ML14224A569

From kanterella
Jump to navigation Jump to search
NRC Scenario 3
ML14224A569
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/27/2013
From:
NRC/RGN-III
To:
Exelon Generation Co
Bruce Palagi
Shared Package
ML13093A388 List:
References
Download: ML14224A569 (26)


Text

Quad Cities 2014 NRC EXAM Scenario 3 Exelon Nuclear 2014 ILT NRC Exam Scenario Scenario Number:

NRC Scenario 3 Revision Number: 00 Date: _10/17/13 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Scenario Outline Form ES-D-1 Facility: Quad Cities Scenario No.: 2014 NRC Scenario 3 Op-Test No.: ILT 12-1 Examiners: ________________________ Operators:_____________________________

Initial Conditions:

The plant is starting up at 100% power. Severe Thunderstorm Warning has been issued.

QCOA 0010-10 in progress.

Turnover: Perform the Acoustic Monitor Test for SRVs 3A, 3B, and 3C.

Event Malf. No. Event Event No. Type* Description 1 None BOP Perform the Acoustic Monitor Test N

2 RH19BR SRO Breaker failure on a Drywell Spray Valve TS (Remote Function)

TS 3 RD07 ATC CRD Pump Trip (QCOA 0300-01)

C 4 RD04 ATC Rod Drift Out TS C (QCOA-0300-11) 5 DIHS156041A BOP Gland Exhauster trip/start standby LOHS156041A4 C (Overrides) 6 MC08 ATC Emergency Power Reduction on Loss of Main R Condenser vacuum (Recoverable) 7 MS04C Crew A Steam line leak in the Drywell results in a reactor M scram per QCOA 0201-01 and entry into QGA 100 and 200.

8 DIHS11001S17A Crew Drywell Spray valves fail to open, Emergency (Override)

M Depressurization per QGA 500-1 when PSP exceeded.

9 MS16 Crew Venting to stay under PCPL M

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ES-301-4 Quantitative attributes: ES-301-5 Quantitative attributes:

Total Malfunctions (5-8): 7 BOP Normal: E1 Malfunction(s) after EOP (1-2): E8 ATC Reactivity (1 per set): E6 Abnormal Events (2-4): E3-6 BOP I/C (4 per set): E5 Major Transient(s) /E-Plan entry (1-2): E7, 8 ATC I/C (4 per set): E3 & 4 EOPs (1-2): QGA 200/ 100 SRO-I I/C (4 per set inc 2 as ATC): E3-5 EOP Contingencies (0-2): E8, 9 SRO Tech Spec (2 per set): E2 & 4 Critical Tasks (2-3): 2 ALL Major Transients (2 per set) E7-9 Quad Cities 2014 NRC EXAM Scenario 3

SUMMARY

  • Initial Conditions:

o Unit 1 is operating at 100% power.

  • Event 1: The BOP performs a partial Acoustic monitor test, QCOS 0203-01 for SRVs 3A, 3B, and 3C.
  • Event 2: The breaker to a Drywell Spray Valve is found Deenergized due to an electrical fault. The SRO must address:

o TRM 3.6.a Condition A o T.S. 3.6.1.3 Power operated PCIV o T.S. 3.3.3.1 PAM Instrument

  • Event 3: The A CRD Pump trips. The ATC Operator and US respond per QCOA 0300-01 to start the B CRD Pump and open its discharge valve.
  • Event 4: Control Rod J-7 drifts out from position 00. The ATC and SRO respond per QCANs and QCOA 300-11. The rod should be inserted and scrammed. The SRO will declare control rod J-7 inoperable per TS 3.1.3, Condition C, requiring the inoperable rod to be fully inserted within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and disarmed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
  • Event 5: The running Gland Seal Exhauster will trip. The BOP will start the standby Exhauster and adjust Gland Exhaust pressure.
  • Event 6: An air leak will result in lowering Main Condenser Vacuum. The crew performs QOA 3300-02 and Emergency Power Reduction. Prompt action by Equipment Operators to re-fill a loop seal line will stabilize Main Condenser Vacuum.
  • Event 7: Drywell Pressure starts to rise when a LOCA is initiated. A manual scram should be attempted per QCOA 0201-01 before Drywell Pressure exceeds 2.5 psig.

After Drywell Pressure exceeds 2.5 psig, QGA 100 and 200 are performed. The crew restores RPV Water Level and attempts to control Drywell Pressure and Temperature with Containment Sprays.

  • Event 8: Div II DW sprays are not available from event 2 (RHR 23B bkr trip) and Div I DW sprays are not available (S17 switch problem), requiring the crew to Blowdown in order to avoid exceeding Pressure Suppression Pressure (PSP).
  • Event 9: During the blowdown, a relief valve tailpipe will rupture and torus to DW vacuum breakers will fail open directly pressurizing containment. The crew will be required to vent containment to avoid exceeding PCPL.

