ML18016A958

From kanterella
Revision as of 05:36, 22 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990513 Ltr
ML18016A958
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/30/1999
From: Alexander D, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-99-089, HNP-99-89, NUDOCS 9905200154
Download: ML18016A958 (7)


Text

carzaoar 1 REGULATO Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

II FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROGERS,S. Carolina Power & Light Co.

ALEXANDER,D.B. Carolina Power &. Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating re Nuclear Plant, Unit. .With'or t

90513 ltr. Shearon Harris DISTRIBUTION CODE: IE24D COPIES RECEIVED,:LTR TITLE: Monthly Operating Report (per Tech Specs)

I ENCL J SIZE:

NOTES:Application"for permit renewal filed. 05000400 E RECIPIENT, COPIES ,RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD2-2 PD 1 1 LAUFER,R. 1 1 INTERNAL: ACRS 1 '

1 AEOD/SPD/RRAB 1 1 CENTER 0 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC NRC PDR 1 1 D

'E NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Carolina Power & Ught Company Harris Nocloar Plant P.O. Box 165 New Hill NC 27562 MAY 13 1999 United States Nuclear Regulatory Commission Serial: HNP-99-089 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.L5, the report of operating statistics and shutdown experience for the month of April 1999 is provided.

Sincerely, D. B. Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure Mr. J. B. Brady - NRC Senior Resident Inspector Mr. R. J. Laufer - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road Now Hill NC

~

<

~.:r'(.r:if'7905200i54 990430 PDR R

ADQCK 05000400 PDR L

'l

1 ~

'7

Enclosure to Serial HNP-99-089 Sheet I of 2 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 05/05/99 OPERATING DATA REPORT RPD36-000 RUN TIME 10:34:28 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEXLA ROGERS OPERATZNG STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTING PERXOD: APRI'L 99
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET KfE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRXCTED XF ANY (NET MWE):
10. REASONS FOR RESTRICTION ZF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 719.00 2879.00 105168.00
12. NUMBER OF HOURS REACTOR CRITICAL 719.00 2717.60 88943.21
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 719.00 2643.11 88028.72
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1990967.04 7140971.88 236560695.84
17. GROSS ELEC. ENERGY GEN (MWH) 663910.00 2388368.00 78732405.00
18. NET ELEC. ENERGY GENERATED (MWH) 625015.00 2234161.00 73471033.00
19. UNIT SERVICE FACTOR 100.00 91.81 83.70
20. UNIT AVAILABILXTYFACTOR 100.00 91.81 83.70
21. UNIT CAP. FACTOR (USING MDC NET) 101.08 90.23 81.23
22. UNIT CAP. FACTOR (USING DER NET) 96.59 86.22 77.62
23. UNIT FORCED OUTAGE RATE .00 8.19 3.26
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTXMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAT1ON): FORECAST ACHIEVED INITIAL CRITICALITY ZNZTXAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

4 p~

4 l

Enclosure to Serial: HNP-99-089 Sheet 2 of 2 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 05/05/99 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 10:34:28 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 APRIL 1999 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 864 17 876 864 18 877 864 19 876 859 20 870 870 21 871 874 22 860 865 23 859 861 871 857 25 876 10 868 26 871 868 27 866 12 872 28 877 13 877 29 875 875 30 874 869 16 871

0 (o V

I, s w &r.. x ~ v.