ML20094F419
| ML20094F419 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 02/12/1992 |
| From: | Shelton D CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20094F420 | List: |
| References | |
| 2020, TAC-M75518, NUDOCS 9202240262 | |
| Download: ML20094F419 (2) | |
Text
.
4-CENTERIOR ENERGY 300 Madism Avenue Donald C. Shetton Toleda. OH 43052 0001 Vice President + Nuclear 619)243 m Davis Besse Docket Number 50-346 License Number 11PF-3 Serial Number 2020 February 12, 1992 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Request to Correct NRC Error in License Amendment 11 umber 162 (TAC 110.#75518) i Genslemen On September 4 1991, the fluelear Regulatory Commission (NRC) issued Amendment !! umber 162 (Toledo Edison Log Number 3550) to Facility Operating License Number NPF-3 for the Davis-Besse Nuclear Power Station Unit !! umber 1.
This was in response to Toledo Edison's application dated February 1, 1990 (Serial Number 1750).
The amendment revised Technical Specifications 3/4.1.3.1, 3/4.1.3.2.
3/4.1.3.3, and 3/4.1.3.4 regarding control rod assembly position indication surveillance requirements and made some administrative corrections.
Technical Specification Bases 3/4.1.3 was also changed to provide a discussion of the revised surveillance requirements.
In revising Bases page B3/4 1-4, the NRC deleted a portion of the existing Bases in a paragraph that should have been unaffected by Amendment Number 162. is marked up to show the correction necessary fcr page B3/4 1-4. shows the wording as it existed prior to Amendment Number 162.
ioledo Edison requests that the NRC issue a corrected page B3/4 1-4.
9202240262 920212 PDR ADOCK 05000346 j
P PDR C
i T
ocem mg cmees Clevetand Electnc litum:nctng j
101edo E0: son
..~ ---. -.. -.- -...
.. -. - ~..
.. -..... _. ~ _. - -..
Docket 11 umber 50-346 i
License ilumber NFP-3.
Serial Number 2020 j
._ Page 2 Should you have any questions, please contact Mr. Robert W. Schrauder,
- Manager - Nuclear Licensing,.at'(419) 249-2366.
Very truly yours.
_ Q!
DRW Attachments l
ec A. B. Davis, Regional Administrator, llRC Region III J. fl. Ilannon. NRC Project D1
=M or PD III-3 J. B. Hopkins. NitC/IlRR DB-1 Senio Project Manager W. Levis, DB_-1 HRC Senior Resident Inspector Utility Radiological Safety Board m
n--vc s
m:m,
-e
,,-a
-.,e, s
n
-e en,
-