MONTHYEARIR 05000321/20230042024-01-31031 January 2024 Integrated Inspection Report 05000321/2023004 and 05000366/2023004 IR 05000321/20233012024-01-17017 January 2024 NRC Operator License Examination Report 05000321/2023301 and 05000366/2023301 IR 05000321/20234022023-11-29029 November 2023 Security Baseline Inspection Report 05000321/2023402, 05000366/2023402, and 07200036/2023401 IR 05000321/20230112023-11-17017 November 2023 Biennial Problem Identification and Resolution Inspection Report 050003212023011 and 050003662023011 IR 05000321/20230032023-11-0202 November 2023 Integrated Inspection Report 05000321/2023003, and 05000366/2023003 IR 05000321/20234032023-10-26026 October 2023 Cyber Security Inspection Report 05000321/2023403 and 05000366/2023403 IR 05000321/20234012023-10-17017 October 2023 Security Baseline Inspection Report 05000321 2023401 and 05000366 2023401 IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 IR 05000321/20230022023-08-0808 August 2023 Integrated Inspection Report 07200036/2023001, 05000321/2023002, and 05000366/2023002 ML23178A0012023-06-27027 June 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000321 2023403 and 05000366 2023403 IR 05000321/20230102023-06-0909 June 2023 Focused Engineering Inspection Report 05000321 2023010 and 05000366 2023010 IR 05000321/20230012023-04-26026 April 2023 Integrated Inspection Report 05000321/2023001 and 05000366/2023001 IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 IR 05000321/20220042023-02-0101 February 2023 Integrated Inspection Report 05000321/2022004 and 05000366/2022004 IR 05000321/20224202022-12-16016 December 2022 Cover Letter - Edwin I. Hatch Nuclear Plant, Units 1 & 2 Security Baseline Inspection Report 05000321/2022420 and 05000366/2022420 IR 05000321/20224042022-11-28028 November 2022 Security Baseline Inspection Report 05000321/2022404 and 05000366/2022404 IR 05000366/20220032022-11-0808 November 2022 Integrated Inspection Report 05000321 /2022003 and 05000366/2022003 IR 05000321/20224032022-10-31031 October 2022 Security Baseline Inspection Report 05000321/2022403 and 05000366/2022403 IR 05000321/20224012022-10-28028 October 2022 Material Control and Accounting Program Inspection Report 05000321/2022401 and 05000366/2022401 Cover Letter IR 05000321/20220052022-08-23023 August 2022 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units and 2 Report 05000321/2022005 and 05000366/2022005 IR 05000321/20220022022-08-0303 August 2022 Integrated Inspection Report 05000321/2022002 and 05000366/2022002 IR 05000321/20224022022-07-19019 July 2022 Security Baseline Inspection Report 05000321/2022402 and 05000366/2022402 IR 05000321/20220112022-07-13013 July 2022 Fire Protection Team Inspection Report 05000321/2022011 and 05000366/2022011 IR 05000321/20220102022-05-20020 May 2022 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000321/2022010 and 05000366/2022010 ML22129A1452022-05-10010 May 2022 IR 2022001 Final IR 05000321/20210062022-03-0202 March 2022 Annual Assessment Letter for Erwin I. Hatch Nuclear Plant, Units 1 and 2 (Report No. 05000321/2021006 and 05000366/2021006) IR 05000321/20210042022-02-0404 February 2022 Integrated Inspection Report 05000321/2021004 and 05000366/2021004 IR 05000321/20213022022-01-21021 January 2022 NRC Operator License Examination Report 05000321/2021302 and 05000366/2021302 IR 05000321/20214022021-12-0606 December 2021 Security Baseline Inspection Report 05000321/2021402 and 05000366/2021402 IR 05000321/20210102021-11-0404 November 2021 Biennial Problem Identification and Resolution Inspection Report 05000321/2021010 and 05000366/2021010 IR 05000321/20210032021-10-19019 October 2021 Integrated Inspection Report 05000321/2021003 and 05000366/2021003 IR 05000321/20214012021-10-0606 October 2021 Security Baseline Inspection Report 05000321/2021401, 05000366/2021401 IR 05000321/20210052021-08-23023 August 2021 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Report 