CRITICAL TASKS:

Critical Task #1 When Drywell temperature CANNOT be maintained < 280 F OR Torus pressure CANNOT be maintained < the Pressure Suppression Pressure Limit, (PSP),

INITIATE an Emergency Depressurization..

Critical task #2: Before Torus pressure reaches the Primary Containment Pressure Limit (PCPL),

INITIATE venting of the containment irrespective of offsite radioactivity release rates. (BWROG PC-7.2 LOCA VENT PC VENT)

Quad Cities 2014 NRC EXAM Scenario 3 EXERCISE PERFORMANCE OBJECTIVES SR-0203-P04 Given an operating plant, perform the Monthly Safety and Relief Valve Acoustic Monitor Surveillance in accordance with QCOS 0203-01 SR-0300-P04 Given an operating reactor plant with a CRD pump trip, start the standby CRD pump in accordance with QCOA 0300-01.

SR-0300-P03 Given an operating reactor plant with a drifting control rod, insert/disarm the drive and attempt to determine the cause in accordance with QCOA 0300-04 and QCOA 0300-11.

SR-3300-P09 Given a reactor plant at power with a loss of condenser vacuum, take action to attempt to locate and correct the cause for lowering vacuum in accordance with QOA 3300-02 and/or QOA 5450-05.

SR-0002-P05 Given a reactor plant at power, perform a power change discernible on neutron monitors using Recirc flow in accordance with QCOP 0202-03 and QCGP 3-1 SR-0002-P04 Given a reactor plant at power, perform a power change discernible on neutron monitors using control rods in accordance with QCOP 0280-01, QCGP 3-1 and QCGP 4-1.

SR-0002-P03 Given a reactor plant at power with a reactor scram, place the plant into a stable condition in accordance with QCGP 2-3.

SR-1000-P05 Given a reactor plant in an accident condition where RHR-LPCI mode has started automatically, determine if LPCI has responded correctly to a valid initiation and throttle flow to restore RPV water level in accordance QCOA 1000-04.

SR-0203-P07 Given a reactor plant in a QGA condition, inhibit ADS in accordance with QGA 100 or QGA 101. (Important PSA task / Inhibiting ADS terminates 5 of top 200 Core Damage Sequences)

SR-1000-P02 Given a reactor plant in an accident condition (QGA), operate torus sprays in accordance with QCOP 1000-30 and appropriate QGA. (Important PRA Operator Action - starting containment sprays has a RAW value of 82.5)

SR-0001-P23 Given a reactor plant with rising containment pressure and temperature due to a LOCA or steam leak, initiate an emergency depressurization when torus pressure cannot be maintained below the Pressure Suppression Pressure (QGA Figure L) or when drywell temperature cannot be restored and held below 280 degrees in accordance with QGA 200 and QGA 500-1.

SR-0001-P24 Given a reactor plant with rising containment pressure due to a LOCA or steam leak, vent the containment irrespective of off-site radioactivity release rates before torus pressure reaches the Primary Containment Pressure Limit (QGA Figure D) in accordance with QGA 200 and QCOP 1600-13.

(Important PRA task. Failure to control containment venting or restore IA for venting results in core damage in 20 of top 100 Core Damage Sequences)

SR-0001-P25 Given a reactor plant with the inability to stay below the Primary Containment Pressure Limit (QGA Figure D), prevent injection from sources outside the primary containment not needed for core cooling or to shut down the reactor in accordance with QGA 100, QGA 101, QGA 200, or QGA 500-4.

Quad Cities 2014 NRC EXAM Scenario 3 Simulator Setup:

1. Reset to IC-21 (100% power).
2. Go to RUN.
3. Verify the following RWM Sequence is loaded: PHESSS
a. Mark up the Control Rod Move Sheet to reflect all rods withdrawn up to Step 20.
b. Markup Step 20 FCL Rods G-9, J-7, and J-9 at position 06.

(The following commands to be utilized for this scenario are contained in the CAEP file:

2014 NRC Scenario 3.cae)

4. Insert Commands for setup:
  • imf ser0986 (3) on (On Trigger 3, Gland Exhauster Trip 901-7 E-12 ON)
  • ior dihs156041a (3) trip (On Trigger 3, 1A Gland Exhauster handswitch to TRIP)
  • ior lohs156041a4 (3) on (On Trigger 3, 1A Gland Exhauster Amber Trip light ON)
  • trgset 5 zdihs10287303A(1) (set trigger 5 true when the 3A control switch is taken to manual)
  • imf ms06a (5) 100 (erode the 3A relief valve seat 100% when trigger 5 is true)
  • imf ms16a (fails 3A relief valve tailpipe)
5. Verify the following commands for scenario performance:
  • irf rh19br open (opens breaker for 1-1001-23B valve)
  • imf rd07a (1A CRD pump trip)
  • irf rd06r3427r inop (closes 1-305-105 valve for HCU 34-27)
  • dmf rd04r3427 (deletes rod drift for J-7)
  • trg! 3 (Trigger 3 used to initiate Event 4 Gland Exhauster Trip)
  • dmf mc08 (deletes Condenser air inleakage)
  • imf ms04c 0.5 10: (Main Steam break in Drywell at 0.5% severity over 10 min)
  • irf rh20ar open (As requested, open the breaker for MO 1-1001-26A vlv)
  • irf rh19ar open (As requested, open the breaker for MO 1-1001-23A vlv)
  • trg! 5 (Trigger 5 used to erode the 3A relief seat 100%)

