Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L0421999-10-21021 October 1999 Forwards Insp Rept 50-382/99-20 on 990815-0925 & Notice of Violation.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217N2111999-10-19019 October 1999 Forwards Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Licensed Operator Requalification Program, Effective,Utilized Systems Approach to Training & Showed Continued Improvements Over Previous Insp Findings ML20217L0101999-10-18018 October 1999 Provides Update of Waterford 3 Effort for Review of Ufsar. Info Listed Includes Background Mgt Expectations,Review Status & Results,Clarifications Re Review & Conclusions ML20217L0141999-10-18018 October 1999 Submits Update to NRC Staff Re Circumstances & Plans for Submitting Certification Rept on Waterford 3 Plant Specific Simulator ML20217G7051999-10-14014 October 1999 Forwards Comments on Four of NRC RO Examination Questions for Exam Administered During Week of 991004 05000382/LER-1999-014, Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal1999-10-12012 October 1999 Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal ML20217D5151999-10-0707 October 1999 Forwards Application for Renewal of SRO License for C Fugate License SOP-43039-3,IAW 10CFR55.57.Without Encls ML20217C6251999-10-0505 October 1999 Informs That NRC Reviewed Util Ltr & Encl Exercise Scenario Package for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Based on Review,Nrc Determined That Exercise Appropriate to Meet Objectives ML20212J6921999-09-29029 September 1999 Forwards Insp Rept 50-382/99-18 on 990830-0902.One Noncited Violation Identified Re Failure to Follow Procedural Instructions to Ensure That Members on Fire Brigade Shift Were Qualified ML20216G2441999-09-27027 September 1999 Forwards Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted 05000382/LER-1999-013, Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form1999-09-23023 September 1999 Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form IR 05000382/19993011999-09-21021 September 1999 Informs That NRC License Exam Previously Associated with NRC Insp Rept 50-382/99-301 Will Be Incorporated Into NRC Insp Rept 50-382/99-14 ML20212D8761999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of Waterford 3.During Assessment Period,Number of Personnel Errors Occurred,Which Demonstrated Lack of Attention to Detail by Plant Personnel.Historical Listing of Issues,Encl ML20212C2471999-09-16016 September 1999 Forwards Five Final Applications for RO Licenses for G Esquival,Jm Hearn,Md Lawson,Re Simpson & PI Wood.Written Exam & Operating Test to Be Administered,Is Requested. Encls Withheld ML20212C2391999-09-16016 September 1999 Requests Cancellation of SRO Licenses for Bn Coble,License SOP-43835,due to Job Assignment Location & CA Rodgers, License SOP-43537-1,due to Resignation from Company, Effective 990901 ML20212C5881999-09-14014 September 1999 Forwards Insp Rept 50-382/99-15 on 990719-23 with Continuing in Ofc Insp Until 0819.No Violations Noted ML20211Q4421999-09-0909 September 1999 Forwards Insp Rept 50-382/99-07 on 990601-11.Three Violations Being Treated as Noncited Violations ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211M8391999-09-0303 September 1999 Forwards Revised Epips,Including Rev 25 to EP-001-020,rev 24 to EP-001-030,rev 25 to EP-001-040,rev 30 to EP-002-100,rev 22 to EP-001-010,rev 27 to EP-002-010,rev 26 to EP-002-102 & Rev 16 to EP-002-190.Listed Proprietary Revs to Epips,Encl ML20211L3681999-09-0202 September 1999 Forwards Five Preliminary Applications for Reactor Operator Licenses for Individuals Listed,Iaw 10CFR55.31.Encls Withheld ML20211K9741999-09-0101 September 1999 Forwards Insp Rept 50-382/99-16 on 990704-0814.Two Severity Level IV Violations Identified & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy 05000382/LER-1999-011, Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form1999-08-31031 