ML14035A399
ML14035A399 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 05/31/2013 |
From: | Hansen D B Arizona Public Service Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML14035A409 | List: |
References | |
102-06824-TNW/RKR 3INT-ISI-1, Rev. 2 | |
Download: ML14035A399 (208) | |
Text
3 rd Inspection Interval Inservice Inspection Program Summary Manual PVNGS Unit 1
Arizona Public Service Company PVNGS PO Box 52034 5801 S Wintersburg Road Phoenix, AZ 85072-2034 Tonopah, AZ 85354
Preparer: ____________________________ ___ Reviewer: __________________________________
ANII: __________________________________ Section Leader: ______________________________
Department Leader: __________________________________
Commercial Service Date: 01-28-1986 Program No: 3INT-ISI-1 Rev. 2 1 of 208 3INT-ISI-1 Rev 2 Hansen, Douglas
B(Z41530)Digitally signed by Hansen, Douglas
B(Z41530)
DN: cn=Hansen, Douglas B(Z41530)
Reason: I am the author of this document
Date: 2013.05.31 11:09:56 -07'00' Cox, Jennifer
Y(Z06399)Digitally signed by Cox, Jennifer
Y(Z06399)
DN: cn=Cox, Jennifer Y(Z06399)
Reason: I have reviewed this document Date: 2013.05.31 11:43:33 -07'00'
- Hogstrom, Robert (YH2450)
Digitally signed by Hogstrom, Robert (YH2450) DN: cn=Hogstrom, Robert (YH2450)
Date: 2013.05.31 12:12:52 -07'00' Schrecker, Kenneth
D(Z99981)Digitally signed by Schrecker, Kenneth D(Z99981)
DN: cn=Schrecker, Kenneth D(Z99981)
Reason: I am approving this document Date: 2013.05.31 13:50:08 -07'00' Dilorenzo, Michael
D(Z99838)Digitally signed by Dilorenzo, Michael
D(Z99838)
DN: cn=Dilorenzo, Michael D(Z99838)
Reason: Department Leader, Program
Engineering
Date: 2013.05.31 14:39:47 -07'00' TABLE OF CONTENTS Summary of Changes .3 1.0 Summary ......................................................................................................... 6 2.0 Code Applicability .......................................................................................... 6 3.0 Description ...................................................................................................... 7 3.1 Scope ............................................................................................................ 7 3.2 System Boundaries ....................................................................................... 8 3.3 Accessibility ................................................................................................. 8 3.4 Examination Techniques .............................................................................. 9 3.5 Inspection Intervals ....................................................................................... 9 3.6 Examination Categories .............................................................................. 10 3.7 Evaluation and Repair ................................................................................. 10 3.8 System Pressure Tests................................................................................. 10 3.9 Exemptions ................................................................................................. 10 3.10 Code Cases ................................................................................................. 11 3.11 Outage Plan Table... 11 3.12 References. ......................................................................................... 12 4.0 ASME Class 1 Summary ............................................................................... 13 5.0 ASME Class 2 Summary ............................................................................... 37 6.0 ASME Class 3 Summary ............................................................................... 68 7.0 Augmented Summary .................................................................................... 75 8.0 Requests for Relief ........................................................................................ 87 9.0 Boundary Drawing Listing ............................................................................ 89 10.0 Zone Drawings .............................................................................................. 91 11.0 Terms and Definitions ................................................................................. 206 2 of 208 3INT-ISI-1 Rev 2
SUMMARY
OF CHANGES Revision 2
- 1. Table of Contents, added Summary of Changes
- 2. Table of Contents, added 3.12 References
- 3. Section 1.2.2, added reference to category C-G (ACT 4343138)
- 4. Section 1.2.4, added for reference to reactor vessel internals aging program (CRAI 4353644)
- 5. Section 1.2.5, added reference to MRP 192 mixing tee examinations (CRAI 4312834)
- 6. Section 2.1, added reference to 10CFR50.55a
- 7. Section 2.3, clarified requirements to the Appendix VIII program (CRAI 4378832)
- 8. Section 3.1.2, added references to UFSAR 6.6.1 requirements to Section 3.0 (CRAI 4178275)
- 9. Section 3.2.2, changed last sentence (CRAI 4398773) 10. Section 3.7.2, Corrected the Reference of Relief Request 38 to 36 11. Section 3.10.1, Updated Code Case list to include reference to Code Case N-537 (CRAI 4404322), N-663 (CRAI 4338597) and N-705 (CRAI 4308456) 12. Section 3.10.3, added reference to Calc PV-23Q-405 (N001-0604-00903) (CRAI 4348764) 13. Section 3.12, added to document references 14. B1.22 and B1.40, changed head Serial Number 15. B2.12, changed to 1 foot from 1 inch 16. B3.140, clarified that 10CFR50.55a requires inner radius examinations 17. B6.10 and B6.50, changed examinations to all period 3 18. B-G-2 entire section changed to remove IEB 82-02 examinations and clarify code requirements 19. B9.21, Zone 27, Zone 32 Zone 36, adjusted exam amounts to compensate for inspections and percentages 20. B-L-1 and B-M-1, added note to 2007 Ed 2008 Addenda 21. B13.10, clarified period 2 and 3 requirements 22. B13.70, changed RR 40 reference to 44 23. B-P requirements changed to reference Pressure Test Program 24. F1.10 B, Zones 28, Zone 33, Zone 39 changed amounts and totals 3 of 208 3INT-ISI-1 Rev 2
- 25. C3.20, Zone 45, Zone 106, Zone 107 changed amounts and totals 26. C5.11, Zone 58 and 59 changed examination amounts 27. C5.11, Added MRP 192 examinations to Period 3 28. C5.51, Zone 58 changed amounts and total item numbers 29. C5.81, moved from Augmented tables (CRAI 4178272) 30. C-G, deleted based on use of 2007 Ed 2008 Addenda (ACT 4343138) 31. C-H, requirements changed to reference Pressure Test Program 32. F1.20 B, Zone 97 changed examination amounts and totals 33. F1.20 C, Zone 65 and 97 changed examination amounts and totals 34. B4.30 and B4.40, changed head serial number 35. N-770-1 Item F, rearranged and clarified frequency 36. AUG B-G-1 & B-G-2, removed IEB 82-02 exams (CRAI 4052305). 37. AUG B-P, removed Zone 31 and 37 (stainless steel) 38. AUG C5.51, moved Zone 54 to period 2 39. AHE 5.51, 5.61, and 5.81, adjusted examination requirements (CRAI 4178275) 40. Section 8, added reference to Request for Relief-added RR 48 and 49; clarified list and removed letter references 41. Zone 2, clarified DCID and referenced as built drawing 42. Zone 6, Added note for locations 43. Zones 16, 17, 18 and 19, added boxes around Seal and Flange studs and nuts for clarification 44. Zone 28, removed RC-18-H9 45. Zone 30, added note for valve replacement and that for bolted bonnets 46. Zone 33, deleted RC-58-HA 47. Zone 39, deleted SI-248-H36 48. Zone 51 and 52, added note for EDC valve replacement and referenced new weld numbers 49. Zone 53, added flow arrows (ACT 4402228) 50. Zone 58, added notes for EDC pipe replacement and referenced new weld numbers and materials 51. Zone 59, moved SG-11-H18 to above 120 4 of 208 3INT-ISI-1 Rev 2
- 52. Zone 62, changed 62-15 in line table to 62-18 53. Zone 63, moved AF-6-H2 54. Zone 65, deleted SG-48-H31 55. Zone 83, Added flow arrow (ACT 4402228) 56. Zone 83, 86, 94, and 95 added reference to MRP 192 mixing tee welds 57. Zone 97, deleted SI-220-H3 and changed H27 to B 58. Zone 106, deleted SI-105-HB 59. Zone 107, deleted welded attachment on SI-112-HC 60. Zone 120 and 121, added flow arrows (ACT 4402228) 61. Zone 121, clarified line number 5 of 208 3INT-ISI-1 Rev 2 PALO VERDE NUCLEAR GENERATING STATION UNIT 1 INSERVICE INSPECTION - PROGRAM
SUMMARY
1.0
SUMMARY
1.1 This document contains a detailed description of the 3 rd 10 Year Interval Inservice Inspection (ISI) Program for Palo Verde Nuclear Generating Station Unit 1. This program conforms to the requirements of 10CFR50.55a (g), PVNGS Technical Specifications, and the PVNGS UFSAR. Exceptions that are known as of this document preparation date are included in the Requests for Relief Section 8.0.
1.2 The revision is being prepared to update the ISI Program for the 3 rd 10 Year Interval. This includes the utilization of the 2001 Edition including the 2003 Addenda of ASME Section XI with the exceptions noted below: 1.2.1 Requests for relief from ASME Section XI requirements are included in Section 8.0. These Relief Requests are prepared in a format similar to that documented in the NEI White Paper Revision 1 dated June 2004, entitled: Standard Format for Requests from Commercial Reactor Licensees Pursuant to 10CFR50.55a. 1.2.2 The 2007 Edition thru the 2008 Addenda was utilized for Category B-L-1, B-M-1 and C-G for pump and valve body welds requirements. (Ref. Letter 102-06454 and SER dated 09-18-2012). (ACT 4343138) 1.2.3 For clarification, this Interval 3 program was prepared, as was Interval 1 and 2 programs, utilizing 40 month periods. 1.2.4 To support future ISI Programs, reference to the reactor vessel internals aging management program was added (Reference 3.12.3). (CRAI 4353644) 1.2.5 This program was updated to include MRP 192 examinations of mixing tee locations (Reference 3.12.4). (CRAI 4312834) 1.3 This revision does not utilize risk informed inservice inspection methodology at this time.
1.4 The information presented is in a form consistent with the 1 st and 2 nd 10 Year Interval ISI Program, the applicable requirements of Standard Review Plan manual and procedures and the recommendations contained in NRC letter dated July 17, 1981, from Mr. R.L. Tedesco, NRC, to E. E. Van Brunt, Jr., APS, Guidance for Preparing Preservice and Inservice Inspection Programs and Relief Requests - Palo Verde Nuclear Generating Station Units 1, 2 and 3.
2.0 CODE APPLICABILITY 2.1 Based on paragraph 10 CFR 50.55a(b) (2) that was published 12 months prior to the start of the 3 rd 10 Year Interval (7-17-08), the 2001 Edition including the 2003 Addenda of ASME Section XI was referenced as the Code to utilize for preparation of this program. Several exceptions to this code are documented in 10CFR50.55a; each of these exceptions was utilized during the preparation of this program.
6 of 208 3INT-ISI-1 Rev 2
- The exemptions of IWB-1220 for Class 1 piping must utilize the 1989 Edition.
- When qualifying VT-3 personnel per IWA-2317, the proficiency of the training must be demonstrated by initial qualification examination and subsequent examinations on a 3 year interval.
- The 1997 Edition must be used for IWA-2240 alternative examination methods, a combination of methods, or newly developed techniques.
- Items B3.120 and B3.140 (nozzle inner radius examinations) of the 1998 Edition must be utilized. An enhanced visual examination with a resolution sensitivity to detect a 1-mil wire or crack may be performed in place of an ultrasonic examination.
- Must utilize the 1995 Edition for examination Item B7.80 per 50.55a.
- IWA-2220, Ultrasonic examination methods are prohibited for surface examinations.
- The surface examination requirements for HPSI systems, Items B9.20, B9.21 and B9.22 are not required to be performed.
2.2 If a code required examination was considered to be impractical during the preparation of this document because of plant design, geometry, accessibility or other conditions, a Request for Relief from that requirement was prepared and included in Section 8.0. If a code required examination is identified to be impractical during the course of an inspection and the code required percentages are not met, a request for relief will be prepared and submitted after each inspection period, and the final interval closeout no later than 12 months after expiration of the Interval.
2.3 This ISI Program will implement the ASME Section XI 2001 Edition Appendix VIII (Performance Demonstration for Ultrasonic Examination Systems) in accordance with 10 CFR 50.55a. These examinations will be conducted in accordance with the Performance Demonstration Initiative (PDI). The PDI Code Comparison document (Reference 3.12.2) explains the complex relationship of regulatory requirements, ASME requirements, code editions, and the PDI program. (CRAI 4378832)
3.0 DESCRIPTION
3.1 SCOPE 3.1.1 This Inservice Inspection Program Summary includes all applicable nondestructive examinations required by ASME Section XI as identified below: 1. Examination of ASME Class 1, 2, and 3 pressure retaining components and their supports 3.1.2 This program also includes an augmented section that includes examinations for other items required to be examined as identified below. 1. Examinations of welds in Class 1 components fabricated with Alloy 600/82/182 materials in accordance with 10CFR50.55a and Code Case N-722-1. 2. Examination of the Reactor Vessel Closure Head in accordance with 10CFR50.55a and Code Case N-729-1. 3. Examination of welds in Class 1 piping and vessel nozzle butt welds fabricated with alloy 82/182 in accordance with 10CFR50.55a and Code Case N-770-1.
7 of 208 3INT-ISI-1 Rev 2
- 4. Examination of high energy line piping in accordance with UFSAR 6.6.1. (CRAI 4178275) 5. Examination of the Reactor Coolant Pump Flywheels in accordance with PVNGS Technical Specifications Section ITS 5.5.7.
- 6. USNRC Circulars, Information Notices, Bulletins, or Orders 7. INPO or other industry operating experiences 8. Combustion Engineering or Westinghouse bulletins or notices 9. Special examinations to satisfy other commitments or concerns that are based on operating experiences, USNRC. These examinations are scheduled throughout this program and reference the applicable notification documents.
3.1.3 Those items that may generally be included in an Inservice Inspection Program, but are not included are identified below:
- 1. The inservice testing of snubbers will be performed in accordance with 10CFR50.55a. 2. The inservice examination of steam generator tubing will be performed in accordance with the PVNGS Technical Specifications Section T5.5.9.
- 3. The Examination Program for the ASME Subsections IWE and IWL will be performed in accordance with 10CFR50.55a and the PVNGS Technical
Specifications.
3.2 SYSTEM BOUNDARIES 3.2.1 A complete set of P&ID drawings indicating the Inservice Inspection boundary are maintained at the PVNGS site. These drawings illustrate the ASME Class 1, 2, and 3 systems; components; and boundaries scheduled for examinations and pressure testing. A referenced listing of these drawings is documented in Section 9.0. 3.2.2 A set of ISI (Zone) Drawings is included in Section 10.0. These drawings are utilized for the planning and scheduling of specific ASME Class 1 and 2 examinations throughout the 10 Year Interval. These also document the location and number of welds, components, and supports. These Zone drawings are controlled in conjunction with this program manual. (CRAI 4398773) 3.3 ACCESSIBILITY 3.3.1 The preservice examinations were performed with examination techniques, automated or manual, similar to those planned for use during Inservice Inspections. The examination limitations noted during the preservice examinations were documented in Requests for Relief submitted with the preservice examination program. There has also been a number of additional code limitations noted during the 1 st and 2 nd 10 Year Intervals and Request for Relief submitted. If included in the required 3 rd Interval examinations they will again be evaluated and relief requested. Note Section 8.0 identifies all the reliefs submitted during the preparation and implementation of the 3 rd Interval. 3.3.2 All items that are scheduled for examination will be examined to the extent practical. In addition, any code limitations that are noted during the examinations will be documented. If relief is required from any of these examinations, a Request for Relief 8 of 208 3INT-ISI-1 Rev 2 will be submitted after the relief is discovered and prior to 12 months after the interval ends. 3.4 EXAMINATION TECHNIQUES 3.4.1 The three types of examinations utilized to perform Inservice Inspections, along with the actual nondestructive examination technique, are identified in the legend below: VT - Visual VT - 1 (General Condition) VT - 2 (Leakage) VT - 3 (Mechanical and Structural Condition)
VE (Visual Examination)
S - Surface PT - Liquid Penetrant MT - Magnetic Particle ET - Eddy Current VOL - Volumetric UT - Ultrasonic RT - Radiography 3.4.2 All the above nondestructive examination techniques will be performed using specific techniques and procedures that are identified in ASME Section XI, or alternative examinations that are demonstrated to be equivalent or superior to those identified.
The provision for substitution of these alternative examination methods, combination of methods, or newly developed techniques will utilize the 1997 Addenda for IWA-2240.
3.5 INSPECTION INTERVALS 3.5.1 The Inservice Inspection Program was prepared in accordance with Program B of ASME Section XI. The 1 st , 2 nd, and 3 rd 10 Year Intervals and corresponding inspection periods are defined below: First Inspection Interval: 01-28-86 to 07-17-98 Second Inspection Interval: 07-18-98 to 07-17-08 Third Inspection Interval: 07-18-08 to 07-17-18 Period One: 07-18-08 to 11-17-11 Period Two: 11-18-11 to 03-17-15 Period Three: 03-18-15 to 07-17-18 It should be noted that the intervals/periods may change to allow for extended outage durations per IWA-2400 of ASME Section XI.
9 of 208 3INT-ISI-1 Rev 2 3.6 EXAMINATION CATEGORIES 3.6.1 The examination categories of ASME Section XI were utilized to develop this program for all systems, components, and supports. The Subprogram summary tables contained in Sections 4.0 and 5.0 are organized by examination category for ASME Class 1 and 2 systems, respectively. For each examination category, these tables identify the system or identification, nondestructive examination method, total number of items, required examination amount for each inspection period, and running percentage. For ASME Class 3 systems, the examinations categories are identified in Section 6.0. 3.7 EVALUATION AND REPAIR 3.7.1 The evaluation of all examination results will be performed in accordance with ASME Section XI Articles IWx-3000. In addition, all applicable repairs and replacements will be performed in accordance with ASME Section XI Articles IWX-4000 and 7000. Pressure tests will be performed on welded and mechanical joint repairs or replacements, in accordance with IWx-4000 and 5000 and 10CFR50. Both the evaluations and repair or replacement will be performed in accordance with the 2001 Edition including the 2003 Addenda of ASME Section XI, or later editions and addenda of ASME Section XI referenced in 10CFR50. Later editions and addenda will be documented with the NRC. 3.7.2 It should be noted that a relief was requested (Relief Request 36) to perform repair and replacement of all three PVNGS units to the 2001 Edition including the 2003 Addenda. This request was documented in conjunction with the relief to perform full structural weld metal overlays. 3.7.3 All repairs and replacements will be documented in accordance with the Work Control program, and are maintained at Palo Verde for review.
3.8 SYSTEM PRESSURE TESTS 3.8.1 ASME Class 1, 2, and 3 components will be pressure tested per the requirements of IWB-5000, IWC-5000 and IWD-5000, except where relief has been requested. 3.8.2 Pressure tests will also be performed on repairs and replacements per ASME Section XI, 10CFR50.55a, and the PVNGS Repair and Replacement program.
3.9 EXEMPTIONS 3.9.1 The exemption criteria identified in the 2001 Edition including the 2003 Addenda of ASME Section XI was utilized for all ASME Class 1, 2, and 3 components and systems. The only exception is that required by 10CFR50.55a for the ASME Class 1 piping exemptions. These are in accordance with the 1989 Edition of ASME XI. 3.9.2 A thorough review of all the systems and components was performed in accordance with the above exemptions and a complete set of color coded Inservice Inspection Exemption drawings was prepared. These drawings are maintained at the PVNGS site for review.
10 of 208 3INT-ISI-1 Rev 2 3.10 CODE CASES 3.10.1 The following Code Cases are accepted for use in Regulatory Guide 1.147 and may be utilized during Interval 3 where applicable (CRAIs 4404322, 4338597, and 4308456):
- 1. N-460 Alternative examination coverage for Class 1 and 2 welds 2. N-526 Alternative requirements for successive inspections of Class 1 and 2 vessels 3. N-532-4 Alternative requirements to repair and replacement documentation 4. N-534 Alternative Requirements for Pneumatic Pressure Testing. 5. N-537 Location of Ultrasonic Depth-Sizing Flaws 6. N-566-2 Corrective Action for Leakage Identified at Bolted Connections 7. N-613-1 Ultrasonic examination of full penetration nozzles in vessels 8. N-624 Successive inspections 9. N-652-1 Alternative requirements to categories B-G-1, B-G-2, and C-D bolting 10. N-663 Alternative requirements for Classes 1 and 2 Surface Examinations 11. N-666 Weld Overlay of Class 1, 2, and 3 Socket Welded Connections 12. N-685 Lighting Requirements for Surface Examinations 13. N-695 Alternative for Qualification Requirements for Dissimilar Metal Piping Welds, Appendix VIII Supplement 10 14. N-700 Alternative Rules for Selection of Class 1, 2, and 3 Vessel Welded Attachments for Examination 15. N-705 Evaluation Criteria for Temporary Acceptance of Degradation in Moderate Energy Class 2 or 3 Vessels and Tanks 3.10.2 The following Code Cases are conditionally accepted for use in Regulatory Guide 1.147 may be utilized with the specified conditions during Interval 3 where
applicable:
- 1. N-513-3 Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RG 1.147 documents acceptance condition is that the repair or replacement activity temporarily deferred under the provisions of this Code Case shall be performed during the next scheduled outage.
- 2. N-648-1 Alternative requirements for inner radius examinations of reactor vessel nozzles RG 1.147 documents acceptance condition is that in place of a UT examination, licensees may perform a visual examination with enhanced magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio. The provisions of Table IWB-2500-1, Examination Category B-D, continue to apply except that, in place of examination volumes, the surfaces to be examined are the external surfaces shown in the figures applicable to this table (the external surface is from point M to point N in the figure).
3.10.3 The following Code Cases are required to be utilized by 10CFR50.55a with additional specified conditions. These are planned to be utilized with the specified conditions
during Interval 3:
- 1. N-722-1 Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated With Alloy 600/82/182 Materials 2. N-729-1 Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds 3. N-770-1 Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated With UNS N06082 or UNS W86182 Weld filler Material With or Without Application of Listed Mitigation Activities (Note Reference 3.12.1 CRAI 4348764) 3.11 OUTAGE PLAN TABLE The outage plan table, controlled by procedure 73DP-9XI03 and 73DP-9EE02, identifies the components scheduled for examination including successive examinations from prior periods. The examination procedures and a listing of calibration blocks is also identified.
11 of 208 3INT-ISI-1 Rev 2 3.12 REFERENCES 3.12.1 SDOC N001-0604-00903 (Supplier Dwg No. PV23Q405), DESIGN REPORT FOR PREEMPTIVE WELD OVERLAY REPAIRS PRESSURIZER AND HOT LEG DISSIMILAR METAL WELDS PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2, AND 3 FOR ARIZONA PUBLIC SERVICE, Rev. 1, dated 05/25/2011. (CRAI 4348764) 3.12.2 EPRI 2012 Technical Report 1026510, Nondestructive Evaluation: Performance Demonstration Initiative (PDI) Comparisons to ASME Section XI, Appendix VIII 2007 Edition with 2008 Addendum, and 10CFR50.55a, Year 2011, dated November 2012. (CRAI 4378832) 3.12.3 SDOC MN755-A00003, PWR INTERNALS AMP FOR PALO VERDE, Rev. 0, dated 09/07/2012. (CRAI 4353644) 3.12.4 EPRI 2012 Technical Report 1024994, Materials Reliability Program: Assessment of Residual Heat Removal Mixing Tee Thermal Fatigue in PWR Plants, dated August 2012. (CRAI 4312834)
12 of 208 3INT-ISI-1 Rev 2 SECTION 4.0 ASME CLASS 1 EXAMINATION
SUMMARY
13 of 208 3INT-ISI-1 Rev 2 INDEX EXAM CATEGORIES B-A Pressure Retaining Welds in Reactor Vessel B-B Pressure Retaining Welds in Vessels Other Than Reactor Vessels B-D Full Penetration Welded Nozzles in Vessels B-F Pressure Retaining Dissimilar Metal Welds in Vessel Nozzles B-G-1 Pressure Retaining Bolting, Greater Than 2 Inches in Diameter B-G-2 Pressure Retaining Bolting, 2 Inches and Less in Diameter B-J Pressure Retaining Welds in Piping B-K Welded Attachments for Vessels, Piping, Pumps and Valves B-L-2 & B-M-2 Pump Casings and Valve Bodies B-N-1 Interior of Reactor Vessel B-N-2 Welded Core Support Structures and Interior Attachments to Reactor Vessels B-N-3 Removable Core Support Structures B-O Pressure Retaining Welds in Control Rod Housings B-P All Pressure Retaining Components B-Q Steam Generator Tubing F-A Class 1 Supports 14 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-A; PRESSURE RETAINING WELDS IN REACTOR VESSEL
- Auto exam with core barrel removed
- RR 40; Required R19B1.10SHELL WELDSB1.11CIRCUMFERENTIAL1-Reactor Vesselwelds78173Vol3010 0203*3100 B1.12LONGITUDINAL1-Reactor Vesselwelds78173Vol90100209*3100 B1.20HEAD WELDS B1.21CIRCUMFERENTIALB1.22MERIDIONAL1-Reactor Vessel Bottom Headweld78173Vol10100201*31002-Closure HeadweldN05065-CHA-02Vol0000 RVH Replaced R15B1.30SHELL-TO-FLANGE WELD1-Reactor Vesselweld78173Vol10100201*3100 B1.40HEAD-TO-FLANGE WELD2-Closure HeadweldN05065-CHA-02S & Vol0000 RVH Replaced R15 15 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-B; PRESSURE RETAINING WELDS VESSELS OTHER THAN REACTOR VESSELS
- category running percent----31332255 43100 PRESSURIZE RB2.10SHELL -TO-HEAD WELDSB2.11CIRCUMFERENTIAL 5- Pressurize rweld78373Vol211*13*B2.12LONGITUDINAL **
5- Pressurize rweld65373Vol421**
- 1' of each 23**intesecting circ exam area STEAM GENERATORS ***B2.30HEAD WELDS B2.31CIRCUMFERENTIAL
- Multiple Vessels3- Steam Generator 1weld224Vol112*4- Steam Generator 2weld225Vol1B2.40TUBESHEET TO HEAD3- Steam Generator 1weld224Vol2124- Steam Generator 2weld225Vol213*
16 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-D; FULL PENETRATION WELDED NOZZLES IN VESSELS-INSPECTION PROGRAM B REACTOR VESSEL B3.90NOZZLE-TO-VESSEL WELDS1- Reactor VesselOutlets - 278173Vol66*3100
- Auto exam with Inlets - 4 core barrel removedB3.100NOZZLE INSIDE RADIUS SECTION1- Reactor VesselOutlets - 278173Vol66*3100
- Auto exam with Inlets - 4 core barrel removed PRESSURIZE RB3.110NOZZLE-TO-VESSEL WELDS 5- Pressurize rSurge - 178373Vol62133Spray - 12267Safeties - 423100 B3.120 NOZZLE INSIDE RADIUS SECTION**
5- Pressurize rSurge - 178373Vol62133Spray - 12267Safeties - 423100 17 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS STEAM GENERATORS B3.130NOZZLE-TO-VESSEL WELDS
- B3.130 & B3.140 running percent----41304260 431003- Steam Generator 1Inlet - 1224Vol311*Outlet - 222*4- Steam Generator 2Inlet - 1225Vol311*Outlet - 223*
B3.140 NOZZLE INSIDE RADIUS SECTION
- added inner radius per 10CFR50.55a3- Steam Generator 1Inlet - 1224Vol311*Outlet - 222*4- Steam Generator 2Inlet - 1225Vol311*Outlet - 223*
18 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-F; PRESSURE RETAINING DISSIMILAR METAL WELDS IN VESSEL NOZZLES PRESSURIZE R B5.40NOMINAL PIPE SIZE >
4 INCH NOZZLE TO SAFEEND BUTT
WELDS 20- Surgebutt weldsRC-028-12S & Vol6***
Mitigated with FSWO 29- Spra ybutt weldsRC-018-4S & Vol Moved to augmented31- Safeties (4)butt weldsRC-001-6S & VolRC-003-6S & Vol RC-005-6S & Vol RC-007-6S & Vol 19 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-G-1; PRESSURE RETAINING BOLTING GREATER THAN 2 IN.
IN DIAMETER REACTOR VESSELB6.10CLOSURE HEAD NUTS2- Closure Headnuts7.237 x 7.91"VT-154543100 B6.20CLOSURE STUDS2- Closure Headstuds7.380 x 76.37"Vol541813318266183100 B6.40THREADS IN FLANGE1- Reactor VesselStud Holes78173Vol54000000543100B6.50CLOSURE WASHERS BUSHINGS2- Closure HeadWashers7.50 x 1.27VT-154543100
PUMPSB6.180BOLTS AND STUDS 16- Reactor Coolant Pump 1 AFlange Studs4.33 x 32.87Vol16163100
- Multiple pumps17- Reactor Coolant Pump 1BFlange Studs4.33 x 32.87Vol16**
18- Reactor Coolant Pump 2 AFlange Studs4.33 x 32.87Vol16**19- Reactor Coolant Pump 2BFlange Studs4.33 x 32.87Vol16**
B6.190 FLANGE SURFACE WHEN CONNECTION DISASSEMBLED
- VT-1 exams on 1 pump per interval (with B12.XX exams) 16- Reactor Coolant Pump 1 Asurface1109-1 AVT-11******17- Reactor Coolant Pump 1Bsurface1109-1BVT-11******
18- Reactor Coolant Pump 2 Asurface1109-2 AVT-11******19- Reactor Coolant Pump 2Bsurface1109-2BVT-11******
20 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSB6.200NUTS, BUSHINGS, AND WASHERS
- VT-1 exams on 1 pump per interval (with
B12.XX exams) 16- Reactor Coolant Pump 1 Anuts & ring1109-1 AVT-116******17- Reactor Coolant Pump 1Bnuts & ring1109-1BVT-116******
18- Reactor Coolant Pump 2 Anuts & ring1109-2 AVT-116******19- Reactor Coolant Pump 2Bnuts & ring1109-2BVT-116******
21 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-G-2; PRESSURE RETAINING BOLTING 2 IN. AND LESS IN DIAMETER* Bolting is required to be examined:
PRESSURIZE R 1. when disassembledB7.20BOLTS, STUDS AND NUTS
- 2. only 1 per interval 5- Pressurizer Manwa yStuds & Nuts1.31 x 14.5VT-12020**
STEAM GENERATORB7.30BOLTS, STUDS AND NUTS3- Steam Generator 1 MANWAYSStuds & Nuts1.31 x 14.5VT-14040**4- Steam Generator 2 MANWAYSStuds & Nuts1.31 x 14.5VT-14040**
PIPING**only 1 of the Z31B7.50BOLTS, STUDS AND NUTS bolted connections is31- Pressurizer SafetiesFlange BoltingRC-001-6VT-188*&***&**
requiredFlange BoltingRC-003-6VT-188*&***&**Flange BoltingRC-005-6VT-188*&***&**
Flange BoltingRC-007-6VT-188*&***&**37- Charging LineFlange V435CH-005-2VT-188**
PUMPSB7.60BOLTS, STUDS AND NUTS 16- Reactor Coolant Pump 1 A seal cove r1.1 x 8.27VT-11616**17- Reactor Coolant Pump 1Bseal cove r1.1 x 8.27VT-11616**
18- Reactor Coolant Pump 2 A seal cove r1.1 x 8.27VT-11616**19- Reactor Coolant Pump 2Bseal cove r1.1 x 8.27VT-11616**
VALVESB7.70BOLTS, STUDS AND NUTS31- Pressurizer Safeties PSV-200RC-001-6VT-11212**
(Body Bolts
)PSV-201RC-003-6VT-11212**
PSV-202RC-005-6VT-11212**
PSV-203RC-007-6VT-11212**
30- Aux Pressurizer Spra yHV-203CH-521-2VT-144**
HV-205CH-520-2VT-144**
22 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS CRD HOUSING
- When disassembled and only once per
intervalB7.80BOLTS, STUDS AND NUTS 2-Closure Head RVLMS Locations Grayloc ClampsCEDM 92VT-144********
23 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-J; PRESSURE RETAINING WELDS IN PIPINGB9.10NPS 4 OR LARGER
- SURFACE EXAMSB9.11* CIRCUMFERENTIAL WELDS NOT REQUIRED 6- RCS Primary PipingHL 1**butt weldsRC-032-42 IDS* & Vol66619
- SURFACE EXAMS CL 2A to RCPbutt weldsRC-073-30 ID NOT REQUIREDCL 2B to RCPbutt weldsRC-084-30 ID WITHCL 1A to RPV**butt weldsRC-034-30 ID AUTO EXAMINATIONSCL 1B to RPV**butt weldsRC-031-30 ID (EWR-3673722 & CL 2A to RPV**butt weldsRC-079-30 ID CODE CASE N663)CL 2B to RPV**butt weldsRC-093-30 ID20- Pressurizer Surge Linebutt weldsRC-028-12S & Vol11129 DM MOVED TO AUG232721- Shutdown Cooling Loop 1butt weldsRC-051-16"S & Vol283114 DM MOVED TO AUG SI-240-16 4228 22- Shutdown Cooling Loop 2butt weldsRC-068-16S & Vol27217 DM MOVED TO AUG SI-193-16" 22143326 23- Safety Injection 1 Abutt weldsSI-207-14S & Vol192110 DM MOVED TO AUGSI-203-12332624- Safety Injection 1Bbutt weldsSI-223-14S & Vol186233 DM MOVED TO AUG SI-221-12 25- Safety Injection 2 Abutt weldsSI-160-14S & Vol226327 DM MOVED TO AUG SI-156-1226- Safety Injection 2Bbutt weldsSI-179-14S & Vol205325 DM MOVED TO AUG SI-175-12 24 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS 28 & 29- Pressurizer Spra ybutt weldsRC-018-4S & Vol161161212 232531- Pressurizer Safetiesbutt weldsRC-001-6S & Vol12118RC-003-61217 RC-005-61325
RC-007-636- Letdown Line (delay coil
)butt weldsRC-091-16S & Vol41325B9.20LESS THAN NPS 4 B9.21* CIRCUMFERENTIAL WELDS OTHER THAN PWR HPSI SYSTEMS 27- Pressurizer Spray 1 Abutt weldsRC-062-3S4010125 DM MOVED TO AUG RC-016-328- Pressurizer Spray 1Bbutt weldsRC-017-3S3710326 DM MOVED TO AUG RC-018-330- Aux Pressurizer Spra ybutt weldsCH-009-2S113227 CH-520-2 CH-521-232- Drain Line Loop 1 Abutt weldsRC-060-2S51120 DM MOVED TO AUG 33- Drain Line Loop 1Bbutt weldsRC-058-2S52240 DM MOVED TO AUG 34- Drain Line Loop 2 Abutt weldsRC-096-2S52340 DM MOVED TO AUG35- Drain Line Loop 2Bbutt weldsRC-089-2S5234036- Letdown Linebutt weldsRC-091-2S70518 DM MOVED TO AUGCH-001-26216732537- Charging Linebutt weldsCH-005-3S63517 25 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSCH-005-25216632538- Drain Line Loop 1butt weldsRC-070-2S112100 B9.22 CIRCUMFERENTIAL WELDS OF PWR HPSI SYSTEMS39- HPSI Long Term Recirculation 1butt weldsSI-248-3Vol526211832740- HPSI Long Term Recirculation 2butt weldsSI-199-3Vol2731114226 B9.30 BRANCH PIPE CONNECTION WELDSB9.31NPS 4 OR LARGER
- 9.31 running percent---711141328 6- RCS Primary PipingSurgebranch weldRC-032-42 IDS & Vol1SD Cooling 1branch weldRC-032-42 IDS & Vol1 SD Cooling 2branch weldRC-063-42 IDS & Vol1 SI 1 Abranch weldRC-034-30 IDS & Vol1SI 1Bbranch weldRC-031-30 IDS & Vol1
SI 2 Abranch weldRC-079-30 IDS & Vol1SI 2Bbranch weldRC-093-30 IDS & Vol1B9.32LESS THAN NPS 4
- 9.32 running percent---141171214 2328 6- RCS Primary Piping Drain 1 Abranch weldRC-033-30 IDS 1 PZR Spray 1 Abranch weldRC-034-30 IDS 1Drain 1Bbranch weldRC-030-30 IDS 1PZR Spray 1Bbranch weldRC-031-30 IDS 1 Drain 2 Abranch weldRC-073-30 IDS 1 26 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSChargingbranch weldRC-079-30 IDS 1Letdownbranch weldRC-084-30 IDS 121- Shutdown Cooling Loop 1branch weldRC-051-16S2 2 Drain & 3" HPSI 22- Shutdown Cooling Loop 2branch weldRC-068-16S1 3" HPSI36- Letdown Linebranch weldRC-091-16S4B9.40SOCKET WELDS
- 9.40 running percent---17211212182329 32- Drain Line Loop 1 Asocket weldRC-060-2S333- Drain Line Loop 1Bsocket weldRC-058-2S3 34- Drain Line Loop 2 Asocket weldRC-096-2S335- Drain Line Loop 2Bsocket weldRC-089-2S3 38- Drain Line Loop 1socket weldRC-070-2S137- Charging Linesocket weldCH-005-3S4 27 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-K; WELDED ATTACHMENTS FOR VESSELS. PIPING, PUMPS AND VALVES PRESSURE VESSELSB10.10WELDED ATTACHMENTS
- Accessible Side3- Steam Generator 1 *support skirt224S**11250
- Multiple vessels4 -Steam Generator 2 *support skirt225S**1 5- Pressurize rsupport skirt78373S**113100 PIPINGB10.20WELDED ATTACHMENTS
- B10.20 running percent---13118131522- Shutdown Cooling 2attachmentSI-193-16S1RC-068-16"S1 27- PZR Spray 1 AattachmentRC-062-3"S1 28- PZR Spray 1BattachmentRC-017-3"S1 29- Combined PZR Spra yattachmentRC-18-3"S136- Letdown LineattachmentRC-091-16S437- Charging LineattachmentCH-005-3"S340- HPSI Long Term 2attachmentSI-199-3"S1 28 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-L-1, PRESSURE RETAINING WELDS IN PUMP CASINGS; B-M-1, PRESSURE RETAINING WELDS IN VALVE BODIES; B-L-2, PUMP CASINGS; B-M-2, VALVE BODIES EXAM CATEGORIES B-L-1 AND B-M-1
DELETED IN THE 2007 ED 2008 ADDB12.20PUMP CASING 16- Reactor Coolant Pump 1 Acasing1109-1 AVT-341**Exam required when17- Reactor Coolant Pump 1Bcasing1109-1BVT-3 pump is disassembled 18- Reactor Coolant Pump 2 Acasing1109-2 A VT-319- Reactor Coolant Pump 2Bcasing1109-2BVT-3B12.50VALVE BODY, EXCEEDING NPS 4
16" Borg Warner Gate Valves
Utilizing Forged ConstructionZone 21UV-651RC-051-16VT-341**
Exam required whenUV-653SI-240-16VT-3 valve is disassembledZone 22UV-652RC-068-16VT-3UV-654SI-193-16VT-3 14" Borg Warner Gate Valves Utilizing Forged ConstructionZone 23UV-634SI-207-14VT-341**
Exam required whenZone 24UV-644SI-223-14VT-3 valve is disassembledZone 25UV-614SI-160-14VT-3 Zone 26UV-624SI-179-14VT-3 12" Borg Warner Check Valves Utilizing Cast ConstructionZone 23V-542SI-203-12"VT-341**
Exam required whenZone 24V-543SI-221-12VT-3 valve is disassembledZone 25V-540SI-156-12VT-3 Zone 26V-541SI-175-12VT-3 14" Borg Warner Check Valves Utilizing Cast ConstructionZone 23V-235SI-207-14VT-381**
Exam required whenV-237SI-207-14VT-3 valve is disassembledZone 24V-245SI-223-14VT-3 29 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSV-247SI-223-14VT-3Zone 25V-215SI-160-14VT-3V-217SI-160-14VT-3Zone 26V-225SI-179-14VT-3V-227SI-179-14VT-3 Dresser PSV Utilizing Forged ConstructionZone 31PSV-200RC-001-6VT-341**
Exam required whenPSV-201RC-003-6VT-3 valve is disassembledPSV-202RC-005-6VT-3PSV-203RC-007-6VT-3 30 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-N-1, INTERIOR OF REACTOR VESSEL; B-N-2, WELDED CORE SUPPORT STRUCTURES AND INTERIOR ATTACHMENTS TO REACTOR VESSELS; B-N-3, REMOVABLE CORE SUPPORT STRUCTURESB13.10VESSEL INTERIOR At 3 year intervals 1- Reactor Vessel accessible areas78173VT-3111100 R17, R19, and R211210013100B13.50INTERIOR ATTACHMENTS WITHIN BELTLINE REGION 1- Reactor Vessel accessible welds78173VT-1113100B13.60INTERIOR ATTACHMENTS BEYOND BELTLINE REGION
1- Reactor Vessel accessible welds78173VT-3113100B13.70CORE SUPPORT STRUCTURE 1- Reactor Vessel accessible areas78173VT-3113100 R19 (note RR 44) 31 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-O; PRESSURE RETAINING WELDS IN CONTROL ROD HOUSINGS*exam category running percent---12601**Replaced RV Head423 R15638B14.10WELDS IN CRD HOUSING 32 peripheral 2- Reactor Vessel Lower Housing66 thru 97Vol32 Closure Head CEDM Housings 2- Reactor Vessel Upper Housing66 thru 97Vol32 Closure Head CEDM Housings 2- Reactor Vessel Lower Tube66-91,93-95,97Vol32 Closure Head RVLMS 92 and 96 CEDM Housings 2- Reactor Vessel Upper Tube66-91,93-95,97Vol30 Closure Head CEDM Housings 32 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-P; ALL PRESSURE RETAINING COMPONENTS Pressure Test Program EXAM CATEGORY B-Q; STEAM GENERATOR TUBING
- Governed by Plant Tech SpecificationsB16.20STEAM GENERATOR TUBING IN*********************
U-TUBE DESIGN 33 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY F-A; SUPPORTSF1.10CLASS 1 PIPING SUPPORTS RESTRAINTS
- F-A; A running percen tNONE F1.10CLASS 1 PIPING SUPPORTS RESTRAINTS
- F-A; B running percen t---817198218 832820- Pressurizer Surge LinesupportsRC-28-12VT-3121- Shutdown Cooling 1supportsRC-51-16VT-314SI-240-16 22- Shutdown Cooling supportsSI-193-16VT-34 23- Safety Injection 1 AsupportsSI-207-14VT-31 25- Safety Injection 2 AsupportsSI-156-12VT-3126- Safety Injection 2BsupportsSI-179-14VT-32 SI-175-12 27- Pressurizer Spray 1 AsupportsRC-62-3VT-38 RC-16-328- Pressurizer Spray 1BsupportsRC-17-3VT-39 RC-18-3RC-18-430- Aux Pressurizer Spra ysupportsCH-521-2VT-31 32- Drain Line 1 AsupportsRC-60-2VT-3133- Drain Line 1BsupportsRC-58-2VT-30 36- Letdown LinesupportsRC-91-2VT-315 CH-001-2 RC-91-1637- Charging LinesupportsCH-5-3VT-316 39- HPSI Long Term Recirculation 1supportsSI-248-3VT-3540- HPSI Long Term Recirculation 2supportsSI-199-3VT-33 34 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSF1.10CLASS 1 PIPING SUPPORTS C-SUPPORTS THAT ALLOW THERMAL MOVEMENT (SPRING)
- F-A; C running percen t---473174215532620- Pressurizer Surge LinesupportsRC-28-12VT-3321- Shutdown Cooling 1supportsSI-240-16VT-33 22- Shutdown Cooling supportsRC-68-16VT-32 23- Safety Injection 1 AsupportsSI-207-14VT-3424- Safety Injection 1BsupportsSI-223-14VT-37
25- Safety Injection 2 AsupportsSI-160-14VT-3126- Safety Injection 2BsupportsSI-179-14VT-32 SI-175-12 27- Pressurizer Spray 1 AsupportsRC-62-3VT-3328- Pressurizer Spray 1BsupportsRC-17-3VT-33
29- Combined Pressurizer Spra ysupportsRC-18-4VT-33 30- Aux Pressurizer Spra ysupportsCH-521-2VT-3137- Charging LinesupportsCH-5-3VT-31139- HPSI Long Term Recirculation 1supportsSI-248-3VT-33 40- HPSI Long Term Recirculation 2supportsSI-199-3VT-31 35 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSF1.40SUPPORTS OTHER THAN PIPING SUPPORTS
- F-A; B running percent---144128**14 req'd due to 4256 multiple components631001 - Reactor Vesselcolumns78173VT-343 - Steam Generator 1*skirt224VT-31*multiple comp4 - Steam Generator-2*skirt225VT-31
5 - Pressurize rskirt78373VT-3116- Reactor Coolant Pump 1A**columns1109-1 AVT-38**multiple comp17- Reactor Coolant Pump 1B**columns1109-1BVT-38 18- Reactor Coolant Pump 2A**columns1109-2 AVT-3819- Reactor Coolant Pump 2B**columns1109-2BVT-38F1.40SUPPORTS OTHER THAN PIPING SUPPORTS
- F-A; C running percen t---8**1250
- 2 req'd due to 13100 multiple components16- Reactor Coolant Pump 1A**snubbers1109-1 AVT-32**multiple comp17- Reactor Coolant Pump 1B**snubbers1109-1BVT-3218- Reactor Coolant Pump 2A**snubbers1109-2 AVT-3219- Reactor Coolant Pump 2B**snubbers1109-2BVT-32 36 of 208 3INT-ISI-1 Rev 2
SECTION 5.0 ASME CLASS 2 EXAMINATION
SUMMARY
37 of 208 3INT-ISI-1 Rev 2 INDEX EXAM CATEGORY C-A Pressure Retaining Welds in Pressure Vessels C-B Pressure Retaining Nozzle Welds in Vessels C-C Welded Attachments for Vessels, Piping, Pumps, and Valves C-D Pressure Retaining Bolting Greater than 2 Inch in Diameter C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping C-G Pressure Retaining Welds in Pumps and Valves C-H All Pressure Retaining Components F-A Class 2 Supports 38 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS EXAM CATEGORY C-A; PRESSURE RETAINING WELDS IN PRESSURE VESSELS
- category running percent---23**4123
- 23 Total, 17 REQ'D8270 multiple vessels53100 STEAM GENERATOR SC1.10SHELL CIRCUMFERENTIAL WELDS (shell to conical section)41- Steam Generator 1welds224Vol222
42- Steam Generator 2welds225Vol2C1.20HEAD CIRCUMFERENTIAL WELDS (head to shell)41- Steam Generator 1welds224Vol11242- Steam Generator 2welds225Vol1C1.30TUBESHEET-TO-SHELL WELDS41- Steam Generator 1welds224Vol11242- Steam Generator 2welds225Vol1 REGENERATIVE HEAT EXCHANGE RC1.10SHELL CIRCUMFERENTIAL WELDS 68- Regenerative Heat Exchangerwelds79119Vol333 C1.20HEAD CIRCUMFERENTIAL WELDS 68- Regenerative Heat Exchangerwelds79119Vol223C1.30TUBESHEET-TO-SHELL WELDS68- Regenerative Heat Exchangerwelds79119Vol442 LETDOWN HEAT EXCHANGERC1.10SHELL CIRCUMFERENTIAL WELDS 69- Letdown Heat ExchangerweldsN2370Vol111 39 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS C1.30TUBESHEET-TO-SHELL WELDS69- Letdown Heat ExchangerweldsN2370Vol111 SHUTDOWN COOLING HEAT EXCHC1.10SHELL CIRCUMFERENTIAL WELDS (shell to flange) 84- SDCHX AweldsS-18341Vol111
87- SDCHX BweldsS-18342Vol1C1.30TUBESHEET-TO-SHELL WELDS 84- SDCHX AweldsS-18341Vol111
87- SDCHX BweldsS-18342Vol1 40 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS EXAM CATEGORY C-B; PRESSURE RETAINING NOZZLE WELDS IN VESSELS C2.20NOZZLES WITHOUT REINFORCING PLATE IN VESSELS >1/2 IN.
NOMINAL THICKNESS C2.21 NOZZLE-TO-SHELL (NOZZLE TO HEAD OR NOZZLE TO NOZZLE)
WELD*C2.21 running percent---20**2120
- 20 Total, 10 REQ'D4260 multiple vessels43100 41- Steam Generator 1welds224S & Vol84242- Steam Generator 2welds225S & Vol84384- SDCHX AweldsS-18341S & Vol221 87- SDCHX BweldsS-18342S & Vol20 C2.22NOZZLE INSIDE RADIUS SECTION
- C2.22 running percent---12**2133
- 12 Total, 6 REQ'D2267 multiple vessels2310041- Steam Generator 1welds224Vol42242- Steam Generator 2welds225Vol42384- SDCHX AweldsS-18341Vol221 87- SDCHX BweldsS-18342Vol20 41 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS EXAM CATEGORY C-C; WELDED ATTACHMENTS FOR VESSELS, PIPING, PUMPS, AND VALVES PRESSURE VESSELSC3.10WELDED ATTACHMENTS
- C3.10 running percent---6**2150
- 6 Total; 4 REQD23100 Multiple Vessels Multiple Vessels41- Steam Generator 1lugs224S22142- Steam Generator 2lugs225S2 68- Regenerative Heat Exchange rsupports79119S223 PIPING C3.20WELDED ATTACHMENTS
- C3.20 running percent---2891013 827 1431143- Main Steam SG 1 East attachmentSG-036S2 44- Main Steam SG 1 WestattachmentSG-033S2 45- Main Steam SG 2 EastattachmentSG-042S22346- Main Steam SG 2 WestattachmentSG-045S254- Feedwater SG No. 1attachmentSG-002S655- Feedwater SG No. 2attachmentSG-005S611 56- Feedwater SG No. 1attachmentSG-202S1 57- Feedwater SG No. 2attachmentSG-205S1 58- Aux Feed S/G 1attachmentSG-008S1 42 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS59- Aux Feed S/G 2attachmentSG-011S262- Auxiliary Feedwater SG 1attachment AF-018S11163- Auxiliary Feedwater SG 1attachment AF-016S164- Blowdown SG 1attachmentSG-039S6 SG-05365- Blowdown SG 2attachmentSG-048S812 SG-05270- LPSI Pump Room A SuctionattachmentSI-067S3 SI-241 SI-30771- LPSI Pump Room A DischargeattachmentSI-078S4 SI-08773- LPSI Pump Room B SuctionattachmentSI-034S2 SI-30874- LPSI Pump Room B DischargeattachmentSI-129S3 76- CS Pump Room A SuctionattachmentSI-009S2 SI-06777- CS Pump Room A DischargeattachmentSI-079S613 SI-08279- CS Pump Room B SuctionattachmentSI-033S1 SI-03480- CS Pump Room B DischargeattachmentSI-119S4 82- SDCHX Room AattachmentSI-078S3 SI-079 43 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS83- SDCHX Room AattachmentSI-070S1121 SI-082 SI-087 SI-089 SI-09085- SDCHX Room BattachmentSI-119S612 SI-12386- SDCHX Room BattachmentSI-072S1223 SI-129 SI-134 SI-13588- East WrapattachmentSI-072S4 SI-07389- East WrapattachmentSI-173S3 SI-19490- East WrapattachmentSI-134S1 91- West WrapattachmentSI-070S492- West WrapattachmentSI-002S511 SI-239 SI-24193- West WrapattachmentSI-089S194- A Train Pipe Chase & 88'attachmentSI-070S912 SI-089 SI-24195- B Train Pipe Chase & 88'attachmentSI-072S913 SI-134 SI-194 44 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS96- Containment LPSI to 1AattachmentSI-202S497- Containment LPSI to 1BattachmentSI-220S6 98- Containment LPSI to 2AattachmentSI-155S299- Containment LPSI to 2BattachmentSI-174S2 100- Containment LPSI A SuctionattachmentSI-007S2 SI-369101- Containment LPSI B SuctionattachmentSI-030S3 SI-194 SI-368 102- SI Pump Suction AattachmentSI-008S911 SI-009 SI-307103- Refueling Water Suction AattachmentCH-142S812 CH-424104- SI Pump Suction BattachmentSI-031S4 SI-033 SI-308105- Refueling Water Suction BattachmentCH-149S1533 CH-425106- HPSI Room Discharge AattachmentSI-099S1911 SI-100 SI-105 SI-106107- HPSI Room Discharge BattachmentSI-107S1232 SI-112 45 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS108- HPSI 88 PipechaseattachmentSI-100S1423 SI-118109- HPSI 88 PipechaseattachmentSI-107S911110- HPSI Discharge West WrapattachmentSI-103S612 SI-107 SI-218 SI-236111- HPSI Discharge West WrapattachmentSI-100S2 112- HPSI Discharge East WrapattachmentSI-100S4 SI-101 SI-102 SI-176113- HPSI DischargeattachmentSI-107S4 SI-157 SI-176118- HPSI Long TermattachmentSI-106S1833119- HPSI Long TermattachmentSI-114S1221 46 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS PUMPSC3.30WELDED ATTACHMENTS
- C3.30 running percent---20**1310
- 20 Total, 10 REQ'D Multiple Vessels 72- LPSI Pump Alugs0876-36S375- LPSI Pump Blugs0876-37S378- Containment Spray Alugs0876-38S381- Containment Spray Blugs0876-39S3
116- HPSI Alugs0776-14S4117- HPSI Blugs0776-15S413 47 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS EXAM CATEGORY C-D; PRESSURE RETAINING BOLTING GREATER THAN 2 in.
IN DIAMETER
- category running percent---10**1133
- 10 total 3 required1267 Multiple Items13100 PUMPSC4.30BOLTS AND STUDS116- HPSI A16 studs0776-14VOL1117- HPSI B16 studs0776-15VOL111 VALVESC4.40BOLTS AND STUDS47- Main Steam SG 1 West 20 studsUV-170VOL112 48- Main Steam SG 1 East20 studsUV-180VOL1 49- Main Steam SG 2 East20 studsUV-171VOL150- Main Steam SG 2 West20 studsUV-181VOL156- Feedwater SG No. 120 studsUV-132VOL113UV-174157- Feedwater SG No. 220 studsUV-137VOL1UV-1771 48 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS EXAM CATEGORY C-F-1; PRESSURE RETAINING WELDS IN AUSTENITIC STAINLESS STEEL OR HIGH ALLOY PIPING C5.10PIPING WELDS >
3/8 IN NOMINAL WALL THICKNESS FOR PIPING
>NPS 4C5.11CIRCUMFERENTIAL WELD
- C5.11 running percent---5181712
- 1097 WELDS USED2524 FOR % DUE TO C-F-14038 Note 258-Aux Feed S/G 16 x 0.562 AF-004S & Vol29416 x 0.432SG-0088 x 0.500SG-00859-Aux Feed S/G 26 x 0.562 AF-006S & Vol33216 x 0.432SG-011428 x 0.500SG-01162-Aux Feed S/G 16 x 0.562 AF-004S & Vol1833 A F-01863-Aux Feed S/G 26 x 0.562 AF-006S & Vol1631 A F-01670-LPSI Pump Room A Suction20 x 0.375SI-307S & Vol204173-LPSI Pump Room B SuctionSI-30882 & 85 SDC Heat Exch20 x 0.500SI-078S & Vol822Room A & BSI-12383 & 86 SDC Heat Exch14 x 0.375SI-90S & Vol5472Room A & BSI-13583 MRP 192 Exams16 x 0.375SI-70 SI-7220 x 0.500SI-70 SI-72 49 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS88 & 91 Safety Injection12 x 0.375SI-72S & Vol79123East and West WrapsSI-73 SI-70 SI-7112 x 1.125SI-155 SI-174 SI-72 SI-73 SI-70 SI-71 SI-202 SI-22020 x 0.500SI-72 SI-70 90 & 93 Safety Injection24 x 0.375SI-30S & Vol10East and West WrapsSI-724 x 0.562SI-308 SI-307 94 & 95 Safety Injection A &
B20 x 0.500SI-70S & Vol1532SI-7223 MRP 192 Exams96, 97, 98, 99 Containment LPSI12 x 1.125SI-202S & Vol108143Loop 1A, 1B, 2A & 2BSI-22022 SI-155 SI-17412 x 1.312SI-202 SI-220 SI-155 SI-174100 & 101 Containment LPSI16 x 1.594SI-241S & Vol812Loop A & B, SuctionSI-19424 x 0.375SI-7 SI-30 50 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS102-Safety Injection A Suction24 x 0.562 SI-307S & Vol194120 x 0.375SI-307103-Refueling Water Tank Suction A20 x 0.375CH-424S & Vol356220 x 0.375CH-142104-Safety Injection B Suction24 x 0.562SI-308S & Vol194320 x 0.375SI-308105-Refueling Water Tank B Suction20 x 0.375CH-425S & Vol477320 x 0.375CH-149 C5.20 PIPING WELDS > 1/5 IN NOMINAL WALL THICKNESS FOR PIPING > NPS 2 AND <
NPS 4C5.21CIRCUMFERENTIAL WELD
- C5.21 running percent---5841012 1825 1838104 SI B Train Suction3 X 0.216CH-150S & Vol413 106 & 107 HPSI Room Discharge4 x 0.438SI-100S & Vol139101 A and B4 x 0.337SI-99 SI-1073 x 0.438SI-106 SI-1072 x 0.344SI-105 SI-112 108 & 109 HPSI 88 Pipechas e4 x 0.438SI-100S & Vol88722 x 0344SI-1184 x 0.377SI-107 51 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS110 & 111 HPSI Discharge4 x 0.337SI-107S & Vol10583West Wrap4 x 0.438SI-218 SI-100 SI-2363 x 0.438SI-218 SI-2362 x 0.344SI-103 SI-107 SI-110 SI-218 SI-236 SI-100112 & 113 HPSI Discharge4 x 0.337SI-107S & Vol9782East Wrap4 x 0.438SI-100 SI-176 SI-1573 x 0.438SI-176 SI-1572 x 0.344SI-101 SI-102 SI-108 SI-109 SI-157 SI-176 114 & 115 HPSI Heade r3 x 0.438SI-218S & Vol4532Loop 1A, 1B, 2A & 2BSI-236 SI-157 SI-176118 & 119 HPSI Long Term3 x 0.438SI-106S & Vol10693 SI-1142 x 0.344SI-319 52 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKSC5.30SOCKET WELDS106 & 107 HPSI Room Discharge2 x 0.344SI-105S31317 A and BSI-112S3 C5.40 PIPE BRANCH CONNECTIONS OF BRANCH PIPING >
NPS 2C5.41CIRCUMFERENTIAL
- C5.41 running percent---27114 127 131182 & 85 SDC Heat Exch20 x 10SI-78S211Room A & BSI-123S283 & 86 SDC Heat Exch20 x 6SI-70S413Room A & B20 x 10SI-72S4 20 x 1488 & 91 Safety Injection20 x 12SI-70S1East and West WrapsSI-72S189 & 92 SDC Suction18 x 12SI-194S1East and West WrapsSI-241S196, 97, 98, 99 Containment LPSI12 x 3SI-202S112Loop 1A, 1B, 2A & 2BSI-220S1SI-155S1SI-174S1102-Safety Injection A Suction24 x 10SI-307S3 24 x 18 24 x 20104-Safety Injection B Suction24 x 10SI-308S4 24 x 1824 x 2024 x 3 53 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS EXAM CATEGORY C-F-2; PRESSURE RETAINING WELDS IN CARBON OR LOW ALLOY STEEL PIPING
- Note exam items are in Aug Summary C5.50PIPING WELDS >
3/8 IN NOMINAL WALL THICKNESS FOR PIPING
>NPS 4C5.51CIRCUMFERENTIAL WELD
- C5.51 running percent---3248121025 103843- Main Steam SG 1 East Butt WeldsSG-36-28S & Vol1911 SG-36-3244- Main Steam SG 1 WestButt WeldsSG-33-28S & Vol2122 SG-33-3245- Main Steam SG 2 EastButt WeldsSG-42-28S & Vol1913 SG-42-3246- Main Steam SG 2 WestButt WeldsSG-45-28S & Vol2121 SG-45-3247- Main Steam SG 1 West Butt Welds**S & Vol**48- Main Steam SG 1 EastButt Welds**S & Vol**49- Main Steam SG 2 EastButt Welds**S & Vol**
50- Main Steam SG 2 WestButt Welds**S & Vol**
51- Atmospheric Dump No. 1Butt Welds**S & Vol**
52- Atmospheric Dump No. 2Butt Welds**S & Vol**
53- Steam to Aux Feedwate rButt Welds**S & Vol**
54 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS54- Feedwater SG No. 1Butt WeldsSG-2-24S & Vol6243 SG-2-16 SG-2-14SG-13-16SG-13-1455- Feedwater SG No. 2Butt WeldsSG-5-24S & Vol5851 SG-5-16SG-5-14SG-14-16SG-14-1456- Feedwater SG No. 1Butt WeldsSG-201-24S & Vol**
SG-202-2457- Feedwater SG No. 2Butt WeldsSG-204-24S & Vol**
SG-205-2458- Aux & Downcomer FW SG 1Butt WeldsSG-8-6S & Vol1422 SG-8-859- Aux & Downcomer FW SG 2Butt WeldsSG-11-6S & Vol1123 SG-11-860- Downcomer Feedwater SG 1Butt WeldsSG-200-8S & Vol**
SG-008-861- Downcomer Feedwater SG 2Butt WeldsSG-203-8S & Vol**
SG-11-864- Blowdown SG 1Butt WeldsSG-39-6S & Vol5052 SG-53-6SG-522-665- Blowdown SG 2Butt WeldsSG-48-6S & Vol4943 SG-52-6SG-523-6 55 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS66- Blowdown SG 1Butt WeldsSG-39-6S & Vol**67- Blowdown SG 2Butt WeldsSG 6S & Vol**
C5.80 PIPE BRANCH CONNECTIONS OF BRANCH PIPING >
NPS 2C5.81CIRCUMFERENTIAL
- category running percent307122 1228 1310047- Main Steam SG 1 West 28 x 12SG-206-28S & Vol771 28 x 648- Main Steam SG 1 East28 x 12SG-207-28S & Vol812 28 x 649- Main Steam SG 2 East28 x 12SG-208-28S & Vol8 28 x 650- Main Steam SG 2 West28 x 12SG-209-28S & Vol713 28 x 6 56 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS EXAM CATEGORY C-G; PRESSURE RETAINING WELDS IN PUMPS AND VALVES EXAM CATEGORY C-G DELETED IN THE 2007 ED 2008 ADD EXAM CATEGORY C-H; ALL PRESSURE RETAINING COMPONENTS Pressure Test Program 57 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS EXAM CATEGORY F-A; SUPPORTS F1.20CLASS 2 PIPING SUPPORTS A-ONE DIRECTIONAL (RODS)
- F-A; A running percen t---3123383- SDCHX Room AsupportsSI-87VT-3112106- HPSI Room Discharge AsupportsSI-100VT-31 107- HPSI Room Discharge BsupportsSI-107VT-31F1.20CLASS 2 PIPING SUPPORTS RESTRAINTS
- F-A; B running percen t---41316141427 3331543- Main Steam SG 1 East supportsSG-36VT-311144- Main Steam SG 1 WestsupportsSG-33VT-31 45- Main Steam SG 2 EastsupportsSG-42VT-3113 46- Main Steam SG 2 WestsupportsSG-45VT-31 54- Feedwater SG No. 1supportsSG-002VT-3511 55- Feedwater SG No. 2supportsSG-005VT-3511 58- Aux & Downcomer FW SG 1supportsSG-8VT-351259- Aux & Downcomer FW SG 2supportsSG-11VT-3612 62- Auxiliary Feedwater SG 1supports AF-018VT-3111 58 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS 63- Auxiliary Feedwater SG 2 supports AF-006VT-33 A F-01664- Blowdown SG 1supportsSG-39VT-31111SG-53VT-3 65- Blowdown SG 2supportsSG-48VT-31112SG-52VT-370- LPSI Pump Room A SuctionsupportsSI-067VT-33 SI-241 SI-30771- LPSI Pump Room A DischargesupportsSI-87VT-3523 SI-7873- LPSI Pump Room B SuctionsupportsSI-034VT-33 SI-30874- LPSI Pump Room B DischargesupportsSI-129VT-3376- CS Pump Room A SuctionsupportsSI-9VT-34 SI-6777- CS Pump Room A DischargesupportsSI-79VT-3723 SI-8279- CS Pump Room B SuctionsupportsSI-033VT-3313 SI-03480- CS Pump Room B DischargesupportsSI-119VT-352382- SDCHX Room AsupportsSI-78VT-32 SI-79 59 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS83- SDCHX Room AsupportsSI-70VT-31311SI-82VT-3 SI-87VT-3SI-89VT-3SI-90VT-385- SDCHX Room BsupportsSI-119VT-3812 SI-12386- SDCHX Room BsupportsSI-72VT-31043SI-129VT-3 SI-134VT-3SI-135VT-3 SI-147VT-388- East WrapsupportsSI-72VT-3523SI-73VT-389- East WrapsupportsSI-38VT-3511SI-173VT-3 SI-194VT-390- East WrapsupportsSI-130VT-33 SI-13491- West WrapsupportsSI-70VT-3711SI-71VT-392- West WrapsupportsSI-2VT-3811SI-241VT-393- West WrapsupportsSI-89VT-3394- A Train Pipe Chase & 88'supportsSI-70VT-31412SI-89VT-3SI-241VT-3 60 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS95- B Train Pipe Chase & 88'supportsSI-194VT-31433SI-72VT-3SI-134VT-396- Containment LPSI to 1AsupportsSI-202VT-371297- Containment LPSI to 1BsupportsSI-220VT-31412 98- Containment LPSI to 2AsupportsSI-155VT-34 99- Containment LPSI to 2BsupportsSI-174VT-35 100- Containment LPSI A SuctionsupportsSI-7VT-32SI-369VT-3101- Containment LPSI B SuctionsupportsSI-30VT-34SI-194VT-3 SI-368VT-3 102- SI Pump Suction AsupportsSI-8VT-31511SI-9VT-3SI-307VT-3103- Refueling Water Suction AsupportsCH-142VT-31422CH-424VT-3104- SI Pump Suction BsupportsSI-31VT-31233SI-33VT-3SI-308VT-3105- Refueling Water Suction BsupportsCH-149VT-31933CH-425VT-3106- HPSI Room Discharge AsupportsSI-100VT-31811 SI-105 SI-106 61 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS107- HPSI Room Discharge BsupportsSI-107VT-31332 SI-112108- HPSI 88 PipechasesupportsSI-100VT-31623 SI-118109- HPSI 88 PipechasesupportsSI-107VT-31111 110- HPSI Discharge West WrapsupportsSI-103VT-31312 SI-107 SI-110 SI-218 SI-236111- HPSI Discharge West WrapsupportsSI-100VT-3513 SI-236112- HPSI Discharge East WrapsupportsSI-100VT-31033 SI-101 SI-102 SI-176113- HPSI DischargesupportsSI-107VT-31011 SI-108 SI-109 SI-157 SI-176 114 HPSI Heade rsupportsSI-218VT-3212Loop 1A & 1BSI-236 115 HPSI Heade rsupportsSI-157VT-32Loop 2A & 2BSI-176118 - HPSI Long TermsupportsSI-106VT-32243 119 - HPSI Long TermsupportsSI-114VT-31921 SI-319 62 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKSF1.20CLASS 2 PIPING SUPPORTS C-SUPPORTS THAT ALLOW THERMAL MOVEMENT (SPRING)
- F-A; C running percen t---1866131129 1331643- Main Steam SG 1 East supportsSG-36VT-311144- Main Steam SG 1 WestsupportsSG-33VT-322145- Main Steam SG 2 EastsupportsSG-42VT-321146- Main Steam SG 2 WestsupportsSG-45VT-321147- Main Steam SG 1 West supportsSG-206VT-3148- Main Steam SG 1 EastsupportsSG-207VT-31 49- Main Steam SG 2 EastsupportsSG-208VT-3150- Main Steam SG 2 WestsupportsSG-209VT-31 51- Atmospheric Dump No. 1supportsSG-59VT-32 SG-7052- Atmospheric Dump No. 2supportsSG-84VT-32 SG-10354- Feedwater SG No. 1supportsSG-002VT-39SG-013VT-355- Feedwater SG No. 2supportsSG-005VT-31011 SG-01456- Feedwater SG No. 1supportsSG-202VT-31 63 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS57- Feedwater SG No. 2supportsSG-205VT-3158- Aux & Downcomer FW SG 1supportsSG-8VT-31123 AF-4VT-359- Aux & Downcomer FW SG 2supportsSG-11VT-31142 AF-6VT-360- Downcomer Feedwater SG 1supportsSG-200VT-32 61- Downcomer Feedwater SG 2supportsSG-203VT-32 62- Auxiliary Feedwater SG 1supports AF-018VT-32 AF-4VT-3 63- Auxiliary Feedwater SG 2 supports AF-006VT-3264- Blowdown SG 1supportsSG-39VT-3565- Blowdown SG 2supportsSG-48VT-3322 71- LPSI Pump Room A DischargesupportsSI-78VT-31 74- LPSI Pump Room B DischargesupportsSI-129VT-331377- CS Pump Room A DischargesupportsSI-79VT-32 79- CS Pump Room B SuctionsupportsSI-034VT-3180- CS Pump Room B DischargesupportsSI-119VT-3512 SI-14782- SDCHX Room AsupportsSI-78VT-31 83- SDCHX Room AsupportsSI-70VT-35SI-87VT-3 SI-90VT-3 64 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS85- SDCHX Room BsupportsSI-119VT-32 SI-12386- SDCHX Room BsupportsSI-72VT-31543 SI-129 SI-134 SI-13588- East WrapsupportsSI-72VT-3913 SI-7389- East WrapsupportsSI-194VT-31 91- West WrapsupportsSI-70VT-33 SI-7192- West WrapsupportsSI-239VT-34SI-241VT-393- West WrapsupportsSI-89VT-31 94- A Train Pipe Chase & 88'supportsSI-89VT-3195- B Train Pipe Chase & 88'supportsSI-72VT-3413 SI-19496- Containment LPSI to 1AsupportsSI-202VT-3113297- Containment LPSI to 1BsupportsSI-220VT-31233 99- Containment LPSI to 2BsupportsSI-174VT-32100- Containment LPSI A SuctionsupportsSI-241VT-31 101- Containment LPSI B SuctionsupportsSI-194VT-31 102- SI Pump Suction AsupportsSI-307VT-31 65 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKS104- SI Pump Suction BsupportsSI-308VT-31106- HPSI Room Discharge AsupportsSI-99VT-33 SI-100107- HPSI Room Discharge BsupportsSI-107VT-3312 108- HPSI 88 PipechasesupportsSI-100VT-32 SI-118109- HPSI 88 PipechasesupportsSI-107VT-33 110- HPSI Discharge West WrapsupportsSI-107VT-3413 SI-218111- HPSI Discharge West WrapsupportsSI-236VT-31 113- HPSI DischargesupportsSI-157VT-31118 - HPSI Long TermsupportsSI-106VT-32 119 - HPSI Long TermsupportsSI-114VT-34 SI-319 120- Containment Spray AsupportsSI-88VT-31121- Containment Spray BsupportsSI-130VT-31 66 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNIN G %REMARKSF1.40SUPPORTS OTHER THAN PIPING SUPPORTS
- F-A; B running percent---22**2120
- 22 Total, 12 REQ'D5270 Multiple Items53100 68- Regenerative Heat Exchange rsupports79119VT-3223 72- LPSI Pump A supports 0876-36VT-3332 75- LPSI Pump Bsupports 0876-37VT-3378- CS Pump Asupports 0876-38VT-33 81- CS Pump Bsupports 0876-39VT-3333 116- HPSI Pump A supports 0776-14VT-3421 117- HPSI Pump Bsupports 0776-15VT-3422F1.40SUPPORTS OTHER THAN PIPING SUPPORTS
- F-A; C running percent---4**1150
- 4 Total, 2 REQ'D13100 Multiple Items41- Steam Generator 1snubbers224VT-321142- Steam Generator 2snubbers225VT-3213 67 of 208 3INT-ISI-1 Rev 2
SECTION 6.0 ASME CLASS 3 EXAMINATION
SUMMARY
68 of 208 3INT-ISI-1 Rev 2 INDEX EXAM CATEGORY D-A Welded Attachments for Vessels, Piping, Pumps and Valves D-B All Pressure Retaining Components F-A Class 3 Supports 69 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY D-A; WELDED ATTACHMENTS FOR VESSELS, PIPING, PUMPS, AND VALVES Pressure Vessels D1.10 Welded Attachments
- D1.10; running percent---22**2120
- 10 req'd due to 3250 multiple comp53100 DF System attachments DFA-T02VT-1213 DFB-T02 DG System attachments DGA-E04VT-1811 DGA-E05 12 DGB-E04 13 DGB-E05 DGA-X01A DGA-X01B DGB-X01A DGB-X01B EC System attachments ECA-E-1VT-1423 ECA-T-1 ECB-E-1 ECB-T-1 EW System attachments EWA-E01VT-1411 EWA-T01 12 EWB-E01 EWB-T01 PC System attachments PCA-E1VT-1212 PCB-E1 SI System attachments SIA-E01VT-1213 SIB-E01 Piping 70 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS D1.20 Welded Attachments
- D1.20; running percent---2409141221012315 AF System attachments pipingVT-1911CT SystemattachmentspipingVT-13 11 DG System attachments pipingVT-11023 EC System attachmentspipingVT-114 11 13 EW System attachmentspipingVT-137 31 22 NC System attachmentspipingVT-119 21 13 PC System attachmentspipingVT-113 11 13SG SystemattachmentspipingVT-14 12 SI SystemattachmentspipingVT-12 12SP SystemattachmentspipingVT-1129 82 73 71 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY D-B; ALL PRESSURE RETAINING COMPONENTS D2.10Pressure retaining componentsClass 3IWD-5221VT-2****
NOTE Pressure Test Program EXAM CATEGORY F-A; SUPPORTS F1.30CLASS 3 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
- F-A; B running percent---2981114142815313 AF System supports pipingVT-318 11 22CT SystemsupportspipingVT-3312 DG System supports pipingVT-3823 EC System supportspipingVT-31623 EW System supportspipingVT-36761 32 NC System supportspipingVT-33521 33 PC System supportspipingVT-31711 13 SG System supportspipingVT-3411 SI System supportspipingVT-3512 SP System supportspipingVT-312572 73 72 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSF1.30CLASS 3 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
- F-A; C running percent---565195218 4325 AF System supports pipingVT-310 12 DG System supports pipingVT-3413 EC System supportspipingVT-3213 EW System supportspipingVT-3921 NC System supportspipingVT-3111 PC System supportspipingVT-31321 13 SG System supportspipingVT-3722 SI System supportspipingVT-3112 SP System supportspipingVT-3913 73 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSF1.40SUPPORTS OTHER THAN PIPING SUPPORTS
- F-A; B running percent---22**2133
- 10 req'd due to 3266 multiple comp53100DF Systemsupports DFA-T02VT-32 13 DFB-T02 DG Systemsupports DGA-E04VT-38 11 DGB-E04 12 DGA-E05 13 DGB-E05 DGA-X01A DGA-X01B DGB-X01A DGB-X01B EC System attachments ECA-E-1VT-34 23 ECB-E-1 ECA-T-1 ECB-T-1 EW System attachments EWA-E01VT-34 11 EWB-E01 12 EWA-T01 EWB-T01 PC System attachments PCA-E1VT-3212 PCB-E1SI Systemattachments SIA-E01VT-3213 SIB-E01 74 of 208 3INT-ISI-1 Rev 2
SECTION 7.0 AUGMENTED EXAMINATION
SUMMARY
75 of 208 3INT-ISI-1 Rev 2 INDEX EXAM CATEGORY N-722-1 PWR Components Containing Alloy 600/82/182 N-729-1 PWR Reactor Vessel Upper Head N-770-1 PWR Pressure Retaining Dissimilar Metal Piping and Vessel Nozzle Butt Welds containing Alloy 82/182 B-J Pressure Retaining Welds in Piping B-P All Pressure Retaining Components C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED HIGH ENERGY C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED FLYWHEEL NA Reactor Coolant Pump Flywheel Examinations 76 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY CC722-1; PWR COMPONENTS CONTAINING ALLOY 600/82/182 REACTOR VESSEL B15.80 RPV bottom mounted instrument penetrations1-Reactor VesselICI Penetrations78173VE6161**
- REQUIRED R16, R18, R20 STEAM GENERATOR B15.1353- Cold leg instrument connectionsPenetrations224VE441***
- Each Interval 4- Cold leg instrument connectionsPenetrations225VE441***
PRESSURIZE R B15.1405- Heater PenetrationsPenetrations 78373VE3636****
- Each RFO B15.1805- Instrument ConnectionsInstruments78373VE77****
PIPING B15.2006- Hot Leg Instrument ConnectionsInstrumentsRCSVE2727****
B15.205 Cold leg instrument connections6- RCP Pressure TapsInstrument RCPVE882
- 6- RCS Cold Leg Instrument RCSVE12123
- B15.215 Cold leg full penetration weld s 23- Safety Injection 1 Abutt weldsSI-207-14VE11********* VE in conjunction with N-770-1 VOL 24- Safety Injection 1Bbutt weldsSI-223-14VE11******25- Safety Injection 2 Abutt weldsSI-160-14VE11****** 77 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS26- Safety Injection 2Bbutt weldsSI-179-14VE11******27- Pzr Spray 1 Abutt weldsRC-062-3"VE11******28- Pzr Spray 1 Bbutt weldsRC-017-3"VE11******32- Drain Line Loop 1 Abutt weldsRC-060-2VE11****** 33- Drain Line Loop 1Bbutt weldsRC-058-2VE11******34- Drain Line Loop 2 Abutt weldsRC-096-2VE11******36- Letdown Linebutt weldsRC-091-2VE11******37- Charging Linebutt weldsCH-005-3VE11****** 78 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS CODE CASE N-729-1; PWR REACTOR VESSEL UPPER HEAD REACTOR VESSEL UPPER HEAD B4.30 Head with nozzles and partial
-penetration welds of PWSCC-resistant materials 2-Closure HeadweldN05065-CHA-02VE9797*100
- R15 (Head Replaced)
REQUIRED R18, R212-Closure HeadVent NozzleN05065-CHA-02VE11*100
- R15 (Head Replaced)
REQUIRED R18, R21 B4.40 Nozzles and partial-penetration welds of PWSCC-resistant materials in head2-Closure HeadCEDM NozzlesN05065-CHA-02S or Vol9797*100
- not to exceed 20202-Closure HeadVent NozzleN05065-CHA-02S11*100
- not to exceed 2020 79 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS CODE CASE N-770-1; PWR PRESSURE RETAINING DISSIMILAR METAL PIPING AND VESSEL NOZZLE BUTT WELDS CONTAINING ALLOY 82/182 Cracked butt weld reinforced by full structural weld overlay of Alloy 52/152
material
INSPECTION ITEM F Mitigated with FSWO During R13; 1st ISI R15 29- Spra ybutt weldsRC-18-4Vol6121620-
- Surgebutt weldsRC-028-12Vol 1332
- Design Calc Exam 31- Safeties (4)butt weldsRC-001-6Vol Frequency 3 years; RC-003-6Vol required R17, R19, R21RC-005-6Vol RC-007-6Vol
20- ** Pressurizer Surge Linebutt weldsRC-028-12Vol31333
- Design Calc Exam 21- Shutdown Cooling Loop 1butt weldsRC-051-16"Vol Frequency 6 years; 22- Shutdown Cooling Loop 2butt weldsRC-068-16Vol required R19 Unmitigated butt weld at Cold Leg operating temperature
INSPECTION ITEM B23- Safety Injection 1Abutt weldsSI-207-14VE & Vol11 100 Examined R15, REQUIRED R1924- Safety Injection 1Bbutt weldsSI-223-14VE & Vol11 100 Examined R15, REQUIRED R1925- Safety Injection 2Abutt weldsSI-160-14VE & Vol11 100 Examined R15, REQUIRED R1926- Safety Injection 2Bbutt weldsSI-179-14VE & Vol11 100 Examined R15, REQUIRED R1927- Pressurizer Spray 1Abutt weldsRC-062-3VE & Vol11 100 REQUIRED R17, R2128- Pressurizer Spray 1Bbutt weldsRC-017-3VE & Vol11 100 REQUIRED R17, R2132- Drain Line Loop 1Abutt weldsRC-060-2VE & Vol11 100 REQUIRED R17, R21 80 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS33- Drain Line Loop 1Bbutt weldsRC-058-2VE & Vol11 100 REQUIRED R17, R2134- Drain Line Loop 2Abutt weldsRC-096-2VE & Vol11 100 REQUIRED R17, R2136- Letdown Linebutt weldsRC-091-2VE & Vol11 100 REQUIRED R17, R2137- Charging Linebutt weldsCH-005-2VE & Vol11 100 REQUIRED R17, R21 81 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-J; PRESSURE RETAINING WELDS IN PIPING B9.20LESS THAN NPS 4 B9.21 CIRCUMFERENTIAL WELDS OTHER THAN PWR HPSI SYSTEMS 30- Aux Pressurizer Spray*
- butt weldsCH-009-2 S & VOL223100** IEB 88-08 & IN 97-19 2 welds and base metal down stream of V431 EXAM CATEGORY B-P; ALL PRESSURE RETAINING COMPONENTS
- 100% each outage UNINSULATED (SUPPORTS PRESSURE TEST PROGRAM)REACTOR VESSELB15.10CLOSURE HEAD NUTS2- Closure Headnuts7.237 x 7.91"VT-25454**B15.10CLOSURE STUDS2- Closure Headstuds7.380 x 76.37"VT-25454**
PRESSURIZE RB15.10BOLTS, STUDS AND NUTS 5- Pressurizer Manwa yStuds & Nuts1.31 x 14.5VT-22020**
STEAM GENERATORB15.10BOLTS, STUDS AND NUTS3- Steam Generator 1 MANWAYSStuds & Nuts1.31 x 14.5VT-24040**
4- Steam Generator 2 MANWAYSStuds & Nuts1.31 x 14.5VT-24040**
82 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY C-F-1; PRESSURE RETAINING WELDS IN AUSTENITIC STAINLESS STEEL OR HIGH ALLOY PIPING C5.1158- Aux & Downcomer FW SG 1Butt WeldsSG-8-6S & Vol1**11100 IEB 79-13 & SER 83-07 SG-8-8(58-1; 59-1)C5.1159- Aux & Downcomer FW SG 2Butt WeldsSG-11-6S & Vol1**13100 SG-11-8EXAM CATEGORY C-F-2; PRESSURE RETAINING WELDS IN CARBON OR LOW ALLOY STEEL PIPING
- Note exam items are in Aug SummaryC5.5154-FW SG 114 x 0.938SG-002S & Vol2*22100
- IEB 79-13, SER 83-07 SG-013 (54-1 & 15; 55-1 & 15)C5.5155-FW SG 214 x 0.938SG-005S & Vol2*23100 SG-014 83 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY C-F-2; PRESSURE RETAINING WELDS IN CARBON OR LOW ALLOY STEEL PIPING
(*) Identifies the number of welds that are not in the ASME CL 2 boundary AHE5.50PIPING WELDS >
3/8 IN NOMINAL WALL THICKNESS FOR PIPING >NPS 4**100% of all intersecting longitudinal welds will be
examined AHE5.51 CIRCUMFERENTIAL WELD**
- category running percent20754127 15233 138310047- Main Steam SG 1 West Butt WeldsSG-206-28S & Vol12(1)131 SG-206-12 SG-206-648- Main Steam SG 1 EastButt WeldsSG-207-28S & Vol12(1)133 SG-207-12 SG-207-649- Main Steam SG 2 EastButt WeldsSG-208-28S & Vol12(1)133 SG-208-12 SG-208-650- Main Steam SG 2 WestButt WeldsSG-209-28S & Vol12(1)133 SG-209-12 SG-209-651- Atmospheric Dump No. 1Butt WeldsSG-59-12S & Vol29131SG-70-1216352- Atmospheric Dump No. 2Butt WeldsSG-84-12S & Vol29293 SG-103-12 84 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS 53- Steam to Aux Feedwate rButt WeldsSG-81-6S & Vol28141SG-83-614356- Feedwater SG No. 1Butt WeldsSG-201-24S & Vol5(2)73 SG-202-24 SG-224-24"57- Feedwater SG No. 2Butt WeldsSG-204-24S & Vol5(2)73 SG-205-24
SG-225-24"60- Downcomer Feedwater SG 1Butt WeldsSG-200-8S & Vol6(8)141 SG-008-861- Downcomer Feedwater SG 2Butt WeldsSG-203-8S & Vol6(8)143 SG-11-866- Blowdown SG 1Butt WeldsSG-39-6S & Vol3(12)15267- Blowdown SG 2Butt WeldsSG 6S & Vol2(10)123 AHE5.60 PIPING WELDS >1/5" NOMINAL WALL THICKNESS FOR PIPING >
NPS 2 AND < NPS 4 AHE5.61 CIRCUMFERENTIAL**
- category running percent4210124 2229 30310051- Atmospheric Dump No. 1Butt WeldsSG-95-4S & Vol21101 22 9352- Atmospheric Dump No. 2Butt WeldsSG-100-4S & Vol21213 85 of 208 3INT-ISI-1 Rev 2 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY NA; RCP FLYWHEEL EXAMINATIONS PER REG GUIDE 1.14NA16-Reactor Coolant Pump 1Aflywheel1AS&VOL443100 S OF ALL EXPOSED17 Reactor Coolant Pump 1Bflywheel1B SURFACES and UT OF 18-Reactor Coolant Pump 2 Aflywheel2 A HIGH STRESS AREAS19-Reactor Coolant Pump 2Bflywheel2B 86 of 208 3INT-ISI-1 Rev 2
SECTION 8.0 REQUESTS FOR RELIEF 87 of 208 3INT-ISI-1 Rev 2 RELIEF REQUESTS INDEX NUMBER DESCRIPTION
- 36. Full Structural Weld Metal Overlay; and for Units 1 and 3, request to use 2001 Edition thru 2003 Addenda for Repair and Replacements 37. Alternative to ASME Code Case N-638-1, Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temperbead Technique. 38 Included for reference to document the Close out of U2 2 nd Interval 39. Safety Injection Tank alternative repair method. 40. Extended Reactor Vessel Examinations to meet the PWROG program 41. Request to utilize Appendix 1 of Code Case N-729-1.
- 42. Request to utilize Leak Path Assessments N-729-1 previously qualified 43. Included for reference to document the Closeout of U3 2 nd Interval 44. Extended Reactor Vessel Examinations
- 45. Included for reference to document the Closeout of U2 RPV 2 nd Interval 46. Included for reference to document the Closeout of U1 2 nd Interval 47. Included for reference to document the Closeout of U3 RPV 2 nd Interval 48. Request for Relief to use UT in Lieu of RT 49. Request to use Alternate Inspection method for Reactor Vessel Leak-off line 88 of 208 3INT-ISI-1 Rev 2
SECTION 9.0 ISI BOUNDARY DRAWINGS 89 of 208 3INT-ISI-1 Rev 2 BOUNDARY DRAWING INDEX Drawing No. Drawing Title Code Class 01-M-AFP-001 Auxiliary - Feedwater System 2 & 3 01-M-CHP-001 Chemical and Volume Control System 1 & 2 01-M-CHP-002 Chemical and Volume Control System 2 & 3 01-M-CHP-003 Chemical and Volume Control System 2 01-M-CLP-001 Containment Integrated and Local Leak Rate Test 2 01-M-CPP-001 Containment Purge System 2 01-M-CTP-001 Condensate Purge System 2 01-M-DFP-001 Diesel Fuel Oil & Transfer System 3 01-M-DGP-001 Diesel Generator System 3 01-M-DWP-002 Demineralized Water System 2 01-M-ECP-001 Essential Chilled Water System 3 01-M-EWP-001 Essential Cooling Water System 3 01-M-FPP-006 Fire Protection System 2 01-M-GAP-001 Service Gas Supply System (N 2 and H 2) 2 & 3 01-N-GRP-001 Gaseous Radwaste System 2 01-M-HCP-001 HVAC Containment Building 2 01-M-HPP-001 Containment Hydrogen Control 2 01-M-IAP-002 Instrument and Service Air System 2 01-M-IAP-003 Instrument and Service Air System 2 01-M-NCP-002 Nuclear Cooling Water System 3 01-M-NCP-003 Nuclear Cooling Water System 2 01-M-PCP-001 Fuel Pool Cooling & Cleanup System 2 & 3 01-M-RCP-001 Reactor Coolant System 1 & 2 01-M-RCP-002 Reactor Coolant System 1 & 2 01-M-RDP-001 Radioactive Waste Drain System 2 01-M-SGP-001 Main Steam System 2 & 3 01-M-SGP-002 Main Steam System 2 01-M-SIP-001 Safety Injection and Shutdown Cooling System 2 01-M-SIP-002 Safety Injection and Shutdown Cooling System 1 & 2 01-M-SIP-003 Safety Injection and Shutdown Cooling System 2 01-M-SPP-001 Essential Spray Pond System 3 01-M-SPP-002 Essential Spray Pond System 3 01-N-SSP-001 Nuclear Sampling System 2 01-M-WCP-001 Normal Chilled Water System 2 13-M-ZZP-001 Symbols and Legend N/A 13-M-ZZP-002 Symbols and Legend N/A 90 of 208 3INT-ISI-1 Rev 2
SECTION 10.0 ZONE DRAWINGS 91 of 208 3INT-ISI-1 Rev 2 ZONE DRAWING INDEX Drawing No. Drawing Title Code Class Zone 1 Reactor Vessel 1 Zone 2 Closure Head 1 Zone 3 Steam Generator 1 1 Zone 4 Steam Generator 2 1 Zone 5 Pressurizer 1 Zone 6 RCS Primary Piping 1 Zone 16 Reactor Coolant Pump 1A 1 Zone 17 Reactor Coolant Pump 1B 1 Zone 18 Reactor Coolant Pump 2A 1 Zone 19 Reactor Coolant Pump 2B 1 Zone 20 Pressurizer Surge Line 1 Zone 21 Shutdown Cooling Loop 1 1 Zone 22 Shutdown Cooling Loop 2 1 Zone 23 Safety Injection 1A 1 Zone 24 Safety Injection 1B 1 Zone 25 Safety Injection 2A 1 Zone 26 Safety Injection 2B 1 Zone 27 Pressurizer Spray 1A 1 Zone 28 Pressurizer Spray 1B 1 Zone 29 Combined Pressurizer Spray 1 Zone 30 Aux. Pressurizer Spray 1 Zone 31 Pressurizer Safeties 1 Zone 32 Drain Line 1A 1 Zone 33 Drain Line 1B 1 Zone 34 Drain Line 2A 1 Zone 35 Drain Line 2B 1 Zone 36 Letdown Line 1 Zone 37 Charging Line 1 Zone 38 Drain Line Loop 1 1 Zone 39 HPSI Long Term Recirc 1 1 Zone 40 HPSI Long Term Recirc 2 1 Zone 41 Steam Generator 1 2 Zone 42 Steam Generator 2 2 Zone 43 Main Steam SG1 East 2 Zone 44 Main Steam SG1 West 2 Zone 45 Main Steam SG2 East 2 Zone 46 Main Steam SG2 West 2 Zone 47 Main Steam SG1 West 2 Zone 48 Main Steam SG1 East 2 Zone 49 Main Steam SG2 East 2 Zone 50 Main Steam SG2 West 2 Zone 51 Atmospheric Dump No. 1 2 Zone 52 Atmospheric Dump No. 2 2 Zone 53 Steam to Aux Feedwater System 2 Zone 54 Feedwater SG No. 1 2 Zone 55 Feedwater SG No. 2 2 Zone 56 Feedwater SG No. 1 2 Zone 57 Feedwater SG No. 2 2 Zone 58 Aux & Downcomer Feedwater SG 1 2 Zone 59 Aux & Downcomer Feedwater SG 2 2 Zone 60 Downcomer Feedwater SG 1 2 Zone 61 Downcomer Feedwater SG 2 2 Zone 62 Aux Feedwater SG 1 2 Zone 63 Aux Feedwater SG 2 2 92 of 208 3INT-ISI-1 Rev 2 ZONE DRAWING INDEX (Continued)
Drawing No. Drawing Title Code Class Zone 64 Blowdown SG 1 2 Zone 65 Blowdown SG 2 2 Zone 66 Blowdown SG 1 2 Zone 67 Blowdown SG 2 2 Zone 68 Regenerative Heat Exchanger 2 Zone 69 Letdown Heat Exchanger 2 Zone 70 LPSI Pump Room A Suction 2 Zone 71 LPSI Pump Room A Discharge 2 Zone 72 LPSI Pump A 2 Zone 73 LPSI Pump Room B Suction 2 Zone 74 LPSI Pump Room B Discharge 2 Zone 75 LPSI Pump B 2 Zone 76 Containment Spray Pump Room A Suction 2 Zone 77 Containment Spray Pump Room A Discharge 2 Zone 78 Containment Spray Pump A 2 Zone 79 Containment Spray Pump Room B Suction 2 Zone 80 Containment Spray Pump Room B Discharge 2 Zone 81 Containment Spray Pump B 2 Zone 82 Shutdown Cooling Heat Exchange Room A 2 Zone 83 Shutdown Cooling Heat Exchange Room A 2 Zone 84 Shutdown Cooling Heat Exchanger A 2 Zone 85 Shutdown Cooling Heat Exchanger Room B 2 Zone 86 Shutdown Cooling Heat Exchanger Room B 2 Zone 87 Shutdown Cooling Heat Exchanger B 2 Zone 88 East Wrap 2 Zone 89 East Wrap 2 Zone 90 East Wrap 2 Zone 91 West Wrap 2 Zone 92 West Wrap 2 Zone 93 West Wrap 2 Zone 94 A Train Misc. Pipe Chases & 88' Pipe Tunnel 2 Zone 95 B Train Misc. Pipe Chases & 88' Pipe Tunnel 2 Zone 96 Containment LPSI Header to Loop 1A 2 Zone 97 Containment LPSI Header to Loop 1B 2 Zone 98 Containment LPSI Header to Loop 2A 2 Zone 99 Containment LPSI Header to Loop 2B 2 Zone 100 Containment LPSI Train A Suction 2 Zone 101 Containment LPSI Train B Suction 2 Zone 102 SI Pumps Train A Suction 2 Zone 103 Refueling Water Suction Train A 2 Zone 104 SI Pumps Train B Suction 2 Zone 105 Refueling Water Suction Train B 2 Zone 106 HPSI Pump Room A Discharge 2 Zone 107 HPSI Pump Room B Discharge 2 Zone 108 HPSI Discharge 88 Pipe Chase 2 Zone 109 HPSI Discharge 88 Pipe Chase 2 Zone 110 HPSI Discharge West Wrap 2 Zone 111 HPSI Discharge West Wrap 2 Zone 112 HPSI Discharge East Wrap 2 Zone 113 HPSI Discharge East Wrap 2 Zone 114 Containment HPSI Header Loop 1A & 1B 2 Zone 115 Containment HPSI Header Loop 2A & 2B 2 Zone 116 HPSI Pump A 2 Zone 117 HPSI Pump B 2 Zone 118 HPSI Long Term 2 Zone 119 HPSI Long Term 2 Zone 120 Containment Spray A 2 Zone 121 Containment Spray B 2 93 of 208 3INT-ISI-1 Rev 2 UNIT 19 1/16SUPPORT COLUMNS INLET OUTLET54 STUD HOLES COUNTED CLOCKWISE
FROM 0° 11 1/4182 1/440 AT 1A41 AT 1B 42 AT 2A 43 AT 2B 0° PLANT NORTH 180° 270° 90° 1-19 0° 180° 270° 90° SHELL SEGMENT CROSS SECTION -LONG SEAMS-REFERENCE DWG:
N001-3.01-15 AND 17 N001-3.01-41 AND 61
N001-3.01-72 NOTES:TAG NO. SERIAL NO.
N.B NO.1MRCEX01 78173 (C-E)
22253 ZONE 1 REACTOR VESSEL 1-11-151-18 1-161-11 1-17 1-20 1-141-7 1-5 1-3 1-91-10 1-13 1-6 1-12 1-8 1-4THREADS IN FLANGE1-30 6 1/2SHEAR KEYS 1-2ICI Penetrations 1 thru 61 1-31B1-60 1-61 1-62Beltline AttachmentsBeyond Beltline AttachmentsRV Interior 1-63Core Support 94 of 208 3INT-ISI-1 Rev 2 UNIT 1 83 91 75 67 86 66 74908297 81 73 89 72 80 96 85 95 92 79 71 88 70 78 94 84 93 77 69 87 68 76 7.388.611.576.37NOTES:1) Full ITEM ID include - CEDM or RVLMS NO2) TAG NO. 1MRCEX01 SERIAL NO. N05065-CHA-02 (Doosan)
N.B. NO. 1699
- 3) ITEM 71 CONTAINS 4 SINGLE STUDS IN A GRAYLOC CLAMP REFERENCE D OCS: NUTSWASHERS CLOSURE HEADSTUDS#1 THRU #54270° 90° 0° 180°CLOSURE HEADTOP VIEWSTUD LOCATIONS 1 THRU 54 CW FROM 0° NOTE 3 RVLMS LOCATED AT 92 & 96UT Baseline Completed on2-61 at CEDM locations:66, 67, 68, 71, 73, 77, 79 81, 82, 84, 85, 87, and 89 ZONE 2 CLOSURE HEAD 2-61 2-602-58 2-71 2-70 2-591 THRU 18 19 THRU 36
37 THRU 541 THRU 1819 THRU 3637 THRU 54 VENT LINE2-8813-MN-740 (Replaced RV HEAD SPEC)R15 WO 3388751 CEDM Penetrations2-89As Built DWG D-PV-11106-C02 95 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 3 STEAM GENERATOR #1 315°14.50 2.75 6.37.87.56 1.310MANWAY STUDSLOOKING DOWN 90° 180° 0° 45°0° MANWAYSTUDS & NUTSNOTE 1112° MANWAYSTUDS & NUTSNOTE 1CHANNEL HEAD CROSS SECTION3-1402531279.3TUBESHEETSKIRT 315° 45°3-1073-1063-1013-1023-1043-100 6.7202.13717.34.633-108 NOTES: 1) Stud Location is #1 TDC Going CW to #20. Serial NO. 224 REFERENCE DWGS:MN725-A700, A701, A702, A703 and A704
- 2) Tag NO 1MRCEE01AMN725-A419, A425, A440 and A448 N. B. NO. 173
- MN725-A605, A622 and A6253-24 3-26 BCold Leg 3-994 Instrument Nozzles 96 of 208 3INT-ISI-1 Rev 2 UNIT 14-100 ZONE 4 STEAM GENERATOR #2 315°14.50 2.75 6.37 1.310MANWAY STUDSLOOKING DOWN 90° 180° 0° 45°0° MANWAYSTUDS & NUTSNOTE 1112° MANWAYSTUDS & NUTSNOTE 1CHANNEL HEAD CROSS SECTION4-1402531279.3TUBESHEETSKIRT 315° 45°4-1074-1064-1014-1024-104 6.7202.13717.34.634-108 NOTES: 1) Stud Location is #1 TDC Going CW to #20. Serial NO. 225 REFERENCE DWGS:MN725-A700, A701, A702, A703 and A704
- 2) Tag NO 1MRCEE01BMN725-A419, A425, A440 and A448 N. B. NO. 174MN725-A605, A622 and A6254-24 4-26 BCold Leg 4-994 Instrument Nozzles 97 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 5 PRESSURIZERNOTES:1) STUD LOCATION IS #1 TDC GOING CW TO #20
SERIAL NO. 78373 (C-E)REFERENCE DWGS:N001-6.04-6, 31 AND 902) TAG NO 1MRCEX02 N.B. NO. 22234 14.502.756.37.87.56 1.310MANWAY STUDS 90° 270° 0° 90° 270° 0°96 1/45ID UPPER SHELL LOWER SHELL 90° 270° 0°MANWAYTOP VIEW ZONE 31SKIRT 48.7ID(TYP)4ZONE 20 ZONE 29368.5510 57 514 511 513 512 56 54 53 51 540 59 52 55 58 521STUDS & NUTS (Note 1)
B 536 537HEATERS (36)INSTRUMENT NOZZLES (7) 98 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 6 RCS PRIMARY PIPINGREFERENCE DWGS:**13-P-ZCG-103N001-6.07-83 AND 112 N001-6.07-90 THRU 94 N001-6.07-96 THRU 10011-9 11-8 11-4 17-111-1 11-7 1-271-28 13-7 13-413-8 13-9 13-118-1RCP 2A ZONE 18 RCP 1B ZONE 17 REACTORVESSEL ZONE 1 SG 2 ZONE 4SG 1 ZONE 3 RCP 1A ZONE 16 RCP 2B ZONE 199-9 9-8 9-4 16-19-1 9-7 1-301-29 15-415-8 15-119-1 1-347-7 7-8 7-4 7-1RC-631-31 6-76-9 6-46-1 6-818-212-112-412-17 12-717-2 10-110-4 10-17 10-716-2 8-1 8-4 8-17 8-7 19-2 14-114-4 14-17 14-7 1A1B2A 2B RC-32RC-79 RC-31RC-34RC-93 RC-30 RC-33 RC-84 RC-73 1-32 1-33 1-351-36 15-710-13 10-1610-19 10-103-103 4-103 12-1012-1912-1612-13 8-108-138-16 8-19 14-1014-19 14-1314-16NOTES:1) PIPE LONG SEAMS AT 3:00 AND 9:00 POSITIONS (FOR CE PIPING ONLY)2) ELBOW LONG SEAMS AT LONG AND SHORT RADIUS (FOR CE PIPING ONLY)3) ANSALDO PIPING AND ELBOWS ARE SEAMLESS (XX-13, XX-16 and XX-19 only)4) PIPING WCL STAMPED WITH CENTER PUNCH MARKS. CE WELDS REFERENCED WITH FOOTAGEMARKS. ANSALDO WELDS REFERENCED WITH CENTER PUNCH MARKS EACH 250 mm.5) FOR REPLACEMENT WELDS, PORTIONS OF THE ORIGINAL WELD MAY REMAIN. THE ORIGINAL WELD CAP IS JOINED TO THE REPLACEMENT WELD.MN725-A343, A383 and A708MN725-A419, A609 and A622 Cold Leg Instrument Nozzles (12) 6-99 RCP Pressure Taps (4 disch & 4 suction) 6-100 Hot Leg Instrument Nozzles (27) 6-101** note reference drawing for locations 99 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 16 REACTOR COOLANT PUMP 1A NOTES:1) STUD LOCATIONS CW FROM REFERENCE DWGS:N001-6.02-418 DISCHARGE C 2) TAG NO. 1MRCEP01A L SERIAL NO. 1109-1A (C-E) N.B. NO. 23439N001-6.02-420 THRU 423N001-6.02-107 & 1088.271.116 SEAL HOUSING STUDS & NUTS16 FLANGE STUDS32.876.936.897.284.5284.33SNUBBER (2)16-20 AND 16-2116-31 SEAL HOUSING STUDS & NUTS- NOTE 116-32 FLANGE STUDS & 16-33 NUTS- NOTE 116-12 THRU 16-15
CW FROM DISCNOZZLE COLUMNSUPPORTS(4)LOWER HORIZONTALSUPPORTS (2)UPPER HORIZONTAL SUPPORTS (2)16-18 AND 16-19MOTOR SUPPORTSTAND163 16416-16 AND 16-17NUTS & RING16-30FLANGE SURFACE 16-34CASING INTERNAL SURFACE BB B BB B CC 100 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 17 REACTOR COOLANT PUMP 1B NOTES:1) STUD LOCATIONS CW FROM REFERENCE DWGS:N001-6.02-418 DISCHARGE C 2) TAG NO. 1MRCEP01B L SERIAL NO. 1109-1B (C-E) N.B. NO. 23440N001-6.02-420 THRU 423N001-6.02-107 & 1088.271.116 SEAL HOUSING STUDS & NUTS16 FLANGE STUDS32.876.936.897.284.5284.33SNUBBER (2)17-31 SEAL HOUSING STUDS & NUTS- NOTE 117-32 FLANGE STUDS & 17-33 NUTS- NOTE 1 CW FROM DISCNOZZLE COLUMNSUPPORTS(4)LOWER HORIZONTALSUPPORTS (2)MOTOR SUPPORTSTAND17-12 THRU 17-1517-20 AND 17-21UPPER HORIZONTAL
SUPPORTS (2)17-18 AND 17-1917-16 AND 17-17173 174NUTS & RING17-30FLANGE SURFACE 17-34CASING INTERNAL SURFACE B BB CC B BB 101 of 208 3INT-ISI-1 Rev 2 UNIT 1 NOTES:1) STUD LOCATIONS CW FROM REFERENCE DWGS:N001-6.02-418 DISCHARGE C 2) TAG NO. 1MRCEP02A L SERIAL NO. 1109-2A (C-E) N.B. NO. 23441N001-6.02-420 THRU 423N001-6.02-107 & 1088.271.116 SEAL HOUSING STUDS & NUTS16 FLANGE STUDS32.876.936.897.284.5284.33SNUBBER (2)18-31 SEAL HOUSING STUDS & NUTS- NOTE 118-32 FLANGE STUDS & 18-33 NUTS- NOTE 1 CW FROM DISCNOZZLE COLUMNSUPPORTS(4)LOWER HORIZONTALSUPPORTS (2)MOTOR SUPPORTSTAND ZONE 18 REACTOR COOLANT PUMP 2A18-12 THRU 18-1518-20 AND 18-21 UPPER HORIZONTAL SUPPORTS (2)18-18 AND 18-1918-16 AND 18-17183184NUTS & RING18-30FLANGE SURFACE 18-34CASING INTERNAL SURFACE B BB CC BB B 102 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 19 REACTOR COOLANT PUMP 2B NOTES:1) STUD LOCATIONS CW FROM REFERENCE DWGS:N001-6.02-418 DISCHARGE C 2) TAG NO. 1MRCEP02B L SERIAL NO. 1109-2B (C-E) N.B. NO. 23442N001-6.02-420 THRU 423N001-6.02-107 & 1088.271.116 SEAL HOUSING STUDS & NUTS16 FLANGE STUDS32.876.936.897.284.5284.33SNUBBER (2)19-31 SEAL HOUSING STUDS & NUTS- NOTE 119-32 FLANGE STUDS & 19-33 NUTS- NOTE 1 CW FROM DISCNOZZLE COLUMNSUPPORTS(4)LOWER HORIZONTALSUPPORTS (2)MOTOR SUPPORTSTAND 19-12 THRU 19-1519-20 AND 19-21UPPER HORIZONTALSUPPORTS (2)19-18 AND 19-1919-16 AND 19-17193194NUTS & RING19-30FLANGE SURFACE 19-34CASING INTERNAL SURFACE B B B CC BB B 103 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 20 PRESSURIZER SURGE RC028 H-1 PRESSURIZER ZONE 5 HOT LEG ZONE 6 PRESSURIZERVAULTRC-028-BCAA-12EL 108-1 3/4EL 108-5EL 110-5PLANTNORTH RC-028-BCAA-12REFERENCE DRAWINGS01-P-RCF-101 20-1-OL 20-2 20-3 20-4 20-5 20-6 20-7 20-8 20-9 20-10 20-11-OL6-4-OL SS CS 5-34-OL CS SS RC028 H-2RC028 H-3 RC028 H-4OL = FSW Overlaid (MRP-139)
B C C CR13 WO 2967794 & 2967797 104 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 21 SHUTDOWN COOLING LOOP 1PLANTNORTHREFERENCE DRAWINGS 01-P-SIF-105SI-240 H-10 21-1221-13B21-1421-1521-1821-19 21-11 21-9 21-8 21-621-421-321-17 21-10 21-721-5 21-121-1A 21-1321-16SI-240H-13SI-240 H-4SI-240 H-9SI-240 H-7SI-240 H-5SI-240H-15SI-240H-2SI-240 H-3SI-240H-16SI-240H-17SI-240 H-11UV-653 CONT ONZONE 100UV-651SI-A-240-BCAA-16RC-A-051-BCAA-16 SECONDARYSHIELD WALLEL 89-9CONT ON ZONE 38CONT ON ZONE 39LOOP 1 HOT LEG ZONE 621-13A21-12A21-11A 21-25SI-240H-1421-26 21-24 21-2121-2221-236-11 OL CS SS21-20 OLRC-051 H-2RC-051 H-3SI-240H-12 B B B B B B B B B B B B B B B COL = FSW Overlaid (MRP-139)R14 WO 2967801 105 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 22 SHUTDOWN COOLING LOOP 2REFERENCE DRAWINGS01-P-SIF-105 22-7A UV-652RC-B-068-BCAA-16RC68 H-4 RC68H-1 SI-193H-23SI-193 H-17SI-193 H-2022-17 22-26 22-15 22-11 22-1422-922-7 22-422-622-522-322-2 22-23 22-22 22-18 22-21 CONT ONZONE 40 T-WALLCONT ONZONE 101UV-654 SECONDARYSHIELD WALLLOOP 2 HOTLEG ZONE 6 WSI-B-193-BCAA-16SI-193 H-8 22-3A 22-25 22-27 22-13 22-29 22-1922-3022-20 22-2822-87-9 OL CS SS22-1 OL W B B B B C COL = FSW Overlaid (MRP-139)R14 WO 2967804 106 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 23 SAFETY INJECTION 1AREFERENCE DRAWINGS01-P-SIF-103 9-1023-26CS/SSV-237 SI-E-207-BCAA-14SI-207 H-11 SI-207 H-7SI-207 H-3 23-2323-24 23-16 23-17 23-19 23-2023-12 23-15 23-2223-14 23-923-823-623-7 23-4 23-223-1 UV-634V-542 CONT ON ZONE 96 LOOP 1 COLDLEG ZONE 6 SECONDARY SHIELD WALLSI TANK 1A 23-3V-235SI-E-203-BCAA-12 SI-207 H-2SI-207 H-5 C C C C B 107 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 24 SAFETY INJECTION 1BREFERENCE DRAWINGS01-P-SIF-10311-10CS/SSSI-E-221-BCAA-12 V-247LOOP 1B COLDLEG ZONE 6 SECONDARY SHIELD WALL UV-644 V-543CONT ON ZONE 97SI TANK 1BSI-E-223-BCAA-14 24-18 24-1624-1724-14 24-124-1124-924-224-21 24-2224-3 24-4 24-23 24-25 24-624-8 24-7 24-19 SI-223H-8SI-223 H-3SI-223 H-1 V245 SI-223 H-2SI-223 H-4SI-223 H-7 SI-223 H-5 C C C C C C C 108 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 25 SAFETY INJECTION 2AREFERENCE DRAWINGS01-P-SIF-136SI-E-156-BCAA-12LOOP 2A COLDLEG ZONE 6UV-614 V-540 CONT ON ZONE 98 SI TANK 2A25-22SI-160 H-1SI-E-160-BCAA-14 V-215SECONDARYSHIELD WALL V-217SI-156 H-9 25-23 25-8 25-26 25-2025-19 25-7 25-9 25-29 25-1825-2725-6 25-2 25-4 25-1 25-10 25-16 25-11 25-1325-1425-1513-10CS/SS25-3 B C 109 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 26 SAFETY INJECTION 2BREFERENCE DRAWINGS01-P-SIF-136 LOOP 2B COLDLEG ZONE 6 UV-624 V-227 CONT ON ZONE 99SI-E-179-BCAA-14SECONDARY SHIELD WALL 15-9CS/SSSI TANK 2BSI-179H-11 SI-179H-8SI-175 H-21SI-175 H-23 V-225 V-541 26-22 26-1526-8 26-25 26-14 26-1926-6 26-17 26-12 26-4 26-23 26-11 26-9 26-2 26-1626-7 26-1FLOOREL - 10026-326-8A26-11ASI-E-175-BCAA-12 B B C C 110 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 27 PRESSURIZER SPRAY 1APLANTNORTHREFERENCE DRAWINGS 01-P-RCF-10227-24 27-227-327-427-5 27-6 27-827-1027-12 27-13 27-14 27-15 27-1627-1827-20 27-2127-22 27-23 27-2527-2627-127-2727-2827-2927-3027-3227-3127-3427-3327-3627-37 27-3927-38 27-4027-4127-4227-43 27-44 9-11 SS CSEL 101-4EL 123-10EL 116-10EL 111-0EL 119-6EL 127-9 3/8EL 131 11 3/8RC-16H-7RC-62H-38RC-62H-37RC-62 H-33RC-62H-32RC-62H-28RC-62H-30RC-62H-26RC-62H-24RC-62H-21RC-62H-39PRESSURIZER VAULTPRESSURIZER VAULTZONE 29 COMBINEDPZR SPRAY PV100EV-243RC- 016-BCAA-3RC- 062-BCAA-3V-240RC- 062-BCAA-3 COLD LEG LOOP 1A ZONE 627-3527-1A W B C C B B B B C B B B 111 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 28 PRESSURIZER SPRAY 1BPLANTNORTHREFERENCE DRAWINGS01-P-RCF-102RC-18H-1228-2 28-128-328-428-5 28-6 28-7 28-928-11 28-1328-14 28-15 28-17 28-18 28-20 28-22 28-2328-24 28-2528-26 28-2728-2828-29 28-3028-31 28-3228-33 28-3428-35 28-36 28-37 28-46 28-3928-40 28-41 28-4211-1128-45 28-44 28-43 SS CSRC-17H-46RC-17H-43RC-17H-42RC-17H-40RC-17H-38RC-17H-34RC-17 H-33RC-17H-31RC-17H-30RC-17H-26RC-17H-24ZONE 29 COMBINED PZR SPRAY PRESSURIZERVAULT PRESSURIZERVAULT 1A & 1B CUBICLE COLD LEGLOOP 1B ZONE 6EL 102-1/4EL 114-6 EL 110-0EL 123-10EL 116-10EL 127 9 3/8RC-018-BCAA-4V-242V-241 PV100F RC-017-BCAA-328-39A W B C C B B B B B C B B B 112 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 29 COMBINED PZR SPRAYPLANTNORTHREFERENCE DRAWINGS01-P-RCF-102RC-18H-17RC-18H-16RC-18H-18 29-135-33-OL PRESSURIZER ZONE 5 ZONE 27PZR SPRAY 1A ZONE 28PZR SPRAY 1BC EL 131-11 3/8 L158-1 5/16WP EL 158-2ZONE 30AUX SPRAY NOZZLEEL 152-5 5/8 SS CSRC-018-BCAA-429-11B 29-1229-11A 29-529-7 29-4 29-329-1 OL 29-2 29-9A 29-1029-11 W C C COL = FSW Overlaid (MRP-139)
R13 WO 2967789 113 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 30 AUX. PZR SPRAYREFERENCE DRAWINGS01-P-CHF-107HV-205CH-B-521-BCAA-2CH-521 H-A V-431HV-20330-11 30-1030-930-1 30-2R 30-4R30-13 30-5 30-6 30-730-12CH-521 H-BEL 153-8 ZONE 29 COMBINEDPZR SPRAYCH-A-520-BCAA-2CH-E-009-BCAA-2 B CR15 WO 3100394 Replaced V431R12 WO 2813828 Replaced 203/205(added bolted bonnet 13-JN699-Z00014) 114 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 31 PRESSURIZER SAFETIESREFERENCE DRAWINGS01-P-RCF-114 5-31-OL PRESSURIZERZONE 5TOP HEADRC-001-BCAA-6RC-005-BCAA-6RC-003-BCAA-6RC-007-BCAA-6 5-30-OL5-29-OL5-32-OL 31-1131-731-15 31-9 31-1031-6 31-5 31-1331-14 31-3 31-231-1 PSV 200PSV203PSV202PSV201 NOTE:Flange Bolting 8 - 2 X 13 1/2 StudsCS/SSCS/SSCS/SSCS/SSFLANGE BOLTINGFLANGE BOLTINGFLANGE BOLTINGFLANGE BOLTING and 16 - NUTSOL = FSW Overlaid (MRP-139)R13 WO 2967774 for RC-005R13 WO 2967779 for RC-007R13 WO 2967764 for RC-001R13 WO 2967769 for RC-003 115 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 32 DRAIN LINE 1AREFERENCE DRAWINGS01-P-CHF-110 RC-60 H-A V-334RC-060-BCAA-2COLD LEGZONE 6 LOOP 1A V-234WP EL 88-10 3/16EL 89 9 11/16 32-1 32-3 8-18 32-5 32-8 32-2 32-6 32-4 32-9 CS SS NOTE: SW = SOCKET WELD SW SW SW N B 116 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 33 DRAIN LINE 1BREFERENCE DRAWINGS01-P-CHF-110 V-335RC-058-BCAA-2COLD LEGZONE 6 LOOP 1B V-23533-110-1833-8 33-9 CS SSNOTE: SW = SOCKET WELD SW SW N33-6 SW33-5 33-4 33-3 33-2 EL 89 117 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 34 DRAIN LINE 2AREFERENCE DRAWINGS01-P-CHF-110 V-233RC-096-BCAA-2 V-33312-18 34-8 34-9 CS SS NOTE: SW = SOCKET WELD SW SW N 34-6 SW 34-1 34-2 34-3 34-4 34-5 COLD LEG LOOP 2A ZONE 6 118 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 35 DRAIN LINE 2BREFERENCE DRAWINGS01-P-CHF-110 V-232RC-089-BCAA-2 V-332 35-8 35-9 NOTE: SW = SOCKET WELD SW SW N35-6 SW 35-1 35-335-2 35-435-5EL 88 9 5/8LETDOWN LINE ZONE 36 119 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 36 LETDOWN LINEREFERENCE DRAWINGS13-CHF-142CH-E-001-BCAA-2 UV-515ZONE 6ZONE 35 EL102EL 94EL119EL131EL 12153 56 54 55 59 63 57 61 60 67 58 62 68 69 64 65 70 82 77 40 75 1 17 83 6 2 38 81 3 18 5 7 4 19 13 12 20 27 11 25 15 21 10 9 85 28 8 26 22 29 14 30 31 84 33 48 23 32 16 34 35 42 49 46 50 43 47 45 52 80 44 51 24 79 41 76 39 78 RC91 HT RC91 HAKRC91 HACRC91 HJRC91 HADRC91 HPRC91 H5 RC91 H6RC91 HAJRC91 HQRC91 HURC91 HW CH1 HA W W14-18 UV-516RC-E-091-BCAA-2RC-E-091-BCAA-16 WRC91 HACRC91HAQRC91 HAP WCS/SS B B B B B B B B B B B B B B B 120 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 37 CHARGING LINECH-E-005-BCAA-3 V433 ZONE 6 EL101EL112EL134EL134EL110EL11536 43 42 19 4118B18A 40 17 15 14 39 13 12 11 10 38 9R 8R 7 6 5 37 4 3 2 1 47 45 44 27 25 24 23 21 20 26 22 33 32 31 30 29 28 34 57 58 59 60 61 62 54 53 52 55 51 56 49 48 50CH-5 H36CH-5 H28CH-5 H27CH-5 H19CH-5 H17CH-5 H42CH-5 H18CH-5 H20 CH-5 H13CH-5 H14CH-5 H38 CH-5 H33CH-5 H39 CH-5 H9 CH-5 H8CH-5 H7 CH-5 H4 CH-5 H3CH-5H44 CH-5 H34 CH-5 H35 CH-5 H21 CH-5H22 CH-5 H32CH-5 H3713-11 V434 V435 PDV240REFERENCE DWG.
13-P-CHF-109 4611064A FLANGEB0LTING W W CH-5 H6 CH-5 H10 W SS CS 63 64 65 66 SWSWSWSEE DETAIL AFOR SOCKET WELDCONFIGURATION OF V433DETAIL A FLOW 63 64 8R 9R 65 66 SWSWSWSWSW C B C C B C B B B C B B B C B C B C C B B B C B B C BRO 15 V433 replaced SWs on WO 3469317 121 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 38 DRAIN LINE LOOP 1REFERENCE DRAWINGS 01-P-SIF-105 38-1ZONE 21SHUTDOWN COOLING NOTE: SW = SOCKET WELDRC-E-070-BCAA-238-12 SW 122 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 39 HPSI LONG TERM RECIRC LOOP 1SI-248-BCAA-3REFERENCE DWG.
01-P-SIF-105C EL 87 5 1/4 LC EL 86 8 1/4 LC EL 88 2 LC EL 86 8 1/4 LC EL 86 8 1/4 LC EL 83 5 L39-52 SI248 H18 SI248 H25SI248 H29 SI248H20SHUTDOWN COOLINGZONE 21SI-248-BCAA-3 SI-248-BCAA-3 V-522 V-957V-523 N 39-17 39-24 39-1239-2539-1539-9 39-14 39-1639-13 39-2039-5139-21 39-1939-22 39-1839-2339-2639-55 39-5439-2739-28 39-34 39-29 39-1039-1139-5639-5 39-739-6 39-1 39-239-339-10A39-5339-5739-5939-5839-6039-6139-62 39-6339-7039-65 39-69 39-6439-7139-72 39-6839-6739-66SI-248 H-35SI-248 H-34SI-248H-32C EL 92 4 LC EL 94 4 3/8 LC EL 95 2 5/16 L39-33ASI-248H-37 B C C B B B B C SI248H19 CSI-248H-28 C 123 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 40 HPSI LONG TERM RECIRCULATION 2PLANTNORTHREFERENCE DRAWINGS01-P-SIF-105 V 53340-1840-3740-2040-7 40-8 40-21 40-23 40-22 40-19 40-3840-1040-1340-1240-6EL. 9340-16 ZONE 2240-1540-1440-1 40-7A 40-5 40-9 40-240-340-4SI-199-BCAA-3 V958 V 532SI199 H15SI199 H18 SI199H17 SI199 H2240-17SI-114-CCBA-3 EL. 84EL. 89-3 C 91/240-2740-26 W B C B B 124 of 208 3INT-ISI-1 Rev 2 UNIT 1 NOTES: 1) 0° IS AT CENTER OF PRI COLD LEG MANWAY REFERENCE DWGS: 2) STUDS ARE 16 - 1.5 X 93) STUDS ARE 16 - 1 X 6
- 4) TAG NO. 1MRCEE01A SERIAL NO. 224 N.B. NO. 173 ZONE 41STEAM GENERATOR 1107 41 42 270° 90° 270° 90°SECONDARY MANWAYS-NOTE 2-SECONDARYAT 0°, 90°-NOTE 3- 31TUBE SHEET193 ID4.885.83232 ID3.414.3ZONE 58ZONE 54ZONE 64AT 270°AT 90°AT 45°AT 315°SECONDARY HANDHOLES AT 0°AND 270°-NOTE 3-ZONE 44ZONE 43 109 114 115106 105104 103 101 100 102 FEEDWATERDOWNCOMER
@ 0°BLOWDOWNAT 12°180°,270°HAND HOLES
@ 27 0°@ 9 0°6.54113 112 90° 270°SNUBBER LUGS108117118MN725-A18, A19, A26, A28 and A29 MN725-A30, A38, A54 and A55 MN725-A243, A390 and A395 ZONE 64DOWNCOMERBLOWDOWN 6
@ 180°110DOWNCOMER RECIRC @ 45° 4 C C 125 of 208 3INT-ISI-1 Rev 2 UNIT 1 NOTES: 1) 0° IS AT CENTER OF PRI COLD LEG MANWAY REFERENCE DWGS: 2) STUDS ARE 16 - 1.5 X 93) STUDS ARE 16 - 1 X 6
- 4) TAG NO. 1MRCEE01B SERIAL NO. 225 N.B. NO. 174 ZONE 42STEAM GENERATOR 2 107 41 42 270° 90° 270° 90°SECONDARYAT 0°,90°-NOTE 3- 31TUBE SHEET193 ID4.885.83232 ID3.414.3ZONE 59 DOWNCOMER
@ 0°ZONE 55ZONE 65AT 270°AT 90°AT 45°AT 315°SECONDARY HANDHOLES AT 0°AND 270°-NOTE 3-ZONE 45ZONE 46 109 114 115 105104 103 101 100 102 FEEDWATER BLOWDOWNAT 12°180°,270°HAND HOLES
@ 27 0°@ 9 0°1066.54113 112 90° 270°SECONDARY MANWAYS
-NOTE 2-108117118MN725-A18, A19, A26, A28 and A29 MN725-A30, A38, A54 and A55 MN725-A243, A390 and A395 DOWNCOMER RECIRC @ 45° 4ZONE 64DOWNCOMERBLOWDOWN 6
@ 180°110 SNUBBER LUGS C C 126 of 208 3INT-ISI-1 Rev 2 UNIT 1 2PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-11843-5LINE #DIA/SCHFROMTOSG-3632 x 2.0043-1 -SG36 H17 SG-E-036-DLBB-28 43-2543-2SG-3628 x 1.25 SG36H1143-4 43-743-1843-2543-21 43-24 43-1743-1543-1243-22 W SG36 H16 ZONE 48 EL. 132C43-843-1443-1043-11 EL. 132-3 C1/16EL. 157-10 C 1/8EL. 171C ZONE 4143-243-1 43-20 W EL. 158C ZONE 43MAIN STEAM (EAST)STEAM GENERATOR 1 43-26 C B C 127 of 208 3INT-ISI-1 Rev 2 UNIT 1 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-118ZONE 41 44-5LINE #DIA/SCHFROMTOSG-3332 x 2.0044-1 -
SG33 H17 SG-E-033-DLBB-2844-3044-2SG-3328 x 1.25 SG33H11 44-444-744-244-144-2144-30 44-31 44-28 44-2044-17 44-1244-24 44-26 W SG33 H16 ZONE 47 EL. 132C44-15 44-844-14 44-1044-11 44-18 EL. 132-3 C 3/8EL. 157-9 C 3/4EL. 171C ZONE 44MAIN STEAM (WEST)STEAM GENERATOR 1 44-32 W B C C 128 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-118 ZONE 42 45-5LINE #DIA/SCHFROMTOSG-4232 x 2.0045-1 -SG-E-042-DLBB-28 45-2545-2SG-4228 x 1.25 WSG42 H17 SG42H11 45-745-8 45-10 45-4 45-2 45-1 45-1845-1445-1245-1145-2545-1545-2445-1745-20 45-2245-21 W SG42H16 EL. 157-10 C ZONE 49 EL. 132C1/8EL. 171C EL. 132-3 C1/16EL. 171-1 C11/163 ZONE 45MAIN STEAM (EAST)STEAM GENERATOR 245-26 C C B 129 of 208 3INT-ISI-1 Rev 2 UNIT 1 4PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-118 EL. 171ZONE 4246-5 CLINE #DIA/SCHFROMTOSG-4532 x 2.0046-1 -SG45 H17SG-E-045-DLBB-28 46-2846-2SG-4528 x 1.25 SG45H1146-746-8 46-10 46-446-246-146-1146-21 46-1246-18 46-2546-14 46-2446-1546-2046-17 46-2746-23 46-28 W SG45 H16 EL. 158C EL. 132CZONE 50 EL. 132C ZONE 46MAIN STEAM (WEST)STEAM GENERATOR 246-29 W C B C 130 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-155LINE #DIA/SCHFROMTOSG-2066x 1.50047-447-20 SG206 H-147-3047-29 47-1 47-2828x 1.75012x 0.844 SG-206 SG-206 EL. 132-0 TURBINE 47-25PSV 572 01-P-SGF-401 NOTE:1 - MAIN STEAM RELIEF VALVE47-1947-12 47-2447-1147-20 47-30 47-15 47-27 47-28 47-2347-29 47-16 UV 170 PSV 573PSV692 PSV 575 PSV 574 47-7 47-447-3 47-2 47-147-8 ZONE 44 1 BUILDINGSG-E-206-DLBB-12 SG-E-206-DLBB-28 ZONE 5112-1 1/4DIA. FLANGE BOLTSPER VALVE2 - MSIV, 20-2 1/4DIA. BODY TOBONNET BOLTS EL. 120-0 47-14A ZONE 47MAIN STEAM (WEST)STEAM GENERATOR 1 C 131 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS01-P-SGF-155 LINE #DIA/SCHFROMTOSG-2076x 1.50048-448-2048-3048-2948-148-2828x 1.75012x 0.844 SG-207 SG-20701-P-SGF-401 NOTE:1 - MAIN STEAM RELIEF VALVE12-1 1/4DIA. FLANGE BOLTSPER VALVE2 - MSIV, 20-2 1/4DIA. BODY TOBONNET BOLTS ZONE 48MAIN STEAM (EAST) STEAM GENERATOR 1 SG207 H-1 EL. 132-0 TURBINE 48-25PSV 57948-19 48-1248-2448-11 48-20 48-30 48-1548-2748-2848-23 48-29 48-16 UV 180PSV578PSV691 PSV 576PSV577 48-7 48-448-3 48-2 48-148-8 ZONE 43 2 BUILDING SG-E-207-DLBB-12 SG-E-207-DLBB-28 ZONE 51ZONE 5348-3548-34MAIN STEAM S/G #1 90° (EAST) INSIDECONTAINMENTZONE 5148-14A C 132 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-155LINE #DIA/SCHFROMTOSG-2086x 1.50049-449-20SG208H-149-3049-29 49-1 49-2828x 1.75012x 0.844 SG-208 SG-208 EL. 132-0 TURBINE 49-25PSV 554 01-P-SGF-40149-19 49-12 49-2449-11 49-20 49-30 49-1549-2749-2849-23 49-29 49-16 UV 171PSV555PSV695 PSV 557PSV556 49-7 49-449-3 49-2 49-149-8 ZONE 45 3 BUILDING SG-E-208-DLBB-12 SG-E-208-DLBB-28ZONE 52ZONE 5349-35 ZONE 5249-34 49-14ANOTE:1 - MAIN STEAM RELIEF VALVE12-1 1/4DIA. FLANGE BOLTSPER VALVE2 - MSIV, 20-2 1/4DIA. BODY TOBONNET BOLTS ZONE 49MAIN STEAM (EAST)STEAM GENERATOR 2 C 133 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-155LINE #DIA/SCHFROMTOSG-2096x 1.50050-450-20 SG209 H-150-3050-29 50-1 50-2828x 1.75012x 0.844 SG-209 SG-209 EL. 132-0 TURBINE 50-25PSV 561 01-P-SGF-40150-1950-12 50-2450-1150-20 50-3050-15 50-27 50-28 50-23 50-29 50-16 UV 181 PSV 560PSV694 PSV 558 PSV 559 50-7 50-450-3 50-2 50-150-8 ZONE 46 4 BUILDINGSG-E-209-DLBB-12 SG-E-209-DLBB-28 ZONE 52S/G #2 ADV NOTE:1 - MAIN STEAM RELIEF VALVE12-1 1/4DIA. FLANGE BOLTSPER VALVE2 - MSIV, 20-2 1/4DIA. BODY TOBONNET BOLTS50-14A ZONE 50MAIN STEAM (WEST)STEAM GENERATOR 2 C 134 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-158LINE #DIA/SCHFROMTOSG-5912x 0.84451-151-5151-10151-351-28 51-33 51-1 51-31 51-2651-651-5151-8451-27 51-85 SG70 H-6SG-7012x 0.844 51-4951-37 51-3051-32ZONE 47SG-E-70-DLBB-12 SG-E-59-DLBB-12SG59 H-6 V955 ZONE 48 51-251-751-29 51-5 51-8B51-35 51-4 51-9 51-8A 51-37 51-34 51-49 HV178 V 48 V949 HV 184 UV169 SG-E-95-DLBB-4SG-954 x 0.33751-10151-120 ZONE 4851-3651-87 51-86 51-8851-10651-105 51-10451-11551-11451-112 R51-11051-11151-103 51-10251-108 51-10951-113R 51-10751-12051-11951-11751-11851-116 ZONE 51 ATMOSPHERIC DUMP 151-121 C C R17 WO 3779460Replaced valve UV169Welds 112R and 113R 135 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-158LINE #DIA/SCHFROMTOSG-10312x 0.84452-152-50 52-84 52-34 52-3752-352-10 52-3152-5252-86 52-952-8 52-8752-1 SG103H-6SG-8412x 0.84452-5252-3852-652-7 52-452-5 ZONE 49SG-E-100-DLBB-4 SG-E-84-DLBB-12ZONE 49 SG84 H-6 V958 ZONE 5052-3552-30 52-3852-88 52-32 52-2852-33 52-27 52-2952-8552-50 HV 179 V 84 V 952 HV185 UV183SG-E-103-DLBB-12SG-1004 x 0.33752-10152-12052-252-11052-112R52-11152-107 52-10652-10952-11752-11652-11852-12052-11452-11552-113R52-119 52-36 52-10452-105 52-108 52-102 52-101 52-103 ZONE 52 ATMOSPHERIC DUMP 252-111A C CR17 WO 3779468 Replaced V183Welds 112R and 113R 136 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-AFF-131LINE #DIA/SCHFROMTOSG-816x 0.43253-153-1553-3553-2653-2753-23 53-2153-11 53-253-1253-34 53-2853-29 53-31 53-32 53-22 53-30 53-2453-2553-13 53-15 53-14 53-9 53-8 53-1053-1 EL. 122-5 EL. 122-5SG-836x 0.432 53-35 53-21MAIN STEAM 53-6 53-753-4 53-5 ZONE 48 SG-E-83-DLBB-6 SG-E-81-DLBB-6MAIN STEAM ZONE 49 UV134 UV 138 ZONE 53STEAM TO AUXILIARY FEEDWATER SYSTEM 137 of 208 3INT-ISI-1 Rev 2 UNIT 154-100PLANTNORTHREFERENCE DRAWINGS01-P-SGF-119 ZONE 56 8 V007LINE #DIA/SCHFROMTOSG-214x 0.93854-1554-2454-4554-53 54-55 54-51 54-12 54-754-854-3154-38 54-60 54-58 54-50 54-59 54-57 54-5654-52 54-5454-25B 54-3454-25A 54-47 54-32 54-3554-24 54-3354-11B54-16 54-15 54-10754-654-2154-1754-14 54-1354-2754-26 54-49 54-43EL. 93SG-2 H15SG-13 H1 SG-2 H-9 SG-2H12SG-2 H-2 SG-2 H14 SG-2 H13 SG-2 H-5 SG-2 H-4 W SG-2H-1EL. 115SG-2 SG-216x 0.84416x 1.75 54-26-54-25A 54-107 V 00354-36 54-3754-20 54-1954-3954-4154-18 ZONE 4154-2254-23 54-60 54-10 54-12-54-13,54-154-11A 54-10024x 1.21814x 0.93816x 0.844 16x 1.75 SG-2 SG-13 SG-13 SG-13 54-154-2954-554-10 54-9 54-28 54-254-3 54-4SG-2-DLBB-14 SG-2-DLBB-24SG-13-DLBB-14 54-30 SG-2H10SG-2H11 SG-2 H-6 SG-2 H-8 54-27 54-29A 54-29B EL. 93ZONE 54 FEEDWATERSTEAM GENERATOR 154-11A 54-63*MN725-A425, A615, and A622 W W W W W B C C B B C C C C B C B C C 138 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-119 ZONE 57 10 V 005LINE #DIA/SCHFROMTOSG-514x 0.93855-15 55-24 55-47 55-5355-5455-52 55-5055-43 55-1255-7 55-955-855-37 55-2055-28 55-32 55-6055-51 55-5955-57 55-56 55-4955-5555-38 55-39 55-4155-45 55-3355-3655-3555-34 55-2955-1055-1155-31 55-30 55-3 55-4 55-555-6 55-1 55-255-13 55-14 55-2755-2655-2255-23 EL. 105EL. 94SG-5 H-6SG-5H14SG-5H11SG-5H10 SG-5 H-8 SG14H-1 SG-5H12 WSG-5 H-9 SG-5 H-3SG-5 H-2 SG-5 H13 SG-5 H-7SG-5 H-5 SG-5 H-4 W SG-5 H-1EL. 115ZONE 42 SG-5 SG-516x 0.84416x 1.75 55-26-55-25 55-107 V006 55-15 55-17 55-18 55-1655-10755-21 55-19 55-100 ZONE 4255-2555-24 55-60 55-10 55-12-55-13, 55-155-11 55-10024x 1.21814x 0.93816x 0.84416x 1.75 SG-5 SG-14 SG-14 SG-14SG-5-DLBB-14 SG-5-DLBB-24SG-14-DLBB-14 55-58 55-61 55-27 ZONE 55 FEEDWATERSTEAM GENERATOR 2MN725-A425, A615, and A622 W W W W B C C C B B C C C B C C B C C 139 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-119 UV132LINE #DIA/SCHFROMTOSG-20124x 1.81256-656-7SG202H-1 SG-E-202-DLBB-2456-456-11 56-1 56-924x 1.53124x 1.812 SG-202 SG-224EL. 115-6EL. 115-656-11 SG-E-201-DLBB-24 SG-224-DLBB-24 UV 174 01-P-FWF-403 NOTE:FWIV, 20-2BODY TO BONNETBOLTS PER VALVE 1/2 DIA ZONE 54 856-9 56-7 56-456-1 56-356-6 ZONE 56 FEEDWATERSTEAM GENERATOR 1 W C 140 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-119 UV137LINE #DIA/SCHFROMTOSG-20424x 1.81257-657-7SG205H-2SG-E-205-DLBB-24 57-457-11 57-1 57-924x 1.53124x 1.812 SG-205 SG-225EL. 115-6EL. 115-657-11SG-E-204-DLBB-24 SG-225-DLBB-24 UV 177 01-P-FWF-403 NOTE:FWIV, 20-2BODY TO BONNETBOLTS PER VALVE 1/2 DIA 10 57-657-957-7 57-3 57-4 57-1 ZONE 55 ZONE 57 FEEDWATERSTEAM GENERATOR 2 W C 141 of 208 3INT-ISI-1 Rev 2 UNIT 1SG-E-008-11PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-120ZONE 62 V 652LINE #DIA/SCHFROMTOSG-88x 0.50058-458-25 58-2058-16BR 58-28 58-7R58-9R58-8R 58-16AR58-16R 58-22 58-21 58-17 58-1858-2358-14A58-19R58-20A 58-29 58-2658-1458-15R 58-1058-11 58-1258-358-458-558-6 58-158-241-11158-13 EL. 131-0 SG-8 H18 SG-8H-9SG-8 H-7SG-8H11AF-4 H-1SG-8 H19SG-8 H-4 SG-8 H14SG-8 H-3 SG-8 H10SG-8 H-2 SG-8 H-6 7558-3358-25 58-32 58-34 V 079 58-24 AF-E-004-DCBA-6ZONE 60 ZONE 41 58-3 58-34-58-158-1941-111 6x 0.432 6x 0.5626x 1.800 SG-8 AF-4 SG-8EL. 131-0 EL. 120-0EL. 89 9 1/2 EL. 143-4 58-3058-31 58-2758-27A EL. 100-0 EL. 104-0 EL. 131-05/16SG-8H-8 SG-8 H15SG-8 H-5SG-8 H20 ZONE 58 AUXILIARY & DOWNCOMER FEEDWATER SG # 1 CS SS CS SS SS CS CS SS CSSG-E-008-DCBA 6 DLBB-8DLBB = CSDCBA = SS Line Number Material Data 58-38MN725-A420 and A622 W CS SS B C C C C B B C C C C B B C CC SS 58-6BR58-6ARR17 WO 3124945; EDC for SS; welds 6AR thru 9RR17 WO 3124943; EDC for SS; welds 15R thru 16BR and 19R 142 of 208 3INT-ISI-1 Rev 2 UNIT 1SG11 H20SG-E-011-DCBA-6PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-120ZONE 63 V653LINE #DIA/SCHFROMTOSG-118x 0.50059-459-25 59-20 59-16B 59-3159-28 59-759-959-8 59-16A59-1659-22 59-21 59-3059-1759-18 59-23 59-16C59-19 59-20A59-29 59-2659-14 59-1559-1059-1159-12 59-359-459-5 59-659-1 59-242-11159-13 EL. 131-0SG11 H16SG11 H14AF-6 H-1SG11 H-3SG11 H-17SG11 H-4SG11H-7SG11H-5SG11H18SG11 H-8SG11H13SG11H11SG11 H10SG11 H-6SG11 H-9 12 76 59-33 59-2559-32 59-34 V 08059-24 AF-E-006-DCBA-6SG-E-011-DCBA-8 ZONE 61 ZONE 4259-359-34-59-159-16C42-111 6x 0.432 6x 0.562 6x 1.800SG-11 AF-6SG-11 EL. 143-4 EL. 131-0 EL. 104-0 EL. 89-9 5/81/2EL. 100-0 EL. 120-0 ZONE 59 AUXILIARY & DOWNCOMER FEEDWATER SG # 2 59-40 59-36 CS SSSG-E-011-DLBB-8 CS SS SS CSEDC-2001-561, 562, 563 59-37 59-38 59-41 59-42MN725-A420 and A622 W WDLBB = CSDCBA = SS Line Number Material DataSG11 H-2 CS SS B B B B B B C C C C C C C C C C C 143 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-156SG-E-200-DLBB-8EL. 114-10 ZONE 5860-11 11 CLINE #DIA/SCHFROMTOSG-2008x 0.71960-260-12 EL. 104-0 C SG200H-13 SG200 H-14 UV172SG-0088x 0.71960-1460-17 UV1305/16V642 SG-E-008-DLBB-8 TURBINE BUILDING 60-1460-860-12 60-960-6 60-16R 60-7 60-4 60-5 60-3 60-260-17 ZONE 60 DOWNCOMER FEEDWATERSTEAM GENERATOR # 1 C C60-15RR14 WO 3035948 Replaced V642 144 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-156SG-E-203-DLBB-8EL. 114-10 ZONE 59 12 CLINE #DIA/SCHFROMTOSG-2038x 0.71961-261-12 EL. 104-0 C SG203H-14 SG203 H-13 UV175SG-0118x 0.71961-1461-17 UV1355/16V693SG-E-011-DLBB-8 TURBINE BUILDING 61-361-461-661-261-5 61-7 61-16 61-1761-8 61-961-11 61-15 61-1461-12 ZONE 61 DOWNCOMER FEEDWATERSTEAM GENERATOR # 2 C C 145 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-AFF-132 AF-B-018-DCBA-6 EL. 94-5 ZONE 58 75 CLINE #DIA/SCHFROMTOAF-186x 0.56262-462-14 AF-A-004-DCBA-6 EL. 94-5 C62-22AF-18 H1 AF-4 H3 AF-18 H2 W UV 36 UV 34AF-46x 0.56262-1862-24 01-P-AFF-13362-7 62-8 62-562-18 62-23 62-1262-14 62-20 62-24 62-1962-2162-662-1362-11 62-9 62-1062-4 ZONE 62 AUXILIARY FEEDWATERSTEAM GENERATOR # 1 B C C 146 of 208 3INT-ISI-1 Rev 2 UNIT 1AF16 H1PLANTNORTHREFERENCE DRAWINGS 01-P-AFF-132AF-A-016-DCBA-6EL. 82 -4 ZONE 59 UV 37 CLINE #DIA/SCHFROMTOAF-166x 0.56263-1863-19AF6 H2AF6 H4 AF6 H3 AF6 H5AF-B-006-DCBA-6 UV 35 76 63-30 63-4AF-66x 0.562 01-P-AFF-133 63-25 63-2163-28 63-23 63-2263-29 63-2663-24 63-30 63-2763-18A63-463-14 63-1963-20 63-18 ZONE 63 AUXILIARY FEEDWATERSTEAM GENERATOR # 2 W C C B B B 147 of 208 3INT-ISI-1 Rev 2 UNIT 1 46PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-122 ZONE 66 V28964-44 64-3664-14 64-49 64-55 64-3864-39 64-2264-764-8 64-3164-15 64-2364-3264-53 64-52 64-5064-8164-2664-5164-4164-4064-42 64-46 64-4364-4564-3564-3364-1964-11 64-37 64-9 64-1864-12 64-16 64-364-564-664-1 64-264-2064-24 64-2564-2164-10EL. 97EL. 109HV 43 HV 41 SG39H22SG39 H36SG39 H-31 SG39 H-5 SG39 H24 SG39 H25SG53 H-5 W SG39 H15 SG39 H18SG39H16 SG39 H12 SG39 H-9EL. 89-3 UV500P ZONE 41 SG39 H1064-2764-29 64-30 EL. 104SG-E-53-DABA-6SG-E-39-DABA-6SG-E-039-DABA-6 64-54LINE #DIA/SCHFROMTOSG-536x 0.56264-164-14SG-39SG-39 6x 0.562 6x 0.562 64-30 64-15 64-31 64-53 ZONE 64 BLOWDOWNSTEAM GENERATOR # 1 W W W W W SG39 H29 SG39 H30ZONE 41 64-90 A POINT A4 LINE CONTINUED ASG-5226x 0.56264-90----
SG39 H38 B B B B B B B B B B B C C C C C 148 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-140 ZONE 67 47 V290LINE #DIA/SCHFROMTOSG-486x 0.56265-165-1465-3565-44 65-43 65-42 65-41 65-40 65-38 65-6 A65-765-9 65-8 65-21 65-2065-1965-5365-5265-51 65-49 65-48 65-50 65-4565-37 65-3665-3465-5465-3365-3165-30 65-18 65-17 65-1565-14 65-1065-11 65-13 65-29 65-365-565-665-165-265-2265-2465-2365-25 65-2865-27EL. 97EL. 109HV 44 HV 42 SG48H11 SG48 H5 SG48 H10 SG48H27 W SG52 H5 W SG48 H14 W SG48 H16 SG48 H18 SG48H21 SG48 H24 SG48 H23 EL. 109UV500R ZONE SG-48 SG-52 6x 0.562 6x 0.562 65-29 65-1565-5265-28 65-55 ZONE 65 BLOWDOWNSTEAM GENERATOR # 2SG-52-DABA-6SG-48-DABA-6 42 W W W W SG48 H29SG48 H30 65-90 ZONE 42 EL. 122A POINT A4 LINE CONTINUED ASG-5236x 0.56265-90----
B B C B B B B B B B B C B WSG52 H2 C 149 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-157SG-E-039-DABA-6EL. 108 - 8 ZONE 64 46 UV500Q CLINE #DIA/SCHFROMTOSG-396x 0.56266-166-15 66-15SG-E-039-DABA-6EL. 108 - 8 C EL. 106-0 C TURBINE BUILDING 66-1466-1366-10 66-966-766-566-11 66-1266-666-866-366-166-2 ZONE 66 BLOWDOWNSTEAM GENERATOR # 166-26 150 of 208 3INT-ISI-1 Rev 2 UNIT 1PLANTNORTHREFERENCE DRAWINGS 01-P-SGF-157EL. 108 - 8SG-E-48-DABA-6 EL. 108 - 8 ZONE 65 47 UV500S C CLINE #DIA/SCHFROMTOSG-486x 0.56267-167-1267-12 67-1067-1167-3A67-567-8 67-6 67-9 67-7 67-267-3 67-1 ZONE 67 BLOWDOWNSTEAM GENERATOR # 2 151 of 208 3INT-ISI-1 Rev 2 UNIT 1 NOTES: Tag No. 1MCHEE01 Serial No. 79119 (AMETEK)
N.B. No. 437 Reference Drawings:
N001-7.03-1 N001-7.03-48 thru 501110 WW TOP LONG SEAMSNEAR & FAR SIDE 8 SCH 160 PIPE AND FITTINGSINLETOUTLETVIEW FACING HEAT EXCHANGERLOOKING PLANT SOUTH 68-468-3 68-768-868-5 68-6 68-268-968-1 ZONE 68 REGENERATIVE HEAT EX-CHANGER BB 152 of 208 3INT-ISI-1 Rev 2 UNIT 1 NOTES: Tag No. 1MCHNE02 Serial No. N2370 (Richmond Engr)
N.B. No. 76129 Reference Drawings:
N001-7.03-26 N001-7.03-27
N001-7.03-28 N001-7.03-29 TubesheetChannelheadCross Section 32 Studs 1 x 9 3/4 3/469-169-2 ZONE 69 LETDOWN HEAT EXCHANGER 153 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS01-P-SIF-201SI-241 H-20 V-201 SI-307H-16 SI-67 H-4 70-56 70-58 70-59 70-60 70-6170-63 70-64 70-66 70-65 70-68 70-69 70-4670-44 70-47 70-55 70-53 70-103 70-52 70-5070-4970-10470-106 70-107 70-109 ZONE 76EL. 47 10 EL. 41 10 LPSIPUMP A SUCTION ZONE 94SI-A-307-GCBC-20SI-A-307-GCBC-14SI-A-067-GCBC-16LINE #DIA X SCHFROMTO SI-67SI-241SI-307SI-307 16 X 0.312 18 X 0.312 14 X 0.312 20 X 0.37570-10370-4470-6370-49 70-10970-4770-6970-61SI-A-241-GCBC-18 ZONE 70 LPSI PUMP ROOM A SUCTION ZONE 102 W W W B B B 154 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS01-P-SIF-207 V-435 SI-87 H-3ZONE 76SI-A-087-FCBA-10LINE #DIA X SCHFROMTO SI-78 SI-87 SI-87 10 X 0.365 8 X 0.322 10 X 0.36572-29 72-5 72-872-3272-672-5772-32 72-3074-4572-2972-2772-2672-2372-2472-2172-2072-18 72-1572-1772-1472-1272-11 72-9 72-8 72-6 72-574-5274-5474-45A74-5174-4974-4874-46 74-5774-55 ZONE 83 V-434 HV-306SI-87 H-2SI-78H-1SI-87 H-1 SI-87 H-11SI-A-078-FCBA-10SI-A-087-FCBA-10LPSIPUMP ADISCHARGEEL 46-9TOG EL.51-6EL 62-9EL 62-9W ZONE 71 LPSI PUMP ROOMA DISCHARGE SI-78 H-3 W W W C B B B B B 155 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGSN001-11.01-3672-3A W 72-3C W 72-3B WVIEW LOOKING DOWNWELDED SUPPORT FEETAND SUPPORT COLUMNSTWENTY-FOUR 2 DIAMETER STUDS(21 @ 9.5 LONG AND 3 @ 8.88 LONG)
DISCHARGEZONE 71 SUCTIONZONE 70N001-11.01-50 NOTES:1) TAG NUMBER: 1MSIAP012) SERIAL NUMBER: 0876-36 INGERSOL RAND3) NATIONAL BOARD NUMBER: 523 ZONE 72 LPSI PUMP A B B B 156 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS 01-P-SIF-202 V-200C/L EL. 41 10LPSIPUMP B SUCTIONSI-B-308-GCBC-20LINE #DIA X SCHFROMTOSI-308SI-308SI-194 SI-34 14 X 0.312 20 X 0.375 18 X 0.312 16 X 0.31271-6371-4971-44 71-105 71-69 71-61 71-4771-111SI-308 H-12 SI-308 H-1371-50 71-10571-10771-49 71-108 71-11071-4671-44 71-5271-111 71-4771-53 71-55 71-5671-5871-59 71-60 71-6171-64 71-65 71-63 71-66 71-6871-69SI-B-308-GCBC-14SI-B-194-GCBC-18 SI-34 H-4SI-B-034-GCBC-16 ZONE 95ZONE 79 ZONE 73 LPSI PUMP ROOM B SUCTION ZONE 104 W W B B B 157 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS01-P-SIF-208 V-447LINE #DIA X SCHFROMTOSI-129SI-129SI-123 8 X 0.322 10 X 0.365 10 X 0.365 73-5 73-873-2773-675-5173-30 73-28 75-39 73-27 73-25 73-24 73-21 73-22 73-19 73-1773-15 73-1273-1473-11 75-48 73-21A 75-4075-51 75-49 ZONE 86 V-446 HV-307 SI-129 H-5 SI-129H-6SI-129 H-1SI-B-123-FCBA-10SI-B-129-FCBA-10 LPSI PUMP B DISCHARGE EL 46-9EL 62-9SI-129 H-4 73-973-8EL 62-9ZONE 79 75-46 75-45 75-43 75-42 73-6 73-5SI-129 H-2 SI-129H-3 73-30 ZONE 74 LPSI PUMP ROOMB DISCHARGE W W W C B B C C B 158 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGSN001-11.01-3673-3A W 73-3C W 73-3B WVIEW LOOKING DOWNWELDED SUPPORT FEETAND SUPPORT COLUMNSTWENTY-FOUR 2 DIAMETER STUDS(21 @ 9.5 LONG AND 3 @ 8.88 LONG)
DISCHARGEZONE 74 SUCTIONZONE 73N001-11.01-50 NOTES:1) TAG NUMBER: 1MSIBP012) SERIAL NUMBER: 0876-37 INGERSOL RAND3) NATIONAL BOARD NUMBER: 524 ZONE 75 LPSI PUMP B B B B 159 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS 01-P-SIF-201 V-157SI-9 H-4EL. 41 10 CONTAINMENTSPRAY PUMP A SUCTIONLINE #DIA X SCHFROMTOSI-067SI-067SI-009SI-009 16 X 0.312 14 X 0.312 14 X 0.312 18 X 0.31270-11070-113 80-1 80-570-11180-1680-480-13 01-P-SIF-207 V-18470-111 72-35 72-3370-114 70-11070-113 80-1980-18 80-17 80-1680-10 80-680-20 80-1380-1280-980-11 80-8 80-7 80-4 80-5 80-3 80-2 80-1SI-67 H-3SI-67 H-2 SI-67 H-1 ZONE 70 ZONE 71 ZONE 82 EL. 70EL. 47 10SI-A-009-GCBC-18SI-A-078-FCBA-10SI-07810 X 0.36572-3372-35SI-A-067-GCBC-14 W ZONE 76 CONTAINMENT SPRAY PUMP ROOM A SUCTIONZONE 102 W B B B B 160 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS 01-P-SIF-207LINE #DIA X SCHFROMTOSI-079SI-079SI-082 8 X 0.322 10 X 0.365 10 X 0.365 82-1A 82-182-31-82-2782-35 HV-684SI-A-082-FCBA-10 V-485 82-2782-2682-2482-2282-25 82-2082-21 82-19 82-18 82-1782-1382-682-2382-31 82-1682-12 82-14 82-1182-1082-582-9 82-882-7 82-4 82-382-2 82-182-1ASI-79 H-9 SI-79 H-5SI-79H-8SI-79H-6 SI-79 H-7SI-79 H-4SI-A-079-FCBA-10SI-A-079-FCBA-10SI-82 H-2 82-3382-3482-32 82-35CONTAINMENTSPRAY PUMP ADISCHARGE ZONE 82 ZONE 83TOGEL 51-6EL 70W EL 70EL 53-6EL 58-682-15 ZONE 77 CONTAINMENT SPRAY PUMP A DISCHARGE82-6882-69SI-79 H-2 SI-79 H-3 W W W W W C C B B B B B B B 161 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGSN001-11.01-3680-3A W 80-3C W 80-3B WVIEW LOOKING DOWNWELDED SUPPORT FEETAND SUPPORT COLUMNSTWENTY-FOUR 2 DIAMETER STUDS(21 @ 9.5 LONG AND 3 @ 8.88 LONG)
DISCHARGEZONE 77 SUCTIONZONE 76 NOTES:1) TAG NUMBER: 1MSIAP032) SERIAL NUMBER: 0876-38 INGERSOL RAND3) NATIONAL BOARD NUMBER: 521 ZONE 78 CONTAINMENT SPRAY PUMP AB B B 162 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS 01-P-SIF-202 V-185CONTAINMENTSPRAY PUMP B SUCTIONLINE #DIA X SCHFROMTOSI-033SI-033SI-034SI-034 14 X 0.312 18 X 0.312 14 X 0.312 16 X 0.312 81-1 81-581-1571-10381-4 81-12 71-101 71-104 01-P-SIF-208 71-104SI-B-033-GCBC-18SI-12310 X 0.36573-3173-33 V-158 73-3381-1281-19 81-1881-1781-1181-1681-1081-981-8 81-15 81-781-6 81-581-4 81-381-2 81-171-10371-10171-10073-31SI-33H-4 SI-34 H-3 SI-34 H-1SI-34 H-6SI-B-034-GCBC-14SI-B-033-GCBC-14SI-B-034-GCBC-16SI-B-123-FCBA-10 ZONE 73ZONE 74 ZONE 85 EL 70EL 41-10EL 47-10 ZONE 79 CONTAINMENT SPRAY PUMP B SUCTION ZONE 104 W C B B B 163 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS 01-P-SIF-208LINE #DIA X SCHFROMTOSI-119SI-119SI-147 8 X 0.322 10 X 0.365 10 X 0.365 83-1A 83-183-30-83-26 83-34 V-484SI-119 H-7SI-B-119-FCBA-10 HV-689SI-B-147-FCBA-10SI-B-119-FCBA-10 83-183-1183-2 83-1A 83-3 83-5 83-12 83-4 83-6 83-7 83-1383-9 83-14 83-34 83-3283-8 83-10 83-3383-31 83-15 83-30 83-16 83-18 83-1783-19 83-2083-2283-2383-2483-2583-26CONTAINMENTSPRAY PUMP BDISCHARGE ZONE 86 ZONE 85 EL 58-6TOG EL 51 6EL 70EL 7083-21EL 63-0EL 53-6EL 49-2SI-119 H-9SI-119 H-8 SI-119 H-6 SI-119H-2 SI-119 H-1 SI-119H-3 SI-119 H-4 SI-119 H-5 WSI-147 H-183-60 ZONE 80 CONTAINMENT SPRAY PUMP B DISCHARGE 83-61 83-6383-62 W W W B C C C B C B B C B 164 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGSN001-11.01-3681-3A W 81-3C W 81-3B WVIEW LOOKING DOWNWELDED SUPPORT FEETAND SUPPORT COLUMNSTWENTY-FOUR 2 DIAMETER STUDS(21 @ 9.5 LONG AND 3 @ 8.88 LONG)
DISCHARGEZONE 80 SUCTIONZONE 79 NOTES:1) TAG NUMBER: 1MSIBP032) SERIAL NUMBER: 0876-39 INGERSOL RAND3) NATIONAL BOARD NUMBER: 522 ZONE 81 CONTAINMENT SPRAY PUMP BB B B 165 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS 01-P-SIF-207 HV-685LINE #DIA X SCHFROMTOSI-078SI-078SI-079 10 X 0.365 20 X 0.500 10 X 0.36572-3672-4982-28 72-48 72-52 72-61 HV-678SI-A-078-FCBA-20 SI-78 H-5SI-78H-4 72-52 72-4972-49A72-4872-4772-4572-44 72-42 72-41 72-3972-38 72-3672-5072-49B72-6072-61 72-5872-5772-55 72-5482-3082-2982-28SI-79 H-10 CS/SSSI-A-078-FCBA-10SI-A-079-FCBA-10 ZONE 77 ZONE 76 SDCHX A INLETNOZZLE ZONE 82 SHUTDOWN COOLING HEAT
EXCHANGER ROOM A W W W B C B 166 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS 01-P-PCF-201LINE #DIA X SCHFROMTO SI-070 SI-070 SI-07020 X 0.50016 X 0.37520 X 0.50074-1 74-21 74-2774-1974-2574-27 V-458SI-89 H-574-98SI-A-090-FCBA-14 01-P-SIF-203 01-P-SIF-207 SI-082 SI-087 SI-08910 X 0.36510 X 0.36510 X 0.365 82-36 74-58 74-7782-3874-7474-87SI-08910 X 0.36582-3982-44SDCHX A OUTLET NOZZLEZONE 77ZONE 94 ZONE 94ZONE 71SI-89 H-3 SI-87 H-4SI-87 H-5 SI-87 H-8 SI-87 H-7 SI-87 H-6SI-87 H-9SI-82 H-1SI-89 H-2SI-89H-1 WSI-90 H-1 W SI-90 H-2SI-90H-4SI-70 H-6SI-70 H-7SI-70 H-2SI-70 H-3 WSI-70H-1 W74-2774-7574-2574-2474-2274-1974-104A74-2174-1874-1674-1574-9674-1374-1074-7674-1274-974-774-674-474-374-174-9774-5874-6374-6174-6774-11874-11774-11274-11474-11574-10974-11174-10874-10674-10574-6474-6074-6674-6974-7074-7174-7374-7482-3982-4282-3682-3882-3774-7774-10074-9974-8674-8074-7874-8374-8474-8182-4382-4482-4182-4074-87 HV-657 HV-687 HV-686 HV-688 V-460SI-A-070-FCBA-20SI-A-087-FCBA-10SI-E-131-FCBA-6SI-A-089-FCBA-10SI-A-082-FCBA-10 CS/SSSI-09014 X 0.37574-10574-118SI-1316 X 0.28074-9774-100 ZONE 83 SHUTDOWN COOLING HEAT EXCHANGER ROOM A W W W W W W W B C B B B B C B C C B C A B B B B B BMRP 192 MIXING TEEWelds 74-13,-15,-75,-76 167 of 208 3INT-ISI-1 Rev 2 UNIT 1 74-121 74-122 74-12474-123INLET NOZZLE - ZONE 82OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 83NOTES:1) TAG NUMBER: 1MSIAE012) SERIAL NUMBER: S-18341 (ENGR & FABRICATORS)3) NATIONAL BOARD NUMBER 17084) ZERO DEGREE FOR GIRTH WELDS IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.
