ML17309A409: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ACCELERATEDDlUTIONDEMONSTRA.NSYSTEMI3.REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)RECIPIENT IDCODE/NAME PD1-3LASTAHLE,CCOPIESLTTRENCL1111ACCESSION NBR:8811180128 DOC.DATE:
{{#Wiki_filter:AC CELE RATED Dl UTI ON DE M ON STRA.N SYSTEM I3.REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)RECIPIENT ID CODE/NAME PD1-3 LA STAHLE,C COPIES LTTR ENCL 1 1 1 1 ACCESSION NBR:8811180128 DOC.DATE: 88/10/31 NOTARIZED:
88/10/31NOTARIZED:
NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244"'UTH.NAME-AUTHOR AFFILIATION MECREDY,R.C.
NODOCKETFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244"'UTH.NAME-AUTHORAFFILIATION MECREDY,R.C.
Rochester Gas&Electric Corp.5W RECIP.NAME RECIPIENT AFFILIATION STAHLE,C.Document Control Branch (Document Control Desk)
Rochester Gas&ElectricCorp.5WRECIP.NAME RECIPIENT AFFILIATION STAHLE,C.
DocumentControlBranch(Document ControlDesk)


==SUBJECT:==
==SUBJECT:==
Forwardsresponsetoaddiinforeutilprocedures generation package.IDISTRIBUTION CODE:A003DCOPIESRECEIVED:LTR (ENCL(SIZE:5+7~9TITLE:OR/Licensing Submittal:
Forwards response to addi info re util procedures generation package.I DISTRIBUTION CODE: A003D COPIES RECEIVED:LTR (ENCL (SIZE: 5+7~9 TITLE: OR/Licensing Submittal:
Suppl1toNUREG-0737(Generic Ltr82-33)8NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
Suppl 1 to NUREG-0737(Generic Ltr 82-33)8 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244/RECIPIENT COPIESIDCODE/NAME LTTRENCLPD1-3PD77INTERNAL:
05000244/RECIPIENT COPIES ID CODE/NAME LTTR ENCL PD1-3 PD 7 7 INTERNAL: ARM/DAF/LFMB NUDOCS-ABSTRACT RES/DSIR/EIB EXTERNAL: LPDR NSIC 1 0 1 1 1 1 1 1 1 1 NRR/DLPQ~~0~XKE NRC PDR 1 1 1 1 1 1 D ,S R I h MIX'ZO ALL"RIDS" RECIPIERIS'IEASE HELP US TO REDUCE HASTE.'XRKACZ
ARM/DAF/LFMB NUDOCS-ABSTRACT RES/DSIR/EIB EXTERNAL:
'LHE DOCUMEÃZ COFZEKL DESK, ROOM Pl-37 (EXT.20079)KO ELOCUTE YOUR NAME FRY DISTRIKlTIGN LISTS FOR DOCUMEXZS YOU DONiT NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 16 I.
LPDRNSIC1011111111NRR/DLPQ~~0~XKENRCPDR111111D,SRIhMIX'ZOALL"RIDS"RECIPIERIS'IEASE HELPUSTOREDUCEHASTE.'XRKACZ
t'ZZZZZZI gruzSZiz gL4$0 f41~~Iiiiti"'iii fiierrZZS 8K.:::: ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649-0001 October 31, 1988 TCLEPHONC Ance coos vie 546-2700 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Mr.Carl Stahle PWR Project Directorate No.1 Washington, D.C.20555  
'LHEDOCUMEÃZCOFZEKLDESK,ROOMPl-37(EXT.20079)KOELOCUTEYOURNAMEFRYDISTRIKlTIGN LISTSFORDOCUMEXZS YOUDONiTNEEDtTOTALNUMBEROFCOPIESREQUIRED:
LTTR17ENCL16I.
t'ZZZZZZIgruzSZizgL4$0f41~~Iiiiti"'iii fiierrZZS 8K.::::ROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.Y.14649-0001 October31,1988TCLEPHONC Ancecoosvie546-2700U.S.NuclearRegulatory Commission DocumentControlDeskAttn:Mr.CarlStahlePWRProjectDirectorate No.1Washington, D.C.20555


==Subject:==
==Subject:==
GinnaPlantProcedures Generation Package(PGP)RequestforAdditional Information R.E.GinnaNuclearPowerPlantDocketNo.50-244
Ginna Plant Procedures Generation Package (PGP)Request for Additional Information R.E.Ginna Nuclear Power Plant Docket No.50-244  


