Text
.
APPENDIX D AVERAGE DAILY POWER LEVEL DOCl(ET NO. 000-0325 UNIT BRUNSWICl( UNIT 1 DATE 11/02/82 COMPLETED DY FRANCES HARRISON TELEPHONE ( 919 ) <157-9521 OCTODER 1982 DAY AVG. DAILY POWER LEVEL DAY AVO. DAILY POWER LEVEL (MWE-NCT~,
(MWE-NLT) 1
-10 17
-6 2
-10 18 319 3
-10 19 404 el
-11 20 414 0
-10 21 407 6
-10 22
-14 7
-10 23
-13 0
-10 24
-11 9
-11 25 4
l 1
10
-12 26 401 f
11
-12 27 463 12
-11 28 600 1
13
-12 29 576 l ei
-12 30 493 l
15
-10 31 526 16
-11 1.16 - 0 8211120327 821104 PDR ADOCK 05000324 R
i 1
OPERATING DATA REPORT pAit AEET NO,/8a053-0325 11/o4 J
COMPLETED BY FRANCE 5 HARRISON t
TELEPHONE 919-457-9521
.:FERATING STATU?
1.
UNIT NAME: BRUNSWICK UNIT 1 I NOTES I
- 2., REPORTING PERIOD: OCTOBER 82
]
I
- 3. LICENSED THERr'ALfPOWER (MWT): 2436 I
I 4,
NAMEPLATE RATING tCROS5 MWE): 867.0 I
I
- 5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0 I
I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
- 7. MAX DEPENDABLE CADACITY (NET MWE) 790.0 8.
IF CHANGES OCCUR IN CAPACIT( RATINGS (ITEMS 3 THRU 7) SINCE LAST REFORT, GIVE, REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE la. REASONS IJP RESTRICTION IF ANY:
i.
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPGRTING PERIOD 745.0 7296.0 49297.0
- 12. NUMDER OF HOURS REACTOR WA5 CRITIC AL 309.6 4661.6 32926.9 13, 3.EACTOR RESEh')E SHUTDOWN HUUR9 0.0 6.0 1647.1
- 14. HOURS GENERATOR ON LINE 244.2 4468.7 31003.a
- 15. UNIT RESERVE SHUTDOWN HOURS 3.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED ( MWH) 359033.6 7900320.5 62318125.1
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 115714.0 2541153.0 20542361.0
- 18. NET ELECT 3l:ICIAL ENERGY GENERATED ( PNH) 105927.0 2425399.6* 19728896.0
- 19. UNIT SERjfCE F ETOR 32.8 61.2 62.9
UNIT CAPACITY FACTOR (USING MDC NET) 18.0 4,2.1 50.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 17.3 40.5 48.7
- 25. UNIT FOM ED OUTACE RATE 67.2 37.4 24.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling 11/27/82 - 5/12/83 s
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
0/ O/ 9
- 26. UNITS IN TEST :.laiU3 (PRIOR TO COMMERICI AL OPERATION): FORCA5T ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERICI AL OPERATIO!?
1.16 - O
- Year To Date & Cumulative have been adjusted to reflect correction made to Sept.
report of 1 mwh.
s t
s g
--w a
-e
-~
s
APPENDIX DOCKET NO.:
050-325 UNIT:
Brunswick No. 1 DATE: November 1982 COMPLETED BY:
Francis Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 1 Brunswick Unit No. I returned to service on October 17, 1982, after the Integrated Leak Rate Testing outage. The unit operated at 32.8 percent availability factor and 18.0 percent capacity factor. There were three off-line outages and two power reductions.
The Integrated Leak Rate Testing Outage detailed report will follow at a later date when completed.
There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick Unit No. 1 fuel pool.
_i o __
O n
o UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
050-0325 UNIT NASIE Brunswick I DATE November 1982 REPORT MONTil October COMPLETED BY Froncoa Morriann TELEPHONE (919) 457-9521 "E
.! E S
.h.5 k Licensee
,E%
be.
No.
Date Cause & Corrective g
3g g
,3 g 5 Event u?
83 Action to H
$5 5
ji5g Report #
@G
[u Prevent Recurrence 6
82-92A 821010 2
Unit A
1 IE VALVEX Reactor scram - manual - scram due to was down.
relief valve F013J stuck open.
