ML14225A621
ML14225A621 | |
Person / Time | |
---|---|
Site: | Quad Cities |
Issue date: | 04/27/2013 |
From: | NRC/RGN-III |
To: | Exelon Generation Co |
Bruce Palagi | |
Shared Package | |
ML13093A388 | List: |
References | |
Download: ML14225A621 (13) | |
Text
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 13 Exelon Nuclear Job Performance Measure Pressurize the Main Steam Lines JPM Number: 2014 ILT NRC JPM c Revision Number: 00 Date: __10/15/2013___
Developed By:
Instructor Date
Validated By:
SME or Instructor Date Reviewed By:
Operations Representative Date Approved By:
Training Department Date
2014 ILT NRC JPM c - Rev 00 Page 2 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initia l validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 1. Task description and number, JPM description and number are identified. ________ 2. Knowledge and Abilities (K/A) references are included. ________ 3. Performance location specified. (in-plant, control room, simulator, or other) ________ 4. Initial setup conditions are identified. ________ 5. Initiating cue (and terminating cue if required) are properly identified. ________ 6. Task standards identifi ed and verified by SME review. ________ 7. Critical steps meet the criteria for critical step s and are identified with an asterisk (*). ________ 8. If an alternate path is used, the task standard contai ns criteria for successful completion. ________ 9. Verify the procedure(s) referenced by this JPM re flects the current revision:
Procedure QCOP 0250-01 Rev: 12 Procedure Rev: Procedure Rev: ________ 10. Verify cues both verbal and visual are free of conflict. ________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written wit h proper responses, then revise the JPM. ________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date
SME / Instructor Date
SME / Instructor Date
2014 ILT NRC JPM c - Rev 00 Page 3 of 13 Revision Record (Summary)
Revision 00, Renamed 2014 ILT NRC JPM c. Restarted numbering accordingly.
Previous changes were:
This JPM is developed IAW guidelines established in NUREG 1021 Rev 9 ES-301 and Appendix C. This JPM meets th e criteria of Category B.1 "Control Room Systems," for RO/SRO candidates.
Bank JPM LS-009-II Rev. 11 was used as the basis for this JPM, which was revised to reflect procedure and JPM template changes for the 2009 ILT NRC licensing exam.
This JPM was also revised to start at a lowe r power, and more stable, initial condition to facilitate the performance of t he other JPMs in the set.
2014 ILT NRC JPM c - Rev 00 Page 4 of 13 SIMULATOR SETUP INSTRUCTIONS 1. Reset the simulator to IC 18. 2. Go to run
NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and ot her JPMs that are scheduled to be run concurrently.
Setup Instructions - Enter/perfo rm the following commands and actions
- 3. Malfunctions and remote functions: (contained in caep file "C caep.cae")
Cause a group 1(2 commands)l00:00:00l01 imf rp05al00:00:02l02 imf rp05bl00:00:04l03 Remove Group 1 signalsl00:00:00l04 dmf rp05al00:00:06l05 dmf rp05bl00:00:08l06 Override 901-3 A-16 offl00:00:00l07 imf ser0717 offl00:00:10l08 delete DW pneu air leakagel00:00:00l09 irf ia13r 0l00:00:12l10
- Do NOT reset the Group 1 Isolation during QCGP 2-3 actions.
- Manually Scram the reactor and perform scram actions IAW QCGP 2-3 as necessary to stabilize the plant.
- Monitor RPV Level and Pressure throughout:
- RPV pressure will rise very slowly at approximately 2 psig / minute.
- RPV Level will rise slowly due to heating up the post-scram water. This results in the RFPs tripping several minutes into t he JPM (and possibly again when the MSIVs are reopened).
- When the Feed Pump trips, restart the Feed Pump.
- 4. Remotes/Overrides:
- Override the following panels' acknowledge buttons to the "acknowledge" position using the Sim Op computer to sele ct the button and override the position to "ACK" (expert commands not available to perform this function) o 901-3 o 901-4 o 901-6 o 901-53 o 901-54 5. Verify the following control panel lineups:
2014 ILT NRC JPM c - Rev 00 Page 5 of 13
- The Main Steam Line Drain Valves are CLOSED.
