Pages that link to "PNO-I-89-079, on 890911,unplanned Reactor Shutdown for Greater than 48 H Due to Problems W/Emergency Diesel Generator.Drywell Entered,Leaking Feedwater Check Valve Repaired & Minor Maint Performed"
Jump to navigation
Jump to search
The following pages link to PNO-I-89-079, on 890911,unplanned Reactor Shutdown for Greater than 48 H Due to Problems W/Emergency Diesel Generator.Drywell Entered,Leaking Feedwater Check Valve Repaired & Minor Maint Performed:
Displayed 50 items.
- ML20149D502 (← links)
- ML20196D789 (← links)
- ML20196C607 (← links)
- ML20196B561 (← links)
- ML20195D157 (← links)
- ML20155G941 (← links)
- ML20155G917 (← links)
- ML20199G788 (← links)
- ML20197H468 (← links)
- ML20206F929 (← links)
- ML20206D013 (← links)
- ML20205P610 (← links)
- ML20205J730 (← links)
- ML20205H033 (← links)
- ML20205E159 (← links)
- ML20205E136 (← links)
- ML20205B675 (← links)
- ML20205B664 (← links)
- ML20204F205 (← links)
- ML20203Q184 (← links)
- ML20202E715 (← links)
- ML20202E710 (← links)
- ML20202E703 (← links)
- PNO-I-97-045, on 970801,electricians Restoring One Set of Main Generator Exciter Brushes,Following Routine Surveillance,When One of Brushes Sparked Excessively & Disintegrated.Electricians Exited Area & Notified CR (← links)
- ML20207M335 (← links)
- PNO-I-86-100, on 861230,steam Leak Identified from Bellows Connection at Main Condenser.Power Reduced to Less than 5% & Reactor Manually Tripped.Insp Showed That Gross Failure of Bellows Occurred.Unit Shut Down for 1 Wk to Replace Bellows (← links)
- ML20206J201 (← links)
- ML20206J182 (← links)
- PNO-I-87-034, on 870423,plant Shutdown Commenced After Investigation Determined Cause for Failure of Electromatic Relief Valve Acoustic Monitor Was Inside Drywell.Cause Will Be Determined When Drywell Accessible (← links)
- ML20207S775 (← links)
- ML20207P911 (← links)
- ML20207N233 (← links)
- PNO-I-86-072, licensee Suspended Site Access to Senior Reactor Operator & Shift Clerk,Due to Third Party Allegations Re Drug Use.Urine Samples Sent to Lab for Analysis & Actions Monitored.Investigation Continuing (← links)
- ML20214F955 (← links)
- ML20213G423 (← links)
- ML20213F040 (← links)
- ML20213E611 (← links)
- PNO-I-87-004, on 870126,radioactive Water Discovered Leaking from Condensate Storage Tank (Cst).Caused by Cracked CST 4-inch Drain Valve Unisolable from Cst.Water Being Recycled Until Source of Leak Repaired (← links)
- ML20212K004 (← links)
- PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power (← links)
- ML20245B959 (← links)
- ML20239A705 (← links)
- PNO-I-87-084, on 870910,licensee Completed Planned Shutdown to Perform Maint on Main Flash Tank Manway.Drywell Entry Will Also Be Made to Repair Leaking Feedwater Isolation Valve Bonnet Pressure Seal Leak & Other Maint (← links)
- ML20238A004 (← links)
- ML20237H751 (← links)
- ML20237E449 (← links)
- PNO-I-87-115, on 871211,licensee Informed NRC That Striking Intl Brotherhood of Electrical Workers Voted to Accept New Contract.Util Has Made Provisions for Retraining Returning Personnel.Strikers Started Returning on 871213 (← links)
- ML20237A376 (← links)
- ML20249B366 (← links)
- ML20249B338 (← links)