At, temp-I&C replaced solenoid valve and as a ting precautionary measure Mechanical to Maintenance replaced the pilot Startup assembly.
h
.i I
2 3
F: Forced Reason:
4 Method:
S: Schedufed A Equipment Failure (Explain) 1-Manual Exhibit G-Instructions B-Maintenance of Test for Preparation of Data 2 Manual Scrarn.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG.
D. Regulatory Restriction I' Opee.iion Ti iining & I.leense IIxaminatloa 4-Continuations 0161) 12-Adnunistiative 5-Load Reductions 5
G-Operational Error (Explain) 6-Other Exhibit !- Same Source (9/77) li-Other (Explain)
,, e. __,, _ _
O n
o UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAh!E Brunswick 1 DATE _ November 1982.
REPORT MONTil _0c tober COMPLETED By Frances Harrison TELEPHONE (414) 457-9521 e.
t
=
re
.3 -x =
E 5 _E E
a5d Licensee
~
y,""
y, #
u Ev.
g*o Cause & Currective h
y.g g
gge Event g]
p g.
Action to y i3 5 Report #
mO c0 Prevent Recurrence
_6 82-92B 821014 F
Unit was A
1 NA IE VALVEX Re' actor shutdown due to problems with.
down.
F013D and E safecy relief valve.
Attempt-ing.to Action dependent on outcome of root sta'rtup cause investigation, when problem occurred j
s I
2 3
F: Forced Reason:
4 Method:
S: Scheduled A Equipment Failure (Exolain) 1-Manual Exhibit G-Instructions B-Maintenance of Test for Preparation of Data 2 Manual Scram.
Entry Sheets for I.ieensee C-Refucting 3-Automatic Scram.
D Regulatory Restriction Event Report (LER) File (NUREG.
17 O pes.ito Ti.ilning & IJecuse lixamination le-Continuations 0161) 12 Administiative 5-Load Reductions.
5 G. Operational Error (Explain) 6-Other (9/77)
Il-Other (Explain)
Exhibit I Same Sourec
.s
's u-O O
O UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-ovs UNIT NAME Brim =t. f, te t DATE November 1982 REPORT MONTil October COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521
.! E 3
.-).Ek Licensee 5%
!E.
No.
Date o
Cause & Currective
- g 3g 5
,3 g 5 Event wT 83-
$E Action to j15g Report
- N0
[U Prevent Recurrence 0
82-95 821021 F
94.3 3
NA B
IIA TURBIN Reactor scram. Turbine load unbalance test with CV closure.
(REPORT WILL FOLLOW WilEN COMPLETED).
e 6
I 2
3 F: Forced Reason:
4 Method:
S: Scheduled A Equipment Failure (Explain) 1 Manual Exhibit C-Instructions B Maintenance of Test for Preparation of Data 2 Manual Scram.
C Refueling Entry Sheets for Licensee D Regulatory Restriction 3 Automatic Scram.
Event Report (LER) File (NUREG.
I 17 Opesatos Taaluing & 1,leenso lixamination h-Continuations 0161) 13 Administiative S-Load Reductions.
G-Operational Error (Explain) 6-Other Exhibit I Same Source 5
(9/77)
H Other (Explain)
n.
2u_,
O n
.g UNITSilUTDOWNS AND POWER REDUC 110NS DOCK E T NO. 050-ovs 4
UNIT NAME Brunswick 1 DATE November 1982 REPORT MONTl! - Octohnr COMPLETED BY _ Frances Harrison TELEPHONE (919) 457-9521 e.
=
=
rs
.3 ss. O C
No.
D.ite E.
j j
gjy jj
$j Cause & Corrective a
y g.2 E
5a e vent
$ I?i g Report #
'su gR Action to a
e o
CC g
Prevent Recurrence O
82-97 821030 F
9.5 A'
5 NA XX PUMPXX Recirc. pump tripped.
(REPORT WILL FOLLOW WHEN COMPLETED)
J t
\\
ll 2
3 F: Forced Re.ison:
4 Method:
0: Scheduled A Equipment Failure (Explain)
- 1. Manual Exhibit C Instructions
- n. Maintenance of Test for Preparation of Data 2 Manual Serarn.
Entry Sheets for Licensee C Refueling l
D Regulatory Restricti.m 3 Automatic Scram.
Event Report (LER) File (NUREC..
Itopeiatos Tialaing A 1.leense fixamination 4-ContInuaeions 0161)
F Adnunlunative t
5-Load Reductions.
5 C-Operational Error (Explain) i F4/77) it-Other (Explain) 6-Cther Exhibit I Same Souree
\\
~
~
'4 c._-
O O
o UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0179 UNIT NAME Brunswick 1 DATE November 1982 REPORTMONTil October COMPLETED BY Frances Harrison TELEPliONE (919) 457-9521 q
.! ?
3
.Y Licensee
,Ev bE No.
Date
- g 3g g
,g g 5 Event
- t ?
E "o Cause & Corrective o
Action to c i:.,
5 ji5g Report *r N0
[d-
. Prevent Recurrence Q
82-98 821031 F
9.0 A-5 NA XX XXXXXX Reduced power to less than 30 percent-due to EHC-PSL-1759 problems.
(REPORT WILL FOLLOW WilEN COMPLETED),
t 2
3 F: Forced Reason:
4 Method:
S: Scheduled Exhibit G-Instructions A Equipment Failure (Explain) 1 Manual B-Maintenance of Test for Preparation of Data 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) Fi!c (NUREG..
D-Regulatory Restriction I' Opci ito rialning & 1.leense !!xamination 4-Continuations 0161) 17 Administiative 5-Load Reductions.
5 C-Operational Error (Explain) 6-Other Exhibit ! Same Souree (9/77) ll Other (Explain)
APPENDIX DOCKET NO.: 050-324 UNIT: Brunswick No. 2 DATE: November 1982 COMPLETED BY: Francis Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 returned to service on October 3, 1982, after the refueling and Integrated Leak Rate Testing outages. The unit operated at a 53.8 percent availability factor and 27.5 capacity factor. There were four off-line outages this month.
i The refueling and Integrated Leak Rate Testing outages detailed reports will follow n1 a later date when c unple_ted.
There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool.
l l
l l
l
. _. _ _ _.-. _ _... _ ___ _ _ __.- _ - _. _. _.. - _ _ _.. _. _ _ - ~... _ _ _.. - -. _ _. _.. _ _.. _
i l' '
I I
4 l1 i
l APPENDIX B i
AVERAGE DAILY POWER LEVEL I
i DOCKET NO. 050-0324
{
i UNIT BRUNSWICK UNIT 2 i
l DATE 11/01/82 l
l CnMPLETED BY FRANCEA HARRISON :
TBLEPHUNE 919-457-9321 l
l I
OCTOBER 8' DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL l
(MWE-NET)
(MWE-NET).
j 1
-16.
17
-15.
i 2
-18.
18
- 214, 3
32.
19 514.
}
4 184.
20 540.
P 5
197.
21 571.
t 6
237.
22 593.
7 283.
23 613.
+
i l
8 423.
24
- 208, i
9 423.
25 315.
5 i
10 341.
26 610.
i i
1 11
-12.
27 582.
l 12
-11.
28 29.
l I
13
-11.
29
-11.
i 14
-14.
30
-11.
1 4
15
-14.
31
-11.
1 i
i 16
-14.
I i
l i
I i
l i
{
i i
i 1.16 - 8 i
l 1
i 4.-,,,- -,
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 11/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
i
- 2. REPORTING PERIOD: OCTOBER 82 I
I
- 3. LICENSED THERMAL POWER (MWT): 2436 I
I
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 I
I
- 5. DESIGN ELECTR1 CAL RATING (NET MWE): 821.0 I
I 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
i
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 745.0 7296.0' 61321.0
- 12. NUMBER OF HOURS REACTOR uA3 CRITICAL 483.6 2975.8 38142.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE 400.7 2785.3 35554.6
- 15. UNIT RES'ERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 557346.4 5025312.2 65022849.9
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 174335.0 1589624.0 21583561.0
- 18. NET ELECTRICIAL ENERGY GENERATED (H4H) 161984.0 1491798.0. 20681200.0
- 19. UNIT SERVICE FACTOR 53.8 38.2 58.0
- 20. UNIT AVAILABILITY FACTOR 53.8 38.2 58.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 27.5 25.9 42.7 l
- 22. UNIT CAPACITY FACTOR (USING DER NET) 26.5 24.9 41.1 i
- 23. UNIT FORCED OUTAGE RATE 18.3 17.3 17.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATER AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIODr ESTIMATED DATE OF START UP: 11/ 2/92
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERICIAL OPERATION 1.16 - 9
...._z 4 L..___....
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT NAME Brunswick 2 DATE November 1982 REPORT MONTil o c e nh n,.
COMPLETED BY Frances Harrison TELEPilONE (919) 457-9521 "E
=
en
.5 -a =
-2 'L
.2 _e s
,.s X Licensee No.
