Requests That NRC Correct Error in Amend 162 to License NPF-3,revising TS 3/4.1.3,3/41.3.2,3/1.3.3 & 3/41.3.4 Re Control Rod Assembly Position Indication Surveillance Requirements
ML20094F419
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/12/1992
From: Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20094F420 List:
References
2020, TAC-M75518, NUDOCS 9202240262
Download: ML20094F419 (2)


Text

-

4-CENTERIOR ENERGY 300 Madism Avenue Donald C. Shetton Toleda. OH 43052 0001 Vice President + Nuclear Davis Besse 619)243 m Docket Number 50-346 License Number 11PF-3 Serial Number 2020 February 12, 1992 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Request to Correct NRC Error in License Amendment 11 umber 162 (TAC 110.#75518) i Genslemen On September 4 1991, the fluelear Regulatory Commission (NRC) issued Amendment !! umber 162 (Toledo Edison Log Number 3550) to Facility Operating License Number NPF-3 for the Davis-Besse Nuclear Power Station Unit !! umber 1. This was in response to Toledo Edison's application dated February 1, 1990 (Serial Number 1750). The amendment revised Technical Specifications 3/4.1.3.1, 3/4.1.3.2.

3/4.1.3.3, and 3/4.1.3.4 regarding control rod assembly position indication surveillance requirements and made some administrative corrections. Technical Specification Bases 3/4.1.3 was also changed to provide a discussion of the revised surveillance requirements.

In revising Bases page B3/4 1-4, the NRC deleted a portion of the existing Bases in a paragraph that should have been unaffected by Amendment Number 162. Attachment 1 is marked up to show the correction necessary fcr page B3/4 1-4. Attachment 2 shows the wording as it existed prior to Amendment Number 162. ioledo Edison requests that the NRC issue a corrected page B3/4 1-4.

9202240262 920212 PDR ADOCK 05000346 j P PDR C i ocem mg cmees T Clevetand Electnc litum:nctng j 101edo E0: son

. . _ . . . .~ --- . - . . - .- -. .. . . - . - ~ . . . . . - - . - . . - . . . . . _ . ~ _ . - - . .

. Docket 11 umber 50-346 i

. License ilumber NFP-3.

  • Serial Number 2020 j

._ Page 2 Should you have any questions, please contact Mr. Robert W. Schrauder, .

- Manager - Nuclear Licensing,.at'(419) 249-2366. ,

Very truly yours.

_ Q!

DRW Attachments l ec A. B. Davis, Regional Administrator, llRC Region III J . fl . Ilannon. NRC Project D1 =M or PD III-3 .

J. B. Hopkins. NitC/IlRR DB-1 Senio Project Manager W. Levis, DB_-1 HRC Senior Resident Inspector Utility Radiological Safety Board m n--vc * ---,-.-- s m:m, ,, , -- -e ,,-a -

, -.,e, en,