Monthly Operating Repts for Oct 1982
ML20066D891
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/02/1982
From: Harrison F
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20066D885 List:
References
NUDOCS 8211120327
Download: ML20066D891 (15)


Text

.

APPENDIX D AVERAGE DAILY POWER LEVEL DOCl(ET NO. 000-0325 UNIT BRUNSWICl( UNIT 1 DATE 11/02/82 COMPLETED DY FRANCES HARRISON TELEPHONE ( 919 ) <157-9521 OCTODER 1982 DAY AVG. DAILY POWER LEVEL DAY AVO. DAILY POWER LEVEL (MWE-NCT~, (MWE-NLT) 1 -10 17 -6 2 -10 18 319 3 -10 19 404 el -11 20 414 0 -10 21 407 6 -10 22 -14 7 -10 23 -13 0 -10 24 -11 9 -11 25 4 l

1 10 -12 26 401 f ,

11 -12 27 463 12 -11 28 600 1

13 -12 29 576 l ei -12 30 493 l 15 -10 31 526 16 -11 1.16 - 0 8211120327 821104 PDR ADOCK 05000324 R PDR

i 1 OPERATING DATA REPORT pAit J AEET11/o4 NO,/8a053-0325 COMPLETED BY FRANCE 5 HARRISON t

TELEPHONE 919-457-9521

.:FERATING STATU?

1. UNIT NAME: BRUNSWICK UNIT 1 I NOTES I
2. , REPORTING PERIOD: OCTOBER 82 ] I
3. LICENSED THERr'ALfPOWER (MWT): 2436 I I 4, NAMEPLATE RATING tCROS5 MWE): 867.0 I I
5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7. MAX DEPENDABLE CADACITY (NET MWE) 790.0
8. IF CHANGES OCCUR IN CAPACIT( RATINGS (ITEMS 3 THRU 7) SINCE LAST REFORT, GIVE, REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE la. REASONS IJP RESTRICTION IF ANY:

i.

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPGRTING PERIOD 745.0 7296.0 49297.0
12. NUMDER OF HOURS REACTOR WA5 CRITIC AL 309.6 4661.6 32926.9 13, 3.EACTOR RESEh')E SHUTDOWN HUUR9 0.0 6.0 1647.1
14. HOURS GENERATOR ON LINE 244.2 4468.7 31003.a
15. UNIT RESERVE SHUTDOWN HOURS 3.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED ( MWH) 359033.6 7900320.5 62318125.1
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 115714.0 2541153.0 20542361.0
18. NET ELECT 3l:ICIAL ENERGY GENERATED ( PNH) 105927.0 2425399.6* 19728896.0
19. UNIT SERjfCE F ETOR 32.8 61.2 62.9
20. UNIT 4/AlLABILITi FAC MR 32.3 61.2 62.9 i_1. UNIT CAPACITY FACTOR (USING MDC NET) 18.0 4,2 .1 50.7
22. UNIT CAPACITY FACTOR (USING DER NET) 17.3 40.5 48.7
25. UNIT FOM ED OUTACE RATE 67.2 37.4 24.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling 11/27/82 - 5/12/83 s

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 0/ O/ 9
26. UNITS IN TEST :.laiU3 (PRIOR TO COMMERICI AL OPERATION): FORCA5T ACHEIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERICI AL OPERATIO!? -------- --------

1.16 - O

  • Year To Date & Cumulative have been adjusted to reflect correction made to Sept.

report of 1 mwh.

s t s ,

g

_s ,

APPENDIX DOCKET NO.: 050-325 UNIT: Brunswick No. 1 DATE: November 1982 COMPLETED BY: Francis Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 1 Brunswick Unit No. I returned to service on October 17, 1982, after the Integrated Leak Rate Testing outage. The unit operated at 32.8 percent availability factor and 18.0 percent capacity factor. There were three off-line outages and two power reductions.

The Integrated Leak Rate Testing Outage detailed report will follow at a later date when completed.

There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick Unit No. 1 fuel pool.

_i o __

O n o

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 .

UNIT NASIE Brunswick I DATE November 1982 REPORT MONTil October COMPLETED BY Froncoa Morriann TELEPHONE (919) 457-9521 "E -

No.

, .! E S .h .5 k Licensee ,E% be.

Date g 3g g ,3 g 5 Cause & Corrective H

$5 5 Event u? 83 Action to ji5g 6

Report # @G

[u Prevent Recurrence 82-92A 821010 2 Unit A 1  % IE VALVEX was Reactor scram - manual - scram due to down. relief valve F013J stuck open.

At, temp-ting I&C replaced solenoid valve and as a precautionary measure Mechanical ,

to Maintenance replaced the pilot Startup assembly.

h

.i I 2 .

