Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr
ML18016A910
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/31/1999
From: Alexander D, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-99-066, HNP-99-66, NUDOCS 9904190252
Download: ML18016A910 (11)


Text

CATEGORY j.

REGULATORY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESQXVh~NBR:9904190252 DOC.DAT . OTARIZED: NO DOCKET ¹ FACIL:5'0-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NICE .I AUTHOR AFFILIATION ROGERS,S. Carolina Power & Light Co.

ALEXANDER,D.B. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating re t or Shearon Harris Nuclear Power Pla .With 990413 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR i ENCL ) SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 0500040(P RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD2-2 PD 1 1 LAUFER,R. 1 1 R

INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 CENTER 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC NRC PDR 1 1 D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Carolina Power & Light Company Harris Nuclear Plant P.O. Box 165 New Hill NC 27562 APR 18 "999 United States Nuclear Regulatory Commission Serial: HNP-99-066 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of March 1999 is provided.

Sincerely,

,@z~.

. B. Alexande Manager, Regulatory Affairs Harris Plant SGR Enclosure 1 C"t i~ I +) Q

~

c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. R. J. Laufer - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road New Hill NC 9904i'70252 'si9033i PDR AMCK OS000400 R PDR

P Enclosure to Serial HNP-99-066 Shcct 1 of 4 cprcL co. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 04/07/99 OPERATING DATA REPORT RPD36-000 RUN TIME 19:38:13 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTXNG PERXOD: MARCH 99
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR XN CAPACITY RATINGS (XTEMS 3 THRU 7) SiNCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED ZF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERXOD 744.00 2160.00 104449.00
12. NUMBER OF HOURS REACTOR CRITICAL 606.92 1998.60 88224.21
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 551.68 1924.11 87309.72
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1436029.20 5150004.84 234569728.80
17. GROSS ELEC. ENERGY GEN (MWH) 478486.00 1724458.00 78068495.00
18. NET ELEC. ENERGY GENERATED (MWH) 441262.00 1609146.00 72846018.00
19. UNIT SERVICE FACTOR 74.15 89.08 83.59
20. UNIT AVAILABILITYFACTOR 74.15 89.08 83.59
21. UNXT CAP. FACTOR (USING MDC NET) 68.96 86.63 81. 10
22. UNIT CAP. FACTOR (USING DER NET) 65.90 82.78 77.49
23. UNXT FORCED OUTAGE RATE 25.85 10.92 3.29
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATXON OF EACH):
25. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS ZN TEST STATUS (PRZOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRZTZCALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

Enclosure to Serial: HNP-99-066 Sheet 2 of 4 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 04/07/99 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 19:38:12 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 MARCH 1999 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (M('rE-NET) (MWE-NET) 878 17 -36 877 18 -38 871 19 878 20 707 881 21 834 872 22 865 207 23 868 120 864 763 25 868 10 875 26 873 878 27 873 12 219 28 871 13 -35 29 871

-35 30 873 15 -36 31 870

-37

lq 1

Cy f -A Ca

'j C;f ~ i ,t

~)

)

IF t

gt (

'I I f

I 'f(

r~

J r>> ',~

P r.~

A

.". V C

E Enclosure to Serial: HNP-99-066 -'.

Sheq> 3 of 4 UNIT SHUTDOWNS AND POPOVER REDUCfION UNIT NAME: Hams DATE: 04/0l/99 COMPLETED BY: S. G. Rogers TELEPHONE: (9I9) 362-2573 REPORT MONTH: March l999 CAUSE AND CORRECTIVE MErHOD OF LICENSEE ACrlONTO DURATION SHUITING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT ¹ CODE 4 CODE 5 Phnt reduced power and 03/07/99 18.25 NA Hl VALVEX came off line 3/7/99 due to loss of Steam Generator blowdown flow fmm B Steam Generator caused by failure of I BD-20. Repairs were made and phnt was 3/9/99 I returned to l00% power on l2:00 I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B.Maintenance or Test 2.Manual Scram Entry Sheets for Licensee Event Rcport C.Refueling 3-Automatic Scram (LER) File D-Regulatory Restriction 4-Continued (NUREG-OI6 I)

E-Operator Training 8c License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Exphin) Exhibit I - Same Source H-Other (Explain)

J Enclosure to-Serial: HNP-99-066 ~

Shee@4 of 4 UNITSHUTDOWNS AND POWER REDUCfION UNIT NAME: Harris DATE: 04/01/99 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: March 1999 MEI'HOD OF LICENSEE CAUSE AND DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT CORRECTIVE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT ¹ CODE 4 CODE 5 ACfIONTO PREVENT RECURRENCE Phnt received auto 99-004 03/12/99 174.07 99-004 CH INSTRU turbine/reac(or trip from high steam generator level in "C'team generator. Repairs were made and phnt was returned to 100% power 3/22/99 8 05:00.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Exphin) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event Report C-Refueling 3-Automatic Scram (LER) File D-Reguhtory Restriction 4-Continued (NUREG-0161)

E-Operator Training 8c License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

fC>> r, gs.