Third 10-Year Interval, Third Period: Owners Activity Report Number U1R19
ML16180A446
Person / Time
Site: Palo Verde 
Issue date: 06/24/2016
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-07288-TNW/CJS, U1R19
Download: ML16180A446 (5)


Text

10 CFR 50.55a A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek 102-07288-TNW/CJS June 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1, Docket No. STN 50-528 Third 10-Year Interval, Third Period:

Owners Activity Report Number U1R19 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owners Activity Report (Form OAR-1) for Unit 1 refueling outage 19 (U1R19). The outage ended on May 14, 2016.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Michael D. Dilorenzo, Regulatory Affairs Department Leader, at (623) 393-3495.

Sincerely, Thomas N. Weber Department Leader, Regulatory Affairs TNW/CJS

Enclosure:

Unit 1 Nineteenth Refueling Outage Owners Activity Report, Report U1R19 cc:

M. L. Dapas NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5764 Weber, Thomas N(Z00499)

Digitally signed by Weber, Thomas N(Z00499)

DN: cn=Weber, Thomas N(Z00499)

Reason: I am approving this document Date: 2016.06.24 10:56:10 -07'00'

ENCLOSURE Unit 1 Nineteenth Refueling Outage Owners Activity Report Report U1R19

FORM OAR-1 OWNER'S ACTIVITY REPORT ReportNumber:_1_R_1_9 ______________________________________________________________ __

Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: _1 __

(if applicable)

Commercial service date: ___ J_c.a_n_2-'-8'--, 1---=9--"8-= Refueling Outage No.: _R'-'-19.;;__ _____ _

Current inspection interval IWB, IWC, IWD, IWF = 3rd, IWE, IWL = 2nd (1'1* 2"". 3"'. 41", other)

Current inspection period IWB, IWC, IWD, IWF, IWE = 3rd IWL =2nd (1'1,2"". 3)

Edition and Addenda of Section XI applicable to the inspection plans 2001 ed, 2003 ad, IWL 2007 ed 2008 ad Date and revision of inspection plans lSI= 11/12/14 R4, Press Tests= 3/19/14 R41WE = 9/23/15 R1 IWL = 8/26/15 R3 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans _2_0_0_1_e_d_2_0_03_a_d ________________________________________ _

Code Cases used: N-532-4, N-733


~---------------------------------------------------------------

(if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U1 R 19 conform to the requirements of Section XI.

(refueling outage number)

Lehman, William T(Z60076)

Digitally signed by Lehman, William T(Z60076)

DN: cn=Lehman, William T(Z60076)

Reason: I am the author of this document Date: 2016.06.14 12:08:35 -07'00' Signed-------------------------------------------

Date:---------------------------

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arizona and employed by of Hartford Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

  • """' t..I..()JL"'t'~oR!)

~\\t:,,:,.f\\1\\

l::.~,t_.E.R.

I"""'S\\'""C.c\\o~

~t->1::>

'""~<.:>\\Z.4 '""<-G.

C.oM?A."<

c:>f' Co..,~'-(..u\\

Commissions N.B. 9685 "A,N,I,C" Az 264


~N~a~tio~na~IB~o~ar7 d.~St~at~e.~Pr~o~~n~ce-,a~nd~E~nd~o~rs~em-e~nts ____ _

Date: ______ -=Ju=n~1~4~20~1~6 __________ _

PV-E0796 Ver. 1

Item Number NONE Palo Verde Nuclear Generating Station Owners Activity Report-Unit 1 Refueling Outage 19 Table 1 Items with flaws or relevant conditions that required evaluation for continued service Description of Work NONE 2