05000321/2021005 and 05000366/2021005) IR 05000321/20210022021-08-0404 August 2021 Integrated Inspection Report 05000321/2021002 and 05000366/2021002 IR 05000321/20200112021-07-15015 July 2021 Plants, Units 1 and 2 Temporary Instruction 2515/193 Inspection Report 05000321/2020011 and 05000366/2020011 IR 05000321/20210112021-06-25025 June 2021 Design Bases Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000321/2021011 and 05000366/2021011 ML21165A1142021-06-14014 June 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200036/2021001 IR 05000321/20210012021-05-0606 May 2021 Integrated Inspection Report 05000321/2021001 and 05000366/2021001 IR 05000321/20200062021-03-0303 March 2021 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant - Report 05000321/2020006 and 05000366/2020006 IR 05000321/20200042021-02-10010 February 2021 Integrated Inspection Report 05000321/2020004 and 05000366/2020004 and Independent Spent Fuel Storage Installation Report 07200036/2020003 IR 05000321/20204022021-01-14014 January 2021 Cyber Security Inspection Report 05000321/2020402 and 05000366/2020402 - Cover Letter (Public) IR 05000321/20200102020-12-22022 December 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000321/2020010 and 05000366/2020010 IR 05000321/20204012020-12-10010 December 2020 Security Baseline Inspection Report 05000321/2020401, 05000366/2020401, and 07200036/2020401 (U) IR 05000321/20200032020-11-10010 November 2020 Integrated Inspection Report 05000321/2020003 and 05000366/2020003 and Independent Spent Fuel Storage Installation Report 07200036/2020002 IR 05000321/20200022020-08-0505 August 2020 Integrated Inspection Report 05000321/2020002 and 05000366/2020002 IR 05000321/20200012020-05-11011 May 2020 Integrated Inspection Report 05000321/2020001 and 05000366/2020001 IR 05000321/20190142020-05-0101 May 2020 Reissue Edwin I. Hatch Nuclear Plant Temporary Instruction 2515/194 - Report 05000321/2019014 and 05000366/2019014 IR 05000321/20190062020-03-0303 March 2020 Annual Assessment Letter for Edwin I Hatch Nuclear Plant - Report 05000321/2019006 and 05000366/2019006 IR 05000321/20190042020-02-0707 February 2020 Integrated Inspection Report 05000321/2019004 and 05000366/2019004 and Independent Spent Fuel Storage Installation Report 07200036/2019002 IR 05000321/20192012019-12-0606 December 2019 FOF Inspection Report 05000321/2019201 and 05000366/2019201 Cover Letter, No Findings 2024-01-31
[Table view] Category:Letter
MONTHYEARIR 05000321/20230042024-01-31031 January 2024 Integrated Inspection Report 05000321/2023004 and 05000366/2023004 NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. ML24012A0652024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000321/20233012024-01-17017 January 2024 NRC Operator License Examination Report 05000321/2023301 and 05000366/2023301 ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems IR 05000321/20234022023-11-29029 November 2023 Security Baseline Inspection Report 05000321/2023402, 05000366/2023402, and 07200036/2023401 NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal IR 05000321/20230112023-11-17017 November 2023 Biennial Problem Identification and Resolution Inspection Report 050003212023011 and 050003662023011 ML23324A4472023-11-14014 November 2023 302 Exam Approval Letter IR 05000321/20230032023-11-0202 November 2023 Integrated Inspection Report 05000321/2023003, and 05000366/2023003 IR 05000321/20234032023-10-26026 October 2023 Cyber Security Inspection Report 05000321/2023403 and 05000366/2023403 IR 05000321/20234012023-10-17017 October 2023 Security Baseline Inspection Report 05000321 2023401 and 05000366 2023401 ML23250A0472023-09-20020 September 2023 Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 IR 05000321/20230022023-08-0808 August 2023 Integrated Inspection Report 07200036/2023001, 05000321/2023002, and 05000366/2023002 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23201A0292023-07-20020 July 