ISI-2 Rev 2

Pressure Vessels

  • D1.10 Welded Attachments ... ... ..
    • D1.10; running percent - - - 22** 3 1 33 10 req'd due to S- I _3 2 66 multiple comp

' __3 3 100 DF System attachments DFA-T02 VT-1 2 2. 1 .. .. ..

DFB-T02 . __

' DG System attachments DGA-E04 VT-1 8 1 1, DGA-E05 2 2 DGB-E04 . ....

-_ _ _ _ _ _ __ _ _ DG B -E 0 5 . .. .. .... .. . ...

DGA-XO1B A....

____ _______ _ ______ D GA-XO 1 B_ _ ___ _ _ _ _ _

_ _ _ _ _ _ __ _DGB-XO1A _ .

____ _DGB-XO1B B

_ EC System attachments ECA-E-1 VT-1 4 1 3 .. . . ......

ECA-T-1 .... .. . .... . .

____ ________ __ _ ____ ____ ECB-E-1_ _ _ _ _ _ _ __ _ _ _ _ _ _ _

IECB-T _ . ....

" _ -EWSystem attachments EWA-EO1 VT-1 4 1 1 . .....

____EW A-TO1 1 3 .. . ....

_____ _____ EWB-EO1 _ _ _ ___ _ _ _ _ _ _ _

_____ _____ EWB-TO 1 _ _ _ _ _ __ _ _ _ _ _ _ _

'_" PC System attachments PCA-E1 VT-i 2 1 2 PCB-E1 .......

,SI System, attachments SIA-EO1 VT-1 2 1 3g ..........

S IB-EOi 1 . _ .. . . ... . . .. . . .. . .. . . .

  • DI.20; runninq percent 240 11 1 5 2 n e 11 1 11 3 14 AF System attachments piping VT-1 9 1 1 .

CT System attachments piping VT-i 3 1 1 " ....

DG System attachments piping VT-1 10 2 3 EC System attachments piping VT-1 14 1 3 .....

EW System attachments piping VT-1 37 4 1 " -

2 2 NC System attachments piping VT-1 19 2 1 1 3 PC System attachments piping VT-1 13 1 1 SG System attachments piping VT-1 4 1 1 1 2 SI System attachments piping VT-1 2 1 1 SP System attachments piping VT-1 129 8 2

  • 1 7 3

Program EXAM CATEGORY F-A; SUPPORTS ______ ________ __________

F1.30) CLASS 3 PIPING SUPPORTS __________ ______________ _________________

B-MULTIDIRECTIONAL RESTRAINTS ____________________ _______

___ **F-A;,B running percent - -,- 297 16 1 5 11 2 9 17 3 14 I AF System supports piping VT-3 18 2 1 _

_1 2 4 3 CT System supports piping VT-3 3 1 1 ',

co_

0 DG System supports piping VT-3 8 2 3 ,

EC System supports piping VT-3 16 2 3 ',

EW System supports piping VT-3 67 6 1 ,

2 2 NC System supports piping VT-3 35 4 1 . -_ . .

_ _ _ 2 3 _ _

PC System supports piping VT-3 17 1 1 . . .

SG System supports piping VT-3 4 1 1 - I

___ _ _ _ ~1 2_ _ _ _ _ _

SI System supports piping VT-3 4 1 1 SP System supports piping VT-3 125 7 2

_ __ __ __ __ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 7 3 _ _ _ _ _ _

1) e) 4

_ 4 3 28 AF System supports piping VT-3 10 1 1 1 2 DG System supports piping VT-3 4 1 3 EC System supports piping VT-3 2 1 3 EW System supports piping VT-3 9 2 1 NC System supports piping VT-3 1 1 1 PC System supports piping VT-3 13 2 1 .

2 3 SG System supports piping VT-3 7 2 2 .. ..

Sl System supports piping VT-3 1 1 2 SP System supports piping VT-3 9 1 1 _

_1 2

4 3 100 DF System supports DFA-T02 VT-3 2 1 1 DFB-T02 DG System supports DGA-E04 VT-3 8 1 1 DGB-E04 1 2 DGA-E05 1 3 DGB-E05 DGA-XO1A DGA-XO1B DGB-XO1A DGB-XO1B EC System attachments ECA-E-1 VT-3 4 1 1 ECB-E-1 1 2 ECA-T-1 ECB-T-1 EW System attachments EWA-EO1 VT-3 4 2 3 _ ..

EWB-EO1 EWA-TO1 EWB-TO1 PC System attachments PCA-E1 VT-3 2 1 2 PCB-E1 SI System attachments SIA-EO1 VT-3 2 1 3 SIB-Eo1

SECTION 7.0 AUGMENTED EXAMINATION

SUMMARY

74 of 208 31NT-ISI-2 Rev 2

INDEX EXAM CATEGORY N-722-1 PWR Components Containing Alloy 600/82/182 N-729-1 PWR Reactor Vessel Upper Head N-770-1 PWR Pressure Retaining Dissimilar Metal Piping and Vessel Nozzle Butt Welds containing Alloy 82/182 B-J Pressure Retaining Welds in Piping B-G-1 Pressure Retaining Bolting, Greater Than 2 Inches in Diameter B-G-2 Pressure Retaining Bolting, 2 Inches and Less in Diameter B-P All Pressure Retaining Components C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED HIGH ENERGY C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED FLYWHEEL NA Reactor Coolant Pump Flywheel Examinations 75 of 208 31NT-ISI-2 Rev 2

RPV bottom moui B15.80 1-Reactor Vessel ICI Penetrations 78173 VE 61 61 *

  • Required R16, R18, 2STEAM GENERATORJ__ ____ __

B15.135 3- Cold leg instrument connections Penetrations 224 VE 4 4 2 ***Each Interval 4- Cold leg instrument connections Penetrations 225 VE 4 4 2 _

R20

"*P"RESSU QR:ZER . ::::::::::__:_:_____:____"_"__...

B15.140 5- Heater Penetrations Penetrations 78373 VE 36 36 ... **Each RFO B15.180 5- Instrument Connections Instruments 78373 VE 7 7 **

PIPI~NG -

6- Hot Leg Instrument Connections Instruments RCS VE 27 27 **

B15.205 Cold leg instrument connections 6- RCP Pressure Taps Instrument RCP VE 4 4 1 25 6- Cold Leg Instrumentation Instrument RCs VE 12 6 2 63 6 3 100

%aUI~U IV JUII PIJIl '.,CILII'. I_

23- Safety Injection 1A butt welds SI-207-14" VE 1 1 ...... VE inconjunction with N-770-1 VOL 24- Safety Injection 1B butt welds Sl-223-14" VE 1 1 ***

25- Safety Injection-2A butt welds SI-160-14" VE 1 1 *** _

26- Safety Injection 2B butt welds S1-179-14" VE 1 1 *** _ .

27- Pzr Spray 1A butt welds RC-062-3" VE 1 1 ***

28- Pzr Spray 1B butt welds RC-01 7-3" VE 1 1 ......

32- Drain Line Loop 1A butt welds RC-060-2" VE 1 1 ......

--4 o 33- Drain Line Loop 1B butt welds RC-058-2" VE 1 1 ......

0o 34- Drain Line Loop 2A butt welds RC-096-2" VE 1 1 ***

36- Letdown Line butt welds RC-091-2" VE 1 1 ***

37- Charging Line butt welds CH-005-3" VE 1 1 ***

- .5. I -- & I

II-<AL I UIK VttI-i1LL UI-'I* HI-AU .. .. _ _

Head with nozzles and partial-penetration welds of PWSCC-resistant B4.30 materials _

2-Closure Head CEDM Penetrations Head Surface N05065-CHA-01 VE 97 97 * *R15 (Head Replaced)

REQUIRED R18, R21 2-Closure Head Vent Penetration Vent Nozzle N05065-CHA-01 YE 1 1 * *R15 (Head Replaced)

_REQUIRED R18, R21 Nozzles and partial-penetration welds of B4.40 PWSCC-resistant materials in head 2-Closure Head CEDM Nozzles & J-Weld CEDM Nozzle N05065-CHA-01 S or Vol 97 97

  • 100
  • not to exceed 2020 00 2-Closure Head Vent Nozzle & J-Weld Vent Nozzle N05065-CHA-01 S or Vol 1 1 *
  • not to exceed 2020

NOMINAL PIPE SIZE > 4 INCH Mitigated with FSWO NOZZLE TO SAFEEND BUTT WELDS During R13; 1st ISI R15 29- Spray butt welds RC-18-4" Vol 6 1 2 14 20- Surge butt welds RC-028-12" Vol 1 3 28 31- Safeties (4) butt welds RC-001-6" Vol _

RC-003-6" Vol RC-005-6" Vol RC-007-6" Vol NPS 4 OR LARGER Mitigated with FSWO

  • CIRCUMFERENTIAL WELDS _ _ __ __During R13; 1st ISI R15 20- Pressurizer Surge Line butt welds RC-028-12" Vol 1 3 33 21- Shutdown Cooling Loop 1 butt welds RC-051-16" Vol

.22- Shutdown Cooling Loop 2 butt welds RC-068-16" Vol

_ _. I _ _ _ _ _ _ I _ _ _ I _ I_ _ I_ . I _ _ I. __ I _ _ I _ _ _

IIN2-IF LA Safety I i I Lie ViL 1 Examined R15, 1 100 REQUIRED R19 23- Safety Inlection 1A butt welds SI-207-14" VE & Vol 1 Examined R15, 24- Safety Injection l B butt welds SI-223-14" VE & Vol 1 1 100 REQUIRED R19 Examined R15, 25- Safety Injection 2A butt welds SI-160-14" VE & Vol 1 1 100 REQUIRED R19 Examined R15, 26- Safety Injection 2B butt welds SI-179-14" VE & Vol 1 1 100 REQUIRED R19 27- Pressurizer Spray 1A butt welds RC-062-3" VE & Vol 1 1 _100 REQUIRED R17, R21 28- Pressurizer Spray 1B butt welds RC-017-3" VE & Vol 1 1 100 REQUIRED R17, R21 32- Drain Line Loop 1A butt welds RC-060-2" VE & Vol 1 1 100 REQUIRED R17, R21 C) co 33- Drain Line Loop I B butt welds RC-058-2" VE & Vol 1 1 100 REQUIRED R17, R21 34- Drain Line Loop 2A butt welds RC-096-2" VE & Vol 1 1 100 REQUIRED R17, R21 36- Letdown Line butt welds CH-001-2" VE & Vol 1 1 100 REQUIRED R17, R21 37- Charging Line butt welds CH-005-2" VE & Vol 1 1 100 REQUIRED R17, R21

REACTOR VESSEL -

B15.10 CLOSURE HEAD NUTS -

2- Closure Head nuts 7.237" x 7.91" VT-2 54 54

  • B15.10 CLOSURE STUDS _

2- Closure Head studs 7.380" x 76.37" VT-2 54 54*

  • PRESSURIZERI B15.10 BOLTS, STUDS AND NUTS 5- Pressurizer Manway Studs & Nuts 1.31" x 14.5" VT-2 20 20*
  • PIPING B15.10 BOLTS, STUDS AND NUTS 31- Pressurizer Safeties Flange Bolting RC-001-6" VT-2 8 8

1537- Charging Line Flange V435 CH-005-2" VT-2 8 8*

B9.20 LESS THAN NPS 4 .

CIRCUMFERENTIAL WELDS OTHER B9.21 THAN PWR HPSI SYSTEMS 30- Aux Pressurizer Spray** butt welds CH-009-2" S 2 2 3 ** IEB 88-08 & IN97-19 2 welds and base metal down stream of V431 EXAM"CATEGO0RY B-G-1; PRESSURE RETAINING BOLTING GREATER THAN 2 IN. IN DIAMETER .

PUMPS B6.180 BOLTS AND STUDS 16- Reactor Coolant Pump 1A Flange Studs 4.33" x 32.87" Vol 16 * * *VT-1 each removal 17- Reactor Coolant Pump 1B Flange Studs 4.33" x 32.87" Vol 16

  • intervals when

_ 19- Reactor Coolant Pump 2B Flange Studs 4.33" x 32.87" Vol 16

- -L 4. 4 ~4 4 4 t PRESSURIZER B7.20 BOLTS, STUDS AND NUTS 5- Pressurizer Manway Studs & Nuts 1.31" x 14.5" S 20 20 .... . at 5 year intervals when removed STEAM GENERATOR _(IEB 82-02)

B7.30 BOLTS, STUDS AND NUTS _

3- Steam Generator 1 MANWAYS Studs & Nuts 1.31" x 14.5" S 40 40 ....

4- Steam Generator 2 MANWAYS Studs & Nuts 1.31" x 14.5" S 40 40 ..

PIPING WELDS > 3/8 IN NOMINAL SWALL THICKNESS FOR P~IPING >NPS C5.51i 58- Ax&DwcmrFW SG 1 Butt Welds38 SG-002" S & Vol 1** 1 2 100 **Examination REQD by SG-013_______ IEB 79-13 & SER 83-07

_____ _____ ______ _________ ___ _ (54-1&1; 5 5-1) &15 C5.11 59- Aux & Downcomner FW SG 2 Butt Welds SG-111-6" S &Vol 1** 1 3 100 _______

___ __ __ ____ __ __ __ __ ___ __ __ S " ___ __ ____ _ __ __ __ __ __ __ _____ _ ___1-8"_ __

PIPING WELDS > 3/8 IN NOMINAL **100% of all intersecting WALL THICKNESS FOR PIPING >NPS longitudinal welds will be AHE5.50 14 examined AHE5.51 CIRCUMFERENTIAL WELD** ....

  • category running percent 199 53 1 27 _

48 2 51 98 3 100 47- Main Steam SG 1 West Butt Welds SG-206-28" S & Vol 11(1) 12 1 SG-206-12" SG-206-6" 0

48- Main Steam SG 1 East Butt Welds SG-207-28" S & Vol 11(1) 12 2 0

SG-207-12" SG-207-6" 49- Main Steam SG 2 East Butt Welds SG-208-28" S & Vol 11(1) 12 3 SG-208-12" SG-208-6" 50- Main Steam SG 2 West Butt Welds SG-209-28" S & Vol 11(1) 12 3 SG-209-12" SG-209-6" 51- Atmospheric Dump No. 1 Butt Welds SG-59-12" S & Vol 27 13 1 SG-70-12" 14 2 52- Atmospheric Dump No. 2 Butt Welds SG-84-12" S & Vol 27 27 3 SG-1 03-12" 53- Steam to Aux Feedwater Butt Welds SG-81-6" S & Vol 29 14 1 SG-83-6" 15 3

___ I _________________ j ______ I _______ I____ I ___ V 1 .1 ___ 1 ________

SG-202-24" SG-224-24" 57- Feedwater SG No. 2 Butt Welds SG-204-24" S & Vol 4(2) 6 3

_ SG-205-24" __ __

SG-225-24" 60- Downcomer Feedwater SG 1 Butt Welds SG-200-8" S & Vol 6(8) 14 1 SG-008-8" 61- Downcomer Feedwater SG 2 Butt Welds SG-203-8" S & Vol 6(8) 14 3 SG-1 1-8" 66- Blowdown SG 1 Butt Welds SG-39-6" S & Vol 2(14) 16 2 _ _.-

0O 67- Blowdown SG 2 Butt Welds SG 6" S & Vol 2(10) 12 3 con CD PIPING WELDS >1/5" NOMINAL WALL THICKNESS FOR PIPING > NPS 2 AHE5.60 AND < NPS 4 AHE5.61 CIRCUMFERENTIAL**

  • category running percent 41 11 1 24 9 2 50 21 3 100

_ 51- Atmospheric Dump No. 1 Butt Welds SG-95-4" S & Vol 20 11 1 9 2 52- Atmospheric Dump No. 2 Butt Welds SG-100-4" S & Vol 21 21 3

PIPE BRANCH CONNECTIONS OF AHE5.80 BRANCH PIPING > NPS 2 AHE5.81 CIRCUMFERENTIAL

  • category running percent 32 7 1 22 1 9 2 50 16 3 100 47- Main Steam SG 1 West 28" x 12" SG-206-28" S 7 7 1 28" x 6" 48- Main Steam SG 1 East 28" x 12" SG-207-28" S 8(1) 9 2 28" x 6" 49- Main Steam SG 2 East 28" x 12" SG-208-28" S 8(1) 9 3 28" x 6" 50- Main Steam SG 2 West 28" x 12" SG-209-28" S 7 7 3 28" x 6" EXAM CATEGORY NA; RCP FLYWHEEL ~~K EXAMINATIONS PER REG GUIDE 1.14 NA 16-Reactor Coolant Pump 1A flywheel 1A S&VOL 4 4 3 100 S OFALL EXPOSED

_17 Reactor Coolant Pump 1 B flywheel 1B SURFACES and UT OF 18-Reactor Coolant Pump 2A flywheel 2A HIGH STRESS AREAS 19-Reactor Coolant Pump 2B flywheel 2B

SECTION 8.0 REQUESTS FOR RELIEF 87 of 208 31NT-ISI-2 Rev 2

RELIEF REQUESTS INDEX NUMBER DESCRIPTION

34. Included for reference to document that the Interval 2 Reactor Vessel volumetric examinations were extended for 1 fuel cycle.

NRC accepted as documented by SER attached to Letter dated September 20, 2006.

35. Included for reference to document that the Interval 2 Reactor Vessel visual examinations were extended for 1 fuel cycle.

NRC accepted as documented by SER attached to Letter dated October 4, 2006.

36. Full Structural Weld Metal Overlay and for Units 1 and 3 only; Request to use 2001 Edition thru 2003 Addenda for Repair and Replacements NRC accepted as documented by SER attached to Letter dated June 21, 2007
37. Alternative to ASME Code Case N-638-1, Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temperbead Technique.

NRC accepted as documented by SER attached to Letter dated June 21, 2007 38 Included for reference to document the Close out of U2 2nd Interval

39. Safety Injection Tank alternative repair method.

Submitted by APS letter 102-05869-DCM/RJR, dated July 11, 2008

40. Extended Reactor Vessel Examinations to meet the PWROG program Submitted by APS letter
41. Request to utilize Appendix 1 of Code Case N-729-1.

Submitted by APS letter

42. Request to utilize Leak Path Assessments N-729-1 previously qualified Submitted by APS letter
43. Included for reference to document the Closeout of U3 2nd Interval Submitted by APS letter
44. Extended Reactor Vessel Examinations Submitted by APS letter
45. Included for reference to document the Closeout of U2 RPV 2nd Interval
46. Included for reference to document the Closeout of U1 2 nd Interval
47. Included for reference to document the Closeout of U3 RPV 2nd Interval 88 of 208 31NT-ISI-2 Rev 2

SECTION 9.0 ISI BOUNDARY DRAWINGS 89 of 208 31NT-ISI-2 Rev 2

BOUNDARY DRAWING INDEX Drawing No. Drawing Title Code Class 02-M-AFP-001 Auxiliary - Feedwater System 2&3 02-M-CHP-001 Chemical and Volume Control System l&2 02-M-CHP-002 Chemical and Volume Control System 2&3 02-M-CHP-003 Chemical and Volume Control System 2 02-M-CLP-001 Containment Integrated and Local Leak Rate Test 2 02-M-CPP-001 Containment Purge System 2 02-M-CTP-001 Condensate Purge System 2 02-M-DFP-001 Diesel Fuel Oil & Transfer System 3 02-M-DGP-001 Diesel Generator System 3 02-M-DWP-002 Demineralized Water System 2 02-M-ECP-001 Essential Chilled Water System 3 02-M-EWP-001 Essential Cooling Water System 3 02-M-FPP-006 Fire Protection System 2 02-M-GAP-001 Service Gas Supply System (N2 and H 2) 2&3 02-N-GRP-001 Gaseous Radwaste System 2 02-M-HCP-001 HVAC Containment Building 2 02-M-HPP-001 Containment Hydrogen Control 2 02-M-IAP-002 Instrument and Service Air System 2 02-M-IAP-003 Instrument and Service Air System 2 02-M-NCP-002 NuclearCooling Water System 3 02-M-NCP-003 Nuclear Cooling Water System 2 02-M-PCP-001 Fuel Pool Cooling & Cleanup System 2&3 02-M-RCP-001 Reactor Coolant System 1&2 02-M-RCP-002 Reactor Coolant System 1 &2 02-M-RDP-001 Radioactive Waste Drain System 2 02-M-SGP-001 Main Steam System 2&3 02-M-SGP-002 Main Steam System 2 02-M-SIP-00 1 Safety Injection and Shutdown Cooling System 2 02-M-SIP-002 Safety Injection and Shutdown Cooling System 1&2 02-M-SIP-003 Safety Injection and Shutdown Cooling System 2 02-M-SPP-001 Essential Spray Pond System 3 02-M-SPP-002 Essential Spray Pond System 3 02-N-SSP-001 Nuclear Sampling System 2 02-M-WCP-001 Normal Chilled Water System 2 13-M-ZZP-001 Symbols and Legend N/A 13-M-ZZP-002 Symbols and Legend N/A 90 of 208 31NT-ISI-2 Rev 2

SECTION 10.0 ZONE DRAWINGS 91 of 208 31NT-ISI-2 Rev 2

ZONE DRAWING INDEX Drawing No. Drawing Title Code Class Zone 1 Reactor Vessel I Zone 2 Closure Head I Zone 3 Steam Generator 1 I Zone 4 Steam Generator 2 1 Zone 5 Pressurizer 1 Zone 6 RCS Primary Piping I Zone 16 Reactor Coolant Pump 1A 1 Zone 17 Reactor Coolant Pump lB 1 Zone 18 Reactor Coolant Pump 2A I Zone 19 Reactor Coolant Pump 2B I Zone 20 Pressurizer Surge Line I Zone 21 Shutdown Cooling Loop 1 1 Zone 22 Shutdown Cooling Loop 2 1 Zone 23 Safety Injection IA 1 Zone 24 Safety Injection lB 1 Zone 25 Safety Injection 2A I Zone 26 Safety Injection 2B I Zone 27 Pressurizer Spray IA I Zone 28 Pressurizer Spray lB I Zone 29 Combined Pressurizer Spray 1 Zone 30 Aux. Pressurizer Spray 1 Zone 31 Pressurizer Safeties 1 Zone 32 Drain Line 1A 1 Zone 33 Drain Line lB I Zone 34 Drain Line 2A I Zone 35 Drain Line 2B 1 Zone 36 Letdown Line I Zone 37 Charging Line I Zone 38 Drain Line Loop 1 I Zone 39 HPSI Long Term Recirc 1 1 Zone 40 HPSI Long Term Recirc 2 1 Zone 41 Steam Generator 1 2 Zone 42 Steam Generator 2 2 Zone 43 Main Steam SG1 East 2 Zone 44 Main Steam SG1 West 2 Zone 45 Main Steam SG2 East 2 Zone 46 Main Steam SG2 West 2 Zone 47 Main Steam SG1 West 2 Zone 48 Main Steam SG1 East 2 Zone 49 Main Steam SG2 East 2 Zone 50 Main Steam SG2 West 2 Zone 51 Atmospheric Dump No. 1 2 Zone 52 Atmospheric Dump No. 2 2 Zone 53 Steam to Aux Feedwater System 2 Zone 54 Feedwater SG No. 1 2 Zone 55 Feedwater SG No. 2 2 Zone 56 Feedwater SG No. 1 2 Zone 57 Feedwater SG No. 2 2 Zone 58 Aux & Downcomer Feedwater SG 1 2 Zone 59 Aux & Downcomer Feedwater SG 2 2 Zone 60 Downcomer Feedwater SG 1 2 Zone 61 Downcomer Feedwater SG 2 2 Zone 62 Aux Feedwater SG 1 2 Zone 63 Aux Feedwater SG 2 2 92 of 208 31NT-ISI-2 Rev 2

ZONE DRAWING INDEX (Continued)

Drawing No. Drawing Title Code Class Zone 64 Blowdown SG 1 2 Zone 65 Blowdown SG 2 2 Zone 66 Blowdown SG 1 2 Zone 67 Blowdown SG 2 2 Zone 68 Regenerative Heat Exchanger 2 Zone 69 Letdown Heat Exchanger 2 Zone 70 LPSI Pump Room A Suction 2 Zone 71 LPSI Pump Room A Discharge 2 Zone 72 LPSI Pump A 2 Zone 73 LPSI Pump Room B Suction 2 Zone 74 LPSI Pump Room B Discharge 2 Zone 75 LPSI Pump B 2 Zone 76 Containment Spray Pump Room A Suction 2 Zone 77 Containment Spray Pump Room A Discharge 2 Zone 78 Containment Spray Pump A 2 Zone 79 Containment Spray Pump Room B Suction 2 Zone 80 Containment Spray Pump Room B Discharge 2 Zone 81 Containment Spray Pump B 2 Zone 82 Shutdown Cooling Heat Exchange Room A 2 Zone 83 Shutdown Cooling Heat Exchange Room A 2 Zone 84 Shutdown Cooling Heat Exchanger A 2 Zone 85 Shutdown Cooling Heat Exchanger Room B 2 Zone 86 Shutdown Cooling Heat Exchanger Room B 2 Zone 87 Shutdown Cooling Heat Exchanger B 2 Zone 88 East Wrap 2 Zone 89 East Wrap 2 Zone 90 East Wrap 2 Zone 91 West Wrap 2 Zone 92 West Wrap 2 Zone 93 West Wrap 2 Zone 94 A Train Misc. Pipe Chases & 88' Pipe Tunnel 2 Zone 95 B Train Misc. Pipe Chases & 88' Pipe Tunnel 2 Zone 96 Containment LPSI Header to Loop 1A 2 Zone 97 Containment LPSI Header to Loop 1B 2 Zone 98 Containment LPSI Header to Loop 2A 2 Zone 99 Containment LPSI Header to Loop 2B 2 Zone 100 Containment LPSI Train A Suction 2 Zone 101 Containment LPSI Train B Suction 2 Zone 102 SI Pumps Train "A" Suction 2 Zone 103 Refueling Water Suction Train "A" 2 Zone 104 SI Pumps Train "B" Suction 2 Zone 105 Refueling Water Suction Train "B" 2 Zone 106 HPSI Pump Room "A" Discharge 2 Zone 107 HPSI Pump Room "B" Discharge 2 Zone 108 HPSI Discharge 88' Pipe Chase 2 Zone 109 HPSI Discharge 88' Pipe Chase 2 Zone 110 HPSI Discharge West Wrap 2 Zone 111 HPSI Discharge West Wrap 2 Zone 112 HPSI Discharge East Wrap 2 Zone 113 HPSI Discharge East Wrap 2 Zone 114 Containment HPSI Header Loop IA & lB 2 Zone 115 Containment HPSI Header Loop 2A & 2B 2 Zone 116 HPSI Pump "A" 2 Zone 117 HPSI Pump "B" 2 Zone 118 HPSI Long Term 2 Zone 119 HPSI Long Term 2 Zone 120 Containment Spray A 2 Zone 121 Containment Spray B 2 93 of 208 31NT-ISI-2 Rev 2

1800 NOTES:

TAG NO. 2MRCEX01 SERIAL NO. 79173 (C-E)

N.B NO. 22513 100% LIGAMENTS 54 STUD HOLES COUNTED CLOCKWISE FROM 0' F130 SHELL SEGMENT CROSS SECTION

-LONG SEAMS-OUTLET REFERENCE DWG:

N001-3.01-15 AND 17 N001-3.01-41 AND 61 NOO1-3.01-72 SUPPORT COLUMNS RX INTERIOR 40 AT 1A B RX INTERIOR 41 AT 1B B RX INTERIOR 42 AT 2A B 43 AT 2B B SHEAR KEYS ICI Penetrations 1 thru 61 1E ,

NOTES:

1) Full ITEM ID include "-CEDM or RVLMS NO"
2) TAG NO. 2MRCEX03 SERIAL NO. N05065-CHA-01 (Doosan)

N.B. NO. 1685

3) ITEM 71 CONTAINS 4 SINGLE STUDS IN A GRAYLOC CLAMP REFERENCE DWGS:

13-MN-740 (Replaced RV HEAD SPEC)

RVLMS R15 WO 3377051 LOCATED AT 92 & 96 UT Baseline Completed on 2-61 at CEDM locations:

F2-881 54, 59, 65, 69, 71, 73, 77 79, 81, 82, 84, 85, 87, 88, 89 VENT LINE NUTS CEDM Penetrations I THRU 18 19TTHRU 36 37 THRU 54 CLOSURE HEAD STUDS 8.6" 0

  1. 1 THRU #54

.n, 1 THRU 18 19 THRU 36 WASHERS 1800 37 THRU 54 1 THRU 18 19 THRU 36 76.37" 37 THRU 54

[Tl 2700 11.5" o

F STUD LOCATIONS UNIT 2 ZONE 2 00 1 THRU 54 CW FROM 00 CLOSURE HEAD TOP VIEW CLOSURE HEAD

1120 MANWAY STUDS & NUTS NOTES:

-NOTE 1- 1) Stud Location is #1 TDC Going CW to #20.

2) Tag NO 2MRCEEO1A Serial NO. 212 N. B. NO. 161 00 MANWAY STUDS & NUTS NOTE 1- R REFERENCE DWGS:

MN725-A16, A17, A19 and A20 1800 MN725-A31, A32, A36, A52 and A72 MN725-A243 and A390 3150 LOOKING DOWN

.87 TUBESHEET Leg SKIRT 4.63"

.56 CHANNEL HEAD CROSS SECTION MANWAY STUDS (20 EA)

1120 MANWAY STUDS & NUTS NOTES:

-NOTE 1- 1) Stud Location is #1 TDC Going CW to #20.

2) Tag NO 2MRCEEO1B Serial NO. 211 N. B. NO. 160 00 MANWAY STUDS & NUTS NOTE 1- ['3Z'41 REFERENCE DWGS:

MN725-A16, A17, A19 and A20 1800 MN725-A31, A32, A36, A52 and A72 MN725-A243 and A390 3150 LOOKING DOWN

.87 0 TUBESHEET Y_'old Leg m4 Instrument Nozzles

.56 CHANNEL HEAD CROSS SECTION MANWAY STUDS (20 EA)

-t fl UNIT 2 ZONE 4 STEAM GENERATOR #2

ZONE 29

.87

-MANWAY STUDS & NUTS NOTE 1-TOP VIEW

.56 2700 9o0 MANWAY STUDS co Co M

00 UPPER SHELL LES (7)

NOTES:

1) STUD LOCATION IS #1 TDC GOING CW TO #20
2) TAG NO 2MRCEX02 SERIAL NO. 79373 (C-E)

N.B. NO. 22252 2700 900 REFERENCE DWGS:

NOO1-6.04-6, 31 AND 90

-4 4,

HEATERS (36)

UNIT 2 ZONE 5 LOWER SHELL 0

PRESSURIZER 3

REFERENCE DWGS:

01-P-ZCC- 103 N001-6.07-83 AND 112 N001-6.07-90 THRU 94 N001-6.07-96 THRU 100 MvN725-A343 and A383 1

-99 Cold Leg Instrument Nozzles (12)

RCP Pressure Taps (4 disch & 4 suction) 6-101 Hot Leg Instrument Nozzles (27) 18-1 NOTES:

1) PIPE LONG SEAMS AT 3:00 AND 9:00 POSITIONS (FOR CE PIPING ONLY)
2) ELBOW LONG SEAMS AT LONG AND SHORT RADIUS (FOR CE PIPING ONLY)
3) ANSALDO PIPING AND ELBOWS ARE SEAMLESS (XX-13, XX-16 and XX-19 only)
4) PIPING WCL STAMPED WITH CENTER PUNCH MARKS. CE WELDS REFERENCED WITH FOOTAGE MARKS. ANSALDO WELDS REFERENCED WITH CENTER PUNCH MARKS EACH 250 mm.
5) FOR REPLACEMENT WELDS, PORTIONS OF THE ORIGINAL WELD MAY REMAIN.. THE ORIGINAL WELD CAP IS JOINED TO THE REPLACEMENT WELD

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 2MRCEPO1A SERIAL NO. I110-1A (C-E)

N.B. NO. 23457 1.1" I-'*

7.28" 8.27" 6.89"f

)

'3 1~ SEAL HOUSING STUDS 32.87" T

6.93" REFERENCE DWGS:

N001-6.02-418 NOO1-6.02-420 THRU 423 NOO1-6.02-107 & 108 FLANGE STUDS 0

0 UNIT 2 ZONE 16 3

NUTS & RINGS U

3 REACTOR COOLANT PUMP 1A

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 2MRCEPO1B SERIAL NO. 1110-1B (C-E)

N.B. NO. 23458 1.1" ý-ý 7.28" 6.89" 1~ SEAL HOUSING STUDS 32.87" 4.528' T

6.93" REFERENCE DWGS:

N001-6.02-418 NOO1-6.02-420 THRU 423 N001-6.02-107 & 108 FLANGE STUDS a UNIT 2 ZONE 17 3.

NUTS & RINGS a

3 REACTOR COOLANT PUMP lB I -

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 2MRCEPO1C SERIAL NO. 1110-2A (C-E)

N.B. NO. 23459 1.1"'

7.28" 6.89" I SEAL HOUSING STUDS 32.ý T

6.93" REFERENCE DWGS:

N001-6.02-418 NOO1-6.02-420 THRU 423 N001-6.02-107 & 108 FLANGE STUDS 2 UNIT 2 ZONE 18 NUTS & RINGS REACTOR COOLANT PUMP 2A

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 2MRCEPO1D SERIAL NO. 1110-2B (C-E)

N.B. NO. 23460 1.1

7.28" I SEAL HOUSING STUDS 32.87" 6.93" REFERENCE DWGS:

N001-6.02-418 NOO1-6.02-420 THRU 423 FLANGE STUDS N001-6.02-107 & 108 NUTS & RINGS

OVERLAY R14 Y " PLANT WO 2967833 NORTH 2967837 PRESSURIZER ZONE 5 SS PRESSURIZER HOT LEG VAULT ZONE 6 REFERENCE DRAWINGS EL 02-P-RCF-101 0 UNIT 2 ZONE 20 0

PRESSURIZER SURGE

-- - I

Y " PLANT NORTH REFERENCE DRAWINGS 02-P-SIF-105 OVERLAY R14 WO 2967844 CONT ON ZONE 38 EL 89'-9"7 ISECONDARY 00 SHIELD WALL CONT ON ZONE 100 7

-1 UNIT 2 ZONE 21 SHUTDOWN COOLING LOOP 1

OVERLAY R14 WO 2967848 T-WALL H1 REFERENCE DRAWINGS 02-P-SIF-105 CoNTO° 22-18 V-654ZONE 101 LOOP 2 HOT221 LEG ZONE 6 H- B 221 22-7 22312-11 22-

- UNIT 2 ZONE 22 SHUTDOWN COOLING LOOP 2

SECONDARY SHIELD WALL (SI-E-203-BCAA-12" 223-23 SI TANK IAONTON CZONE96 REFERENCE DRAWINGS 02-P-SIF- 103 UNIT 2 ZONE 23 SAFETY INJECTION lA

SI TANK 1B REFERENCE DRAWINGS 02-P-SIF-103 0

0 00 CONT ON ZONE 97 3 UNIT 2 ZONE 24 0

3 SAFETY INJECTION 1B L__________________________

SECONDARY SHIELD WALL LEG ZONE 6 LOOP 2A COLD V-215 (SI-E-156-BCAA-12"

~SI TANK 2A 25-276-4 REFERENCE DRAWINGS 02-P-SIF-136 CONT ON ZONE 98 UNIT 2 ZONE 25 SAFETY INJECTION 2A J.

LOOP 2B COLD LEG ZONE 6 REFERENCE DRAWINGS 02-P-SIF-136 SECONDARY 0

SHIELD WALL 7

I, SI TANK UNIT 2 ZONE 26 2B 4.)

D SAFETY INJECTION 2B 4,

PLANT NORTH 2REFERENCE DRAWINGS 02-P-RCF-102 PRESSURIZER VAULT ZONE 29 COMBINED 127,9 3/83/8 LEL E7EL 119'-6" C-16 27-64 EL EL 16-10" H-2 27-38 PRESSURIZER VAULT LOOP 1A ZONE 6

ZONE 29 COMBINED REFERENCE DRAWINGS PZR SPRAY 02-P-RCF- 102 Y* PLANT NORTH

-PRESSURIZER VAULT EL 123'-10" PRESSURIZER VAULT LOOP 1B ZONE 6

REFERENCE DRAWINGS 02-P-RCF- 102 N* PLANT NORTH WP EL 158'-2" ZONE 30 AUX SPRAY 3 OL ss 158'-1 5/16" NOZZLE PRESSURIZER EL 152'-5 5/ ZONE 5

'3 OVERLAY R14 WO 2967827 ZONE 27 PZR SPRAY IA IKEL 130"-11 3/8" 3 ZONE 28 UNIT 2 ZONE 29 PZR SPRAY 0

1B 3 COMBINED PZR SPRAY

REFERENCE DRAWINGS sw 02-P-CHF-107

_ EL 153'-8" I 130-21 UNIT 2 ZONE 30 ZONE29 COMBINED PZR SPRAY AUX. PZR SPRAY

'3

+ /

REFERENCE DRAWINGS 02-P-RCF-114 OVERLAYS R14 WO 2967812 2967813 2967816 2967825 2 NOTE:

8 - 2" X 13 1/2" STUD PRESSURIZER 10 16 - NUTS ZONE 5 UNIT 2 ZONE 31 TOP HEAD PRESSURIZER SAFETIES

COLD LEG ZONE 6 LOOP 1A EL 89' 9 11/16" REFERENCE DRAWINGS 02-P-CHF- 110 NOTE:

SW = SOCKET WELD WP EL 88'-10 3/16" SW UNIT 2 ZONE 32 fl DRAIN LINE 1A

EL 89' N

COLD LEG REFERENCE DRAWINGS lB 02-P-CHF- 110

z 4

NOTE:

SW = SOCKET WELD UNIT 2 ZONE 33 7'

DRAIN LINE 1B

/

COLD LEG LOOP 2A ZONE6 /

SW REFERENCE DRAWINGS 02-P-CHF-110

-t NOTE:

SW = SOCKET WELD 00 23 A UNIT 2 ZONE 34 DRAIN LINE 2A

EL 88' 9 5/8" LETDOWN LINE ZONE 36 REFERENCE DRAWINGS 02-P-CHF-110 NOTE:

SW = SOCKET WELD SW UNIT 2 ZONE35 DRAIN LINE 2B

REFERENCE DRAWINGS 02-CHF- 142 221 EL 121' RC91 RAC 94'1 p 73 4

ZONkE35ý 102'

134' 134' C1- H1 - ýCJ FLANGE3 BOTN

]*~~H- 8H-0-CA-")ZN H33 02P-5F 109

~1- UNI 2 2ONX 3 CHARGING LINE 9E1L1 850 E 5 2 2 101c13 1 9 9 .EL15 C'

REFERENCE DRAWINGS 02-P-SIF-105 NOTE:

SW = SOCKET WELD ZONE 21 SHUTDOWN COOLING W

z UNIT 2 ZONE38 DRAIN LINE LOOP 1

REFERENCE DWG 02-P-SIF-105 CONT POINT NI-A 1/2 B

39-1 CLEL 86' 8 1/4" CLEL 88' 2"

/

/

/

/

/

8 1/4"

/

/

/

3

/

/

V2 / UNIT 2 ZONE 39 3

0

/

3 HPSI LONG TERM RECIRC LOOP 1

Y* PLANT NORTH EL. 93' M

0 EL. 89'-391/2" REFERENCE DRAWINGS 02-P-SIF-105 EL.

-0 z

UNIT 2 ZONE 40 HPSI LONG TERM RECIRCULATION 2

NOTES:

1) Ox IS AT CENTER OF COLD LEG MANWAY
2) STUDS ARE 16 - 1.5" X 9'
3) STUDS ARE 16-1" X 6"
4) TAG NO. 2MRCEEO1A SERIAL NO. 212 (ANSALDO)

N. B. NO. 161

@ 900 E 43 REFERENCE DWGS:

MN725-A18, A19, A26, A28 and A29 MN725-A30, A38, A54 and A55 MN725-A243, A390 and A395 3.41" 107 SECONDARY 900 5.83" MANWAYS

-NOTE 2- 270'

ZI1,

- DOWNCOMER RECIRC @ 450 SNUBBER -ZONE 58 DOWNCOMER @ 00

[091 105 8"

0

,SECONDARY HANDHOLES AT °AND 2700

-NOTE 3-UNIT 2 ZONE 41 3

0 3

STEAM GENERATOR 1

NOTES:

1) Ox IS AT CENTER OF COLD LEG MANWAY
2) STUDS ARE 16 - 1.5" X 9"
3) STUDS ARE 16-1" X 6"
4) TAG NO. 2MRCEEO1B SERIAL NO. 211 (ANSALDO)

N.B. NO. 160

@ 900 REFERENCE DWGS:

MN725-A18, A19, A26, A28 and A29 MN725-A30, A38, A54 and A55 MN725-A243, A390 and A395 DOWNCOMER RECIRC @ 45' ZONE 59 0

4DARY HANDHOLES AT W AND 2700

-NOTE 3-UNIT 2 ZONE 42 3

0 3

STEAM GENERATOR 2

.1.~

1-LINE # DIAISCH FROM TO PLANT SG-36 32"x 2" 43-1 NORTH SG-36 28"x 1.25" 43-2 43-25

_, t EL. 157'-101/8" t EL-432' t EL. )-ZONE

{-4iEL. 171' 48 ZONE 41 REFERENCE DRAWINGS 02-P-SGF- 118 MAIN STEAM (EAST)

STEAM GENERATOR 1

"< PLANT NORTH

_, t EL. 157'-93/4"

-- t EL. 132'

_, t EL. 132'-33/8" ZONE 47 ZONE 41 REFERENCE DRAWINGS 02-P-SGF- 118 UJNIT 2 1 ZONE44 MAIN STEAM (WEST)

STEAM GENERATOR 1

PLANT NORTH

- t EL. 132' t EL. 171'-III/16"_ ZONE 49

. { EL. 157'-101/8"

'-It EL. 171' ZONE 30 42 CaEL. 132'-31/'16" REFERENCE DRAWINGS 02-P-SGF- 118 3

I, UNIT 2 ZONE 45 3

a 3

MAIN STEAM (EAST)

STEAM GENERATOR 2

PLANT NORTH -- t EL. 132' ZONE 50 t EL. 171'*

ZONE 42 t EL. 158' t EL. REFERENCE DRAWINGS 02-P-SGF-118 MAIN STEAM (WEST)

STEAM GENERATOR 2

LINE # DIA/SCH FROM TO

  • < PLANT SG-206 28"x 1.750" 47-1 47-30 NORTH SG-206 6"x 1.500" 47-4 47-20 SG-206 12"x 0.844" 47-28 47-29 ZONE 51 TURBINE

'I..

--- EL. 120'-0" REFERENCE DRAWINGS 02-P-SGF-155 02-P-SGF-401 EL. 132'-0' ZONE 44 NOTE:

1 - MAIN STEAM RELIEF VALVE ZONE 47 12-1 1/4"DIA. FLANGE BOLTS PER VALVE 2 - MSIV, 20-2 1/4"DIA. BODY TO MAIN STEAM (WEST)

BONNET BOLTS STEAM GENERATOR 1

LINE # DIA/SCH FROM TO N*"< PLANT SG-207 28"x 1.750" 48-1 48-30 NORTH SG-207 6"x 1.500" 48-4 48-20 SG-207 12"x 0.844" 48-28 48-29 ZONE 51 ZONE 51

'4' TURBINE BUILDING

'3 REFERENCE DRAWINGS 02-P-SGF-155 02-P-SGF-401 REV 5 EL. 132'-0"-

ZONE 43 MAIN STEAM S/G #1 900 (EAST) INSIDE CONTAINMENT 3 NOTE: UNIT 2 ZONE 48 0 1 - MAIN STEAM RELIEF VALVE 12-1 1/4"DIA. FLANGE BOLTS 3 PER VALVE MAIN STEAM (EAST) 2 - MSIV, 20-2 1/4"DIA. BODY TO STEAM GENERATOR 1 BONNET BOLTS J. -

LINE # DIA/SCH FROM TO N*"< PLANT SG-208 28"x 1.750" 49-1 49-30 NORTH SG-208 6"x 1.500" 49-4 49-20 SG-208 12"x 0.844" 49-28 49-29 ZONE 52 ZONE 52 TURBINE

,. BUILDING REFERENCE DRAWINGS 02-P-SGF- 155 02-P-SGF-401 EL. 132'-0"--

ZONE 45 NOTE:

1 - MAIN STEAM RELIEF VALVE UNIT 2 ZONE 49 12-1 1/4"DIA. FLANGE BOLTS PER VALVE 2 - MSIV, 20-2 1/4"DIA. BODY TO MAIN STEAM (EAST)

BONNET BOLTS STEAM GENERATOR 2

LINE # DIA/SCH FROM TO PLANT SG-209 28"x 1.750" 50-1 50-30 NORTH SG-209 6"x 1.500" 50-4 50-20 SG-209 12"x 0.844" 50-28 50-29 ZONE52 S/G #2 ADV TURBINE BUILDING REFERENCE DRAWINGS 02-P-SGF-155 02-P-SGF-401 EL. 132'-0' ZONE 46 NOTE:

1 - MAIN STEAM RELIEF VALVE ZONE 50 12-1 1/4"DIA. FLANGE BOLTS PER VALVE 2 - MSIV, 20-2 1/4"DIA. BODY TO MAIN STEAM (WEST)

BONNET BOLTS STEAM GENERATOR 2

LINE # DIA/SCH FROM Y " PLANT SG-59 12"x 0.844" 51-1 NORTH SG-70 12"x 0.844" 51-37 SG-95 4" x 0.337 51-65 3~

'3 ZONE 48

-1 REFERENCE DRAWINGS UNIT2 ZONE51 02-P-SGF- 158 ATMOSPHERIC DUMP 1

-1

LINE # DIA/SCH FROM TO Y* PLANT SG-103 12"x 0.844" 52-1 52-40 NORTH SG-84 12"x 0.844" 52-38 52-41 SG- 100 4" x 0.337 52-65 52-76 7

-1 REFERENCE DRAWINGS n 02-P-SGF-158 UNIT 2 ZONE 52 ATMOSPHERIC DUMP 2

LINE # DIA/SCH Y* PLANT SG-81 6"x 0.432" NORTH SG-83 6"x 0.432" 122'-5"

  • o REFERENCE DRAWINGS 02-P-AFF-131

-0 UNIT 2 ZONE 53 STEAM TO AUXILARY FEEDWATER SYSTEM

LINE # DIA/SCH FROM TO PLANT SG-2 14"x 0.938' 54-15 54-24 NORTH SG-2 16"x 0.844'54-25A 54-26 SG-2 16"x 1.75"54-107 -

SG-2 24"x 1.218' 54-13, 54-60 ZONE 54-27 56 SG-13 14"x 0.938' 54-1 54-10 SG-13 16"x 0.844'54-11A 54-12 SG-13 16"x 1.75"54-100 -

EL.

ED REFERENCE DRAWINGS 02-P-SGF- 119 MN725-A256

-- EL. 93' 4,

-I UNIT 2 ZONE 54 FEEDWATER STEAM GENERATOR 1 L -

LINE # DIA/SCH FROM TO ZONE SG-5 14"x 0.938' 55-15 55-24 55-657 PLANT NORTH SG-5 16"x 0.844' 55-25 55-26 SG-5 16"x 1.75" 55-107 -

SG-5 24"x 1.218' 55-13, 55-60 7f 55-27 EL. 115'-

14"x 0.938' 55-1 55-10 5 ss SG-14 55-157 SG-14 16"x 0.844' 55-11 55-12 55-1 SG-14 16"x 1.75" 55-100 -

S42 5-8 52ss 5555-51 55-2 5555-5 55455-5 55-5

- c 55-SG- 1 -LB -1 (SGG55DLBB--14" 16"2 REFERENC RAWIS I2Z 02-P-SGF-1 19 . .

MN725-A256 FEED WATER STEAM GENERATOR 2

LINE# DIA/SCH FROM TO Y ' PLANT SG-202 24"x 1.531" 1 4 NORTH SG-201 24"x 1.812" 6 7 SG-224 24"x 1.812" 9 11 EL. 115'-6" NOTE:

FWIV, 20-21/2" DIA BODY TO BONNET BOLTS PER VALVE REFERENCE DRAWINGS 02-P-SGF- 119 02-P-FWF-403 EL. 115'-6"-i*

ZONE 54 Lo 71)

UNIT 2 ZONE 56 FEEDWATER STEAM GENERATOR 1

- J.

LINE # DIA/SCH FROM TO PLANT SG-205 24"x 1.531" 57-1 57-4 NORTH SG-204 24"x 1.812" 57-6 57-7 SG-225 24"x 1.812" 57-9 57-11 EL. 115'-6" NOTE:

FWIV, 20-21/2" DIA BODY TO BONNET BOLTS PER VALVE REFERENCE DRAWINGS EL. 115'-6"--- 02-P-SGF- 119 02-P-FWF-403 ZONE 55

-l UNIT 2 ZONE 57 FEEDWATER STEAM GENERATOR 2 A.

LINE # DIA/SCH FROM TO PLANT SG-8 6"x 0.562" 58-1 58-3 NORTH SG-8 8"x 0.500" 58-4 58-25 AF-4 6"x 0.562" 58-19 58-34 SG-8 6"x 1.800" 41-1111 -

cs ss ZONE 60 EL. 13 1'-0j

'-0" ZONE 62 REFERENCE DRAWINGS

-4 02-P-SGF-120 I) MN725-A254 UNIT 2 ZONE58 AUXILIARY & DOWNCOMER FEEDWATER SG #1

LINE # DIA/SCH FROM TO SG-11 6"x 1.800"42-111 -

SG-11 6"xO.562" 59-1 59-3 PLANT SG-11 8"xO.500" 59-4 59-25 NORTH AF-6 6"xO.432"59-16C -

AF-6 6"x 0.562" 59-20 59-334 42-111

/=E]

ZONE c 42 // S Lo fl

'3 02-P-SGF-120 UNIT 2 ZONE 59 MIN725-A254

'3 AUXILIARY & DOWNCOMER FEEDWATER SG #2

LINE # DIA/SCH FROM TO

  • < PLANT TURBINE SG-200 8"x 0.719" 60-2 60-12 BUILDING NORTH SG-008 8"x 0.719" 60-14 60-17
t. EL. 114'-105/16" C

REFERENCE DRAWINGS 02-P-SGF-156 EL.

DOWNCOMER FEEDWATER STEAM GENERATOR #1

Y " PLANT TURBINE

'BUILDING NORTH t EL. 1 Go REFERENCE DRAWINGS 02-P-SGF- 156 7

H I, UNIT 2 ZONE 61 5~

t EL. 104'-0"'-

DOWNCOMER FEEDWATER STEAM GENERATOR #2

LINE# DIA/SCH FROM TO PLANT AF-18 6"x 0.562" 62-4 62-14 NORTH AF-4 6"x 0.562" 62-18 62-24 L EL. 94'-5"- -

EL. 94'-5"

'3 REFERENCE DRAWINGS 02-P-AFF- 132 02-P-AFF-133 3 UNIT 2 ZONE 62 0

3 AUXILIARY FEEDWATER STEAM GENERATOR #1

.5.

Y " PLANT NORTH ZONE 59 EL. 82' -4" REFERENCE DRAWINGS 02-P-AFF- 132 02-P-AFF- 133 ZONE 63 AUXILARY FEEDWATER STEAM GENERATOR #2

LINE# I DIA/SCH FROM TO REFERENCE DRAWINGS SG-53 6"x 0.562" 64-1 64-1, 02-P-SGF-122 SG-39 6"x 0.562" 64-30 64-31 02-P-SGF-177 SG-39 6"x 0.562" 64-15 64-5.

Y** PLANT SG-522 6"x 0.562" 64-60 64-8(

NORTH EL. 109'_

EL.

ZONE 66

,-EL. 104' ZONE 64 BLOWDOWN STEAM GENERATOR #1

LINE # DIA/SCH FROM TO REFERENCE DRAWINGS 02-P-SGF- 140 SG-48 6"x 0.562" 65-1 65-14 02-P-SGF-177 SG-48 6"x 0.562" 65-29 65-52

"*< PLANT SG-52 6"x 0.562" 65-15 65-28 NORTH SG523 6"x 0.652" 65-56 65-89 ZONE 67 ZONE B

)c EL. 1 UNIT 2 ZONE 65 BLOWDOWN STEAM GENERATOR #2

LINE # DIA/SCH FROM TO SG-39 6"x 0.562" 66-1 66-15

  • " PLANT NORTH TURBINE BUILDING EL. 108'- 8" EL. 108'-

REFERENCE DRAWINGS 02-P-SGF- 157 t EL. 106'-0"

-l ZONE UNIT 2 ZONE 66 3

0 64 3

BLOWDOWN STEAM GENERATOR #1

LINE # DIA/SCH FROM TO PLANT NORTH SG-48 6"x 0.562" 67-1 67-12

{_ EL. 108' - 8" t EL. 108' - 8" REFERENCE DRAWINGS 02-P-SGF-157 ZONE 65 BLOWDOWN STEAM GENERATOR #2

NOTES:

Tag No. 2MCHEEO1 Serial No. 79313 (AMETEK)

N.B. No. 547 Reference Drawings:

N001-7.03-1 N001-7.03-48 thru 50 100 SINLET H0 TOP Z LONG SEAMS OUTLET NEAR & FAR SIDE LLO 8" SCH 160 PIPE AND FITTINGS UNIT 2 ZONE 68 REGENERATIVE HEAT EXCHANGER

Tubesheet NOTES:

Tag No. 2MCHNE02 Serial No. N2373 (Richmond Engr)

N.B. No. 77334 32 Studs 1" x 9 3/4"' Reference Drawings:

3/4" N001-7.03-26 Channelhead Cross Section N001-7.03-27 N001-7.03-28 N001-7.03-29 o

iD UNIT 2 ZONE 69 3

3 LETDOWN HEAT EXCHANGER

EL. 47' 10" LINE # DIA X SCH FROM TO ZONE 76 SI-67 16" X 0.312"70-103 70-109 SI-241 18" X 0.3 12" 70-44 70-47 SI-307 14" X 0.312" 70-63 70-69 SI-307 20" X 0.375" 70-49 70-61 REFERENCE DRAWINGS 02-P-S IF-20 1 ZONE 102 00 EL. 41' 10" LPSI PUMP A SUCTION ZONE 94 UNIT 2 ZONE 70 LPSI PUMP ROOM "A" SUCTION

ZONE 83 LINE # DIA X SCH FROM TO SI-78 10" X 0.365" 72-29 72-32 SI-87 8" X 0.322" 72-5 72-6 SI-87 10" X 0.365" 72-8 72-57 REFERENCE DRAWINGS 02-P-SIF-207 72-8 72-9 EL 46'-9" UNIT 2 ZONE 71 LPSI PUMP ROOM "A" DISCHARGE

NOTES:

1) TAG NUMBER: 2MSIAPO1
2) SERIAL NUMBER: 0876-40 INGERSOL RAND WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN TWENTY-FOUR 2" DIAMETER STUDS (21 @ 9.5" LONG AND 3 @ 8.88" LONG) m I I f-\ I

.__1J L DISCHARGE ZONE 71 REFERENCE DRAWINGS N001-11.01-36 N001-11.01-50

-I SUCTION ZONE 70 UNIT 2 ZONE 72 71 I-LPSI PUMP A

LINE # DIA X SCH FROM TO REFERENCE DRAWINGS 02-P-SIF-202 SI-308 14" X 0.312" 71-63 71-69 SI-308 20" X 0.375" 71-49 71-61 SI-194 18" X 0.312" 71-44 71-47 SI-34 16" X 0.312"71-105 71-111 LPSI PUMP B SUCTION ZONE 95 UNIT 2 ZONE 73 C/L EL. 41' 10" LPSI PUMP ROOM "B" SUCTION

ZONE 86 LINE # DIA X SCH FROM TO SI-129 8" X 0.322" 73-5 73-6 SI-129 10" X 0.365" 73-8 75-51 SI-123 10" X 0.365" 73-27 73-30 REFERENCE DRAWINGS 02-P-SIF-208 ZONE 74 LPSI PUMP ROOM "B" DISCHARGE

NOTES:

1) TAG NUMBER: 2MSIBPO1
2) SERIAL NUMBER: 0876-41 INGERSOL RAND WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN

-I, l "1 I TWENTY-FOUR 2" DIAMETER STUDS AII /--N II /-"(21 @ 9.5" LONG AND 3 @ 8.88" LONG)

L _u- Ll.