Evaluation Description NONE

Item Code Class Description 1

1JRCETW0121Y 1

1JRCETW0121Y 1

1MRCEE01A 1

1MRCEE01A 1

1MRCEE01B 1

1MRCEE01A 1

1CH026HOOL 2

1MCHNE02 2

1JSIBUV0616 2

1SI107H012 2

1PSGEL008 3

1PSPBL025 3

1PSPAL098 3

1PSPAL099 3

1MDGAE04 3

1PSPAL100 3

1MEWBE01 3

1MDGAE01A 3

1MDGAE01A/B 3

1MDGAE01B 3

1MDGAE04 3

1MDGAE05 3

1PSPBL025 Palo Verde Nuclear Generating Station Owners Activity Report - Unit 1 Refueling Outage 19 Table 2 Abstract of repair/replacement activities required for continued service Description of Work seal weld for RTD nozzle Install MNSA CC N-733 Hot leq tube pluqs Cold Leg tube plugs Hot leq tube plugs Cold Leg tube plugs Snubber replaced Repair Divider Plate Body to Bonnet Seal Weld ReQ_air Snubber replaced Piping Replacement FAC Pipe Cap replaced for corrosion Replaced for corrosion Replaced for corrosion Replaced piping for corrosion Replaced pipinq for corrosion Weld Repair EW htexch for corrosion Weld Repair of intercooler for corrosion Weld Repair of spools 5,6,7,8 Weld Repair of intercooler for corrosion Weld Repair of LO cooler for corrosion Weld Repair of JW cooler for corrosion Weld Repair of piping for corrosion 3

Date Repair/Replacement Completed Plan Number 05/06/16 4764314/0 05/12/16 4764314/3 05/04/16 4737273/0 05/04/16 4737274/0 05/04/16 4737272/0 05/04/16 4737275/0 05/02/16 4764673/0 05/05/16 4769814/0 05/07/16 4774367/0 02/16/16 4625803/0 05/12/16 4629309/0 04/25/16 4385102/0 03/04/16 4581287/1 03/04/16 4581288/1 03/04/16 4581902/1 03/04/16 4581910/1 04/25/16 4609961/0 03/04/16 4703682/0 03/04/16 4703682/0 03/04/16 4703682/0 03/04/16 4703682/0 03/04/16 4703682/0 04/25/16 4766449/0

10 CFR 50.55a A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek 102-07288-TNW/CJS June 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1, Docket No. STN 50-528 Third 10-Year Interval, Third Period:

Owners Activity Report Number U1R19 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owners Activity Report (Form OAR-1) for Unit 1 refueling outage 19 (U1R19). The outage ended on May 14, 2016.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Michael D. Dilorenzo, Regulatory Affairs Department Leader, at (623) 393-3495.

Sincerely, Thomas N. Weber Department Leader, Regulatory Affairs TNW/CJS

Enclosure:

Unit 1 Nineteenth Refueling Outage Owners Activity Report, Report U1R19 cc:

M. L. Dapas NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5764 Weber, Thomas N(Z00499)

Digitally signed by Weber, Thomas N(Z00499)

DN: cn=Weber, Thomas N(Z00499)

Reason: I am approving this document Date: 2016.06.24 10:56:10 -07'00'

ENCLOSURE Unit 1 Nineteenth Refueling Outage Owners Activity Report Report U1R19

FORM OAR-1 OWNER'S ACTIVITY REPORT ReportNumber:_1_R_1_9 ______________________________________________________________ __

Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: _1 __

(if applicable)

Commercial service date: ___ J_c.a_n_2-'-8'--, 1---=9--"8-= Refueling Outage No.: _R'-'-19.;;__ _____ _

Current inspection interval IWB, IWC, IWD, IWF = 3rd, IWE, IWL = 2nd (1'1* 2"". 3"'. 41", other)

Current inspection period IWB, IWC, IWD, IWF, IWE = 3rd IWL =2nd (1'1,2"". 3)

Edition and Addenda of Section XI applicable to the inspection plans 2001 ed, 2003 ad, IWL 2007 ed 2008 ad Date and revision of inspection plans lSI= 11/12/14 R4, Press Tests= 3/19/14 R41WE = 9/23/15 R1 IWL = 8/26/15 R3 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans _2_0_0_1_e_d_2_0_03_a_d ________________________________________ _

Code Cases used: N-532-4, N-733


~---------------------------------------------------------------

(if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U1 R 19 conform to the requirements of Section XI.

