Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARBSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 BSEP-98-0055, Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0038, Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0007, Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 2 BSEP-97-0528, Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0500, Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0456, Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant BSEP-97-0410, Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 2 BSEP-97-0373, Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0323, Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0266, Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-97-0219, Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0142, Monthly Operating Repts for March 1997 for Bsep,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Bsep,Units 1 & 2 BSEP-97-0105, Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 21997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 2 BSEP-97-0055, Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 21997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 2 ML20138H7881996-12-31031 December 1996 Corrected Monthly Operating Rept for Dec 1996 for Brunswick Unit 1 BSEP-97-0015, Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0451, Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 2 ML20138H7821996-11-30030 November 1996 Corrected Monthly Operating Rept for Nov 1996 for Brunswick Unit 1 BSEP-96-0422, Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0375, Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 2 BSEP-96-0330, Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0295, Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0253, Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0236, Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0204, Monthly Operating Repts for April 1996 for BSEP1996-04-30030 April 1996 Monthly Operating Repts for April 1996 for BSEP BSEP-96-0146, Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0097, Monthly Operating Repts for Feb 1996 for BSEP1996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for BSEP BSEP-96-0053, Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 2 BSEP-96-0008, Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 ML20236T1961998-07-0101 July 1998 Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr ML20236T1921998-07-0101 July 1998 Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20236T1971998-06-30030 June 1998 Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 ML20247N7501998-04-30030 April 1998 Rev 0 to BSEP Unit 1,Cycle 12 Colr ML20247N7721998-04-30030 April 1998 Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 1999-09-30
[Table view] |
Text
.
APPENDIX D AVERAGE DAILY POWER LEVEL DOCl(ET NO. 000-0325 UNIT BRUNSWICl( UNIT 1 DATE 11/02/82 COMPLETED DY FRANCES HARRISON TELEPHONE ( 919 ) <157-9521 OCTODER 1982 DAY AVG. DAILY POWER LEVEL DAY AVO. DAILY POWER LEVEL (MWE-NCT~, (MWE-NLT) 1 -10 17 -6 2 -10 18 319 3 -10 19 404 el -11 20 414 0 -10 21 407 6 -10 22 -14 7 -10 23 -13 0 -10 24 -11 9 -11 25 4 l
1 10 -12 26 401 f ,
11 -12 27 463 12 -11 28 600 1
13 -12 29 576 l ei -12 30 493 l 15 -10 31 526 16 -11 1.16 - 0 8211120327 821104 PDR ADOCK 05000324 R PDR
i 1 OPERATING DATA REPORT pAit J AEET11/o4 NO,/8a053-0325 COMPLETED BY FRANCE 5 HARRISON t
TELEPHONE 919-457-9521
.:FERATING STATU?
- 1. UNIT NAME: BRUNSWICK UNIT 1 I NOTES I
- 2. , REPORTING PERIOD: OCTOBER 82 ] I
- 3. LICENSED THERr'ALfPOWER (MWT): 2436 I I 4, NAMEPLATE RATING tCROS5 MWE): 867.0 I I
- 5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0 I I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
- 7. MAX DEPENDABLE CADACITY (NET MWE) 790.0
- 8. IF CHANGES OCCUR IN CAPACIT( RATINGS (ITEMS 3 THRU 7) SINCE LAST REFORT, GIVE, REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE la. REASONS IJP RESTRICTION IF ANY:
i.