August 1999 Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form ML20211M3641999-08-30030 August 1999 Forwards Written Examination,Operating Tests & Supporting Ref Matl Identified in Attachment 2 of ES-210,in Response to NRC .Encl Withheld ML20211G5751999-08-27027 August 1999 Forwards RAI Re IPEEE Submittal.Please Provide RAI within 60 Days of Receipt of Ltr,Per Util Response to GL 88-20,suppl 4 ML20211E3281999-08-26026 August 1999 Forwards fitness-for-duty Performance Data for Period of 990101-0630,IAW 10CFR26.71(d).Ltr Does Not Contain Commitments 05000382/LER-1999-009, Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately1999-08-26026 August 1999 Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately 05000382/LER-1999-010, Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form1999-08-26026 August 1999 Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form ML20211F5421999-08-24024 August 1999 Forwards Proposed marked-up TS Page Xviii, Index Administrative Controls, Correcting Page Number Re TS Change Request NPF-38-220.Editorial Changes for TS Change NPF-38-221 Discussed ML20211F3561999-08-24024 August 1999 Forwards CTS Pages & TS Proposed marked-up Pages for Insertion Into TS Change Request NPF-38-207 Re Efas, Originally Submitted on 980702.Original NSHC Determination Continues to Be Applicable ML20211F4611999-08-24024 August 1999 Informs That NRC Reviewed Ltr & Encl Objectives for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Exercise Objectives Appropriate to Meet Emergency Plan Requirements ML20211G1731999-08-23023 August 1999 Informs That Info Submitted in ,B&W Rept 51-1234900-00,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20210T9791999-08-18018 August 1999 Discusses Which Responded to Reconsideration of Violation Denial (EA 98-022) Enforcement Action Detailed in .Concludes That Violation Occurred as Stated ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S0561999-08-12012 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for NRC Fys 2000 & 2001 for Waterford 3 ML20210Q6161999-08-12012 August 1999 Forwards Corrected Copy of Monthly Operating Rept for July 1999 for Waterford 3.Original Rept,Submitted with ,Contained Typos ML20217F2661999-08-12012 August 1999 Forwards Copy of 1999 Waterford 3 Biennial Exercise Package to Be Performed Using Waterford 3 CR Simulator ML20210R9231999-08-11011 August 1999 Forwards Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Nrc Has Determined That One Severity Level IV Violation of NRC Requirements Occurred ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 05000382/LER-1999-008, Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl1999-07-29029 July 1999 Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl ML20210H4291999-07-29029 July 1999 Forwards Response to NRC Rai,Associated with TS Change Request NPF-38-208,proposing to Replace Ref to Supplement 1 with Ref to Supplement 2 of Calculative Methods for CE Small Break LOCA Evaluation Model, in ACs Section of TSs ML20210F9451999-07-27027 July 1999 Forwards Proprietary & non-proprietary Version of Rev 29 to EPIP EP-002-100, Technical Support Ctr Activation,Operation & Deactivation. Proprietary Info Withheld,Per 10CFR2.790 ML20210D3171999-07-23023 July 1999 Submits Proposal for Final Resolution of Reracking Spent Fuel Pool at Plant,Per License Amend 144,issued by NRC in .No New Commitments Are Contained in Ltr 05000382/LER-1999-007, Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached1999-07-23023 July 1999 Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached ML20210D8701999-07-23023 July 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 Through ISI-020 for Entergy Operations,Inc,Unit 3 ML20210B1521999-07-15015 July 1999 Forwards Insp Rept 50-382/99-13 on 990523-0703.Three Violations Being Treated as Noncited Violations ML20209G9771999-07-13013 July 1999 Forwards Objectives & Guidelines for Waterford 3 Emergency Preparedness Exercise Scheduled for 991013.List of Objectives cross-referenced Where Applicable to Relevant Sections of NUREG-0654 IR 05000382/19990081999-07-12012 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/99-08 Issued on 990503 ML20209E5231999-07-0909 July 1999 Informs That as Result of NRC Review of Util Responses to GL-92-01,rev 1 & Suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes Staff Efforts Re TAC MA0583 ML20209D4051999-07-0707 July 1999 Forwards Revised TS Pages to Replace Attachment C,Entirely in Original TS Change Request NPF-38-207,per 990519 Discussion with C Patel of Nrc.Changes to Action 20 Delete Word Requirement & Revise Word Modes to Mode 1999-09-09
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20128Q9331996-10-16016 October 1996 Submits Comments for Consideration Re Generic Fundamentals Exam W3P86-2371, Forwards Discharge Monitoring Rept for Aug 1986.Certifies That Rept Prepared Under Author Direction in Accordance W/ Sys Designed to Assure Qualified Personnel Gather & Evaluate Info1986-09-15015 September 1986 Forwards Discharge Monitoring Rept for Aug 1986.Certifies That Rept Prepared Under Author Direction in Accordance W/ Sys Designed to Assure Qualified Personnel Gather & Evaluate Info ML20198G9121986-05-22022 May 1986 Reissued Cover Ltr Forwarding NPDES Permit Renewal Application Filed for Facility on 860102 W3P86-0124, Confirms 860131 Telcon W/C Groome Re Extension Until 860211 to Comment on Draft NPDES Permit LA0007374.Original Draft Permit Incomplete1986-01-31031 January 1986 Confirms 860131 Telcon W/C Groome Re Extension Until 860211 to Comment on Draft NPDES Permit LA0007374.Original Draft Permit Incomplete W3P85-3519, Forwards Form 2-C for Renewal of NPDES Permit La 0007374. Waiver for Biological Oxygen Demand Analyses for All Outfalls & TOC Analyses for All Outfalls Except 01C Requested.Performing All Three Analyses Unnecessary Expense1986-01-0202 January 1986 Forwards Form 2-C for Renewal of NPDES Permit La 0007374. Waiver for Biological Oxygen Demand Analyses for All Outfalls & TOC Analyses for All Outfalls Except 01C Requested.Performing All Three Analyses Unnecessary Expense W3P85-2598, Forwards Discharge Monitoring Rept for Oct 1985.Discussion of Permit Noncompliance Also Encl1985-11-15015 November 1985 Forwards Discharge Monitoring Rept for Oct 1985.Discussion of Permit Noncompliance Also Encl W3P85-2545, Forwards NPDES Discharge Monitoring Rept for Jul 1985. Certification Listed in Lieu of Printing in Rept1985-08-15015 August 1985 Forwards NPDES Discharge Monitoring Rept for Jul 1985. Certification Listed in Lieu of Printing in Rept W3P85-2518, Forwards Comments on Draft NPDES Permit LA0007374 Issued 850621.Several Inconsistencies or Inaccuracies Noted1985-07-15015 July 1985 Forwards Comments on Draft NPDES Permit LA0007374 Issued 850621.Several Inconsistencies or Inaccuracies Noted W3P85-1060, Forwards Discharge Monitoring Repts for Mar & May 19851985-06-17017 June 1985 Forwards Discharge Monitoring Repts for Mar & May 1985 W3P85-0552, Requests Amend to NPDES Permit La 0007374,modifying Listed Changes Re Boron Discharge Through Outfalls.Changes Will Reduce Unnecessary Solid Waste Production.Discussion of Requested Mods Encl1985-03-0101 March 1985 Requests Amend to NPDES Permit La 0007374,modifying Listed Changes Re Boron Discharge Through Outfalls.Changes Will Reduce Unnecessary Solid Waste Production.Discussion of Requested Mods Encl ML20100F4401984-11-30030 November 1984 Forwards Task Force Evaluation of Prelicensing Issue 20 Re Const Matl Testing Personnel Qualification Records ML20108A1251984-11-11011 November 1984 Ack That Counsel Served W/Joint Intervenor Motion to Reopen & Accompanying Exhibits on 841109 Instead of 841108 as Stated in Certificate of Svc.Addl 5 Days Granted to Respond. Related Correspondence W3P84-1035, Forwards Updated Status of Responses to Recommendations Developed by INPO During 831212-16 Corporate Assistance Visit1984-04-26026 April 1984 Forwards Updated Status of Responses to Recommendations Developed by INPO During 831212-16 Corporate Assistance Visit ML20128L8661984-01-17017 January 1984 Submits Listed Compilation of Concerns Expressed During QA Interview Sessions.Answers Requested by 840130 for Release to Individuals Expressing Concerns.Related Documents Encl ML20086N9701983-05-0303 May 1983 Forwards News Article Re NRC Concern W/Qa.One Area Previously Unspecified Now Identified as Potential Significant Deficiency Incident 8 Re Common Foundation Mat Radial Cracks Inside Ring Wall ML20028F6381983-01-28028 January 1983 Inquires Whether Recipient Wishes to Remain on Svc List.Svc List Encl.Related Correspondence ML20070J0501982-12-21021 December 1982 Forwards Aslab 730731 Memorandum & Order ALAB-138,affirming ASLB Decisions to Reopen Hearing on Fuel Densification Issue & to Permit Operation During Proceeding & Reversing Determination to Reopen on Four Issues.W/Svc List ML20027D1741982-10-25025 October 1982 Provides List of Correspondence from Applicant to NRC & FEMA Since Record Closed on 820512.Some Ltrs & Svc List Encl. Related Correspondence ML20039E1831981-12-30030 December 1981 Forwards Draft La Peacetime Radiological Response Plan & Attachment 1,including Emergency Response Plan for St Charles & St John the Baptist Parishes.State & Local Plans Submitted by La to FEMA on 811116.Related Correspondence ML20003F6171981-04-15015 April 1981 Forwards Applicant Responses to Joint Intervenors Interrogatories for Contentions 19-1 Through 19-7.Related Correspondence ML19341D6871981-04-0202 April 1981 Forwards Fj Drummond Affidavit Verifying Applicant Responses to Joint Intervenors' Interrogatories 2-6,2-7, 2-12 & 2-16.Certificate of Svc Encl ML19345G5291981-03-25025 March 1981 Forwards Applicant Responses to Joint Intervenors' Interrogatories for Contentions 1,2 & 17.Responses to Interrogatories for Contention 19 Forthcoming.Related Correspondence.W/O Encl ML19345G5521981-03-25025 March 1981 Forwards Applicant Responses to La Consumer League 791113 Interrogatories 11-14.Related Correspondence ML19262B4881979-11-29029 November 1979 Confirms 791129 Telcon Conveying Licensee Agreement Not to Object to LL Jones 791123 Motion Requesting Delayed Filing of Interrogatories.Jones Time for Filing Addl TMI-related Contentions Extended to 791210.Certificate of Svc Encl ML19270H8271979-11-29029 November 1979 Confirms 791129 Telcon Agreeing,On Behalf of La Consumers League,That Time for Filing Addl TMI-related Contentions Be Extended Until 791210.Licensee Has Deferred Answers to Interrogatories Re Emergency Plans.Certificate of Svc Encl ML19256F8441979-11-13013 November 1979 Forwards Interrogatories of La Consumer'S League for Response by Util 1996-10-16
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARW3P86-2371, Forwards Discharge Monitoring Rept for Aug 1986.Certifies That Rept Prepared Under Author Direction in Accordance W/ Sys Designed to Assure Qualified Personnel Gather & Evaluate Info1986-09-15015 September 1986 Forwards Discharge Monitoring Rept for Aug 1986.Certifies That Rept Prepared Under Author Direction in Accordance W/ Sys Designed to Assure Qualified Personnel Gather & Evaluate Info ML20198G9121986-05-22022 May 1986 Reissued Cover Ltr Forwarding NPDES Permit Renewal Application Filed for Facility on 860102 W3P86-0124, Confirms 860131 Telcon W/C Groome Re Extension Until 860211 to Comment on Draft NPDES Permit LA0007374.Original Draft Permit Incomplete1986-01-31031 January 1986 Confirms 860131 Telcon W/C Groome Re Extension Until 860211 to Comment on Draft NPDES Permit LA0007374.Original Draft Permit Incomplete W3P85-3519, Forwards Form 2-C for Renewal of NPDES Permit La 0007374. Waiver for Biological Oxygen Demand Analyses for All Outfalls & TOC Analyses for All Outfalls Except 01C Requested.Performing All Three Analyses Unnecessary Expense1986-01-0202 January 1986 Forwards Form 2-C for Renewal of NPDES Permit La 0007374. Waiver for Biological Oxygen Demand Analyses for All Outfalls & TOC Analyses for All Outfalls Except 01C Requested.Performing All Three Analyses Unnecessary Expense W3P85-2598, Forwards Discharge Monitoring Rept for Oct 1985.Discussion of Permit Noncompliance Also Encl1985-11-15015 November 1985 Forwards Discharge Monitoring Rept for Oct 1985.Discussion of Permit Noncompliance Also Encl W3P85-2545, Forwards NPDES Discharge Monitoring Rept for Jul 1985. Certification Listed in Lieu of Printing in Rept1985-08-15015 August 1985 Forwards NPDES Discharge Monitoring Rept for Jul 1985. Certification Listed in Lieu of Printing in Rept W3P85-2518, Forwards Comments on Draft NPDES Permit LA0007374 Issued 850621.Several Inconsistencies or Inaccuracies Noted1985-07-15015 July 1985 Forwards Comments on Draft NPDES Permit LA0007374 Issued 850621.Several Inconsistencies or Inaccuracies Noted W3P85-1060, Forwards Discharge Monitoring Repts for Mar & May 19851985-06-17017 June 1985 Forwards Discharge Monitoring Repts for Mar & May 1985 W3P85-0552, Requests Amend to NPDES Permit La 0007374,modifying Listed Changes Re Boron Discharge Through Outfalls.Changes Will Reduce Unnecessary Solid Waste Production.Discussion of Requested Mods Encl1985-03-0101 March 1985 Requests Amend to NPDES Permit La 0007374,modifying Listed Changes Re Boron Discharge Through Outfalls.Changes Will Reduce Unnecessary Solid Waste Production.Discussion of Requested Mods Encl ML20100F4401984-11-30030 November 1984 Forwards Task Force Evaluation of Prelicensing Issue 20 Re Const Matl Testing Personnel Qualification Records ML20108A1251984-11-11011 November 1984 Ack That Counsel Served W/Joint Intervenor Motion to Reopen & Accompanying Exhibits on 841109 Instead of 841108 as Stated in Certificate of Svc.Addl 5 Days Granted to Respond. Related Correspondence W3P84-1035, Forwards Updated Status of Responses to Recommendations Developed by INPO During 831212-16 Corporate Assistance Visit1984-04-26026 April 1984 Forwards Updated Status of Responses to Recommendations Developed by INPO During 831212-16 Corporate Assistance Visit ML20128L8661984-01-17017 January 1984 Submits Listed Compilation of Concerns Expressed During QA Interview Sessions.Answers Requested by 840130 for Release to Individuals Expressing Concerns.Related Documents Encl ML20086N9701983-05-0303 May 1983 Forwards News Article Re NRC Concern W/Qa.One Area Previously Unspecified Now Identified as Potential Significant Deficiency Incident 8 Re Common Foundation Mat Radial Cracks Inside Ring Wall ML20028F6381983-01-28028 January 1983 Inquires Whether Recipient Wishes to Remain on Svc List.Svc List Encl.Related Correspondence ML20070J0501982-12-21021 December 1982 Forwards Aslab 730731 Memorandum & Order ALAB-138,affirming ASLB Decisions to Reopen Hearing on Fuel Densification Issue & to Permit Operation During Proceeding & Reversing Determination to Reopen on Four Issues.W/Svc List ML20027D1741982-10-25025 October 1982 Provides List of Correspondence from Applicant to NRC & FEMA Since Record Closed on 820512.Some Ltrs & Svc List Encl. Related Correspondence ML20039E1831981-12-30030 December 1981 Forwards Draft La Peacetime Radiological Response Plan & Attachment 1,including Emergency Response Plan for St Charles & St John the Baptist Parishes.State & Local Plans Submitted by La to FEMA on 811116.Related Correspondence ML20003F6171981-04-15015 April 1981 Forwards Applicant Responses to Joint Intervenors Interrogatories for Contentions 19-1 Through 19-7.Related Correspondence ML19341D6871981-04-0202 April 1981 Forwards Fj Drummond Affidavit Verifying Applicant Responses