Monthly Operating Rept for Apr 1994 for Shearon Harris Nuclear Power Plant Unit 1.W/940511 Ltr
ML18011A433
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/30/1994
From: Robinson W, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-94-039, HNP-94-39, NUDOCS 9405190189
Download: ML18011A433 (5)


Text

ACCELERATED DI UTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROGERS,S.G.

Carolina Power 6 Light Co.ROBINSON,W,R.

Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthly operating rept for A r or Shearon Harris Nuclear Power Plant Unit 940511 r.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.D 05000400/RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DS P/TPAB NRR/DRIL/RPEB RGN2 EXTERNAL EGGG BRYCE i J~H NSIC COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LE,N AEOD/DOA NRR OEAB REG FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:

A D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21 Carolina Power&Light Company PO Box 165 New Hill NC 27562 MAY~1 1994 File: HO-940315 William R.Robinson Vice President Harris Nuclear Plant Serial HNP-94-039 United States Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATIONS REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Unit No.1, Carolina Power 4, Light Company herewith submits the report of operation statistics and shutdown experience for the month of April 1994.Sincerely, W.R.Robinson SGR:dmw Enclosure c: Mr.S.D.Ebneter (NRC-RII)Mr.N.B.Le (NRR)Mr.J.E.Tedrow (NRC-SHNPP)

VOOSie01a9 9eoeso PDR ADOCK 05000400 E PDg C~0 0 gr,r,c<6 StateRoad1134 NewHill NC Tel 919362-2502 Fax 919362-6950 l.CPSL, CO RUN DATE 05/09/94 RUN TIME 10:02:03PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 Enclosure to Serial HNP-94-039 Sheet 1 of 3 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 NOTES l.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERIOD: APRIL 94 3.LICENSED THERMAL FOWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950~9 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET WE): 860.0 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: NQNE 9.POWER LEVEL TO WHICH RESTRICTED IP ANY (NET MWE): NQ'NE 10.REASONS FOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUMUL ATZVE 11.HOURS ZN REPORTING PERZOD 719.00 2879~00 61344.00 12.NUMBER OF HOURS REACTOR CRITICAL~00 1849~83 50152~14 13.REACTOR RESERVE SHUTDOWN HRS.00.00 F 00 14.HOURS GENERATOR ON LINE.00 1849.55 49627.18 15.UNIT RESERVE SHUTDOWN HOURS.00.00.00 16.GROSS THERMAL ENERGY GEN.(MWH).00 5068200.06 132326854.02 17.GROSS ELKS ENERGY GENo (MWH).00 1708521.00 44142742.00 18.NET ELEC.ENERGY GENERATED (MWH)-7821.00 1588518.00 41121915.00 19.UNIT SERVICE FACTOR.00 64.24 80.90 20.UNIT AVAILABILITY FACTOR.00 64.24 80.90 21.UNIT CAP.FACTOR (USING MDC NET)-1.26 64.16 77.95 22.UNIT CAP.FACTOR (USING DER NET)-l.21 61.31 74.48 23.UNIT FORCED OUTAGE RATE~00.00 3'2 24 SHUTDOWNS SCHED~OVER NEXT 6 MONTHS (TYPEi DATEi AND DURATION OF EACH)t Unit was shutdown on March 19, 1994 and remains in refueling outage number S.25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UPcMay 12, 1994 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 MZS/MNTH-OPR.RPT/3/OS4 Enclosure'o

.: ', Serial'HNP-94-039 Sheet 2 of 3~~j CPCL CO PLANT PERFORMANCE DATA SYSTEM RUN DATE 05/05/94 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 11:41:54 HARRIS UNIT 1 PAGE 1 RPD39-000 DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 APRIL 1994 DAY AVE DAILY POWER LEVEL (MWE-NET)DAY AVG.DAILY POWER LEVEL (MWE-NET)-12 17-12 18 19-12 20 21 22 23"12-12 24"6-12 25 10 26 27 12 28"12 13-10 29 30-10 15"9 16-10 1.16-8 MIS/MNTH-OPR.RPT/3/OS4 UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: 5/2/94 COMPLETED BY: S.G.Rogers TELEPHONE:

(919)362-2573 SERIAL NO.: HNP-94-039 REPORT MONTH: APRIL 1994 No.94-007 Date 940319 T1 y P e Duration (Hours)1029.45 R~e a s 0 n Method of Shutting Down Reactor~Licensee Event Report¹N/A System Code 4 ZZ Component Code 5 ZZZZZ Cause 5.Corrective Action to Prevent Recurrence Unit remains in scheduled RFO5 refueling outage.1 F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 5 License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG%1 61)5 Exhibit 1-Same Source~cn+CD CD tA g C o g H tA i O CO lA