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPGRTING PERIOD 745.0 7296.0 49297.0
- 12. NUMDER OF HOURS REACTOR WA5 CRITIC AL 309.6 4661.6 32926.9 13, 3.EACTOR RESEh')E SHUTDOWN HUUR9 0.0 6.0 1647.1
- 14. HOURS GENERATOR ON LINE 244.2 4468.7 31003.a
- 15. UNIT RESERVE SHUTDOWN HOURS 3.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED ( MWH) 359033.6 7900320.5 62318125.1
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 115714.0 2541153.0 20542361.0
- 18. NET ELECT 3l:ICIAL ENERGY GENERATED ( PNH) 105927.0 2425399.6* 19728896.0
- 19. UNIT SERjfCE F ETOR 32.8 61.2 62.9
- 20. UNIT 4/AlLABILITi FAC MR 32.3 61.2 62.9 i_1. UNIT CAPACITY FACTOR (USING MDC NET) 18.0 4,2 .1 50.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 17.3 40.5 48.7
- 25. UNIT FOM ED OUTACE RATE 67.2 37.4 24.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling 11/27/82 - 5/12/83 s
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 0/ O/ 9
- 26. UNITS IN TEST :.laiU3 (PRIOR TO COMMERICI AL OPERATION): FORCA5T ACHEIVED INITIAL CRITICALITY -------- --------
INITIAL ELECTRICITY -------- --------
COMMERICI AL OPERATIO!? -------- --------
1.16 - O
- Year To Date & Cumulative have been adjusted to reflect correction made to Sept.
report of 1 mwh.
s t s ,
g
_s ,
APPENDIX DOCKET NO.: 050-325 UNIT: Brunswick No. 1 DATE: November 1982 COMPLETED BY: Francis Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 1 Brunswick Unit No. I returned to service on October 17, 1982, after the Integrated Leak Rate Testing outage. The unit operated at 32.8 percent availability factor and 18.0 percent capacity factor. There were three off-line outages and two power reductions.
The Integrated Leak Rate Testing Outage detailed report will follow at a later date when completed.
There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick Unit No. 1 fuel pool.
_i o __
O n o
UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 .
UNIT NASIE Brunswick I DATE November 1982 REPORT MONTil October COMPLETED BY Froncoa Morriann TELEPHONE (919) 457-9521 "E -
No.
- , .! E S .h .5 k Licensee ,E% be.
Date g 3g g ,3 g 5 Cause & Corrective H
$5 5 Event u? 83 Action to ji5g 6
Report # @G
[u Prevent Recurrence 82-92A 821010 2 Unit A 1 % IE VALVEX was Reactor scram - manual - scram due to down. relief valve F013J stuck open.
At, temp-ting I&C replaced solenoid valve and as a precautionary measure Mechanical ,
to Maintenance replaced the pilot Startup assembly.
h
.i I 2 .
F: Forced 3 4 Reason:
S: Schedufed Method:
A Equipment Failure (Explain) 1-Manual Exhibit G-Instructions -
B-Maintenance of Test for Preparation of Data '
2 Manual Scrarn. Entry Sheets for Licensee
' C Refueling D. Regulatory Restriction 3 Automatic Scram. Event Report (LER) File (NUREG .
I' Opee.iion Ti iining & I.leense IIxaminatloa 4-Continuations 0161) 12-Adnunistiative 5-Load Reductions G-Operational Error (Explain) 5 (9/77) li-Other (Explain) 6-Other Exhibit !- Same Source
,, e. __ , , _ _
O n
o UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 ,
UNIT NAh!E Brunswick 1 DATE _ November 1982.
REPORT MONTil _0c tober COMPLETED By Frances Harrison TELEPHONE (414) 457-9521
- e. .
t -
~
= re .3 -x = E a5d y,""
' y, # u 5 _E E Licensee Ev. g*o '
gge Cause & Currective h y .g g Event p .
g]
- g. Action to c0
- y i3 5 Report # mO Prevent Recurrence 6 -
82-92B 821014 F Unit was A NA IE VALVEX 1
Re' actor shutdown due to problems with.
F013D and E safecy relief valve.
. Attempt-
- ing.to Action dependent on outcome of root sta'rtup .
cause investigation, when .
problem occurred -
j s
I 2 ' .
F: Forced 3 4 Reason: -
S: Scheduled Method:
A Equipment Failure (Exolain) 1-Manual Exhibit G-Instructions '
B-Maintenance of Test for Preparation of Data -
C-Refucting 2 Manual Scram. . Entry Sheets for I.ieensee D Regulatory Restriction 3-Automatic Scram. Event Report (LER) File (NUREG .
- 17 O pes.ito Ti.ilning & IJecuse lixamination le-Continuations 0161) 12 Administiative G. Operational Error (Explain) 5-Load Reductions . 5 (9/77) Il-Other (Explain) 6-Other Exhibit I Same Sourec
, .s _ _ _ . . _ .
