{{Adams|number = ML093240387}}
{{Adams
| number = ML093240387
| issue date = 11/18/2009
| title = IR 05000341-09-403, (Drs), on 10/19/2009 - 10/23/2009, for Fermi Power Plant, Unit 2
| author name = Duncan E R
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Davis J M
| addressee affiliation = Detroit Edison
| docket = 05000341
| license number = NPF-043
| contact person =
| case reference number = EA-09-136
| document report number = IR-09-403
| document type = Letter, Inspection Report
| page count = 4
}}


{{IR-Nav| site = 05000341 | year = 2009 | report number = 403 }}
{{IR-Nav| site = 05000341 | year = 2009 | report number = 403 }}


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 18, 2009 EA-09-136
[[Issue date::November 18, 2009]]


EA-09-136
Mr. Jack Senior Vice President and Chief Nuclear Officer Detroit Edison Company


Mr. Jack Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166
Fermi 2 - 210 NOC  
 
6400 North Dixie Highway Newport, MI 48166


SUBJECT: FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT 05000341/2009403(DRS)
SUBJECT: FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT 05000341/2009403(DRS)
Line 18: Line 34:
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and the conditions of your license.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and the conditions of your license.


The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified. However, one licensee-identified violation, which was determined to be of very low security significance, is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section VI.A.1. of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program. If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:
The inspectors reviewed selected procedures and records, observed activities, and interviewed  
Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Fermi Power Plant, Unit 2. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agency wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
 
personnel.
 
Based on the results of this inspection, no findings of significance were identified. However, one licensee-identified violation, which was determined to be of very low security significance, is listed in this report. The NRC is treating this viol ation as a non-cited violation (NCV) consistent with Section VI.A.1. of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program. If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Fermi Power Plant, Unit 2. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
 
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agency wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
 
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).


Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA/ Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic  
Sincerely,/RA/ Eric Duncan, Chief  
 
Plant Support Branch  
 
Division of Reactor Safety  
 
Docket No. 50-341 License No. NPF-43 Nonpublic  


===Enclosure:===
===Enclosure:===
Line 29: Line 59:


===w/Attachment:===
===w/Attachment:===
Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/STSB T. Strong, Chief, State Liaison Officer, State of Michigan cc w/o encl: Distribution via ListServ
Supplemental Information  
 
cc w/encl: S. Coker, NSIR/DSO/DDSO/STSB T. Strong, Chief, State Liaison Officer, State of Michigan  
 
cc w/o encl: Distribution via ListServ
}}
}}

Revision as of 20:27, 24 August 2018

IR 05000341-09-403, (Drs), on 10/19/2009 - 10/23/2009, for Fermi Power Plant, Unit 2
ML093240387
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/18/2009
From: Duncan E R
Plant Support Branch II
To: Davis J M
Detroit Edison
References
EA-09-136 IR-09-403
Download: ML093240387 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 18, 2009 EA-09-136

Mr. Jack Senior Vice President and Chief Nuclear Officer Detroit Edison Company

Fermi 2 - 210 NOC

6400 North Dixie Highway Newport, MI 48166

SUBJECT: FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT 05000341/2009403(DRS)

Dear Mr. Davis:

On October 23, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 23, 2009, with Mr. Plona and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel.

Based on the results of this inspection, no findings of significance were identified. However, one licensee-identified violation, which was determined to be of very low security significance, is listed in this report. The NRC is treating this viol ation as a non-cited violation (NCV) consistent with Section VI.A.1. of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program. If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Fermi Power Plant, Unit 2. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agency wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA/ Eric Duncan, Chief

Plant Support Branch

Division of Reactor Safety

Docket No. 50-341 License No. NPF-43 Nonpublic

Enclosure:

Inspection Report 05000341/2009403(DRS)

w/Attachment:

Supplemental Information

cc w/encl: S. Coker, NSIR/DSO/DDSO/STSB T. Strong, Chief, State Liaison Officer, State of Michigan

cc w/o encl: Distribution via ListServ