Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr
ML18016A767
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/30/1998
From: EADS J H, ROGERS S G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-98-181, NUDOCS 9812210177
Download: ML18016A767 (9)


Text

CATEGORY 1 REGULATO Y INFORMATION DISTRIBUTION SYSTEM (RIDS)'FACIL:50-400 Shearon Harris.Nuclear Power Plant, Unit 1, Carolina AUTH.NAME.Q.AUTHOR AFFILIATION ROGERS;S.u.

Carolina Power 6 Light Co.EADS,J.H;Carolina Power&, Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthly oper Nov 1998 for SH Nuclear Power Plant, Unit.With 981215 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR 1 ENCL L SIZE'ITLE:

Monthly Operating Repor t (per Tech Specs)NOTES:Application for permit renewal filed.0500040ÃRECIPIENT ID CODE/NAME PD2-1 PD INTERNAL AC ILE CENTER RGN2 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME FLANDERS,S AEOD/SPD/RRAB OC/DBA/PAD COPIES LTTR ENCL 1 1 1 1.1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR.1 1 1 1 NOAC 1 1 D N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 Carolina Power 8c Ught Company Harris Nuclear Plant P.O.8ox 165 New Hill NC 27562 OEC l 5 l998 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 Serial: HNP-98-181 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power&Light Company's Hams Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of November 1998 is provided, Sincerely, J.H.Eads Acting Manager, Regulatory Affairs Harris Plant SGR Enclosure c: Mr.J.B.Brady-NRC Senior Resident Inspector Mr.S.C.Flanders-NRC Project Manager Mr.L.A.Reyes-NRC Regional Administrator 5413 Shearon Harris Road New Hill NC'it8i22iOi77 98ii30 I';PDR ADGCK 05000400~PDR~l 4 P~O 1 r~'j i k ,-a$lI L'E C'I t Enclosure to Serial HNP-98-181 Sheet 1 of 3 CP&L CO.RUN DATE 12/03/98 RUN TIME 10:27:08 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36"000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERIOD: NOVEMBER 98 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0 6.HAX DEPENDABLE CAPACXTY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.ZF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 10.REASONS FOR RESTRICTION IF ANY: THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS XN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRXTICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILXTY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 720.00 72.23.00 48.40.00 44835.12 12417.00 641.00 6.72 6.72.10.10.00 (TYPE, DATE/101545.00 85481.61.00 84641.61.00 227403828.54 75665275.00 70599749.00 83.35 83.35 80.84 77.25 3.12 8016.00 7171.90.00 7148.07.00 19569051.36 6483471.00 6074444.00 89.17 89.17 88.12 84.20.05 AND DURATION OF EACH): 25.ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHZEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCZAL OPERATION 1.16-9 11 I l t<

Enclosure to Serial: HNP-98-181 Sheet2of3 CPr L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 12/03/98 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 10:27:08 HARRIS UNIT 1 PAGE 1 RPD39-000 NOVEMBER 1998 DAY AVG.DAILY POWER LEVEL (MWE-NET)DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)17 10 12 13 as 16-10-12-12-12-12-10-10-10-10 18 19 20 21 22 23 25 26 27 28 29 30-10-10-10-15-23-36-35-37 282 1.16-8 k'4 It I UNIT NAME: Harris DATE: 11/30/98 COMPLETED BY: S.G.Rogers TELEPHONE:

(919)362-2573 REPORT MONTH: November 1998 UNIT SHUTDOWNS AND POPOVER REDUCfION Enclosure to Serial: HNP-t)8-181 Sheet 3of3 NUMBER 98405 DATE TYPE I 10/23/98 DURATION (HOURS)671.6 REASON 2 METHOD OF SHUTfING DOWN REACTOR 3 LICENSEE EVENT REPORTS N/A SYSTEM CODE 4 COMPONENT CODE 5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE Plant remained off-line for Refueling Outage(RF08).

Plant was rctumed to service on 11/28/98 tm 23:36 and commenced ramp-up to 10(P/o popover.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G<perational Error (Explain)Hither (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161) 5 Exhibit I-Same Source p A 4 r~'i~