2014 NRC Scenario Scenario 3 ReMA.doc Scenario 3 QCOA Scenario 3 QCOS 3.cae 0010-10.pdf 0203-01.pdf Quad Cities 2014 NRC EXAM Scenario 3

  • Simulator Setup:
6. Complete the following Control Panel setup items:
  • Verify the LOCA TRIP ENABLED labels are above the 1A and 1C Circ Water Pumps.
  • Display the Power/Flow Map on Monitor 3.
  • Clear all SBO Panel alarms.
7. Provide the scenario 3 REMA.
8. Perform the applicable steps of TQ-QC-201-0113 Simulator Exam Security Actions Checklist.
9. Provide a marked up copy of:
  • QCOA 0010-10 with steps D.1, D.2, D.3, D.6, and D.9 signed off. Steps D.4, D.5, D.7, D.8 and D.10 are marked at N/A.
  • QCOS 0203-01 (Partial), Test the Acoustic monitors on A, B and C relief valves only. Sign prerequisite step as Unit Supervisor.
10. Provide the 901-16 key (scram test panel key) to the lead evaluator for event 4.
11. Place protected equipment placards on the following:
12. Verify 3 orange rings are available to support equipment status.
13. Ensure a step stool is available to support the acoustic monitor surveillance.

Quad Cities 2014 NRC EXAM Scenario 3 LIST OF POTENTIAL PROCEDURES Annunciator Procedures o 901-3 A-16 PRIMARY CONTAINMENT HIGH PRESSURE, Rev. 14 o 901-3 E-14 ACOUSTIC MON SAFETY RLF VALVES OPEN, Rev. 7 o 901-3 G-4 DRYWELL HIGH PRESSURE, Rev. 8 o 901-5, B-2, CRD PP TRIP, Rev. 7 o 901-5, F-2, CRD CHARGING WATER LOW PRESSURE, Rev. 5 o 901-5 A-3, ROD DRIFT, Rev. 7 o 901-5 D-11 PRIMARY CNMT HIGH PRESS, Rev. 11 o 901-7 E-12 GLAND STEAM EXH MOTOR TRIP, Rev. 3 QCGP 1-1, Normal Unit Startup, Rev. 94 QCGP 2-3, Reactor Scram, Rev. 80 QCGP 3-1, Reactor Power Operations, Rev. 74 QCGP 4-1, Control Rod Movement and Control Rod Sequence, Rev. 44 QGA 100, RPV Control, Rev. 9 QGA 200, Primary Containment Control, Rev. 9 QGA 500-1, RPV Blowdown, Rev. 13 QCOA 0300-01, CRD Pump Failure, Rev. 18 QCOA 0300-11, Control Rod Drift, Rev. 23 QCOP 0300-01, CRD System Startup, Rev. 26 QCOP 0300-07, CRD Directional Control Valve Disarmament/Armament, Rev. 6 QCOS 0300-14, Control Rod Drive Inoperable Outage Report, Rev. 11 QCOA 0201-01, Increasing Drywell pressure, Rev. 23 QCOP 0203-01, Reactor Pressure Control Using Manual Relief Valve Actuation, Rev. 14 QCOP 1000-30, Post-Accident RHR Operation, Rev. 29 QCOP 1600-13, Post Accident Venting of the Primary Containment Rev, 25 QCOP 3700-02, RBCCW System Startup and Operation, Rev. 26 QOP 5600-01, Gland Seal System Rev, 18 QCOP 5750-19, Drywell Cooler Operation, Rev. 10 Quad Cities 2014 NRC EXAM Scenario 3 CREW TURNOVER 1.) Plant Conditions:

a.) Unit 1 is at 100% Power.

b.) Unit 2 is at 100% Power.

c.) Technical Specification limitations:

(1) Unit 1: None (2) Unit 2: None d.) On Line Risk is YELLOW.

2.) Significant problems/abnormalities:

  • A Severe Thunderstorm Warning has been issued. QCOA 0010-10 is in progress. The Shift manager is working through OP-AA-108-111-1001, Severe Weather and Natural Disaster Guidelines.

3.) Evolutions/maintenance for the oncoming shift:

a.) Perform QCOS 0203-01, Acoustic Monitor Test for the 3A, 3B and 3C Relief Valves.

4.) Protected equipment:

a.) Unit 1 HPCI.

b.) Unit 1 RCIC.

Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 1 Page 1 of 2 Event

Description:

Perform the Acoustic Monitor Test Time Position Applicants Actions or Behavior SRO Directs BOP to perform partial QCOS 0203-01 to test the Acoustic monitors on 3A, 3B and 3C Relief Valves and supervises as necessary.

BOP Performs partial QCOS 0203-01 to test the Acoustic monitors on A, B and C relief valves only.

BOP (H.1) Selects desired valve.

BOP (H.2) Places display switch in I, checks and records INPUT values.

BOP (H.3) Determines THRESHOLD setpoint.

BOP Places display switch in T.

BOP Records THRESHOLD setpoint.

BOP Returns display switch to I.

BOP (H.4) Tests alarms and indications.

BOP Places and holds TEST/RESET switch in TEST.

BOP Verifies Input level greater than Threshold setpoint.

BOP Verifies Open (Red) comes ON and Closed (Green) goes OFF as Threshold setpoint is reached.

BOP Verifies MEMORY (Amber) light comes ON.

BOP Verifies annunciator at Panel 901-3 E-14 ACOUSTIC MON SAFETY RLF VALVES OPEN is received.

BOP Verifies Process Computer Alarm SAFETY/ELECTROMAGNETIC VLV 203-XX OPEN.

BOP Releases TEST/RESET switch.

BOP Verifies Open (Red) light is OFF.

BOP Verifies Closed (Green) is ON.

BOP Verifies annunciator at Panel 901-3 E-14 can be cleared.

BOP Records satisfactory annunciator response.

BOP Verifies PPC Alarm SAFETY/ELECTROMAGNETIC VLV 203-3A(3B)(3C) CLOSED.

Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 1 Page 2 of 2 Event

Description:

Perform the Acoustic Monitor Test Time Position Applicants Actions or Behavior BOP Records satisfactory Computer Alarm response.

BOP Momentarily places TEST/RESET switch in RESET.

BOP Verifies MEMORY (Amber) light goes OUT.

(H.5) Verifies proper operation of acoustic monitor:

o Input level less than 0.09 prior to testing.

o Acoustic Monitor alarms when Threshold setpoint is exceeded.

o Threshold Setpoint is greater than or equal to 0.09 and less BOP than or equal to .11 when display switch is in the T position.

BOP (H.6) Records discrepancies as necessary.

BOP Repeats Steps H.1 through H.6 for remaining valves.

ATC Monitors Reactor and Reactor Pressure Vessel indications.

End of Event 1 Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 2 Page 1 of 1 Event

Description:

Breaker failure on a Drywell Spray Valve Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead Examiner, trip the MO 1-1001-23B breaker by inserting remote function irf rh19br open, Then contact the Control Room an EO in the Reactor Building with the following report:

The breaker for MO-1-1001-23B is tripped and there is an acrid odor near MCC 19-4. There is no fire. If requested to reset and close the breaker, indicate the breaker will not reset.

As an EO, if directed to contact EMD, tell them you will contact EMD.

If EMD is contacted by the control room, tell them you will start a troubleshooting work package.

ATC Monitors Reactor and Reactor Pressure Vessel indications.

BOP Confirms that the B RHR Loop Outboard Drywell Spray Valve appears De-energized.

BOP Monitors Balance-of-Plant equipment.

SRO Enters the following Tech Spec / TRM conditions:

  • Drywell Spray Valve MO 1-1001-23B is inoperable resulting in a 7 Day LCO per TLCO 3.6.a Condition A.
  • As a power operated PCIV, it has been closed and deactivated within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per TS 3.6.1.3 Condition A.
  • TS 3.3.3.1 PAM Instrumentation for PCIV Position indication has also been satisfied by the closed/deactivated valves per Table 3.3.3.1-1 Note (a).

End of Event 2 Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 3 Page 1 of 2 Event

Description:

CRD Pump Trip (QCOA 0300-01)

Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead Examiner, trip the 1A CRD Pump: imf rd07a Key Parameter Response: 1A CRD Pump indication lights off, Lowering CRD pressures.

Expected Annunciator(s):

901-5, B-2, CRD PP TRIP 901-5, F-2, CRD CHARGING WATER LOW PRESSURE Automatic Actions: None ATC Acknowledges annunciator 901-5 B-2, CRD PP TRIP, and reports the 1A CRD pump has tripped. Performs actions per the QCAN.

SRO Enters and directs QCOA 0300-01.

SRO May set scram criteria of 2 or more accumulator trouble alarms AND charging water header pressure less than 940 psig for 20 minutes (This scram criteria comes from TS 3.1.5 Conditions B & D).

ATC Verifies the MO 1-301-2B, 1B PMP DISCH VLV, is closed for the standby pump.

ATC Starts the 1B CRD pump ATC Verifies current is less than 34 amps on the 1-302-1B (QCAN 901-5 B-2).

ATC Throttles MO 1-301-2B to maintain 1400-1500 psig discharge pressure.

ATC Closes MO 1-301-2A on the tripped pump.

ATC Dispatches EO to verify proper operation of running pump.

BOP Monitors Balance-of-Plant equipment.

SIMOP ROLE PLAY: As EO dispatched to the CRD pump, wait 2 minutes and report the 1B CRD pump sounds normal, no leaks, and oil levels are in band.