DISCHARGE ZONE 74 REFERENCE DRAWINGS N001-11.01-36 N001-11.01-50

-I SUCTION

1 ZONE 73 UNIT 2 ZONE 75 F 1 LPSI PUMP B

EL. 70' ZONE 71 EL. 47' ZONE 70 REFERENCE DRAWINGS 02-P-SIF-201 02-P-SIF-207 41' 10" LINE # DIA X SCH FROM TO ZONE 102 SI-067 16" X 0.312"70-110 70-111 SI-067 14" X 0.312"70-113 80-16 CONTAINMENT SPRAY PUMP A SI-009 14" X 0.312" 80-1 80-4 SUCTION SI-009 18" X 0.312" 80-5 80-13 SI-078 10" X 0.365" 72-33 72-35 CONTAINMENT SPRAY PUMP ROOM "A" SUCTION

ZONE 83 EL 58'-6" LINE # DIA X SCH FROM TO SI-079 8" X 0.322" 82-IA -

SI-079 10" X 0.365" 82-1 82-27 SI-082 10"X0.365" 82-31 82-35 REFERENCE DRAWINGS EL 53'-6"- 02-P-SIF-207 CONTAINMENT SPRAY PUMP A ZONE 82 DISCHARGE UNIT 2 ZONE 77 CONTAINMENT SPRAY PUMP ROOM "A" DISCHARGE

NOTES:

1) TAG NUMBER: 2MSIAP03
2) SERIAL NUMBER: 0876-42 1NGERSOL RAND WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN N,

ýL I TWENTY-FOUR 2" DIAMETER STUDS (21 @ 9.5" LONG AND 3 @ 8.88" LONG)

AII \ II DISCHARGE ZONE 77 REFERENCE DRAWINGS N001-11.01-36 I...,

4~

-I SUCTION 0

ZONE 76 UNIT 2 ZONE 78 3

0 -

3 CONTAINMENT SPRAY PUMP A

EL 47'- 10" LINE # DIA X SCH FROM Tro 81-4 81-12 71-101 71-104 73-33 UNIT 2 ZONE 79 CONTAINMENT SPRAY PUMP ROOM "B" SUCTION PUMP ROOM 2

CONTAINMENT SPRAY SUCTION "B"ZONE 79 UNiT J.____________________

ZONE 86 LINE # DIA X SCH FROM TO SI-119 8" X 0.322" 83-1A -

SI-119 10" X 0.365" 83-1 83-26 SI-147 10" X 0.365" 83-30 83-34 REFERENCE DRAWINGS 02-P-SIF-208 EL 53'-6" ZONE 85 EL 63'-0" E

EL 49'-2" CONTAINMENT SPRAY PUMP ROOM "B" DISCHARGE

NOTES:

1) TAG NUMBER: 2MSIBPO3
2) SERIAL NUMBER: 0876-43 INGERSOL RAND WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN DISCHARGE ZONE 80 REFERENCE DRAWINGS N001-11.01-36 I,

U r

~71z -1 SUCTION ZONE 79 UNIT2 ZONE 81 CONTAINMENT SPRAY PUMP B

LINE # DIA X SCH FROM TO SI-078 10" X 0.365" 72-36 72-48 SI-078 20" X 0.500" 72-49 72-52 SI-079 10" X 0.365" 82-28 72-61 REFERENCE DRAWINGS 02-P-SIF-207 ZONE SDCHX A INLET NOZZLE ZONE76 SHUTDOWN COOLING HEAT EXCHANGER ROOM A

LINE # DIA X SCH FROM ITO SI-070 20" X 0.500" 74-1 74-19 REFERENCE DRAWINGS SI-070 16" X 0.375" 74-21 74-25 02-P-PCF-201 02-P-SIF-203 SI-070 20" X 0.500" 74-27 74-27 02-P-SIF-207 SI-082 10" X 0.365" 82-36 82-38 SI-087 10" X 0.365" 74-58 74-74 SI-089 10" X 0.365" 74-77 82-44 SI-089 10" X 0.365" 82-39 82-40 SI-090 14" X 0.375"74-105 74-118 SI-131 6" X 0.280" 74-97 74-100 E;

H I, UNIT 2 ZONE 83 U

SHUTDOWN COOLING HEAT EXCHANGER ROOM A 5-

NOTES:

1) TAG NUMBER: 2MSIAEO1
2) SERIAL NUMBER: S-18343 TUBE SHEET (ENGR & FABRICATORS) 1/8" 3) NATIONAL BOARD NUMBER 1710
4) ZERO DEGREE FOR GIRTH WELDS IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.

64 STUDS 1.5" X 17" REFERENCE DRAWINGS:

N001-7.03-020 N001-7.03-25 N001-11.01-209 CHANNEL HEAD CROSS SECTION 74-121 75-122 DETAIL 30 INLET NOZZLE - ZONE 82 OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 83 SHUTDOWN COOLING HEAT EXCHANGER A

EL 75' EL 80'-2" EL 75' ZONE 80 SDCHX B INLET NOZZLE REFERENCE DRAWINGS 02-P-SIF-208 LINE # DIA X SCH FROM TO SI-119 10" X 0.365" 83-27 73-63 SHUTDOWN COOLING HEAT SI-123 10" X 0.365" 73-34 73-46 EXCHANGER ROOM B SI-123 20" X 0.500" 73-48 73-54

LINE # DIA X SCH FROM I TO SI-072 20" X 0.500" 75-1 75-17 SI-072 16"X 0.375" 75-19 75-23 SI-072 20" X 0.500" 75-25 75-25 SI-129 10" X 0.365" 75-53 75-61 SI-131 6" X 0.280" 75-8 1 75-84

-4 2

~2 7o H

J2

NOTES:

1) TAG NUMBER: 2MSIBE01
2) SERIAL NUMBER: S-18344 TUBESHEET (ENGR & FABRICATORS) 1/8" 3) NATIONAL BOARD NUMBER 1711
4) ZERO DEGREE FOR GIRTH WELDS IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.

64 STUDS 1.5" X 17" REFERENCE DRAWINGS:

N001-7.03-020 N001-7.03-25 N001-11.01-209 CHANNEL HEAD CROSS SECTION 75-76 75-77 DETAIL 30 INLET NOZZLE - ZONE 85 OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 86 SHUTDOWN COOLING HEAT EXCHANGER B

LINE # DIA X SCH FROM TO REFERENCE DRAWINGS SI-072 12" X 0.375" 78-2 78-11 02-P-SIF-208 SI-072 12" X 1.125" 78-13 78-14 SI-072 20" X 0.500" 75-35 75-38 SI-073 12" X 0.375" 79-1 79-11 SI-073 12"X 1.125" 79-13 79-14 SI-155 12" X 1.125" 78-16 78-21 SI-172 10" X 0.365" 78-IOC 78-IOD ZONE 99 SI-174 12"X 1.125" 79-16 79-21 UNIT 2 ZONE 88 U

EAST WRAP

REFERENCE DRAWINGS 02-P-SIF-202 02-P-SIF-208

-J LINE #

SI-38 3

SI-173 SI-173 ZONE 89 3 SI-173 SI-194 3

SI-194 18" X 0.312" 71-13 71-18 SI-194 18"X 0.312" 71-13 71-18

ZONE 121 EL 95' ZONE 101 REFERENCE DRAWINGS 02-P-SIF-202 02-P-SIF-208 1-UNIT 2 ZONE 90

'3 EAST WRAP ZONE 104

  • EL 73'-7"

LINE # DIA X SCH IFROM _TO 97 ZONE 91 WEST WRAP

ZONE 100 REFERENCE DRAWINGS 02-P-SIF-201 02-P-SIF-207 EL. 84'-3" M

00 ZONE 91 EL 78'-9" ZONE 94 LINE # DIA X SCH FROM TO

-I SI-002 12" X 0.250" 70-85 70-98 I, UNIT 2 ZONE 92 SI-239 10" X 0.250" 70-70 70-82A SI-239 10" X 0.365" 83 -

WEST WRAP SI-241 16" X 0.312" 70-1 70-14 SI-241 18" X 0.312" 70-16 70-22

LINE # DIA X SCH FROM TO ZONE 120 SI-089 8" X 0.322" 82-66 82-67 SI-089 10" X 0.365" 82-55 82-65 SI-007 24" X 0.375" 84-6 84-8 SI-307 24" X 0.562" 84-9 84-11 SI-088 10" X 0.365" 93-42 93-43 SI-088 8" X 0.322" 93-40 93-41 REFERENCE DRAWINGS 02-P-SIF-201 02-P-SIF-207 B

EL 92'-6" ZONE 94 ZONE 100

'EL 84' -°8"

-71 UNIT 2 ZONE 93

o WEST WRAP ZONE 102 EL 73'-7"

EL 92'-6" ZONE 92 ZONE 93 EL 64' I "- EL 72' ZONE 83 "i

EL 41'-10" 7

12 UNIT 2 ZONE 94 LINE # DIA X SCH FROM TO SI-070 20" X 0.500" 74-28 74-41 A TRAIN MISC. PIPE CHASES REFERENCE DRAWINGS:

SI-089 10" X 0.365" 82-45 82-54 02-P-SIF-201 AND 88' PIPE TUNNEL 02-P-SIF-207 SI-241 18" X 0.312" 70-23 70-43 L -

EL 95' ZONE 88 EL 72' ZONE 86

-'1 n

'3 REFERENCE DRAWINGS:

02-P-SIF-202 02-P-SIF-208 EL 88' ZONE 86 UNIT 2 ZONE 95 LINE # DIA X SCH FROM TO SI-072 20" X 0.500" 75-27 75-33 B TRAIN MISC. PIPE CHASES SI-134 10" X 0.365" 83-44 83-52 AND 88' PIPE TUNNEL SI-194 18"X0.312" 71-19 71-43

ZONE 23 114 REFERENCE DRAWINGS 02-P-SIF-103 LINE # DIA X SCH FROM TO SI-202 12" X 1.125" 76-22 76-25 CONTAINMENT SI-202 12" X 1.312" 76-27 76-47 LPSI HEADER TO LOOP 1A

I LINE # DIA X SCH FROM TO EL SI-220 12"X 1.125" 77-22 77-25 SI-220 12" X 1.312" 77-27 77-47 REFERENCE DRAWINGS 02-P-SIF-103 CONTAINMENT LPSI HEADER TO LOOP 1B

LINE # DIA X SCH FROM TO SI-155 12" X 1.125" 78-22 78-25 EL 89'-9" SI-155 12" X 1.312" 78-27 78-47 ZONE 88 REFERENCE DRAWINGS 02-P-SIF-136 7

UNIT 2 ZONE 98 CONTAINMENT LPSI HEADER TO LOOP 2A

ZONE 115 EL 93'-5" ZONE 26 \ZIJ ZONE 88 REFERENCE DRAWINGS 02-P-SIF-136 UNIT 2 ZONE 99 CONTAINMENT LPSI HEADER TO LOOP 2B

LINE # DIA X SCH FROM TO 84-2 84-3 REFERENCE DRAWINGS SI-007 24" X 0.375" 02-P-SIF-105 SI-241 16" X 0.312"70-116 70-119 02-P-SIF-151 13-P-ZCG-112 SI-241 16" X 1.594"70-120 70-121 Pzs V19 SI-369 10" X 0.250"70-122 70-132 ZONE 21 7

-1 I,

ZONE 100 CONTAINMENT LPSI TRAIN A SUCTION

ZONE 22 ZONE 90 3~

'3 PSV-189 LINE # DIA X SCH FROM TO.

ZONE 89 SI-030 24" X 0.375" 85-2 85-3 SI-194 16" X 0.312"71-112 71-121 SI-194 16" X 1.594"71-122 71-123 SI-368 10" X 0.250"70-124 71-143 SI-368 6" X 0.280"71-145 -

REFERENCE DRAWINGS 0

02-P-SIF-105 UNIT 2 ZONE 101 3

02-P-SIF-151 0 13-P-ZCG-112 3

CONTAINMENT LPSI TRAIN B SUCTION

LINE# DIA/SCH FROM TO SI-307 24" x 0.562" 84-12 84-37 SI-307 20" x 0.375" 84-39 84-46 CONT. ON ZONE 93 WEST WRAP

-I

2) ZONE 102 SAFETY INJECTION PUMPS A TRAIN SUCTION

ESSENTIAL PIPE TUNNEL CONT ON ZONE 102 SI PUMP SUCT.

-o Reference DWG'S.

7 LINE# DIA/SCH FROM TO UNIT 2 ZONE 103 02-P-SIF-201 02-P-ZYA-925 CH- 424 20" x 0.375" 86-1 86-20 REFUELING WATER SUCTION CH- 142 20" x 0.375" 86-21 86-59 A TRAIN

LINE# DIA/SCH FROM TO SI-308 24" x 0.562" 85-12 85-37 SI-308 20" x 0.375" 85-38 85-49 SI-33 18" x 0.312" 85-50 81-13 SI-31 10" x 0.250" 85-59 85-80 70-6" CH-150 3" X 0.216" 104-2 104-5 REFERENCE DWG'S 02-P-SIF -202 02-P-CHF-206 CONT. ON ZONE 79 CONT. SPRAY CONT. ON 3 PUMP "B" SUCT. ZONE 73 LPSI PUMP UNIT 2 ZONE 104 "B" SUCT.

3* SAFETY INJECTION PUMPS B TRAIN SUCTION HPSI PUMP #2 ZONE 117

-- J

ESSENTIAL PIPE TUNNEL 88' REFUELING WATER TANK Reference DWG'S.

02-P-SIF-202 02-P-ZYA-925 CONT. ON ZONE 104

LINE # DIA X SCH FROM TO SI-099 4" X 0.337" 106-1 106-6 SI-100 4" X 0.438" 106-7 106-44 SI-100 106-10 161 zON JE 108 silow

-7 0 4" X 0.43 8" 106-24 16-281 EL 88' H2H3161 SI-1055 2" X 0.344" 106-49 106-72 5 2" X 0.344" 106-63 106-68 106-32 106-8 061 H,-l 106-32 108 SI-10(6 3" X 0.438" 106-45_ 106-48 106-31 B V-04100A 106-36 Am3 o B 1064 I W00 SI 16-28l 106-57 064

-0 I-AH C106-14 106 43 1076-23 I)

S DRAWIN6 -A00-CCBA-4"'

1I 0 106-43 PO06-1 P0NTNJ A1 TH ID TSI--10\5 H-1 106-63 w 10-6-52 106-53 106-6 4 yz 1A42E A 106-57 106 HPSI A 10606568 PUMP IA15CB-7 B 106-59 W SI-105 -- 06-8

-I H-C 106-60 REFERENCE DRAWIN( 3s UNIT 2 ZONE 106 n

02-P-SIF-203

.3 HPSI PUMP ROOM "A" NOTE:

SW = SOCKET WELD)3 DISCHARGE

DIAXSCH FROM TO LINE #

LINE #- DIA X SCH FROM TO SI-107 4" X 0.337" 107-1 107-41 SI-107 4" X 0.337" 107-23 107-27 SI-107 3" X 0.438" 107-68 107-71 SI-112 2" X 0.344" 107-42 107-65 SI-112 2" X 0.344" 107-56 107-60 ZONE 109 SI-112 2" X 0.344" 107-66 107-67 REFERENCE DRAWINGS 02-P-SIF-204 EL 51'-6" NOTE:

SW = SOCKET WELD POINTA CONTINUED THISDRAWING UNIT 2 ZONE 107 I,

HPSI PUMP ROOM "B" DISCHARGE

REFERENCE DRAWINGS 02-P-SIF-203 02-P-SIF-204 CHARGING 02-P-CHF-207 PUMP A ZONE 112 10" EL. 89' HPSI DISCHARGE 88' PIPE CHASE ZONE 106

REFERENCE DRAWINGS 02-P-SIF-203 02-P-SIF-204 ZONE 10" B

ZONE 110 EL. 92' 2" EL. 91' EL. 89' EL. 51' 8" FROM HPSI B 40' ZONE 107 ZONE 109 HPSI DISCHARGE 88' PIPE CHASE

r 1-,-

LINE # DIA X SCH FROM TO SI-103 2" X 0.344" 110-40 110-52 SI-107 2" X 0.344" 110-53 110-59 SI-107 4" X 0.337" 110-1 110-10 SI-l11 2" X 0.344" 110-11 110-17 SI-218 2" X 0.344" 110-18 110-22 SI-218 3" X 0.438" 110-38 110-39 SI-218 4" X 0.438" 110-23 110-37 SI-236 2" X 0.344" 110-60 110-64 Do H

n ZONE 110 a

HPSI DISCHARGE 3

WEST WRAP

LINE # DIA X SCH IFROM TO SI-100 2" X 0.344" 111-9 111-25 SI-100 4" X 0.438" 111-1 111-8 SI-236 3" X 0.438" 111-40 111-41 SI-236 4" X 0.438" 111-26 111-39 REFERENCE DRAWINGS 02-P-SIF-203 00 8'6" EL. 85' F ZONE 108 v) UNIT 2 ZONE 1I1 0

HPSI DISCHARGE WEST WRAP

LINE #

  • I.

DIA XX SCH SCH FROM I TO FROM ITO SI-100 4" X 0.438" 112-1 112-6 SI-1ol 2" X 0.344" 112-7 112-20 SI-102 2" X 0.344" 112-21 112-32 ZONE 113 SI-176 4" X 0.438" 112-33 112-44 SI-176 3" X 0.438" 112-45 112-46 21 9',

.170 0

'3 E 108 7

-I 0 UNIT 2 ZONE 112 HPSI DISCHARGE EAST WRAP

LINE# DIA X SCH FROM TO SI-108 2" X 0.344" 113-7 113-15 SI-107 4" X 0.337" 113-1 113-6 REFERENCE DRAWINGS SI-109 2"X 0.344" 113-21 113-27 02-P-SIF-204 SI-157 4" X 0.438" 113-33 113-49 SI-157 3" X 0.438" 113-50 113-51 SI-157 2" X 0.344" 113-16 113-20 SI-176 2" X 0.344" 113-28 113-32 ZONE 115 00 ZONE 112 7

.I 109 UNIT 2 ZONE 113 HPSI DISCHARGE EAST WRAP

REFERENCE DRAWINGS 02-P-SIF-103 EL 93'-5"

/EL 93'-5" ZONE 96 ZONE 97 ZONE 111 ZONE 110 CONTAINMENT HPSI HEADER LOOP 1A & 1B

REFERENCE DRAWINGS 02-P-SIF-136 ZONE 113 ZONE 112 EL 89'-9" ZONE 98 ZONE 99 CONTAINMENT HPSI HEADER LOOP 2A & 2B

1) TAG NUMBER: 2MSIAP02
2) SERIAL NUMBER: INGERSOL RAND S/N 0776-16
3) DISCHARGE HEAD STUDS 16@ 2.25" DIA. X 10.88" REFERENCE DRAWINGS 02-P-SIF-201 02-P-SIF-203 DISCHARGE ZONE 102 ZONE 106 SUCTION t

DISCHARGE HEAD STUDS UNIT 2 ZONE 116 J

a HPSI PUMP A

1) TAG NUMBER: 2MSIBP02
2) SERIAL NUMBER: INGERSOL RAND S/N 0776-17
3) DISCHARGE HEAD STUDS 16@ 2.25" DIA. X 10.88" REFERENCE DRAWINGS 02-P-SIF-201 02-P-SIF-203 DISCHARGE ZONE 104 SUCTION ZONE 107 i SUCTION t
  • DISCHARGE HEAD STUDS a UNIT 2 ZONE 117 0

HPSI PUMP B

LINE # DIA XSCH IFROM I TO SI-106 3"XO.438" 1118-1 1118-49 REFERENCE DRAWINGS 02-P-SIF-203 02-P-SIF-105 POINTA CONTINUED THIS DRAWING ZONE 106 7

-4 j)

EL 46'-3" UNIT 2 ZONE 118

'S HPSI "A" LONG TERM RECIRCULATION

REFERENCE DRAWINGS 02-P-SIF-105 HPSI "B" LONG TERM 02-P-SIF-204 RECIRCULATION 02-P-CHF-207 107

EL 116'-4" EL 112' CONT ZONE 93 REFERENCE DRAWINGS 13-P-ZCG-105

EL 116'-4"

( S-B13-GCBC- 10" EL CONT ZONE 90 REFERENCE DRAWINGS 13-P-ZCG-105

SECTION 11.0 Terms and Definitions 206 of 208 31NT-ISI-2 Rev 2

AHE: Augmented High Energy ANII: Authorized Nuclear Inservice Inspector APS: Arizona Public Service Company, et al ASME: American Society of Mechanical Engineers Aux: Auxiliary BWR: Boiling Water Reactor CE: Combustion Engineering CEDM: Control Element Drive Mechanism CFR: Code of Federal Regulations CH: Charging CHR: Containment Heat Removal Circ: Circumferential CL: Cold Leg CRD: Control Rod Drive CS: Containment Spray CSP: Containment Spray Pump DWG: Drawing ECCS: Emergency Core Cooling System FW: Feedwater HL: Hot Leg HPSI: High Pressure Safety Injection HV: Hand Control Valve Hx: Heat Exchanger ICI: In Core Instrumentation IEB: Inspection and Enforcement Bulletin IEIN: Inspection and Enforcement Information Notice Inj: Injection INPO: Institute for Nuclear Power Operations ISI: Inservice Inspection LPSI: Low Pressure Safety Injection MSSS: Main Steam Support Structure NDE: Nondestructive Examination NRC: Nuclear Regulatory Commission PDV: Pressure Differential Valve PSV: Pressure Relief or Safety Valve PWR: Pressurized Water Reactor PVNGS: Palo Verde Nuclear Generating Station PZR: Pressurizer RC: Reactor Coolant RCP: Reactor Coolant Pump REV: Revision RHR: Reactor Residual Heat Removal Recirc: Recirculation 207 of 208 31NT-ISI-2 Rev 2

RCS: Reactor Coolant System RPV: Reactor Pressure Vessel RVLMS: Reactor Vessel Level Monitoring System REM: Roentgen Equivalent Man SDCHX: Shutdown Cooling Heat Exchanger SD: Shutdown SER: Significant Event Report SG: Steam Generator SI: Safety Injection SN: Serial Number T: Thickness Tech. Spec: Technical Specification UFSAR: Updated Final Safety Analysis Report USNRC: United States Nuclear Regulatory Commission UV: Multivariable Control Valve V: Valve 208 of 208 31NT-ISI-2 Rev 2

Attachment 3 PVNGS Unit 3 - Revised Third 10-Year Interval Inservice Inspection Plan

/

-A 3 rd Inspection Interval Inservice Inspection Program Summary Manual PVNGS Unit 3 Arizona Public Service Company PVNGS PO Box 52034 5801 S Wintersburg Road Phoenix, AZ 85072-2034 Tonopah, AZ 85354 Digitally signed by Hansen, Douglas Ahlstrom, WileyAW Digitallysigned by Ahlstrom, WleyJ(zgg422)

DN:cn=Ahlstrom, Hansen, Douglas DN:cn=Hansen, Douglas B(Z41530)

Wiley Reason: lam the author ofthis J(Z99422) J1Z99A221 B(Z41Rvee Date Preparer: -Date: 2011.09.13 05:22:43 -0T00' Reviewer: 'J Date:2011.09.13 04:53:32 -07'00' Hogstrom, HDigitally *jRobert signed by Hogstrom, (YH2450) k: Digitally signed by Pobst, Donald ON: cn=Hogstrom, Robert Pobst, Donald 4201 Z7420 Robert I-C(YH2450)

Reason: I have reviewed this S"(Z7542 0) / Reason: Iam appyung this ANII:)

-, ,lDocumnenD t S U~ t as Section Leader.

el--I I'X ANII 250)

('"H Date:2011.09.13 06:36:17-0700' Section Leader:

Date: 2011.09.13 13:47:28 -07O00' D'

Digitally signed by Thiele,Car Thiele, Carl B(Z99692)

,DDN:cn=ThieleCarl1BZ996921 Reason: Iam approving this Department Leader:

B(Z99692),' Datm:2nt.

Date: 2011].09.14 00:34:57-OT7X)

Commercial Service Date: 01-08-1988 Program No: 3INT-ISI-3 Rev. 1 1 of 208 31NT-ISI-3 Rev 1

TABLE OF CONTENTS 1.0 Summ ary ......................................................................................................... 3 2.0 Code Applicability .................................................................................... 3 3.0 Description ................................................................................................ 4 3.1 Scope ...................................................................................................... 4 3.2 System Boundaries ................................................................................ 5 3.3 Accessibility .......................................................................................... 5 3.4 Exam ination Techniques ......................................................................... 6 3.5 Inspection Intervals ................................................................................... 6 3.6 Exam ination Categories ............................................................................ 7 3.7 Evaluation and Repair .............................................................................. 7 3.8 System Pressure Tests .............................................................................. 7 3.9 Exemptions .............................................................................................. 7 3.10 Code Cases ............................................................................................. 8 3.11 Outage Plan Table ..................................................................................... 8 4.0 ASM E Class 1 Summ ary ............................................................................ 9 5.0 A SM E Class 2 Summ ary .......................................................................... 34 6.0 A SM E Class 3 Summ ary .......................................................................... 67 7.0 Augm ented Summ ary .............................................................................. 74 8.0 Requests for Relief ........................................................................................ 87 9.0 Boundary Drawing Listing ....................................................................... 89 10.0 Zone Drawings ......................................................................................... 91 11.0 Term s and Definitions ................................................................................. 206 2 of 208 31NT-ISI-3 Rev 1

PALO VERDE NUCLEAR GENERATING STATION UNIT 3 INSERVICE INSPECTION - PROGRAM

SUMMARY

1.0

SUMMARY

1.1 This document contains a detailed description of the 3 rd 10 Year Interval Inservice Inspection (ISI) Program for Palo Verde Nuclear Generating Station Unit 3. This program conforms to the requirements of 10CFR50.55a (g), PVNGS Technical Specifications, and the PVNGS UFSAR. Exceptions that are known as of this document preparation date are included in the Requests for Relief Section 8.0.

1.2 The revision is being prepared to update the ISI Program for the 3 rd 10 Year Interval. This includes the utilization of the 2001 Edition including the 2003 Addenda of ASME Section XI with the exceptions noted below:

1.2.1 Requests for relief from ASME Section XI requirements are included in Section 8.0.

These Relief Requests are prepared in a format similar to that documented in the NEI White Paper Revision 1 dated June 2004, entitled: "Standard Format for Requests from Commercial Reactor Licensees Pursuant to 10CFR50.55a".

1.2.2 The 2007 Edition thru the 2008 Addenda was utilized for Category B-L-1 and B-M-1 for pump and body weld requirements.

1.2.3 For clarification, this Interval 3 program was prepared, as was Interval 1 and 2 programs, utilizing 40 month periods.

1.3 This revision does not utilize risk informed inservice inspection methodology at this time.

1.4 The information presented is in a form consistent with the 1st and 2 nd 10 Year Interval ISI Program, the applicable requirements of Standard Review Plan manual and procedures and the recommendations contained in NRC letter dated July 17, 1981, from Mr. R.L. Tedesco, NRC, to E. E. Van Brunt, Jr., APS, "Guidance for Preparing Preservice and Inservice Inspection Programs and Relief Requests - Palo Verde Nuclear Generating Station Units 1, 2 and 3."

2.0 CODE APPLICABILITY 2.1 Based on paragraph 10 CFR 50.55a(b) (2) that was published 12 months prior to the start of the 3 rd 10 Year Interval (1-11-08), the 2001 Edition including the 2003 Addenda of ASME Section XI was referenced as the Code to utilize for preparation of this program. Several exceptions to this code are documented in 10CFR50.55a; each of these exceptions was utilized during the preparation of this program.

  • The exemptions of IWB-1220 for Class 1 piping must utilize the 1989 Edition.
  • When qualifying VT-3 personnel per IWA-2317, the proficiency of the training must be demonstrated by initial qualification examination and subsequent examinations on a 3 year interval.

3 of 208 31NT-ISI-3 Rev 1

0 The 1997 Edition must be used for IWA-2240 alternative examination methods, a combination of methods, or newly developed techniques.

  • Items B3.120 and B3.140 (nozzle inner radius examinations) of the 1998 Edition must be utilized. An enhanced visual examination with a resolution sensitivity to detect a 1-mil wire or crack may be performed in place of an ultrasonic examination.
  • Must utilize the 1995 Edition for examination Item B7.80.
  • IWA-2220, Ultrasonic examination methods are prohibited for surface examinations.
  • The surface examination requirements for HPSI systems, Items B9.20, B9.21 and B9.22 are not required to be performed.

2.2 If a code required examination was considered to be impractical during the preparation of this document because of plant design, geometry, accessibility or other conditions, a Request for Relief from that requirement was prepared and included in Section 8.0. If a code required examination is identified to be impractical during the course of an inspection and the code required percentages are not met, a request for relief will be prepared and submitted after each inspection period, and the final interval closeout no later than 12 months after expiration of the Interval.

2.3 This program will implement Appendix VIII to Section XI in accordance with 10 CFR 50.55a. Appendix VIII examinations will be conducted in accordance with the Performance Demonstration Initiative (PDI). The PDI Code Comparison document explains the complex relationship of regulatory requirements, ASME requirements, code editions, and the PDI program.

3.0 DESCRIPTION

3.1 SCOPE 3.1.1 This Inservice Inspection Program Summary includes all applicable nondestructive examinations required by ASME Section XI as identified below:

1. Examination of ASME Class 1, 2, and 3 pressure retaining components and their supports 3.1.2 This program also includes an augmented section that includes examinations for other items required to be examined as identified below.
1. Examinations of welds in Class 1 components fabricated with Alloy 600/82/182 materials in accordance with 10CFR50.55a and Code Case N-722-1.
2. Examination of the Reactor Vessel Closure Head in accordance with 10CFR50.55a and Code Case N-729-1.
3. Examination of welds in Class 1 piping and vessel nozzle butt welds fabricated with alloy 82/182 in accordance with 10CFR50.55a and Code Case N-770-1.
4. Examination of the Reactor Coolant Pump Flywheels in accordance with PVNGS Technical Specifications Section ITS 5.5.7.
5. USNRC Circulars, Information Notices, Bulletins, or Orders
6. INPO or other industry operating experiences 4 of 208 31NT-ISI-3 Rev 1
7. Combustion Engineering or Westinghouse bulletins or notices
8. Special examinations to satisfy other commitments or concerns that are based on operating experiences, USNRC. These examinations are scheduled throughout this program and reference the applicable notification documents.

3.1.3 Those items that may generally be included in an Inservice Inspection Program, but are not included are identified below:

1. The inservice testing of snubbers will be performed in accordance with 10CFR50.55a.
2. The inservice examination of steam generator tubing will be performed in accordance with the PVNGS Technical Specifications Section T5.5.9.
3. The Examination Program for the ASME Subsections IWE and IWL will be performed in accordance with 10CFR50.55a and the PVNGS Technical Specifications.

3.2 SYSTEM BOUNDARIES 3.2.1 A complete set of P&ID drawings indicating the Inservice Inspection boundary are maintained at the PVNGS site. These drawings illustrate the ASME Class 1, 2, and 3 systems; components; and boundaries scheduled for examinations and pressure testing. A referenced listing of these drawings is documented in Section 9.0.

3.2.2 A set of ISI (Zone) Drawings is included in Section 10.0. These drawings are utilized for the planning and scheduling of specific ASME Class 1 and 2 examinations throughout the 10 Year Interval. These also document the location and number of welds, components, and supports. These Zone drawings are revision controlled in conjunction with this program manual.

3.3 ACCESSIBILITY 3.3.1 The preservice examinations were performed with examination techniques, automated or manual, similar to those planned for use during Inservice Inspections. The examination limitations noted during the preservice examinations were documented in Requests for Relief submitted with the preservice examination program. There has also been a number of additional code limitations noted during the I" and 2 nd 10 Year Intervals and Request for Relief submitted. If included in the required 3 rd Interval examinations they will again be evaluated and relief requested. Note Section 8.0 identifies all the reliefs submitted during the preparation and implementation of the 3rd Interval.

3.3.2 All items that are scheduled for examination will be examined to the extent practical.

In addition, any code limitations that are noted during the examinations will be documented. If relief is required from any of these examinations, a Request for Relief will be submitted after the relief is discovered and prior to 12 months after the interval ends.

5 of 208 3INT-ISI-3 Rev 1

3.4 EXAMINATION TECHNIQUES 3.4.1 The three types of examinations utilized to perform Inservice Inspections, along with the actual nondestructive examination technique, are identified in the legend below:

VT - Visual VT - 1 (General Condition)

VT - 2 (Leakage)

VT - 3 (Mechanical and Structural Condition)

VE (Visual Examination)

S - Surface PT - Liquid Penetrant MT - Magnetic Particle ET - Eddy Current VOL - Volumetric UT - Ultrasonic RT - Radiography 3.4.2 All the above nondestructive examination techniques will be performed using specific techniques and procedures that are identified in ASME Section XI, or alternative examinations that are demonstrated to be equivalent or superior to those identified.

The provision for substitution of these alternative examination methods, combination of methods, or newly developed techniques will utilize the 1997 Addenda for IWA-2240.

3.5 INSPECTION INTERVALS 3.5.1 The Inservice Inspection Program was prepared in accordance with Program B of ASME Section XI. The 1s, 2 nd, and 3rd 10 Year Intervals and corresponding inspection periods are defined below:

First Inspection Interval: 01-08-88 to 01-10-98 Second Inspection Interval: 01-11-98 to 01-10-08 Third Inspection Interval: 01-11-08 to 01-10-18 Period One: 01-11-08 to 05-10-11 Period Two: 05-11-11 to 09-10-14 Period Three: .09-11-14 to 01-10-18 It should be noted that the intervals/periods may change to allow for extended outage durations per IWA-2400 of ASME Section XI.

6 of 208 31NT-ISI-3 Rev 1

3.6 EXAMINATION CATEGORIES 3.6.1 The examination categories of ASME Section XI were utilized to develop this program for all systems, components, and supports. The Subprogram summary tables contained in Sections 4.0 and 5.0 are organized by examination category for ASME Class 1 and 2 systems, respectively. For each examination category, these tables identify the system or identification, nondestructive examination method, total number of items, required examination amount for each inspection period, and running '

percentage. For ASME Class 3 systems, the examinations categories are identified in Section 6.0.

3.7 EVALUATION AND REPAIR 3.7.1 The evaluation of all examination results will be performed in accordance with ASME Section XI Articles IWx-3000. In addition, all applicable repairs and replacements will be performed in accordance with ASME Section XI Articles IWX-4000 and 7000. Pressure tests will be performed on welded and mechanical joint repairs or replacements, in accordance with IWx-4000 and 5000 and 10CFR50. Both the evaluations and repair or replacement will be performed in accordance with the 2001 Edition including the 2003 Addenda of ASME Section XI, or later editions and addenda of ASME Section XI referenced in 10CFR50. Later editions and addenda will be documented with the NRC.

3.7.2 It should be noted that a relief was requested (Relief Request 38) to perform repair and replacement of all three PVNGS units to the 2001 Edition including the 2003 Addenda. This request was documented in conjunction with the relief to perform full structural weld metal overlays. (APS letter to the USNRC 102-05641 dated 2-8-2007).

3.7.3 All repairs and replacements will be documented in accordance with the Work Control program, and are maintained at Palo Verde for review.

3.8 SYSTEM PRESSURE TESTS 3.8.1 ASME Class 1, 2, and 3 components will be pressure tested per the requirements of IWB-5000, IWC-5000 and IWD-5000, except where relief has been requested.

3.8.2 Pressure tests will also be performed on repairs and replacements per ASME Section XI, 10CFR50.55a, and the PVNGS Repair and Replacement program.

3.9 EXEMPTIONS 3.9.1 The exemption criteria identified in the 2001 Edition including the 2003 Addenda of ASME Section XI was utilized for all ASME Class 1, 2, and 3 components and systems. The only exception is that required by 10CFR50.55a for the ASME Class 1 piping exemptions. These are in accordance with the 1989 Edition of ASME XI.

3.9.2 A thorough review of all the systems and components was performed in accordance with the above exemptions and a complete set of color coded Inservice Inspection Exemption drawings was prepared. These drawings are maintained at the PVNGS site for review.

7 of 208 31NT-ISI-3 Rev 1

3.10 CODE CASES 3.10.1 The following Code Cases are accepted for use in Regulatory Guide 1.147 and may be utilized during Interval 3 where applicable:

1. N-460 Alternative examination coverage for Class 1 and 2 welds
2. N-526 Alternative requirements for successive inspections of Class 1 and 2 vessels
3. N-532-4 Alternative requirements to repair and replacement documentation
4. N-534 Alternative Requirements for Pneumatic Pressure Testing.
5. N-566-2 Corrective Action for Leakage Identified at Bolted Connections
6. N-613-1 Ultrasonic examination of full penetration nozzles in vessels
7. N-624 Successive inspections
8. N-652-1 Alternative requirements to categories B-G-i, B-G-2, and C-D bolting
9. N-666 Weld Overlay of Class 1, 2, and 3 Socket Welded Connections
10. N-685 Lighting Requirements for Surface Examinations
11. N-695 Alternative for Qualification Requirements for Dissimilar Metal Piping Welds, Appendix VIII Supplement 10
12. N-700 Alternative Rules for Selection of Class 1, 2, and 3 Vessel Welded Attachments for Examination 3.10.2 The following Code Cases are conditionally accepted for use in Regulatory Guide 1.147 may be utilized with the specified conditions during Interval 3 where applicable:
1. N-513-3 Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RG 1.147 documents acceptance condition is that the repair or replacement activity temporarily deferred under the provisions of this Code Case shall be performed during the next scheduled outage.
2. N-648-1 Alternative requirements for inner radius examinations of reactor vessel nozzles RG 1.147 documents acceptance condition is that in place of a UT examination, licensees may perform a visual examination with enhanced magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio. The provisions of Table IWB-2500-1,Examination Category B-D, continue to apply except that, in place of examination volumes, the surfaces to be examined are the external surfaces shown in the figures applicable to this table (the external surface is from point M to point N in the figure).

3.10.3 The following Code Cases are required to be utilized by 10CFR50.55a with additional specified conditions. These are planned to be utilized with the specified conditions during Interval 3:

1. N-722-1 Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated With Alloy 600/82/182 Materials
2. N-729-1 Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds
3. N-770-1 Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated With UNS N06082 or UNS W86182 Weld filler Material With or Without Application of Listed Mitigation Activities 3.11 OUTAGE PLAN TABLE The outage plan table, controlled by procedure 73DP-9XI03 and 73DP-9EE02, identifies the components scheduled for examination including successive examinations from prior periods. The examination procedures and a listing of calibration blocks is also identified.

8 of 208 31NT-ISI-3 Rev 1

SECTION 4.0 ASME CLASS 1 EXAMINATION

SUMMARY

9 of 208 31NT-ISI-3 Rev 1

INDEX EXAM CATEGORIES B-A Pressure Retaining Welds in Reactor Vessel B-B Pressure Retaining Welds in Vessels Other Than Reactor Vessels B-D Full Penetration Welded Nozzles in Vessels B-F Pressure Retaining Dissimilar Metal Welds in Vessel Nozzles B-G-1 Pressure Retaining Bolting, Greater Than 2 Inches in Diameter B-G-2 Pressure Retaining Bolting, 2 Inches and Less in Diameter B-J Pressure Retaining Welds in Piping B-K Welded Attachments for Vessels, Piping, Pumps and Valves B-L-2 & B-M-2 Pump Casings and Valve Bodies B-N-1 Interior of Reactor Vessel B-N-2 Welded Core Support Structures and Interior Attachments to Reactor Vessels B-N-3 Removable Core Support Structures B-O Pressure Retaining Welds in Control Rod Housings B-P All Pressure Retaining Components B-Q Steam Generator Tubing F-A Class 1 Supports 10 of 208 31NT-ISI-3 Rev 1

B1.10 SHELLWELDS iI111 1 B1.11 CIRCUMFERENTIAL 1-Reactor Vessel welds 65173 Vol 3 0 1 0 0 2 0

    • 0* 3 0 **Relief Request 40 Examine in 2028 B1.12 LONGITUDINAL 1-Reactor Vessel welds 65173 Vol 9 0 1 0 0 2 0

.**0 3 0 B1.20 HEAD WELDS B1.21 CIRCUMFERENTIAL B1.22 MERIDIONAL 1-Reactor Vessel Bottom Head weld 65173 Vol 1 0 1 0 0 2 0

.**0 3 0 2-Closure Head weld N05065-CHA-03 Vol 0 0 1 0 RVH Replaced R15 0 2 0 0 3 0 B13.30 SHELL-TO-FLANGE WELD 1-Reactor Vessel weld 65173 Vol 1 0 1 0 0 2 0

    • 0* 3 0 B1.40 HEAD-TO-FLANGE WELD 2-Closure Head weld N05065-CHA-03 S & Vol 0 01 0 RVH Replaced R15 0 2 0 0 3 0

I I I *I* 1 - I -

4 3 100 IPRESSURIZER 1 " "

B2.10 SHELL TO-HEAD WELDS .. ..

B2.11 CIRCUMFERENTIAL _

5- Pressurizer weld 65373 Vol 2 1 1 1 3 B2.12 LONGITUDINAL**

I5- Pressurizer weld 65373 Vol 4 2 1 ** 1 of each 2 3 intersecting circ exam area

_STEAM GENERATORS ***

B2.30 HEAD WELDS.-

B2.31 CIRCUMFERENTIAL ***Multiple Vessels

_ 3- Steam Generator 1 weld 242 Vol 1 1 2 4- Steam Generator 2 weld 243 Vol 1 B2.40 TUBESHEET TO HEAD

_ 3- Steam Generator 1 weld 242 Vol 2 1 2 4- Steam Generator 2 weld 243 Vol 2 1 3

1- Reactor Vessel Outlets - 2 65173 Vol 6 0* 3 0 *Relief Request 40 Inlets - 4 Examine in 2028 B3.100 NOZZLE INSIDE RADIUS SECTION 1- Reactor Vessel Outlets- 2 65173 Vol 6 0* 3 0 *Relief Request Inlets - 4 , Examine in 2028 PRESSURIZER ,

B3.1 10 NOZZLE-TO-VESSEL WELDS ,

5- Pressurizer Surge- 1 65373 Vol 6 2 1 33 _,

Spray--1 2 2 67 ,

Safeties - 4 2 3 100 B3.120 NOZZLE INSIDE RADIUS SECTION**" ,

5- Pressurizer Surge - 1 65373 Vol 6 2 1 33 I _"

Spray--1 2 2 67 _

Safeties- 4 2 3 100 _

IjILjI"UVI '~L- 1 -InLtr I %;I1%

B3.130 NOZZLE-TO-VESSEL WELDS B3_140 NOZZLE INSIDE RADIUS SECTION**

  • B3.130 & B3.140 running percent 4 1 33 4 2 67 4 3 100 3- Steam Generator 1 Inlet - 1 242 Vol 31. 1 Outlet - 2 2 2 4- Steam Generator 2 Inlet - 1 243 Vol 3 1 1 Outlet - 2 2 3 B3.140 NOZZLE INSIDE RADIUS SECTION** inner radius

-_**added per 10CFR50.55a 3- Steam Generator 1 Inlet - 1 242 Vol 3 1 1 o Outlet - 2 2 2 0

4- Steam Generator 2 Inlet - 1 243 Vol 3 1 1 Outlet - 2 2 3

NOMINAL PIPE SIZE > 4 INCH NOZZLE TO SAFEEND BUTT B5.40 WELDS 20- Surge butt welds RC-028-12" S & Vol 6.*

  • 3 *itigated with FSWO 29- Spray butt welds RC-018-4" S & Vol *
  • Moved to Augmented 31- Safeties (4) butt welds RC-001-6" S & Vol
  • Tables RC-003-6" S & Vol RC-005-6" S & Vol

__RC-007-6" S & Vol EXAM CATEGrORY B-G-1; PRESSURE' RETAINING IN ii GREATER BOL~TING D IA METERi;i !=11,: THAN ii iiiiii; 2 IN.!!!II !~ !i i !£:!ii ii i i!!i! :l,:; ~. .. . .

REACTOR VESSEL _

B6.10 CLOSURE HEAD NUTS I 2- Closure Head nuts 7.237" x 7.91' VT-1 54 18 1 33 18 2 66

__18 3 100 B6.20 CLOSURE STUDS 2- Closure Head studs 7.380" x 76.37" Vol 54 18 1 33 _

18 2 66

"- 18 3 100 B6.40 THREADS IN FLANGE 1- Reactor Vessel Stud Holes 65173 Vol 54 0 1 0 '

0 2 0 54 3 100 B6.50 CLOSURE WASHERS BUSHINGS .. ...... .

" 2- Closure Head Washers 7.50" x 1.27" VT-1 54 18 1 33 " _ _

PUMPS B6.180 BOLTS AND STUDS 16- Reactor Coolant Pump 1A Flange Studs 4.33" x 32.87" Vol 16 16 .3 100 Multiple pumps 17- Reactor Coolant Pump. lB Flange Studs 4.33" x 32.87" Vol 16 *

    • VT-1 exams on 1 FLANGE SURFACE WHEN pump per interval (with B6.190 CONNECTION DISASSEMBLED B12.XX exams) 16- Reactor Coolant Pump 1A surface 1111-1A VT-1 1 ......

17- Reactor Coolant Pump 1B surface 1111-1B VT-1 1 ......

18- Reactor Coolant Pump 2A surface 111 1-2A VT-1 1 ......

19- Reactor Coolant Pump 2B surface 1111-2B VT-1 1 ......

C) 0o co

  • VT-1 exams on 1 pump per interval (with B6.200 NUTS, BUSHINGS, AND WASHERS B12.XX exams) 16- Reactor Coolant Pump 1A nuts & ring 11111-11A VT-1 16.

17- Reactor Coolant Pump 1B nuts & ring 1111-1B VT-i 16 .... **

18- Reactor Coolant Pump 2A nuts & ring 1111-2A VT-1 16 ......

19- Reactor Coolant Pump 2B nuts & ring 1111-2B VT-1 16 ......

4 .1. - 4 4 4 4 1 1 -

PRESSUJRIZER B7.20 BOLTS, STUDS AND NUTS _ __ _.. ...

5- Pressurizer Manway Studs & Nuts 1.31" x 14.5" VT-1 20 20 *.....

___STEAM GENERATOR ___ ____ __ ______

B7.30 BOLTS, STUDS AND NUTS

_ 3- Steam Generator 1 MANWAYS Studs &Nuts 1.31" x 14.5" VT-1 40 40 ......

4- Steam Generator 2 MANWAYS Studs & Nuts 1.31" x 14.5" VT-1 40 40 ......

When disassembled and only once per PIPINGnlvon interval B7.50 BOLTS, STUDS AND NUTS

_ 31- Pressurizer Safeties Flange Bolting RC-001-6" VT-1 8 8 ........

___ Flange Bolting RC-003-6" VT-1 8 8 ........

Flange Bolting RC-005-6" VT-1 8 8 ........

Flange Bolting RC-007-6" VT-1 8 8 ........

37- Charging Line Flange V435 CH-005-2" VT-1 8 8 ........

PUMPS B7.60 BOLTS, STUDS AND NUTS

    • VT-1 exams required 16- Reactor Coolant Pump 1A seal cover 1.1" x 8.27" VT-1 16 16 .... once per interval (B-L-2) 17- Reactor Coolant Pump 1B seal cover 1.1"x 8.27" VT-1 16 16 ....

18- Reactor Coolant Pump 2A seal cover 1.1" x 8.27" VT-1 16 16 ....

19- Reactor Coolant Pump 2B seal cover 1.1" x 8.27" VT-1 16 16 ** **

VALVES B7.70 BOLTS, STUDS AND NUTS During VENDOR 31- Pressurizer Safeties PSV-200 RC-001-6" VT-1 12 12 **..... disassembly (B-M-2)

PSV-201 RC-003-6" VT-1 12 12 .......

PSV-202 RC-005-6" VT-1 12 12 .......

PSV-203 RC-007-6" VT-1 12 12 ___...

When disassembled and only once per

_CRD HOUSING interval B7.80 BOLTS, STUDS AND NUTS _

2-Closure Head RVLMS Locations Grayloc Clamps CEDM 92 VT-1 4 4 CEDM96 VT-1 4 4 *_*** __..

B9.11

  • CIRCUMFERENTIAL WELDS 6- RCS Primary Piping HL 1** butt welds RC-032-42" ID S* & Vol 62 6 1 10 ** AUTO EXAM OF HL 2** butt welds RC-063-42" ID 6 2 19 NOZZLE TO EXT AND CL 1A to RCP butt welds RC-033-30" ID 7 3 31 EXT TO PIPE WELDS CL 1B to RCP butt welds RC-030-30" ID CL 2A to RCP butt welds RC-073-30" ID __*Surface exams not CL 2B to RCP butt welds RC-084-30" ID required in conjunction CL 1A to RPV** butt welds RC-034-30" ID with auto examination CL 1B to RPV** butt welds RC-031-30" ID (EWR-3673722 &

CL 2A to RPV** butt welds RC-079-30" ID Code Case N663)

CL 2B to RPV** butt welds RC-093-30" ID 20- Pressurizer Surge Line butt welds RC-028-12" S & Vol 12 1 1 8 DM Moved to AUG 0C) co 1 2 16 0o 1 3 25 21- Shutdown Cooling Loop 1 butt welds RC-051-16" S & Vol 25 3 1 12 DM Moved to AUG SI-240-16" 4 2 28 22- Shutdown Cooling Loop 2 butt welds RC-068-16" S & Vol 19 2 1 11 DM Moved to AUG SI-193-16" 3 2 26 3 3 31 23- Safety Injection 1A butt welds SI-207-14" S & Vol 19 5 1 26 DM Moved to AUG S 1-203-12" 24- Safety Injection 1B butt welds $1-223-14" S & Vol 18 5 2 28 DM Moved to AUG SI-221-12" 25- Safety Injection 2A butt welds SI-160-14" S & Vol 22 6 3 27 DM Moved to AUG SI-156-12"

_______ I_________________________________________ I________________ I __________________ I __________ I__________ I __________ i _______________ i_________ I -~

_1 17r_, 10" 28 & 29- Pressurizer Spray butt welds RC-018-4" S & Vol 15 1 1 7 1 2 14 2 3 27 31- Pressurizer Safeties butt welds RC-001-6" S & Vol 12 1 1 8 RC-003-6" 1 2 17 RC-005-6" 1 3 25 RC-007-6" 36- Letdown Line (delay coil) butt welds RC-091-16" S & Vol 4 1 3 25 B9.20 LESS THAN NPS 4 o

  • CIRCUMFERENTIAL WELDS 0 B9.21 OTHER THAN PWR HPSI SYSTEMS 0

o0 27ý Pressurizer Spray 1A butt welds RC-062-3" S 40 11 1 27 DM Moved to AUG RC-0 16-3" 28- Pressurizer Spray 1B butt welds RC-017-3" S 37 10 3 27 DM Moved to AUG RC-0 18-3" 30- Aux Pressurizer Spray butt welds CH-009-2" S 10 3 2 30 DM Moved to AUG CH-520-2" CH-521-2" 32- Drain Line Loop 1A butt welds RC-060-2" S 6 2 1 33 DM Moved to AUG 33- Drain Line Loop 1B butt welds RC-058-2" S 6 2 2 33 DM Moved to AUG 34- Drain Line Loop 2A butt welds RC-096-2" S 6 2 3 33 DM Moved to AUG 35- Drain Line Loop 2B butt welds' RC-089-2" S 5 2 3 40

I* ,J- L 1--

CH-001-2" .6 2 16 6 3 25 37- Charging Line butt welds CH-005-3" S 62 5 1 8 DM Moved to AUG CH-005-2" 5 2 16 6 3 26 38- Drain Line Loop 1 butt welds RC-070-2" S 1 1 2 100 CIRCUMFERENTIAL WELDS OF B9.22 PWR HPSI SYSTEMS 39- HPSI Long Term Recirculation 1 butt welds SI-248-3" Vol 53 6 2 11 8 3 26 140- HPSI Long Term Recirculation 2 butt welds SI-199-3" Vol 24 3 1 12 4 2 29

_______ A. .8. 1 1 1 -

BRANCH PIPE CUNNEL; ION B9.30 WELDS B9.31 NPS 4 OR LARGER

  • 9.31 running percent 7 7 1 1 14 1 3 28 6- RCS Primary Piping Surge branch weld RC-032-42" ID S & Vol 1 SD Cooling 1 branch weld RC-032-42" ID S & Vol 1 SD Cooling 2 branch weld RC-063-42" ID S & Vol 1 SI 1A branch weld RC-034-30" ID S & Vol 1 SI 1B branch weld RC-031-30" ID S &Vol 1 SI 2A branch weld RC-079-30" ID S & Vol 1 SI 2B branch weld RC-093-30" ID S & Vol 1 B9.32 LESS THAN NPS 4
  • 9.32 running percent 14 1 1 7 1 2 14 2 3 28 6- RCS Primary Piping Drain 1A branch weld RC-033-30" ID S 1 PZR Spray 1A branch weld RC-034-30" ID S 1 Drain 1B branch weld RC-030-30" ID S 1 PZR Spray 1B branch weld RC-031-30" ID S 1 Drain 2A branch weld RC-073-30" ID S 1 Charging branch weld RC-079-30" ID S 1 o Letdown branch weld RC-084-30" ID S 1 21- Shutdown Cooling Loop 1 branch weld RC-051-16" S 1 2" Drain & 3" HPSI SI-240-16" 1 22- Shutdown Cooling Loop 2 branch weld RC-068-16" S 1 3" HPSI 36- Letdown Line branch weld RC-091-16" S 4

I. VVrLLJO

  • 9.40 running percent 21 1 1 16 2 2 18 2 3 30 30- Aux Pressurizer Spray butt welds CH-520-2" S 4 CH-521-2" 32- Drain Line Loop 1A socket weld RC-060-2" 5 3 33- Drain Line Loop 1B socket weld RC-058-2" S 3 34- Drain Line Loop 2A socket weld RC-096-2" S 3 35- Drain Line Loop 2B socket weld RC-089-2" S 3 Charging socket weld RC-005-3" S 4 38- Drain Line Loop 1 socket weld RC-070-2" S 1

PRESSURE VESSELS B10.10 WELDED ATTACHMENTS **Accessible Side 3- Steam Generator 1

  • support skirt 242 S** 1 1 2 50
  • Multiple vessels 4 -Steam Generator 2
  • support skirt 243 S** 1 5- Pressurizer support skirt 65373 S** 1 1 1 100 PIPING B10.20 WELDED ATTACHMENTS
    • 10.20 running percent - 12 1 1 8 1 3 17 22- Shutdown Cooling 2 attachment SI-193-16" S 1 RC-068-16" S 1 27- PZR Spray 1A attachment RC-062-3" S 1 28- PZR Spray 1B attachment RC-017-3" S 1 36- Letdown Line attachment RC-091-16" S 2 RC-091-2" 2 37- Charging Line attachment CH-005-3" S 3 40- HPSI Long Term 2 attachment SI-199-3" S 1

______ .5. _________________________________ .5. _____________ .1. _______________ &________ .5. - A I. ____________ & A -

B12.20 PUMP CASING 16- Reactor Coolant Pump 1A casing 1111-1A VT-3 4 1.* Exam required when 17- Reactor Coolant Pump 1B casing 1111-11B VT-3 pump is disassembled 18- Reactor Coolant Pump 2A casing 1111-2A VT-3 19- Reactor Coolant Pump 2B casing 1111-2B VT-3 B12.50 VALVE BODY, EXCEEDING NPS 4 16" Borg Warner Gate Valves Utilizing Forged Construction Zone 21 UV-651 RC-051-16" VT-3 4 1 Exam required when UV-653 SI-240-16" VT-3 valve is disassembled Zone 22 UV-652 RC-068-16" VT-3 UV-654 SI-193-16" VT-3 14" Borg Warner Gate Valves Utilizing Forged Construction Zone 23 UV-634 SI-207-14" VT-3 4 1 *

  • Exam required when Zone 24 UV-644 SI-223-14" VT-3 ..... valve is disassembled Zone 25 UV-614 S1-160-14" VT-3 _

Zone 26 UV-624 SI-179-14" VT-3

Zone 24 V-543 SI-221-12" VT-3 valve is disassembled Zone 25 V-540 SI-156-12" VT-3 Zone 26 V-541 SI-175-12" VT-3 14" Borg Warner Check Valves __

Utilizing Cast Construction Zone 23 V-235 SI-207-14"

  • VT-3 8* Exam required when V-237 SI-207-14" VT-3 valve is disassembled Zone 24 V-245 SI-223-14" VT-3 V-247 S1-223-14" VT-3 Zone 25 V-215 SI-160-14" VT-3 V-217 SI-160-14" VT-3 Zone 26 V-225 SI-179-14" VT-3 V-227 SI-179-14" VT-3 Dresser PSV Utilizing Forged Construction Zone 31 PSV-200 RC-001-6" VT-3 4 1 *
  • Exam required when

_ PSV-201 RC-003-6" VT-3 valve is disassembled PSV-202 RC-005-6" VT-3 PSV-203 RC-007-6" VT-3

1- Reactor Vessel accessible areas 65173 VT-3 1 1 1 100 R17, R19, and R21 2 100 3 100 B13.50 INTERIOR ATTACHMENTS WITHIN BELTLINE REGION 1- Reactor Vessel accessible welds 65173 VT-1 1 1 3 100 B13.60 INTERIOR ATTACHMENTS BEYOND BELTLINE REGION 1- Reactor Vessel accessible welds 65173 VT-3 1 0 3 0 2028 (note RR 44)

B13.70 CORE SUPPORT STRUCTURE Reactor Vessel accessible areas 65173 VT-3 1 0 3 0 2028 (note RR 44)

___ I________________ I______ I _______ i____ ____ ____ I______ I___ I ________

4 2 3 R15

__6 3 8 B14.10 WELDS IN CRD HOUSING_ 32 peripherial

',2- Reactor Vessel Lower Housing 66 thru 97 S or Vol 32 Closure Head CEDM Housings 12- Reactor Vessel Upper Housing 66 thru 97 S or Vol 32 Closure Head SCEDM Housings _

12- Reactor Vessel Lower Tube 66-91,93-95,97 S or Vol 30 Closure Head RVLMS 92 and 96 S or Vol 2 CEDM Housings

'2- Reactor Vessel Upper Tube 66-91 ,93-95,97 S or Vol 30 Closure Head

, CEDM Housings

£ A £ ___________________________________

.5. 1 .5. ~ -.5.

COMPONENTS Program COMPONENTS t B15.10 PRESSURE RETAINING Class 1 IWB-5222b VT-2 .. .... ** **NOTE Pressure Test COMPONENTS Program SEXAM CATEGORY 6-0; STEAM it*,Governed by Plant SGENERATOR TUBING~ Tech Specifications B16.20 STEAM GENERATOR TUBING IN * . ......

U-TUBE DESIGN

ýj (D

co NJ 0

4 -- I - t I I I

~F1O.1 CLASS 1 PIPING SUPPORTS_________________ ______________

B-MULTIDIREOTIONAL RESTRAINTS _________ ___ ____ ______

  • F-A; B running percent 84 7 1 8

__8 2 18 8 3 27 20- Pressurizer Surge Line supports RC-28-12" VT-3 1 21- Shutdown Cooling 1 supports RC-51-16" VT-3 2 00 SI-240-16" VT-3 11 0 22- Shutdown Cooling 2 supports SI-193-16" VT-3 4 23- Safety Injection 1A supports SI-207-14" VT-3. 1 24- Safety Injection 1 B supports SI-223-14" VT-3 1 25- Safety Injection 2A supports SI-156-12" VT-3 1 26- Safety Injection 2B supports SI-179-14" VT-3 1 SI-175-12" VT-3 1 27- Pressurizer Spray 1A supports RC-62-3" VT-3 7 RC-16-3" VT-3 1 28- Pressurizer Spray 1B supports RC-1 7-3" VT-3 8 RC-18-3" VT-3 1 RC-18-4" VT-3 1 30- Aux Pressurizer Spray supports CH-521-2" VT-3 1 32- Drain Line 1A supports RC-60-2" VT-3 1 33- Drain Line 1B supports RC-58-2" VT-3 1 ....

36- Letdown Line supports RC-91-2" VT-3 12 CH-1-2" VT-3 1

_ RC-91-16" VT-3 2 37- Charging Line supports CH-5-3" VT-3 .15 39- HPSI Long Term Recirculation 1 supports SI-248-3" VT-3 7 40- HPSI Long Term Recirculation 2 supports S1 -199-3" VT-3 3 ___

4 2 18 4 3 28 20- Pressurizer Surge Line supports RC-28-12" VT-3 3 21- Shutdown Cooling 1 supports SI-240-16" VT-3 2 _.

22- Shutdown Cooling 2 supports RC-68-16" VT-3 2 _ .

23- Safety Injection 1A supports SI-207-14" VT-3 2 _.

24- Safety Injection 1B supports SI-223-14" VT-3 2 .

25- Safety Injection 2A supports SI-160-14" VT-3 1 26- Safety Injection 2B supports SI-179-14" VT-3 1 SI-175-12" VT-3 1 27- Pressurizer Spray 1A supports RC-62-3" VT-3 3 28- Pressurizer Spray 1B supports RC-1 7-3" VT-3 3 .

_29- Combined Pressurizer Spray supports RC-18-4" VT-3 3 30- Aux Pressurizer Spray supports CH-521-2" VT-3 1 37- Charging Line supports CH-5-3" VT-3 11 39- HPSI Long Term Recirculation 1 supports SI-248-3" VT-3 3 40- HPSI Long Term Recirculation 2 supports S1 -199-3" VT-3 1-

4 2 56. multiple components 6 3 100 1 - Reactor Vessel columns 65173 VT-3 4 3-,Steam Generator 1* skirt 242 VT-3 1 tnmultiple comp 4 - Steam Generator-2* skirt 243 VT-3 1 5 - Pressurizer skirt 65373 VT-3 1 16- Reactor Coolant Pump 1A** columns 1111-1A VT-3 4 **multiple comp upper horz 1111-1A VT-3 2 lower horz 1111-1A VT-3 2 17- Reactor Coolant Pump 1B** columns 1111-1B VT-3 4 upper horz 1111-1B VT-3 2 lower horz 1111-1B VT-3 2 18- Reactor Coolant Pump 2A** columns 111 1-2A VT-3 4 upper horz 1111-2A VT-3 2 lower horz 1111-2A VT-3 2 19- Reactor Coolant Pump 2B** columns 1111-2B VT-3 4 upper horz 1111-2B VT-3 2 lower horz 1111-2B VT-3 2

1 3 100 multiple components 16- Reactor Coolant Pump 1A** snubbers 1111-1A VT-3 2 **multiple comp 17- Reactor Coolant Pump 1 B** snubbers 1111-11B VT-3 2 18- Reactor Coolant Pump 2A** snubbers 1111-2A VT-3 2 19- Reactor Coolant Pump 2B** snubbers 111 1-2B VT-3 2

SECTION 5.0 ASME CLASS 2 EXAMINATION

SUMMARY

34 of 208 31NT-ISI-3 Rev 1

INDEX EXAM CATEGORY C-A Pressure Retaining Welds in Pressure Vessels C-B Pressure Retaining Nozzle Welds in Vessels C-C Welded Attachments for Vessels, Piping, Pumps, and Valves C-D Pressure Retaining Bolting Greater than 2 Inch in Diameter C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping C-G Pressure Retaining Welds in Pumps and Valves C-H All Pressure Retaining Components F-A Class 2 Supports 35 of 208 31NT-ISI-3 Rev 1

- - - __"8 2 71 multiple vessels

_____ _______5 3 100 _ _ _ _ _ _ _

STEAM GENERATORS "__53_0 C1.0 SHELL CIRCUMFERENTIAL WELDS

_(shell to conical section) 41- Steam Generator 1 welds 242 Vol 2 2 2

_(head to shell) 41- Steam Generator 1 welds 242 Vol 1 1 2

42- Steam Generator 2 welds 243 Vol 1 REGENERATIVE HEAT EXCHANGER C1.1 SHELL CIRCUMFERENTIAL WELDS 3__

68- Regenerative Heat Exchanger welds 79314 Vol 3 3 3 C1.20 HEAD CIRCUMFERENTIAL WELDS 68- Regenerative Heat Exchanger welds 79314 Vol 2 2 3

  • _

C1.30 TUBESHEET-TO-SHELL WELDS 168- Regenerative Heat Exchanger welds 79314 Vol 4 4 2

69- Letdown Heat Exchanger welds N2376 Vol 1 1 C1.30 TUBESHEET-TO-SHELL WELDS 69- Letdown Heat Exchanger welds N2376 Vol 1 1 SHUTDOWN COOLING HEAT EXCH C1.10 SHELL CIRCUMFERENTIAL WELDS (shell to flange) 84- SDCHX A welds S-18345 Vol 1 87- SDCHX B welds S-18346 Vol

--4 C1.30 TUBESHEET-TO-SHELL WELDS W

84- SDCHX A welds S-18345 Vol 1 1 1

  • co 87- SDCHX B welds S-18346 Vol

.5. *1 I - .L ~5

NOZZLES WITHOUT REINFC PLATE IN VESSELS >1/2 IN. 4. 4. ~4 9 .9- -.9- - 1-

4. 4.

NOMINAL THICKNESS C2.21 NOZZLE-TO-SHELL (NOZZLE TO HEAD OR NOZZLE TO NOZZLE)

WELD

  • C2.21 running percent - 20** 2 1 20 ** 20 Total, 10 REQ'D

_4 2 60 multiple vessels 4 3 100 41- Steam Generator 1 welds 242 S & Vol 8 4 2 42- Steam Generator 2 welds 243 S & Vol 8 4 3 84- SDCHX A welds S-18345 S & Vol 2 1 1 87- SDCHX B welds S-18346 S & Vol 2 1 1 C2.22.NOZZLE INSIDE RADIUS SECTION

  • C2.22 running percent - 12** 2 1** 12 Total, 6 REQ'D I 2 2 67 multiple vessels 2 3 100

__ 41- Steam Generator 1 welds 242 Vol 4 2 2

_ 42- Steam Generator 2 welds 243 Vol 4 2 3 84- SDCHX A welds S-18345 Vol 2 1 1

-. 87- SDCHX B welds S-18346 Vol 2 1 1

C3.10 WELDED ATTACHMENTS

  • C3.10 running percent 6** 2 1 **6Total; 6 4 REQD 2 3 , Multiple Vessels Multiple Vessels 41- Steam Generator 1 lugs 242 S 2 2 1.

42- Steam Generator 2 lugs 243 S 2 68- Regenerative Heat Exchanger supports 79314 S 2 2 3 PIPING C3;20 WELDED ATTACHMENTS

  • C3.20 running percent 301 10 1 3 C) 10 0

CO 2 7 "

Co 12 3 10 43- Main Steam SG 1 East attachment SG-036 S 2 44- Main Steam SG 1 West attachment SG-033 S 2 45- Main Steam SG 2 East attachment SG-042 S 2 46- Main Steam SG 2 West attachment SG-045 S 2 54- Feedwater SG No. 1 attachment SG-002 S 6 55- Feedwater SG No. 2 attachment SG-005 S 6 1 1 56- Feedwater SG No. 1 attachment SG-202 S 1 Feedwater SG No. 2 attachment SG-205 S 1 58- Aux Feed S/G 1 attachment SG-008 S 1

- - A 1 4 4 - _______ 4 4 I I 62- Auxiliary Feedwater SG 1 attachment AF-018 S 1 _

63- Auxiliary Feedwater SG 2 attachment AF-016 S 1 1 1 64- Blowdown SG 1 attachment SG-039 S 6 1 2 SG-053 S 1 65- Blowdown SG 2 attachment SG-048 S 6 1 2 SG-052 S 1 70- LPSI Pump Room A Suction attachment SI-067 S 1 SI-241 S 1 SI-307 S 1 71- LPSI Pump Room A Discharge attachment SI-078 S 3 SI-087 1 73- LPSI Pump Room B Suction attachment SI-034 S 1 SI-308 S 1 74- LPSI Pump Room B Discharge attachment SI-129 S 3 76- CS Pump Room A Suction attachment SI-009 S 1 SI-067 S 1 77- CS Pump Room A Discharge attachment SI-079 S 5 1 3 SI-082 S 1 79- CS Pump Room B Suction attachment SI-033 S 1 80- CS Pump Room B Discharge attachment SI-119 S 4 82- SDCHX Room A attachment SI-078 S 2 SI-079 S 1

Sl-087 S 2 SI-089 S 2 SI-090 S 2 85- SDCHX Room B attachment SI-119 S 3 1 21 SI-123 S 3 86- SDCHX Room B attachment SI-072 S 4 2 3 SI-129 S 3 SI-134 S 3 S1-135 S 2 88- East Wrap attachment SI-072 S 3

-pt SI-073 S 1 0

IQO M3 89- East Wrap attachment SI-173 S 1 co SI-194 S 2 90- East Wrap attachment S1-134 S 1 91- West Wrap attachment SI-070 S 4 92- West Wrap attachment SI-239 S 1 1 1 SI-241 S 3 93- West Wrap attachment SI-089 S 1 94- A Train Pipe Chase & 88' attachment SI-070 S 3 1 2 SI-089 S 2 SI-241 S 4 95- B Train Pipe Chase & 88' attachment SI-072 S 1 1 3 S1-134 S 2 S1-194 S 6

__ i ____________ I_____ I _____ j ___ I ___ t ___ I ____ I__ I ______

97- Containment LPSI to 1B attachment SI-220 S 6 98- Containment LPSI to 2A attachment SI-155 S 2 99- Containment LPSI to 2B attachment SI-174 S 2 1 2 100- Containment LPSI A Suction attachment SI-007 S 1 SI-369 S .1 __

101- Containment LPSI B Suction attachment SI-030 S 1 SI-194 S 1 SI-368 S 1 102- SI Pump Suction A attachment SI-008 S 3 1 1 _

SI-009 S 3 SI-307 S 6 103- Refueling Water Suction A attachment CH-142 S 6 1 2 CH-424 S 3 104- SI Pump Suction B attachment SI-031 S 2 SI-033 S I1 SI-308 S 7 105- Refueling Water Suction B attachment CH-149 S 13 3 3 CH-425 S 2 106- HPSI Room Discharge A attachment SI-099 S 2 2 1 S1-100 S 13 S1-105 S 4 SI-106 S 1 107- HPSI Room Discharge B attachment SI-107. S 11 3 2 SI-112 S 2 "

'.,11iuu S1-118 S 4 109- HPSI 88' Pipechase attachment S1-107 S 9 1 1 110- HPSI Discharge West Wrap attachment SI-103 S 1 1 2 _

SI-107 S 3 SI-218 S 1 SI-236 S 1 111- HPSI Discharge West Wrap attachment S1-100 S 2 112- HPSI Discharge East Wrap attachment S1-100 S 1 S1-101 S 1 S1-102 S 1 S1-176 S_ S 1 113- HPSI Discharge attachment S1-107 S 1 S1-157 S 2 S1-176 S 1 118- HPSI Long Term attachment S1-106 S 18 3 3 119- HPSI Long Term attachment S1-114 S 12 2 1 t I I ______ - I I~

  • 't At'*

C3.3urunning percent - Uz I 2 oral, lU IlEUU IU Multiple Vessels 72- LPSI Pump A lugs SN 0876-44 S 3 "

75- LPSI Pump B lugs SN 0876-45 S 3 78- Containment Spray A lugs SN 0876-46 3 81- Containment Spray B lugs SN 0876-47 S 3 116- HPSI A lugs SN 0776-19 S 4

_ 117- HPSI B lugs SN 0776-18 S 4 1 2 0

0o

UV-174 1 57- Feedwater SG No. 2 bonnet UV-137 VOL 1 UV-177 1

FI-"INL, VV-LUZ > 616 IN INUMIN/

WALL THICKNESS FOR PIPING C5.10 >NPS 4 C5.l1 CIRCUMFERENTIAL WELD ,'

  • C5.11 running percent 496 20 1 2 *1075 WELDS USED 22 2 4 FOR % DUE TO C-F-1

' 40 3 8 NOTE 2

' 58-Aux Feed S/G 1 6" x 0.562" AF-004 S & Vol 15 4 1 6"x 0.432" SG-008 8" x 0.500 SG-008

'59-Aux Feed S/G 2 6" x 0.562" AF-006 S & Vol 18 4 2 "

,____ 6" x 0.432" SG-011 _ _-

, 8" x 0.500 SG-0111

'62-Aux Feed S/G 1 6" x 0.562" AF-004 S & Vol 18 3 3

_ _AF-018

-__63-Aux Feed S/G 2 6" x 0.562" AF-006 S & Vol 16 3 1 -

AF-016 70-LPSI Pump Room A Suction 20" x 0.375 SI-307 S & Vol 20 4 1 73-LPSI Pump Room B Suction SI-308 182 & 85 SDC Heat Exch 20" x 0.500" SI-078 S & Vol 9 2 2

_ Room A & B SI-123

' 83 & 86 SDC Heat Exch 14" x 0.375" SI-90 S &Vol 56 7 2 * " "

Room A & B SI-135 .. ..

16" x 0.375" SI-70 SI-72 20" x 0.500" SI-70 SI-72 I

,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ I _ I _ _

SI-70 I 4 4 I 4 1* 1. - -- - _________

SI-71 12" x 1.125" SI-155 S1-174 SI-72 SI-73 SI-70 SI-71 SI-202 SI-220

_ 20" x 0.500" SI-72 .

SI-70 "4ý 90 & 93 Safety Injection 24" x 0.375" SI-30 S & Vol 10 2 1 East and West Wraps SI-7 0o 24" x 0.562" SI-308 CO SI-307 94 & 95 Safety Injection A & B 20" x 0.500 SI-70 S & Vol 17 3 1 SI-72 96, 97, 98, 99 Containment LPSI 12" x 1.125" SI-202 S & Vol 108 14 3 Loop 1A, 1B, 2A & 2B SI-220 2 2 SI-155 SI-174 12" x 1.312" SI-202 SI-220 SI-155 S1-174 100 & 101 Containment LPSI 16" x 1.594 SI-241 S & Vol 8 1 2 Loop A & B, Suction SI-194 24" x 0.375 SI-7 ......

SI-30

103-Refueling Water Tank Suction A 20" x 0.375" CH-424 S & Vol 35 6 2 _ _

20" x 0.375" CH-142 104-Safety Injection B Suction 24" x 0.562" SI-308 S & Vol 19 4 3 20" x 0.375" SI-308 105-Refueling Water Tank B Suction 20" x 0.375" CH-425 S & Vol 47 7 3 20" x 0.375" CH-149 PIPING WELDS > 1/5 IN NOMINAL WALL THICKNESS FOR PIPING >

C5.20 NPS 2 AND <NPS 4 C5.21 CIRCUMFERENTIAL WELD

  • C5.21 running percent 580 10 1 2 18 2 5 18 3 8 104 SI B Train Suction 3" X 0.216" CH-150 S & Vol 4 1 3 106 & 107 HPSI Room Discharge 4" x 0.438" SI-100 S & Vol 137 10 1 A and B 4" x 0.337" SI-99 SI-107 3" x 0.438" S1-106 SI-107 2" x 0.344" S1-105 SI-112 108 & 109 HPSI 88' Pipechase 4" x 0.438" SI-100 S & Vol 86 7 2 2" x 0344" SI-118 4" x 0.377" SI-107

_____ I ___________________________ I ___________ I____________ I_______ I_______ I it __________ I______ I______________

West Wrap 4" x 0.438" SI-218 S1-100 SI-236 3" x 0.438" SI-218 SI-236 2" x 0.344" SI-103 S1-107 S1-110 SI-218 SI-236 S1-100 112 & 113 HPSI Discharge 4" x 0.337" SI-107 S & Vol 99 82 East Wrap 4" x 0.438" S1-100 SI-176 S1-157 3" x 0.438" SI-176 S1-157 2" x 0.344" S1-101 SI-102 SI-108 S1-109 SI-157 SI-176 114 & 115 HPSI Header 3" x 0.438" SI-218 S & Vol 44_3_2 Loop 1A, 1_B, 2A & 2B SI-236 SI-157 SI-176 118 & 119 HPSI Long Term 3" x 0.438" SI-106 S & Vol 106 8 2 S1-114 2" x 0.344" SI-319

__ I____________ I_____ i_____ I ___ I___ I___ I ____ I __ I______

I VUV I.X V I IF,., 1 1*.-I-IJll IIL I( I1.. I__._____._____.__,_

A and B S1-112 S 3 PIPE BRANCH CONNECTIONS OF C5.40 BRANCH PIPING > NPS 2 C5.41 CIRCUMFERENTIAL

  • C5.41 running percent - 27 1 1 4 1 2 7 11 3 11 82 & 85 SDC Heat Exch 20" x 10" SI-78 S 2 1 Room A & B SI-123 S 2 83 & 86 SDC Heat Exch 20" x 6" SI-70 S 4 1 3 ci, 03 Room A & B 20" x 10" SI-72 S 4 0

CO 20" x 14" 0

2O 88 & 91 Safety Injection 20" x 12" SI-70 S 1 East and West Wraps SI-72 S 1 89 & 92 SDC Suction 18" x 12" SI-194 S 1 East and West Wraps SI-241 S 1 96, 97, 98, 99 Containment LPSI 12" x 3" SI-202 S 1 1 2 Loop 1A, 1B, 2A & 2B SI-220 S 1 SI-155 S 1 SI-174 S 1 102-Safety Injection A Suction 24" x 10" SI-307 S 3 24" x 18" 24" x 20" 104-Safety Injection B Suction 24" x 10" SI-308 S 3 24" x 18" 24" x 20" 24" x 3" CH-150 S 1

PIPING WELDS > 3/8 IN NOMIN/

WALL THICKNESS FOR PIPING C5.50 >NPS 4 C5.51 CIRCUMFERENTIAL WELD _ I

  • C5.51 running percent 334 8 1 2 .

10 2 5 10 3 8 43- Main Steam SG 1 East Butt Welds SG-36-28" S & Vol 19 1 1 SG-36-32" 1 44- Main Steam SG 1 West Butt Welds SG-33-28" S & Vol 21 2 2 SG-33-32" 1 0

0% 45- Main Steam SG 2 East Butt Welds SG-42-28" S & Vol 19 1 3 SG-42-32" 1 46- Main Steam SG 2 West Butt Welds SG-45-28" S & Vol 21 2 1 SG-45-32" 1 47- Main Steam SG 1 West Butt Welds ** S & Vol **

48- Main Steam SG 1 East Butt Welds ** S & Vol **

49- Main Steam SG 2 East Butt Welds ** S & Vol **

50- Main Steam SG 2 West Butt Welds ** S & Vol **

51- Atmospheric Dump No. 1 Butt Welds ** S & Vol **

52- Atmospheric Dump No. 2 Butt Welds ** S & Vol **

53- Steam to Aux Feedwater Butt Welds ** S & Vol **

.5. .5._________ .5.___________ 1 .L- - I L _________ I

0 IU SG-2-14" 10 SG-13-16" 2 SG-13-14" 10 55- Feedwater SG No. 2 Butt Welds SG-5-24" S & Vol 30 5 1 SG-5-16" 2 SG-5-14" 10 SG-14-16" 2 SG-14-14" 10 56- Feedwater SG No. 1 Butt Welds S & Vol **

57- Feedwater SG No. 2 Butt Welds S & Vol **

58- Aux & Downcomer FW SG 1 Butt Welds SG-8-6" S & Vol 1 2 2 SG-8-8" 22 59- Aux & Downcomer FW SG 2 Butt Welds SG-1 1-6" S & Vol 1 1 3 SG-11-8" 20 60- Downcomer Feedwater SG 1 Butt Welds S & Vol 61- Downcomer Feedwater SG 2 Butt Welds S & Vol 64- Blowdown SG 1 Butt Welds SG-39-6" S & Vol 34 6 2 SG-53-6" 13 SG-522-6" 1 65- Blowdown SG 2 Butt Welds SG-48-6" S & Vol 34 4 3 SG-52-6" 14 SG-523-6" 1 66- Blowdown SG 1 Butt Welds ** S & Vol **

67- Blowdown SG 2 Butt Welds ** S & Vol **

PIPE BRANCH CONNECTI " Note exam items are in 05.80 BRANCH PIPING > NPS 2 Aug Summary 05.81 CIRCUMFERENTIAL 47- Main Steam SG 1 West 28" x 12" S 28" x 6" 48- Main Steam SG 1 East 28" x 12" S 28" x 6" 49- Main Steam SG 2 East 28" x 12".. S **

28" x 6" 50- Main Steam SG 2 West 28" x 12" S 28" x 6"

- - n A I - I -J A. I -

A. A. 1. 1 .& I - _________ 1 I.

PUMPS C6.10 PUMP CASING WELDS 116 & 117 HPSI PUMP casing inlet nozzle S 2 2 * *BY THE END OF THE Loop A & B outlet nozzle S 2 INTERVAL VALVES 06.20 VALVE BODY WELDS 47- Main Steam SG 1 West 6"x1O" PSV-572 S 5 1 ** **EXAMINE

- 1 VALVE PSV-573 BY THE END OF THE (n PSV-574 INTERVAL 0ý PSV-575 c: PSV-692 __.

0o 48- Main Steam SG 1 East 6"xl0" PSV-576 S 5 PSV-577 PSV-578 PSV-579 PSV-691 49- Main Steam SG 2 East 6"x10" PSV-554 S 5 PSV-555 PSV-556 PSV-557 PSV-695

__I_ __ _____] I ___ I _ _ I __ t _ _ I _ _ _I_ _ _

PSV-560 I t 1* 1* t

+ 4 PSV-561

  • 4 4 - 4
  • 4

+ -

PSV-694 83 & 86 SDC Heat Exch 6" Gate V-460 S 2 1 ** -

Room A & B V-464 _

89 & 92 SDC Suction 16" Gate UV-655 S 1 **

East and West Wraps UV-656 106 & 107 HPSI Room Discharge 4" Gate V-476 s 4 A and B HV-698 V-478 HV-699 _

106 & 107 HPSI Room Discharge 4" Check V-404 S 2 1 A and B V-405

I1 PRESSURE RETAINING *NOTE Pressure Test C7.10 COMPONENTS Class 2 IWC-5222 VT-2 * *

  • Program

______EXAM CATEGORY F-A; SUPPORTS F1.20~ CLASS 2 PIPIN~G SUPPORTS _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.A-ONE DIRECTIONAL (RODS) __________________

    • F-A; A running percent 3 1 2 33 83- SDCHX Room A supports SI-87 VT-3 1 1 2 106- HPSI Room Discharge A supports SI-100 VT-3 1 1107- HPSI Room Discharge B supports SI-107 VT-3 1

_____ I _______________________ i ______ - J ______ I _________ I

i [U1llllll9 PUI L:PIII - - ' Q 1O I

14 2 9 28 3 15 43- Main Steam SG 1 East supports SG-36 VT-3 2 1 1

. 44- Main Steam SG 1 West supports SG-33 VT-3 1 45- Main Steam SG 2 East supports SG-42 VT-3 2 1 3 46- Main Steam SG 2 West supports SG-45 VT-3 1 54- Feedwater SG No. 1 supports SG-002 VT-3 5 1 1 55- Feedwater SG No. 2 supports SG-005 VT-3 5 1 1 58- Aux & Downcomer FW SG 1 supports SG-8 VT-3 5 1 2 59- Aux & Downcomer FW SG 2 supports SG-1 1 VT-3 6 1 2 62- Auxiliary Feedwater SG 1 supports AF-018 VT-3 1 1 1 63- Auxiliary Feedwater SG 2 supports AF-006 VT-3 2 2 1 AF-016 VT-3 1 64- Blowdown SG 1 supports SG-39 VT-3 10 1 1 SG-53 VT-3 1 65- Blowdown SG 2 supports SG-48 VT-3 10 1 2 SG-52 VT-3 1 70- LPSI Pump Room A Suction supports SI-067 VT-3 1 SI-241 VT-3 1

_SI-307 VT-3 1

SI-87 VT-3 4 73- LPSI Pump Room B Suction supports S1-034 VT-3 2 1 1 SI-308 VT-3 1 74- LPSI Pump Room B Discharge supports SI-129 VT-3 3 76- CS Pump Room A Suction supports SI-9 VT-3 1 SI-67 VT-3 3 77- CS Pump Room A Discharge supports SI-79 VT-3 6 2 3 SI-82 VT-3 1 79- CS Pump Room B Suction supports SI-033 VT-3 1 2 3 SI-034 VT-3 2 80- CS Pump Room B Discharge supports SI-119 VT-3 5 82- SDCHX Room A supports SI-78 VT-3 1 SI-79 VT-3 1 83- SDCHX Room A supports SI-70 VT-3 4 3 1 SI-82 VT-3 1 SI-87 VT-3 2 SI-89 VT-3 4 SI-90 VT-3 2 85- SDCHX Room B supports SI-119 VT-3 3 1 2 SI-123 VT-3 5 86- SDCHX Room B supports SI-72 VT-3 3 2 3 SI-129 VT-3 3 SI-134 VT-3 2 SI-135 VT-3 1 SI-147 VT-3 1

. -I" V I 89- East Wrap supports SI-173 VT-3 1 1 SI-194 VT-3 3 90- East Wrap supports SI-130 VT-3 1 _

SI-134 VT-3 2 91- West Wrap supports SI-70 VT-3 6 1 SI-71 VT-3 1 92- West Wrap supports SI-241 VT-3 5 93- West Wrap supports SI-89 VT-3 3 1 1 94- A Train Pipe Chase & 88' supports SI-70 VT-3 3 1 2 C) SI-89 VT-3 3 O

SI-241 VT-3 8 95- B Train Pipe Chase & 88' supports SI-72 VT-3 1 3 3 SI-134 VT-3 3 SI-194 VT-3 10

___96- Containment LPSI to 1A supports SI-202 VT-3 11 1 2 97- Containment LPSI to 1B supports SI-220 VT-3 17 1 2 98- Containment LPSI to 2A supports SI-155 VT-3 4 99- Containment LPSI to 2B supports SI-174 VT-3 5 100- Containment LPSI A Suction supports SI-7 VT-3 1

  • SI-369 VT-3 1

S1-194 VT-3 2 SI-368 VT-3 1 102- SI Pump Suction A supports SI-8 VT-3 4 SI-9 VT-3 3 SI-307 VT-3 7

.103- Refueling Water Suction A supports CH-142 VT-3 10 2 2 CH-424 VT-3 4 104- SI Pump Suction B supports SI-31 VT-3 3 3 3 SI-33 VT-3 1 S 1-308 VT-3 8 0) 105- Refueling Water Suction B CH-149 VT-3 17 3 3 supports CH-425 VT-3 2 00 106- HPSI Room Discharge A supports S1-100 VT-3 13 2 1 1

SI-105 VT-3 4 SI-106 VT-3 1 107- HPSI Room Discharge B supports SI-107 VT-3 10 3 2 SI-112 VT-3 3 108- HPSI 88' Pipechase supports S1-100 VT-3 10 2 3 SI-118 VT-3 6 109- HPSI 88"Pipechase supports SI-107 VT-3 11 1 1 110- HPSI Discharge West Wrap supports SI-103 VT-3 4 1 2 SI-107 VT-3 4 SI-110 VT-3 1 SI-218 VT-3 3 SI-236 VT-3 1

