ML17254A712

From kanterella
Revision as of 14:03, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Rev 11 to QA Program for Station Operation. Organization Changes & Responsibilities in Engineering Organization Discussed
ML17254A712
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/20/1985
From: KOBER R W
ROCHESTER GAS & ELECTRIC CORP.
To: MURLEY T E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17254A713 List:
References
NUDOCS 8601130078
Download: ML17254A712 (8)


Text

ACCSSIONNBR:FACIL:50-244AUTH.NArtEKQHERIR.W.RECIP.NAKEI"tURLFYi T.E.REGULATORY "FORMATION DISTRIBUTION SYN(RIDS)8601130078DOC.DATE:85/12/20NOTARIZED:

NORobertEr+IetGinnaNuclearPlantiUnit1IRochester AUTt.iQRAFFILIATION Rochester Gas5ElectricCorp.RECIPIENIAFFILIATION Region1IOfficeofDirectorDOCKETIG05000244.-,SUBJt.-"CT:ForwardsRev11to"GAProgramforStationOperation.

"Organization changes8;responsibilities inengineering organizationdiscussed.

r/DISTRIBUTION CODE:GOOIDCORIRECEID:TRgENCLQSIZE:TITLF:Gua1itgAssurance Dist.,forReportUnderReviet'OTES:NRRPNR-BISAPD1cg.OL:09/1'P/69 05000244RECIPIENtIDCODE/NAI'tE CLIFFQRDI JCOPIESLTTRENCL11RECIPIENT IDCODE/NAME COPIESLTTRENCLINTERNAt..:ACRSISUB08101010322*D<l/LFt'tBIE/DGAVT/GAB 01EXTERNAL:

24XNRCPDR021111LPDRNOTES:TOTALNUI'tHEROFCOPIESREQUIRED:

LTTR20ENCL19'I

~'l>IIIIflf'I zairezzsizzgklzeelj~IIIIIIIIIIIII 8K::::ROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.Y.14649.0001 ROGERW.KOBERWCEPRE@DENTElECTRIC&STEAMPRODUCTlON TELEPHONE AREACODETie546.2700December20<1985Dr.ThomasE.MurleyRegionalAdministrator U.S.NuclearRegulatory Commission Region1631ParKAve.KingofPrussia>Pennsylvania 19406

SUBJECT:

Submittal ofQualityAssurance ProgramR.E.GinnaNuclearPowerPlantDocketNumber50-244

DearDr.Murley:

Inaccordance with50.54of10CFRPart50,enclosedisRevisionlltotheQualityAssurance ProgramforStationOperation.

TherevisioninvolveschangesintheRG6Emanage-ment>GinnaandEngineering organizations.

Following thesuddendeathoftheSeniorVicePresident, Operations<

RG6EManagement withtheconcurrence oftheBoardofDirectorsf hasdecidednottofillthisposition.

Undertheneworganization thevicepresidents, whohadreportedtotheSeniorVicePresident>

Operations, willnowreportdirectlytothePresident andChiefOperating Officer.Arealignment ofresponsibilities intheEngineering organi-zationhasresultedinachangeintitlewherebytheEngineering Department nowreportstotheVicePresident, Engineering andConstruction>

andapositionofChiefEngineerhasbeenreinstated.

ThepositionofAssistant ChiefEngineer, Engineering andConstruction<

hasbeenreplacedbythepositionofDirectorofEngineering Services.

Inordertomaintainindependence oftheQualityAssurance organization fromthedesign>construction andotherengineering functions, theExecutive VicePresident willhaveoverallresponsibility andauthority todirectQualityAssurance<

however,theday-to-day direction willcomefromtheChiefEngineer.

8tflP>f3007885<~0PDRADOCN,050002D4R+

pTheGinnaorganization changesconsistofthefollowing:

b06,),

)n ThepositionofSuperintendentI NuclearProduction andSuperintendent ofGinnaStationhasbeenchangedtothepositionofSuperintendent>

NuclearProduction.

ThepositionofSuperintendent ofGinnaStationhasbeendividedintoSuperintendent-Ginna Production andSuperinten-dent-Ginna SupportServices.

TheSuperintendent Ginna-Production isresponsible foroverallon-siteGinnaStationoperation.

ThepositionofAssistant, Superintendent hasbeeneliminated.

NuclearAssurance willreporttotheSuperintendent>

NuclearProduction and.isresponsible forassuringthatactivities affecting qualityareprescribed andcarriedoutinaccordance withapproveddrawingsI specifications andprocedures.

CentralRecordswillreporttotheNuclearAssurance Manager.TheHealthPhysicsandChemistry Manager<theMaintenance ManagerIandtheOperation ManagerwillreporttotheSuperintendent-Ginna Production.

TheTechnical ManagerandtheMaterials Supervisor willreporttotheSuperintendent-Ginna SupportServices.

Minorchangeshavealsobeenmadeunderthevariousmanagerswhichisreflected inthefigures.Thisreorganization willprovidegreatermanagement attention toNuclearAssurance andlongtexmplanninganddirection for,thestation.;i<Day-'o-day operation ofthe"stationwillbemademoreeffective bycre'ating

'aproducti'on

.grouptoconcentrate onoperations>

maintenance>

andhealthphysicsandchemistry.

TheSupportGroupwillthenbeabletoconcentrate onnon-day-to-day issues.The'emoval ofthecommunications pathfromtheQualityControlEngineertotheSuperintendent, NuclearProduction andGinnaStationSuperintendent coincides withelevating theleadqualityresponsibility fromtheQualityControlEngineertotheManager<NuclearAssurance.

ThischangeisintendedtoenhancetheGinnaqualityprogramthroughreestablishing thedirectreporting linktotheresponsible superintendent andthroughreassignment ofaformerexperienced leadQualityContxolEngineerasManagerINuclearAssurance.

ThePurchasing department hasbeenrenamedMaterials Manage-ment.HoweverIwithinthatdepartment theresponsibilities forpurchasing willremainwiththePurchasing Agentandremainessentially unchanged.

.Ji'1PP'Il4CC.

Thesechanges,whichhavebeenpreviously submitted asachangetoTechnical Specifications>

willnotreducetheeffective-nessoftheGinnaQualityAssurance Programnorreduceanyofourpreviouscommitments.

rtrulyyours<RerN.KoberEnclosure xc:N.A.Cook>SeniorResidentInspector JfhIN.'I'.)p'