to Joint Intervenors' Interrogatories 2-6,2-7, 2-12 & 2-16.Certificate of Svc Encl ML19345G5291981-03-25025 March 1981 Forwards Applicant Responses to Joint Intervenors' Interrogatories for Contentions 1,2 & 17.Responses to Interrogatories for Contention 19 Forthcoming.Related Correspondence.W/O Encl ML19345G5521981-03-25025 March 1981 Forwards Applicant Responses to La Consumer League 791113 Interrogatories 11-14.Related Correspondence ML19262B4881979-11-29029 November 1979 Confirms 791129 Telcon Conveying Licensee Agreement Not to Object to LL Jones 791123 Motion Requesting Delayed Filing of Interrogatories.Jones Time for Filing Addl TMI-related Contentions Extended to 791210.Certificate of Svc Encl ML19270H8271979-11-29029 November 1979 Confirms 791129 Telcon Agreeing,On Behalf of La Consumers League,That Time for Filing Addl TMI-related Contentions Be Extended Until 791210.Licensee Has Deferred Answers to Interrogatories Re Emergency Plans.Certificate of Svc Encl ML19256F8441979-11-13013 November 1979 Forwards Interrogatories of La Consumer'S League for Response by Util 1986-09-15
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _
s, n -&NUS --
[ d%vt.mo acemusa NUS-W3-A760 November 30, 1984 Mr. J. M. Cain President and Chief Executive Officer Louisiana Power and Light Company 317 Barrone Street New Orleans, Louisiana 70160
Dear Mr. Cain:
As indicated in its October 12, 1984 letter, the Task Force is continuing to complete its evaluations of individual LP&L responses to the 23 issues.
Issue 20, Construction Material Testing (CMT) Personn31 Qualification Records This issue, in the view of the Task Fcree, does not represent a constraint on fuel load or power operation of the plant.
Task Force members L. L. Humphreys and R. L. Ferguson have reviewed and concurred in this report. A letter from the Task Force authorizing my submittal of this report to you has been issued on this date and a copy will be sent directly to you and Mr. D. G. Eisenhut of the NRC.
Sincerely,
_f -?
Peter V. dd Project Manager Prelicensing Issues Task Force Support Group PVJ/cn Enclosure cc D. G. Eisenhut D. Crutchfield 8412060578 841130 DR ADOCK 05000382 PDR 0 4 "a:"oertoo comnamv
2 LIccua #20 Paga 1 of 3
.(
PRELICENSING ISSUES TASK FORCE REPORT
, Issue 20: Construction Material Testing (CMT) Personnel Qualification Records p
- 1. NRC' Instructions-I The NRC instructed LP&L to (1) conduct a review of supporting docttaentation 4
for GEO corrective action stated in Attachment 6 of NCR W3-F7-116 (EBASCO l W3-6497); (2) the review should focus on individuals who were apparently j qualified on written statements by others attesting to the individual's
- training and qualifications; and (3) for such cases LP&L should pursue any new information or evaluations which could provide further assurance in uupport of the actual past work experience end training referenced by the
] written statements.
4 2. Task Force Evaluation j
i a. The LP&L response to Issue 20, Revision 1, issued November 21, 1984, I
indicated LP&L performed a 100 percent review of GEO (CMT) inspection 3 personnel qualification and certification records and, where possible,
{. verified past work experience through a background investigation. This
} review was to verify that each inspector's qualifications met or j exceeded the requirements of ANSI N45.2.6-1973 and/or -1978.
i l The TFSG requested GEO (CMT) to identify those inspectors who were j_ responsible for Cadweld Splice Tensile Tests. GEO (CMT) supplied a-i list of 32 inspectors who were involved in Cadweld Splice Tensile i
Tests. The TFSG reviewed GEO (CMT) logs to verify that the list was correct and verified that 16 of the inspectors did not meet the requirements of ANSI N45.2.6. LP&L concurred with this finding; and Revision 1 of the LP&L response to Issue 20, issued November 21, 1984,
- _ addresses the disposition of the finding.