==DearMr.Stahle:==
==Dear Mr.Stahle:==
YourlettertoR.Kober,datedJune27,1988requested.
Your letter to R.Kober, dated June 27, 1988 requested.
additional information regarding theGinnaPlantProcedures Generation Package(PGP).Inresponse, pleasefindattachedtheinformation yourequested aswellasbackground information explaining ourpresentsystemofcontrolling EOPs.Ifyouhaveanyquestions regarding theinformation providedorrequireadditional information, pleasecallCharlesJ.Mambretti (716)724-8071.
additional information regarding the Ginna Plant Procedures Generation Package (PGP).In response, please find attached the information you requested as well as background information explaining our present system of controlling EOPs.If you have any questions regarding the information provided or require additional information, please call Charles J.Mambretti (716)724-8071.Ro ert C.cred General Manager Nuclear Production Attachment ZC: U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA" 19406 Ginna Senior Resident Inspector goo~88iliSOiZS SSi03i PDR ADOCK 05000244" PDC RESPONSE TO CONCERNS REGARDING THE GINNA PROCEDURES GENERATION PACKAGE (PGP)The Ginna PGP was formulated based upon interpretation of NRC requirements and the guidance of NUREG-0899.
RoertC.credGeneralManagerNuclearProduction Attachment ZC:U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA"19406GinnaSeniorResidentInspector goo~88iliSOiZS SSi03iPDRADOCK05000244"PDC RESPONSETOCONCERNSREGARDING THEGINNAPROCEDURES GENERATION PACKAGE(PGP)TheGinnaPGPwasformulated baseduponinterpretation ofNRCrequirements andtheguidanceofNUREG-0899.
The PGP provided the guidelines required to generate the original EOPs which were implemented in December of 1985.In addition, the package described the development of the EOPs and the manner in which they were implemented.
ThePGPprovidedtheguidelines requiredtogeneratetheoriginalEOPswhichwereimplemented inDecemberof1985.Inaddition, thepackagedescribed thedevelopment oftheEOPsandthemannerinwhichtheywereimplemented.
It is important to recognize that thereafter, implementation and changes to the EOPs were controlled in accordance with the guidance contained in the following Ginna Administrative procedures.
Itisimportant torecognize thatthereafter, implementation andchangestotheEOPswerecontrolled inaccordance withtheguidancecontained inthefollowing GinnaAdministrative procedures.
A-502.1 A-503.1 A-601.6 Emergency and Abnormal Procedure Writers Guide Emergency and Abnormal Procedures Users Guide Procedure Changes Control-Emergency and Abnormal Procedures These documents have evolved into the"living" governing documents (revised as necessary) for EOP maintenance and.the original PGP is not used to control Emergency and Abnormal Procedures.
A-502.1A-503.1A-601.6Emergency andAbnormalProcedure WritersGuideEmergency andAbnormalProcedures UsersGuideProcedure ChangesControl-Emergency andAbnormalProcedures Thesedocuments haveevolvedintothe"living"governing documents (revisedasnecessary) forEOPmaintenance and.theoriginalPGPisnotusedtocontrolEmergency andAbnormalProcedures.
The controlling documents for the training program have become procedures:
Thecontrolling documents forthetrainingprogramhavebecomeprocedures:
A-103.6 Operator Training Responsibilities TRC-5.1 Initial License Operator Training TRC-5.2 Operator Requalification Training As a result of an internal EOP assessment completed in February 1988, and NRC concerns resulting from the Ginna PGP review transmitted to RG&E on June 27, 1988, RG&E has initiated an EOP upgrade program scheduled for completion in April 1989.This program includes revision to the EOP governing procedures.
A-103.6OperatorTrainingResponsibilities TRC-5.1InitialLicenseOperatorTrainingTRC-5.2OperatorRequalification TrainingAsaresultofaninternalEOPassessment completed inFebruary1988,andNRCconcernsresulting fromtheGinnaPGPreviewtransmitted toRG&EonJune27,1988,RG&Ehasinitiated anEOPupgradeprogramscheduled forcompletion inApril1989.ThisprogramincludesrevisiontotheEOPgoverning procedures.
Draft copies of these revisions are attached for information.
Draftcopiesoftheserevisions areattachedforinformation.
Responses to each of the NRC concerns are provided below including, where appropriate, references to sections of the draft procedures.
Responses toeachoftheNRCconcernsareprovidedbelowincluding, whereappropriate, references tosectionsofthedraftprocedures.
8811180128 I r" CONCERNS AND RESPONSES Concern 1 The PGF states that deviations from and additions to the generic technical guidelines (WOG"ERGs)will be documented, and will include technical justification supporting these additions and/or deviations.
8811180128 Ir" CONCERNSANDRESPONSES Concern1ThePGFstatesthatdeviations fromandadditions tothegenerictechnical guidelines (WOG"ERGs)willbedocumented, andwillincludetechnical justification supporting theseadditions and/ordeviations.
The PGP should also state that the safety significance of these differences will be identified and documented in the PGP.~Res onse Procedure A-606.1 Section 3.3 and..Appendix 2B, items 22 and 22A (attached) address the need.to assess the safety significance of deviations from the technical guidelines (WOG ERG)and documentation thereof.Concern 2 Sections 4.5.3 or 5.2 should be revised to indicate a specific method for highlighting notes (e.g., outlining/boxing) to differentiate them from cautions while drawing attention to their content.~Res onse Procedure A-502.1 provides the following instructions:
ThePGPshouldalsostatethatthesafetysignificance ofthesedifferences willbeidentified anddocumented inthePGP.~ResonseProcedure A-606.1Section3.3and..Appendix2B,items22and22A(attached) addresstheneed.toassessthesafetysignificance ofdeviations fromthetechnical guidelines (WOGERG)anddocumentation thereof.Concern2Sections4.5.3or5.2shouldberevisedtoindicateaspecificmethodforhighlighting notes(e.g.,outlining/boxing) todifferentiate themfromcautionswhiledrawingattention totheircontent.~ResonseProcedure A-502.1providesthefollowing instructions:
4.5.2 CAUTION STATEMENTS
4.5.2CAUTIONSTATEMENTS
-text should be in a block format, as shown in Figure 3, in addition to the following formatting requirements:
-textshouldbeinablockformat,asshowninFigure3,inadditiontothefollowing formatting requirements:
4.5.2.1 Caution'tatements should.'e enclosed at the top and bottom by a continuous line of asterisks which should begin three lines below the preceding text.This differentiates the CAUTION and NOTE.4.5.2.2 The statement header CAUTION should be centered and placed two lines below he preceding line of asterisks.
4.5.2.1Caution'tatements should.'e enclosedatthetopandbottombyacontinuous lineofasterisks whichshouldbeginthreelinesbelowthepreceding text.Thisdifferentiates theCAUTIONandNOTE.4.5.2.2Thestatement headerCAUTIONshouldbecenteredandplacedtwolinesbelowhepreceding lineofasterisks.
4.5.2.3 Caution statement text.should begin two lines below the caution header and extend from margin to margin.4.5.2.4 Caution statements should be emphasized as described in section 5.2, Emphasis Techniques, by using all upper case capitalization.
4.5.2.3Cautionstatement text.shouldbegintwolinesbelowthecautionheaderandextendfrommargintomargin.4.5.2.4Cautionstatements shouldbeemphasized asdescribed insection5.2,EmphasisTechniques, byusingalluppercasecapitalization.
4.5.2.5 Caution statements which apply to the whole procedure shall be stated prior to any operator action step and be shown on the foldout page if applicable.  
4.5.2.5Cautionstatements whichapplytothewholeprocedure shallbestatedpriortoanyoperatoractionstepandbeshownonthefoldoutpageifapplicable.  
~, L-h 4.5.2.6 Caution statements which apply to a particular step shall be stated prior to that step.4.5.2.74.5.3 Caution statements should be written to preclude confusion as to which step or evolution they refer.NOTE STATEMENTS
~,L-h 4.5.2.6Cautionstatements whichapplytoaparticular stepshallbestatedpriortothatstep.4.5.2.74.5.3Cautionstatements shouldbewrittentoprecludeconfusion astowhichsteporevolution theyrefer.NOTESTATEMENTS
-t:ext should be in a block format as shown in Figure 3, in addition to the following formatting requirements:
-t:extshouldbeinablockformatasshowninFigure3,inadditiontothefollowing formatting requirements:
4.5.3.1 4.5.3.2 The statement header NOTE should be on the same line as the text but separated from the text by a colon.Note statement text should begin two lines below the preceding text and extend from margin to margin.4.5.3.3 Note statements should be preceded with a bullet (o)to also differentiate them from a CAUTION.4.5.3.4 Note statements which apply to a particular step shall be stated prior to that step.Concern 3 Sections will not the PGP.4.5.2 and 4.5.3 should state that cautions and notes contain action steps, as is stated in Figure 4.2-2 of R~es onse Procedure A-502.1 contains the following instructions:
4.5.3.14.5.3.2Thestatement headerNOTEshouldbeonthesamelineasthetextbutseparated fromthetextbyacolon.Notestatement textshouldbegintwolinesbelowthepreceding textandextendfrommargintomargin.4.5.3.3Notestatements shouldbeprecededwithabullet(o)toalsodifferentiate themfromaCAUTION.4.5.3.4Notestatements whichapplytoaparticular stepshallbestatedpriortothatstep.Concern3SectionswillnotthePGP.4.5.2and4.5.3shouldstatethatcautionsandnotescontainactionsteps,asisstatedinFigure4.2-2ofR~esonseProcedure A-502.1containsthefollowing instructions:
2.3.2 CAUTION STATEMENTS
2.3.2CAUTIONSTATEMENTS
-statements denote potential hazards to personnel or equipment.
-statements denotepotential hazardstopersonnel orequipment.
Cautions which apply to a particular action step should appear directly before that step.Cautions which apply throughout a procedure, or a portion of it, should appear at the start of the procedure or at the point where they become applicable.
Cautionswhichapplytoaparticular actionstepshouldappeardirectlybeforethatstep.Cautionswhichapplythroughout aprocedure, oraportionofit,shouldappearatthestartoftheprocedure oratthepointwheretheybecomeapplicable.
A caution statement will not contain a direct action.A passive action statement.
Acautionstatement willnotcontainadirectaction.Apassiveactionstatement.
may be appropriate.
maybeappropriate.
An example would be the continuous monitoring of a parameter with an associated action if a prescribed, value is reached.2.3.3 NOTE STATEMENTS
Anexamplewouldbethecontinuous monitoring ofaparameter withanassociated actionifaprescribed, valueisreached.2.3.3NOTESTATEMENTS
-statements contain advisory or administrative information for subsequent action steps or for caution stat:ements.
-statements containadvisoryoradministrative information forsubsequent actionstepsorforcautionstat:ements.
The directions in step 2.3.2 for placement and action content should be applied to notes.Where cautions and notes are included together all caution statements should be listed before any note statement.
Thedirections instep2.3.2forplacement andactioncontentshouldbeappliedtonotes.Wherecautionsandnotesareincludedtogetherallcautionstatements shouldbelistedbeforeanynotestatement.
5'Q 1 l Concern 4 Section 5.12 addresses logic terms and conditional statements.
5'Q1l Concern4Section5.12addresses logictermsandconditional statements.
The writer's guide should be expanded to included examples of acceptable and.unacceptable combinations.
Thewriter'sguideshouldbeexpandedtoincludedexamplesofacceptable and.unacceptable combinations.
See NUREG-0899, Appendix B, for additional guidance.R~es onse Procedure A-502.1 This procedure has been expanded to include Appendix A (attached) which provides additional guidance on logic terms and conditional statements as well as examples illustrating this guidance.Concern 5 Section 5e3 provides guidelines for referencing sections, subsections, and steps within a procedure and for referencing another procedure.
SeeNUREG-0899, AppendixB,foradditional guidance.
However, it should also provide guidelines or criteria for writers,to decide when the steps of a referenced procedure are to be included.in the EOP, rather than referenced.
R~esonseProcedure A-502.1Thisprocedure hasbeenexpandedtoincludeAppendixA(attached) whichprovidesadditional guidanceonlogictermsandconditional statements aswellasexamplesillustrating thisguidance.
~Res onse Procedure A-502.1 provides the following instructions=
Concern5Section5e3providesguidelines forreferencing
: sections, subsections, andstepswithinaprocedure andforreferencing anotherprocedure.
However,itshouldalsoprovideguidelines orcriteriaforwriters,to decidewhenthestepsofareferenced procedure aretobeincluded.
intheEOP,ratherthanreferenced.
~ResonseProcedure A-502.1providesthefollowing instructions=
5.12.4~~REFERENCING
5.12.4~~REFERENCING
-referencing isusedtodenoteaprocedure whichmayprovideusefulornecessary information totheoperatorduringtheexecution ofanEOP/AP.Ingeneral,thoseprocedures referenced coverlowprobability occurrences ornormalplantoperations whoseinclusion withinanEOP/APwouldcauseexcessive complication andreduceeffectiveness oftheprocedure ineffect.Referencing isdenotedbythetermREFERfollowedbytheprocedure designator andtitleasshownby;REFERTOER-AFW.1, ALTERNATE WATERSUPPLYTOAFWPUMPS.Concern6Theformatand.contentofCriticalSafetyFunctionStatusTrees(CSFSTs)shouldbespecified inthewriter'sguide.~ResonseProcedure A-502.16.0FORMATOFCRITICALSAFETYFUNCTIONSTATUSTREES Ir\PIht 6.1CriticalSafetyFunctionStatusTrees(CSFSTs)areblockformatdevicesusedintheevaluation ofpredefined safetyconcernsdesignated asCriticalSafetyFunctions.
-referencing is used to denote a procedure which may provide useful or necessary information to the operator during the execution of an EOP/AP.In general, those procedures referenced cover low probability occurrences or normal plant operations whose inclusion within an EOP/AP would cause excessive complication and reduce effectiveness of the procedure in effect.Referencing is denoted by the term REFER followed by the procedure designator and title as shown by;REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS.Concern 6 The format and.content of Critical Safety Function Status Trees (CSFSTs)should be specified in the writer's guide.~Res onse Procedure A-502.1 6.0 FORMAT OF CRITICAL SAFETY FUNCTION STATUS TREES I r\P I h t 6.1 Critical Safety Function Status Trees (CSFSTs)are block format devices used in the evaluation of predefined safety concerns designated as Critical Safety Functions.(FIGURE 6-CSFST).6.1.1~~6.1.2 The blocks are aligned so that the user will enter each tree on the left-hand side of its page and.move towards the right-hand side.)Each block contains a question concerning current plant conditions.
(FIGURE6-CSFST).6.1.1~~6.1.2Theblocksarealignedsothattheuserwillentereachtreeontheleft-hand sideofitspageand.movetowardstheright-hand side.)Eachblockcontainsaquestionconcerning currentplantconditions.
The question in each block may be dependent on previous blocks.6.1s3 Each question is written to obtain a YES or NO response.The response dictates which branch of the status tree will be taken.6.1.4 Questions should be written so that a YES response branch will move the user down the page.Each possible complete path through the tree ends in its own end point, or terminus.The last path segment and the associated terminus circle use a color-code and/or pattern-code as shown in FIGURE 7.6.1.6 Terminals should be ordered so that the highest priority condition terminus is at the top of the page and the priority levels descend down the page.The priority order for color-coding, in descending order, is RED"ORANGE-YELLOW-GREEN.
Thequestionineachblockmaybedependent onpreviousblocks.6.1s3EachquestioniswrittentoobtainaYESorNOresponse.
6.1.7 All terminals color-coded other than GREEN will provide an applicable Functional Restoration procedure designator.
Theresponsedictateswhichbranchofthestatustreewillbetaken.6.1.4Questions shouldbewrittensothataYESresponsebranchwillmovetheuserdownthepage.Eachpossiblecompletepaththroughthetreeendsinitsownendpoint,orterminus.
Concern 7 The writer's guide addresses simple action steps.However, it should also include verification steps, continuous or periodic steps, alternative and equally acceptable steps, and steps which refer the operator to another subsection of the procedure.
Thelastpathsegmentandtheassociated terminuscircleuseacolor-code and/orpattern-code asshowninFIGURE7.6.1.6Terminals shouldbeorderedsothatthehighestprioritycondition terminusisatthetopofthepageandtheprioritylevelsdescenddownthepage.Thepriorityorderforcolor-coding, indescending order,isRED"ORANGE-YELLOW-GREEN.
The content and, format of each type of action step needs to be described in the writer's guide.See NUREG-0899, Subsections 5.7.2-5.7.8, for additional guidance.~Res onse Procedure A-502.1 provides the following instructions:
6.1.7Allterminals color-coded otherthanGREENwillprovideanapplicable Functional Restoration procedure designator.
5.12 BRANCHING-branching encompasses transitioning, either to another step in the same procedure or to another EOP/AP;and referencing another procedure for supplemental information or direction.
Concern7Thewriter'sguideaddresses simpleactionsteps.However,itshouldalsoincludeverification steps,continuous orperiodicsteps,alternative andequallyacceptable steps,andstepswhichrefertheoperatortoanothersubsection oftheprocedure.
Transitioning in a series operation while referencing is a parallel operation.
Thecontentand,formatofeachtypeofactionstepneedstobedescribed inthewriter'sguide.SeeNUREG-0899, Subsections 5.7.2-5.7.8, foradditional guidance.
f I QA 0 K 5.12.1 5.12.2 5.12.3 5.12.3.1 TRANSITION TO A LATER STEP WITHIN CURRENT EOP/AP-shall be performed by using the words GO TO as shown by;GO TO Step 20.TRANSITION TO A PREVIOUS STEP WITHIN CURRENT EOP/AP-shall be performed by using the words RETURN TO as shown by;RETURN TO Step 20.TRANSITION TO ANOTHER EOP (or AP)-should be performed by using the words GO TO, followed by the procedure designator, number, title, and the specific procedure step as shown by;GO TO ES-0.1, REACTOR TRIP RESPONSE, Step 20.If a specific step is not shown it is to be assumed.that transition is to the beginning of the designated procedure.
~ResonseProcedure A-502.1providesthefollowing instructions:
5.12.3.2 Transition from an EOP.to an AP should not be used.5.12.3.3 5.12.4 5.12.4.1 5.12.4.2 5.12.5 Procedures entered for supplemental guidance or from CSFST direction may use a RETURN TO statement.
5.12BRANCHING
This statement should contain the appropriate procedure designator, title and step number where applicable.
-branching encompasses transitioning, eithertoanotherstepinthesameprocedure ortoanotherEOP/AP;andreferencing anotherprocedure forsupplemental information ordirection.
A procedure with multiple entry conditions may use an open return statement as shown by;RETURN TO PROCEDURE AND STEP IN EFFECT.This denotes a transition to the last previous EOP in use.REFERENCING
Transitioning inaseriesoperation whilereferencing isaparalleloperation.
-referencing is used to denote a procedure which may provide useful or necessary information to the operator during the execution of an EOP/AP.In general, those procedures referenced cover low probability occurrences or normal plant operations whose inclusion within an EOP/AP would cause excessive complication and reduced effectiveness of the procedure in effect.Referencing is denoted by the term REFER followed by the procedu're designator and title as shown by;REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS.Referencing a procedure does not constitute leaving the procedure in effect as it is providing only additional information.
fIQA0K 5.12.15.12.25.12.35.12.3.1TRANSITION TOALATERSTEPWITHINCURRENTEOP/AP-shallbeperformed byusingthewordsGOTOasshownby;GOTOStep20.TRANSITION TOAPREVIOUSSTEPWITHINCURRENTEOP/AP-shallbeperformed byusingthewordsRETURNTOasshownby;RETURNTOStep20.TRANSITION TOANOTHEREOP(orAP)-shouldbeperformed byusingthewordsGOTO,followedbytheprocedure designator, number,title,andthespecificprocedure stepasshownby;GOTOES-0.1,REACTORTRIPRESPONSE, Step20.Ifaspecificstepisnotshownitistobeassumed.thattransition istothebeginning ofthedesignated procedure.
Referencing should be minimized for procedure continuity.
5.12.3.2Transition fromanEOP.toanAPshouldnotbeused.5.12.3.35.12.45.12.4.15.12.4.25.12.5Procedures enteredforsupplemental guidanceorfromCSFSTdirection mayuseaRETURNTOstatement.
The referencing terms GO TO, RETURN TO and REFER TO and the procedure designator and title shall be all capitalized.
Thisstatement shouldcontaintheappropriate procedure designator, titleandstepnumberwhereapplicable.
and the word Step shall be initially capitalized for emphasis.
Aprocedure withmultipleentryconditions mayuseanopenreturnstatement asshownby;RETURNTOPROCEDURE ANDSTEPINEFFECT.Thisdenotesatransition tothelastpreviousEOPinuse.REFERENCING
va t~P Concern 8 Sections 4.1.9 and 5.6.5 should.be revised to indicate that page rotation and breaking of words are unacceptable at all times.R~es onse Procedure A-502.1 contains the following instructions:
-referencing isusedtodenoteaprocedure whichmayprovideusefulornecessary information totheoperatorduringtheexecution ofanEOP/AP.Ingeneral,thoseprocedures referenced coverlowprobability occurrences ornormalplantoperations whoseinclusion withinanEOP/APwouldcauseexcessive complication andreducedeffectiveness oftheprocedure ineffect.Referencing isdenotedbythetermREFERfollowedbytheprocedu're designator andtitleasshownby;REFERTOER-AFW.1, ALTERNATE WATERSUPPLYTOAFWPUMPS.Referencing aprocedure doesnotconstitute leavingtheprocedure ineffectasitisproviding onlyadditional information.
4.1.8 4.1.8.1 TEXT'CONTINUITY
Referencing shouldbeminimized forprocedure continuity.
-the text of operator action steps;with applicable substeps, cautions, notes;should be wholly contained on the same page.Where physical constraints preclude this the following guidelines apply.-Cautions'nd/or notes may be placed alone on the immediately preceding page.4.1.8.2 4.1.8.2.1 If a step must be continued on to another page, then: The initial page shall be annotated at the bottom of the action step field portion of the page to indicate that the step continues.(i.e., THIS STEP CONTINUED ON FOLLOWING PAGE.)4.1.8.2.2 The following page shall have the initial action step heading repeated and.be annotated to indicate that the step is being continued from a previous page.ex.,Establish letdown-THIS STEP CONTINUED FROM PREVIOUS PAGE 4.1.9 PAGE ROTATION-should be minimized but when it is necessary to rotate a page for the sake of clarity and readability (i.e., proper graph construction), the following rules are applicable; 4.1.9.1 The left hand edge of the normal page shall become the top of the rotated page.4.1.9.2 Page margins, identification and.numbering shall n'ot rotate.Concern 9 Because the licensee has chosen check spaces as a method of placekeeping the writer's guide should state that all action steps should have check-off spaces.
Thereferencing termsGOTO,RETURNTOandREFERTOandtheprocedure designator andtitleshallbeallcapitalized.
andthewordStepshallbeinitially capitalized foremphasis.
vat~P Concern8Sections4.1.9and5.6.5should.berevisedtoindicatethatpagerotationandbreakingofwordsareunacceptable atalltimes.R~esonseProcedure A-502.1containsthefollowing instructions:
4.1.84.1.8.1TEXT'CONTINUITY
-thetextofoperatoractionsteps;withapplicable
: substeps, cautions, notes;shouldbewhollycontained onthesamepage.Wherephysicalconstraints precludethisthefollowing guidelines apply.-Cautions'nd/or notesmaybeplacedaloneontheimmediately preceding page.4.1.8.24.1.8.2.1 Ifastepmustbecontinued ontoanotherpage,then:Theinitialpageshallbeannotated atthebottomoftheactionstepfieldportionofthepagetoindicatethatthestepcontinues.
(i.e.,THISSTEPCONTINUED ONFOLLOWING PAGE.)4.1.8.2.2 Thefollowing pageshallhavetheinitialactionstepheadingrepeatedand.beannotated toindicatethatthestepisbeingcontinued fromapreviouspage.ex.,Establish letdown-THISSTEPCONTINUED FROMPREVIOUSPAGE4.1.9PAGEROTATION-shouldbeminimized butwhenitisnecessary torotateapageforthesakeofclarityandreadability (i.e.,propergraphconstruction),
thefollowing rulesareapplicable; 4.1.9.1Thelefthandedgeofthenormalpageshallbecomethetopoftherotatedpage.4.1.9.2Pagemargins,identification and.numbering shalln'otrotate.Concern9Becausethelicenseehaschosencheckspacesasamethodofplacekeeping thewriter'sguideshouldstatethatallactionstepsshouldhavecheck-off spaces.
l  
l  
~ResonseTheoriginalintentwastousecheckoffspaces,however,duringthedevelopment andvalidation oftheEOPs,thevalueofcheckoffs becamequestionable forplacekeeping purposes.
~Res onse The original intent was to use checkoff spaces, however, during the development and validation of the EOPs, the value of checkoffs became questionable for placekeeping purposes.As a result, the requirement was removed from Procedure A-502.1.Alternatives for.placekeeping are contained in Procedure A-503.1 as follows: 3.7.3 Placekeeping is the responsibility of the EOP User;normally the Control Room Foreman.In order to ensure proper placekeeping, the EOP User may checkoff or annotate steps by using pen/pencil markings to the immediate right of the Action Step or Response Not Obtained (RNO)performed.
Asaresult,therequirement wasremovedfromProcedure A-502.1.Alternatives for.placekeeping arecontained inProcedure A-503.1asfollows:3.7.3Placekeeping istheresponsibility oftheEOPUser;normallytheControlRoomForeman.Inordertoensureproperplacekeeping, theEOPUsermaycheckofforannotatestepsbyusingpen/pencil markingstotheimmediate rightoftheActionSteporResponseNotObtained(RNO)performed.
Also available to him,.are stick-on pads or note pads which may be affixed to pages where transition or looping are necessary.
Alsoavailable tohim,.arestick-onpadsornotepadswhichmaybeaffixedtopageswheretransition orloopingarenecessary.
Concern 10 Section 5.6e9 states that brackets are to be used.only in calculations.
Concern10Section5.6e9statesthatbracketsaretobeused.onlyincalculations.
The writer's guide should describe how values for adverse containment conditions will be specified in the EOPs.R~es onse Procedure A-502.1 contains the following guidance:.
Thewriter'sguideshoulddescribehowvaluesforadversecontainment conditions willbespecified intheEOPs.R~esonseProcedure A-502.1containsthefollowing guidance:.
5.6.6~~.PARENTHESES
5.6.6~~.PARENTHESES
-areusedtoprovidetheadversecontainment valuesforinstrumentation readingsinapplicable steps.Theyareusedtoprovidevalvenumberdesignations andinstrument designators whenthesearenotedinadditiontoaworddescriptor.
-are used to provide the adverse containment values for instrumentation readings in applicable steps.They are used to provide valve number designations and instrument designators when these are noted in addition to a word descriptor.
Parentheses mayalsobeusetoprovideamplifying orusefulinformation suchaslocations, breakercubicledesignations, andinformation whichcannotbeplacedinanotepriortoastepasitonlyappliestoaspecificsubstepcondition.
Parentheses may also be use to provide amplifying or useful information such as locations, breaker cubicle designations, and information which cannot be placed in a note prior to a step as it only applies to a specific substep condition.
Concern11Regarding actionstatements, thefollowing concernsshouldbespecifically addressed inthewriter'sguide:a.Actionstepsshouldbestructured sothattheycanbeexecutedbytheminimumshiftstaffingrequiredbytheTechnical Specifications.
Concern 11 Regarding action statements, the following concerns should be specifically addressed in the writer's guide: a.Action steps should be structured so that they can be executed by the minimum shift staffing required by the Technical Specifications.
b.Actionstepsshouldbestructured tobeconsistent withtherolesandresponsibilities oftheoperators.
b.Action steps should be structured to be consistent with the roles and responsibilities of the operators.
c.Actionstepsshouldbestructured soastominimizethemovementofpersonnel aroundthecontrolroomwhilecarryingoutprocedural steps..8 e
c.Action steps should be structured so as to minimize the movement of personnel around the control room while carrying out procedural steps..8 e
d.Actionstepsshouldbestructured.
d.Action steps should be structured.
toavoidunintentional duplication oftasks.e.Actionstepsshouldbestructured toenablethecontrolroomsupervisor tofollowstaffactionsandmonitorplantstatus.~ResenseProcedure A-502.1containsthefollowing guidance:
to avoid unintentional duplication of tasks.e.Action steps should be structured to enable the control room supervisor to follow staff actions and monitor plant status.~Res ense Procedure A-502.1 contains the following guidance: 2', 2.3.1 OPERATOR ACTION STEPS-general requirements are that action steps be structured so that they can be executed.by minimum shift staffing as required by Technical Specifications, and be consistent with the responsibilities of the shift positions.
2',2.3.1OPERATORACTIONSTEPS-generalrequirements arethatactionstepsbestructured sothattheycanbeexecuted.
In addition, the action steps should minimize the movement of personnel in the Control Room and enable the effective supervisory overview to monitor plant status.OPERATOR ACTION STEPS are short, precise statements presenting exactly the task to be performed and the expected response or result of that task.It is not necessary to state expected results of routine tasks.Steps are assumed to be performed in sequence unless otherwise denoted.Actions directed in a step should not be expected to be complete before the next step is begun.If a particular action must be completed before continuation,:
byminimumshiftstaffingasrequiredbyTechnical Specifications, andbeconsistent withtheresponsibilities oftheshiftpositions.
this must be stated in that step or substep.The actionsteps are presented in a dual column f ormat and are identif ied as immediate or subsequent actions.5.5 NARRATIVE STYLE-steps may be written as complete sentences, short phrases, or some combination of the two.Notes and cautions should be written as complete sentences.
Inaddition, theactionstepsshouldminimizethemovementofpersonnel intheControlRoomandenabletheeffective supervisory overviewtomonitorplantstatus.OPERATORACTIONSTEPSareshort,precisestatements presenting exactlythetasktobeperformed andtheexpectedresponseorresultofthattask.Itisnotnecessary tostateexpectedresultsofroutinetasks.Stepsareassumedtobeperformed insequenceunlessotherwise denoted.Actionsdirectedinastepshouldnotbeexpectedtobecompletebeforethenextstepisbegun.Ifaparticular actionmustbecompleted beforecontinuation,:
Sentences, clauses and phrases should be short and precise utilizing'normal American English word order where practical.
thismustbestatedinthatsteporsubstep.Theactionstepsarepresented inadualcolumnformatandareidentifiedasimmediate orsubsequent actions.5.5NARRATIVE STYLE-stepsmaybewrittenascompletesentences, shortphrases,orsomecombination ofthetwo.Notesandcautionsshouldbewrittenascompletesentences.
Operator action steps should: 5.5.1 5.5.2 Be short, imperative statements which state the exact task that the operator is expected to perform.Deal with only one idea.Complex evolutions should be broken down into a series of steps and substeps.5.5.3 5.5e4 Be clear as to the objectives of operator actions.Be written in sentence form in the right-hand.
Sentences, clausesandphrasesshouldbeshortandpreciseutilizing
'normalAmericanEnglishwordorderwherepractical.
Operatoractionstepsshould:5.5.15.5.2Beshort,imperative statements whichstatetheexacttaskthattheoperatorisexpectedtoperform.Dealwithonlyoneidea.Complexevolutions shouldbebrokendownintoaseriesofstepsandsubsteps.
5.5.35.5e4Beclearastotheobjectives ofoperatoractions.Bewritteninsentenceformintheright-hand.
column.
column.
ttJ1 Concern12ThePGPshouldaddresstheaccessibility ofEOPsandtechniques todistinguish themfromotherplantprocedures.
tt J1 Concern 12 The PGP should address the accessibility of EOPs and techniques to distinguish them from other plant procedures.
~ResensePresently theEOPsarecontained involumeswithredcoveredjackets.TheEOPsaretheonlycontrolroomprocedures differentiated inthismannerandareeasilydistinguishable.
~Res ense Presently the EOPs are contained in volumes with red covered jackets.The EOPs are the only control room procedures differentiated in this manner and are easily distinguishable.
Uponcompletion oftheEOPupdateinApril1989,theEOPswillbestoredinabookcaseseparatefromallotherprocedures.
Upon completion of the EOP update in April 1989, the EOPs will be stored in a bookcase separate from all other procedures.
Additionally, theEOPswillhaveauniquebinderandformat,asdescribed below.Procedure A-,503.1,provides thefollowing instructions:
Additionally, the EOPs will have a unique binder and format, as described below.Procedure A-,503.1,provides the following instructions:
2.0EOP/APSectionOranization
2.0 EOP/AP Section Or anization-in order to facilitate rapid location of specific sections and subsections of the EOP/AP, the control room copy is arranged per FIGURE 3 as follows: 2.1 2.2 COVER SHEET-which is used for administrative purposes and does not provide any active function in the EOP/AP to be used.The Cover Sheet of the control room copy is the first page seen in the binder.PURPOSE and ENTRY CONDITIONS/SYMPTOMS PAGE-in the control room copy is immediately following the cover sheet.2.2.1~~A Purpose Statement which specifically describes the intent of the procedure.
-inordertofacilitate rapidlocationofspecificsectionsandsubsections oftheEOP/AP,thecontrolroomcopyisarrangedperFIGURE3asfollows:2.12.2COVERSHEET-whichisusedforadministrative purposesanddoesnotprovideanyactivefunctionintheEOP/APtobeused.TheCoverSheetofthecontrolroomcopyisthefirstpageseeninthebinder.PURPOSEandENTRYCONDITIONS/SYMPTOMS PAGE-inthecontrolroomcopyisimmediately following thecoversheet.2.2.1~~APurposeStatement whichspecifically describes theintentoftheprocedure.
2.2.2 Entry conditions and/or Symptoms sections which specify the conditions, transitions and/or symptoms which dictate or direct entry into the procedure.
2.2.2Entryconditions and/orSymptomssectionswhichspecifytheconditions, transitions and/orsymptomswhichdictateordirectentryintotheprocedure.
The symptoms used should be unique to the procedure.
Thesymptomsusedshouldbeuniquetotheprocedure.
2.3 OPERATOR ACTION STEP PAGES-which may be subdivided into Immediate Operator Action pages, followed by subsequent operator action pages.Operator action step pages may contain;2.3.1 CAUTION STATEMENTS
2.3OPERATORACTIONSTEPPAGES-whichmaybesubdivided intoImmediate OperatorActionpages,followedbysubsequent operatoractionpages.Operatoractionsteppagesmaycontain;2.3.1CAUTIONSTATEMENTS
-which provide information about hazards to personnel or equipment and advice on actions or transitions which may become necessary depending on changes in plant conditions.
-whichprovideinformation abouthazardstopersonnel orequipment andadviceonactionsortransitions whichmaybecomenecessary depending onchangesinplantconditions.
2.3.2 NOTE STATEMENTS
2.3.2NOTESTATEMENTS
-which provide administrative or advisory information which supports operator actions.10 I P OPERATOR ACTION STEPS-presented in a two column format, direct the operator through specific step by step tasks, give the expected results from those tasks and provide contingency actions to be taken should an expected task method not be available or an expected result not be obtained.ATTACHMENT PAGES-which may be used to provide additional information to the operator.They provide information concerning a particular step or evolution addressed in the procedure.
-whichprovideadministrative oradvisoryinformation whichsupportsoperatoractions.10 IP OPERATORACTIONSTEPS-presented inatwocolumnformat,directtheoperatorthroughspecificstepbysteptasks,givetheexpectedresultsfromthosetasksandprovidecontingency actionstobetakenshouldanexpectedtaskmethodnotbeavailable oranexpectedresultnotbeobtained.
The information presented is of importance to the action or decision where referenced, but is of a length or format which precludes incorporation into the procedure step.Similar information is contained in A-502.1 Section 3.5.11  
ATTACHMENT PAGES-whichmaybeusedtoprovideadditional information totheoperator.
Theyprovideinformation concerning aparticular steporevolution addressed intheprocedure.
Theinformation presented isofimportance totheactionordecisionwherereferenced, butisofalengthorformatwhichprecludes incorporation intotheprocedure step.Similarinformation iscontained inA-502.1Section3.5.11  


A-503.1:19 FIGURE3CONTROLROOMEOP/APBINDERAEGUQIGEMENT (TRI-FOLD BINDER)EOPFOLDOVERPAGESATTACHMENTS IIIIIIIIIIFOLDOUTPAGESIISUMMARYATTACHMENT IIEOPIIIIII-coversheet
A-503.1:19 FIGURE 3 CONTROL ROOM EOP/AP BINDER AEGUQIGEMENT (TRI-FOLD BINDER)EOP FOLD OVER PAGES ATTACHMENTS II II II II IIFOLD OUT PAGES II
-purpose/entry IIconditions/symptomsll
 
==SUMMARY==
ATTACHMENT II EOP II II II-coversheet
-purpose/entry II conditions/symptomsll
-immediate/
-immediate/
((subsequent action((IIIIB1-FOLDBINDERFOLDOVERPAGESAttachment IIIIoIIIIIIIIIIIIIIIIAPoIIIIcoversheet IIpurpose/entry IIconditions/symptom immediate/
((subsequent action ((II II B1-FOLD BINDER FOLD OVER PAGES Attachment II I I o II II II II II II II II AP o II II coversheet II purpose/entry II conditions/symptom immediate/
subsequent actions(IIII12 0
subsequent actions (I II I 12 0
Concern13Thequalityofthereproduced copiesoftheEOPsshouldbeaddressed inthePGPsinceallcopiesoftheEOPsneedtobelegibleandcomplete.
Concern 13 The quality of the reproduced copies of the EOPs should be addressed in the PGP since all copies of the EOPs need to be legible and complete.~Res onse Since EOPs/APs are considered Plant procedures, these procedures and any changes to these procedures are governed by the provisions of A-601.2 (Procedure Control-Permanent Changes)and A-602 (Procedure Distribution).
~ResonseSinceEOPs/APsareconsidered Plantprocedures, theseprocedures andanychangestotheseprocedures aregovernedbytheprovisions ofA-601.2(Procedure Control-Permanent Changes)andA-602(Procedure Distribution).
These procedures provide for proofreading and distribution of EOPs/APs to address this concern.Concern 14 Particular attention should be paid.to deviations from and additions to the generic technical guidelines that are of safety significance during the verification and validation programs.The PGP should discuss how the deviations and additions will be verified and validated.
Theseprocedures provideforproofreading anddistribution ofEOPs/APstoaddressthisconcern.Concern14Particular attention shouldbepaid.todeviations fromandadditions tothegenerictechnical guidelines thatareofsafetysignificance duringtheverification andvalidation programs.
~Res onse Procedure A-601.6 provides the following directions:
ThePGPshoulddiscusshowthedeviations andadditions willbeverifiedandvalidated.
 
~ResonseProcedure A-601.6providesthefollowing directions:
====3.3.2 Verification====
3.3.2Verification Performance:
Performance:
~~~~~3.3.2.1Theverification processshallbeperformed bypre-identifying theknowledgeable individuals neededtoperformthereviewsonATTACHMENT 2.3.3.2.2Individuals performing thetechnical accuracyreviewshouldincludeoperations, STA,trainingstaff,operations supervision, technical staff,nuclearengineering, etc.,asdeemed'ecessary bytheTechnical Assistant totheOperations managerordesignee.
~~~~~3.3.2.1 The verification process shall be performed by pre-identifying the knowledgeable individuals needed to perform the reviews on ATTACHMENT 2.3.3.2.2 Individuals performing the technical accuracy review should include operations, STA, training staff, operations supervision, technical staff, nuclear engineering, etc., as deemed'ecessary by the Technical Assistant to the Operations manager or designee.3.3.2.3 The Technical Assistant to, the Operations Manager or designee shall perfo'rm the written accuracy review.3.3.2.4 Deviation or changes to existing setpoints (footnotes) or new setpoints shall require review by technical staff and independent review by nuclear engineering.
3.3.2.3TheTechnical Assistant to,theOperations Managerordesigneeshallperfo'rmthewrittenaccuracyreview.3.3.2.4Deviation orchangestoexistingsetpoints (footnotes) ornewsetpoints shallrequirereviewbytechnical staffandindependent reviewbynuclearengineering.
Included with the review shall be a documented basis, to include calculations or analysis, as applicable.
Includedwiththereviewshallbeadocumented basis,toincludecalculations oranalysis, asapplicable.
3.3.2.5 Deviations from the WOG ERG guidance shall require review by knowledgeable licensed operations staff.Included shall be a documented basis which assesses the safety significance of the deviation.
3.3.2.5Deviations fromtheWOGERGguidanceshallrequirereviewbyknowledgeable licensedoperations staff.Includedshallbeadocumented basiswhichassessesthesafetysignificance ofthedeviation.
13 S l
13 Sl 3.3.3Verification Documentation:
 
3.3.3.1Verification shallbecompleted bydocumentation onATTACHMENT 2.3.3.3.2TheTechnical Assistant totheOperation Manager(TAOM)~~~ordesigneeshallpre-identify theindividuals neededtoperformthetechnical reviewbynameandasterisks onATTACHMENT 2.3.3.3.3TheTechnical Assistant totheOperations Managerordesigneeshalldocumentanydeviations fromtheWOG'ERGsorsetpointchangesonATTACHMENT 2,addinganyadditional pagesasnecessary.
====3.3.3 Verification====
Includedwithanydeviations shallbethejustification and.the,.safety,significance ofthedifference fromtheWOGERGs.NOTE:Allcommentsmustberesolvedbeforethevalidation processisstarted.IntheeventacommentcannotberesolvedtheEPCshallreviewtheproposedchangeandresolvethecomment.3.3.3.43.53.5.1Following completion oftheverification process,theTechnical Assistant totheOperations Managerordesigneeshallresolveanycommentsandfollowupwithanyfurtherreviews,asnecessary, andindicateresolution/completion bysignature onATTACHMENT 2.FinalReviewandAroyal:Following validation andverification, theTAOMshallinitiateaPCNfortheprocedure changeornewprocedure andinitiatetherequired.
Documentation:
10CFR50.59 reviewcriteriaasrequiredbyReference 2.2and2.3.Concern15Section5.2.A(page67)statesthatallEOPswillbeverified, butSection5.3.B(page93)statesthat"yellowpath"functional restoration procedures maynotbevalidated.
3.3.3.1 Verification shall be completed by documentation on ATTACHMENT 2.3.3.3.2 The Technical Assistant to the Operation Manager (TAOM)~~~or designee shall pre-identify the individuals needed to perform the technical review by name and asterisks on ATTACHMENT 2.3.3.3.3 The Technical Assistant to the Operations Manager or designee shall document any deviations from the WOG'ERGs or setpoint changes on ATTACHMENT 2, adding any additional pages as necessary.
Toassurecompletevalidation ofalltheEOPstheprogramdescription shouldincludeanindication thatthefullcomlementofEOPswillbevalidated.
Included with any deviations shall be the justification and.the,.safety ,significance of the difference from the WOG ERGs.NOTE: All comments must be resolved before the validation process is started.In the event a comment cannot be resolved the EPC shall review the proposed change and resolve the comment.3.3.3.4 3.5 3.5.1 Following completion of the verification process, the Technical Assistant to the Operations Manager or designee shall resolve any comments and follow up with any further reviews, as necessary, and indicate resolution/completion by signature on ATTACHMENT 2.Final Review and A royal: Following validation and verification, the TAOM shall initiate a PCN for the procedure change or new procedure and initiate the required.10CFR50.59 review criteria as required by Reference 2.2 and 2.3.Concern 15 Section 5.2.A (page 67)states that all EOPs will be verified, but Section 5.3.B (page 93)states that"yellow path" functional restoration procedures may not be validated.
~ResenseWhiletheinitialsetofyellowpathFRprocedures havenotbeenformallyvalidated, theyhavebeenusedsuccessfully duringsimulator training.
To assure complete validation of all the EOPs the program description should include an indication that the full com lement of EOPs will be validated.
RG&Ehasahighconfidence levelintheseprocedures.
~Res ense While the initial set of yellow path FR procedures have not been formally validated, they have been used successfully during simulator training.RG&E has a high confidence level in these procedures.
Futurerevisions totheseprocedures willreceivevalidation.
Future revisions to these procedures will receive validation.
14  
14  
~~
~~
Concern16Thevalidation programdescription shouldstatethatalloftheEOPswillbevalidated onthedynamicsimulator, onceitiscompleted, usingtheprocedures andscenarios described inthecurrentvalidation programdescription.
Concern 16 The validation program description should state that all of the EOPs will be validated on the dynamic simulator, once it is completed, using the procedures and scenarios described in the current validation program description.
ForthepartsoftheEOPsthatcannotbevalidated onthesimulator, theexistingmethodofprocedure validation maybereliedupon.Revisions totheEOPsneedtobeverified, andvalidated.
For the parts of the EOPs that cannot be validated on the simulator, the existing method of procedure validation may be relied upon.Revisions to the EOPs need to be verified, and validated.
Theverification andvalidation programdescriptions shoulddiscussthecriteriaormethodsthatwillbeusedfordetermining theneedto'reverify andrevalidate anychangesintheEOPs,.andhowtheverification andvalidation processistobecarriedout.~ResenseProcedure A-601.6containsthefollowing instructions:
The verification and validation program descriptions should discuss the criteria or methods that will be used for determining the need to'reverify and revalidate any changes in the EOPs,.and how the verification and validation process is to be carried out.~Res ense Procedure A-601.6 contains the following instructions:
3.4VALIDATION PROCESS:3.4.1Validation istheprocessbywhichtheuseability oftheprocedure isconfirmed.
 
3.4.1.1Validation providesameansbywhichminimumoperating shiftpersonnel testtheprocedure andproposedchangesinaplantspecificcontrolroomenvironment underscenariodriven,simulated emergency conditions.
===3.4 VALIDATION===
3.4.1.2Validation maybeconducted byoneoftwomethods;the~~~simulator methodorthewalkthrough(tabletop)method.3.4.1.3hSimulator validations willbeutilizedtothemaximumextentpossibleonallprocedures whichaffectactionconducted intheControlRoom.3.4.1.4Walkthroughvalidations willbeutilizedforoperatoractionswhichareconducted outsidethecontrolroomorwherethesimulator lacksthecapability toproperlyvalidatetheprocedure orchange.3.4.2ScenarioDeveloment:NOTE:Validation shallbeperformed onallmajorchangesornewprocedures.
PROCESS: 3.4.1 Validation is the process by which the useability of the procedure is confirmed.
3.4.2.13.4.2.2TheTAOMordesigneeshalldevelopadetailedeventscenariousingthefinaldraftprocedure aftertheverification process.iscompleted.
3.4.1.1 Validation provides a means by which minimum operating shift personnel test the procedure and proposed changes in a plant specific control room environment under scenario driven, simulated emergency conditions.
ATTACHMENT 3providesalistingofscenarios.
3.4.1.2 Validation may be conducted by one of two methods;the~~~simulator method or the walk through (t abletop)method.3.4.1.3 h Simulator validations will be utilized to the maximum extent possible on all procedures which affect action conducted in the Control Room.3.4.1.4 Walk through validations will be utilized for operator actions which are conducted outside the control room or where the simulator lacks the capability to properly validate the procedure or change.3.4.2 Scenario Develo ment: NOTE: Validation shall be performed on all major changes or new procedures.
Fornewprocedures thescenariomustcontainsufficient guidancetoplacetheplantinacoldshutdownorsafecondition toensurethatallnecessary transitions areaccomplished.
3.4.2.1 3.4.2.2 The TAOM or designee shall develop a detailed event scenario using the final draft procedure after the verification process.is completed.
ATTACHMENT 3 provides a listing of scenarios.
For new procedures the scenario must contain sufficient guidance to place the plant in a cold shutdown or safe condition to ensure that all necessary transitions are accomplished.
15  
15  
'
'
Forchangestoexistingprocedures, thescenarioshallbedeveloped insuchamannerthatthestep(s)changedarefullytestedincluding ResponseNotObtained(RNO)actions.TheTAOMordesigneeshalldetailthescenarioandthevalidation methodtobeusedontheValidation Scenariosheet,ATTACHMENT 3A.Forchangesmadeasaresultofsimulator trainingfeedbackwhenusingtheprocedures, theTAOMordesigneeshallconsulttheappropriate simulator instructor forscenariodetails.Validation Performance:
For changes to existing procedures, the scenario shall be developed in such a manner that the step(s)changed are fully tested including Response Not Obtained (RNO)actions.The TAOM or designee shall detail the scenario and the validation method to be used on the Validation Scenario sheet, ATTACHMENT 3A.For changes made as a result of simulator training feedback when using the procedures, the TAOM or designee shall consult the appropriate simulator instructor for scenario details.Validation Performance:
NOTE:Forchangestoprocedures asaresultofsimulator trainingfeedback, theTAOMordesigneeshallensurethat,thevalidation performance hasbeenconducted and.documented inaccordance withsteps3.4.3.1through3.4.3.8.Forbothsimulator orwalkthroughmethods,thevalidation scenarioshallbeperformed bytheminimumcontrolroomcomplement of3licensedoperators, withatleastonebeinganSRO,andanSTA.TheValidation Coordinator shallbeeitheraSROorasimulator instructor withSROequivalent plantcertification.
NOTE: For changes to procedures as a result of simulator training feedback, the TAOM or designee shall ensure that ,the validation performance has been conducted and.documented in accordance with steps 3.4.3.1 through 3.4.3.8.For both simulator or walk through methods, the validation scenario shall be performed by the minimum control room complement of 3 licensed operators, with at least one being an SRO, and an STA.The Validation Coordinator shall be either a SRO or a simulator instructor with SRO equivalent plant certification.
TheValidation Coordinator isnormallytheTAOMordesignee.
The Validation Coordinator is normally the TAOM or designee.Using the Validation Scenario Sheet, the Validation Coordinator shall brief the validation team in all the necessary initial conditions, systems and/or, entry conditions to begin the validation.
UsingtheValidation ScenarioSheet,theValidation Coordinator shallbriefthevalidation teaminallthenecessary initialconditions, systemsand/or,entryconditions tobeginthevalidation.
At no time shall the details of the scenario be made known to the validation team.The Validation Coordinator shall direct the entire scenario performance, including any information necessary for operator decision making.Included.shall be determination when the scenario has progressed sufficiently to effect termination.
Atnotimeshallthedetailsofthescenariobemadeknowntothevalidation team.TheValidation Coordinator shalldirecttheentirescenarioperformance, including anyinformation necessary foroperatordecisionmaking.Included.
The validation team will respond to the data available to them (simulator or walk through)and perform the actions of the procedure.
shallbedetermination whenthescenariohasprogressed sufficiently toeffecttermination.
The Validation Coordinator and simulator instructor shall observe the actions of the crew and assess their performance.
Thevalidation teamwillrespondtothedataavailable tothem(simulator orwalkthrough)andperformtheactionsoftheprocedure.
The Validation Coordinator may terminate the scenario when the scenario objective has been accomplished.
TheValidation Coordinator andsimulator instructor shallobservetheactionsofthecrewandassesstheirperformance.
16 I 4 3.4.3.7 3.4.3.8~~3.4'.=3.9 Immediately following conclusion.of the scenario, the Validation Coordinator shall debrief the validation team using-the applicable guidance contained in ATTACHMENT 3B, validation criteria',.
TheValidation Coordinator mayterminate thescenariowhenthescenarioobjective hasbeenaccomplished.
The Validation Coordinator shall complete a Validation Performance Sheet, ATTACHMENT
16 I4 3.4.3.73.4.3.8~~3.4'.=3.9Immediately following conclusion
.3C', and record any comments for further evaluation/resolution.
.ofthescenario, theValidation Coordinator shalldebriefthevalidation teamusing-theapplicable guidancecontained inATTACHMENT 3B,validation criteria',.
The TAOM''or designee shall be responsible for resolution of comments prior to submittal of the change for final processing.
TheValidation Coordinator shallcompleteaValidation Performance Sheet,ATTACHMENT
Major changes as a result of comments shall require verification and revalidation.
.3C',andrecordanycommentsforfurtherevaluation/resolution.
e The walk through (tabletop) validation method shall be conducted in a manner similar to'.;the simulator (steps...3.4.3.1 through..3.4.3."8)
TheTAOM''ordesigneeshallberesponsible forresolution ofcommentspriortosubmittal ofthechangeforfinalprocessing.
'except that no actual control manipulation will take place.,However, the process used, time required arid any necessary tools shall be factored into the.task(s).required, for validity.Documentation shall be'ompleted per ATTACHMENT 3C.Details pertaining to Verification were discussed.
Majorchangesasaresultofcommentsshallrequireverification andrevalidation.
in Concern 14.to its f commitme R~es ense Upon completing the development of the EOPs in 1985, all licensed individuals were given classroom training on the EOPs.When the installation of the new plant specific simulator was completed, the simulator was utilized to train all licensed.personnel on all EOPs,."'inally,-ongoing EOP train'ing j.s provided in the Regual'ification Program.As a part~of~the-Licensed.Operat;or" Initial Training Program, each license candidate receives training on every EOP.This consists of'lassroom tiaining reinforced by simulator exercises.
eThewalkthrough(tabletop) validation methodshallbeconducted inamannersimilarto'.;thesimulator (steps...3.4.3.1 through..3.4.3."8)
r Concern 17-Ya It is crucial that all operators be trained on all aspects of e'ach EOP.so that.all-operators-are prepared to execute each EOP ullest extent.The training program should include.a-nt to train, all operators on all EOPsss Concern 18 The EOP training program description should include a commitment to formal,EOP training (,or retraining) on the simulator when the simulator'is finished, and plans for this training.This description should indicate the ,'use of:,,'wide variety of scenarios; including multiple failures, to fully exercise the EOPs on the simulator and thus expose the operators to a wide variety of EOP uses.  
'exceptthatnoactualcontrolmanipulation willtakeplace.,However, theprocessused,timerequiredaridanynecessary toolsshallbefactoredintothe.task(s).required, forvalidity.
~i R~es onse Formal EOP simulator training was conducted for all licensed individuals when the simulator was ready for training.1n addition, the operators receive EOP training on the simulator each year as part of the Licensed Operator Requalification Program.This training includes scenarios which exercise all EOPs.The lessons are written to allow the instructor the flexibility to exercise many different paths through the procedures.
Documentation shallbe'ompleted perATTACHMENT 3C.Detailspertaining toVerification werediscussed.
This training also includes scenarios with multiple failures.Concern 19 The EOP training program should include the method to be used to train operators in areas where the simulator does not react like the plant and in parts of the EOPs that cannot be run on the simulator.
inConcern14.toitsfcommitmeR~esenseUponcompleting thedevelopment oftheEOPsin1985,alllicensedindividuals weregivenclassroom trainingontheEOPs.Whentheinstallation ofthenewplantspecificsimulator wascompleted, thesimulator wasutilizedtotrainalllicensed.
~Res ense All EOPs can be fully exercised on the simulator.
personnel onallEOPs,."'inally,-ongoingEOPtrain'ing j.sprovidedintheRegual'ification Program.Asapart~of~the-Licensed.Operat;or" InitialTrainingProgram,eachlicensecandidate receivestrainingoneveryEOP.Thisconsistsof'lassroom tiainingreinforced bysimulator exercises.
There are no discrepancies between the simulator and the plant which prevent the use of the EOPs.Concern 20 The EOP training program description should indicate how the operators are to be: evaluated during classroom instruction, tabletop discussions, replicate control room walkthroughs, and future simulator exercises.
rConcern17-YaItiscrucialthatalloperators betrainedonallaspectsofe'achEOP.sothat.all-operators-arepreparedtoexecuteeachEOPullestextent.Thetrainingprogramshouldinclude.a-nttotrain,alloperators onallEOPsssConcern18TheEOPtrainingprogramdescription shouldincludeacommitment toformal,EOP training(,orretraining) onthesimulator whenthesimulator
~Res onse The operators are evaluated in.training in accordance with training department procedures.
'isfinished, andplansforthistraining.
A written exam is used for classroom training, a formal oral exam is used for control room walkthroughs, and an operational exam is used.for simulator training.These exams are modeled after NRC licensing ezams.Tabletop discussions are not used as a primary training tool.18 b
Thisdescription shouldindicatethe,'useof:,,'widevarietyofscenarios; including multiplefailures, tofullyexercisetheEOPsonthesimulator andthusexposetheoperators toawidevarietyofEOPuses.  
Figure 2 STATUS TREE PRIORITY INDENTIF ICATION Color Line Code Symbol Code Status/Response Red The critical safety function is under extreme challen e;immediate operator action is required.Orange r e a r Yellow~~~~~The critical safety function is under severe chaiien e;prompt operator action is required.The critical safety function conditon is off-normal.Operator action may be taken.Green The critical safety function is satisfied.
~i R~esonseFormalEOPsimulator trainingwasconducted foralllicensedindividuals whenthesimulator wasreadyfortraining.
No operator action is needed.  
1naddition, theoperators receiveEOPtrainingonthesimulator eachyearaspartoftheLicensedOperatorRequalification Program.Thistrainingincludesscenarios whichexerciseallEOPs.Thelessonsarewrittentoallowtheinstructor theflexibility toexercisemanydifferent pathsthroughtheprocedures.
,4<g I A-503.1:19 FIGURE 3 CONTROL ROOM EOP/AP BINDER ARRANGEMENT (TRI-FOLD BINDER)ATTACHMENTS II II II EOP FOLD OVER PAGES II I II FOLD OUT PAGES I II
Thistrainingalsoincludesscenarios withmultiplefailures.
 