ATC Dispatches EO to CLOSE the MIN FLOW ISOLATION Valve on A CRD Pump (1-301-254A) and OPEN the MIN FLOW ISOLATION Valve on B CRD Pump (1-301-254B).

SIMOP ROLE PLAY: As EO dispatched to the CRD pump, wait 2 minutes and report the 1B CRD pump Min Flow valve is Open and the 1A CRD Pump Min Flow Valve is Closed.

Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 3 Page 2 of 2 Event

Description:

CRD Pump Trip (QCOA 0300-01)

Time Position Applicants Actions or Behavior ATC May adjust CRD Drive Water Press to 260-350 psig per QCOP 0300-01 step G.21.

ATC Throttles MO 1-302-8, DRIVE PRESS VLV (throttles closed valve to raise pressure).

SRO May direct an orange ring be placed on the 1A CRD Pump control switch.

SIMOP ROLE PLAY: If also requested to check the 1A CRD pump breaker at Bus 13, wait 3 minutes and report the breaker tripped on overcurrent.

End of Event 3 Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 4 Page 1 of 2 Event

Description:

Rod Drift Out Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead examiner initiate the Rod Drift Out on rod J-7 (HCU 34-27): imf rd04r3427 Key Parameter Response: Rod J-7 position changing on Full Core Display; Rated thermal power rising.

Expected Annunciator(s): 901-5 A-3, ROD DRIFT Automatic Actions: None ATC Acknowledges annunciator 901-5 A-3, Rod Drift, and reports control rod J-7 is drifting out.

SRO Directs actions of QCOA 0300-11, Control Rod Drift SRO May give Scram Criteria of 2 or more Control Rods drifting.

ATC Bypasses RWM and inserts control rod J-7 using the RMCS to position 00 (Immediate operator action).

SIMOP ROLE PLAY: If contacted as Shift Manager and/or QNE in the next steps, Role play as necessary to acknowledge the report.

SRO Notifies Shift Manager and QNE.

BOP Demands an OD-20.

ATC Releases RMCS, observes rod J-7 begins to drift out from position 00, then applies continuous insert signal to keep rod J-7 at position 00.

ATC Reports control rod J-7 will NOT latch at position 00.

SRO Directs control rod J-7 scrammed using the Rod Scram Test Switch.

BOP EVALUATOR: Provide the Scram Test Panel Key (901-16 panel key) to the BOP.

BOP Places the individual Control Rod Scram Test Switch for J-7 into the scram position at the 901-16 panel.

ATC Confirms blue scram light for control rod J-7 is lit and releases RMCS.

BOP Dispatches EO to close the 1-305-105, CRD EXH VLV, for HCU 34-27.

Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 4 Page 2 of 2 Event

Description:

Rod Drift Out Time Position Applicants Actions or Behavior SIMOP ROLE PLAY: As EO dispatched to the North CRD Bank, wait 2 minutes, then insert the Remote Function to close the 1-305-105 valve: irf rd06r3427r inop and delete the Rod Drift Out Malfunction: dmf rd04r3427.

Call the NSO to report that the 1-305-105 valve for HCU 34-27 is closed.

SRO Declares control rod J-7 inoperable and enters TS 3.1.3, Condition C, which is 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to fully insert and 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to disarm and may direct an EO to disarm the Control Rod per QCOP 0300-07 SIMOP ROLE PLAY: If contacted as an EO to disarm the rod, acknowledge the direction.

SIMOP ROLE PLAY: If contacted as System Engineer; Acknowledge the report and state that you will start troubleshooting.

SRO Enters QCOS 0300-14 to track inoperable rod and electrically disarm.

ATC May adjust CRD Drive Water Press to 260-350 psig per QCOP 0300-01.

ATC Throttles MO 1-302-8, DRIVE PRESS VLV (throttles closed valve to raise pressure).

End of Event 4 Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 5 Page 1 of 1 Event

Description:

Gland Exhauster trip/start standby Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead Examiner, trip the running Gland Exhauster: trg! 3 Verify the following commands go active:

imf ser901-7e12 (3) on, ior dihs156041a (3) trip, and ior lohs156041a4 (3) on Key Parameter Response: 1A Exhauster Amber Trip light on and Red Running light off:

Lowering Vacuum on Gland Seal Exhaust Vacuum indication, 1-5140-70 Expected Annunciator(s): 901-7 E-12 GLAND STEAM EXH MOTOR TRIP Automatic Actions: None BOP Responds to annunciator and informs the Unit Supervisor.

BOP Identifies and reports the loss of 1A Gland Steam Exhauster.

SRO Directs BOP to perform the actions of QCAN 901-7 E-12.

SRO/BOP Dispatches an EO and or EMD to the tripped breaker.

SIMOP ROLE PLAY: As the EO, wait 3 minutes after being dispatched to MCC 15-1 and call back to report the breaker is tripped, there is no obvious problem at the breaker and you have contacted EMD to investigate.

BOP Starts the 1B Gland Steam Exhauster.