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement ML23178A0012023-06-27027 June 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000321 2023403 and 05000366 2023403 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use IR 05000321/20230102023-06-0909 June 2023 Focused Engineering Inspection Report 05000321 2023010 and 05000366 2023010 NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 IR 05000321/20230012023-04-26026 April 2023 Integrated Inspection Report 05000321/2023001 and 05000366/2023001 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal ML23065A1092023-03-0808 March 2023 Correction of Relief Request HNP-ISI-RR-05-02 Allowing to Continue Operation with a Flaw Indication on One Reactor Pressure Vessel Closure Bolt Until December 31, 2025 ML23053A2182023-03-0303 March 2023 Correction of Amendment Nos. 321 and 266 Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 2024-01-31
[Table view] |
Inspection Report - Hatch - 2003009 |
---|
|
|
Text
rch 31, 2006
SUBJECT:
EDWIN I. HATCH NUCLEAR POWER PLANT - NRC INSPECTION REPORT NOS. 05000321/2003009 AND 05000366/2003009
Dear Mr. Sumner:
On February 14, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an in-office review related to an unresolved item identified during the Triennial Fire Protection Inspection of 2003. A meeting was held in the Region II office with regional staff and Mr. R. Baker and Mr. D. Parker on December 7, 2005, to discuss the status of SNC's proposed resolutions for protecting the affected cables of eleven safety-relief valves and to clarify the staffs position regarding the use of local operator actions in lieu of circuit protection as required by NRC regulations. Following completion of additional review in the Region II office, a final exit was held by telephone with Mr. D. Madison and other members of your staff on March 31, 2006.
The in-office review consisted of evaluating the safety significance of particular spurious valve operations and reviewing your compensatory measures and various proposed final resolutions.
The issue remains unresolved for reasons described in the enclosed report.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact us.
Sincerely,
\\RA\\
D. Charles Payne, Chief Engineering Branch 2 Division of Reactor Safety cc w/encl - See next page
SNC 2 Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5
Enclosure:
NRC Triennial Fire Protection Inspection Report Nos. 05000366/2003009, 05000321/2003009 w/Attachment: Supplemental Information
REGION II==
Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5 Report No.: 05000321/2003009 and 05000366/2003009 Licensee: Southern Nuclear Operating Company Facility: Edwin I. Hatch Nuclear Plant, Units 1 and 2 Location: P. O. Box 2010 Baxley, GA. 31513 Dates: February 14, 2006 Inspector: N. Staples, Reactor Inspector Approved by: D. Charles Payne, Chief Engineering Branch 2 Division of Reactor Safety Summary of Findings IR 05000366/2003-009, 05000321/2003-009; 02/14/2006; E. I. Hatch Nuclear Plant, Units 1 and 2.
Enclosure
The report covered an in-office review of an unresolved item related to fire protection by a Regional Inspector. The NRC*s program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 3, dated July 2000.
A. NRC-Identified and Self-Revealing Findings None B. Licensee-Identified Violations None Enclosure
REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Other (Discussed) URI 05000366/2003006-01: Concerns Associated with Potential Opening of SRVs Introduction: The Inspector reviewed an unresolved item (URI) involving the failure to protect circuits against fire which could lead to spurious opening of all eleven safety relief valves (SRV). The team had found instrumentation cables, that could cause maloperation of safe shutdown equipment, in FA 2104 without adequate spatial separation or fire barriers. The finding remains unresolved pending review of proposed corrective actions for the circuit design of the eleven SRVs.