SI-236 VT-3 1 112- HPSI Discharge East Wrap supports SI-100 VT-3 1 3 3 S1-101 VT-3 4 SI-102 VT-3 2 SI-176 VT-3 3 113- HPSI Discharge supports SI-107 VT-3 2 1 1 SI-108 VT-3 1 SI-109 VT-3 1 SI-157 VT-3 5 SI-176 VT-3 1 114 HPSI Header supports SI-218 VT-3 1 1 2 Loop 1A& 1B SI-236 VT-3 1 115 HPSI Header

_ supports SI-157 VT-3 1 Loop 2A & 2B .... _ SI-176 VT-3 1 118 - HPSI Long Term supports SI-106 VT-3 22 4 3 119 - HPSI Long Term supports SI-114 VT-3 18 2 1 SI-319 VT-3 2

14 2 11 10 3 17 43- Main Steam SG 1 East supports SG-36 VT-3 44- Main Steam SG 1 West supports SG-33 VT-3 2 45- Main Steam SG 2 East supports SG-42 VT-3 1 46- Main Steam SG 2 West supports SG-45 VT-3 2 47- Main Steam SG 1 West supports SG-206 VT-3 1 48- Main Steam SG 1 East supports SG-207 VT-3 1 49- Main Steam SG 2 East supports SG-208 VT-3 1 50- Main Steam SG 2 West supports SG-209 VT-3 1 51- Atmospheric Dump No. 1 supports SG-59 VT-3 1 SG-70 VT-3 1 52- Atmospheric Dump No. 2 supports SG-84 VT-3 1 SG-103 VT-3 1 54- Feedwater SG No. 1 supports SG-002 VT-3 8 1 1 SG-013 VT-3 1 55- Feedwater SG No. 2 supports. SG-005 VT-3 9 1 1 SG-014 VT-3 1 156- Feedwater SG No. 1 supports SG-202 VT-3 1

57- Feedwater SG No. 2 supports SG-205 VT-3 1 58- Aux & Downcomer FW SG 1 supports SG-8 VT-3 10 2 3 AF-4 VT-3 1 59- Aux & Downcomer FW SG 2 supports AF-006 VT-3 1 4 2 SG-11 VT-3 10 60- Downcomer Feedwater SG 1 supports SG-200 VT-3 2 61- Downcomer Feedwater SG 2 supports SG-203 VT-3 2 62- Auxiliary Feedwater SG 1 supports AF-004 VT-3 1 AF-018 VT-3 1 63- Auxiliary Feedwater SG 2 supports AF-006 VT-3 2 64- Blowdown SG 1 supports SG-39 VT-3 5 1 1 65- Blowdown SG 2 supports SG-48 VT-3 3 1 2 71- LPSI Pump Room A Discharge supports SI-78 VT-3 1 74- LPSI Pump Room B Discharge supports SI-129 VT-3 3 1 3 77- CS Pump Room A Discharge supports SI-79 VT-3 2 79- CS Pump Room B Suction supports SI-034 VT-3 1 80- CS Pump Room B Discharge supports SI-119 VT-3 4 1 2 SI-147 VT-3 1 82- SDCHX Room A supports SI-78 VT-3 1 83- SDCHX Room A supports SI-70 VT-3 1 11 SI-87 VT-3 3 SI-90 VT-3 1

S1-123 VT-3 1

+ 4 I 4 t 86- SDCHX Room B supports SI-72 VT-3 4 4 3 S1-129 VT-3 4 SI-134 VT-3 5 SI-135 VT-3 2 88- East Wrap supports SI-72 VT-3 7 1 3 SI-73 VT-3 2 89- East Wrap supports SI-194 VT-3 1 91- West Wrap supports SI-70 VT-3 2 SI-71 VT-3 1 92- West Wrap supports SI-239 VT-3 3 1 1 SI-241 VT-3 1 93- West Wrap supports SI-89 VT-3 1 94- A Train Pipe Chase & 88' supports SI-89 VT-3 1 95- B Train Pipe Chase & 88' supports SI-72 VT-3 3 1 3 SI-194 VT-3 1 96- Containment LPSI to 1A supports SI-202 VT-3 8 2 2 97- Containment LPSI to 1B supports. SI-220 VT-3 7 3 -2 99- Containment LPSI to 2B supports SI-174 VT-3 2 2 2 100- Containment LPSI A Suction supports SI-241 VT-3 1 101- Containment LPSI B Suction supports SI-194 VT-3 1

SI-008 v-r-3' I 104- SI Pump Suction B supports SI-308 VT-3 1i _

106- HPSI Room Discharge A supports SI-99 VT-3 2 SI-100 VT-3 1 107- HPSI Room Discharge B supports SI-107 VT-3 3"1 2 ....

_ " 108- HPSI 88' Pipechase supports SI-100 VT-3 1 SI-118 VT-3 1 109- HPSI 88' Pipechase supports SI-107 VT-3 3 co 110- HPSl Discharge West Wrap supports SI-107 VT-3 3 3 0o 0

SI-218 VT-3 1 111- HPSI Discharge West Wrap supports Sl-236 VT-3 1 113- HPSI Discharge supports SI-157 VT-3 1 118 - HPSI Long Term supports SI-106 VT-3 2 119 - HPSI Long Term supports SI-114 VT-3 1 1 1 SI-319 VT-3 2 120- Containment Spray A supports SI-88 VT-3 1 _

1121- Containment Spray B supports SI-130 VT-3 1

5 2 70 IMultiple Items 5 3 100 68- Regenerative Heat Exchanger supports 79314 VT-3 2 2 3 72- LPSI Pump A supports 3MSIAP01 VT-3 3 3 2 75- LPSI Pump B supports 3MSIBP01 VT-3 3 78- CS Pump A supports 3MSIAP03 VT-3 3 81- CS Pump B supports 3MSIBPO3 VT-3 3 3 3 _ _

116- HPSI Pump A supports 3MSIAP02 VT-3 4 2 1 117- HPSI Pump B supports 3MSIBPO2 VT-3 4 2 2

  • F1.40 SUPPORTS OTHER THAN~ ____ _____ ______ __ ______

___PIPING SUPORTS&___ ______ __ ______

SECTION 6.0 ASME CLASS 3 EXAMINATION

SUMMARY

67 of 208 31NT-ISI-3 Rev 1

INDEX EXAM CATEGORY D-A Welded Attachments for Vessels, Piping, Pumps and Valves D-B All Pressure Retaining Components F-A Class 3 Supports 68 of 208 31NT-ISI-3 Rev 1

1. -0OUIO vVOOVO)

D1.10 Welded Attachments

  • D1.10; running percent 22 3 1 30 **10 req'd due to 3 2 50 multiple comp 4 3 100 DF System_ attachments DFA-T02 VT-1 2 1 1 DFB-T02 DG System attachments DGA-E04 VT-1 8 1 1 DGA-E05 1 2 DGB-E04 1 3 0)

DGB-E05 (0

0 DGA-X01A o

DGA-XO1 B 0*

DGB-XO1A DGB-X01B EC System attachments ECA-E-1 VT-1 4 1 2

_ECA-T-1 1 3 ECB-E-1 ECB-T-1 EW System attachments EWA-EO1 VT-1 4 1 1 EWA-TO1 1 3 EWB-EO1 EWB-T01 PC System attachments PCA-El VT-1 2 2 PCB-E1 SI System attachments SIA-EO1 VT-1 2 1 3 SIB-EO1

D1.20 Welded Attachments _ _

  • D1.20; running percent - 240 10 1 4 11 2. 9 16 3 15 AF System attachments piping VT-i1 9 1 CT System attachments piping VT-1 .3 1 " _ _

DG System attachments piping VT-1 10 2 EC System attachments piping VT-1 14 2 EW System attachments piping VT-1 37 1 NC System

_ attachments piping VT-1 19 4 PC System attachments piping VT-1 13 2 SG System attachments piping VT-1 4 1 SI System attachments piping VT-1 2 1

_ SP System attachments piping VT-1 129 1

______ _________________________________ I ______________ I ________________ .L .L ________ I .L ____________ _______ I

D2.10 Pressure retaining components Class 3 IWD-5221 VT-2 * *Note ISI Pressure Program EXAM CATEGORY F-A; SUPPORTS______________________

F1.30 CLASS 3 PIPING SUPPORTS , I________ ___________

-M U LTI DIRECTIONAL RESTRAINTS _____________ _______

  • F-AB runniing percent iK - - - 297 18 1 6 12 2 10 15 3 14 AF System supports piping VT-3 18 4 _

CT System supports piping VT-3 3 1 DG System supports piping VT-3 8 EC System supports piping VT-3 16 3 EW System supports piping VT-3 67 10 NC System supports piping VT-3 35 7 PC System supports piping VT-3 17 2 SG System supports piping VT-3 4 1 SI System supports piping VT-3 4 1

,SP System, supports piping VT-3 125 14

1) I r 5 3 25 AF System supports piping VT-3 10 1 DG System supports piping VT-3 4 1 EC System supports piping VT-3 2 1 EW System supports piping VT-3 9 2 NC System supports piping VT-3 1 1 PC System supports piping VT-3 13 3 SG System supports piping VT-3 7 2 SI System supports piping VT-3 1 1 SP System supports piping VT-3 9 2

3 2 50 multiple comp 4 3 100 DF System supports DFA-T02 VT-3 2 1 1 DFB-T02 DG System supports DGA-E04 VT-3 8 1 1 DGB-E04 1 2

._ _ DGA-E05 1 3 DGB-E05 DGA-XO1A DGA-XO1 B

___DGB-XO1A DGB-XO1B EC System attachments ECA-E-1 VT-3 4 1 2 ECB-E-1 1 3 ECA-T-I ECB-T-1 EW System attachments EWA-E01 VT-3 4 1 1 EWB-E01 1 3 EWA-TO1 EWB-TO1 PC System attachments PCA-E1 VT-3 2 1 2 PCB-E1 SI System attachments SIA-EO1 VT-3 2 1 3 SIB-E01

SECTION 7.0 AUGMENTED EXAMINATION

SUMMARY

74 of 208 31NT-ISI-3 Rev 1

INDEX EXAM CATEGORY N-722-1 PWR Components Containing Alloy 600/82/182 N-729-1 PWR Reactor Vessel Upper Head N-770-1 PWR Pressure Retaining Dissimilar Metal Piping and Vessel Nozzle Butt Welds containing Alloy 82/182 B-J Pressure Retaining Welds in Piping B-G-1 Pressure Retaining Bolting, Greater Than 2 Inches in Diameter B-G-2 Pressure Retaining Bolting, 2 Inches and Less in Diameter B-P All Pressure Retaining Components C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED HIGH ENERGY C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED FLYWHEEL NA Reactor Coolant Pump Flywheel Examinations 75 of 208 31NT-ISI-3 Rev 1

RPV bottom mounted instrument B15.80 penetrations

  • Required R16, R18, 1-Reactor Vessel ICI Penetrations 65373 VE 61 61 *
  • R20 B13 3-lTEAM GENERATOR c ns VE 4 4. .Ecnr 3- Cold leg instrument connections 415.135 Penetrations 242 VE 4 4 2 Each Interval

____4- Cold leg instrument connections Penetrations 243 VE 4 4 2 ___

___ RES-$,U ýlZER K_________ __ ___ __

B15.140 Heater Penetrations Penetrations 65373 VE 36 36 ... **Each RFO B15.180 Instrument Connections Instruments 65373 VE 7 7

.. _ PIPING B15.200 Hot Leg Instrument Connections Instruments RCS VE 27 27 ..

B15.205 Cold leg instrument connections _ _

RCS Cold Leg Instrument RCS VE 8 8 2 ***

RCP Pressure Taps Instrument RCP VE 12 12 3 ***

      • VE in conjunction with 23- Safety Injection 1A butt welds SI-207-14" VE 1 1 N-770-1 VOL 24- Safety Injection 1B butt welds SI-223-14" VE 1 1 ***

25- Safety Injection 2A butt welds SI-160-14" VE 1 1 ***

26- Safety Injection 2B butt welds SI-179-14" VE 1 1 ***

27- Pzr Spray IA butt welds RC-062-3" VE 1 1 ***

28- Pzr Spray 1B butt welds RC-01 7-3" VE 1 1 32- Drain Line Loop 1A butt welds RC-060-2" VE 1 1 0 33- Drain Line Loop 1B butt welds RC-058-2" VE 1 1 C) 0o 34- Drain Line Loop 2A butt welds RC-096-2" VE 1 1 36- Letdown Line butt welds RC-091-2" VE 1 1

_ 37- Charging Line butt welds CH-005-3" VE 1 1 ***

I 4 + t I I t t t RFACTOR VPSSFI [UPPFR HEAD Head with nozzles and partial-penetration welds of PWSCC-resistant B4.30 materials 2-Closure Head weld N05065-CHA-03 VE 97 97

  • 100 *R15 (Head replaced)

Required R18, R21 2-Closure Head Vent Nozzle N05065-CHA-03 VE 1 1

  • 100 *R15 (Head replaced).

Required R18, R21 Nozzles and partial-penetration welds of B4.40 PWSCC-resistant materials in head 2-Closure Head CEDM Nozzles N05065-CHA-03 S or Vol 97 97 100

  • not to exceed 2020 2-Closure Head Vent Nozzle N05065-CHA-03 S or Vol 1 1 100
  • not to exceed 2020 I I I I I I I 1 4 I A A. & I I I - -

Cracked butt weld reinforced by full A

.... st ral weld overlay of Alloy 52/152 mnaterial

___INS.PECTION ITEIM F _______ _________

NOMINAL PIPE SIZE > 4 INCH Mitigated with FSWO NOZZLE TO SAFEEND BUTT WELDS During R13; 1st ISI R15 29-20- Spray*

Surge butt welds butt RC-18-4" Vol 6 1 2 16 welds RC-028-12" Vol 6 1 3 32 *Design Caic Exam 31- Safeties (4) butt welds RC-001-6" Vol Frequency 3 years; RC-003-6" Vol required R17, R19, R21

__ RC-005-6" Vol RC-007-6" Vol NPS 4 OR LARGER Mitigated with FSWO

  • CIRCUMFERENTIAL WELDS _During R13; 1st ISI R15 20- ** Pressurizer Surge Line butt welds RC-028-12" Vol 3 1 3 33 **Design Calc Exam 21- Shutdown Cooling Loop 1 butt welds RC-051-16" Vol _ Frequency 6 years; 22- Shutdown Cooling Loop 2 butt welds RC-068-16" Vol required R19

INSPECTION ITEM B.

Examined R15, 23- Safety Iniection 1A butt welds SI-207-14" VE & Vol 1 1 100 REQUIRED R19 Examined R15, 24- Safety Injection 1B butt welds SI-223-14" VE & Vol 1 1 100 REQUIRED R19 Examined R15, 25- Safety Injection 2A butt welds S1-160-14" VE & Vol 1 1 100 REQUIRED R19 Examined R15, 26- Safety Injection 2B butt welds SI-179-14" VE & Vol 1 1 100 REQUIRED R19 27- Pressurizer Spray 1A butt welds RC-062-3" VE & Vol 1 1 100. REQUIRED R16, R20 28- Pressurizer Spray 1B butt welds RC-017-3" VE & Vol 1 1 100 REQUIRED R16, R20 cO 32- Drain Line Loop 1A butt welds RC-060-2" VE & Vol 1 1 100 REQUIRED R16, R20 00 o

33- Drain Line Loop 1B butt welds RC-058-2" VE & Vol 1 1 100 REQUIRED R16, R20 34- Drain Line Loop 2A butt welds RC-096-2" VE & Vol 1 1 100 REQUIRED'R16, R20 36- Letdown Line butt welds CH-001-2" VE & Vol 1 1 100 REQUIRED R16, R20 37- Charging Line butt welds CH-005-2" VE & Vol 1 1 100 REQUIRED R16, R20

--I (I)

C.D CD

REACTOR VESSEL B15.10 CLOSURE HEAD NUTS 2- Closure Head nuts 7.237" x 7.91" VT-2 54 54

  • B15.10 CLOSURE STUDS 2- Closure Head studs 7.380" x 76.37" VT-2 54 54
  • PRESSURIZER B15.10 BOLTS, STUDS AND NUTS 5- Pressurizer Manway Studs & Nuts 1.31" x 14.5" VT-2 20 20

B9.20 LESS THAN NPS 4 CIRCUMFERENTIAL WELDS OTHER B9.21 THAN PWR HPSI SYSTEMS .

. 30- Aux Pressurizer Spray** butt welds CH-009-2" S 2 2 3 100 ** IEB 88-08 & IN97-19 2 welds and base metal down stream of V431 EXAM CATEGORY BDG-1; PRESSURE

  • RETAINING BOLTING GREATER THAN 2 IN.IN , I DIAMETER PUMPS B6.180 BOLTS AND STUDS

'16- Reactor Coolant Pump 1A Flange Studs 4.33" x 32.87" Vol 16 .* VT-1 each removal

' 17- Reactor Coolant Pump 1B Flange Studs 4.33" x 32.87" Vol 16 *

  • and S exam at 5 year

'18- Reactor Coolant Pump 2A Flange Studs 4.33" x 32.87" Vol 16 *

EXAM CATEGORY B-.G-2; PRESSURE .

.RETAINING BOLTING 2 IN. AND LESS IN ~-

'PRESSURIZER B7.20 BOLTS, STUDS AND NUTS 5- Pressurizer Manway Studs & Nuts 1.31" x 14.5" S 20 20 .... . at 5 year intervals when removed

'STEAM GENERATOR (IEB 82-02)

B7.30 BOLTS, STUDS AND NUTS

'3- Steam Generator 1 MANWAYS Studs & Nuts 1.31" x 14.5" S 40 40 ....

_4- Steam Generator 2 MANWAYS Studs & Nuts 1.31" x 14.5" S 40 40 ....

kulmkuulv C5.51 54-FW SG 1 14" x 0.938" SG-002 S & Vol 2* 2 1 100 Examination REQD by SG-013 IEB 79-13 & SER 83-07

_(54-1 & 15; 55-1 & 15) 05.51 55-FW SG 2 14" x 0.938" SG-005 S & Vol 2* 2 3 100 SG-014 05.11 58- Aux & Downcomer FW SG 1 Butt Welds SG-8-6" S & Vol 1** 1 2 100 **Examination REQD by SG-8-8" IEB 79-13 & SER 83-07 (58-1; 59-1) 05.11 59- Aux & Downcomer FW SG 2 Butt Welds SG-1 1-6" S &.Vol 1** 1 3 100 SG-1 1-8"

PIPING WELDS > 3/8 IN NOMINAL **100% of all intersecting WALL THICKNESS FOR PIPING >NPS longitudinal welds will be AHE5.50 14 examined AHE5.51 CIRCUMFERENTIAL WELD**

  • category running percent 201 53 1 27 49 2 51 99 3 100 47- Main Steam SG 1 West Butt Welds SG-206-28" S & Vol 4(1) 12 1 SG-206-12" 2 SG-206-6" 5

" 48- Main Steam SG 1 East Butt Welds SG-207-28" S & Vol 4(1) 12 2 SG-207-12" 2 SG-207-6" 5 49- Main Steam SG 2 East Butt Welds SG-208-28" S & Vol 4(1) 12 3 SG-208-12" 2 SG-208-6" 5 50- Main Steam SG 2 West Butt Welds SG-209-28" S &Vol 4(1) 12 3 SG-209-12" 2 SG-209-6" 5 51- Atmospheric Dump No. 1 Butt Welds SG-59-12" S & Vol 13 13 1 SG-70-12" 16 16 2 52- Atmospheric Dump No. 2 Butt Welds SG-84-12" S & Vol 13 13 3 SG-1i 03-12" 16 16 53- Steam to Aux Feedwater Butt Welds SG-81-6" S & Vol 14 14 1 SG-83-6" 14 14 3 .

%JJýlr ue_ý411 SG-224-24' -2 I I 4 SG-224-24' 4 4 -2 + 4 I t 57- Feedwater SG No. 2 Butt Welds SG-204-24" S & Vol 2 6 3 SG-205-24" 2 SG-225-24" -2 60- Downcomer Feedwater SG 1 Butt Welds SG-200-8" S & Vol 2(8) 14 1 SG-008-8" 4 _

61- Downcomer Feedwater SG 2 Butt Welds SG-203-8" S & Vol 2(8) 14 3 SG-11-8" 4 66- Blowdown SG 1 Butt Welds SG-39-6" S & Vol 2(13) 15 2 67- Blowdown SG 2 Butt Welds SG 6" S & Vol 2(10) 12 3 PIPING WELDS >1/5" NOMINAL WALL THICKNESS FOR PIPING > NPS 2 AHE5.60 AND< NPS 4 AHE5.61 CIRCUMFERENTIAL**

  • category running percent 40 10 1 25 10 2 50 20 3 100 51- Atmospheric Dump No. 1 Butt Welds SG-95-4" S &Vol 20 10 1 10 2 52- -Atmospheric Dump No. 2 Butt Welds SG-1 00-4" S &Vol 20 203

_ _ I _ _ _ __ _ I _ _ _ I _ I _ _ _ I _ _ I _ II_ I _ _ _

4 4 t I

.5. L I A A A A - - ___________________

RIAr PriP IuNIG>NPSI AHE5.80 BRANCH PIPING > NPS 2 AHE5.81 CIRCUMFERENTIAL

  • category running percent 32 7 1 22 9 2 50 16 3 100 47- Main Steam SG 1 West 28" x 12" SG-206-28" S 2 7 1 28" x 6" 5 48- Main Steam SG 1 East 28" x 12" SG-207-28" S 2 9 2 28" x 6" 6 (1) 49- Main Steam SG 2 East 28" x 12" SG-208-28" S 2 9 3 28" x 6" 6 (1) 50- Main Steam SG 2 West 28" x 12" SG-209-28" S 2 7 3 28" x 6" 5 EXAM CATEGORY NA; RCP FLYWHEEL EXAMINATIONS PER REG GUIDE 1.14 ~)

NA 16-Reactor Coolant Pump 1A flywheel 1A S&VOL 4 4 3 100 S OF ALL EXPOSED 17 Reactor Coolant Pump 1B flywheel 1B SURFACES and UT OF 18-Reactor Coolant Pump 2A flywheel 2A HIGH STRESS AREAS 19-Reactor Coolant Pump 2B flywheel 2B

SECTION 8.0 REQUESTS FOR RELIEF 87 of 208 31NT-ISI-3 Rev 1

RELIEF REQUESTS INDEX NUMBER DESCRIPTION

34. Included for reference to document that the Interval 2 Reactor Vessel volumetric examinations were extended for 1 fuel cycle.

NRC accepted as documented by SER attached to Letter dated September 20, 2006.

35. Included for reference to document that the Interval 2 Reactor Vessel visual examinations were extended for I fuel cycle.

NRC accepted as documented by SER attached to Letter dated October 4, 2006.

36. Full Structural Weld Metal Overlay and for Units 1 and 3 only; Request to use 2001 Edition thru 2003 Addenda for Repair and Replacements NRC accepted as documented by SER attached to Letter dated June 21, 2007
37. Alternative to ASME Code Case N-638-1, Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temperbead Technique.

NRC accepted as documented by SER attached to Letter dated June 21, 2007 38 Included for reference to document the Close out of U2 2nd Interval

39. Safety Injection Tank alternative repair method.

Submitted by APS letter 102-05869-DCM/RJR, dated July 11, 2008

40. Extended Reactor Vessel Examinations to meet the PWROG program Submitted by APS letter
41. Request to utilize Appendix 1 of Code Case N-729-1.

Submitted by APS letter

42. Request to utilize Leak Path Assessments N-729-1 previously qualified Submitted by APS letter
43. Included for reference to document the Closeout of U3 2 nd Interval Submitted by APS letter
44. Extended Reactor Vessel Examinations Submitted by APS letter
45. Included for reference to document the Closeout of U2 RPV 2nd Interval
46. Included for reference to document the Closeout of U 2 nd Interval
47. Included for reference to document the Closeout of U3 RPV 2nd Interval 88 of 208 31NT-ISI-3 Rev 1

SECTION 9.0 ISI BOUNDARY DRAWINGS 89 of 208 31NT-ISI-3 Rev 1

BOUNDARY DRAWING INDEX Drawing No. Drawing Title Code Class 03-M-AFP-001 Auxiliary - Feedwater System 2&3 Chemical and Volume Control System 1&2 03-M-CHP-001 Chemical and Volume Control System 2&3 03-M-CHP-002 03-M-CHP-003 Chemical and Volume Control System 2 03-M-CLP-001 Containment Integrated and Local Leak Rate Test 2 03-M-CPP-001 Containment Purge System 2 03-M-CTP-001 Condensate Purge System 2 03-M-DFP-001 Diesel Fuel Oil & Transfer System 3 03-M-DGP-001 Diesel Generator System 3 03-M-DWP-002 Demineralized Water System 2 03-M-ECP-001 Essential Chilled Water System 3 03-M-EWP-001 Essential Cooling Water System 3 03-M-FPP-006 Fire Protection System 2 03-M-GAP-001 Service Gas Supply System (N 2 and H2) 2&3 03-N-GRP-001 Gaseous Radwaste System 2 03-M-HCP-001 HVAC Containment Building 2 03-M-HPP-001 Containment Hydrogen Control 2 03-M-IAP-002 Instrument and Service Air System 2 03-M-IAP-003 Instrument and Service Air System 2 03-M-NCP-002 Nuclear Cooling Water System 3 03-M-NCP-003 Nuclear Cooling Water System 2 03-M-PCP-001 Fuel Pool Cooling & Cleanup System 2&3 03-M-RCP-001 Reactor Coolant System 1 &2 03-M-RCP-002 Reactor Coolant System 1&2 03-M-RDP-001 Radioactive Waste Drain System 2 03-M-SGP-001 Main Steam System 2&3 03-M-SGP-002 Main Steam System 2 03-M-SIP-001 Safety Injection and Shutdown Cooling System 2 03-M-SIP-002 Safety Injection and Shutdown Cooling System 1 &2 03-M-SIP-003 Safety Injection and Shutdown Cooling System 2 03-M-SPP-001 Essential Spray Pond System 3 03-M-SPP-002 Essential Spray Pond System 3 03-N-SSP-001 Nuclear Sampling System 2 03-M-WCP-001 Normal Chilled Water System 2 13-M-ZZP-001 Symbols and Legend N/A 13-M-ZZP-002 Symbols and Legend N/A 90 of 208 31NT-ISI-3 Rev 1

SECTION 10.0 ZONE DRAWINGS 91 of 208 31NT-ISI-3 Rev 1

ZONE DRAWING INDEX Drawing No. Drawing Title Code Class Zone 1 Reactor Vessel I Zone 2 Closure Head I Zone 3 Steam Generator 1 I Zone 4 Steam Generator 2 1 Zone 5 Pressurizer I Zone 6 RCS Primary Piping I Zone 16 Reactor Coolant Pump 1A I Zone 17 Reactor Coolant Pump 1B B Zone 18 Reactor Coolant Pump 2A I Zone 19 Reactor Coolant Pump 2B I Zone 20 Pressurizer Surge Line 1 Zone 21 Shutdown Cooling Loop 1 1 Zone 22 Shutdown Cooling Loop 2 1 Zone 23 Safety Injection 1A I Zone 24 Safety Injection lB 1 Zone 25 Safety Injection 2A I Zone 26 Safety Injection 2B 1 Zone 27 Pressurizer Spray IA I Zone 28 Pressurizer Spray lB I Zone 29 Combined Pressurizer Spray I Zone 30 Aux. Pressurizer Spray I Zone 31 Pressurizer Safeties 1 Zone 32 Drain Line 1A 1 Zone 33 Drain Line lB 1 Zone 34 Drain Line 2A 1 Zone 35 Drain Line 2B 1 Zone 36 Letdown Line 1 Zone 37 Charging Line I Zone 38 Drain Line Loop 1 1 Zone 39 HPSI Long Term Recirc 1 I Zone 40 HPSI Long Term Recirc 2 1 Zone 41 Steam Generator 1 2 Zone 42 Steam Generator 2 2 Zone 43 Main Steam SGI East 2 Zone 44 Main Steam SG1 West 2 Zone 45 Main Steam SG2 East 2 Zone 46 Main Steam SG2 West 2 Zone 47 Main Steam SGI West 2 Zone 48 Main Steam SG1 East 2 Zone 49 Main Steam SG2 East 2 Zone 50 Main Steam SG2 West 2 Zone 51 Atmospheric Dump No. 1 2 Zone 52 Atmospheric Dump No. 2 2 Zone 53 Steam to Aux Feedwater System 2 Zone 54 Feedwater SG No. 1 2 Zone 55 Feedwater SG No. 2 2 Zone 56 Feedwater SG No. 1 2 Zone 57 Feedwater SG No. 2 2 Zone 58 Aux & Downcomer Feedwater SG 1 2 Zone 59 Aux & Downcomer Feedwater SG 2 2 Zone 60 Downcomer Feedwater SG 1 2 Zone 61 Downcomer Feedwater SG 2 2 Zone 62 Aux Feedwater SG 1 2 Zone 63 Aux Feedwater SG 2 2 92 of 208 31NT-ISI-3 Rev 1