(refueling outage number)

Lehman, William T(Z60076)

Digitally signed by Lehman, William T(Z60076)

DN: cn=Lehman, William T(Z60076)

Reason: I am the author of this document Date: 2016.06.14 12:08:35 -07'00' Signed-------------------------------------------

Date:---------------------------

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arizona and employed by of Hartford Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

  • """' t..I..()JL"'t'~oR!)

~\\t:,,:,.f\\1\\

l::.~,t_.E.R.

I"""'S\\'""C.c\\o~

~t->1::>

'""~<.:>\\Z.4 '""<-G.

C.oM?A."<

c:>f' Co..,~'-(..u\\

Commissions N.B. 9685 "A,N,I,C" Az 264


~N~a~tio~na~IB~o~ar7 d.~St~at~e.~Pr~o~~n~ce-,a~nd~E~nd~o~rs~em-e~nts ____ _

Date: ______ -=Ju=n~1~4~20~1~6 __________ _

PV-E0796 Ver. 1

Item Number NONE Palo Verde Nuclear Generating Station Owners Activity Report-Unit 1 Refueling Outage 19 Table 1 Items with flaws or relevant conditions that required evaluation for continued service Description of Work NONE 2

Evaluation Description NONE

Item Code Class Description 1

1JRCETW0121Y 1

1JRCETW0121Y 1

1MRCEE01A 1

1MRCEE01A 1

1MRCEE01B 1

1MRCEE01A 1

1CH026HOOL 2

1MCHNE02 2

1JSIBUV0616 2

1SI107H012 2

1PSGEL008 3

1PSPBL025 3

1PSPAL098 3

1PSPAL099 3

1MDGAE04 3

1PSPAL100 3

1MEWBE01 3

1MDGAE01A 3

1MDGAE01A/B 3

1MDGAE01B 3

1MDGAE04 3

1MDGAE05 3

1PSPBL025 Palo Verde Nuclear Generating Station Owners Activity Report - Unit 1 Refueling Outage 19 Table 2 Abstract of repair/replacement activities required for continued service Description of Work seal weld for RTD nozzle Install MNSA CC N-733 Hot leq tube pluqs Cold Leg tube plugs Hot leq tube plugs Cold Leg tube plugs Snubber replaced Repair Divider Plate Body to Bonnet Seal Weld ReQ_air Snubber replaced Piping Replacement FAC Pipe Cap replaced for corrosion Replaced for corrosion Replaced for corrosion Replaced piping for corrosion Replaced pipinq for corrosion Weld Repair EW htexch for corrosion Weld Repair of intercooler for corrosion Weld Repair of spools 5,6,7,8 Weld Repair of intercooler for corrosion Weld Repair of LO cooler for corrosion Weld Repair of JW cooler for corrosion Weld Repair of piping for corrosion 3

Date Repair/Replacement Completed Plan Number 05/06/16 4764314/0 05/12/16 4764314/3 05/04/16 4737273/0 05/04/16 4737274/0 05/04/16 4737272/0 05/04/16 4737275/0 05/02/16 4764673/0 05/05/16 4769814/0 05/07/16 4774367/0 02/16/16 4625803/0 05/12/16 4629309/0 04/25/16 4385102/0 03/04/16 4581287/1 03/04/16 4581288/1 03/04/16 4581902/1 03/04/16 4581910/1 04/25/16 4609961/0 03/04/16 4703682/0 03/04/16 4703682/0 03/04/16 4703682/0 03/04/16 4703682/0 03/04/16 4703682/0 04/25/16 4766449/0