's u-O O
O .
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-ovs '
UNIT NAME Brim =t. f, te t DATE November 1982 REPORT MONTil October COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521 No. Date o .! E 3g 3 .-).Ek Licensee 5% !E.
- g 5 ,3 g 5 Event wT Cause & Currective .'
$E $ N0 83- Action to
[U Prevent Recurrence 0 .
82-95 821021 F 94.3 B 3 NA .
IIA TURBIN
, Reactor scram. Turbine load unbalance test with CV closure.
(REPORT WILL FOLLOW WilEN COMPLETED) . ,
, e .
6 I -
2
3 4 -
S: Scheduled Method: .
A Equipment Failure (Explain) 1 Manual Exhibit C-Instructions
- B Maintenance of Test for Preparation of Data ' .
C Refueling 2 Manual Scram. . Entry Sheets for Licensee .
D Regulatory Restriction 3 Automatic Scram. Event Report (LER) File (NUREG .
I 17 Opesatos Taaluing & 1,leenso lixamination h-Continuations 0161) 13 Administiative G-Operational Error (Explain) S-Load Reductions. -
5 (9/77) H Other (Explain) 6-Other Exhibit I Same Source .
n . . . . 2u_ ,
O n
.g ,
UNITSilUTDOWNS AND POWER REDUC 110NS DOCK E T NO. 050-ovs 4 UNIT NAME Brunswick 1 DATE November 1982 REPORT MONTl! - Octohnr COMPLETED BY _ Frances Harrison TELEPHONE (919) 457-9521
- e. .
= .
= rs .3 ss. O C No. D.ite E. j j gjy a jj $j Cause & Corrective y g .2 E 5a e vent a CC %
$ I?i g Report # 'sue g gRo Action to Prevent Recurrence O -
82-97 821030 F 9.5 A' 5 NA XX PUMPXX Recirc. pump tripped.
J ,
(REPORT WILL FOLLOW WHEN COMPLETED) t
\ .
ll 2 * -
F: Forced 3 4 Re.ison: -
0: Scheduled Method: .
A Equipment Failure (Explain) 1. Manual Exhibit C Instructions '
- n. Maintenance of Test for Preparation of Data
- C Refueling 2 Manual Serarn. .
Entry Sheets for Licensee D Regulatory Restricti.m 3 Automatic Scram. Event Report (LER) File (NUREC. . '
l
- Itopeiatos Tialaing A 1.leense fixamination 4-ContInuaeions 0161)
F Adnunlunative t C-Operational Error (Explain) 5-Load Reductions. -
5 i F4/77)
~
it-Other (Explain) 6-Cther Exhibit I Same Souree
\
. ~ . ... . _ _ _
'4 c._- . . _ _
O O o .
UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0179
- UNIT NAME Brunswick 1 DATE November 1982 REPORTMONTil October COMPLETED BY Frances Harrison TELEPliONE (919) 457-9521 q .
No. Date
, .! ?
3g 3g .Y Licensee ,Evo bE
,g g 5
- g Event E "o Cause & Corrective .
- t ?
c i:., 5 ji5g Report *r N0 Action to
[d- . Prevent Recurrence 82-98 821031 F 9.0 A- 5 NA XX XXXXXX Reduced power to less than 30 percent-due to EHC-PSL-1759 problems. -
(REPORT WILL FOLLOW WilEN COMPLETED) ,
t
F: Forced 3 4 Reason: -
S: Scheduled Method:
A Equipment Failure (Explain) 1 Manual Exhibit G-Instructions *
- B-Maintenance of Test for Preparation of Data '
- C-Refueling 2 Manual Scram. . Entry Sheets for Licensee D-Regulatory Restriction 3-Automatic Scram. Event Report (LER) Fi!c (NUREG. .
- I' Opci ito rialning & 1.leense !!xamination 4-Continuations 0161) 17 Administiative C-Operational Error (Explain) 5-Load Reductions . -
5 (9/77) ll Other (Explain) 6-Other Exhibit ! Same Souree .
