Letter Sequence Acceptance Review |
---|
CAC:MF8293, Control Room Habitability (Approved, Closed) |
Results
Other: JAFP-15-0027, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), JAFP-15-0105, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), JAFP-16-0028, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), JAFP-16-0140, Seventh Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, JAFP-17-0018, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), ML16243A055, ML16243A056, ML17041A196, ML17041A274, ML17086A205, ML17090A188
|
MONTHYEARJAFP-15-0027, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-02-27027 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other JAFP-15-0105, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other JAFP-16-0028, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2016-02-26026 February 2016 Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other CNRO-2016-00010, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report, Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)2016-03-30030 March 2016 Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report, Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) Project stage: Request JAFP-16-0096, Supporting Information for Request for Relaxation of March 12, 2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Reliable Spent Fuel Pool..2016-06-16016 June 2016 Supporting Information for Request for Relaxation of March 12, 2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Reliable Spent Fuel Pool.. Project stage: Request ML16235A0812016-08-18018 August 2016 Application for Order Approving Transfer of Renewed Facility Operating License and Proposed Conforming License Amendment Project stage: Request JAFP-16-0140, Seventh Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2016-08-25025 August 2016 Seventh Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Project stage: Other JAFP-16-0147, Request for Extension to Comply with 03/12/2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Reliable Spent Fuel Pool Instrumentation2016-09-0808 September 2016 Request for Extension to Comply with 03/12/2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Reliable Spent Fuel Pool Instrumentation Project stage: Request ML16243A0552016-09-0909 September 2016 Notice of Consideration of Approval of Transfer of Renewed Facility Operating License and Conforming Amendment, and Opportunity for a Hearing - James A. Fitzpatrick Nuclear Power Plant Project stage: Other ML16243A0562016-09-0909 September 2016 FRN for License Transfer for FitzPatrick NPP: from ENO to Exelon Project stage: Other ML16250A4612016-09-19019 September 2016 Request for Withholding Information from Public Disclosure for James A. FitzPatrick Nuclear Power Plant Project stage: Withholding Request Acceptance ML16266A4832016-10-0303 October 2016 Plan: Acceptance of Requested Licensing Action Application for Order Approving Transfer of Renewed Facility Operating License and Proposed Conforming License Amendment Project stage: Acceptance Review ML16299A0192016-11-0202 November 2016 Request for Additional Information Regarding Direct License Transfer from Entergy to Exelon Project stage: RAI ML16335A1042016-11-29029 November 2016 Independent Spent Fuel Storage Installation, Response to Request for Additional Information Regarding Application for Order Approving Transfer F Renewed Facility Operating License and Proposed Conforming License Amendment Project stage: Response to RAI ML17012A2802017-01-0404 January 2017 Withdrawal of Certification of Permanent Cessation of Power Operations Project stage: Request JAFP-17-0018, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2017-02-28028 February 2017 Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML17041A2742017-03-0101 March 2017 Federal Register Notice - Order Approving Direct License Transfer of FitzPatrick Power Plant from Entergy Nuclear FitzPatrick, LLC and Entergy Nuclear Operations, Inc. to Exelon Generation Company, LLC Project stage: Other ML17041A1962017-03-0101 March 2017 LTR with Order Approving Direct Transfer of Renewed Facility Operating License and Independent Spent Fuel Storage Installation General License and Conforming Amendment Project stage: Other ML17086A2052017-03-27027 March 2017 Notification of Expected Date of Transfer of Nuclear Unit to Exelon Generation Company, LLC, Notification of Satisfactory Documentary Evidence of Insurance, and Notification of Receipt of All Required Regulatory Approvals Project stage: Other ML17090A1882017-03-31031 March 2017 ISFSI - Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Entergy Project stage: Other ML17082A2832017-03-31031 March 2017 Issuance of Amendment Application for Order to Transfer Renewed Facility Operating License, Independent Spent Fuel Storage Installation General License, and Conforming Amendment from Entergy Nuclear to Exelon Generation CAC No. MF8293) Project stage: Approval ML17206A3952017-07-24024 July 2017 ISFSI - Application for Order Approving Transfer of Direct Ownership Under Renewed Facility Operating License and Proposed Conforming License Amendment Project stage: Request 2016-08-25