Dste o
c' Cause & Corrective g
3g g
jg5 Event
- ?
83-s s-u Report #
m0 E U Action to cc a:
3 Di 's g
Prevent Recurrence 6
82-057 821021 S
1.3 B-1 NA IE XL W e
Unit separated from grid for routine overspeed trip test.
~
I 3
j
?
I
~
2 3
F: Forced Reason:
4 Method:
S: Scheduled Exhibit G-Instructions A Equipment Failure (Explain) 1-Manual B-Maintenance of Test for Preparation of Data 2 Manual Scrarn.
C-Refueling Entry Sheets for Licensee D Regulatory Restriction 3-Automatic Scram.
Event Report (LER) File (NUREG..
li Opciato Ti Ining & l.leense lixumination 4-Con t inua t ions 0161)
F Adminisisative 5-Load Reductions.
G-Operational Error (Explain) 5 (9/77)
Il-Other (Explain) 6-Other Exhibit ! Same Source
_m.
O n
.m
~
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0324 UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMON111_ October COMPLETED BY - Frances Harrison TELEPHONE (919) 457-9521 t m2 e
ce c
No.
Date E.
h 5
35b Lh'v#
I*
ok E*"S* A C""8I
p 32 0
5a e ent 4
3 Di j Report #
NU gg Action to a
o CO g
Prevent Recurrence 6
82-059 821010 F
175.7 A-3 NA SB PIPEXX Reactor scram.
Cracks in heater drain
, piping.
Loss of E-3 Bus #3 diesel g'nerator output breaker would not e
close in on E-3 bus.
(REPORT WILL FOLLOW UHEN COMPLETED)
+
i l.
l:
I l
2 3
F: Forced Reason:
4 Method:
S: Scheduled A liguipment Failure (Exp!ain) 1 Manual Exhibit G-Instructions l
B Maintenance of Test for Preparation of Data
- 2. Manual Scram.
C-Refueling Entry Sheets for Licensee D Regulatory Restriction 3-Automatic Scram.
Event Report (LER) File (NUREG..
17 Opes.itos is.iining & 1lecuse l*xamination 4-Continuations 0161)
F Adnunist ative S-Load Reductions.
G-Oper:.:ional Error (Explain) 6-Other i
5 (9/77)
H-Other (Explain)
Exhibit ! Same Source
_w-.--_-
O n
o UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT N AME Brunswick 2 DATE November 1982 REPORTMONTif _ October COMPLETED BY Frances Harrison TELEPliONE (919) 457-9571 e.
'3 2 E 5
e en
.a _:
s 7.E X Licensee
_=%
g.
gg g
,3 g 5 Event 5?
8.4 Cause & Corrective No.
Date c
jb" Action to
$ F.
5 j di g Report
- N0 Prevent Recurrence 6
82-062 821024 F
15.5 A*
2 NA XX XXXXXX Normal reactor shutdown in order to lower AT between steam dome saturation temperature and bottom head drain, e
t i
1 I
t i
2 3
F: Forced Reason:
4 Method:
S: Scheduled Exhibit G-Instructions A Equipment Failure (Explain)
- 1. Manual B. Maintenance or Test for Preparation of Data
- 2. Manual Scra,m.
Entry Sheets for Licensee C. Refueling 3-Automatic Scram.
D-Regulatory Restriction Event Report (LER) File (NUREG.
17 Opes.itos Ts.iining & l.icense Examination 4-Continuations 0161)
I.Administiative S-Load Reductions.
G-Operationa! Error (Explain) 6-Other 5
(9/77) li-Other(Explain)
Exliibi I-Same Source
?
- -u
.=
O O
O UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0324 UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMONTH October COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521
.!E 3
Licensee
,E%
!o%
Cause & Corrective No.
Date
- g 3g g
,;; g 5 Event
=?
o-l Action to c3 5 5
jgg Report #
- G v
Prevent Recurrence c5 82-064 821028 F
A' 2
NA TIP outage in progress.
e k
i i
b 1
2 1
3 F: Forced Reason:
4 I
Method:
S: Scheduled Exhibit G-Instruellons A 1:quipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refucting 3 Automatic Scram.
Event Report (LER) File (NUREG.
D-Regulatory Restriction 1:-Opeiason Tiaining & I.iecuse !!xamination 4-Continuations 0161)
I Administrative 5-Load Reductions.
G-Operational Error (Explain) 6-Other 19/77)
H-Other (Explain)
Exhibit I-Same Source
.