ZONE DRAWING INDEX (Continued)

Drawing No. Drawing Title Code Class Zone 64 Blowdown SG 1 2 Zone 65 Blowdown SG 2 2 Zone 66 Blowdown SG 1 2 Zone 67 Blowdown SG 2 2 Zone 68 Regenerative Heat Exchanger 2 Zone 69 Letdown Heat Exchanger 2 Zone 70 LPSI Pump Room A Suction 2 Zone 71 LPSI Pump Room A Discharge 2 Zone 72 LPSI Pump A 2 Zone 73 LPSI Pump Room B Suction 2 Zone 74 LPSI Pump Room B Discharge 2 Zone 75 LPSI Pump B 2 Zone 76 Containment Spray Pump Room A Suction 2 Zone 77 Containment Spray Pump Room A Discharge 2 Zone 78 Containment Spray Pump A 2 Zone 79 Containment Spray Pump Room B Suction 2 Zone 80 Containment Spray Pump Room B Discharge 2 Zone 81 Containment Spray Pump B 2 Zone 82 Shutdown Cooling Heat Exchange Room A 2 Zone 83 Shutdown Cooling Heat Exchange Room A 2 Zone 84 Shutdown Cooling Heat Exchanger A 2 Zone 85 Shutdown Cooling Heat Exchanger Room B 2 Zone 86 Shutdown Cooling Heat Exchanger Room B 2 Zone 87 Shutdown Cooling Heat Exchanger B 2 Zone 88 East Wrap 2 Zone 89 East Wrap 2 Zone 90 East Wrap 2 Zone 91 West Wrap 2 Zone 92 West Wrap 2 Zone 93 West Wrap 2 Zone 94 A Train Misc. Pipe Chases & 88' Pipe Tunnel 2 Zone 95 B Train Misc. Pipe Chases & 88' Pipe Tunnel 2 Zone 96 Containment LPSI Header to Loop IA 2 Zone 97 Containment LPSI Header to Loop lB 2 Zone 98 Containment LPSI Header to Loop 2A 2 Zone 99 Containment LPSI Header to Loop 2B 2 Zone 100 Containment LPSI Train A Suction 2 Zone 101 Containment LPSI Train B Suction 2 Zone 102 SI Pumps Train "A" Suction 2 Zone 103 Refueling Water Suction Train "A" 2 Zone 104 S1 Pumps Train "B" Suction 2 Zone 105 Refueling Water Suction Train "B" 2 Zone 106 HPSI Pump Room "A" Discharge 2 Zone 107 HPSI Pump Room "B" Discharge 2 Zone 108 HPSI Discharge 88' Pipe Chase 2 Zone 109 HPSI Discharge 88' Pipe Chase 2 Zone 110 HPSI Discharge West Wrap 2 Zone Il1 HPSI Discharge West Wrap 2 Zone 112 HPSI Discharge East Wrap 2 Zone 113 HPSI Discharge East Wrap 2 Zone 114 Containment HPSI Header Loop 1A & 1B 2 Zone 115 Containment HPSI Header Loop 2A & 2B 2 Zone 116 HPSI Pump "A" 2 Zone 117 HPSI Pump "B" 2 Zone 118 HPSI Long Term 2 Zone 119 HPSI Long Term 2 Zone 120 Containment Spray A 2 Zone 121 Containment Spray B 2 93 of 208 31NT-ISI-3 Rev 1

1800 NOTES:

TAG NO. 3MRCEXO1 SERIAL NO. 65173 (C-E)

N.B NO. 22655 DO SHELL SEGMENT 11 1/4" CROSS SECTION

-LONG SEAMS-

- INLET REFERENCE DWG:

NOO1-3.01-15 AND 17 NOO1-3.01-41 AND 61 N001-3.01-72 SUPPORT COLUMNS 40 AT IA Cold Leg B 41 AT lB Cold Leg B z 42 AT 2A Cold Leg B 43 AT 2B Cold Leg B 7'

UNIT 3 ZONE I SHEAR - 2 KEYS ICI Penetrations 1 thru 61 REACTOR VESSEL 6 1/2"

NOTES:

1) CEDM'S: ITEM NO. - CEDM NO.
2) TAG NO.3MRCEX03 SERIAL NO.05065-CHA-03 (DOOSAN)

NOTE 3 -T- N.B. NO. 1706

3) ITEM 21 CONTAINS 4 SINGLE STUDS IN A GRAYLOC CLAMP
4) NEW HEAD REPLACEMENT R 15 WO 3388752 RVLMS LOCATED AT 92 & 96 ted on mns: REFERENCE DWGS:

77, 79, 13-MN-740 (Replaced RV Head Spec) 89, 1 THRU 18 CLOSURE 19 THRU 36 HEAD 37 THRU 54 STUDS 8.6" NUTS 1 THRU 18 D 19 THRU 36 37 THRU 54 1 THRU 18 19 THRU 36 WASHERS 37 THRU 54 1800 76.37" 900. 00 0 0 0 0 00 0 0000002080 70000 00 00072 60660 0 I*0 073089 0 0 0 073 7490* 0 81 11.5"

-I STUD LOCATIONS fl (0o 1 THRU 54 CW FROM 00 UNIT 3 ZONE 2 CLOSURE HEAD I TOP VIEW CLOSURE HEAD

1120 MANWAY STUDS & NUTS NOTES:

-NOTE 1- 1) Stud Location is #1 TDC Going CW to #20.

2) Tag NO 3MRCEEO1A Serial NO. 242 NB NO. 191 0o MANWAY STUDS & NUTS NOTE 1- 13-241 REFERENCE DWGS:

MN725-A700, A701, A702, A703, A704 MN725-A419, A425, A440, A448 0O 1800 MN725-A605, A622, A625 3150 LOOKING DOWN

.87 TUBESHEET Leg SKIRT B

.56 CHANNEL HEAD CROSS SECTION MANWAY STUDS

112* MANWAY STUDS & NUTS

  • NOTES:

-NOTE 1- 1) Stud Location is #1 TDC Going CW to #20.

2) Tag NO 3MRCEEO1B Serial NO. 243 NB NO. 192 00 MANWAY STUDS & NUTS NOTE 1-
  • REFERENCE DWGS:

MN725-A700, A701, A702, A703, A704 00 180°. MN725-A419, A425, A440, A448 MN725-A605, A622, A625 3150 LOOKING DOWN

.87 TUBESHEET

.56 CHANNEL HEAD CROSS SECTION MANWAY STUDS

I UNIT 3 ZONE 4 STEAM GENERATOR #2

ZONE 29

.87 STUDS & NUTS TAY NOTE 1 TOP VIEW 5",

.56 2700 900 MANWAY STUDS 0

)D UPPER SHELL LES (7)

NOTES:

1) STUD LOCATION IS #1 TDC GOING CW TO #20
2) TAG NO 3MRCEX02 SERIAL NO. 65373 (C-E)

N.B. NO. 22254 2700 900 REFERENCE DWGS:

NOO1-6.04-6, 31 AND 90

-I fl HEATERS (36)

UNIT 3 ZONE 5 LOWER SHELL PRESSURIZER

REFERENCE DWGS:

03-P-ZCC-103 N001-6.07-83 AND 112 N001-6.07-90 THRU 94 N001-6.07-96 THRU 100 MN725-A343, A383, A708 MN725-A419, A622, A609 1

6-99 Cold Leg Instrument Nozzles (12)

RCP Pressure Taps (4 disch & 4 suction)

Hot Leg Instrument Nozzles (27) i-I NOTES:

1) PIPE LONG SEAMS AT 3:00 AND 9:00 POSITIONS (FOR CE SUPPLIED PIPING ONLY)
2) ELBOW LONG SEAMS AT LONG AND SHORT RADIUS (FOR CE SUPPLIED PIPING ONLY)
3) ANSALDO PIPING AND ELBOWS ARE SEAMLESS (XX-13, XX-16 and XX-19 only)
4) PIPING WCL STAMPED WITH CENTER PUNCH MARKS. CE WELDS REFERENCED WITH FOOTAGE MARKS. ANSALDO WELDS REFERENCED WITH CENTER PUNCH MARKS EACH 250 mm. {* & ***}
5) FOR REPLACEMENT WELDS, PORTIONS OF THE ORIGINAL WELD MAY REMAIN. THE ORIGINAL WELD CAP IS JOINED TO THE REPLACEMENT WELD ***

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 3MRCEPO1A SERIAL NO. 1111-1A (C-E)

N.B. NO. 23461 1.1" *H, 7.28" 8.27" 6.89"f

-U SEAL HOUSING STUDS 32.87" T

6.93" REFERENCE DWGS:

N001-6.02-418 NOO1-6.02-420 THRU 423 NOO1-6.02-107 & 108 FLANGE STUDS UNIT 3 ZONE 16 REACTOR COOLANT PUMP 1A

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 3MRCEPOIB SERIAL NO. 1111-IB (C-E)

N.B. NO. 23462 7.28" 6.89"f I- SEAL HOUSING STUDS 32.87" T

6.93" REFERENCE DWGS:

N001-6.02-418 N001-6.-420 THRU 423 N001-6.02-107 & 108 FLANGE STUDS UNIT 3 ZONE 17 REACTOR COOLANT PUMP lB

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 3MRCEPO1C SERIAL NO. 1111 -2A (C-E)

N.B. NO. 23463 1.1" -

7.28" 8.27" 6.89"f

-U SEAL HOUSING STUDS 32.87" T

6.93",

REFERENCE DWGS:

N001-6.02-418 NOO1-6.02-420 THRU 423 N001-6.02-107 & 108 FLANGE STUDS z

in UNIT 3 ZONE 18 REACTOR COOLANT PUMP 2A

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 3MRCEPO1D SERIAL NO. 1111-2B (C-E)

N.B. NO. 23464 1.1" 7.28" 6.89" 2

~2 I SEAL HOUSING STUDS 32.87" T

6.93" REFERENCE DWGS:

N001-6.02-418 N001-6.02-420 THRU 423 N001-6.02-107 & 108 FLANGE STUDS 7

-A I, UNIT 3 ZONE 19 1

REACTOR COOLANT PUMP 2B

Y* PLANT NORTH PRESSURIZER ZONE 5 B

CS SS CS (RC-028-BCAA- 12")

  • PRESSURIZER HOT LEG VAULT ZONE 6 REFERENCE DRAWINGS EL 03-P-RCF- 101

-I UNIT 3 ZONE 20 PRESSURIZER SURGE

  • < PLANT LOOP I HOT LEG ZONE 6 NORTH REFERENCE DRAWINGS 03-P-SIF-105 NOTES:

R14 WO 2967884 6-11-OL, 21-20-OL CONT ON ZONE 38 EL 89'-9"7

] SECONDARY SHIELD WALL CONT ON ZONE 100 UNIT 3 ZONE 21 SHUTDOWN COOLING LOOP 1

NOTES:

R14 WO 2967888 7-9-OL, 22-1 -OL REFERENCE DRAWINGS 03-P-SIF-105 CONT ON ZONE 101 5B 2222-17 22-28 22-31 LOOLOO O 2

C SECONDARY SHIELD WALL LEG ZONE 6 28F237 V-235 233-23 23-20 SI TANK IA CONT ON ZONE 96 REFERENCE DRAWINGS 03-P-SIF-103 UNIT 3 ZONE 23 SAFETY INJECTION lA

REFERENCE DRAWINGS 03-P-SIF-103

  • C CONT ON ZONE 97 H

I) UNIT 3 ZONE 24 U

SAFETY INJECTION lB

SECONDARY SHIELD WALL LEG ZONE 6 LOOP 2A COLD 25-16 V-215 SI-E" 56-BCAA-12" 25-26 SI TANK 2A REFERENCE DRAWINGS 03-P-SIF-136 B H- CONT ON ZONE 98 UNIT 3 ZONE 25 SAFETY INJECTION 2A

LOOP 2B COLD REFERENCE DRAWINGS 03-P-SIF-136 SI TANK 2B UNIT 3 ZONE 26 SAFETY INJECTION 2B

"*< PLANT NORTH REFERENCE DRAWINGS 03-P-RCF- 102 PRESSURIZER VAULT 27-4 ZONE 29 COMBINED PZR SPRAY E 3EL 131' 113/8" EL 119'-6" H-7 27-127-36 C

73 9 -

RC-62 c 11E24 27-34

___EL 123'-10" -B ,e \- 73 ZONE 6

ZONE 29 COMBINED REFERENCE DRAWINGS 03-P-RCF- 102 PLANT NORTH

( RC-018-BCAA-4")

C B

VAULT

REFERENCE DRAWINGS 03-P-RCF- 102 Y* PLANT NORTH WP EL 158'-2" ZONE 30 AUX SPRAY ss 5-330L Trg 158'-1 5/16" - NOZZLE PRESSURIZER EL 152'-5 5/8" 1ýiýZONE 5 ZONE 27 PZR SPRAY IA

- (EL130"-11 3/8"

-I n

ZONE 28 UNIT 3 ZONE 29 PZR SPRAY 1B COMBINED PZR SPRAY

-.1.

NOTES:

R14 WO 3329247, 3329254 30-20, 30-21, 30-22, 30-23 30-7R,30-12R REFERENCE DRAWINGS 03-P-CHF-107

_ EL 153'-8" SW (CH-B-521-BCAA-2" S CH-A-520-BCAA-2" F30-8 (CH-E-009-BCAA-2",

30-UNIT 3 ZONE 30 ZONE 29 30-1 D ~PZR COMBINED SPRAY AAUX. PZR SPRAY

PSV 200 AFLANGE BOLTING

.11

+ /

REFERENCE DRAWINGS 03-P-RCF-1 14 NOTE: PRESSURIZER 7

-4 8 - 2" STUDS ZONE 5 j2 16 - NUTS TOP HEAD UNIT 3 ZONE 31 PRESSURIZER SAFETIES

COLD LEG ZONE 6 LOOP 1A EL 89' 911/16" REFERENCE DRAWINGS 03-P-CHF-110 3'2-' NOTE:

SW = SOCKET WELD WP EL 88'-10 3/16" SW SW

-I n

UNIT 3 ZONE 32 Uo DRAIN LINE lA

EL 89' SW COLD LEG REFERENCE DRAWINGS ZONE 6 LOOP lB 03-P-CHF-110 NOTE:

SW = SOCKET WELD UNIT 3 ZONE 33 DRAIN LINE lB

"*ý /

COLD LEG LOOP 2A ZONE6 /

SW REFERENCE DRAWINGS 03-P-CHF-110 NOTE:

SW = SOCKET WELD SW W1 UNIT 3 ZONE 34 DRAIN LINE 2A

EL 88' 9 5/8" LETDOWN LINE ZONE 36 REFERENCE DRAWINGS 03-P-CHF-110 NOTE:

SW = SOCKET WELD 0

Do SW

-I UNIT 3 ZONE 35 DRAIN LINE 2B

REFERENCE DRAWINGS EL 03-CHF-142 131' RC91 RC91 B HAP W A2

___EL

- 121' 21 RC9 1 B HAD~

ýjA ZONE 6 8REFERENCE DWG.

03-P-CHF- 109 45 6NOTES:

sw3 B.,* R15 WO 3469325 w B 9630-63, 30-64, 30-65, H30-66, 30-8R, 30-9R UNIT 3 ZONE 37 z PDV240V43-EL "*Detail A CHARGING LINE 101'

REFERENCE DRAWINGS 03-P-SIF-105 NOTE:

SW = SOCKET WELD

'3 D3

)o ZONE 21 SHUTDOWN COOLING

-1 UNIT 3 ZONE 38 DRAIN LINE LOOP 1

POINT A 1-11, .

sI-A-248-BcAA-Y' , CONT ZONE ON 118 LEL 83' 5"

)D 31 39-18 3-CLEL 86'8 1/4" 39-11 CLEL 88' 2" 9-17 39-17 /9 B S24 39-16 39-15 /91 2 CLEL 86' 8 1/4" 391/9-43 -

39-33-/

~/

391-22/

39-37 UNIT 3 ZONE 39 REFERENCE DWG. HPSI LONG TERM RECIRC 03-P-SIF-105 LOOP 1

PLANT NORTH U * -EL. 93' CONT ON ZONE 119 II I

I 402 10- 1 EL. 89'-391/2" REFERENCE DRAWINGS 03-P-SIF-105 EL.

7

-I UNIT 3 ZONE 40 HPSI LONG TERM -

RECIRCULATION 2

NOTES:

1) 00 IS AT CENTER OF COLD LEG MANWAY
2) STUDS ARE 16 - 1.5" X 9"
3) STUDS ARE 16 - 1" X 6"
4) TAG NO. 3MRCEEO1A SERIAL NO. 242 N.B. NO. 191

@ 900 E43 REFERENCE DWGS:

MN725-A420, A423, A426, A437, A443, A446 MN725-A700, A701, A731 MN725-A395, A622 and A625 3.1" 5.83" 3O -sDOWNCOMER RECIRC @ 4504 IN

- ZONE 58 DOWNCOMER @ 00 09 8"

0

-SECONDARY HANDHOLES AT WAND 270'

-NOTE 3-z W UNIT3 ZONE 41 CD STEAM GENERATOR 1

NOTES:

1) 0' IS AT CENTER OF COLD LEG MANWAY
2) STUDS ARE 16 - 1.5" X 9"
3) STUDS ARE 16-1" X 6"
4) TAG NO. 3MRCEEO1B SERIAL NO. 243 N.B. NO. 193

@g90 E43 REFERENCE DWGS:

MN725-A420, A423, A426, A437, A443, A446 MN725-A700, A701, A731 MN725-A395, A622 and A625 3.41" 910 5.83"

-DOWNCOMER RECIRC @ 450 4 IN

-ZONE 58 DOWNCOMER @ 00 09

.051 8"

0

-SECONDARY HANDHOLES AT WAND 2700

-NOTE 3-UNIT 3 ZONE 42 STEAM GENERATOR 2

NI< PLANT NORTH L_.

EL. 157'-101/8" t EL_32' t EL. 132'-31/16" t EL.

{t EL. 171' ZONE 41 REFERENCE DRAWINGS 03-P-SGF- 118 UNIT 3 1 ZONE 43 MAIN STEAM (EAST)

STEAM GENERATOR 1

LINE # DIA/SCH FROM TO

  • " PLANT SG-33 32" x 2.00" 44-1 -

NORTH SG-33 28" x 1.25" 44-2 44-31

_ t EL. 157'-93/4" L_EL. 132'-33/8" - t EL. 132'

-*Z ;ONE 44-26

'3

'3 REFERENCE DRAWINGS 03-P-SGF-118

-I UNIT 3 ZONE 44 MAIN STEAM (WEST)

STEAM GENERATOR 1

LINE # DIA/SCH FROM TO

  • < PLANT SG-42 32"x 2" 45-1 NORTH SG-42 28"x 1.25" 45-2 45-26 tý t EL. 132' EL. 171'-111/16"___ ZONE 49

_EL. 157'-101/8"

"--t EL. 171' ZONE 42

- t EL. 132'-31/16" REFERENCE DRAWINGS 03-P-SGF-118 UNIT 3 ZONE 45 MAIN STEAM (EAST)

STEAM GENERATOR 2

LINE # DIA/SCH FROM TO

  • r. PLANT SG-45 32"x 2" 46-1 -

NORTH SG-45 28"x 1.25" 46-2 46-29 _- t EL. 132' ZONE 50

t. EL. 171'<

J ZONE 42 t EL. 158' t EL. REFERENCE DRAWINGS 03-P-SGF-118

-I UNIT 3 ZONE 46 MAIN STEAM (WEST)

STEAM GENERATOR 2 I-

LINE # DIA/SCH FROM TO Y *' PLANT SG-206 28"x 1.750" 47-1 47-30 NORTH SG-206 6"x 1.500" 47-4 47-20 SG-206 12"x 0.844" 47-28 47-29 ZONE 51 TURBINE BUILDING D

10

--- EL. 129'-0" REFERENCE DRAWINGS 03-P-SGF-155 03-P-SGF-401 EL. 132'-0".

ZONE 44 p-i NOTE:

1 - MAIN STEAM RELIEF VALVE UNIT 3 ZONE 47 12-1 1/4"DIA. FLANGE BOLTS PER VALVE 2 - MSIV, 20-2 1/4"DIA. BODYTO MAIN STEAM (WEST)

BONNET BOLTS STEAM GENERATOR 1

LINE # DIA/SCH FROM TO Y* PLANT SG-207 28"x 1.750" 48-1 48-31 NORTH SG-207 6"x 1.500" 48-4 48-2 SG-207 12"x 0.844" 48-28 48-2 ZONE 51

',4 ZONE 51

-4' TURBINE BUILDING 0

REFERENCE DRAWINGS 03-P-SGF-155 03-P-SGF-401 EL. 132'-0"---

ZONE 43 MAIN STEAM S/G #1 900 (EAST) INSIDE CONTAINMENT

-4 NOTE: UNIT 3 ZONE 48 1 - MAIN STEAM RELIEF VALVE 12-1 1/4"DIA. FLANGE BOLTS PER VALVE MAIN STEAM (EAST) 2 - MSIV, 20-2 1/4"DIA. BODY TO STEAM GENERATOR 1 BONNET BOLTS

LINE # DIA/SCH FROM TO

  • < PLANT SG-208 28"x 1.750" 49-1 49-30 NORTH SG-208 6"x 1.500" 49-4 49-20 SG-208 12"x 0.844" 49-28 49-29 ZONE 52 ZONE 52 TURBINE BUILDING Li 00 REFERENCE DRAWINGS 03-P-SGF-155 03-P-SGF-401 EL. 132'-0"-'-

ZONE 45

.z W NOTE:

1 - MAIN STEAM RELIEF VALVE UNIT 3 ZONE 49 12-1 1/4"DIA. FLANGE BOLTS PER VALVE 2 - MSIV, 20-2 1/4"DIA. BODY TO MAIN STEAM (EAST)

BONNET BOLTS STEAM GENERATOR 2

  • < PLANT NORTH ZONE 52-S/G #2 ADV* TURBINE BUILDING REFERENCE DRAWINGS 03-P-SGF-155 03-P-SGF-401 EL. 132'-0",

ZONE 46 NOTE:

1 - MAIN STEAM RELIEF VALVE 12-1 1/4"DIA. FLANGE BOLTS PER VALVE 2 - MSIV, 20-2 1/4"DIA. BODY TO MAIN STEAM (WEST)

BONNET BOLTS STEAM GENERATOR 2

LINE# DIA/SCH FROM TO

  • < PLANT SG-059 12"x0.844" 51-1 51-51 NORTH SG-070 12"x 0.844" 51-37 51-49 SG-095 4" x 0.337" 51-65 51-76 z

REFERENCE DRAWINGS UNIT 3 ZONE 51 03-P-SGF-158 ATMOSPHERIC DUMP 1

LINE # DIA/SCH FROM PLANT SG-103 12"x 0.844" 52-1 NORTH SG-084 12"x 0.844" 52-38 SG-100 4" x 0.337" 52-65 7 REFERENCE DRAWINGS

-0 I,

03-P-SGF- 158 UNIT 3 ZONE 52 ATMOSPHERIC DUMP 2

LINE # DIA/SCH FROM TO Y* PLANT SG-081 6"x 0.432" 53-1 53-15 NORTH SG-083 6"x 0.432" 53-21 53-35 122'-5"

-4 2

'2 REFERENCE DRAWINGS 03-P-AFF- 131 UNIT 3 ZONE 53 STEAM TO AUXILIARY FEEDWATER SYSTEM

LINE # DIA/SCH FROM TO PLANT SG-002 14"x0.938' 54-15 54-24 NORTH SG-002 16"x 0.844'54-25A 54-26 SG-002 16"x 1.75"54-107 -

SG-002 24"x 1.218' 54-13, 54-60 ZONE 54-27 56 SG-013 14"x 0.938' 54-1 54-10 SG-013 16"x0.844'54-11A 54-12 SG-013 16"x 1.750'1 54-100 -

EL. 115'"

)C ic REFERENCE DRAWINGS 03-P-SGF- 119 EL. 93' UNIT 3 ZONE 54 FEEDWATER STEAM GENERATOR 1

FROM TO LINE # DIASCH DIAISCH FROM TO ZONE

'1ý 57 0

EL. 15-55-5-0 553RFRNEDRAWI z55 HH HiB 03-P-SGF-1 19 ZONE 55 NOTES:

FEEDWATER R15 WO 3381628 STEAM GENERATOR 2 55-6R, 55-7R, 55-8R, 55-9R,55-10R, 55-11R,55-12R

LINE # DIA/SCH FROM TO

  • < PLANT SG-202 24"x 1.53 1" 1 4 NORTH SG-201 24"x 1.812" 6 7 SG-224 24"x 1.812" 9 11 115'-6" NOTE:

FWIV, 20-21/2" DIA BODY TO BONNET BOLTS PER VALVE REFERENCE DRAWINGS 03-P-SGF- 119 03-P-FWF-403 EL. 115' ZONE 54 co UNIT 3 ZONE 56 FEEDWATER STEAM GENERATOR 1

LINE # DIA/SCH FROM TO PLANT SG-205 24"x 1.531" 57-1 57-4 NORTH SG-204. 24"x 1.812" 57-6 57-7 SG-225 24"x 1.812" 57-9 5741 EL. 115'-6" NOTE:

FWIV, 20-21/2" DIA BODY TO BONNET BOLTS PER VALVE REFERENCE DRAWINGS EL. 11 '-6-- 03-P-SGF- 119 03-P-FWF-403 ZONE 55 ^

7

-I I, UNIT 3 ZONE 57 FEEDWATER STEAM GENERATOR 2

LINE # DIA/SCH FROM TO

  • <" PLANT SG-008 6"x.432" 58-1 58-3 NORTH SG-008 8"x.500" 58-4 58-25 AF-004 6"x.562" 58-19 58-34 EL. 143'-45/16" SG-008 6"xl.8"41-111 -

ZONE 60 EL. 131 EL. 13 V-0" REFERENCE DRAWINGS

-1 03-P-SGF- 120 UNIT 3 ZONE 58 j)

AUXILIARY & DOWNCOMER FEED WATER SG #1

LINE # DIA/SCH FROM TO N* PLANT SG-11 6"x.432" 59-1 59-3 NORTH SG-11 8"x.500" 59-4 59-25 AF-6 6"x.562"59-16C 59-34 SG-11 6"xl.8"42-111 -

El ZONE 59-1 42 2O 7

-4 REFERENCE DRAWINGS I) 03-P-SGF-120 UNIT 3 1 ZONE 59 AUXILIARY & DOWNCOMER FEEDWATER SG #2 A.

LINE# DIA/SCH FROM TO

  • <' PLANT TURBINE SG-200 8"x.719" 60-2 60-12 BUILDING NORTH SG-008 8"x.719" 60-14 60-17

' EL. 1 I~.

REFERENCE DRAWINGS 03-P-SGF- 156

-I UNIT 3 ZONE 60 EL. 104'-0" - - -

ZONE DOWNCOMER FEEDWATER 58 STEAM GENERATOR #1 N .

LINE # DIA/SCH FROM TO

  • < PLANT SG-203 8"x.719" 61-2 61-12 NORTH SG-011 8"x.719" 61-14 61-17 EL. 114'-105/16"-'-

.1,

)

D REFERENCE DRAWINGS 03-P-SGF- 156 W

UNIT 3 ZONE 61 t EL. ZONE DOWNCOMER FEEDWATER 59 STEAM GENERATOR #2

LINE# DIA/SCH FROM TO

  • < PLANT AF-018 6"x.562" 62-4 62-14 NORTH AF-004 6"x.562" 62-15 62-24
  • t EL. 94'-5"- -

EL. 94'-5" REFERENCE DRAWINGS 03-P-AFF- 132 03-P-AFF- 133 ZONE 58 UNIT 3 AUXILIARY FEEDWATER STEAM GENERATOR #1

LINE # DIA/SCH PLANT AF-016 6"x 0.562" NORTH AF-006 6"x 0.562" C

ZONE 59 EL. 82' -4" REFERENCE DRAWINGS 03-P-AFF-132 03-P-AFF-133 ZONE 63 AUXILIARY FEEDWATER STEAM GENERATOR #2

REFERENCE DRAWINGS 03-P-SGF-122 LINE # DIA/SCH FROM TO PLANT SG-053 6"x 0.562" 64-1 64-14 NORTH SG-039 6"x 0.562" 64-15 64-53 SG-522 6"x 0.562" 64-80 EL. 109',-

ZONE 66.

10 EL. 104' 7

-4 I, ZONE 64 BLOWDOWN STEAM GENERATOR #1

LINE # DIA/SCH FROM TO REFERENCE DRAWINGS N*< PLANT SG-048 6"x 0.562" 65-1 65-52 03-P-SGF-140 NORTH SG-052 6"x 0.562" 65-15 65-28 SG-523 6"x 0.562" 64-89 ZONE 67 POINTA EL. 122' 4" LINE CONTINUED 5-9

~~ZONE 42 H

UNIT 3 ZONE 65 U

I BLOWDOWN STEAM GENERATOR #2

LINE # DIA/SCH FROM TO SG-39 6"x.562" 66-1 66-15 PLANT NORTH TURBINE BUILDING t_ EL. 108'- 8" t EL. 108'-

-'1 2

REFERENCE DRAWINGS 03-P-SGF-157 EL. 106'-0" 7

-I J) UNIT 3 ZONE 66 ZONE 64 BLOWDOWN STEAM GENERATOR #1

LINE#I DIA/SCH FROM TO Y* PLANT SG-48 6"x.562" 67-1 67-12 NORTH EL. 108' - 8"

  • 3~

2 t_ EL. 108' - 8"

~2 REFERENCE DRAWINGS 03-P-SGF- 157 7

-I ZONE UNIT 3 ZONE 67 I) 65 BLOWDOWN STEAM GENERATOR #2

NOTES:

Tag No. 3MCHEEO1 Serial No. 79314 (AMETEK)

N.B. No. 630 Reference Drawings:

N001-7.03-1 N001-7.03-48 thru 50 o I INLET 0 TOP z G SEAMSUTLET NEAR&FAR SIDE OT Z

<0

'Mi~ 0 8" SCH 160 PIPE AND FITTINGS UNIT 3 ZONE 68 REGENERATIVE HEAT EXCHANGER

NOTES:

Tag No. 3MCHNE02 Serial No. N2376 (Richmond Engr)

N.B. No. 78454 32 Studs 1" x 9 3/4" Reference Drawings:

3/4" N001-7.03-26 Channelhead Cross Section N001-7.03-27 N001-7.03-28 N001-7.03-29 E,

00 UNIT 3 ZONE69 LETDOWN HEAT EXCHANGER

EL. 47' 10" LINE # DIA X SCH FROM TO ZONE 76 SI-67 16" X 0.312"70-103 70-109 SI-241 18" X 0.312" 70-44 70-47 SI-307 14" X 0.312" 70-63 70-69 SI-307 20" X 0.375" 70-49 70-6 1 REFERENCE DRAWINGS 03-P-SIF-201 ZONE 102 EL. 41' 10" LPSI PUMP A SUCTION ZONE 94 7

UNIT 3 ZONE 70 LPSI PUMP ROOM "A" SUCTION

ZONE 83 LINE # DIA X SCH FROM TO SI-78 10" X 0.365" 72-29 72-32 SI-87 8" X 0.322" 72-5 72-6 SI-87 10" X 0.365" 72-8 72-57 REFERENCE DRAWINGS 03-P-SIF-207 72-8 72-9 EL 46'-9"

-4 UNIT 3 ZONE 71 LPSI PUMP ROOM "A" DISCHARGE

NOTES:

1) TAG NUMBER: 3MSIAPO1
2) SERIAL NUMBER: 0876-44 INGERSOL RAND
3) NATIONAL BOARD NUMBER: 523 A WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN ii 2)

TWENTY-FOUR 2" DIAMETER STUDS (21 @ 9.5" LONG AND 3 @ 8.88" LONG)

DISCHARGE

. ZONE 71 REFERENCE DRAWINGS N001-11.01-36 N001-11.01-50 J2 UNIT 3 ZONE 72 1o F-LPSI PUMP A

LINE # DIA X SCH FROM TO REFERENCE DRAWINGS 03-P-SIF-202 SI-308 14"X 0.312" 71-63 71-69 SI-308 20" X 0.375" 71-49 71-61 SI-194 18" X 0.312" 71-44 71-47 SI-34 16" X 0.312"71-105 71-111 LPSI PUMP B SUCTION ZONE 95 ZONE 73 C/L EL. 41' 10" LPSI PUMP ROOM "B" SUCTION

ZONE 86 REFERENCE DRAWINGS 03-P-SIF-208 O

N)

-1 UNIT 3 ZONE 74 LPSI PUMP ROOM "B" DISCHARGE

NOTES:

1) TAG NUMBER: 3 MSIBPO1
2) SERIAL NUMBER: 0876-45 INGERSOL RAND
3) NATIONAL BOARD NUMBER: 524 WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN

.11 0

__ TWENTY-FOUR 2" DIAMETER STUDS MI /--N II (21 @ 9.5" LONG AND 3 @ 8.88" LONG)

-i_,

LI L_

DISCHARGE ZONE 74 REFERENCE DRAWINGS N001-11.01-36 N001-11.01-50 W

zo SUCTION ZONE 73 UNIT 3 ZONE 75 In -F -1 a I I I I I I l LPSI PUMP B

ZONE 82 Ky10...

SI-67 H-i EL. 7'l H*3BB ZONE 71 8ZONE 70 80I15 REFERENCE DRAWINGS 03-P-SIF-201 801 SI-A-009-GCBC-1-8" L 1 "0----0 03-P-SIF-207

-180-7 LNE # DIA X SCH FROM TO ZONE 102 SI-067 16" X 0.312"70-110 70-111 CI SI-067 14" X 0.312"70-113 80-16 SPRAY PUMP A SI-009 14" X 0.312" 80-1 80-4 SUCTION H-"

SI-009 18" X 0.312" 80-5 80-13 S1-A-009-GCBC-14" SI-078 10" X 0.365" 72-33 72-35 UNIT 3 ZONE 76 CONTAINMENT SPRAY PUMP ROOM "A" SUCTION

LINE # DIA X SCH FROM TO ZONE 83 SI-079 8" X 0.322" 82-IA -

SI-079 10" X 0.365" 82-1 82-27 SI-082 10" X 0.365" 82-31 82-35 SI-079* 10" X 0.365" 77-60 77-62 REFERENCE DRAWINGS 03-P-SIF-207 *Annubar Mod 10 CONTAINMENT SPRAY PUMP A DISCHARGE 7

-I I) UNIT 3 ZONE 77 CONTAINMENT SPRAY PUMP ROOM "A" DISCHARGE

NOTES:

1) TAG NUMBER: 3MSIAP03
2) SERIAL NUMBER: 0876-46 INGERSOL RAND
3) NATIONAL BOARD NUMBER: 521 WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN DL TWENTY-FOUR 2" DIAMETER STUDS 1

Li,---t-_1 all f--\ l's L

-1 (21 @ 9.5" LONG AND 3 @ 8.88" LONG)

DISCHARGE ZONE 77 REFERENCE DRAWINGS N001-11.01-36

]

-I SUCTION ZONE 76 UNIT 3 ZONE 78 F

CONTAINMENT SPRAY PUMP A I-

EL 47'-10" LINE # DIA X SCH FROM TO SI-033 14" X 0.312" 81-1 81-4 SI-033 18" X 0.312" 81-5 81-12 SI-034 14" X 0.312" 81-15 71-101 SI-034 16" X 0.312"71-103 71-104 SI-123 10"X 0.365" 73-31 73-33 REFERENCE DRAWINGS 03-P-SIF-202 EL 41'-10" ZONE 104 03-P-SIF-208 CONTAINMENT SPRAY PUMP B SUCTION

( SI-B-033-GCBC-=18" 7

12 UNIT 3 ZONE 79 8

CONTAINMENT SPRAY PUMP ROOM "B" SUCTION

LINE # DIA X SCH FROM TO ZONE 86 SI-119 8" X 0.322" 83-IA -

SI-119 10" X 0.365" 83-1 83-26 SI-147 10" X 0.365" 83-30 83-34 SI-119* 10" X 0.365" 80-60 80-62 REFERENCE DRAWINGS EL 53'-6" 03-P-SIF-208 *Annubar Mod ZONE 85 EL 63'-0" UNIT 3 ZONE 80 EL 49'-2" CONTAINMENT SPRAY PUMP ROOM "B" DISCHARGE

NOTES:

1) TAG NUMBER:3MSIBP03
2) SERIAL NUMBER: 0876-47 INGERSOL RAND
3) NATIONAL BOARD NUMBER: 522 WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN J TWENTY-FOUR 2" DIAMETER STUDS (21 @ 9.5" LONG AND 3 @ 8.88" LONG)

, Il ll" l l

/--N II

  • l - l . .. .. ,

J LI-lir- DISCHARGE ZONE 80 REFERENCE DRAWINGS N001-11.01-36 SUCTION ZONE 79 F 1"1

LINE # DIA X SCH FROM TO SI-078 10" X 0.365" 72-36 72-48 SI-078 20" X 0.500" 72-49 72-52 SI-079 10" X 0.365" 82-28 72-61 REFERENCE DRAWINGS 03-P-SIF-207 SDCHX A INLET NOZZLE ZONE 76 SHUTDOWN COOLING HEAT EXCHANGER ROOM A

LINE # DIA X SCH FROM TO SI-070 20" X 0.500" 74-1 74-19 REFERENCE DRAWINGS 74-21 74-25 SI-070 16" X 0.375" 03-P-PCF-201 03-P-SIF-203 SI-070 20" X 0.500" 74-27 74-27 03-P-SIF-207 SI-082 10" X 0.365" 82-36 82-38 SI-087 10" X 0.3 65" 74-58 74-74 SI-089 10" X 0.365" 74-77 74-87 SI-089 10" X 0.365" 82-39 82-44 SI-090 14" X 0.375"74-105 74-118 SI-131 6"X 0.280" 74-97 74-100

-i UNIT 3 ZONE 83 SHUTDOWN COOLING HEAT EXCHANGER ROOM A

NOTES:

1) TAG NUMBER: 3MSIAE01
2) SERIAL NUMBER: S-18345 TUBE SHEET (ENGR & FABRICATORS) 1-7/16" 3) NATIONAL BOARD NUMBER 1532
4) ZERO DEGREE FOR GIRTH WELDS IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.

64 STUDS 1.5" X 17" REFERENCE DRAWINGS:

N001-7.03-020 N001-7.03-25 N001-11.01-209 CHANNEL HEAD CROSS SECTION 74-121 75-122 DETAIL for NOZZLE to PIPE 30 deg.

z W INLET NOZZLE - ZONE 82 UNIT 3 ZONE 84 CD OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 83 SHUTDOWN COOLING HEAT EXCHANGER A

EL 75' EL 80'-2" EL 75' T

ZONE 80 n,

SDCHX B INLET NOZZLE REFERENCE DRAWINGS 03-P-SIF-208 H

LINE # DIA X SCH FROM TO UNIT 3 ZONE 85 SI-119 10" X 0.365" 83-27 73-63 SHUTDOWN COOLING HEAT SI-123 10" X 0.365" 73-34 73-46 EXCHANGER ROOM B SI-123 20" X 0.500" 73-48 73-54

LINE # DIA X SCH FROM TO SI-072 20" X 0.500" 75-1 75-17 SI-072 16" X 0.375" 75-19 75-23 SI-072 20" X 0.500" 75-25 75-25 SI-129 10" X 0.365" 75-53 75-61 SI-131 6" X 0.280" 75-81 75-84 SI-134 10" X 0.365" 75-62 83-43 SI-135 14" X 0.375" 75-87 75-100 SI-147 10" X 0.365" 83-35 8.3-37 ZONE 95

-J 2

~2 ZONE 74 7

-I i2 REFERENCE DRAWINGS UNIT 3 ZONE 86 03-P-PCF-201 1 03-P-SIF-204 03-P-SIF-208 SHUTDOWN COOLING HEAT OULLET EXCHANGER ROOM B NOZZLE

NOTES:

1) TAG NUMBER: 3MSIBEO1
2) SERIAL NUMBER: S-18346 TUBE SHEET (ENGR & FABRICATORS) 1-7/16" 3) NATIONAL BOARD NUMBER 1599
4) ZERO DEGREE FOR GIRTH WELDS IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.

64 STUDS 1.5" X 17" REFERENCE DRAWINGS:

N001-7.03-020 N001-7.03-25 N001-11.01-209 CHANNEL HEAD CROSS SECTION 75-76 75-77 DETAIL for NOZZLE to PIPE Weld 30 deg.

Clad 7--I

.J) z UNIT 3 ZONE 87 OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 86 SHUTDOWN COOLING HEAT EXCHANGER B

LINE # DIA X SCH FROM TO REFERENCE DRAWINGS SI-072 12" X 0.375" 78-2 78-11 03-P-SIF-208 SI-072 12" X 1.125" 78-13 78-14 S1-072 20" X 0.500" 75-35 75-38 SI-073 12" X 0.375" 79- 1 79-11 SI-073 12"X 1.125" 79-13 79-14 SI-155 12" X 1.125" 78-16 78-21 SI-172 10" X 0.365" 78-IOC 78-IOD ZONE 99 SI-174 12"X 1.125" 79-16 79-21 N.)

ZONE 95 UNIT 3 ZONE 88 EAST WRAP

REFERENCE DRAWINGS 03-P-SIF-202 03-P-SIF-208 LINE #

SI-38 SI-173 SI-173 ZONE 89 SI-173 SI-194 WRAP SI-194 18" X 0.312" 71-13 71-18 SI-194 18" X 0.3 12" 7 1-13 71-18

ZONE 121 EL 95' ZONE 95 ZONE 101 REFERENCE DRAWINGS 03-P-SIF-202 03-P-SIF-208 NOTES:

R15 WO 3187448 90-50, 85-8R ZONE 104ý -- EL 73'-7"

LINE # DIA X SCH FROM TO SI-070 20" X 0.500" 74-42 74-44 SI-070 12" X 0.375" 76-2 76-13 ZONE 96 SI-070 12" X 1.125" 76-52 76-14 ZONE 97 SI-071 12" X 0.375"74-103 77-11 SI-071 12" X 1.125" 77-13 77-14 SI-071 10" X 0.365"77-10C 77-10D TOG SI-202 12" X 1.125" 76-16 76-21 EL 87'-3" SI-220 12" X 1.125" 77-16 77-21

-4 11 REFERENCE DRAWINGS 03-P-SIF-207 2

UNIT 3 ZONE 91 WEST WRAP

ZONE 100 REFERENCE DRAWINGS 03-P-SIF-201 03-P-SIF-207 EL. 84'-3" ZONE 91 EL 78 '-9" ZONE 94 LINE # DIA X SCH FROM TO 7

-I SI-002 12" X 0.250" 70-85 70-98 UNIT 3 ZONE 92 SI-239 10" X 0.250" 70-70 70-82A SI-239 10" X 0.365" 70-83 WEST WRAP SI-241 16"X0.312" 70-1 70-14 SI-241 18" X 0.312" 70-16 70-22

LINE # DIA X SCH FROM TO SI-089 8" X 0.322" 82-66 82-67 SI-089 10" X 0.365" 82-55 82-65 ZONE 120 SI-007 24" X 0.375" 84-6 84-8R SI-307 24" X 0.562" 84-9 84-11 SI-088 10" X 0.250" 90-42 90-43 SI-088 8" X 0.250" 90-40 90-41 NOTES:

R15 WO 3187454 93-50, 84-8R

-J ZONE 100

\'j*/ 17 ZONE 94 EL 84'-8" REFERENCE DRAWINGS 03-P-SIF-201 03-P-SIF-207 i

UNIT 3 ZONE 93 ZONE 102 EL 73'-7" WEST WRAP

EL 92'-6" ZONE 92 ZONE 93 EL 64' EL 41'-10" LI]Z,ZONE 83

  • - EL 72' ONE 70

-0 UNIT 3 ZONE 94 LINE # DIA X SCH FROM TO SI-070 20" X 0.500" 74-28 74-41 A TRAIN MISC. PIPE CHASES REFERENCE DRAWINGS:

SI-089 10" X 0.365" 82-45 82-54 03-P-SIF-201 AND 88' PIPE TUNNEL 03-P-SIF-207 SI-241 18" X 0.312" 70-23 70-43

EL 95' EL 92'-6"-

&ZJ - EL 72' ZONE 86 O

REFERENCE DRAWINGS:

03-P-SIF-202 03-P-SIF-208 EL 88' ZONE 86 Lo z

7' UNIT 3 ZONE 95 LINE # DIA X SCH FROM TO SI-072 20" X 0.500" 75-27 75-33 B TRAIN MISC. PIPE CHASES SI-134 10" X 0.365" 83-44 83-52 AND 88' PIPE TUNNEL SI-194 18"X0.312" 71-19 71-43

ZONE 23 ZONE 114 REFERENCE DRAWINGS 03-P-SIF-103 LINE # DIA X SCH FROM TO Sl-202 12" X 1.125" 76-22 76-25 CONTAINMENT SI-202 12" X 1.312" 76-27 76-47 LPSI HEADER TO LOOP IA

B ZONE 24 C

LINE # DIA X SCH FROM TO SI-220 12" X 1.125" 77-22 77-25 SI-220 12" X 1.312" 77-27 77-47 REFERENCE DRAWINGS 03-P-SIF-103

-I UNIT 3 ZONE 97 Do CONTAINMENT ZONE 91 LPSI HEADER TO LOOP 1B

LINE # DIA X SCH FROM TO SI-155 12" X 1.125" 78-22 78-25 EL 89'-9" SI-155 12" X 1.312" 78-27 78-47 ZONE 88 ZONE 25 REFERENCE DRAWINGS 03-P-SIF-136 CONTAINMENT LPSI HEADER TO LOOP 2A

LINE # DIA X SCH FROM TO SI-174 12" X 1.125" 79-23 79-25 SI-174 12" X 1.312" 79-27 79-47 ZONE 115 0o EL 93'-5" ZONE 26 ZONE 88 REFERENCE DRAWINGS

-1 03-P-SIF-136 UNIT 3 ZONE 99 CONTAINMENT LPSI HEADER TO LOOP 2B

LINE # DIA X SCH FROM TO SI-007' 24" X 0.375" 84-2 84-3 REFERENCE DRAWINGS 03-P-SIF-105 SI-241 16" X 0.312"70-116 70-119 03-P-SIF-151 PSV-179 16" X 1.594"70-120 70-121 13-P-ZCG-112 SI-241 SI-369 10" X 0.250"70-122 70-132 SI-369 6" X 0.280"70-134 -

ZONE 21 ZONE 92 ZONE 93 CONTAINMENT LPSI TRAIN A SUCTION

ZONE 22 ZONE 90 PSV-189 LINE # DIA X SCH FROM TO ZONE 89 SI-030 24" X 0.375" 85-2 85-3 SI-194 16" X 0.312"71-112 71-121 SI-194 16" X 1.594"71-122 71-123 SI-368 10" X 0.250"70-124 71-143 SI-368 6" X 0.280"71-145 -

REFERENCE DRAWINGS

.0 03-P-SIF-105 UNIT 3 ZONE 101 03-P-SIF-151 13-P-ZCG-112 CONTAINMENT LPSI TRAIN B SUCTION

LINE# DIA/SCH FROM TO SI-307 24" x 0.562" 84-12 84-37 SI-307 20" x 0.375" 84-39 84-46 CONT. ON ZONE 93 WEST WRAP D

X)

In ZONE 102 SAFETY INJECTION PUMPS A TRAIN SUCTION

ESSENTIAL PIPE TUNNEL CONT ON ZONE 102 SI PUMP SUCT.

-4

'4 Reference DWG'S.

LINE# DIA/SCH FROM TO 03-P-SIF-201 UNIT 3 ZONE 103 03-P-ZYA-925 CH- 424 20" x 0.375" 86-1 86-20 REFUELING WATER SUCTION A TRAIN CH- 142 20" x 0.375" 86-21 86-59

LINE# DIA/SCH FROM TO CONT. ON SI-308 24" x 0.562" 85-12 85-37 ZONE 90 EAST WRAP SI-308 20" x 0.375" 85-38 85-49 SI-33 18" x 0.312" 85-50 81-13 SI-31 10" x 0.250" 85-59 85-80 CH-150 3" x 0.216" 104-2 104-5 REFERENCE DWG'S 03-P-SIF-202 03-P-CHF-206 CONT. ON CONT. ON ZONE 79 CONT. SPRAY PUMP"B" SUCT CONT ON

-1 ZONE73 LPSI PUMP UNIT 3 ZONE 104 "B" SUCT SAFETY INJECTION PUMPS B TRAIN SUCTION HPSI PUMP #2 ZONE 117

ESSENTIAL PIPE TUNNEL 88'

'EL. 88' REFUELING WATER TANK Reference DWG'S.

03-P-SIF-202 03-P-ZYA-925 CONT. ON ZONE 104

B B si- 00 SI-A-105-CCBB-2")

EL 48'-10' H-15 sl-loo w

\LY w H-9 H 1 106-25 106-4 H-36 106-29 106-15 106-43 A POINTA 106-23 CONTINUED EL 5l'-6" w THIS DRAWING 106-22 106-21 1-100 7 106-35 H-5 SI-99 HV-698 ZONE 118 W SI-99 H-1 106-24 3 W si-loo H-8 EL 46'-3" HV-604 H2 106-16 100 1 6-42 1-6 SI-100 c 106-41 106-48 B 106-3 106- 0 106-17 H-7 w SI-106 106-2 106-18 SI-A I H-1 106-39 IG SI-A-106-CCBA-3"

ý si-io5 si-105 SI-A-99-CCBB A H-J 106-63 106-47 EL 4 V-2" 106-46 106-45 106-53 106-64 106-1 106-19 V-218 106-55 106-56 106-57 4106-65 HPSI A 106-58 106-66 PUMP w SI-105 B 106-67 H SI-A-101-CCBB-2" 106-59 SI-105 B 106-68 W H-C 106-60 106-61 V424 UNIT 3 ZONE I sw 106-62 106-6 si-105 B w REFERENCE DRAWINGS H-B HPSI PUMP ROOM "A' K-FZ,;Zz--) 03-P-SIF-203 DISCHARGE

FROMj TO LINE # DIA X X SCH SCH FROM TO SI-107 4" X 0.337" 107-1 107-41 Sl-107 4" X 0.337" 107-23 107-27 Sl107 3" X 0.438" 107-68 107-71 SI-112 2" X 0.344" 107-42 107-65 SI-112 2" X 0.344" 107-56 107-60 ZONE 109 SI-112 2" X 0.344" 107-66 107-67 B

REFERENCE DRAWINGS EL 51 -6" 03-P-SIF-204

,n POINT A CONTINUED

'.o THIS DRAWING z

Ti UNIT 3 ZONE 107 HPSI PUMP ROOM "B" DISCHARGE

REFERENCE DRAWINGS 03-P-SIF-203 03-P-SIF-204 CHARGING 03-P-CHF-207 PUMP A ZONE 112 10" EL. 89' HPSI DISCHARGE 88' PIPE CHASE ZONE 106

REFERENCE DRAWINGS 03-P-SIF-203 03-P-SIF-204 ZONE 113, 93' 10" ZONE 110 EL. 92' 2" EL.

EL. 51' 8" FROM HPSI B 40' ZONE 107 UNIT 3 HPSI DISCHARGE 88' PIPE CHASE

LINE# DIA X SCH FROM TO SI-103 2" X 0.344 110-40 110-52 SI-107 2" X 0.344" 110-53 110-59 SI-107 4" X 0.337" 110-1 110-10 SI-l11 2" X 0.344" 110-11 110-17 SI-218 2" X 0.344" 110-18 110-22 SI-218 3"X0.438" 110-38 110-39 SI-218 4" X 0.438" 110-23 110-37 SI-236 2" X 0.344" 110-60 110-64 0

0.

7

-I

?)

ZONE 110 HPSI DISCHARGE WEST WRAP J.

S -

LINE # DIA X SCH FROM TO SI-100 2" X 0.344" 111-9 111-25 SI-100 4" X 0.438" 111-1 111-8 ZONE 114 SI-236 3" X 0.438" 111-40 111-41 SI-236 4" X 0.438" 111-26 111-39 REFERENCE DRAWINGS 03-P-SIF-203 8'6" EL. 85' EL. 85' F SI-A-100-CCBA-4" SI-100 H-30 37ZONE 108 UNIT3 ZONEII I

HPSI DISCHARGE WEST WRAP

  • 1* Y-Y-LINE # DIA X SCH FROM TO SI-100 4" X 0.438" 112-1 112-6 SI-101 2" X 0.344" 112-7 112-20 SI-102 2" X 0.344" 112-21 112-32 ZONE 113 SI-176 4" X 0.438" 112-33 112-44 SI-176 3" X 0.438" 112-45 112-46 z

7' UNIT 3 ZONE 112 HPSI DISCHARGE EAST WRAP

LINE# DIA X SCH FROM TO SI-108 2" X 0.344" 113-7 113-15 S1407 4" X 0.337" 113-1 113-6 REFERENCE DRAWINGS SI-109 2" X 0.344" 113-21 113-27 03-P-SIF-204

-SI-157 4" X 0.438" 113-33 113-49 SI-157 3" X 0.438" 113-50 113-51 SI-157 2" X 0.344" 113-16 113-20 SI-176 2" X 0.344" 113-28 113-32 ZONE 115 D

DO ZONE 112 z 109 UNIT 3 ZONE 113 HPSI DISCHARGE EAST WRAP

REFERENCE DRAWINGS 03-P-SIF-103 EL 93'-5" ZONE 96 ZONE 97 ZONE 111 ZONE 110 CONTAINMENT HPSI HEADER LOOP 1A & 1B

REFERENCE DRAWINGS 03-P-SIF-136 ZONE 113 ZONE 112 EL 93'-5" EL 89'-9" ZONE 98 ZONE 99 ZONE 115 CONTAINMENT HPSI HEADER LOOP 2A & 2B

1) TAG NUMBER: 3MSIAP02
2) SERIAL NUMBER: INGERSOL RAND S/N 0776-19
3) DISCHARGE HEAD STUDS 16@ 2.25" DIA. X 10.88" REFERENCE DRAWINGS 03-P-SIF-201 03-P-SIF-203 N, DISCHARGE ZONE 102 ZONE 106 0o SUCTION t
  • DISCHARGE HEAD STUDS

-I UNIT 3 ZONE 116 HPSI PUMP A

1) TAG NUMBER: 3MSIBP02
2) SERIAL NUMBER: INGERSOL RAND S/N 0776-18
3) DISCHARGE HEAD STUDS 16@ 2.25" DIA. X 10.88" REFERENCE DRAWINGS 03-P-SIF-201 03-P-SIF-203 DISCHARGE ZONE 104 No ZONE 107

.) U ý.JIN DISCHARGE HEAD STUDS

-I UNIT 3 ZONE 117 HPSI PUMP B

REFERENCE DRAWINGS ZONE 39 03-P-SIF-203 03-P-SIF-105 6"

ZONE 106 EL 46'-3" HPSI "A" LONG TERM RECIRCULATION

REFERENCE DRAWINGS 03-P-SIF-105 HPSI "B" LONG TERM 03-P-SIF-204 RECIRCULATION 03-P-CHF-207 107

LINE # DIA X SCH FROMI TO SI-088 10" X 0.250" 120-1 120-19 I

EL 116'-4" CONT ZONE 93 Lo UNIT 3 ZONE 120 CONTAINMENT REFERENCE DRAWINGS 13-P-ZCG- 105 SPRAY A

EL 116'-4" CONT ZONE 90 REFERENCE DRAWINGS 13-P-ZCG-105

SECTION 11.0 Terms and Definitions 206 of 208 31NT-ISI-3 Rev 1

AHE: Augmented High Energy ANII: Authorized Nuclear Inservice Inspector APS: Arizona Public Service Company, et al ASME: American Society of Mechanical Engineers Aux: Auxiliary BWR: Boiling Water Reactor CE: Combustion Engineering CEDM: Control Element Drive Mechanism CFR: Code of Federal Regulations CH: Charging CHR: Containment Heat Removal Circ: Circumferential CL: Cold Leg CRD: Control Rod Drive CS: Containment Spray CSP: Containment Spray Pump DWG: Drawing ECCS: Emergency Core Cooling System FW: Feedwater HL: Hot Leg HPSI: High Pressure Safety Injection HV: Hand Control Valve Hx: Heat Exchanger ICI: In Core Instrumentation IEB: Inspection and Enforcement Bulletin IEIN: Inspection and Enforcement Information Notice Inj: Injection INPO: Institute for Nuclear Power Operations ISI: Inservice Inspection LPSI: Low Pressure Safety Injection MSSS: Main Steam Support Structure NDE: Nondestructive Examination NRC: Nuclear Regulatory Commission PDV: Pressure Differential Valve PSV: Pressure Relief or Safety Valve PWR: Pressurized Water Reactor PVNGS: Palo Verde Nuclear Generating Station PZR: Pressurizer RC: Reactor Coolant RCP: Reactor Coolant Pump REV: Revision RHR: Reactor Residual Heat Removal Recirc: Recirculation 207 of 208 31NT-ISI-3 Rev 1

RCS: Reactor Coolant System RPV: Reactor Pressure Vessel RVLMS: Reactor Vessel Level Monitoring System REM: Roentgen Equivalent Man SDCHX: Shutdown Cooling Heat Exchanger SD: Shutdown SER: Significant Event Report SG: Steam Generator SI: Safety Injection SN: Serial Number T: Thickness Tech. Spec: Technical Specification UFSAR: Updated Final Safety Analysis Report USNRC: United States Nuclear Regulatory Commission UV: Multivariable Control Valve V: Valve 208 of 208 31NT-ISI-3 Rev 1