Line 21: |
Line 21: |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
| JAMES A. FITZPATRICK NUCLEAR POWER PLANT -REQUEST FOR ADDITIONAL INFORMATION REGARDING DIRECT LICENSE TRANSFER FROM ENTERGY TO EXELON (CAC NO. MF8293) | | JAMES A. FITZPATRICK NUCLEAR POWER PLANT -REQUEST FOR ADDITIONAL INFORMATION REGARDING DIRECT LICENSE TRANSFER FROM ENTERGY TO EXELON (CAC NO. MF8293) |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| On August 18, 2016, Entergy Nuclear Operations, Inc. (Entergy) and Exelon Generation | | On August 18, 2016, Entergy Nuclear Operations, Inc. (Entergy) and Exelon Generation Company, LLC (Exelon) submitted an application for a direct license transfer for James A. Fitzpatrick Nuclear Power Plant (FitzPatrick) from Entergy to Exelon. Entergy and Exelon request written consent to transfer the FitzPatrick Renewed Facility Operating License No. DPR-59 and the transfer of the generally licensed Independent Spent Fuel Storage Installation. |
| : Company, LLC (Exelon) submitted an application for a direct license transfer for James A. Fitzpatrick Nuclear Power Plant (FitzPatrick) from Entergy to Exelon. Entergy and Exelon request written consent to transfer the FitzPatrick Renewed Facility Operating License No. DPR-59 and the transfer of the generally licensed Independent Spent Fuel Storage Installation.
| |
| The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). On October 24, 2016, the Entergy and Exelon staff indicated that a response to the RAI would be provided within 30 days of the date of this letter. Please contact me at (301) 415-3629 if you have any questions on this issue. Docket Nos. 50-333 and 72-12 | | The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). On October 24, 2016, the Entergy and Exelon staff indicated that a response to the RAI would be provided within 30 days of the date of this letter. Please contact me at (301) 415-3629 if you have any questions on this issue. Docket Nos. 50-333 and 72-12 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
|
| |
|
| As stated cc w/encls: | | As stated cc w/encls: Distribution via Listserv Diane Render, Ph.D. Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION REGARDING DIRECT LICENSE TRANSFER TO EXELON GENERATION COMPANY, LLC ENTERGY NUCLEAR FITZPATRICK, LLC AND ENTERGY NUCLEAR OPERATIONS, INC. DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT In an application dated August 18, 2016 (Agencywide Documents Access and Management System Accession No. ML 16235A081 |
| Distribution via Listserv Diane Render, Ph.D. Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION REGARDING DIRECT LICENSE TRANSFER TO EXELON GENERATION | | ), Entergy Nuclear Operations, Inc. (Entergy) and Exelon Generation Company, LLC (Exelon) submitted an application for a direct license transfer for James A. Fitzpatrick Nuclear Power Plant (FitzPatrick) from Entergy to Exelon. Entergy and Exelon request written consent to transfer the FitzPatrick Renewed Facility Operating License No. DPR-59 and the transfer of the generally licensed Independent Spent Fuel Storage Installation. |
| : COMPANY, LLC ENTERGY NUCLEAR FITZPATRICK, LLC AND ENTERGY NUCLEAR OPERATIONS, INC. DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT In an application dated August 18, 2016 (Agencywide Documents Access and Management System Accession No. ML 16235A081
| |
| ), Entergy Nuclear Operations, Inc. (Entergy) and Exelon Generation | |
| : Company, LLC (Exelon) submitted an application for a direct license transfer for James A. Fitzpatrick Nuclear Power Plant (FitzPatrick) from Entergy to Exelon. Entergy and Exelon request written consent to transfer the FitzPatrick Renewed Facility Operating License No. DPR-59 and the transfer of the generally licensed Independent Spent Fuel Storage Installation.
| |
| The Nuclear Regulatory Commission staff is reviewing the submittal and has the following question: | | The Nuclear Regulatory Commission staff is reviewing the submittal and has the following question: |
| DRA/APHB RAI -1: Title 1 O of the Code of Federal Regulations (CFR), Section 50.80, "Transfer of licenses," | | DRA/APHB RAI -1: Title 1 O of the Code of Federal Regulations (CFR), Section 50.80, "Transfer of licenses," requires the Commission's written consent to a transfer of an operating license under Part 50 of the same chapter. Specifically, 1 O CFR 50.80(c) states, in part, that "the Commission will approve an application for the transfer of a license, if the Commission determines: |
| requires the Commission's written consent to a transfer of an operating license under Part 50 of the same chapter. | | (1) That the proposed transferee is qualified to be the holder of the license; and (2) That the transfer of the license is otherwise consistent with applicable provisions of law, regulations, and orders issued by the Commission pursuant thereto." 1 O CFR 50.54(m)(2) provides the minimum requirements for on-site staffing of nuclear power units by operators and senior operators licensed under 1 O CFR Part 55, "Operators' Licenses." NUREG-0800, "Standard Review Plan," Section 13.1.2-13.1.3, "Operating Organization," Revision 7, is used to evaluate the structure, functions, and responsibilities of the onsite organization proposed to operate and maintain the facility as a result of the license transfer. |
| Specifically, 1 O CFR 50.80(c) states, in part, that "the Commission will approve an application for the transfer of a license, if the Commission determines: | |
| (1) That the proposed transferee is qualified to be the holder of the license; and (2) That the transfer of the license is otherwise consistent with applicable provisions of law, regulations, and orders issued by the Commission pursuant thereto." | |
| 1 O CFR 50.54(m)(2) provides the minimum requirements for on-site staffing of nuclear power units by operators and senior operators licensed under 1 O CFR Part 55, "Operators' Licenses." | |
| NUREG-0800, "Standard Review Plan," Section 13.1.2-13.1.3, "Operating Organization," | |
| Revision 7, is used to evaluate the structure, functions, and responsibilities of the onsite organization proposed to operate and maintain the facility as a result of the license transfer. | |
| This review includes verifying that the applicant has an acceptable organization and the adequate resources (i.e., staffing) to provide technical support for the operation and maintenance of the facility under both normal and off-normal conditions. | | This review includes verifying that the applicant has an acceptable organization and the adequate resources (i.e., staffing) to provide technical support for the operation and maintenance of the facility under both normal and off-normal conditions. |
| ENCLOSURE The licensee stated on Page 3 of the LAR that: The proposed transaction will not require any significant change in the staffing and qualifications of personnel who currently operate FitzPatrick. | | ENCLOSURE The licensee stated on Page 3 of the LAR that: The proposed transaction will not require any significant change in the staffing and qualifications of personnel who currently operate FitzPatrick. |
| Prior to closing the transaction, Exelon Generation will offer employment to substantially all of the Entergy employees at FitzPatrick such that at the time of the closing of the transaction and transfer of the License, the Entergy employees who accept offers of employment will become employees of Exelon Generation. | | Prior to closing the transaction, Exelon Generation will offer employment to substantially all of the Entergy employees at FitzPatrick such that at the time of the closing of the transaction and transfer of the License, the Entergy employees who accept offers of employment will become employees of Exelon Generation. |
| Please provide additional information regarding what arrangements have been and will be made to secure adequate resources (i.e., sufficient staffing levels), | | Please provide additional information regarding what arrangements have been and will be made to secure adequate resources (i.e., sufficient staffing levels), to ensure that Exelon will continue to comply with 10 CFR 50.54(m)(2) at FitzPatrick Nuclear Power Plant, after Entergy employees are offered employment with Exelon. |
| to ensure that Exelon will continue to comply with 10 CFR 50.54(m)(2) at FitzPatrick Nuclear Power Plant, after Entergy employees are offered employment with Exelon. | |
| November 2, 2016 Site Vice President Entergy Nuclear Operations, Inc. James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 | | November 2, 2016 Site Vice President Entergy Nuclear Operations, Inc. James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
| JAMES A. FITZPATRICK NUCLEAR POWER PLANT -REQUEST FOR ADDITIONAL INFORMATION REGARDING DIRECT LICENSE TRANSFER FROM ENTERGY TO EXELON (CAC NO. MF8293) | | JAMES A. FITZPATRICK NUCLEAR POWER PLANT -REQUEST FOR ADDITIONAL INFORMATION REGARDING DIRECT LICENSE TRANSFER FROM ENTERGY TO EXELON (CAC NO. MF8293) |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| On August 18, 2016, Entergy Nuclear Operations, Inc. (Entergy) and Exelon Generation | | On August 18, 2016, Entergy Nuclear Operations, Inc. (Entergy) and Exelon Generation Company, LLC (Exelon) submitted an application for a direct license transfer for James A. Fitzpatrick Nuclear Power Plant (FitzPatrick) from Entergy to Exelon. Entergy and Exelon request written consent to transfer the FitzPatrick Renewed Facility Operating License No. DPR-59 and the transfer of the generally licensed Independent Spent Fuel Storage Installation. |
| : Company, LLC (Exelon) submitted an application for a direct license transfer for James A. Fitzpatrick Nuclear Power Plant (FitzPatrick) from Entergy to Exelon. Entergy and Exelon request written consent to transfer the FitzPatrick Renewed Facility Operating License No. DPR-59 and the transfer of the generally licensed Independent Spent Fuel Storage Installation.