APPENDIX DOCKET NO.: 050-324 UNIT: Brunswick No. 2 DATE: November 1982 COMPLETED BY: Francis Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 returned to service on October 3, 1982, after the refueling and Integrated Leak Rate Testing outages. The unit operated at a 53.8 percent availability factor and 27.5 capacity factor. There were four off-line outages this month.
i The refueling and Integrated Leak Rate Testing outages detailed reports will follow n1 a later date when c unple_ted.
There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool.
l l
l l
l
. _ . _ _ _.-. _ _... _ ___ _ _ __.- _ - _ . _ . _ . . - _ _ _ . . _ . _ _ - ~ . . . _ _ _ . . - - . _ _ . _ . . _ _ . . _
i -
l' ' I I 4 l1 i
l APPENDIX B i
I AVERAGE DAILY POWER LEVEL i !
- DOCKET NO. 050-0324 {
i UNIT BRUNSWICK UNIT 2 i l DATE 11/01/82 l l CnMPLETED BY FRANCEA HARRISON :
- TBLEPHUNE 919-457-9321 l l
I OCTOBER 8' '
DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL l (MWE-NET) (MWE-NET) . j 1 -16. 17 -15. i 2 -18. 18 214, 3 32. 19 514. }
4 184. 20 540. P 5 197. 21 571.
t 6 237. 22 593. ;
7 283. 23 613.
+
i ,
l 8 423. 24 208, i
! 9 423. 25 315. 5 i
10 341. 26 610. i i
1 11 -12. 27 582. l
! 12 -11. 28 29. '
l !
I "
13 -11. 29 -11.
i 1
14 -14. 30 -11. !
4
- 15 -14. 31 -11. ;
1 i i 16 -14.
I i l i
I i
l i
{ i i !
i 1.16 - 8 i
l 1 i, 4.-,,,- - , . . , _
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 11/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I i 2. REPORTING PERIOD: OCTOBER 82 I I
- 3. LICENSED THERMAL POWER (MWT): 2436 I I
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
- 5. DESIGN ELECTR1 CAL RATING (NET MWE): 821.0 I I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I i
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 745.0 7296.0' 61321.0
- 12. NUMBER OF HOURS REACTOR uA3 CRITICAL 483.6 2975.8 38142.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE 400.7 2785.3 35554.6
- 15. UNIT RES'ERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 557346.4 5025312.2 65022849.9
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 174335.0 1589624.0 21583561.0
- 18. NET ELECTRICIAL ENERGY GENERATED (H4H) 161984.0 1491798.0. 20681200.0
- 19. UNIT SERVICE FACTOR 53.8 38.2 58.0
- 20. UNIT AVAILABILITY FACTOR 53.8 38.2 58.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 27.5 25.9 42.7 l 22. UNIT CAPACITY FACTOR (USING DER NET) 26.5 24.9 41.1 i
- 23. UNIT FORCED OUTAGE RATE 18.3 17.3 17.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATER AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIODr ESTIMATED DATE OF START UP: 11/ 2/92
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------
INITIAL ELECTRICITY -------- --------
COMMERICIAL OPERATION -------- --------
1.16 - 9
...._z . _ ,
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 .
UNIT NAME Brunswick 2 DATE November 1982 REPORT MONTil o c e nh n ,. COMPLETED BY Frances Harrison TELEPilONE (919) 457-9521
=
"E '
en .5 -a =
.2 _e s , .s X Licensee No. Dste o
g 3g g jg5 Event
% -2 c' 'L Cause & Corrective .'
s cc s- u a:
Report # :*?
m0 83-EU Action to
- 3 Di 's g Prevent Recurrence 6 * '82-057 821021 S 1.3 B- 1 NA IE XL W Unit separated from grid for routine e
overspeed trip test.
~
I 3
j
?
I ~
2 * .
