ML17261B022

From kanterella
Revision as of 13:19, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Provides Revised Test Schedule for motor-operated Valve Diagnostic Test Program,Per IE Bulletin 85-003.NRC Notification of Changes to Valve Operability Program Required by Generic Ltr 89-10,dtd 890828
ML17261B022
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/22/1990
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
Office of Nuclear Reactor Regulation
References
GL-89-10, IEB-85-003, IEB-85-3, NUDOCS 9003290233
Download: ML17261B022 (3)


Text

CACCELERATFJ3 DTRJBUTION DEMONSHTION SYSTEMREGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9003290233 DOC.DATE:

90/03/22NOTARIZED:

NODOCKETFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION MECREDEY,R.C.

Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

ProjectDirectorate I-3SIZE:

SUBJECT:

ProvidesrevisedtestscheduleforMOVdiagnostic testprogram.DISTRIBUTION CODE:1E11DCOPIESRECEIVED:LTR ENCLTITLE:BulletinResponse(50DKT)NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).

05000244RECIPIENT IDCODE/NAME PD1-3LAJOHNSON,A INTERNAL:

AEOD/DOANRR/DET/EMEB9H3 NRR/DOEA/OGCB11 NRR/DST/SE2NUDOCS-ABSTRACT RES/DSIR/EIB EXTERNAL:

LPDRNSICCOPIESLTTRECL11RECIPIENT IDCODE/NAME PD1-3PDAEOD/DSP/TPAB NRR/DOEA/OEAB11 NRR/DREP/PEPB9D NRRPSILRB12L02G1FILE01NRCPDRCOPIESLTTRECL1NOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMP1-37(EXT.20079)TOELIMINATE YOURNAMEFROMISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:

LTTR18ENCL RSP/~TOSSSTATCROCHESTER GASANDELECTRICCORPORATION

~'89EASTAVENUE,ROCHESTER, N.Y.1484g-ggg1 March22,1990TCS.CP~OA1C ARCACOOC71'462700U.S.NuclearRegulatory Commission DocumentControlDeskAttn:AllenR.JohnsonProjectDirectorate I-3Washington, D.C.20555

Subject:

ChangetotheIEB85-03ProgramR.E.GinnaNuclearPowerPlantDocketNo.50-244

Reference:

1.RGGEtoNRCletterdatedJuly8,1988fromR.E.SmithtoC.Stahle,"IEB85-03,ReportSummarizing ProgramCompletion" 2.GenericLetter89-10,"Safety-Related MotorOperatedValveTestingandSurveillance",

datedJune28,1989

DearMr.Johnson:

InReference 1,RG&Esubmitted aprogramthatsatisfied therequirements ofIEB85-03.Thatprogramprescribed atestscheduleconsisting ofanannualmotorloadtestforACMOVs,annualbaselinetestforDCMOVsandafullbaselinetestforACMOVseveryfouryears.Thisschedulewasacknowledged tobeflexible, subjecttochangebasedoneitherindustryorin-plantdata.SinceReference 1wassubmitted, RGGEhasre-evaluated theMOVdiagnostic testprogrambasedprimarily upontheresultsoftheReliability CenteredMaintenance ProgramatGinnaStation,changesinmotorloadtestingmethodology andtheundertaking ofanextensive valverefurbishment program.Thetestschedulehassubsequently beenrevisedasfollows:CtUnteaCVOQFrCsGGQU>+csCSjgoFiOC.~OCACVROQ'Q0QQ1.Acompletebaselinetestshallbeperformed onceoneachMOV(ACorDC).IftheMOVisoverhauled orextensive corrective maintenance isperformed, newbaselinesignatures willbeacquiredasnecessary.

2.EachMOVshallberetestedataspecified intervalateitherthemotorcontrolcenter(i.e.,motorloadtest)orthevalveasfollows:a.Environmentally Qualified MOVs-3yearsb.Safety-Related MOVs-5yearsc.NonSafety-Related MOVs-10yearsInaddition, motorloadtestingwillbeperformed asnecessary uponcompletion ofminorcorrective maintenance tasks.gP/

NRCnotification ofchangestotheValveOperability ProgramisrequiredbyReference 2whichwasissuedonJune28,1989.Detailedjustification forthesechangeshasbeenretainedonsiteasrequiredbyReference 2.Verytrulyyours,RobertC.MecedyDivisionManagerNuclearProduction RWEN092Attachment xc:Mr.AllenR.Johnson(MailStop14D1)ProjectDirectorate I-3Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector