Similar Documents at Fermi |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217J5441998-03-27027 March 1998 Proposed Tech Specs Eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray ML20217J5841998-03-27027 March 1998 Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned ML20199H9371998-01-28028 January 1998 Proposed Tech Specs Re thermal-hydraulic Stability,Idle Recirculation Loop Startup & Post Accident Monitoring ML20199H2611998-01-28028 January 1998 Proposed Tech Specs Re Access Control to Provide Flexibility While Maintaining Similar Control Over Access ML20199H2561998-01-28028 January 1998 Proposed Tech Specs,Modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Requirements Per 10CFR50.36a ML20199H2501998-01-28028 January 1998 Proposed Tech Specs 4.4.3.2.2.a,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements ML20199H2411998-01-28028 January 1998 Proposed Tech Specs,Revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch Can Be Performed ML20199H2141998-01-28028 January 1998 Proposed Tech Specs,Revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement ML20199H2281998-01-28028 January 1998 Proposed Marked Up & Retyped TS of Sheet 2,Table 3.3.6-2, Deleting RCS Recirculation Flow Trip Functions ML20203F1941997-12-10010 December 1997 Proposed Tech Specs Revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20202A7961997-11-26026 November 1997 Proposed Tech Specs Reflecting Alternative Wording for Surveillance Which Address Only Clarification to Situational Testing Requirement NRC-97-0089, Proposed Tech Specs,Relocating Selected Requirements & Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested1997-09-29029 September 1997 Proposed Tech Specs,Relocating Selected Requirements & Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested ML20216F3581997-09-0505 September 1997 Proposed Tech Specs,Adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing ML20141B8881997-06-20020 June 1997 Proposed Tech Specs Re Relocation of Reactor Recirculation Sys MG Set Scoop Tube Stop Setting Surveillance 1999-09-03
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217J5841998-03-27027 March 1998 Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned 1999-09-03
[Table view] |
Text
{{#Wiki_filter:, - - - - -
l s 11 e a a s s s 's a s- a s is i si A g ;
...'.a
;
a g
I.
=. ,...
a SO Y S S o$ $ oE eE o$ oE $ eE e Ie i .I e$
a . . . ..
= w i e mw a w w w
- a Y..,,......l-,.... .l y
' ;
l e
I t <
c s u 1 4 a j l ty 5
E I s q J- s- i. 4 j s- 45 M
.j I f
~
j Ialf i ly1 NNi 4
i i !1!1 liliml,;bl4g i ll h i
'(
pL.aaeaa:aeis'sniii av! f 3/4 F 51 Amenement No. 28 RNG - WEi 2
[[[2cgggg[$$o!{gi P
c
, ,- - -- ;,. fp'. .
, , _ _. " ~
< .. ; , .
~ <
g 1 .;, ,.: .
, 7
- 7. m, memmyy w .w ."+y- -< , ,ng.
; ..q-m r; ypm. .p 7 n,;;;w.p gmpL.. ; . - :;3 u ~ .wn n
~"i..w . +-
..M ,n.._+
' 8 t., , -.
- _ :;::; g- +
. - ,~
. ~ ~g?
r: .- ,2
',w.,_ , 3: c. ..N ;.<., ,q,.ggb 3,%w '
y',
.-1. . : c. . . ,e. ; .;
,_mc
.-v - . .a3 ,.
- - - ,y;;-, _ ,- .
, -Vf"a
.; .
my w s 4 -
% + ~
. Wpy'
' mL ,-
~
< . . ?';;;;(! _vn; 7
,~,. ,
;y:
- n. -w, ,
' ;;. .* : " XQ '
' ~
) 3.\ ,;;;
q- ;'
r .
'n '," - M.
3/4 3-61"Inserti ~ :.&c 7 '
>[ : * %
? - = ~ . [ ;; s -; : * ' 1
_/. , -
+
s : ,+. i>z. @s
,a
, 1. .. .. ..
r M
;t MINIMUM: :. APPLICABLE?
~
, -REQUIRED MUMBER~ : CHANNELS-' JOPERATIONAL.~ i INSTRUMENT " OF ' C:4ANNELS ' OPERABLE' - 'CONOITIONS' . . .-ACTIONL_ ,
r . . .
- 2. Reactor Vessel Water Level -
- a. Fuel Zone '2-
- 1.1 ; i 1. '.:2 80.1 - M
- b. Wide Range- '2. ;1 1.52" .
. ' 90 l.
J
- 13. Standby Gas Treatment System Radiation Monitors **- '4 . .
' * /
- a. SGTS - Noble Gas.(Low-range)*** .2 ,2- J 1. - 2. 3L 81' -
b .. SGST..-' Noble Gas (Mid-range) .
2 2:. ;1.:2. 3j l E 1 ;i- e
- c. SGT5 - AXM-Noble Gas-(Mid-range)- '2~ 2- ;1. 2. 3- ;81' -
- d. SGTS - AXM-Noble Gas-(High-range)' 2 "2' '1. 2 3; ,81i " ~
14 Neutron Flux. .. -
- a. Intermediate Range Monitors- -1/ division <1. f- 1. .' 2 : c 80 '
- b. Power-Range Monitors 1/ division- I i
' 1. ~ 2 ~ . ;80;
.2-f .-
..y
'5 T . - ' ' - .* g 9'
.,,\
N-T ' ?, ,
k
. w'.
4 s
4
+
,++ _
'j',
+
r, - -' ,; .,
..,7
~ s - ~
*f ' . * ,
Y
*w i -
/ ,a'n $-
t
'I~~ 's
' ~
.% a . -m_ , , . , . .i [- __ --i2 + e --.~ ' - ~ '
i A
~ ,
b,,., _
. . +, * ;
.. ~
? ...
TABLE 3.3.7.5-1 (Continued)
ACCIDENT IGNITORIIG IllSTRSENTATION
_i. 1 ACTICII STATBENTS ,
ACTION 80 -
e.. With the ausber of OPERABLE accident monitorint instrumentation channels less than the Required llueber of Channels shown in Table 3.3.7.51, restore the inoperable channel (s) to OPERABLE ,
status within 7 days or be in at least ICT SWTD0let within the :
mest 12 hours. ,
- b. Mth the nueer of OPERABLE accident monitoring instrumentation' channels less than the IHatsus Channels OPERABLE requirements t
of Table 3.3.7.5-1, restore the inoperable channel (s) to ;
OPERABLE status within 48 hours or to in at least ICT SWTDmm ~
within the next 12 hours. L
' ACTION 81 - With the nueber of OPERABLE channels less then required by the-einimum channels OPERABLE requirements, initiate the preplanned alternate method of monitoring the appropriate parameter (s) within 72 hours, and:
- 1) either testore the inoperable channel (s) to OPERABLE ,
status within 7 days of the event, or-t .
L: 2) prepare end submit a Special Soport to the Commission .
l pursuant to Specification 5.9.2 within 14 days following
" the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the
' systen to OPERABLE status.
- t. .=..
~
f f 3 L !
L e
3/4 3-62 Amendment Iso. 28 FEWII - UllIT 2
- u. ,
. ;
';; . ,- .-. ' .
]
y .: : l l
fage 3/4 54a Insert ACTIM Sa Path the useber of WWIAE2 soofdsat monitoring f instrumentation ebensels less then re.uired by the. ,
mina. a ea Wimase 1es.t.. fan. -
)
' 3 3 1 5-1, within 48 hours either: .1 Bestore the lamperable shommel(s) to W ERAM 2 ]
a.
-states, or
, b. .
Boolare the affected tactation valve lamperable and take the ACTION specified by Specification 3 6 3 .
, ACTION a. I i
l l
r-- ;
;(
l sQ e
1 .
l l
.( '
l l
I 1
I i
i I
l
.-__.____Li__.__________.__.____ _ _ _ _ _ _ _ _ _ _ _ _ . , _ . _ _ _ _ _ _ _ , . . . . . _ _ . . . , . _ . _ . . , , , . , _ . , _ . . , . . . , . . . , , . . . . . . _ , _ , , , _ , _ . , . _ , _ , _ , . . . . . ,
. _ _ . - . - - . . ~ . . . . . . . . . . . . . . . . . - . . . - ~ . - - . _ . . . . . - - - . . . . - , .
s -m . ,
* -.; ;,;
H. , ,
y . si: .,
l; '
1
. j
.- ~ ~ ~ .,~ ~ ~.~ ~ ~ ~ ~ ~ ~ ., ~ .
$'$ $ $ $'$ $ $ $ $ $ $ $ $-e? ~$
b I J
15 i 5, .
L .
lg ........5.1.... . ,,
- i. j]
as l
. 3 J
-- h 5 s a a a s - s z . s a a a a a ar. n a j{
o
- R 5 o,g l
n g
]. - j ll i I o.
L E
n x
jnf, I 3,
I 3,
.h.
gl: *j _ilk u
-3 .s r 2
l 33 * '
.l p.1 u
j 3g3;]sl fgr 5 a) u .a
j~
j111 i
i
[]]p,, f ,}1gleh.
_I I, ,5
.gI Ei ,
D 55i l
$i ll $^$ $ $8 ] '
Sh}l 8 j S i 8
= === ::
o
[I l I-N a b IIII $,d O' I awesssagescanzes ....... Idd ( 8 :
.g FEMI - WIT 2 3/4 3-63
__I~III_ lY-'_E'.i __ _ Ms.
).
,. 7c
- u -- g
.-N g '
- 7 -- _, g, .
5 - er 7- - yp ,.
s .
= -
7
,7 ,
m ; .-
w u. :ngy .~
n y_ -
.g <- ;;;p p
.,,x
<= '1. -
n .- , ,.
n _ - _
n: 9., , 3 e w + r ,
~ ,- .
,. , ...s- ~
r-
;u"= .%
y ~. .. w x; p.
' .,. ~
,.~
- .;w;;u 9, . j.:r
, d-- .
~ .mt:..
*. ?
n - .Y; u<,.,, . 2 y%:r, v a ss ?
1:m>
- , '- - . , . . m.;; y 1 ' , y,_+ r.
~.
G s p.; L
. , .q
, ' < > u.c.~
~ w eA2p 1,_ ..,,_-9
.:s:-
e,f -~ e , -o p. ,;pp
~.',-
,r... - p 3, s
' - r ~
- ~ . ,
.4 .., : . -.. -a .
73/4(3-63'InsertJ. T:- .*
' d41 D
-V'
- 3. <
+
- QA ;%: ? , > :w j VE-%-
r - -
'+~','.f,~.,.
- t.
s ,
w
.. . . . . - , . . . [ EAPPLICABLE J4i
~
~
- ? CHANNEL ; CHANNEL!. w. OPERATIONAL ~L : :n
2 CHECK' mCALISRATION T CONOITIONS , r
, #I
; ,
- 2. ' Reactor Vessel. Water; Level' , ..
f, 7. -.
/.
4
\ +
~ We 9 ./6 M; LR, ,1 ; -: 2 : " " ' ',i
- a. Fuel' Zone _ c.~ .r . *
- b. - Wide Range -:
i
_ . M s- ,
' R l-
.~
g:.~ .
~ ,
- 13. Standby Gas Treatment System Raca lation Monitors._ . . . . . -
, ~g_
~
- a. SGTS -. Noble Gas (Low-range)' JM. LR& 11, 2.J3 ~
- b. SGTS 1 Noble Gas (Mid-range) .M: -. R '.
s1 s 2. : 3 .
- c. ' SGTS - AXM-Noble Gas (Mid-range) M: Rf ?1 2.1 3- ~
- d. . SGTS - AXM-Noble ' Gas (High-range) -
'M- l' q,R , 1. J- 2. ';,3 . . ,
'M- R[ ;1 1. 2 - 4 ;-4
- 14. Neutron Flux ,
i
- a. Intermediate Range Monitors. ' M- 'R;
- 1. ; 2 -: ,.
Power Range Monitors. M ,. -R' $1. 2 N b.
h g:'
a . 3 43
..n.,,,
- , ~ ~ ,
;,.s.a-4 v s
'f
,, w
.n .,
' 4
.;.'. y c
Q
+
b V
.n
< ' d .s
_ . . ,, F4
'6,
> -{"
4
- .t p', . ,
r j ,. "
' V'
. '- ,.' .h' I 44- t
---.~.c . - . - . . _ . . - . . - -
+- g m
.a -
_ :e.. 2,. ..