The Task Force Support Group (TFSG) as part of its validation effort 3 randomly selected fifteen (15) GEO (CMT) inspector qualification and
! certification records for independent review out of a total of 64 inspectors who had been verified by LP&L as meeting the requirements of_ ANSI N45.2.6. The TFSG evaluation of these 15 inspectors' records resulted in the conclusion that those inspectors identified by the LP&L
- review as being qualified did meet the requirements of ANSI N45.2.6.
The final results of LP&L's review of GEO (CMT) inspection personnel 2 identified 82 inspectors who did not meet the requirements of ANSI N.45.2.6. The TFSG verified that the inspectors who did not meet the I requirements of ANSI N45.2.6 were properly identified, and a Corrective Action Report (CAR) EQA 84-21S1 was issued for disposition. The TFSG reviewed'the disposition action taken to resolve the CAR as stated in
- the LP&L response and in Reference 3 to that document, " Engineering i Evaluation Report on the Review and Analysis of the Work of GEO (CMT)."
The results of the TFSG review are covered in paragraphs b, c, and d of this report.
i
. ._ . .. _ ._ _ . _ _ _.__.____m- _. . .
[ Iccua #20 Pcg2 2 of 3 C
The Task Force considers the LP&L response to Issue-20, Revision 1, issued on November 21, 1984, to be appropriate to the NRC instructions.
1
- b. -The TFSG concurs that a cylinder break test is an indicator of quality and strength of concrete placed in the structures and thus is the most important test. A technician can perform a break test-satisfactorily after'a brief~ training by a qualified individual. An-improper testing of a concrete cylinder would result in a lower compressive strength value. The TFSG has reviewed the statistical studies of concrete compressive strength tests performed in accordance with American Concrete Code ACI-214 by LP&L. The TFSG has verified-that the overall coefficient of variance for all concrete mixes ranged from 7.45 percent to 10.32 percent, indicating good to very good control, and the within-test coefficient of variation ranged from 1.07 percent to 2.00 percent, indicating very good to excellent control of testing operation as compared to the standards of control of ACI-214.
The TFSG concurs with LP&L that en in-place density test determines c.
whether the backfill material has been compacted as required by the specification and thus is the most important test. A technician can perform the in-place density test satisfactorily after being trained by a qualified individual. The TFSG has reviewed the backfill statistical studies performed on the in-place density tests.and concluded that the Class "A" backfill was constructed in accordance with the relative density requirements of the EBASCO Specification LOU-1564.482, filler, and backfill. The standard deviation was found to be within the specified tolerances. Other field and laboratory tests were conducted to ensure a good control of the soil material'and compaction process but did not provide direct data for determination of the specification compliance.
E
- d. The TFSG has reviewed the procedure to perform a break test on cadwelds and concluded that a technician can perform this test satisfactorily after being trained by a qualified individual. The TFSC has reviewed the cadweld break test results and found that the average tensile ,
strength of the cadwelds is in compliance with the specification requirements.
- 3. _ Summary' The TFSG conducted a review of Corrective Action Report (CAR) EQA 84-21S1, Attachment 6 of NCR W3-F7-116 (EBASCO W3-6497), and the Engineering
. Evaluation Report on the Review and Analysis of the Work of GEO (CMT)
(Reference 3 of the LP&L November 21, 1984, response to Issue 20). The Task Force concludes that'LP&L has properly addressed the NRC concern and that appropriate corrective action has been taken.
- 4. Cause, Generic Implications, and Safety Significance The cause of this issue was improper implementation of ANSI N45.2.6-1973.
GEO (CMT) issued certifications to testing personnel without properly
Incua #20 Prga 3 of 3 documenting other factors used as substitution for education and experience. LP&L has performed 100 percent review of GEO (CMT) inspection personnel qualification records and has issued a Corrective Action Report for dispositioning the inspection activities of QC inspectors whose
-qualifications could-not be verified. Based on the TFSG review and concurrence with~the action taken to disposition CAR EQA 84-21S1, the Task
~
Force believes that'this issue has no remaining safety significance and therefore poses no constraint to fuel load or power operation of the plant.
=