BOP Throttles the MO 1-5405B to obtain 10 inches to 15 inches of vacuum as indicated on the 1-5140-70 per QOP 5600-01 step F.1 or F.2.

BOP Throttles closed MO 1-5405A, (holds control switch for 25 sec after full closed indication is received).

ATC Monitors Panel 901-5 parameters.

SRO May direct an orange ring be placed on the 1A Gland Stm Exhauster motor control switch.

SIMOP ROLE PLAY: If summoned to the control room as EMD, tell the crew the problem appears to be with the control switch and it should be left as is until further troubleshooting can be done.

End of Event 5 Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 6 Page 1 of 2 Event

Description:

Emergency Power Reduction on Loss of Main Condenser Vacuum Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead Examiner, initiate a loss of vacuum: imf mc08 100 25:

(Note: Approximately 90 seconds to receive the 901-3 D-2 alarm)

Key Parameter Response: Main Condenser backpressure rising on PR 1-5640-79; Generator Mwe lowering Expected Annunciator(s):

901-3 D-2 OFF GAS HI RADIATION 901-7 H-3 CONDENSER LO VACUUM 24 IN HG (in 8.5 minutes with no operator action) 901-5 F-5 CONDENSER VACUUM LO (in 9 minutes with no operator action)

Automatic Actions: (If alarms not addressed) Reactor Scram and Turbine trip BOP Respond to annunciator 901-3 D-2 and informs the Unit Supervisor.

SRO Directs that reactor power be held constant until the cause of the high radiation is determined.

EVALUATOR NOTE: QCAN 901-3 D-2 lists Condenser Air in-leakage as a probable cause for this alarm. The next 3 actions may not be performed if the crew recognizes those indications.

BOP Monitor SJAE and Main Steam Line radiation levels.

BOP Monitor Area Radiation Monitors.

BOP/SRO Notify Chemistry and Qualified Nuclear Engineer of abnormal Offgas activity.

CREW Monitors Condenser Backpressure and informs the US that backpressure is rising.

BOP/SRO Dispatches Equipment Operators and/or Field Supervisor to investigate.

SIMOP ROLE PLAY: In-plant operators as necessary to acknowledge directives.

BOP/SRO Enter QCOA 3300-02, Loss of Condenser Vacuum.

SRO Directs Emergency Power Reduction by reducing total core flow or inserting CRAM rods. (See next Page)

ATC Reduces Reactor Recirculation flow using the Master Controller or Individual Controllers as necessary to attempt to maintain Main Condenser backpressure < 6.0 in Hg.

ATC (For FCL >59.4%) Does not reduce core flow to the point of entry into Instability Region 2.

Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 6 Page 2 of 2 Event

Description:

Emergency Power Reduction on Loss of Main Condenser Vacuum Time Position Applicants Actions or Behavior ATC If MANUAL RUNBACK pushbuttons are used to reduce Reactor Recirculation flow:

Depress buttons no more than 3 times within a 5 second period.

Verify MANUAL pushbutton is lit on both A and B Speed Controllers.

Verify speed demand on both A and B Controllers decreases by 10% for each time the pushbutton was depressed.

ATC May insert CRAM rods to maintain FCL within the MELLLA boundary.

SRO May set scram criteria of 7.5 in./Hg Main Condenser backpressure.

BOP/SRO Dispatches Equipment Operators and/or Field Supervisor to investigate.

BOP May notify Chemistry to review CY-QC-110-608 for aligning RB sample panel drains with lowering vacuum.

SIMOP ROLE PLAY: If contacted as Chemistry, state you will review CY-QC-110-608.

SIMOP ROLE PLAY: When Emergency Power Reduction has been performed to the satisfaction of the Lead Examiner, AND If an EO/FS has been dispatched, then delete the in-leakage malfunction at 4 inches backpressure: dmf mc08 AND As EO/FS report that the Main Condenser Loop Seals have been re-filled.

BOP Confirms that Condenser Backpressure is returning to normal.

SRO Directs the suspension of Emergency Power Reduction.

ATC Holds Recirc Flow as directed.

SRO Contacts Power Team and informs them of current power level and contacts QNE for assistance in determining thermal limits and recovery actions for control rods.

SIMOP ROLE PLAY: Acknowledge reports from the Unit Supervisor.

End of Event 6 Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 7 Page 1 of 3 Event

Description:

Main Steam Break/Rising DW pressure/ Rx scram Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead Examiner, insert a Main Steam Line break inside containment: imf ms04c 0.5 10: (0.5% severity over 10 minutes).

Key Parameter Response: Drywell Pressure Rising; Control rods insert Expected Annunciator(s):

901-3 A-16 PRIMARY CONTAINMENT HIGH PRESSURE 901-5 D-11 PRIMARY CNMT HIGH PRESS Automatic Actions: (Not a complete list) Group 2 Isolation, CR and RB Vents isolate, SBGTS starts, ECCS systems initiate, EDGs start BOP/ATC Informs the US that alarm 901-3 A-16 is in and reports DW pressure value and trend.

SRO May set Scram Criteria of 2 psig.

SRO Directs BOP to take actions per QCOA 0201-01.

BOP Enters and performs QCOA 0201-01.

BOP May start the 7th Drywell Cooler.

CREW Notifies Radiation Protection of rising DW pressure, evacuates the RB and requests RP to establish access control.

SIMOP ROLE PLAY: If directed as RP, state you will set up access control for the RB.

ATC As directed, inserts and manual reactor scram.

ATC Takes the Reactor Mode Switch to SHUTDOWN.

ATC Verifies all Control Rods are fully inserted.

ATC Makes scram report including entry into QGA 100 on RPV Water Level

< 0 inches.

ATC Attempts to maintain RPV level 0 to +48 with preferred injection systems.

Verifies DFWLC in Single Element.

May isolate Feed Water Reg Valve(s).

May place Low Flow Feed Reg Valve in Service.

May secure unnecessary Feed and Condensate Pumps.

ATC (CONTINUOUS) Monitors RPV water level and pressure.

Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 7 Page 2 of 3 Event

Description:

Main Steam Break/Rising DW pressure/ Rx scram Time Position Applicants Actions or Behavior ATC Verifies Main Turbine trips, all SVs, CVs, ISVs, IVs and extraction steam check valves close.

ATC Verifies Main Generator Output Breakers tripped after 30 seconds and places control switches in PTL.

Verifies Main Generator Field and Exciter Field Breakers tripped.

ATC ATC Verifies all 4 KV buses powered from T-12.

ATC Verifies both Recirc Pumps running at minimum speed in Manual (may be tripped due to DW pressure).

ATC Starts the Control Room AFU Booster Fan within 40 minutes.

ATC Dispatches EO to reset the Generator 86 Relays and open the Main Disconnects (QCGP 2-3 attachment A step 11).

SIMOP ROLE PLAY: As EO, acknowledge the directive to reset Generator 86 Relays and open the Main Disconnects as necessary.

SRO Enters QGA 100, RPV Control and QGA 200, Primary Containment Control, on 2.5 psig DW pressure.

SRO Directs ATC/BOP to verify 0 and 2.5 psig isolations and auto-starts.

ATC/BOP Verifies RPV Pressure < 1060 psig with the Turbine Bypass Valves.

ATC/BOP Verifies Group 2 and 3 Isolations, RB vent isolation and SBGT start.

BOP Monitors and reports Primary Containment parameters and trends.

ATC/BOP Reports ECCS auto started.

ATC/BOP Controls HPCI injection manually or trip latches HPCI after SRO concurrence.

ATC/BOP Verifies Diesels auto started and dispatches EO to verify proper operation.

SIMOP ROLE PLAY: As EO, acknowledge the directive to verify proper operation of U1 and 1/2 EDGs.

BOP As directed, verifies 1A and 1B CAMs operating.

Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 7 Page 3 of 3 Event

Description:

Main Steam Break/Rising DW pressure/ Rx scram Time Position Applicants Actions or Behavior SRO May direct actions to start all available drywell cooling.

ATC/BOP As directed, restores RBCCW and DW coolers per QCOP 5750-19 Verifies Bus 18 and 19 voltage >450 volts Takes the U1 DIV I DW CLR/RBCCW/FPC TRIP BYPASS switch to BYPASS position Takes the U1 DIV II DW CLR/RBCCW/FPC TRIP BYPASS switch to BYPASS position Checks Drywell temperature is less than 260 °F Starts 1A and 1B RBCCW pump Starts drywell coolers one at a time Starts Drywell Booster Fan SRO Verifies Torus level <27 ft.

SRO Before Torus Pressure reaches 5 psig, directs BOP to place Torus Sprays on IAW QCOP 1000-30 BOP Maintains the following during Post-Accident RHR Operation:

  • RHR Pressure 100-250 psig BOP Prepares RHR for Operation Verifies RHR Pumps running Places LOOP A/B CONTAINMENT COOLING PERMISSIVE Switch 17 to ON Places LOOP A/B RHR SW START PERMISSIVE Switch 19 to MANUAL OVERRIDE End of Event 7 Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 8 Page 1 of 3 Event

Description:

Main Steam Break/ QGA 200 actions/ Failed Drywell sprays Time Position Applicants Actions or Behavior BOP Starts RHR Service Water.

Opens MO 1-1001-5A/B to approximately 40%.

Starts A/B RHR SW Pump.

Throttles MO 1-1001-5A/B as necessary.

Throttles MO 1-1001-16A/B as necessary.

BOP Initiates Torus Cooling per QCOP 1000-30 and as directed, initiates Torus Sprays.

Opens MO 1-1001-34B.

Opens MO 1-1001-37B.

BOP Opens/Throttles MO 1-1001-36B as necessary to maintain RHR Discharge Pressure.

SRO Directs BOP to secure Torus Sprays before Torus Pressure drops to 0 psig.

BOP Recognizes and reports that the A Loop RHR valves will not open.

BOP May contact EMD to assist with troubleshooting LOOP A CONTAINMENT COOLING PERMISSIVE Switch 17.

SIMOP ROLE PLAY: If directed as EMD or IMD to troubleshoot LOOP A CONTAINMENT COOLING PERMISSIVE Switch 17, inform the operator you will locate your supervisor and come to the control room (No EMD or IMD personnel will enter the simulator).

BOP Reports Torus pressure >5 psig.

SRO Verifies Torus level >17 ft.

SRO Verifies inside DW Spray Initiation Limit Curve.

SRO Verifies Recirc pumps are tripped and directs Drywell coolers tripped if restarted.

BOP Trips drywell coolers.

SRO Directs BOP to start DW Sprays.

Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 8 Page 2 of 3 Event

Description:

Main Steam Break/ QGA 200 actions/ Failed Drywell sprays Time Position Applicants Actions or Behavior BOP As directed, initiates Drywell Sprays per QCOP 1000-30.

Attempts to open MO 1-1001-23A.

BOP Reports MO 1-1001-23A failed to open from the 901-3 panel.

BOP/SRO Directs EO, with RP assistance, to open one RHR drywell spray valve (23A, 23B, 26A or 26B) by verifying the circuit breaker is open then manually hand cranking the valve open.

SIMOP ROLE PLAY: If requested to locally operate the Drywell Spray valves, wait 3 min.

and then open only the breakers directed using the following remotes:

  • irf rh19ar open (MO 1-1001-23A)
  • irf rh20ar open (MO 1-1001-26A)

SIMOP ROLE PLAY: If asked for status of opening the DW spray valves indicate you are having trouble moving the handwheel and you have requested assistance from another EO.

SRO May direct actions to start all available drywell cooling.

ATC/BOP As directed, restores RBCCW and DW coolers per QCOP 5750-19.

SRO Enters QGA 500-1 to blowdown the vessel when it is determined drywell temperature cannot be restored below 280ºF or torus pressure cannot be maintained within PSP limits.

CT1 SRO Directs actions of QGA 500-1 (actions in steps below).

ATC/BOP Prevents injection from Core Spray and LPCI not needed for Core Cooling by diverting LPCI flow to Torus cooling and/or placing pumps in PTL.

ATC Maintains Rx water level with Feed/Condensate.

SRO Verifies torus level > 5 feet.

CT1 ATC/BOP Opens all ADS valves, leaves switches in MAN IAW QCOP 0203-01, Manual Relief Valve Actuation, using hard card.

BOP Verifies all ADS valves open by acoustic monitor indication on the 901-21 panel.

ATC Trips RFPs due to level exceeding +48 inches.

ATC/BOP Monitors RPV water level instruments for indications of saturation.

Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 8 Page 3 of 3 Event

Description:

Main Steam Break/ QGA 200 actions/ Failed Drywell sprays Time Position Applicants Actions or Behavior End of Event 8 Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 9 Page 1 of 2 Event

Description:

ADS Tailpipe Rupture and Venting of Containment to Stay Below PCPL Time Position Applicants Actions or Behavior SIM OP: When the A ADS valve is opened, verify trigger 5 goes true rupturing the tailpipe.

If trigger 5 is not true, manually insert trg! 5.

BOP Reports Drywell and Torus pressure are rising rapidly.

BOP Reports Torus AND Drywell pressure are > 25 psig.

CT2 SRO Directs BOP to vent the Torus per QCOP 1600-13, and also states it is OK to exceed release rates.

BOP May start all available Turbine Building and Radwaste Exhaust Fans.

BOP Verifies the following valves are closed:

  • AO 1-1601-23
  • AO 1-1601-24
  • AO 1-1601-60
  • AO 1-1601-61
  • AO 1-1601-62
  • AO 1-1601-63 BOP Evacuates the Reactor AND Turbine Building.

CT2 BOP Places MASTER VENT MODE switch in the APCV position.

BOP Verifies the AO 1-1699-7 valve closed.

CT2 BOP Places the AO 1-1601-24, CIS OVERRIDE, switch in OVERRIDE position for 1 second.

CT2 BOP Simultaneously places the AO 1-1601-23 AND AO 1-1601-60 CIS OVERRIDE switches to the OVERRIDE position and holds them for 1 second.

CT2 BOP Opens the AO 1-1601-24.

Directs BOP to vent to maintain Torus pressure in a specified band SRO below PCPL.

CT2 BOP Verifies Torus level is < 27 ft and opens AO 1-1601-60.

Quad Cities 2014 NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 9 Page 2 of 2 Event

Description:

ADS Tailpipe Rupture and Venting of Containment to Stay Below PCPL Time Position Applicants Actions or Behavior CT2 Initiates venting by cycling the AO 1-1699-6 and monitoring Drywell BOP and Torus pressure.

Monitors the 1/2-1740-19, CHIMNEY GAS ACTIVITY, on the 912-4 BOP panel.

LEAD EVALUATOR: At the discretion of the Lead Evaluator, freeze the simulator.

End of Scenario