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML23261C3982023-09-0808 September 2023 Acceptance Review of Amendment to Update the Fuel Handling Accident Analysis ML23244A2662023-09-0101 September 2023 Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirement 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML23194A1822023-08-0303 August 2023 Acceptance Review for LAR Re SRM 3.3.1.2 ML22063A4742021-11-29029 November 2021 Acceptance of Requested Licensing Action License Amendment Request to Eliminate Selected Response Time Testing ML21246A2072021-09-0303 September 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21246A2142021-06-23023 June 2021 Acceptance of Requested Licensing Action Regarding License Amendment Request to Adopt TSTF-264 ML21077A1772021-04-0808 April 2021 Withdrawal of Requested Exemption from Certain Requirement in 10 CFR 50.55a (Epids L-2021-LLE-0014, 0015, & 0016) ML21056A1992021-03-0101 March 2021 Acceptance of Requested Licensing Action Amendment Request Revising Surveillance Requirement 3.5.1.6 Involving Recirculation Pump Discharge Valves ML20217L3882020-08-0404 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Modify Primary Containment Isolation Valve TS (EPID L-2020-LLA-0145) (E-Mail) ML20204A9692020-07-22022 July 2020 Acceptance of Requested Licensing Action License Amendment Request to Adopt-TSTF-478 Revision 2 ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML18354A9602018-12-20020 December 2018 License Amendment Request for TS Change to Remove UHS Bar Rack Heaters ML18064A3252018-03-12012 March 2018 Acceptance of License Amendment Request to Revise Emergency Action Level Schemes Based on NEI 99-01, Revision 6 ML17004A1352017-01-0909 January 2017 Acceptance of Requested Licensing Action Cyber Security Implementation Schedule ML16270A0462016-10-0303 October 2016 Acceptance of Requested Licensing Action Relief Request for Proposed Alternative for the Implementation of BWRVIP-05 ML16266A4832016-10-0303 October 2016 Plan: Acceptance of Requested Licensing Action Application for Order Approving Transfer of Renewed Facility Operating License and Proposed Conforming License Amendment ML16266A4172016-10-0303 October 2016 Acceptance of Requested Licensing Action Application for Order to Transfer Master Decommissioning Trust, Consenting to Amendments to Trust Agreement, and Approving Proposed License Amendments to Modify And. ML16260A0172016-09-21021 September 2016 Acceptance of Requested Licensing Action Revision of Technical Specifications Section 5.5.6 for Extension of Type a and Type C Leak Rate Test Frequencies Amendment ML16250A4612016-09-19019 September 2016 Request for Withholding Information from Public Disclosure for James A. FitzPatrick Nuclear Power Plant ML16253A3412016-09-14014 September 2016 Acceptance of Requested Licensing Action Relief Request for Plant Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-241 ML1202607432012-01-26026 January 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Acceptance Review Email, Amendment to Revise Quality Assurance Program Manual and Staff Qualification Technical Speci ML1125504082011-09-12012 September 2011 ME6877, E-mail to Licensee, Acceptance of LAR Changes to the Licensing Basis, Authorizing the Use of on Load Tap Changers for Reserve Station Service Transformer ML1123601152011-08-24024 August 2011 ME6755, E-mail to Licensee for Acceptance Review Adoption of TSTF-425 Rev 3 ML12227A5692011-07-25025 July 2011 R.E. Fitzpatrick Nuclear Power Plant - Acceptance Review for Amendment Request for Approval of Cyber Security Plan Implementation Schedule ML1103500882011-02-0404 February 2011 ME5323, Acceptance of LAR Revision of License Condition 2C(3), Fire Protection Plan ML1021400902010-08-0202 August 2010 ME4267, Acknowledgment of Withdrawal of LAR Dated November 23, 2009, and Acceptance of Revised LAR Dated July 15, 2010 - Cyber Security Plan ML1019300082010-07-0909 July 2010 ME4124, Acceptance Review-Draft Requests for Information Required ML1013301712010-05-13013 May 2010 Acceptance Review for FitzPatrick TAC ME3786 ML1012004922010-04-30030 April 2010 Acceptance Review for FitzPatrick TAC No. ME3787 ML0935108212009-12-17017 December 2009 ME2809 & ME2810, Acceptance Review of License Amendment Requests SRV Testing and ASME Codes ML0931703722009-11-13013 November 2009 Acceptance Review of Entergy'S Request to Extend Orders (TAC ME1515 - ME2522) ML0914704832009-05-27027 May 2009 Acceptance Review for Entergy'S Request to Extend Effectiveness of July 28, 2008, Orders ML0913200592009-05-12012 May 2009 Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207) 2023-09-08
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 3, 2016 Mr. Brian Sullivan Site Vice President Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093
SUBJECT:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: APPLICATION FOR ORDER APPROVING TRANSFER OF RENEWED FACILITY OPERATING LICENSE AND PROPOSED CONFORMING LICENSE AMENDMENT (CAC NO. MF8293)
Dear Mr. Sullivan:
By application dated August 18, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16235A081), Entergy Nuclear Operations, Inc. (ENO) and Exelon Generation Company, LLC. (Exelon) submitted an application for an order approving the transfer of Renewed Facility Operating License No. DPR-59 and the general license authorizing the operation of an independent spent fuel storage installation for James A. FitzPatrick Nuclear Power Plant. In addition, the applicants request conforming license amendments to reflect the transfer of the licenses from ENO to Exelon. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request.
The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.80 of Title 10 of the Code of Federal Regulations (10 CFR), an application for transfer of a license shall include as much of the information described in sections 50.33 and 50.34 of 10 CFR 50, with respect to identity and technical and financial qualifications of the proposed transferee. Also, consistent with 10 CFR 50.90, an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal addresses the design and operating characteristics, unusual or novel design features, and principal safety considerations.
B. Sullivan The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
If you have any questions, please contact me at (301) 415-3629.
Sincerely, ia , ect Man er Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-333 and 72-012 cc: Distribution via Listserv
ML16266A483 OFFICE LPLl-1/PM LPLl-1/LA LPLl-1/BC LPLl-1/PM NAME DRender KGoldstein TT ate DRender DATE 09/22/2016 09/23/16 09/29/16 10/03/16