Third 10-Year Interval, Third Period: Owner'S Activity Report Number U1R19
ML16180A446
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/24/2016
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-07288-TNW/CJS, U1R19
Download: ML16180A446 (5)


Text

10 CFR 50.55a Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 102-07288-TNW/CJS Mail Station 7636 June 24, 2016 Tel: (623) 393-5764 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1, Docket No. STN 50-528 Third 10-Year Interval, Third Period:

Owners Activity Report Number U1R19 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owners Activity Report (Form OAR-1) for Unit 1 refueling outage 19 (U1R19). The outage ended on May 14, 2016.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Michael D. Dilorenzo, Regulatory Affairs Department Leader, at (623) 393-3495.

Sincerely, Digitally signed by Weber, Thomas Weber, Thomas N(Z00499) DN: cn=Weber, Thomas N(Z00499)

N(Z00499)

Reason: I am approving this document Date: 2016.06.24 10:56:10 -07'00' Thomas N. Weber Department Leader, Regulatory Affairs TNW/CJS

Enclosure:

Unit 1 Nineteenth Refueling Outage Owners Activity Report, Report U1R19 cc: M. L. Dapas NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

ENCLOSURE Unit 1 Nineteenth Refueling Outage Owners Activity Report Report U1R19

FORM OAR-1 OWNER'S ACTIVITY REPORT ReportNumber:_1_R_1_9___________________________________________ _____________________

Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: _1_ __ Commercial service date: ___J_c.a_n_2-'-8'--,1---=9--"8-= Refueling Outage No.: _R'-'-19.;;________

(if applicable)

Current inspection interval IWB, IWC, IWD, IWF = 3rd, IWE, IWL = 2nd 1

(1'

  • 2"". 3"'. 41", other)

Current inspection period IWB, IWC, IWD, IWF, IWE = 3rd IWL =2nd (1'1,2"". 3)

Edition and Addenda of Section XI applicable to the inspection plans 2001 ed, 2003 ad, IWL 2007 ed 2008 ad Date and revision of inspection plans lSI= 11/12/14 R4, Press Tests= 3/19/14 R41WE = 9/23/15 R1 IWL = 8/26/15 R3 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans _2_0_0_1_e_d_2_0_03_a_d_________________________________________

Code Cases used: N-532-4, N-733


~---------------------------------------------------------------

(if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U1 R 19 conform to the requirements of Section XI.

(refueling outage number)

Digitally signed by Lehman, William T(Z60076)

DN: cn=Lehman, William T(Z60076)

Lehman, William T(Z60076) Reason: I am the author of this document Date: 2016.06.14 12:08:35 -07'00' Signed----------------------------------------- -- Date:---------------------------

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Hartford Connecticut Arizona and employed by '*' of have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

  • """' t..I..()JL"'t'~oR!) ~\t:,,:,.f\1\ l::.~,t_.E.R. I"""'S\'""C.c\o~ ~t->1::> '""~<.:>\Z.4 '""<-G. C.oM?A."< c:>f' Co..,~'-(..u\

Commissions N.B. 9685 "A,N,I,C" Az 264


~N~a~tio~na~IB~o~ar7 d.~St~at~e.~Pr~o~~n~ce-,a~nd~E~nd~o~rs~em-e~nts_____

Date: ______-=Ju=n~1~4~20~1~6___________

PV-E0796 Ver. 1

Palo Verde Nuclear Generating Station Owners Activity Report- Unit 1 Refueling Outage 19 Table 1 Items with flaws or relevant conditions that required evaluation for continued service Item Description Evaluation Number of Work Description NONE NONE NONE 2