Description: During the 2003 Triennial Fire Protection Inspection, the inspection team performed a circuit analysis of Group A safety relief valves for which the licensee took safe shutdown credit for fires in Fire Area 2104, Unit 2 East Cableway. The requirements of 10 CFR 50, Appendix R, Section III.G.2, apply to this fire area. The team identified that two reactor pressure instrument cables (for circuits ABE019C08 and ABE019C09) were located in the same cable tray and thereby exposed to the same heating rate which could potentially cause both circuits to simultaneously fail high and result in all eleven SRVs spuriously opening. Each cable consisted of a single twisted pair of insulated conductors, an uninsulated drain wire that was wound around the twisted pair of conductors, and a foil shield. The conductor insulation and jacket material of each cable was cross-linked polyethylene (XLPE). A thermal assault on instrument cables could result in (false high) signals, generated as a result of leakage current in each damaged cable. These undesired false high signals could actuate the SRV electrical backup scheme and cause all eleven SRVs to open. In addition, this failure mode would defeat the capability to manually control these SRVs. Normally, whenever a SRV lifted, it would remain open until nuclear boiler pressure was reduced to about 85% of its overpressure lift setpoint. However, if the instrument loops have failed high, the trip unit master relays and the trip unit slave relays would continue to energize the pilot valve of the individual SRV and maintain the SRV open. As a result, this failure mode could result in spurious actuation of all eleven SRVs with the eleven SRVs subsequently remaining open.
In response to this finding, the licensee initiated Condition Report 2003008203 and promptly revised AOP 34AB-X43-001-2, Fire Procedure, Version 10.8 dated May 28, 2003. The procedure change enabled the local operator actions to prevent all eleven SRVs from opening simultaneously to be accomplished earlier during a fire in the Unit 2 East Cableway, or in other fire areas that were vulnerable to the potential for spuriously opening all eleven safety relief valves. While, the revised procedure was an acceptable interim compensatory measure, it was not a permanent resolution to the circuit damage issue because Appendix R,Section III.G.2 does not allow use of local operator actions in lieu of circuit protection to ensure safe shutdown. On December 7, 2005, NRC staff met with the licensee to discuss proposed options for protecting cables from a fire in FA 2104 and to clarify the staffs position on regulation regarding the use of local operator actions in lieu of circuit protection. While various options were presented by the licensee, the licensee had not yet determined a final resolution. This URI will remain open pending the licensees final resolution.
4OA6 Meetings, Including Exit Exit meeting Summary On March 31, 2006, the regional staff presented the status results to Dennis Madison and other members of his staff, who acknowledged the findings. The inspectors asked the licensee whether any of the material examined during the inspection should be considered proprietary.
No proprietary information was identified.
Enclosure
SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel:
R. Baker, Licensing Supervisor (Corporate)
I. Luker, Senior Engineer, Licensing D. Madison, General Manager for Plant Hatch D. Parker, Senior Engineer, Electrical K. Underwood, Performance Analysis Supervisor J. Vance, Senior Engineer, Mechanical & Civil O. Vidal, Principal Engineer, Licensing P. Wells, Plant Support General Manager LIST OF ITEMS DISCUSSED Discussed 05000366/2003006-01 URI Concerns Associated with Potential Opening of SRVs LIST OF DOCUMENTS REVIEWED Procedure:
AOP 34AB-X43-001-2, Fire Procedure, Version 10.8 Drawings H-11821, Fire Hazards Analysis, Turbine Bldg. El. 130=-0@, Rev. 0 H-26014, R.H.R. System P&ID Sheet 1, Rev. 49 H-26015, R.H.R. System P&ID Sheet 2, Rev. 46 H-26018, Core Spray System P&ID, Rev. 29 H-11821, Fire Hazards Analysis Drawing, Turbine Building, Rev. 11 Calculations, Analyses, and Evaluations E. I. Hatch Nuclear Plant Units 1 and 2 Safe Shutdown Analysis Report, Rev. 20.
Edwin I. Hatch Nuclear Plant Fire Hazards Analysis and Fire Protection Program, Rev. 20 Corrective Action Reviewed CR 2003008203, Safety relief valves Manual Action Steps in Fire Procedure Attachment
License Basis Documents Hatch UFSAR Section 6.3, Emergency Core Cooling System, Rev. 21 Safe Shutdown Analysis Report for E.I. Hatch Nuclear Plant Units 1 and 2, Rev. 26 Fire Hazards Analysis for E. I. Hatch Nuclear Plant Units 1 and 2, Rev.18 C, dated 7/00 Attachment
_________________________
OFFICE RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE NLS2 PJF CWR1 DCP NAME NStaples PFillion CRapp DPayne DATE 3/17/2006 3/20/2006 3/21/2006 3/31/2006 4/ /2006 4/ /2006 4/ /2006 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO