IR 05000341/2021401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000341/2021401
ML21158A293
Person / Time
Site: Fermi 
Issue date: 06/07/2021
From: Steven Orth
NRC/RGN-III
To: Peter Dietrich
DTE Electric Company
References
EA-19-138 IR 2021401
Download: ML21158A293 (7)


Text

June 7, 2021

SUBJECT:

FERMI NUCLEAR POWER PLANT, UNIT 2 - SECURITY BASELINE INSPECTION REPORT 05000341/2021401

Dear Mr. Dietrich:

On April 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Fermi Nuclear Power Plant, Unit 2 and discussed the results of this inspection with Mr. Brian Sullivan and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety

Docket No. 05000341 License No. NPF-43

Enclosure:

As stated

Inspection Report

Docket Number:

05000341

License Number:

NPF-43

Report Number:

05000341/2021401

Enterprise Identifier: I-2021-401-0116

Licensee:

DTE Energy

Facility:

Fermi Nuclear Power Plant, Unit 2

Location:

Newport, MI

Inspection Dates:

January 19, 2021 to April 30, 2021

Inspector:

N. Egan, Senior Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Fermi Nuclear Power Plant,

Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status NOV 05000341/2020403-01 Failure To Implement Access Authorization Program 92702 Closed NOV 05000341/2020403-02 Failure To Maintain Complete And Accurate Vital Area Access Authorization List 92702 Closed NOV 05000341/2020403-03 Failure To Implement The Behavioral Observation Program 92702 Closed

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could, in part, be performed remotely.

SAFEGUARDS

71130.01 - Access Authorization

The inspector evaluated the access authorization program. The following elements were

===evaluated:

Access Authorization===

(1)

  • Tier I: All requirements
  • Tier II: 02.05 a-b, 02.06 a-c, 02.07 (a)
  • Tier III: 02.10 a-c, 02.11 (a)

71130.02 - Access Control

The inspector evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All requirements
  • Tier II: 02.06 a-d, 02.07 (a), 02.08 a-c
  • Tier III: 02.10 (a)

71130.04 - Equipment Performance, Testing, and Maintenance

The inspector evaluated the security equipment testing and maintenance program through completion of the following inspection elements:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All requirements

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspector verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17)

=

(1) July 1, 2020 through February 28,

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

===92702 - Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders

Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders===

(1) The inspectors conducted a follow-up inspection of DTE Energys response to a Notice of Violation (NOV) EA-19-138 issued on July 15, 2020. The inspectors evaluated the corrective actions that were implemented by DTE Energy to determine whether they were adequate to address the identified deficiencies and to prevent recurrence. The inspectors concluded that DTE Energy's corrective actions were both timely and appropriate. Based on the results of this review, no additional NRC actions are necessary, and the following violations are closed: 05000341/2020403-01, 05000341/2020403-02, and 05000341/2020403-03.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

  • On April 30, 2021, the inspector presented the security baseline inspection results to Mr.

Brian Sullivan and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Procedures

MGA09

Access Control

50A

MGA22

Access Authorization / Background Screening

MGA26

Inprocessing, Outprocessing, and Change of Vendor

14A

SEP-SE1-13

Access Authorization

SEP-SE1-14

Photo Identification and Key Cards

71130.02

Procedures

EP-205-01

Security Force

30A

MGA09

Access Control

50A

SEP-SE1-02

Security Lock and Key Control

21B

SEP-SE1-14

Photo Identification and Keycards

SEP-SE1-24

Owner Controlled Area - Access Control

SEP-SE1-25

Personnel, Vehicle, and Materials Search and Entry

SEP-SE1-30

Personnel, Vehicle, and Materials Search Exceptions and

Handling

3A

Self-Assessments Audit: 21-0101

Nuclear Quality Assurance Audit of the Cyber Security,

Security, and Control of Safeguards Programs

03/15/2021

NSSE-21-0003

Quick Hit Self-Assessment Report - Security Access Control

01/25/2021

71130.04

Procedures

SEP-SE1-01

Testing and Maintenance

SEP-SE1-22

Weapons Preventative Maintenance

Self-Assessments NSSE-20-0023

Formal Self-Assessment - Testing and Maintenance

07/27/2020

2702

Corrective Action

Documents

CARD 19-10102

01/16/2019

CARD 20-25405

04/29/2020

CARD 20-25406

04/29/2020

CARD 20-25407

04/29/2020

Miscellaneous

EA-19-138

Fermi Nuclear Power Plant, Unit 2 - Notice of Violation; NRC

Investigation Report NO. 3-2019-004; NRC Inspection Report

NO. 05000341/2020404

2/15/2020

EA-19-138

Fermi Nuclear Power Plant, Unit 2 - Security Baseline

Inspection Report 05000341/2020403; NRC Investigation

Report No. 3-2019-004 and Apparent Violations

04/29/2020

NRC-20-0035

Response to Apparent Violations in NRC Inspection Report 05000341/2020403; EA-19-138

05/29/2020