IR 05000261/2021301

From kanterella
Revision as of 10:58, 18 January 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
NRC Operator License Examination Report 05000261/2021301
ML21323A112
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 11/19/2021
From: Gerald Mccoy
Division of Reactor Safety I
To: Kapopoulos E
Duke Energy Progress
References
50-261/21-301
Download: ML21323A112 (10)


Text

November 19, 2021

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000261/2021301

Dear Mr. Kapopoulos:

During the period September 20-27, 2021, the Nuclear Regulatory Commission (NRC)

administered operating tests to employees of your company who had applied for licenses to operate the H. B. Robinson Steam Electric Plant. The written examination was administered by your staff on September 30, 2021. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination with those members of your staff identified in the enclosed report.

All applicants passed both the operating test and written examination. There were no post-examination comments. A Simulator Fidelity Report is included in this report as Enclosure 2.

The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4551

Sincerely,

/RA/

Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos: 50-261 License Nos: DPR-23

Enclosures:

1. Report Details 2. Simulator Fidelity Report

REGION II==

Examination Report Docket No.: 05000261 License No.: DPR-23 Report No.: 05000261/2021301 Enterprise Identifier: L-2021-OLL-0037 Licensee: Duke Energy Progress, LLC Facility: H. B. Robinson Steam Electric Plant, Unit 2 Location: Hartsville, SC Dates: Operating Test - September 20-27, 2021 Written Examination - September 30, 2021 Examiners: M. Meeks, Chief Examiner, Senior Operations Engineer M. Donithan, Operations Engineer N. Lacy, Operations Engineer Approved by: Gerald J. McCoy, Chief Operations Branch Division of Reactor Safety Enclosure 1

SUMMARY ER 05000261/2021301; September 20-27, 2021 & September 30, 2021; H. B. Robinson Steam Electric Plant, Unit 2; Operator License Examinations.

Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 11, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.

Members of the H. B. Robinson Steam Electric Plant staff developed both the operating tests and the written examination. The initial operating test, written RO examination, and written SRO examination submittals met the quality guidelines contained in NUREG-1021.

The NRC administered the operating tests during the period September 20-27, 2021. Members of the H. B. Robinson Steam Electric Plant training staff administered the written examination on September 30, 2021. All Reactor Operator (RO) and Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. All applicants were issued licenses commensurate with the level of examination administered.

There were no post-examination comments.

No findings were identified.

REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations a. Inspection Scope The NRC evaluated the submitted operating test by combining the scenario events and JPMs in order to determine the percentage of submitted test items that required replacement or significant modification. The NRC also evaluated the submitted written examination questions (RO and SRO questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approved knowledge and ability (K/A) statement. Any questions that were deleted during the grading process, or for which the answer key had to be changed, were also included in the count of unacceptable questions. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG-1021, Operator Licensing Standards for Power Reactors.

The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.

The NRC performed an audit of license applications during the preparatory site visit in order to confirm that they accurately reflected the subject applicants qualifications in accordance with NUREG-1021.

The NRC administered the operating tests during the period September 20-27, 2021.

The NRC examiners evaluated six Reactor Operator (RO) and six Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. Members of the H. B. Robinson Steam Electric Plant training staff administered the written examination on September 30, 2021. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the H. B. Robinson Steam Electric Plant met the requirements specified in 10 CFR Part 55, Operators Licenses.

The NRC evaluated the performance or fidelity of the simulation facility during the preparation and conduct of the operating tests.

b. Findings No findings were identified.

The NRC developed the written examination sample plan outline. Members of the H. B.

Robinson training staff developed both the operating tests and the written examination.

All examination material was developed in accordance with the guidelines contained in Revision 11, of NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.

The NRC determined, using NUREG-1021, that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.

All applicants passed both the operating test and written examination and were issued licenses.

Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.

The licensee did not submit any post-examination comments. A copy of the final written examination and answer key, with all changes incorporated, may be accessed not earlier than October 23, 2023, in the ADAMS system (ADAMS Accession Number(s)

ML21309A557 and ML21309A732.)

4OA6 Meetings, Including Exit Exit Meeting Summary On October 1, 2021, the NRC examination team discussed generic issues associated with the operating test and written examination with Mr. E. Kapopoulos, Site Vice president, and members of the H. B. Robinson Steam Electric Plant staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.

KEY POINTS OF CONTACT Licensee personnel T. Bardauskas, Regulatory Affairs G. Curtis, Training Manager N. Flippin, Plant Manager R. Fredrick, Assistant Operations Manager-Support J. Goodridge, Operations Training D. Hall, Nuclear Support Services Manager D. Hoffman, Operations Manager E. Kapopoulos, Site Vice President A. Mallner, Regulatory Affairs C. McComber, Operations Training J. Rackley, Superintendent Operations Training N. Roh, Assistant Operations Manager-Shift M. Santalla, Superintendent Operations Training E. Whitley, Operations Training

SIMULATOR FIDELITY REPORT Facility Licensee: H. B. Robinson Steam Electric Plant, Unit 2 Facility Docket No.: 05000261 Operating Test Administered: September 20-27, 2021 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.

No simulator fidelity or configuration issues were identified.

Enclosure 2