- All Turbine Bypass Valves are CLOSED.
- On the <CONTROL> <RX COOLDOWN> screen, verify REACTOR COOLDOWN is OFF. 6. Verify that a blank current revision of QCOP 0250-01 "PRESSURIZING THE MAIN STEAM LINES", is available 7. Snap the setup to Zero when all other conditions for concurrently run JPMs are established. 8. Place AO 1-4723 in "Man Open" (901-4 panel) 9. This completes the setup for this JPM.JPM C QCOP 0250-01, Rev 012, P RF:\2014 ILT NRC Exam\JPMs\Systems J
2014 ILT NRC JPM c - Rev 00 Page 6 of 13 INITIAL CONDITIONS - You are the Unit 1 ANSO. - A spurious Group I Isolation occurred approximately 30 minutes ago. - Reactor water level ha s been maintained <100
" by Feed/C ondensate. - An extra reactor operator will control pressure between 800 and 1000 psig with relief valves. - A Shift Supervisor is standing by to provide the necessary verifications. - Group 1 isolation signals do NOT need to be bypassed. - This JPM is NOT time critical.
INITIATING CUE Pressurize the Main Steam lines and re-open the MSIV's per QCOP 0250-01 "PRESSURIZING THE MAIN STEAM LINES". Notify the Unit Superviso r when the MSIVs are open. {When candidate acknowledges the cue, provide the candidate with the procedure QCOP 0250-01}
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elemen ts of a critical step.
Number any comments in the "Comment Nu mber" column on the following pages. Then annotate that comment in the "C omments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marg inal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment i ssues should be entered and tracked using the site's appropriate tracking system.
Some operations that are perform ed from outside of the contro l room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to per form groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
2014 ILT NRC JPM c - Rev 00 Page 7 of 13 JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number *F.1. *Place MN STM ISOL RESET to INBD.
- Places MN STM ISOL RESET switch on the 901-5
panel to INBD position. ___ ______
- F.3 *At the DEHC Operator's Workstation, on the
<CONTROL> <PRESSURE
CONTROL> screen, adjust DEHC Pressure Set 200 psig above reactor pressure OR as high as possible.
- Pressure Set adjusted to at least 200 psig above reactor
pressure.
- Select STPT/RAMP
- Enter desired value for Set Point and a desired value for
Ramp. Select OK to
enter values.
- Select OK to confirm values or CANCEL to abort changes ___ ______EVALUATOR NOTE: In steps F.4 and F.5, the candidate may open two valves simultaneously. The student may also perform F.5 prior to F.4 (allowed by procedure)
- F.4. *Open Outboard MSIVs:
- On Panel 901-3 , C/S for: AO 1-203-2A taken to OPEN; Valve indicates OPEN. AO 1-203-2B taken to OPEN; Valve indicates OPEN.
AO 1-203-2C taken to OPEN; Valve indicates OPEN.
AO 1-203-2D taken to OPEN; Valve indicates OPEN. ___ ______
2014 ILT NRC JPM c - Rev 00 Page 8 of 13 STEP ELEMENT STANDARD SAT UNSAT Comment Number *F.5. *Open Steam Line drain valves:
- On Panel 901-3 , C/S for: MO 1-220-90A taken to OPEN; Valve indicates open MO 1-220-90B taken to OPEN; Valve indicates open MO 1-220-90C taken to OPEN; Valve indicates open MO 1-220-90D taken to OPEN; Valve indicates open ___ ______
- F.6. *Equalize pressure across MSIVs* On Panel 901-3 , C/S for:
MO 1-220-1 taken to OPEN; Valve indicates open.
MO 1-220-2 taken to OPEN; Valve indicates open.
MO 1-220-3 throttled OPEN; Valve indicates open or mid position ___ ______
F.7. Monitor differential pressure across the MSIVs. Verifies Differential Pressure is decreasing using: a. Reactor Pressure
- b. PI 1-3040-10, TURB THROT PRESS (at panel 901-7) ___ ______EVALUATORS : Steps F.7.a (1), (2), and (3) are applicable only if the THROTTLE PRESS MED (XMITTER X) FAILED LOW alarm was received. F.7.a Checks DEHC for diagnostic Alarm: "THROTTLE PRESS
MED (XMITTER X) FAILED
LOW" DEHC checked for Diagnostic Alarms ___ ______
2014 ILT NRC JPM c - Rev 00 Page 9 of 13 STEP ELEMENT STANDARD SAT UNSAT Comment Number F.7.a(1) Verify each Throttle Pressure Transmitter indicates an
increasing trend From the <AUX> <XMITTER RESET> SCREEN:
Increasing trends on Throttle Pressure Transmitters
verified.
___ ______
F.7.a(2) If necessary, RESET THROTTLE #X for each Throttle
Pressure transmitter that
indicates FAILED.
From the <AUX> <XMITTER RESET> SCREEN:
Selects RESET for each failed transmitter and selects OK to confirm each reset.
___ ______
F.7.a(3) Verify each Throttle Pressure transmitter alarm indicates a
NORMAL state and clear alarms by selecting ACK ALL From the ALARMS screen, verifies each Throttle
Pressure alarm indicates a
"NORMAL" state and clears
all alarms by selecting ACK
ALL. ___ ______EVALUATORS : Steps F.7.a (4)&(5) are not applicable because all transmitter alarms will reset.
EVALUATORS : Step F.8. is not applicable because the di fferential pressure across the MSIVs will decrease to <200 psig. CUE: If asked, grant permission to open the Inboard MSIVs.
2014 ILT NRC JPM c - Rev 00 Page 10 of 13 STEP ELEMENT STANDARD SAT UNSAT Comment Number EVALUATOR NOTE: The candidate may open two valves simultaneously to avoid a possible Group I isolation on high Main Steam Line flow rates.
- F.9. *WHEN diff. press. across the MSIVs is <2 00 psid, OR has stopped decreasing and Unit Supervisor has given permission to proceed, THEN open inboard MSIVs:
- On Panel 901-3, C/S for:
AO 1-203-1A taken to OPEN; Valve indicates OPEN.
AO 1-203-1B taken to OPEN; Valve indicates OPEN.
AO 1-203-1C taken to OPEN; Valve indicates OPEN.
AO 1-203-1D taken to OPEN; Valve indicates OPEN. ___ ______EVALUATOR NOTE: The candidate should inform you that the MSIV's are open.
CUE: Another NSO will comp lete the rema ining procedure steps. JPM Stop Time:
2014 ILT NRC JPM c - Rev 00 Page 11 of 13 JPM
SUMMARY
Operator's Name
- Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title: Pressurize The Main Steam Lines JPM Number: 2014 ILT NRC JPM c Revision Number: 00 Task Number and Title: Pressurize the Main Steam Lines SR-0250-P01 (Freq: LIC=B) Given a r eactor plant at power when an inadvertent Group 1 isolation occurs, det ermine the cause, reset the Group 1 and re-open the MSIVs in accordance with QCOP 0250-01.
K/A Number and Importance:
K/A: 239001 A4.01 Rating: 4.2/4.0 Ability to manually operate and/or monitor in the control room:
MSIV's Suggested Testing Environment: Simulator
Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 0250-01, Rev. 12, PRESSURIZING THE MAIN STEAM LINES Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 17 minutes Actual Time Used:
minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operator's performance wa s evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluator's Name
- (Print) Evaluator's Signature
- Date: [If this page is an odd numbered page, a blank page is automatically generated after this page to keep the student cue sheet separate from this page]
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS - You are the Unit 1 ANSO. - A spurious Group I Isolation occurred approximately 30 minutes ago. - Reactor water level ha s been maintained <100
" by Feed/C ondensate. - An extra reactor operator will control pressure between 800 and 1000 psig with relief valves. - A Shift Supervisor is standing by to provide the necessary verifications. - Group 1 isolation signals do NOT need to be bypassed. - This JPM is NOT time critical.
INITIATING CUE Pressurize the Main Steam lines and re-open the MSIV's per QCOP 0250-01 "PRESSURIZING THE MAIN STEAM LINES". Notify the Unit Superviso r when the MSIVs are open.