~ "'
P- -
TABLE 3.3.7.12-1' ^
3 >-
;. .
. E .RACIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION-
- ' t t
E MINIMUM CNANNELS:
M INSTRUMENT OPERABLE -APPLICABILITY ACTION
. 1. REACTOR SUILDI N ENNAUST PLENUM i EFFLUENT MONITORING SYSTEM i
l- a. Noble Gas Activity Monitor -
l Providing Alarm 1-
* :121-i .
i Iodine Sampler .* 122
, b. .1
~
Particulate Sampler -* 122 l c. 1
- 123 i w d. Sampler Flow Rate Monitor 1 k
- w 2. OFFGAS M NITORING SYSTEM (At the 2.2 minute-
4 w
delay piping) 1 - ** 124
- a. Hydrogen Monitor
*** 126
- b. Noble Gas Activity Monitor 1-
- 3. STANDBY GAS TREA1 MENT SYSTEM f #-
- a. Noble Gas Activity Monitor -
Providing Alam 1 # 125 k b. todine Sampler 1 # 122
}3 c. Particulate Sampler 1 # 122-F d. ' Sampler Flow Rate' Monitor l' #- 123
.i
;h i
1-
. . . - - #w-~, . + , . - - , . . , ~ . - ~ -- . - - . ~ . - .~.- - - - - - ~ -
- , . .. - -- - . . - - - - _ - . - ~ . - -- ..
,7 r j
;.;
~, ,
s
~"
- TABLE 3.3.7.12-1-(Continued) >
3 TABLE NOTATIONS +
t
** During main condenser offges treatment system operation.
'***Durihgoperationofthemaincondenseraire.jector. '
'( During operation of the standby cas treatment system.
pr-p- l} b., , ,, J / cl s n. N < 3 . E. 7. f - / & / 3 m ACTION STATEMENTS '
. ACTION 121 - With the number of channels OPERABLE less than required by the Minimum Channels OPERA.9LE requirement, effluent relettes via .
this pathway may continue provided grab samples are taken at least once per 12 hours and these samples are analyzed for '
, gross activity within 24 hours. Otherwise, suspend release of !
- j. radioactive effluents via this pathway.
1 L ' ACTION 122 - With the number of channnels OPERABLE ene less than required by the Minimum Channels OPERABLE requirement, effluent releases
- via this pathway may continue provided that within 8 hours l _
semples are continuously collected with auxiliary sampling equip- g ment as required in Table 4.11.2.1.2-1.
-ACTION 123 - With the number of channels OPERABLE 1ess than required by the i Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue provided the flow rate is estimated ,
at least once per 4 hours. Otherwise, suspend release of
- radioactive effluents via this pathway.
1.
ACTION 124 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, operation of main condenser-offgas treatment system may continue provided grab samples are l collected at least' once per 4- hours and analyzed within the '
following 4 hours. Otherwise, suspend release of radioactive
.- effluents via this pathway.
, ACTION 125 -- With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may, continue provided grab samples are taken at l 1 east once per 4 hours and these samples are analyzed for gross activity within 24 hours. Otherwise, suspend release of radio-active effluents via this pathway. ,
' ACTION 126 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, releases via this pathway ,
to the environment may continue for up to 7 days provided that:
- a. The offgas system is not b' passed, and The reactor building exhaust plenum noble gas effluent I b.
(downstream) monitor is OPERABLE; Otherwise, be in at least HOT STANDBY within 12 hours.
FERMI - UNIT 2 3/4 3-80 Amendment No. 24
+.4,. , ,
_. _ _ 4- j
%A1000ENTihiini
)
F MAILL AND SUPPRES$10N DWSER OXYGEN CONCENTRATION .
.S.- . LIMITING E+TITION FOR OPERATION
' 3.6.6.2 The drywell and suppression chamber atmosphere oxygen concentration .j shall be less than 45 by volume.