Palo Verde Nuclear Generating Station Owners Activity Report - Unit 1 Refueling Outage 19 Table 2 Abstract of repair/replacement activities required for continued service Item Description Date Repair/Replacement Code Class Description of Work Completed Plan Number 1 1JRCETW0121Y seal weld for RTD nozzle 05/06/16 4764314/0 1 1JRCETW0121Y Install MNSA CC N-733 05/12/16 4764314/3 1 1MRCEE01A Hot leq tube pluqs 05/04/16 4737273/0 1 1MRCEE01A Cold Leg tube plugs 05/04/16 4737274/0 1 1MRCEE01B Hot leq tube plugs 05/04/16 4737272/0 1 1MRCEE01A Cold Leg tube plugs 05/04/16 4737275/0 1 1CH026HOOL Snubber replaced 05/02/16 4764673/0 2 1MCHNE02 Repair Divider Plate 05/05/16 4769814/0 2 1JSIBUV0616 Body to Bonnet Seal Weld ReQ_air 05/07/16 4774367/0 2 1SI107H012 Snubber replaced 02/16/16 4625803/0 2 1PSGEL008 Piping Replacement FAC 05/12/16 4629309/0 3 1PSPBL025 Pipe Cap replaced for corrosion 04/25/16 4385102/0 3 1PSPAL098 Replaced for corrosion 03/04/16 4581287/1 3 1PSPAL099 Replaced for corrosion 03/04/16 4581288/1 3 1MDGAE04 Replaced piping for corrosion 03/04/16 4581902/1 3 1PSPAL100 Replaced pipinq for corrosion 03/04/16 4581910/1 3 1MEWBE01 Weld Repair EW htexch for corrosion 04/25/16 4609961/0 3 1MDGAE01A Weld Repair of intercooler for corrosion 03/04/16 4703682/0 3 1MDGAE01A/B Weld Repair of spools 5,6,7,8 03/04/16 4703682/0 3 1MDGAE01B Weld Repair of intercooler for corrosion 03/04/16 4703682/0 3 1MDGAE04 Weld Repair of LO cooler for corrosion 03/04/16 4703682/0 3 1MDGAE05 Weld Repair of JW cooler for corrosion 03/04/16 4703682/0 3 1PSPBL025 Weld Repair of piping for corrosion 04/25/16 4766449/0 3

10 CFR 50.55a Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 102-07288-TNW/CJS Mail Station 7636 June 24, 2016 Tel: (623) 393-5764 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1, Docket No. STN 50-528 Third 10-Year Interval, Third Period:

Owners Activity Report Number U1R19 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owners Activity Report (Form OAR-1) for Unit 1 refueling outage 19 (U1R19). The outage ended on May 14, 2016.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Michael D. Dilorenzo, Regulatory Affairs Department Leader, at (623) 393-3495.

Sincerely, Digitally signed by Weber, Thomas Weber, Thomas N(Z00499) DN: cn=Weber, Thomas N(Z00499)

N(Z00499)

Reason: I am approving this document Date: 2016.06.24 10:56:10 -07'00' Thomas N. Weber Department Leader, Regulatory Affairs TNW/CJS

Enclosure:

Unit 1 Nineteenth Refueling Outage Owners Activity Report, Report U1R19 cc: M. L. Dapas NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

ENCLOSURE Unit 1 Nineteenth Refueling Outage Owners Activity Report Report U1R19

FORM OAR-1 OWNER'S ACTIVITY REPORT ReportNumber:_1_R_1_9___________________________________________ _____________________

Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: _1_ __ Commercial service date: ___J_c.a_n_2-'-8'--,1---=9--"8-= Refueling Outage No.: _R'-'-19.;;________

(if applicable)

Current inspection interval IWB, IWC, IWD, IWF = 3rd, IWE, IWL = 2nd 1

(1'

  • 2"". 3"'. 41", other)

Current inspection period IWB, IWC, IWD, IWF, IWE = 3rd IWL =2nd (1'1,2"". 3)

Edition and Addenda of Section XI applicable to the inspection plans 2001 ed, 2003 ad, IWL 2007 ed 2008 ad Date and revision of inspection plans lSI= 11/12/14 R4, Press Tests= 3/19/14 R41WE = 9/23/15 R1 IWL = 8/26/15 R3 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans _2_0_0_1_e_d_2_0_03_a_d_________________________________________

Code Cases used: N-532-4, N-733


~---------------------------------------------------------------

(if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U1 R 19 conform to the requirements of Section XI.

(refueling outage number)

Digitally signed by Lehman, William T(Z60076)

DN: cn=Lehman, William T(Z60076)

Lehman, William T(Z60076) Reason: I am the author of this document Date: 2016.06.14 12:08:35 -07'00' Signed----------------------------------------- -- Date:---------------------------

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Hartford Connecticut Arizona and employed by '*' of have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

  • """' t..I..()JL"'t'~oR!) ~\t:,,:,.f\1\ l::.~,t_.E.R. I"""'S\'""C.c\o~ ~t->1::> '""~<.:>\Z.4 '""<-G. C.oM?A."< c:>f' Co..,~'-(..u\

Commissions N.B. 9685 "A,N,I,C" Az 264


~N~a~tio~na~IB~o~ar7 d.~St~at~e.~Pr~o~~n~ce-,a~nd~E~nd~o~rs~em-e~nts_____

Date: ______-=Ju=n~1~4~20~1~6___________

PV-E0796 Ver. 1

Palo Verde Nuclear Generating Station Owners Activity Report- Unit 1 Refueling Outage 19 Table 1 Items with flaws or relevant conditions that required evaluation for continued service Item Description Evaluation Number of Work Description NONE NONE NONE 2

Palo Verde Nuclear Generating Station Owners Activity Report - Unit 1 Refueling Outage 19 Table 2 Abstract of repair/replacement activities required for continued service Item Description Date Repair/Replacement Code Class Description of Work Completed Plan Number 1 1JRCETW0121Y seal weld for RTD nozzle 05/06/16 4764314/0 1 1JRCETW0121Y Install MNSA CC N-733 05/12/16 4764314/3 1 1MRCEE01A Hot leq tube pluqs 05/04/16 4737273/0 1 1MRCEE01A Cold Leg tube plugs 05/04/16 4737274/0 1 1MRCEE01B Hot leq tube plugs 05/04/16 4737272/0 1 1MRCEE01A Cold Leg tube plugs 05/04/16 4737275/0 1 1CH026HOOL Snubber replaced 05/02/16 4764673/0 2 1MCHNE02 Repair Divider Plate 05/05/16 4769814/0 2 1JSIBUV0616 Body to Bonnet Seal Weld ReQ_air 05/07/16 4774367/0 2 1SI107H012 Snubber replaced 02/16/16 4625803/0 2 1PSGEL008 Piping Replacement FAC 05/12/16 4629309/0 3 1PSPBL025 Pipe Cap replaced for corrosion 04/25/16 4385102/0 3 1PSPAL098 Replaced for corrosion 03/04/16 4581287/1 3 1PSPAL099 Replaced for corrosion 03/04/16 4581288/1 3 1MDGAE04 Replaced piping for corrosion 03/04/16 4581902/1 3 1PSPAL100 Replaced pipinq for corrosion 03/04/16 4581910/1 3 1MEWBE01 Weld Repair EW htexch for corrosion 04/25/16 4609961/0 3 1MDGAE01A Weld Repair of intercooler for corrosion 03/04/16 4703682/0 3 1MDGAE01A/B Weld Repair of spools 5,6,7,8 03/04/16 4703682/0 3 1MDGAE01B Weld Repair of intercooler for corrosion 03/04/16 4703682/0 3 1MDGAE04 Weld Repair of LO cooler for corrosion 03/04/16 4703682/0 3 1MDGAE05 Weld Repair of JW cooler for corrosion 03/04/16 4703682/0 3 1PSPBL025 Weld Repair of piping for corrosion 04/25/16 4766449/0 3