F: Forced 3 4 Reason:

S: Schedufed Method:

A Equipment Failure (Explain) 1-Manual Exhibit G-Instructions -

B-Maintenance of Test for Preparation of Data '

2 Manual Scrarn. Entry Sheets for Licensee

' C Refueling D. Regulatory Restriction 3 Automatic Scram. Event Report (LER) File (NUREG .

I' Opee.iion Ti iining & I.leense IIxaminatloa 4-Continuations 0161) 12-Adnunistiative 5-Load Reductions G-Operational Error (Explain) 5 (9/77) li-Other (Explain) 6-Other Exhibit !- Same Source

,, e. __ , , _ _

O n

o UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 ,

UNIT NAh!E Brunswick 1 DATE _ November 1982.

REPORT MONTil _0c tober COMPLETED By Frances Harrison TELEPHONE (414) 457-9521

e. .

t -

~

= re .3 -x = E a5d y,""

' y, # u 5 _E E Licensee Ev. g*o '

gge Cause & Currective h y .g g Event p .

g]

g. Action to c0
  • y i3 5 Report # mO Prevent Recurrence 6 - 82-92B 821014 F Unit was A NA IE VALVEX 1

Re' actor shutdown due to problems with.

  • down.

F013D and E safecy relief valve.

. Attempt-

  • ing.to Action dependent on outcome of root sta'rtup .

cause investigation, when .

problem occurred -

j s

I 2 ' .

F: Forced 3 4 Reason: -

S: Scheduled Method:

A Equipment Failure (Exolain) 1-Manual Exhibit G-Instructions '

B-Maintenance of Test for Preparation of Data -

C-Refucting 2 Manual Scram. . Entry Sheets for I.ieensee D Regulatory Restriction 3-Automatic Scram. Event Report (LER) File (NUREG .

  • 17 O pes.ito Ti.ilning & IJecuse lixamination le-Continuations 0161) 12 Administiative G. Operational Error (Explain) 5-Load Reductions . 5 (9/77) Il-Other (Explain) 6-Other Exhibit I Same Sourec

, .s _ _ _ . . _ .

's u-O O

O .

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-ovs '

UNIT NAME Brim =t. f, te t DATE November 1982 REPORT MONTil October COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521 No. Date o .! E 3g 3 .-).Ek Licensee 5% !E.

  • g 5 ,3 g 5 Event wT Cause & Currective .'

$E $ N0 83- Action to

  • j15g Report *

[U Prevent Recurrence 0 .

82-95 821021 F 94.3 B 3 NA .

IIA TURBIN

, Reactor scram. Turbine load unbalance test with CV closure.

(REPORT WILL FOLLOW WilEN COMPLETED) . ,

, e .

6 I -

2

  • F: Forced Reason:

3 4 -

S: Scheduled Method: .

A Equipment Failure (Explain) 1 Manual Exhibit C-Instructions

  • B Maintenance of Test for Preparation of Data ' .

C Refueling 2 Manual Scram. . Entry Sheets for Licensee .

D Regulatory Restriction 3 Automatic Scram. Event Report (LER) File (NUREG .

I 17 Opesatos Taaluing & 1,leenso lixamination h-Continuations 0161) 13 Administiative G-Operational Error (Explain) S-Load Reductions. -

5 (9/77) H Other (Explain) 6-Other Exhibit I Same Source .

n . . . . 2u_ ,

O n

.g ,

UNITSilUTDOWNS AND POWER REDUC 110NS DOCK E T NO. 050-ovs 4 UNIT NAME Brunswick 1 DATE November 1982 REPORT MONTl! - Octohnr COMPLETED BY _ Frances Harrison TELEPHONE (919) 457-9521

e. .

= .

= rs .3 ss. O C No. D.ite E. j j gjy a jj $j Cause & Corrective y g .2 E 5a e vent a CC  %

$ I?i g Report # 'sue g gRo Action to Prevent Recurrence O -

82-97 821030 F 9.5 A' 5 NA XX PUMPXX Recirc. pump tripped.

J ,

(REPORT WILL FOLLOW WHEN COMPLETED) t

\ .

ll 2 * -

F: Forced 3 4 Re.ison: -

0: Scheduled Method: .

A Equipment Failure (Explain) 1. Manual Exhibit C Instructions '

n. Maintenance of Test for Preparation of Data
  • C Refueling 2 Manual Serarn. .

Entry Sheets for Licensee D Regulatory Restricti.m 3 Automatic Scram. Event Report (LER) File (NUREC. . '

l

- Itopeiatos Tialaing A 1.leense fixamination 4-ContInuaeions 0161)

F Adnunlunative t C-Operational Error (Explain) 5-Load Reductions. -

5 i F4/77)

~

it-Other (Explain) 6-Cther Exhibit I Same Souree

\

. ~ . ... . _ _ _

'4 c._- . . _ _

O O o .

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0179

  • UNIT NAME Brunswick 1 DATE November 1982 REPORTMONTil October COMPLETED BY Frances Harrison TELEPliONE (919) 457-9521 q .

No. Date

, .! ?

3g 3g .Y Licensee ,Evo bE

,g g 5

  • g Event E "o Cause & Corrective .
t ?

c i:., 5 ji5g Report *r N0 Action to

  • Q

[d- . Prevent Recurrence 82-98 821031 F 9.0 A- 5 NA XX XXXXXX Reduced power to less than 30 percent-due to EHC-PSL-1759 problems. -

(REPORT WILL FOLLOW WilEN COMPLETED) ,

t

  • 2 ' .

F: Forced 3 4 Reason: -

S: Scheduled Method:

A Equipment Failure (Explain) 1 Manual Exhibit G-Instructions *

  • B-Maintenance of Test for Preparation of Data '
  • C-Refueling 2 Manual Scram. . Entry Sheets for Licensee D-Regulatory Restriction 3-Automatic Scram. Event Report (LER) Fi!c (NUREG. .
  • I' Opci ito rialning & 1.leense !!xamination 4-Continuations 0161) 17 Administiative C-Operational Error (Explain) 5-Load Reductions . -

5 (9/77) ll Other (Explain) 6-Other Exhibit ! Same Souree .

APPENDIX DOCKET NO.: 050-324 UNIT: Brunswick No. 2 DATE: November 1982 COMPLETED BY: Francis Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 returned to service on October 3, 1982, after the refueling and Integrated Leak Rate Testing outages. The unit operated at a 53.8 percent availability factor and 27.5 capacity factor. There were four off-line outages this month.

i The refueling and Integrated Leak Rate Testing outages detailed reports will follow n1 a later date when c unple_ted.

There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool.

l l

l l

l

. _ . _ _ _.-. _ _... _ ___ _ _ __.- _ - _ . _ . _ . . - _ _ _ . . _ . _ _ - ~ . . . _ _ _ . . - - . _ _ . _ . . _ _ . . _

i -

l' ' I I 4 l1 i

l APPENDIX B i

I AVERAGE DAILY POWER LEVEL i  !

DOCKET NO. 050-0324 {

i UNIT BRUNSWICK UNIT 2 i l DATE 11/01/82 l l CnMPLETED BY FRANCEA HARRISON :

TBLEPHUNE 919-457-9321 l l

I OCTOBER 8' '

DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL l (MWE-NET) (MWE-NET) . j 1 -16. 17 -15. i 2 -18. 18 214, 3 32. 19 514. }

4 184. 20 540. P 5 197. 21 571.

t 6 237. 22 593.  ;

7 283. 23 613.

+

i ,

l 8 423. 24 208, i

! 9 423. 25 315. 5 i

10 341. 26 610. i i

1 11 -12. 27 582. l

! 12 -11. 28 29. '

l  !

I "

13 -11. 29 -11.

i 1

14 -14. 30 -11.  !

4

15 -14. 31 -11.  ;

1 i i 16 -14.

I i l i

I i

l i

{ i i  !

i 1.16 - 8 i

l 1 i, 4.-,,,- - , . . , _

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 11/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I i 2. REPORTING PERIOD: OCTOBER 82 I I
3. LICENSED THERMAL POWER (MWT): 2436 I I
4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
5. DESIGN ELECTR1 CAL RATING (NET MWE): 821.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I i
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 745.0 7296.0' 61321.0
12. NUMBER OF HOURS REACTOR uA3 CRITICAL 483.6 2975.8 38142.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 400.7 2785.3 35554.6
15. UNIT RES'ERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 557346.4 5025312.2 65022849.9
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 174335.0 1589624.0 21583561.0
18. NET ELECTRICIAL ENERGY GENERATED (H4H) 161984.0 1491798.0. 20681200.0
19. UNIT SERVICE FACTOR 53.8 38.2 58.0
20. UNIT AVAILABILITY FACTOR 53.8 38.2 58.0
21. UNIT CAPACITY FACTOR (USING MDC NET) 27.5 25.9 42.7 l 22. UNIT CAPACITY FACTOR (USING DER NET) 26.5 24.9 41.1 i
23. UNIT FORCED OUTAGE RATE 18.3 17.3 17.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATER AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIODr ESTIMATED DATE OF START UP: 11/ 2/92
26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERICIAL OPERATION -------- --------

1.16 - 9

...._z . _ ,

  • 4 L. .___ . . . .

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 .