APPLICABILITY: -OPERATIONAL CONDITION I , during the time period:
I
- a. . Within 24 hours after THEWiAL POWER is greater than 155 of RATED l
THERMAL POWER, fellowing startup, to Within 24 hours prior to reducing THERMAL POWER to less than 155 of l
- b. .
RATED THEmiAL POWER, preliminary to a reactor shutdown. l l
M: -!
;
With the drywell and/or suppression chamber oxygen concentration '
exceeding the limit, restore the oxygen concentration to within the limit within 24 hours or be in at least STARTUP within the next 8 hours.
;
l
/
)
1- .
[ . SURVEILLANCE REQUIREMENTS 4.6.6.2 The drywell and suppression chamber oxygen concentration shall be' verified to be within the limit within 24 hours after THERMAL POWER is greater than 155 of RATED THERMAL POWER and at least once per 7 days thereafter.
^;. . ;, . . . . T. . ;. -:-- _ = 7. : ... ;..;.;.
)
FERMZ - UNIT 2 3/4 6-58 i
+
--*f*- vetw.-wd..w,,.,_,...,,y,,, ,_ ,
~
(+ ,
.' K De,le.ha- bis Ae.ge ._
j ,L' -r e g Ett1AL TEST EERIFfleits p/4.18.5 GINREN WHt21ffRAT10ll
- a;-liasii dBISfflell POR SPERATION '
1
'I 3.10.5 The provistens of Speciftsetion 3.6.6.2 and the SPERASILITY fleetten 3.3.7.5 votuirements-any be et..the 11 n Consentration testr oent of Progree until either the inn perfomance of the Startap required 105 of thTB llEWEL P0lER tri tests hove been sempleted or the.-
Teoster has operated for 180 fffective 1 fewer toys.. ..
gPPLICABILITY: OPERATIONAL OBSITIONS 1 and 1.- a M .
l- With the pequirements of the above speciftsetion met settsfied.' te in at least E STARTUP within 8 hours.
O} *
'l I,
i SURVEILLAfftf M id! E s NTS-h
- 4.10.5' The' Iffective Full Power Days of Operetten shall be verified to be less l
then 120. ty selceletion, et least once per 7 days duria0 the Starte Test l Pre 0res. ~ \
l 1
i L -
1.
(
e --
3/4 10-5 Amenesent No. 3
. pgm3 . gN11 2 .
HW O * * * '
e e .
S S e
= . . - . - . - . - --
- p. .. .
S .H, _,,T' l-( .
. :, [ 1 l
. . 1
,1/4.10 - SPECIAL TEST **PrPTIONS -
l anet .
~ 3/4.10.1 PRIMARY CONTAIl0ENT I N EGRITY The requirement' for PRIMARY CONTA!IMENT INTEGRITY is not applicable du:
'the ied when epen vessel tests are being performed during the leu power-C5 TESTS. '
L f/4.10.2 RDO SE* *HCE CONYdDL~ SYSTEM
.In order to perfeve the tests required in the technical specifications The if,is necessary to bypass the sequence restraints on control red sevement.
. additional surveillance requirements ensure that the specifications d d during the on heat L
' . generation rates and shutdeun margin requirements are not e
..* not exceed the values assumed in the safety analysis, k 13/4.10.3 SNLIT*** MARGIN OBWNSTRATIONS ;
l head removed 1
. Performance of shutdown'oergin demonstrations with the vesse f-. requires additional restrictions in order to ensure that criticality is pr annitored and controlled.-
3/4.10.'4 RECI*PULATION LOOP 1 -
This special test exception pefeits reactor criticality under no flow l L
conditions and is-required ta perfore certain startup and PHYSICS TESTS while !
at. low THEMAL POWER 1evels. ;
' ons is necessary in order Relief free the oxyge initial startup and i to provide access to the regras l testi . tHthout this access the s ricted and delayed.
3/4.10.6 TulNING STARTUPS 4
;
the reactor vessel depressurized at low THERMAL POW '
controlling RCS temperature with one RHR subsystem aligned in the shutdown cooling mode in order to minimize contaminated water discharge to the radioactive wasta disposal system.
L k
FEMI - UNIT 2 3 3/4 10-1
}}}