F: Forced Reason:
3 4 S: Scheduled Method:
A Equipment Failure (Explain) 1-Manual Exhibit G-Instructions -
B-Maintenance of Test for Preparation of Data '
C-Refueling 2 Manual Scrarn. Entry Sheets for Licensee D Regulatory Restriction 3-Automatic Scram. Event Report (LER) File (NUREG. .
li Opciato Ti Ining & l.leense lixumination 4-Con t inua t ions 0161)
F Adminisisative G-Operational Error (Explain) 5-Load Reductions . -
5 (9/77) Il-Other (Explain) 6-Other Exhibit ! Same Source
-. _- __ _ _m. _ _ _ _
O n .m . <
~
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0324 .
UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMON111_ October COMPLETED BY - Frances Harrison TELEPHONE (919) 457-9521 e ce t m2 c No. Date E.
p h 32 5
0 35b 5a e Lh'v#
ent I*4o a ok gg E*"S* A C""8I
Action to CO " 3 Di j Report # NU g Prevent Recurrence 6
82-059 821010 F 175.7 A- 3 NA SB PIPEXX .
Reactor scram. Cracks in heater drain
, piping. Loss of E-3 Bus #3 diesel g'nerator e output breaker would not close in on E-3 bus.
(REPORT WILL FOLLOW UHEN COMPLETED)
+
i l.
l:
I l 2 F: Forced 3 4 Reason:
S: Scheduled Method: ,
A liguipment Failure (Exp!ain) 1 Manual Exhibit G-Instructions -
l B Maintenance of Test for Preparation of Data '
C-Refueling 2. Manual Scram. Entry Sheets for Licensee D Regulatory Restriction 3-Automatic Scram. Event Report (LER) File (NUREG. .
17 Opes.itos is.iining & 1lecuse l*xamination 4-Continuations 0161)
F Adnunist ative G-Oper:.:ional Error (Explain) S-Load Reductions. 5 (9/77) H-Other (Explain) 6-Other Exhibit ! Same Source i
_w-.--_-
O n o UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 ,
UNIT N AME Brunswick 2 DATE November 1982 REPORTMONTif _ October COMPLETED BY Frances Harrison TELEPliONE (919) 457-9571 e.
e en '3 2 E 5c No.
- ., .a _
- s 7 .E X Licensee Date g. gg g _=% Cause & Corrective
,3 g 5 Event 5? 8.4 -
$ F. 5 j di g Report
Prevent Recurrence 6 '82-062 821024 F 15.5 A* 2 NA XX
- XXXXXX Normal reactor shutdown in order to lower AT between steam dome saturation temperature and bottom head drain, e
t i
1 I
t i 2 F: Forced 3 4 Reason: !
S: Scheduled Method:
A Equipment Failure (Explain) 1. Manual Exhibit G-Instructions
- B. Maintenance or Test for Preparation of Data
- 2. Manual Scra,m. .
' C. Refueling Entry Sheets for Licensee '
D-Regulatory Restriction 3-Automatic Scram. Event Report (LER) File (NUREG .
17 Opes.itos Ts.iining & l.icense Examination 4-Continuations 0161)
I .Administiative G-Operationa! Error (Explain) S-Load Reductions. 5 (9/77) li-Other(Explain) 6-Other Exliibi I-Same Source ?
.= .- *-u -
O O O UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0324 .
UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMONTH October COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521 No. Date
- , .!E 3g 3g .$
,;; g 5 Licensee ,E% !
o% Cause & Corrective
- g Event =? o-lv c3 5 5 jgg Report # #G Action to Prevent Recurrence c5 82-064 821028 F A' 2 NA TIP outage in progress.
e
. . k i
i.
b 1
2 -
1 F: Forced 3 4 Reason: Method:
I S: Scheduled A 1:quipment Failure (Explain) Exhibit G-Instruellons -
1-Manual for Preparation of Data
- B Maintenance of Test 2-Manual Scram.
. C-Refucting . Entry Sheets for Licensee D-Regulatory Restriction 3 Automatic Scram. Event Report (LER) File (NUREG .
1:-Opeiason Tiaining & I.iecuse !!xamination 4-Continuations 0161)
- I Administrative 5-Load Reductions .
G-Operational Error (Explain) $
19/77) H-Other (Explain) 6-Other Exhibit I- Same Source
.