UNIT NAME Brunswick 2 DATE November 1982 REPORT MONTil o c e nh n ,. COMPLETED BY Frances Harrison TELEPilONE (919) 457-9521

=

"E '

en .5 -a =

.2 _e s , .s X Licensee No. Dste o

g 3g g jg5 Event

% -2 c' 'L Cause & Corrective .'

s cc s- u a:

Report #  :*?

m0 83-EU Action to

  • 3 Di 's g Prevent Recurrence 6 * '82-057 821021 S 1.3 B- 1 NA IE XL W Unit separated from grid for routine e

overspeed trip test.

~

I 3

j

?

I ~

2 * .

F: Forced Reason:

3 4 S: Scheduled Method:

A Equipment Failure (Explain) 1-Manual Exhibit G-Instructions -

B-Maintenance of Test for Preparation of Data '

C-Refueling 2 Manual Scrarn. Entry Sheets for Licensee D Regulatory Restriction 3-Automatic Scram. Event Report (LER) File (NUREG. .

li Opciato Ti Ining & l.leense lixumination 4-Con t inua t ions 0161)

F Adminisisative G-Operational Error (Explain) 5-Load Reductions . -

5 (9/77) Il-Other (Explain) 6-Other Exhibit ! Same Source

-. _- __ _ _m. _ _ _ _

O n .m . <

~

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0324 .

UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMON111_ October COMPLETED BY - Frances Harrison TELEPHONE (919) 457-9521 e ce t m2 c No. Date E.

p h 32 5

0 35b 5a e Lh'v#

ent I*4o a ok gg E*"S* A C""8I

Action to CO " 3 Di j Report # NU g Prevent Recurrence 6

82-059 821010 F 175.7 A- 3 NA SB PIPEXX .

Reactor scram. Cracks in heater drain

, piping. Loss of E-3 Bus #3 diesel g'nerator e output breaker would not close in on E-3 bus.

(REPORT WILL FOLLOW UHEN COMPLETED)

+

i l.

l:

I l 2 F: Forced 3 4 Reason:

S: Scheduled Method: ,

A liguipment Failure (Exp!ain) 1 Manual Exhibit G-Instructions -

l B Maintenance of Test for Preparation of Data '

C-Refueling 2. Manual Scram. Entry Sheets for Licensee D Regulatory Restriction 3-Automatic Scram. Event Report (LER) File (NUREG. .

17 Opes.itos is.iining & 1lecuse l*xamination 4-Continuations 0161)

F Adnunist ative G-Oper:.:ional Error (Explain) S-Load Reductions. 5 (9/77) H-Other (Explain) 6-Other Exhibit ! Same Source i

_w-.--_-

O n o UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 ,

UNIT N AME Brunswick 2 DATE November 1982 REPORTMONTif _ October COMPLETED BY Frances Harrison TELEPliONE (919) 457-9571 e.

e en '3 2 E 5c No.

., .a _
s 7 .E X Licensee Date g. gg g _=% Cause & Corrective

,3 g 5 Event 5? 8.4 -

$ F. 5 j di g Report

  • N0 jb" Action to '

Prevent Recurrence 6 '82-062 821024 F 15.5 A* 2 NA XX

  • XXXXXX Normal reactor shutdown in order to lower AT between steam dome saturation temperature and bottom head drain, e

t i

1 I

t i 2 F: Forced 3 4 Reason:  !

S: Scheduled Method:

A Equipment Failure (Explain) 1. Manual Exhibit G-Instructions

  • B. Maintenance or Test for Preparation of Data
2. Manual Scra,m. .

' C. Refueling Entry Sheets for Licensee '

D-Regulatory Restriction 3-Automatic Scram. Event Report (LER) File (NUREG .

17 Opes.itos Ts.iining & l.icense Examination 4-Continuations 0161)

I .Administiative G-Operationa! Error (Explain) S-Load Reductions. 5 (9/77) li-Other(Explain) 6-Other Exliibi I-Same Source  ?

.= .- *-u -

O O O UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0324 .

UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMONTH October COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521 No. Date

, .!E 3g 3g .$

,;; g 5 Licensee ,E%  !

o% Cause & Corrective

  • g Event =? o-lv c3 5 5 jgg Report # #G Action to Prevent Recurrence c5 82-064 821028 F A' 2 NA TIP outage in progress.

e

. . k i

i.

b 1

2 -

1 F: Forced 3 4 Reason: Method:

I S: Scheduled A 1:quipment Failure (Explain) Exhibit G-Instruellons -

1-Manual for Preparation of Data

  • B Maintenance of Test 2-Manual Scram.

. C-Refucting . Entry Sheets for Licensee D-Regulatory Restriction 3 Automatic Scram. Event Report (LER) File (NUREG .

1:-Opeiason Tiaining & I.iecuse !!xamination 4-Continuations 0161)

  • I Administrative 5-Load Reductions .

G-Operational Error (Explain) $

19/77) H-Other (Explain) 6-Other Exhibit I- Same Source

.