REFERENCE DRAWINGS:N001-7.03-020 N001-7.03-25 30 deg.30 deg.Inconel Weld SA-105 Clad 74-121 75-122DETAIL ZONE 84 SHUTDOWN COOLING HEAT EXCHANGER AN001-11.01-209 TUBE SHEETCHANNEL HEAD CROSS SECTION 1/8 CLAD 1-7/1664 STUDS1.5 X 17 168 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS 01-P-SIF-208 HV-694LINE #DIA X SCHFROMTOSI-119SI-123SI-123 10 X 0.365 10 X 0.365 20 X 0.50083-2773-3473-48 73-63 73-46 73-54 HV-679SI-119 H-14SI-B-123-FCBA-10 SI-119H-13SI-119 H-11SI-119H-10SI-123 H-2SI-123 H-8SI-123 H-5SI-123 H-6 SI-123 H-7 73-62 73-63 73-60 73-59 73-57 73-56 83-2983-28 73-34 83-27 73-3673-37 73-4073-3973-42 73-4573-45A 73-4373-46 73-4873-4773-64 73-49 73-51 73-52SI-B-123-FCBA-20SI-B-119-FCBA-1073-54 CS/SSZONE 80 ZONE 79SDCHX BINLET NOZZLET OF EL 70T OF EL 70 EL 75EL 75EL 80-2EL 80-2SI-123 H-1 ZONE 85 SHUTDOWN COOLING HEAT EXCHANGER ROOM B W W W W W W B B B B B C B B B C 169 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS01-P-PCF-201LINE #DIA X SCHFROMTO SI-072 SI-072 SI-072 20 X 0.500 16 X 0.375 20 X 0.50075-1 75-19 75-2575-1775-2375-25 HV-696SI-B-147-FCBA-10 SI-129 SI-131 SI-134 10 X 0.365 6 X 0.280 10 X 0.365 75-53 75-81 75-6275-6175-8483-43 SI-135 SI-147 14 X 0.375 10 X 0.365 75-87 83-35 75-10083-39SI-72H-3SI-72H-4SI-72 H-2SI-72 H-1 WSI-72H-12 W SI-72 H-5 SI-72 H-6 SI-147 H-2SI-134 H-8SI-134 H-3SI-134 H-2SI-134 H-1 SI-134 H-6SI-134 H-5 SI-134 H-7SI-135 H-1SI-135 H-3 SI-135 H-2SI-129 H-11SI-129 H-10 SI-129H-12 SI-129H-9 SI-129H-8 SI-129H-7 SI-129H-1375-5875-6075-1475-2675-2575-2375-9075-5575-2275-2075-8875-1975-9175-9975-5675-1775-1675-8775-9675-10075-1375-9375-8175-8275-1275-8375-11A75-1175-875-9775-8475-975-7275-7175-6975-6875-775-6675-6575-6375-575-6275-275-475-175-5483-3675-5375-6175-9483-3783-3883-3983-4283-4383-3583-4083-41 ZONE 80 SDCHX BOULLETNOZZLE ZONE 74 ZONE 95ZONE 95SI-B-129-FCBA-10SI-B-135-FCBA-14SI-B-072-FCBA-20 HV-695 HV-693 V-464 V-455 HV-658SI-B-134-FCBA-1001-P-SIF-20401-P-SIF-208 ZONE 86 SHUTDOWN COOLING HEAT EXCHANGER ROOM B W W W W W W W W W W B CB B C C C C B C C B C C C C B CB C C C B B BMRP 192 MIXING TEEWelds 75-8, -9, -11, -26 170 of 208 3INT-ISI-1 Rev 2 UNIT 175-7675-7775-79 75-78INLET NOZZLE - ZONE 85OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 86NOTES:1) TAG NUMBER: 1MSIBE012) SERIAL NUMBER: S-18342 (ENGR & FABRICATORS)
REFERENCE DRAWINGS:N001-7.03-020 N001-7.03-253) NATIONAL BOARD NUMBER 17094) ZERO DEGREE FOR GIRTH WELDS IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.
30 deg.30 deg.Inconel Weld SA-105 Clad 75-76 75-77DETAIL ZONE 87 SHUTDOWN COOLING HEAT EXCHANGER BN001-11.01-209 TUBE SHEETCHANNEL HEAD CROSS SECTION 1/8 CLAD 1-7/1664 STUDS1.5 X 17 171 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGSLINE #DIA X SCHFROMTO SI-072 SI-072 SI-072 12 X 0.375 12 X 1.125 20 X 0.50078-2 78-13 75-3578-1178-1475-38SI-E-174-CCBA-12 SI-073 SI-073 SI-155 12 X 0.375 12 X 1.125 12 X 1.12579-1 79-13 78-1679-1179-1478-21 SI-172 SI-174 10 X 0.365 12 X 1.12578-10C 79-16 78-10D79-21 01-P-SIF-208 17 1879-179-779-679-879-1079-1379-1179-1479-1679-1779-1879-1979-2079-2175-3875-3675-3775-3578-1378-10K78-10J78-1178-10C78-2078-10B78-1978-10A78-9J78-878-2178-1878-1778-10D78-1678-9G78-9F78-778-1478-9K78-9C78-678-978-578-378-2 ZONE 89 ZONE 98ZONE 99 SI-73 H-1SI-72 H-16SI-72 H-17SI-72 H-15SI-72 H-11SI-72 H-14SI-72 H-13SI-72H-18SI-72H-22SI-72 H-21 SI-72 H-20 wSI-73 H-3SI-73 H-2 UV-615 HV-690 UV-625SI-B-073-FCBA-12SI-B-072-FCBA-20SI-E-155-CCBA-12SI-B-172-FCBA-10 ZONE 88EAST WRAPSI-72H-19 ZONE 95 W W W CC C B C B B B C BC C CC 172 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS01-P-SIF-202 SI-173 H-1 w HV-690 SI-B-173-GCBC-16 2601-P-SIF-208SI-194 H-13SI-194 H-12SI-194 H-14SI-194 H-2371-8171-8471-8571-87A71-9471-771-7171-9371-7371-7571-9171-7871-9071-1871-7071-7671-7971-8271-1671-8871-1371-571-1471-1171-1071-871-471-271-1 ZONE 88 TOG87-3SI-B-038-GCBC-12SI-B-194-GCBC-18SI-B-194-GCBC-16ZONE 101 ZONE 95 UV-656 V-442LINE #DIA X SCHFROMTOSI-38 SI-173 SI-173 12 X 0.250 16 X 0.312 10 X 0.250 71-90 71-70 71-7371-9471-7171-87A SI-173 SI-194 10 X 0.365 16 X 0.312 71-8871-1 11SI-19418 X 0.31271-1371-18 ZONE 89EAST WRAP W WSI-38H-1 C B B B B B 173 of 208 3INT-ISI-1 Rev 2 UNIT 1 REFERENCE DRAWINGS 01-P-SIF-202 24 01-P-SIF-208 ZONE 101LINE #DIA X SCHFROMTO SI-030 SI-134 SI-13424 X 0.37510 X 0.3658 X 0.32285-6 83-53 83-5885-8R 83-57 83-59SI-30824 X 0.56285-985-11V-206 UV-67685-1185-985-685-8RSI-B-308-GCBC-24SI-B-030-HCBA-24EL 73-7ZONE 90EAST WRAP ZONE 104 SI-134 H-10 UV-671 ZONE 95 SI-134H-983-5983-5383-5483-5883-5583-5683-57SI-B-134-FCBA-10EL 95W 22 ZONE 121SI-B-130-GCBC-1090-4190-4290-4390-4490-4590-4690-40SI-130 H-2SI-13010 X 0.36590-4290-46SI-1308 X 0.32290-4090-41 B B B90-50R14 WO 313672390-50 & 85-8R 174 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS 01-P-SIF-207 UV-645LINE #DIA X SCHFROMTOSI-070SI-070SI-070SI-07120 X 0.50012 X 0.37512 X 1.12512 X 0.375 74-42 76-2 76-5274-10374-4476-1376-1477-11SI-71 H-3SI-A-070-FCBA-12SI-07112 X 1.12577-1377-14SI-07110 X 0.36577-10C77-10DSI-20212 X 1.12576-1676-21SI-22012 X 1.12577-1677-21 UV-635 HV-69176-1176-2 76-3 76-5 76-6 76-7 76-876-1376-1076-1476-1676-1776-1876-1976-2076-21SI-A-202-CCBA-12SI-A-071-FCBA-12SI-E-220-CCBA-12SI-A-070-FCBA-2074-4277-7 74-43 74-10374-104 74-102 77-8 77-16 77-13 77-1177-2177-10C 77-20 77-10D 77-19 77-10B77-1877-10A 77-14 77-10 77-17 SI-70 H-10SI-71 H-2SI-70 H-13SI-70 H-11 W SI-70 H-16 WSI-70 H-14SI-70 H-9 W SI-70 H-15 74-44ZONE 94 ZONE 97 ZONE 96TOGEL 87-3TOGEL 87-3TOGEL 87-3TOGEL 87-3ZONE 92SI-70 H-12 W 19 20 76-54 76-53 76-52 76-51 ZONE 91WEST WRAP C CC B B B B B B B 175 of 208 3INT-ISI-1 Rev 2 UNIT 1 REFERENCE DRAWINGSLINE #DIA X SCHFROMTO SI-002 SI-239 SI-23912 X 0.25010 X 0.25010 X 0.365 70-85 70-70 70-8370-98 70-82A-SI-241 SI-24116 X 0.31218 X 0.31270-1 70-1670-1470-22 01-P-SIF-201 2770-97 SI-239H-1SI-241 H-12SI-241 H-21 wHV-691SI-A-002-GCBC-12 01-P-SIF-20770-9570-9470-8970-9270-8870-8670-1370-9170-2070-1970-1470-1770-1170-1070-7370-2270-8570-16A70-870-1670-770-7070-7770-570-7170-7470-7970-7670-8070-82A70-8370-470-270-9870-1 SI-239H-2SI-239 H-3 wSI-241 H-14SI-241 H-15 SI-241H-11 SI-241H-9SI-2 H-2EL. 84-3EL 78-9EL 87-3EL 87-3ZONE 100ZONE 94 UV-655 V-256EL 70SI-A-239-GCBC-10SI-A-241-GCBC-16 ZONE 92WEST WRAP ZONE 91 W W C C C C B B B B B BSI-2 H-3 B WSI-2H-4 B 176 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS 01-P-SIF-201 23 01-P-SIF-207 ZONE 100LINE #DIA X SCHFROMTOSI-089SI-089SI-007 8 X 0.322 10 X 0.365 24 X 0.37582-6682-55 84-682-6782-6584-8RSI-30724 X 0.56284-984-11V-205 UV-67484-1184-984-684-8RSI-A-307-GCBC-24EL 73-7ZONE 93 WEST WRAPSI-A-007-HCBA-24ZONE 102 UV-672ZONE 94SI-89 H-1182-5582-5682-5782-5882-5982-6182-6282-6082-6382-6482-6582-6682-67SI-89H-10 SI-89 H-13SI-89H-12 WEL 92-6EL 84-8TOGEL 87-3TOGEL 87-3SI-A-089-FCBA-10 21 ZONE 12093-4393-4193-4093-42SI-A-088-GCBC-10SI-08810 X 0.36593-4293-43SI-0888 X 0.32293-4093-41 B B B C93-50R14 WO 313675493-50 & 84-8R 177 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS; 01-P-SIF-201 01-P-SIF-207LINE #DIA X SCHFROMTO SI-070 SI-089 SI-241 20 X 0.500 10 X 0.365 18 X 0.312 74-28 82-45 70-2374-4182-5470-43 SI-89 H-7SI-A-241-GCBC-18SI-70H-8 W82-4582-4682-4982-4782-4882-5082-5182-5282-5382-54 SI-89 H-8SI-89 H-9SI-89 H-670-3470-3370-3070-3170-2870-2570-2770-2470-2370-4070-4170-4370-3670-3770-39SI-241 H-8 SI-241H-17SI-241 H-7 SI-241 H-4 SI-241 H-3 SI-241 H-2SI-241 H-5SI-241 H-674-3074-2874-3174-3274-3474-3574-3774-3874-40SI-70 H-5 W SI-70 H-474-41SI-A-089-GCBC-10SI-A-070-FCBA-20EL 72EL 89-4EL 92-6EL 64EL 41-10EL 90-2ZONE 83ZONE 91 ZONE 93ZONE 92 ZONE 70EL 88ZONE 94A TRAIN MISC. PIPE CHASES AND 88 PIPE TUNNEL ZONE 83 W W W W W W W C B B B B B B B B B B B B B BMRP 192 MIXING TEEWelds 74-28 178 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS; 01-P-SIF-202 01-P-SIF-208LINE #DIA X SCHFROMTOSI-072SI-134SI-194 20 X 0.500 10 X 0.365 18 X 0.31275-2783-4471-19 75-33 83-52 71-43 SI-194 H-6 W SI-134 H-12SI-B-134-FCBA-1071-4071-3971-3771-3671-2671-3471-4371-3371-3271-2571-4171-3071-2971-2371-2771-2271-2071-19 SI-194 H-7 SI-194H-2 SI-194 H-8 SI-194H-15SI-194 H-4 SI-194 H-10SI-194 H-21 SI-194 H-9 SI-194 H-11SI-194 H-583-4783-4483-4583-4683-4983-4883-5083-5183-52 SI-134H-1175-3375-3175-3075-2975-27SI-72H-8SI-72 H-10SI-72H-9SI-72 H-7EL 92-6ZONE 88EL 72ZONE 86EL 88ZONE 86 ZONE 90EL 95EL 92-1ZONE 73EL 41-10EL 89-9ZONE 89SI-B-072-FCBA-20SI-B-194-GCBC-18 ZONE 95B TRAIN MISC. PIPE CHASES AND 88 PIPE TUNNELSI-134 H-4 W W W W W W W W C C C C B B B B B B BB B BB B B BMRP 192 MIXING TEEWelds 75-27 179 of 208 3INT-ISI-1 Rev 2 UNIT 1 V-542 ZONE 91LINE #DIA X SCHFROMTO SI-202 SI-20212 X 1.12512 X 1.312 76-22 76-2776-2576-4776-25 SI-202 H-17 SI-202 H-12 WSI-E-202-CCBA-12 19REFERENCE DRAWINGS 01-P-SIF-103 A ASI-202 H-7 SI-202 H-8 SI-202 H-9 SI-202 H-10 SI-202H-6SI-202 H-1176-2876-3976-4076-4176-4276-4476-4376-4576-4676-47 SI-202 H-18 SI-202 H-2 SI-202 H-4SI-202 H-15 SI-202 H-3SI-202 H-5SI-202 H-16SI-202 H-176-3076-3176-2776-3276-3476-2976-3576-3776-3376-3876-3676-2376-2276-24SI-E-202-CCBA-12 ZONE 23FL EL 100EL 89-9V-134ZONE 114 ZONE 96 CONTAINMENT LPSIHEADER TO LOOP 1A76-7876-27A W W SI-202 H-14SI-202 H-13 W B B B C B B C B B C C C CC C C C C 180 of 208 3INT-ISI-1 Rev 2 UNIT 1 V-144 ZONE 91LINE #DIA X SCHFROMTOSI-220SI-220 12 X 1.125 12 X 1.31277-2277-27 77-25 77-47SI-E-220-CCBA-12REFERENCE DRAWINGS 01-P-SIF-103 A77-28C 20 A ZONE 24EL 89-9SI-220 H-18 SI-220 H-15 SI-220H-14SI-220 H-20 SI-220 H-17 SI-220 H-13 SI-220H-12 SI-220 H-28 SI-220H-10SI-220 H-1177-28B77-3877-3977-3177-3477-3077-2877-28A77-2977-28D77-3777-3577-3677-3277-3377-4077-2377-2277-38A77-2577-2477-2777-4677-4577-46B77-46A77-4277-4177-4477-4377-4777-46F77-46D77-46C77-46ESI-220 H-29SI-220 H-24 SI-220 H-8SI-220 H-7SI-220 H-23 SI-220 H-5 SI-220 H-27SI-220 H-9SI-220H-22 SI-220H-19SI-220 H-1 V-543SI-E-220-CCBA-12SI-220 H-21ZONE 114 ZONE 97 CONTAINMENT LPSIHEADER TO LOOP 1B77-7777-4877-27A77-40A77-42A W SI-220H-6SI-220 H-26 SI-220 H-25 W W W W W B C C C B B C B C BBBC B B B C C B C B B C B C 181 of 208 3INT-ISI-1 Rev 2 UNIT 1 V-114 ZONE 88LINE #DIA X SCHFROMTO SI-155 SI-155 12 X 1.125 12 X 1.312 78-22 78-2778-2578-47SI-E-155-CCBA-12REFERENCE DRAWINGS 01-P-SIF-13678-32 17SI-155 H-7 SI-155 H-2SI-155 H-6SI-155 H-578-3378-3578-3478-3878-3978-3778-4278-3678-4078-4178-4478-4378-4578-4678-4778-3078-2978-2878-2578-2778-2478-2378-2278-31 ZONE 25V-540 FL EL100EL 89-9ZONE 115 ZONE 98 CONTAINMENT LPSIHEADER TO LOOP 2A78-48 W W B B B B 182 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 88LINE #DIA X SCHFROMTO SI-174 SI-174 12 X 1.125 12 X 1.312 79-23 79-2779-2579-47REFERENCE DRAWINGS 01-P-SIF-136 18V-541 ZONE 26SI-174 H-11 SI-174 H-5SI-174 H-4SI-174 H-12SI-174 H-10 SI-174 H-8 SI-174 H-1379-2379-2579-4179-2779-3579-3479-3679-3779-4279-3879-3979-4079-4479-4379-4579-4679-47 V-124EL 93-5SI-E-174-CCBA-12ZONE 115 ZONE 99 CONTAINMENT LPSIHEADER TO LOOP 2B 79-67 W W B C B B B B C 183 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONELINE #DIA X SCHFROMTO SI-007 SI-24124 X 0.37516 X 0.31284-270-116 84-370-119 27 V-673SI-241 H-1984-5 W84-3SI-A-007-HCBA-24 23SI-369 H-1 W84-270-13470-13270-13170-12870-12270-12970-12670-12570-11770-12370-119 70-12070-121 V-653PSV-17970-116 92ZONE 93SI-A-241-GCBC-16SI-A-369-GCBC-10SI-24116 X 1.59470-12070-121SI-36910 X 0.25070-12270-132SI-3696 X 0.28070-134-REFERENCE DRAWINGS 01-P-SIF-105 01-P-SIF-15113-P-ZCG-112 ZONE 100 CONTAINMENT LPSI TRAIN A SUCTION70-186 ZONE 21 B B C 184 of 208 3INT-ISI-1 Rev 2 UNIT 1LINE #DIA X SCHFROMTO SI-030 SI-194 24 X 0.375 16 X 0.31285-271-112 85-371-121 26V-675 SI-194 H-22 85-5 W85-3SI-B-030-HCBA-24 24PSV-189 ZONE 90SI-B-194-GCBC-16SI-B-368-GCBC-10SI-19416 X 1.59471-12271-123SI-36810 X 0.25070-12471-143SI-3686 X 0.28071-145-REFERENCE DRAWINGS 01-P-SIF-105 01-P-SIF-15113-P-ZCG-112 ZONE 89 SI-194H-16SI-194H-26 SI-368 H-271-11271-12371-12471-12171-11971-12571-11871-12771-14871-13671-12271-11671-11571-14971-11371-15171-13171-13771-13071-13371-13471-14071-13971-14271-14371-145 ZONE 22UV-654 ZONE 101 CONTAINMENT LPSI TRAIN B SUCTION85-271-118A71-118B W W C B B B B 185 of 208 3INT-ISI-1 Rev 2 UNIT 1 84-14 H5 SI-009LINE#DIA/SCHFROMTOSI-30724" x 0.562"84-1284-37SI-30720" x 0.375"84-3984-46SI-918" x 0.312"80-1484-87SI-810" x 0.250"84-5184-84 REFERENCE DWG'S 01-P-SIF-201 ZONE 93 WEST WRAP 84-12V-205EL72'84-16 H2SI-A-307-GCBC-24" 84-18 84-20 84-22 84-26 84-51 84-2884-2984-31 84-53SI-A-008-GCBC-10" 84-55 84-57 84-5984-63 84-65 84-67 84-6984-7184-72V-470 84-74 84-75 84-7784-7984-80 84-82 84-84HPSI PUMP #1 84-33 84-8784-86 SI-A-009-GCBC-18" 84-3584-37 84-39 84-50V-105 80-15 80-14V-157 ZONE 76CSP SUCTIONSI-A-307-GCBC-20" 84-85 84-8 9 84-41 84-43HV-68384-44 84-46V-201 ZONE 70LPSI "A" SUCTIONCONT. ONCONT. ONCONT. ONSI-307 84-34CONT. ONZONE 103 RWT SUCTION H6 SI-307 H7 H8H10SI-307 H1 H2 H2 H4 H3 H1 SI-008 SI-008 SI-008SI-008 SI-009 SI-009SI-307 SI-307 84-48H15 SI-307 W H3SI-307 H5SI-307ZONE 116 ZONE 102 SAFETY INJECTION PUMPSTRAIN A SUCTION 84-92 84-93 84-8884-90 H5SI-008 W W W W W W W W C B B B B B B B B B B B B B B B 186 of 208 3INT-ISI-1 Rev 2 UNIT 1LINE#DIA/SCHFROMTOCH- 42420" x 0.375"86-186-20CH- 14220" x 0.375"86-2186-59 Reference DWG'S.
01-P-SIF-20113-P-ZYA-925 ZONE 103REFUELING WATERTRAIN A SUCTION 86-20 86-14 86-12 86-18 86-16 25 86-27 86-29 86-31V-306 86-5 86-86-23 CH-142-HCBA-20" 86-33 86-1 86-35 86 86-10 8 86-86-7 86-3 86-5SI PUMP SUCT.
CH-424-GCBC-20"HV531ZONE 102 REFUELINGWATERTANK 86-59 86-57CH-142-HCBA-20" 86-51 86-49 86-47 86-62 86-45 86-4386-41 86-60 86-55 86-53 86-37 ESSENTIAL PIPE TUNNEL 88'AUX BLDG 86-39-21 CONT ON88' PIPE CHASEH20 CH-14270El. 51 6" H14CH-142 H22CH-142 H13 CH-142 H2 CH-424 H3 CH-424 H6CH-424 H8CH-142 H1 CH-424 H4 CH-142 H6 CH-142 H1 CH-142 H3CH-142 H2CH-142 W W 86-66 86-69 W W W W W W B B B B B B B B B B B B B B 187 of 208 3INT-ISI-1 Rev 2 UNIT 1LINE#DIA/SCHFROMTOSI-30824" x 0.562"85-1285-37SI-30820" x 0.375"85-3885-49 SI-3318" x 0.312"85-5081-13SI-3110" x 0.250"85-5985-80CH-1503" x 0.216"104-2104-5 REFERENCE DWG'S 01-P-SIF-202 ZONE 90EAST WRAP 85-12 85-14SI-308-GCBC-24" 85-1685-1885-20 85-22 85-24 85-26 85-2885-59 85-6185-6985-6385-6585-67 85-7185-72V-206V-402 85-7485-7585-77 85-78SI-B-031-GCBC-10" 85-80 85-29 85-3185-3885-3785-50 SI-033-GCBC-18"V-15881-14V-104 81-13 85-5885-56 85-5485-52ZONE 79CONT. SPRAYPUMP "B" SUCT.V-200 85-49 85-47 85-46HV-69285-44 85-42SI-308-GCBC-20"SI-308-GCBC-24" 85-40 85-33 85-34 85-36ZONE 105RWT SUCT.T.O.G. EL. 70'6" HPSI PUMP #2 LPSI PUMP"B" SUCT.CONT. ON W H3 H1 H4CONT. ONCONT. ONZONE 73CONT. ON H3H15SI-308 H1 H4 H2H11 H5 H8 H9 H5 SI-308 SI-308SI-308SI-308 SI-308SI-31 SI-31SI-31 SI-033SI-308SI-308SI-308 ZONE 104 SAFETY INJECTION PUMPSTRAIN B SUCTION 85-82V-327 104-4 104-5 104-3104-2104-1 CH-150-GCBC-3IPCA 01-008 01-P-CHF-206 IPCA 04-009 W W W C B BB B B B B B B B B B 188 of 208 3INT-ISI-1 Rev 2 UNIT 1LINE#DIA/SCHFROMTOCH-42520" x 0.375"87-187-18CH-14920" x 0.375"87-1987-75 ZONE 105REFUELING WATER TRAIN B SUCTION 87-75CH-149-HCBA-20" 87-73 87-71 87-69 87-67 87-65 87-63 87-6187-5987-57 87-55 87-53 87-5187-49 87-8887-47 87-86 87-4587-8487-43 87-82 87-41 87-8087-39 87-78 87-37 87-35 87-33 87-31 87-29 EL. 88'70'87-27 CH-149-HCBA-20" 87-25 87-23 87-2187-76 87-19HV53087-1887-1487-16 EL 51'6" 87-1287-10 87-8V-305 87-7 87-5 87-3 87-1AUX. BLDG.
88'ESSENTIAL PIPE TUNNEL REFUELINGWATER TANK Reference DWG'S.
W W WH21 CH-149 H13CH-149H10 CH-149H12 CH-149 H27CH-149H25 CH-149 H26 CH-149 H2CH-149 H6CH-149 H7CH-149 H4CH-149 H5CH-149 H8CH-149 H14CH-149 H3CH-149 H1CH-149 H1CH-425 H6CH-425 H9 CH-149 87-71 87-69 87-67 87-65 87-63 87-61CH-425-GCBC-20"87-10 87-8V-305 87-7 87-5 87-3 87-1 SI-PUMP SUCTIONCONT. ON Reference DWG'S.
01-P-SIF-20213-P-ZYA-925 H1CH-425ZONE 104 87-90 W W W W W W W W W W W W B B B B B B B B B B B B B B B B B B B 189 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGSLINE #DIA X SCHFROMTOSI-099SI-100SI-100 4 X 0.337 4 X 0.438 4 X 0.438106-1106-7106-24 106-6106-44106-28 HV-604 SI-A-100-CCBA-4SI-100 H-2 SI-99 H-1SI-100 H-9SI-100 H-10SI-100 H-1SI-100 H-8SI-100 H-6 SI-100 H-5SI-100 H-4 SI-105H-DSI-105 H-C SI-100 H-3 SI-106 H-1 SI-99 H-2106-68106-69106-17106-44106-65106-72 106-6106-24106-20106-4106-70106-71106-66106-49106-18106-25106-59106-32106-29106-1106-33106-21106-50106-30106-67106-12106-7106-42106-40106-51106-10106-23106-48106-22106-8106-41106-9106-16106-31106-38106-36106-47106-35106-3106-39106-2106-5106-46106-19106-45106-27106-43106-61 106-37106-60 106-62ZONE 108 SI-A-105-CCBB-2SI-A-106-CCBA-3 V424 V-404 V-218 UV-666 01-P-SIF-203 SI-100 H-16 SI-100H-15 SI-100 H-36 SI-100H-7106-14106-13106-15106-11 V-476 HV-698106-54106-52106-56106-57106-58106-63106-55106-53106-64 A APOINT A CONTINUEDTHIS DRAWING POINT ACONTINUEDTHIS DRAWING SI-100 H-34106-26EL 41-2EL 46-3EL 41-2EL 48-10SI-A-105-CCBB-2SI-A-100-CCBA-4SI-100 H-11SI-A-99-CCBB-4SI-1052 X 0.344106-49106-72EL 88SI-1052 X 0.344106-63106-68SI-1063 X 0.438106-45106-48 HPSI A PUMP106-34 EL 51-6106-28 ZONE 106 HPSI PUMP ROOM ADISCHARGESW denotes Socket Weld SW SW SWZONE 118 W W SI-105 H-J W W W W W W W W W W W W W W W W W A C C C B B B B B B B B B B B B B B B B B 190 of 208 3INT-ISI-1 Rev 2 UNIT 1 REFERENCE DRAWINGSLINE #DIA X SCHFROMTOSI-107SI-107SI-107 4 X 0.337 4 X 0.337 3 X 0.438107-1107-23107-68107-41107-27107-71SI-107 H-8 SI-107 H-5SI-107 H-46 SI-107 H-3 SI-107 H-48 SI-107 H-12 SI-107 H-2107-15107-11107-41107-8107-45107-38107-37107-35107-24107-44107-71107-3107-6107-1107-26107-33107-36107-25107-34107-2107-14107-39107-31107-16107-23107-4107-5107-42107-47107-46 ZONE 109SI-B-107-CCBB-4SI-B-107-CCBB-4 V405 HV-609 HV-69901-P-SIF-204 SI-107 H-4107-12107-40107-32107-7107-10107-43107-21107-9POINT A CONTINUEDTHIS DRAWING EL 47-3EL 41-2EL 46-9SI-B-107-CCBB-3SI-B-112-CCBB-2 HPSI B PUMPSI-1122 X 0.344107-42107-65SI-1122 X 0.344107-56107-60SI-1122 X 0.344107-66107-67 SI-107H-11 SI-107 H-7SI-107 H-6SI-107 H-9SI-107 H-10 V-478107-28107-20107-18107-19107-17107-69107-70107-48107-13107-30107-29107-22107-27107-68SI-112 H-H SI-112 H-G SI-112H-C107-57107-63107-61107-62107-58107-52107-59107-54 107-53 107-55SI-B-112-CCBB-2 V426 V-219 UV667107-64107-67107-49107-50107-51107-56107-65 107-66107-60 APOINT A CONTINUEDTHIS DRAWINGEL 41-2 V400 A EL 44SI-107 H-1EL 41-2EL 48-10EL 51-6ZONE 107 HPSI PUMP ROOM BDISCHARGE SW SW SWNote: SW denotes a socket weld107-72107-73ZONE 119 W W W W W W W W W W W W A C C C B B B B B B B B B B B B B 191 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGSSI-A-100-CCBA-401-P-SIF-203SI-100 H-18108-701-P-SIF-204 01-P-CHF-207EL. 89 4SI-100 H-21SI-100 H-26 SI-100H-29SI-100 H-13SI-100H-12SI-100 H-19 SI-100 H-32SI-100 H-35 SI-100 H-31SI-118 H-S SI-118H-R SI-118 H-P SI-118 H-NSI-118 H-ESI-118 H-HSI-118 H-A108-17108-8108-16108-13108-12108-9108-11108-2108-18108-4108-14108-5108-19108-6108-15108-27108-26108-33108-35108-31108-25108-39108-22108-40108-41108-38108-32108-28108-29108-37108-34108-36108-24108-23108-20108-21108-30108-43108-44108-42108-45SI-A-100-CCBA-4 SI-E-118-CCBA-2EL. 89 EL. 922 EL. 92EL. 92 EL. 93 10 V508ZONE 112ZONE 106 CHARGING PUMP AZONE 111108-3108-1108-10 SI-100 H-20LINE #DIA X SCHFROMTOSI-100SI-118 4 X 0.438 2 X 0.344 108-1108-35 108-34 108-45 ZONE 108HPSI DISCHARGE 88 PIPE CHASE W W W W W W W W W W W W W W C C B B B B B B B B B B B B B B B B 192 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS SI-B-107-CCBB-4 01-P-SIF-203109-39SI-107 H-25 SI-107H-26 SI-107 H-35SI-107 H-21 SI-107H-20SI-107 H-14SI-107H-13SI-107H-47SI-107H-16 SI-107H-19SI-107H-15 SI-107 H-34SI-107 H-37 SI-107 H-3619-37109-38109-35109-34109-36109-33109-32109-31109-30109-9109-8109-5109-6109-4109-7109-3109-1109-2109-29109-26109-28109-24109-27109-25109-23109-22109-20109-21109-16109-14109-19109-15109-18109-13108-17109-12109-11109-10109-40109-41109-42109-43 01-P-SIF-204 SI-B-107-CCBB-4EL. 88 6EL. 51 8FROMHPSI B 40EL. 89 4EL. 91EL. 89 4EL. 92 2ZONE 110ZONE 107ZONE 113EL. 93 10LINE #DIA X SCHFROMTO SI-1074 X 0.337109-1109-43 ZONE 109HPSI DISCHARGE 88 PIPE CHASE W W W W W W W W W C C C B B B B B B B B B B B 193 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGSSI-B-107-CCBB-4 01-P-SIF-203110-24EL. 88 6ZONE 109 SI-236 H-B SI-107 H-ASI-218 H-1SI-218 H-3SI-218 H-2SI-218 H-B SI-110H-ASI-107 H-42 SI-107H-45SI-107 H-41 SI-107 H-39 SI-103H-DSI-103 H-BSI-103H-E110-15110-29110-30110-31110-22110-28110-26110-17110-21110-27110-25110-12110-16110-23110-19110-10110-14110-20110-18110-5110-9110-13110-11110-3110-8110-53110-7110-1110-4110-6110-2110-35110-36110-37110-39110-32110-34110-38110-33110-57110-56110-60110-62110-59110-58110-61110-63110-47110-45110-46110-50110-49110-48110-64110-51110-42110-41110-40110-44110-43 UV636 UV646UV637ZONE 111ZONE 114ZONE 111 15EL. 85EL. 93 5EL. 86 6EL. 88 6EL. 85 9/16SI-107 H-44SI-107 H-43 SI-E-218-CCBA-2 SI-E-218-CCBA-4SI-B-110-CCBB-2SI-E-218-CCBA-3 SI-A-103-CCBA-2SI-E-236-CCBA-2SI-B-107-CCBB-2 SI-103H-A110-55110-54110-52LINE #DIA X SCHFROMTOSI-1032 X 0.344110-40110-52SI-1074 X 0.337110-1110-10SI-1102 X 0.344110-11110-17SI-2182 X 0.344110-18110-22SI-2183 X 0.438110-38110-39SI-1072 X 0.344110-53110-59SI-2184 X 0.438110-23110-37SI-2362 X 0.344110-60110-64ZONE 110HPSI DISCHARGE WEST WRAP W W W W W W C C C C B B B B B B B B B B B B B 194 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS 01-P-SIF-203 SI-100 H-37111-29 UV647 16EL. 85SI-A-100-CCBA-4ZONE 110ZONE 110111-30111-33111-31111-34111-37111-32111-35111-38111-36111-39111-40111-22111-28111-26111-27111-25111-24111-17111-18111-20111-19111-21111-23111-8111-12111-15111-13111-16111-14111-11111-5111-6111-9111-7111-10111-4111-2111-1111-3SI-100 H-B SI-236 H-2 SI-236H-3 SI-100 H-30 SI-100H-A SI-A-100-CCBA-2SI-E-236-CCBA-4SI-E-236-CCBA-3EL. 88 6EL. 85EL. 93 5ZONE 108111-41LINE #DIA X SCHFROMTO SI-1002 X 0.344111-9111-25SI-2363 X 0.438111-40111-41SI-2364 X 0.438111-26111-39SI-1004 X 0.438111-1111-8ZONE 111HPSI DISCHARGEWEST WRAPZONE 114 W W C B B B B B 195 of 208 3INT-ISI-1 Rev 2 UNIT 1SI-176 H-2 SI-101H-ASI-176 H-3112-3112-25112-8112-42112-46112-45112-35112-44SI-176 H-1112-43 SI-102H-BSI-102 H-ASI-100 H-17SI-101 H-D112-17112-21112-26SI-A-100-CCBA-4 14112-40112-18112-38112-39112-32112-41112-30112-33112-31112-37112-29112-36112-24112-34112-20112-28 UV-617112-4112-12112-9112-23112-5112-14112-16112-27112-6112-13112-7112-2112-1112-15112-22112-10112-11SI-E-176-CCBA-3SI-E-176-CCBA-4SI-A-101-CCBA-2 ZONE 108 ZONE 115SI-E-102-CCBA-2SI-101 H-B112-19 UV-627 ZONE 113 ZONE 113LINE #DIA X SCHFROMTOSI-100SI-101SI-1024 X 0.4382 X 0.3442 X 0.344112-1112-7112-21112-6112-20112-32SI-1764 X 0.438112-33112-44SI-1763 X 0.438112-45112-46REFERENCE DRAWINGS01-P-SIF-204EL 88-9EL 92-6EL 93-5SI-101 H-CZONE 112HPSI DISCHARGEEAST WRAP W W W W B B B BB B B B B B 196 of 208 3INT-ISI-1 Rev 2 UNIT 1 SI-107 H-22 SI-109H-A SI-157 H-4 SI-157 H-6 SI-107 H-24113-38113-37113-51113-7113-2113-1113-41113-49 SI-176 H-A A POINT ACONTINUEDTHIS DRAWING SI-10 8H-A SI-157H-5113-3SI-B-107-CCBB-4 13113-30113-31113-20 UV-626113-9113-36113-43113-39113-25113-42113-28113-14113-12113-11113-10113-17113-18113-16113-13113-19113-8113-15113-4113-21113-23113-26113-6113-22113-5113-24113-40113-27113-35113-33113-34113-48113-47113-45113-44 UV-616 SI-157H-9SI-E-157-CCBA-4SI-E-157-CCBA-4SI-B-108-CCBB-2SI-B-109-CCBB-2 A POINT ACONTINUEDTHIS DRAWING ZONE 109 ZONE 115REFERENCE DRAWINGSLINE #DIA X SCHFROMTO 01-P-SIF-204 SI-1082 X 0.344113-7113-15SI-1092 X 0.344113-21113-27SI-1574 X 0.438113-33113-49SI-1573 X 0.438113-50113-51SI-1572 X 0.344113-16113-20 SI-157H-A SI-157H-1SI-1074 X 0.337113-1113-6113-50 ZONE 112 ZONE 112113-29SI-E-176-CCBA-2SI-B-157-CCBA-2EL 86EL 92-6EL 88-9EL 84-6113-46113-32SI-1762 X 0.344113-28113-32 WZONE 113HPSI DISCHARGEEAST WRAP W W W B C B B B B B B B B B 197 of 208 3INT-ISI-1 Rev 2 UNIT 1SI-218 H5 SI-236H-5114-16114-10114-9 15 16114-20114-5114-7114-11114-1114-3114-4114-2114-21114-19114-8114-17114-6114-15114-22114-18SI-E-218-CCBA-3SI-E-236-CCBA-3 ZONE 97 ZONE 111REFERENCE DRAWINGSLINE #DIA X SCHFROMTOSI-218SI-236 3 X 0.438 3 X 0.438114-1114-12114-11114-23 01-P-SIF-103 ZONE 96EL 91-4 V-133EL 93-5114-12114-14 V-143114-23114-13 EL 93-5ZONE 110 ZONE 114 CONTAINMENT HPSI HEADER LOOP 1A & 1B B B 198 of 208 3INT-ISI-1 Rev 2 UNIT 1 SI-157 H-11115-17115-20115-19115-7115-5 13 14115-8115-9115-6115-11115-12115-10115-1115-3115-14115-21115-15115-22115-16115-18115-2115-4115-13 SI-176 H-4SI-E-157-CCBA-3SI-E-176-CCBA-3 ZONE 99 ZONE 112ZONE 113REFERENCE DRAWINGSLINE #DIA X SCHFROMTOSI-157SI-176 3 X 0.438 3 X 0.438115-1115-13115-12115-22 01-P-SIF-136 ZONE 98EL 91-4EL 91-4 V-113 V-123EL 89-9EL 93-5ZONE 115 CONTAINMENT HPSI HEADER LOOP 2A & 2B B B 199 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGS1) TAG NUMBER: 1MSIAP022) SERIAL NUMBER: INGERSOL RANDDISCHARGE SUCTION ZONE 102 ZONE 106116-1D W116-1A W 116-1C W 116-1B W NZONE 116 HPSI PUMP A116-2116-1S/N 0776-14 01-P-SIF-201 01-P-SIF-203 DISCHARGE HEAD STUDS3) DISCHARGE HEAD STUDS 16@ 2.25 DIA. X 10.88116-20 B B B B 200 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGSDISCHARGE SUCTION1) TAG NUMBER: 1MSIBP022) SERIAL NUMBER: INGERSOL RAND ZONE 104 ZONE 107117-1D W 117-1B W117-1A W 117-1C W NZONE 117 HPSI PUMP B117-2117-1S/N 0776-153) DISCHARGE HEAD STUDS 16@ 2.25 DIA. X 10.88 DISCHARGE HEAD STUDS 01-P-SIF-201
01-P-SIF-203117-20 B B B B 201 of 208 3INT-ISI-1 Rev 2 UNIT 1REFERENCE DRAWINGSLINE #DIA X SCHFROMTO SI-1063 X 0.438118-1118-49 HV-604 SI-106H-18SI-106 H-24 SI-106H-3SI-106H-11 SI-106 H-10SI-106 H-9 SI-106 H-7SI-106 H-14SI-106 H-15 SI-106H-13SI-106H-16118-31118-48118-32118-34118-3118-36118-4118-20118-22118-25118-49118-5118-27118-43118-47118-14118-33118-26118-13118-28118-29118-19118-10118-8118-37118-7118-1118-35118-2118-39118-38118-17118-15118-9ZONE 39SI-A-106-CCBA-301-P-SIF-203 SI-106 H-6SI-106 H-8118-42118-45 V-523 HV-321 APOINT A CONTINUEDTHIS DRAWINGSI-106 H-23118-18EL 46-3EL 85SI-106 H-12EL 92 6ZONE 118 HPSI A LONG TERM RECIRCULATION118-6EL 51-6118-21SI-106 H-4SI-106 H-5 SI-106H-21 SI-106 H-22SI-106 H-2 77118-44SI-106 H-25 SI-106 H-20 SI-106 H-19118-41118-40118-46 A POINT ACONTINUEDTHIS DRAWING118-23118-16118-24118-11118-1201-P-SIF-105SI-A-106-CCBA-3 ZONE 106 SI-106 H-26118-30 W W W W W W W W W W W W W W W W W W C C B B B B B B B B B B B B B B B B B B B B B B 202 of 208 3INT-ISI-1 Rev 2 UNIT 1LINE #DIA X SCHFROMTOSI-114 SI-3193 X 0.4382 X 0.344119-1119-53119-52119-57 ZONE 119 HPSI B LONG TERM RECIRCULATIONREFERENCE DRAWINGS SI-114H-8SI-114 H-4SI-114 H-1 SI-114H-10SI-114 H-22SI-114 H-9 SI-114H-26119-54119-52119-14119-24119-49119-11119-10119-8119-23119-30119-2119-26119-32119-41119-57119-6119-9119-7119-47119-12119-4119-56119-55119-21119-53119-35119-15119-17 ZONE 40SI-E-319-CCBA-2SI-B-114-CCBA-3 HV331 HV-609 V-509 01-P-SIF-105 SI-114H-27119-43119-13119-5119-16119-19119-31119-20119-25EL 46-3EL 87-3EL 46-8SI-B-114-CCBA-3SI-114 H-7SI-114 H-3SI-114 H-2 SI-114H-5 SI-114H-6119-3119-44119-33119-50119-18119-22119-42119-36119-1119-34119-40SI-B-114-CCBA-3 V-533119-46119-51119-45EL 87-3AEL 88SI-114 H-21EL 85-4EL 94-3EL 51-6SI-319 H-ASI-319 H-G 67 A ZONE 107119-29119-28119-27SI-114H-17SI-114H-15SI-114 H-16119-37119-38119-39 01-P-SIF-20401-P-CHF-207 SI-114 H-13SI-114 H-12 SI-319H-B POINT ACONTINUEDTHIS DRAWING POINT ACONTINUEDTHIS DRAWING119-48 W W W W W W W W W W W SI-319 H-J W C C C C B B B B B B B B B B B B B B B B B B B 203 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 120CONTAINMENT SPRAY A CONT ZONE 93LINE #DIA X SCHFROMTOSI-08810 X 0.250120-1120-19REFERENCE DRAWINGS13-P-ZCG-105 21 SI-88 H-5120-9120-12120-6120-11120-10120-7120-5120-8120-2120-1 V-164SI-A-088-GCBC-10120-13120-4120-3EL 116-4120-14120-15120-16120-19120-18120-17 C 204 of 208 3INT-ISI-1 Rev 2 UNIT 1 ZONE 121CONTAINMENT SPRAY BCONT ZONE 90LINE #DIA X SCHFROMTOSI-13010 X 0.250121-1121-21REFERENCE DRAWINGS13-P-ZCG-105 22SI-130H-7121-13121-6121-14121-07121-5121-18 V-165 SI-B-130-GCBC-10121-08121-4121-19EL 116-4121-15121-16121-17121-20121-21121-3121-1121-2121-9121-11121-12121-10 C 205 of 208 3INT-ISI-1 Rev 2
SECTION 11.0 Terms and Definitions 206 of 208 3INT-ISI-1 Rev 2 AHE: Augmented High Energy ANII: Authorized Nuclear Inservice Inspector APS: Arizona Public Service Company, et al ASME: American Society of Mechanical Engineers Aux: Auxiliary BWR: Boiling Water Reactor CE: Combustion Engineering CEDM: Control Element Drive Mechanism CFR: Code of Federal Regulations CH: Charging CHR: Containment Heat Removal Circ: Circumferential CL: Cold Leg CRD: Control Rod Drive CS: Containment Spray CSP: Containment Spray Pump DWG: Drawing ECCS: Emergency Core Cooling System FW: Feedwater HL: Hot Leg HPSI: High Pressure Safety Injection HV: Hand Control Valve Hx: Heat Exchanger ICI: In Core Instrumentation IEB: Inspection and Enforcement Bulletin IEIN: Inspection and Enforcement Information Notice Inj: Injection INPO: Institute for Nuclear Power Operations ISI: Inservice Inspection LPSI: Low Pressure Safety Injection MSSS: Main Steam Support Structure NDE: Nondestructive Examination NRC: Nuclear Regulatory Commission PDV: Pressure Differential Valve PSV: Pressure Relief or Safety Valve PWR: Pressurized Water Reactor PVNGS: Palo Verde Nuclear Generating Station PZR: Pressurizer RC: Reactor Coolant RCP: Reactor Coolant Pump REV: Revision RHR: Reactor Residual Heat Removal Recirc: Recirculation 207 of 208 3INT-ISI-1 Rev 2 RCS: Reactor Coolant System RPV: Reactor Pressure Vessel RVLMS: Reactor Vessel Level Monitoring System REM: Roentgen Equivalent Man SDCHX: Shutdown Cooling Heat Exchanger SD: Shutdown SER: Significant Event Report SG: Steam Generator SI: Safety Injection SN: Serial Number T: Thickness Tech. Spec: Technical Specification UFSAR: Updated Final Safety Analysis Report USNRC: United States Nuclear Regulatory Commission UV: Multivariable Control Valve V: Valve
208 of 208 3INT-ISI-1 Rev 2