| |
| The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). On October 24, 2016, the Entergy and Exelon staff indicated that a response to the RAI would be provided within 30 days of the date of this letter. Please contact me at (301) 415-3629 if you have any questions on this issue. Docket Nos. 50-333 and 72-12 | | The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). On October 24, 2016, the Entergy and Exelon staff indicated that a response to the RAI would be provided within 30 days of the date of this letter. Please contact me at (301) 415-3629 if you have any questions on this issue. Docket Nos. 50-333 and 72-12 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
|
| |
|
| As stated cc w/encls: | | As stated cc w/encls: Distribution via Listserv DISTRIBUTION: |
| Distribution via Listserv DISTRIBUTION: | |
| PUBLIC LPLl-1 Reading File RidsNrrDorlDpr RidsNrrDorllpll-1 RidsNrrLAKGoldstein | | PUBLIC LPLl-1 Reading File RidsNrrDorlDpr RidsNrrDorllpll-1 RidsNrrLAKGoldstein |
|
| |
|
| RidsRgn 1 MailCenter ADAMS A . N ML 16299A019 ccess1on o.: OFFICE LPLl-1/PM LPLl-1/LA DRA/APHB Sincerely, | | RidsRgn 1 MailCenter ADAMS A . N ML 16299A019 ccess1on o.: OFFICE LPLl-1/PM LPLl-1/LA DRA/APHB Sincerely, /RAJ Diane Render, Ph.D. Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrPMFitzpatrick RidsACRS_MailCTR SWeerakkody |
| /RAJ Diane Render, Ph.D. Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrPMFitzpatrick RidsACRS_MailCTR SWeerakkody | |
| *b *1 1yema1 LPLl-1/BC LPLl-1/PM NAME DRender KGoldstein SWeerakkody* | | *b *1 1yema1 LPLl-1/BC LPLl-1/PM NAME DRender KGoldstein SWeerakkody* |
| BMozafari (A) DRender DATE 10/24/2016 10/25/16 10/20/2016 11/2/16 11/2/16 OFFICIAL RECORD COPY}} | | BMozafari (A) DRender DATE 10/24/2016 10/25/16 10/20/2016 11/2/16 11/2/16 OFFICIAL RECORD COPY}} |
Letter Sequence RAI |
---|
CAC:MF8293, Control Room Habitability (Approved, Closed) |
Results
Other: JAFP-15-0027, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), JAFP-15-0105, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), JAFP-16-0028, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), JAFP-16-0140, Seventh Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, JAFP-17-0018, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), ML16243A055, ML16243A056, ML17041A196, ML17041A274, ML17086A205, ML17090A188
|
MONTHYEARJAFP-15-0027, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-02-27027 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other JAFP-15-0105, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other JAFP-16-0028, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2016-02-26026 February 2016 Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other CNRO-2016-00010, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report, Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)2016-03-30030 March 2016 Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report, Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) Project stage: Request JAFP-16-0096, Supporting Information for Request for Relaxation of March 12, 2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Reliable Spent Fuel Pool..2016-06-16016 June 2016 Supporting Information for Request for Relaxation of March 12, 2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Reliable Spent Fuel Pool.. Project stage: Request ML16235A0812016-08-18018 August 2016 Application for Order Approving Transfer of Renewed Facility Operating License and Proposed Conforming License Amendment Project stage: Request JAFP-16-0140, Seventh Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2016-08-25025 August 2016 Seventh Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Project stage: Other JAFP-16-0147, Request for Extension to Comply with 03/12/2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Reliable Spent Fuel Pool Instrumentation2016-09-0808 September 2016 Request for Extension to Comply with 03/12/2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Reliable Spent Fuel Pool Instrumentation Project stage: Request ML16243A0552016-09-0909 September 2016 Notice of Consideration of Approval of Transfer of Renewed Facility Operating License and Conforming Amendment, and Opportunity for a Hearing - James A. Fitzpatrick Nuclear Power Plant Project stage: Other ML16243A0562016-09-0909 September 2016 FRN for License Transfer for FitzPatrick NPP: from ENO to Exelon Project stage: Other ML16250A4612016-09-19019 September 2016 Request for Withholding Information from Public Disclosure for James A. FitzPatrick Nuclear Power Plant Project stage: Withholding Request Acceptance ML16266A4832016-10-0303 October 2016 Plan: Acceptance of Requested Licensing Action Application for Order Approving Transfer of Renewed Facility Operating License and Proposed Conforming License Amendment Project stage: Acceptance Review ML16299A0192016-11-0202 November 2016 Request for Additional Information Regarding Direct License Transfer from Entergy to Exelon Project stage: RAI ML16335A1042016-11-29029 November 2016 Independent Spent Fuel Storage Installation, Response to Request for Additional Information Regarding Application for Order Approving Transfer F Renewed Facility Operating License and Proposed Conforming License Amendment Project stage: Response to RAI ML17012A2802017-01-0404 January 2017 Withdrawal of Certification of Permanent Cessation of Power Operations Project stage: Request JAFP-17-0018, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2017-02-28028 February 2017 Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML17041A2742017-03-0101 March 2017 Federal Register Notice - Order Approving Direct License Transfer of FitzPatrick Power Plant from Entergy Nuclear FitzPatrick, LLC and Entergy Nuclear Operations, Inc. to Exelon Generation Company, LLC Project stage: Other ML17041A1962017-03-0101 March 2017 LTR with Order Approving Direct Transfer of Renewed Facility Operating License and Independent Spent Fuel Storage Installation General License and Conforming Amendment Project stage: Other ML17086A2052017-03-27027 March 2017 Notification of Expected Date of Transfer of Nuclear Unit to Exelon Generation Company, LLC, Notification of Satisfactory Documentary Evidence of Insurance, and Notification of Receipt of All Required Regulatory Approvals Project stage: Other ML17090A1882017-03-31031 March 2017 ISFSI - Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Entergy Project stage: Other ML17082A2832017-03-31031 March 2017 Issuance of Amendment Application for Order to Transfer Renewed Facility Operating License, Independent Spent Fuel Storage Installation General License, and Conforming Amendment from Entergy Nuclear to Exelon Generation CAC No. MF8293) Project stage: Approval ML17206A3952017-07-24024 July 2017 ISFSI - Application for Order Approving Transfer of Direct Ownership Under Renewed Facility Operating License and Proposed Conforming License Amendment Project stage: Request 2016-08-25
[Table View] |
|
---|
Category:Letter
MONTHYEARML24276A1332024-10-17017 October 2024 Issuance of Amendment No. 357 Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision-4, and Administrative Changes ML24282B0302024-10-11011 October 2024 Project Manager Assignment RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing JAFP-24-0051, Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-0882024-10-0303 October 2024 Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088 ML24270A0742024-09-30030 September 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0134) - LTR ML24270A1452024-09-26026 September 2024 Notice of Enforcement Discretion for James A. Fitzpatrick Nuclear Power Plant JAFP-24-0046, Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation2024-09-25025 September 2024 Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation JAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications IR 05000333/20240112024-09-19019 September 2024 Follow-up to Inspection Procedure 71153 Report 05000333/2024011 and Preliminary White Finding and Apparent Violation JAFP-24-0044, Core Operating Limits Report Cycle 272024-09-16016 September 2024 Core Operating Limits Report Cycle 27 JAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2024-09-12012 September 2024 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues 05000333/LER-2024-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation2024-09-0404 September 2024 Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation ML24165A0382024-09-0404 September 2024 Issuance of Amendment No. 356 Update Fuel Handling Accident Analysis IR 05000333/20240052024-08-29029 August 2024 Updated Inspection Plan for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2024005) 05000333/LER-2024-001-01, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-08-21021 August 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000333/20240022024-08-0707 August 2024 Integrated Inspection Report 05000333/2024002 JAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report ML24208A0492024-07-30030 July 2024 Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Proposed No Significant Hazards Consideration Determination (Letter) JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test IR 05000333/20244032024-07-18018 July 2024 Biennial Problem Identification and Resolution Inspection Report 05000333/2024403 (Cover Letter Only) IR 05000333/20244012024-07-15015 July 2024 Security Baseline Inspection 05000333/2024401 RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24190A1932024-07-0909 July 2024 Correction Letter of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance IR 05000333/20240102024-07-0808 July 2024 Commercial Grade Dedication Inspection Report 05000333/2024010 ML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24136A1162024-06-26026 June 2024 Issuance of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML24176A2412024-06-24024 June 2024 Licensed Operator Positive Fitness-for-Duty Test JAFP-24-0027, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations JAFP-24-0026, Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance2024-06-12012 June 2024 Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 JAFP-24-0023, 2023 Annual Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000333/20240012024-05-0909 May 2024 Integrated Inspection Report 05000333/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests JAFP-24-0020, 2023 Annual Radioactive Effluent Release Report2024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report JAFP-24-0019, 2023 REIRS Transmittal of NRC Form 52024-04-18018 April 2024 2023 REIRS Transmittal of NRC Form 5 ML24106A0152024-04-15015 April 2024 Request for Withholding Information from Public Disclosure Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24107A6972024-04-12012 April 2024 Engine Systems, Inc Part 21 Report Re EMD Cylinder Liner Water Leak RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24068A0532024-03-28028 March 2024 Issuance of Amendment No. 354 Revise Technical Specifications Section 3.3.1.2, Source Range Monitors Instrumentation JAFP-24-0014, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-03-25025 March 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0010, Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2024-02-29029 February 2024 Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-24-0009, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-02-28028 February 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis IR 05000333/20230062024-02-28028 February 2024 Annual Assessment Letter for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2023006) IR 05000333/20230042024-02-0707 February 2024 Integrated Inspection Report 05000333/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200012/2023001 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24298A1382024-10-24024 October 2024 Final RAI for FitzPatrick JAFP-24-0047 (L-2024-LLA-0134) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24060A0512024-02-28028 February 2024 NRR E-mail Capture - FitzPatrick - Final Arcb RAI Regarding Amendment to Update the Fuel Handling Accident Analysis ML24033A0542024-02-0101 February 2024 NRR E-mail Capture - FitzPatrick - Final HFE RAI Regarding Amendment to Update the Fuel Handling Accident Analysis ML24024A1372024-01-24024 January 2024 NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance ML24018A0012024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000333/2024010) and Request for Information ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23164A0322023-06-13013 June 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000333/2023010 ML22321A0102022-11-17017 November 2022 Notification of Conduct of a Fire Protection Team Inspection ML22124A2672022-05-0404 May 2022 Request for Additional Information for James A. FitzPatrick Nuclear Power Plant TSTF-505 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21187A0522021-07-0606 July 2021 Fitz RAI Regarding FitzPatrick Amendment Request to Modify SR 3.5.1.6 ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21041A1932021-02-10010 February 2021 Request for Information for a Triennial Baseline Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements Inspection; Inspection Report (05000333/2021011) ML20066L3682020-03-0505 March 2020 Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment ML20056E7992020-02-25025 February 2020 Request for Additional Information for LAR on Primary Containment Hydrodynamic Loads ML20035D5762020-02-0303 February 2020 Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequence ML20027A0112020-01-23023 January 2020 Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation ML19353A9452019-12-19019 December 2019 Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML19322A0062019-11-15015 November 2019 NRR E-mail Capture - Fermi 2: Request for Additional Information- Relief Request VRR-006, Proposed Alternative for Preservice Testing of Butterfly Valves ML19280A0372019-10-0505 October 2019 NRR E-mail Capture - FitzPatrick Revised Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 Days ML19280A0392019-10-0505 October 2019 NRR E-mail Capture - FitzPatrick Additional Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 Days ML19280A0362019-10-0404 October 2019 NRR E-mail Capture - FitzPatrick Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 Days ML19099A2672019-04-16016 April 2019 Use of Encryption Software for Electronic Transmission of Safeguards Information ML19099A2852019-03-12012 March 2019 Draft RAI: FitzPatrick Request to Update Electronic Transmission of Safeguards Information ML19025A1202019-01-24024 January 2019 NRR E-mail Capture - Calvert Cliffs, Fitzpatrick, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Response Organization Staffing ML18353B5112018-12-20020 December 2018 Request for Additional Information Relief Request No. 14R-22, for Fourth 10-Year Inservice Inspection Interval ML18164A3652018-06-13013 June 2018 NRR E-mail Capture - FitzPatrick RAIs - LAR to Adopt EAL Schemes Pursuant to NEI 99-01, Revision 6 ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML18085A6922018-03-26026 March 2018 NRR E-mail Capture - James A. FitzPatrick Nuclear Power Plant, Unit 1 - Request for Information to Adopt Traveler TSTF-542, RPV Water Inventory Control ML18085A6912018-03-23023 March 2018 NRR E-mail Capture - Draft Request for Information (RAI) for JAFNPP Traveler TSTF-542, RPV Water Inventory Control ML18029A8422018-01-29029 January 2018 NRR E-mail Capture - Request for Additional Information: FitzPatrick License Amendment Request to Revise Technical Specifications to Address Secondary Containment Personnel Access Door Openings ML17335A1002017-11-29029 November 2017 NRR E-mail Capture - FitzPatrick - Request for Additional Information - Relief Request 15R-02 Regarding the Use of BWRVIP Guidelines Instead of ASME Code (CAC: MG0116; EPID: L-2017-LLR-0083) ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17228A0052017-08-15015 August 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie Relief Request #3 - Icw 30 Pipe Defect Removal (MF9288) ML16299A0192016-11-0202 November 2016 Request for Additional Information Regarding Direct License Transfer from Entergy to Exelon ML16287A6502016-10-21021 October 2016 Request for Additional Information Regarding: License Amendment Request to Revise Technical Specifications Section 5.5.6 for Extension of Type a and Type C Leak Rate Test Frequencies ML16280A5732016-10-18018 October 2016 Request for Additional Information Relief Request for Proposed Alternative for the Implementation of BWRVIP-05 ML16117A1862016-04-26026 April 2016 Entergy Fleet Relief Request EN-ISI-15-1 Request for Additional Information - 04/26/16 Email from R. Guzman to G. Davant (CAC Nos. MF7133-MF7136) ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML14240A6122014-09-24024 September 2014 Request for Additional Information Regarding Proposed Changes to the Technical Specification Low Pressure Safety Limit ML14184A6152014-07-25025 July 2014 Request for Additional Information Regarding Proposed Safety Limit Minimum Critical Power Ratio License Amendment ML14195A0972014-07-16016 July 2014 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening Report ML14164A5382014-07-0202 July 2014 Request for Additional Information Regarding 10 CFR 50.55A Alternate Request PRR-05 (Tac No. MF3680) ML14093A6772014-05-0101 May 2014 SONGS - Request for Additional Information Concerning Pre-Emption Authority 2024-07-12
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 2, 2016 Site Vice President Entergy Nuclear Operations, Inc. James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093
SUBJECT:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT -REQUEST FOR ADDITIONAL INFORMATION REGARDING DIRECT LICENSE TRANSFER FROM ENTERGY TO EXELON (CAC NO. MF8293)
Dear Sir or Madam:
On August 18, 2016, Entergy Nuclear Operations, Inc. (Entergy) and Exelon Generation Company, LLC (Exelon) submitted an application for a direct license transfer for James A. Fitzpatrick Nuclear Power Plant (FitzPatrick) from Entergy to Exelon. Entergy and Exelon request written consent to transfer the FitzPatrick Renewed Facility Operating License No. DPR-59 and the transfer of the generally licensed Independent Spent Fuel Storage Installation.
The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). On October 24, 2016, the Entergy and Exelon staff indicated that a response to the RAI would be provided within 30 days of the date of this letter. Please contact me at (301) 415-3629 if you have any questions on this issue. Docket Nos. 50-333 and 72-12
Enclosures:
As stated cc w/encls: Distribution via Listserv Diane Render, Ph.D. Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION REGARDING DIRECT LICENSE TRANSFER TO EXELON GENERATION COMPANY, LLC ENTERGY NUCLEAR FITZPATRICK, LLC AND ENTERGY NUCLEAR OPERATIONS, INC. DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT In an application dated August 18, 2016 (Agencywide Documents Access and Management System Accession No. ML 16235A081
), Entergy Nuclear Operations, Inc. (Entergy) and Exelon Generation Company, LLC (Exelon) submitted an application for a direct license transfer for James A. Fitzpatrick Nuclear Power Plant (FitzPatrick) from Entergy to Exelon. Entergy and Exelon request written consent to transfer the FitzPatrick Renewed Facility Operating License No. DPR-59 and the transfer of the generally licensed Independent Spent Fuel Storage Installation.
The Nuclear Regulatory Commission staff is reviewing the submittal and has the following question:
DRA/APHB RAI -1: Title 1 O of the Code of Federal Regulations (CFR), Section 50.80, "Transfer of licenses," requires the Commission's written consent to a transfer of an operating license under Part 50 of the same chapter. Specifically, 1 O CFR 50.80(c) states, in part, that "the Commission will approve an application for the transfer of a license, if the Commission determines:
(1) That the proposed transferee is qualified to be the holder of the license; and (2) That the transfer of the license is otherwise consistent with applicable provisions of law, regulations, and orders issued by the Commission pursuant thereto." 1 O CFR 50.54(m)(2) provides the minimum requirements for on-site staffing of nuclear power units by operators and senior operators licensed under 1 O CFR Part 55, "Operators' Licenses." NUREG-0800, "Standard Review Plan," Section 13.1.2-13.1.3, "Operating Organization," Revision 7, is used to evaluate the structure, functions, and responsibilities of the onsite organization proposed to operate and maintain the facility as a result of the license transfer.
This review includes verifying that the applicant has an acceptable organization and the adequate resources (i.e., staffing) to provide technical support for the operation and maintenance of the facility under both normal and off-normal conditions.
ENCLOSURE The licensee stated on Page 3 of the LAR that: The proposed transaction will not require any significant change in the staffing and qualifications of personnel who currently operate FitzPatrick.
Prior to closing the transaction, Exelon Generation will offer employment to substantially all of the Entergy employees at FitzPatrick such that at the time of the closing of the transaction and transfer of the License, the Entergy employees who accept offers of employment will become employees of Exelon Generation.
Please provide additional information regarding what arrangements have been and will be made to secure adequate resources (i.e., sufficient staffing levels), to ensure that Exelon will continue to comply with 10 CFR 50.54(m)(2) at FitzPatrick Nuclear Power Plant, after Entergy employees are offered employment with Exelon.
November 2, 2016 Site Vice President Entergy Nuclear Operations, Inc. James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093
SUBJECT:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT -REQUEST FOR ADDITIONAL INFORMATION REGARDING DIRECT LICENSE TRANSFER FROM ENTERGY TO EXELON (CAC NO. MF8293)
Dear Sir or Madam:
On August 18, 2016, Entergy Nuclear Operations, Inc. (Entergy) and Exelon Generation Company, LLC (Exelon) submitted an application for a direct license transfer for James A. Fitzpatrick Nuclear Power Plant (FitzPatrick) from Entergy to Exelon. Entergy and Exelon request written consent to transfer the FitzPatrick Renewed Facility Operating License No. DPR-59 and the transfer of the generally licensed Independent Spent Fuel Storage Installation.
The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). On October 24, 2016, the Entergy and Exelon staff indicated that a response to the RAI would be provided within 30 days of the date of this letter. Please contact me at (301) 415-3629 if you have any questions on this issue. Docket Nos. 50-333 and 72-12
Enclosures:
As stated cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC LPLl-1 Reading File RidsNrrDorlDpr RidsNrrDorllpll-1 RidsNrrLAKGoldstein
RidsRgn 1 MailCenter ADAMS A . N ML 16299A019 ccess1on o.: OFFICE LPLl-1/PM LPLl-1/LA DRA/APHB Sincerely, /RAJ Diane Render, Ph.D. Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrPMFitzpatrick RidsACRS_MailCTR SWeerakkody
- b *1 1yema1 LPLl-1/BC LPLl-1/PM NAME DRender KGoldstein SWeerakkody*
BMozafari (A) DRender DATE 10/24/2016 10/25/16 10/20/2016 11/2/16 11/2/16 OFFICIAL RECORD COPY