Concern19TheEOPtrainingprogramshouldincludethemethodtobeusedtotrainoperators inareaswherethesimulator doesnotreactliketheplantandinpartsoftheEOPsthatcannotberunonthesimulator.
==SUMMARY==
~ResenseAllEOPscanbefullyexercised onthesimulator.
ATTACHMENT II-EOP II II II-coversheet II-purpose/entry conditions/symptoms//
Therearenodiscrepancies betweenthesimulator andtheplantwhichpreventtheuseoftheEOPs.Concern20TheEOPtrainingprogramdescription shouldindicatehowtheoperators aretobe:evaluated duringclassroom instruction, tabletopdiscussions, replicate controlroomwalkthroughs, andfuturesimulator exercises.
~ResonseTheoperators areevaluated in.traininginaccordance withtrainingdepartment procedures.
Awrittenexamisusedforclassroom
: training, aformaloralexamisusedforcontrolroomwalkthroughs, andanoperational examisused.forsimulator training.
TheseexamsaremodeledafterNRClicensing ezams.Tabletopdiscussions arenotusedasaprimarytrainingtool.18 b
Figure2STATUSTREEPRIORITYINDENTIFICATIONColorLineCodeSymbolCodeStatus/Response RedThecriticalsafetyfunctionisunderextremechallene;immediate operatoractionisrequired.
OrangerearYellow~~~~~Thecriticalsafetyfunctionisunderseverechaiiene;promptoperatoractionisrequired.
Thecriticalsafetyfunctionconditonisoff-normal.Operatoractionmaybetaken.GreenThecriticalsafetyfunctionissatisfied.
Nooperatoractionisneeded.  
,4<gI A-503.1:19 FIGURE3CONTROLROOMEOP/APBINDERARRANGEMENT (TRI-FOLD BINDER)ATTACHMENTS IIIIIIEOPFOLDOVERPAGESIIIIIFOLDOUTPAGESIIISUMMARYATTACHMENT II-EOPIIIIII-coversheet II-purpose/entry conditions/symptoms//
-immediate/
-immediate/
IIsubsequent actionIIIIIIIIB1-FOLDBINDERAPFOLDOVERPAGESAttachment IIIIoAPoIlII-coversheet II-purpose/entry conditions/symptom
II subsequent action II II II II B1-FOLD BINDER AP FOLD OVER PAGES Attachment II II o AP o Il II-coversheet II-purpose/entry conditions/symptom
-immediate/
-immediate/
subsequent actionsIIIII
subsequent actions II II I


Number:Title:RevisionNunber:PIGURE1 0lW Number:Title:RevisionNader:A.PURPOSE-Thisprocedure provides.~~~~~~~~~~t~~~t~~~~~~~~~B.ENTRYCONDITIONS/SYMPTOMS l.ENTRYCONDITIONS
Number: Title: Revision Nunber: PIGURE 1 0 lW Number: Title: Revision Nader: A.PURPOSE-This procedure provides.~~~~~~~~~~t~~~t~~~~~~~~~B.ENTRY CONDITIONS/SYMPTOMS l.ENTRY CONDITIONS
-Thisprocedure isenteredfrom>a~b.d.2.SYMPTOMS-Thesymptomsof...'Procedure Title)...are;a~b.coFIGURE2
-This procedure is entered from>a~b.d.2.SYMPTOMS-The symptoms of...'Procedure Title)...are;a~b.co FIGURE 2


Number:Title:RevisionNurber:STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINEDImperitive Action-RESULTAlternate Commanda.Sequential Substep-RESULTa.Alternate CommandoNonsequential substep-RESULToAlternate CommandNOTE:oThefollowing aretypicalexamplesofoperatoractionsteps;1VerifyReactorTrip:Tripreactormanually.
Number: Title: Revision Nurber: STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED Imperitive Action-RESULT Alternate Command a.Sequential Substep-RESULT a.Alternate Command o Nonsequential substep-RESULT o Alternate Command NOTE: o The following are typical examples of operator action steps;1 Verify Reactor Trip: Trip reactor manually.o Reactor Trip Breakers-OPEN o Neutron flux-DECREASING Check if all RCPs should be Stopped: a.SI pumps-AT LEAST ONE RUNNING a.GO TO Step 2*********************k**********************************************************
oReactorTripBreakers-OPENoNeutronflux-DECREASING CheckifallRCPsshouldbeStopped:a.SIpumps-ATLEASTONERUNNINGa.GOTOStep2*********************k**********************************************************
CAUTION ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY IF CST LEVEL DECREASES TO LESS THAN 19.5 FEET.**************k*****************************************************************
CAUTIONALTERNATE WATERSOURCESFORAFWPUMPSWILLBENECESSARY IFCSTLEVELDECREASES TOLESSTHAN19.5FEET.**************k*****************************************************************
Check Intact S/G Levels: a.Narrow range level-GREATER THAN (LATER)a.Maintain total feed flow low greater than (Later)FIGURE 3 I 1
CheckIntactS/GLevels:a.Narrowrangelevel-GREATERTHAN(LATER)a.Maintaintotalfeedflowlowgreaterthan(Later)FIGURE3 I1


Nwher:Titie:RevisionNumber:FOLDOUTPAGE1.Includeanyinformation neededbytheoperatorthroughout theprocedure.
Nwher: Ti tie: Revision Number: FOLDOUT PAGE 1.Include any information needed by the operator throughout the procedure.
~~~~~~~~~~~~~2~~~~~~~~~~~~~~~~~~~~~3~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~4FIGURE5 O}}
~~~~~~~~~~~~~2~~~~~~~~~~~~~~~~~~~~~3~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~4 FIGURE 5 O}}

Revision as of 11:12, 6 July 2018

Forwards Response to 880627 Ltr Requesting Addl Info Re Plant Procedures Generation Package & Background Info Explaining Present Sys of Controlling Emergency Operating Procedures
ML17309A409
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/31/1988
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: STAHLE C
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17251A351 List:
References
NUDOCS 8811180128
Download: ML17309A409 (52)


Text

AC CELE RATED Dl UTI ON DE M ON STRA.N SYSTEM I3.REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)RECIPIENT ID CODE/NAME PD1-3 LA STAHLE,C COPIES LTTR ENCL 1 1 1 1 ACCESSION NBR:8811180128 DOC.DATE: 88/10/31 NOTARIZED:

NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244"'UTH.NAME-AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas&Electric Corp.5W RECIP.NAME RECIPIENT AFFILIATION STAHLE,C.Document Control Branch (Document Control Desk)

SUBJECT:

Forwards response to addi info re util procedures generation package.I DISTRIBUTION CODE: A003D COPIES RECEIVED:LTR (ENCL (SIZE: 5+7~9 TITLE: OR/Licensing Submittal:

Suppl 1 to NUREG-0737(Generic Ltr 82-33)8 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244/RECIPIENT COPIES ID CODE/NAME LTTR ENCL PD1-3 PD 7 7 INTERNAL: ARM/DAF/LFMB NUDOCS-ABSTRACT RES/DSIR/EIB EXTERNAL: LPDR NSIC 1 0 1 1 1 1 1 1 1 1 NRR/DLPQ~~0~XKE NRC PDR 1 1 1 1 1 1 D ,S R I h MIX'ZO ALL"RIDS" RECIPIERIS'IEASE HELP US TO REDUCE HASTE.'XRKACZ

'LHE DOCUMEÃZ COFZEKL DESK, ROOM Pl-37 (EXT.20079)KO ELOCUTE YOUR NAME FRY DISTRIKlTIGN LISTS FOR DOCUMEXZS YOU DONiT NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 16 I.

t'ZZZZZZI gruzSZiz gL4$0 f41~~Iiiiti"'iii fiierrZZS 8K.:::: ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649-0001 October 31, 1988 TCLEPHONC Ance coos vie 546-2700 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Mr.Carl Stahle PWR Project Directorate No.1 Washington, D.C.20555

Subject:

Ginna Plant Procedures Generation Package (PGP)Request for Additional Information R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Stahle:

Your letter to R.Kober, dated June 27, 1988 requested.

additional information regarding the Ginna Plant Procedures Generation Package (PGP).In response, please find attached the information you requested as well as background information explaining our present system of controlling EOPs.If you have any questions regarding the information provided or require additional information, please call Charles J.Mambretti (716)724-8071.Ro ert C.cred General Manager Nuclear Production Attachment ZC: U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA" 19406 Ginna Senior Resident Inspector goo~88iliSOiZS SSi03i PDR ADOCK 05000244" PDC RESPONSE TO CONCERNS REGARDING THE GINNA PROCEDURES GENERATION PACKAGE (PGP)The Ginna PGP was formulated based upon interpretation of NRC requirements and the guidance of NUREG-0899.

The PGP provided the guidelines required to generate the original EOPs which were implemented in December of 1985.In addition, the package described the development of the EOPs and the manner in which they were implemented.

It is important to recognize that thereafter, implementation and changes to the EOPs were controlled in accordance with the guidance contained in the following Ginna Administrative procedures.

A-502.1 A-503.1 A-601.6 Emergency and Abnormal Procedure Writers Guide Emergency and Abnormal Procedures Users Guide Procedure Changes Control-Emergency and Abnormal Procedures These documents have evolved into the"living" governing documents (revised as necessary) for EOP maintenance and.the original PGP is not used to control Emergency and Abnormal Procedures.

The controlling documents for the training program have become procedures:

A-103.6 Operator Training Responsibilities TRC-5.1 Initial License Operator Training TRC-5.2 Operator Requalification Training As a result of an internal EOP assessment completed in February 1988, and NRC concerns resulting from the Ginna PGP review transmitted to RG&E on June 27, 1988, RG&E has initiated an EOP upgrade program scheduled for completion in April 1989.This program includes revision to the EOP governing procedures.

Draft copies of these revisions are attached for information.

Responses to each of the NRC concerns are provided below including, where appropriate, references to sections of the draft procedures.

8811180128 I r" CONCERNS AND RESPONSES Concern 1 The PGF states that deviations from and additions to the generic technical guidelines (WOG"ERGs)will be documented, and will include technical justification supporting these additions and/or deviations.

The PGP should also state that the safety significance of these differences will be identified and documented in the PGP.~Res onse Procedure A-606.1 Section 3.3 and..Appendix 2B, items 22 and 22A (attached) address the need.to assess the safety significance of deviations from the technical guidelines (WOG ERG)and documentation thereof.Concern 2 Sections 4.5.3 or 5.2 should be revised to indicate a specific method for highlighting notes (e.g., outlining/boxing) to differentiate them from cautions while drawing attention to their content.~Res onse Procedure A-502.1 provides the following instructions:

4.5.2 CAUTION STATEMENTS

-text should be in a block format, as shown in Figure 3, in addition to the following formatting requirements:

4.5.2.1 Caution'tatements should.'e enclosed at the top and bottom by a continuous line of asterisks which should begin three lines below the preceding text.This differentiates the CAUTION and NOTE.4.5.2.2 The statement header CAUTION should be centered and placed two lines below he preceding line of asterisks.

4.5.2.3 Caution statement text.should begin two lines below the caution header and extend from margin to margin.4.5.2.4 Caution statements should be emphasized as described in section 5.2, Emphasis Techniques, by using all upper case capitalization.

4.5.2.5 Caution statements which apply to the whole procedure shall be stated prior to any operator action step and be shown on the foldout page if applicable.

~, L-h 4.5.2.6 Caution statements which apply to a particular step shall be stated prior to that step.4.5.2.74.5.3 Caution statements should be written to preclude confusion as to which step or evolution they refer.NOTE STATEMENTS

-t:ext should be in a block format as shown in Figure 3, in addition to the following formatting requirements:

4.5.3.1 4.5.3.2 The statement header NOTE should be on the same line as the text but separated from the text by a colon.Note statement text should begin two lines below the preceding text and extend from margin to margin.4.5.3.3 Note statements should be preceded with a bullet (o)to also differentiate them from a CAUTION.4.5.3.4 Note statements which apply to a particular step shall be stated prior to that step.Concern 3 Sections will not the PGP.4.5.2 and 4.5.3 should state that cautions and notes contain action steps, as is stated in Figure 4.2-2 of R~es onse Procedure A-502.1 contains the following instructions:

2.3.2 CAUTION STATEMENTS

-statements denote potential hazards to personnel or equipment.

Cautions which apply to a particular action step should appear directly before that step.Cautions which apply throughout a procedure, or a portion of it, should appear at the start of the procedure or at the point where they become applicable.

A caution statement will not contain a direct action.A passive action statement.

may be appropriate.

An example would be the continuous monitoring of a parameter with an associated action if a prescribed, value is reached.2.3.3 NOTE STATEMENTS

-statements contain advisory or administrative information for subsequent action steps or for caution stat:ements.

The directions in step 2.3.2 for placement and action content should be applied to notes.Where cautions and notes are included together all caution statements should be listed before any note statement.

5'Q 1 l Concern 4 Section 5.12 addresses logic terms and conditional statements.

The writer's guide should be expanded to included examples of acceptable and.unacceptable combinations.

See NUREG-0899, Appendix B, for additional guidance.R~es onse Procedure A-502.1 This procedure has been expanded to include Appendix A (attached) which provides additional guidance on logic terms and conditional statements as well as examples illustrating this guidance.Concern 5 Section 5e3 provides guidelines for referencing sections, subsections, and steps within a procedure and for referencing another procedure.

However, it should also provide guidelines or criteria for writers,to decide when the steps of a referenced procedure are to be included.in the EOP, rather than referenced.

~Res onse Procedure A-502.1 provides the following instructions=

5.12.4~~REFERENCING

-referencing is used to denote a procedure which may provide useful or necessary information to the operator during the execution of an EOP/AP.In general, those procedures referenced cover low probability occurrences or normal plant operations whose inclusion within an EOP/AP would cause excessive complication and reduce effectiveness of the procedure in effect.Referencing is denoted by the term REFER followed by the procedure designator and title as shown by;REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS.Concern 6 The format and.content of Critical Safety Function Status Trees (CSFSTs)should be specified in the writer's guide.~Res onse Procedure A-502.1 6.0 FORMAT OF CRITICAL SAFETY FUNCTION STATUS TREES I r\P I h t 6.1 Critical Safety Function Status Trees (CSFSTs)are block format devices used in the evaluation of predefined safety concerns designated as Critical Safety Functions.(FIGURE 6-CSFST).6.1.1~~6.1.2 The blocks are aligned so that the user will enter each tree on the left-hand side of its page and.move towards the right-hand side.)Each block contains a question concerning current plant conditions.

The question in each block may be dependent on previous blocks.6.1s3 Each question is written to obtain a YES or NO response.The response dictates which branch of the status tree will be taken.6.1.4 Questions should be written so that a YES response branch will move the user down the page.Each possible complete path through the tree ends in its own end point, or terminus.The last path segment and the associated terminus circle use a color-code and/or pattern-code as shown in FIGURE 7.6.1.6 Terminals should be ordered so that the highest priority condition terminus is at the top of the page and the priority levels descend down the page.The priority order for color-coding, in descending order, is RED"ORANGE-YELLOW-GREEN.

6.1.7 All terminals color-coded other than GREEN will provide an applicable Functional Restoration procedure designator.

Concern 7 The writer's guide addresses simple action steps.However, it should also include verification steps, continuous or periodic steps, alternative and equally acceptable steps, and steps which refer the operator to another subsection of the procedure.

The content and, format of each type of action step needs to be described in the writer's guide.See NUREG-0899, Subsections 5.7.2-5.7.8, for additional guidance.~Res onse Procedure A-502.1 provides the following instructions:

5.12 BRANCHING-branching encompasses transitioning, either to another step in the same procedure or to another EOP/AP;and referencing another procedure for supplemental information or direction.

Transitioning in a series operation while referencing is a parallel operation.

f I QA 0 K 5.12.1 5.12.2 5.12.3 5.12.3.1 TRANSITION TO A LATER STEP WITHIN CURRENT EOP/AP-shall be performed by using the words GO TO as shown by;GO TO Step 20.TRANSITION TO A PREVIOUS STEP WITHIN CURRENT EOP/AP-shall be performed by using the words RETURN TO as shown by;RETURN TO Step 20.TRANSITION TO ANOTHER EOP (or AP)-should be performed by using the words GO TO, followed by the procedure designator, number, title, and the specific procedure step as shown by;GO TO ES-0.1, REACTOR TRIP RESPONSE, Step 20.If a specific step is not shown it is to be assumed.that transition is to the beginning of the designated procedure.

5.12.3.2 Transition from an EOP.to an AP should not be used.5.12.3.3 5.12.4 5.12.4.1 5.12.4.2 5.12.5 Procedures entered for supplemental guidance or from CSFST direction may use a RETURN TO statement.

This statement should contain the appropriate procedure designator, title and step number where applicable.

A procedure with multiple entry conditions may use an open return statement as shown by;RETURN TO PROCEDURE AND STEP IN EFFECT.This denotes a transition to the last previous EOP in use.REFERENCING

-referencing is used to denote a procedure which may provide useful or necessary information to the operator during the execution of an EOP/AP.In general, those procedures referenced cover low probability occurrences or normal plant operations whose inclusion within an EOP/AP would cause excessive complication and reduced effectiveness of the procedure in effect.Referencing is denoted by the term REFER followed by the procedu're designator and title as shown by;REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS.Referencing a procedure does not constitute leaving the procedure in effect as it is providing only additional information.

Referencing should be minimized for procedure continuity.

The referencing terms GO TO, RETURN TO and REFER TO and the procedure designator and title shall be all capitalized.

and the word Step shall be initially capitalized for emphasis.

va t~P Concern 8 Sections 4.1.9 and 5.6.5 should.be revised to indicate that page rotation and breaking of words are unacceptable at all times.R~es onse Procedure A-502.1 contains the following instructions:

4.1.8 4.1.8.1 TEXT'CONTINUITY

-the text of operator action steps;with applicable substeps, cautions, notes;should be wholly contained on the same page.Where physical constraints preclude this the following guidelines apply.-Cautions'nd/or notes may be placed alone on the immediately preceding page.4.1.8.2 4.1.8.2.1 If a step must be continued on to another page, then: The initial page shall be annotated at the bottom of the action step field portion of the page to indicate that the step continues.(i.e., THIS STEP CONTINUED ON FOLLOWING PAGE.)4.1.8.2.2 The following page shall have the initial action step heading repeated and.be annotated to indicate that the step is being continued from a previous page.ex.,Establish letdown-THIS STEP CONTINUED FROM PREVIOUS PAGE 4.1.9 PAGE ROTATION-should be minimized but when it is necessary to rotate a page for the sake of clarity and readability (i.e., proper graph construction), the following rules are applicable; 4.1.9.1 The left hand edge of the normal page shall become the top of the rotated page.4.1.9.2 Page margins, identification and.numbering shall n'ot rotate.Concern 9 Because the licensee has chosen check spaces as a method of placekeeping the writer's guide should state that all action steps should have check-off spaces.

l

~Res onse The original intent was to use checkoff spaces, however, during the development and validation of the EOPs, the value of checkoffs became questionable for placekeeping purposes.As a result, the requirement was removed from Procedure A-502.1.Alternatives for.placekeeping are contained in Procedure A-503.1 as follows: 3.7.3 Placekeeping is the responsibility of the EOP User;normally the Control Room Foreman.In order to ensure proper placekeeping, the EOP User may checkoff or annotate steps by using pen/pencil markings to the immediate right of the Action Step or Response Not Obtained (RNO)performed.

Also available to him,.are stick-on pads or note pads which may be affixed to pages where transition or looping are necessary.

Concern 10 Section 5.6e9 states that brackets are to be used.only in calculations.

The writer's guide should describe how values for adverse containment conditions will be specified in the EOPs.R~es onse Procedure A-502.1 contains the following guidance:.

5.6.6~~.PARENTHESES

-are used to provide the adverse containment values for instrumentation readings in applicable steps.They are used to provide valve number designations and instrument designators when these are noted in addition to a word descriptor.

Parentheses may also be use to provide amplifying or useful information such as locations, breaker cubicle designations, and information which cannot be placed in a note prior to a step as it only applies to a specific substep condition.

Concern 11 Regarding action statements, the following concerns should be specifically addressed in the writer's guide: a.Action steps should be structured so that they can be executed by the minimum shift staffing required by the Technical Specifications.

b.Action steps should be structured to be consistent with the roles and responsibilities of the operators.

c.Action steps should be structured so as to minimize the movement of personnel around the control room while carrying out procedural steps..8 e

d.Action steps should be structured.

to avoid unintentional duplication of tasks.e.Action steps should be structured to enable the control room supervisor to follow staff actions and monitor plant status.~Res ense Procedure A-502.1 contains the following guidance: 2', 2.3.1 OPERATOR ACTION STEPS-general requirements are that action steps be structured so that they can be executed.by minimum shift staffing as required by Technical Specifications, and be consistent with the responsibilities of the shift positions.

In addition, the action steps should minimize the movement of personnel in the Control Room and enable the effective supervisory overview to monitor plant status.OPERATOR ACTION STEPS are short, precise statements presenting exactly the task to be performed and the expected response or result of that task.It is not necessary to state expected results of routine tasks.Steps are assumed to be performed in sequence unless otherwise denoted.Actions directed in a step should not be expected to be complete before the next step is begun.If a particular action must be completed before continuation,:

this must be stated in that step or substep.The actionsteps are presented in a dual column f ormat and are identif ied as immediate or subsequent actions.5.5 NARRATIVE STYLE-steps may be written as complete sentences, short phrases, or some combination of the two.Notes and cautions should be written as complete sentences.

Sentences, clauses and phrases should be short and precise utilizing'normal American English word order where practical.

Operator action steps should: 5.5.1 5.5.2 Be short, imperative statements which state the exact task that the operator is expected to perform.Deal with only one idea.Complex evolutions should be broken down into a series of steps and substeps.5.5.3 5.5e4 Be clear as to the objectives of operator actions.Be written in sentence form in the right-hand.

column.

tt J1 Concern 12 The PGP should address the accessibility of EOPs and techniques to distinguish them from other plant procedures.

~Res ense Presently the EOPs are contained in volumes with red covered jackets.The EOPs are the only control room procedures differentiated in this manner and are easily distinguishable.

Upon completion of the EOP update in April 1989, the EOPs will be stored in a bookcase separate from all other procedures.

Additionally, the EOPs will have a unique binder and format, as described below.Procedure A-,503.1,provides the following instructions:

2.0 EOP/AP Section Or anization-in order to facilitate rapid location of specific sections and subsections of the EOP/AP, the control room copy is arranged per FIGURE 3 as follows: 2.1 2.2 COVER SHEET-which is used for administrative purposes and does not provide any active function in the EOP/AP to be used.The Cover Sheet of the control room copy is the first page seen in the binder.PURPOSE and ENTRY CONDITIONS/SYMPTOMS PAGE-in the control room copy is immediately following the cover sheet.2.2.1~~A Purpose Statement which specifically describes the intent of the procedure.

2.2.2 Entry conditions and/or Symptoms sections which specify the conditions, transitions and/or symptoms which dictate or direct entry into the procedure.

The symptoms used should be unique to the procedure.

2.3 OPERATOR ACTION STEP PAGES-which may be subdivided into Immediate Operator Action pages, followed by subsequent operator action pages.Operator action step pages may contain;2.3.1 CAUTION STATEMENTS

-which provide information about hazards to personnel or equipment and advice on actions or transitions which may become necessary depending on changes in plant conditions.

2.3.2 NOTE STATEMENTS

-which provide administrative or advisory information which supports operator actions.10 I P OPERATOR ACTION STEPS-presented in a two column format, direct the operator through specific step by step tasks, give the expected results from those tasks and provide contingency actions to be taken should an expected task method not be available or an expected result not be obtained.ATTACHMENT PAGES-which may be used to provide additional information to the operator.They provide information concerning a particular step or evolution addressed in the procedure.

The information presented is of importance to the action or decision where referenced, but is of a length or format which precludes incorporation into the procedure step.Similar information is contained in A-502.1 Section 3.5.11

A-503.1:19 FIGURE 3 CONTROL ROOM EOP/AP BINDER AEGUQIGEMENT (TRI-FOLD BINDER)EOP FOLD OVER PAGES ATTACHMENTS II II II II IIFOLD OUT PAGES II

SUMMARY

ATTACHMENT II EOP II II II-coversheet

-purpose/entry II conditions/symptomsll

-immediate/

((subsequent action ((II II B1-FOLD BINDER FOLD OVER PAGES Attachment II I I o II II II II II II II II AP o II II coversheet II purpose/entry II conditions/symptom immediate/

subsequent actions (I II I 12 0

Concern 13 The quality of the reproduced copies of the EOPs should be addressed in the PGP since all copies of the EOPs need to be legible and complete.~Res onse Since EOPs/APs are considered Plant procedures, these procedures and any changes to these procedures are governed by the provisions of A-601.2 (Procedure Control-Permanent Changes)and A-602 (Procedure Distribution).

These procedures provide for proofreading and distribution of EOPs/APs to address this concern.Concern 14 Particular attention should be paid.to deviations from and additions to the generic technical guidelines that are of safety significance during the verification and validation programs.The PGP should discuss how the deviations and additions will be verified and validated.

~Res onse Procedure A-601.6 provides the following directions:

3.3.2 Verification

Performance:

~~~~~3.3.2.1 The verification process shall be performed by pre-identifying the knowledgeable individuals needed to perform the reviews on ATTACHMENT 2.3.3.2.2 Individuals performing the technical accuracy review should include operations, STA, training staff, operations supervision, technical staff, nuclear engineering, etc., as deemed'ecessary by the Technical Assistant to the Operations manager or designee.3.3.2.3 The Technical Assistant to, the Operations Manager or designee shall perfo'rm the written accuracy review.3.3.2.4 Deviation or changes to existing setpoints (footnotes) or new setpoints shall require review by technical staff and independent review by nuclear engineering.

Included with the review shall be a documented basis, to include calculations or analysis, as applicable.

3.3.2.5 Deviations from the WOG ERG guidance shall require review by knowledgeable licensed operations staff.Included shall be a documented basis which assesses the safety significance of the deviation.

13 S l

3.3.3 Verification

Documentation:

3.3.3.1 Verification shall be completed by documentation on ATTACHMENT 2.3.3.3.2 The Technical Assistant to the Operation Manager (TAOM)~~~or designee shall pre-identify the individuals needed to perform the technical review by name and asterisks on ATTACHMENT 2.3.3.3.3 The Technical Assistant to the Operations Manager or designee shall document any deviations from the WOG'ERGs or setpoint changes on ATTACHMENT 2, adding any additional pages as necessary.

Included with any deviations shall be the justification and.the,.safety ,significance of the difference from the WOG ERGs.NOTE: All comments must be resolved before the validation process is started.In the event a comment cannot be resolved the EPC shall review the proposed change and resolve the comment.3.3.3.4 3.5 3.5.1 Following completion of the verification process, the Technical Assistant to the Operations Manager or designee shall resolve any comments and follow up with any further reviews, as necessary, and indicate resolution/completion by signature on ATTACHMENT 2.Final Review and A royal: Following validation and verification, the TAOM shall initiate a PCN for the procedure change or new procedure and initiate the required.10CFR50.59 review criteria as required by Reference 2.2 and 2.3.Concern 15 Section 5.2.A (page 67)states that all EOPs will be verified, but Section 5.3.B (page 93)states that"yellow path" functional restoration procedures may not be validated.

To assure complete validation of all the EOPs the program description should include an indication that the full com lement of EOPs will be validated.

~Res ense While the initial set of yellow path FR procedures have not been formally validated, they have been used successfully during simulator training.RG&E has a high confidence level in these procedures.

Future revisions to these procedures will receive validation.

14

~~

Concern 16 The validation program description should state that all of the EOPs will be validated on the dynamic simulator, once it is completed, using the procedures and scenarios described in the current validation program description.

For the parts of the EOPs that cannot be validated on the simulator, the existing method of procedure validation may be relied upon.Revisions to the EOPs need to be verified, and validated.

The verification and validation program descriptions should discuss the criteria or methods that will be used for determining the need to'reverify and revalidate any changes in the EOPs,.and how the verification and validation process is to be carried out.~Res ense Procedure A-601.6 contains the following instructions:

3.4 VALIDATION

PROCESS: 3.4.1 Validation is the process by which the useability of the procedure is confirmed.

3.4.1.1 Validation provides a means by which minimum operating shift personnel test the procedure and proposed changes in a plant specific control room environment under scenario driven, simulated emergency conditions.

3.4.1.2 Validation may be conducted by one of two methods;the~~~simulator method or the walk through (t abletop)method.3.4.1.3 h Simulator validations will be utilized to the maximum extent possible on all procedures which affect action conducted in the Control Room.3.4.1.4 Walk through validations will be utilized for operator actions which are conducted outside the control room or where the simulator lacks the capability to properly validate the procedure or change.3.4.2 Scenario Develo ment: NOTE: Validation shall be performed on all major changes or new procedures.

3.4.2.1 3.4.2.2 The TAOM or designee shall develop a detailed event scenario using the final draft procedure after the verification process.is completed.

ATTACHMENT 3 provides a listing of scenarios.

For new procedures the scenario must contain sufficient guidance to place the plant in a cold shutdown or safe condition to ensure that all necessary transitions are accomplished.

15

'

For changes to existing procedures, the scenario shall be developed in such a manner that the step(s)changed are fully tested including Response Not Obtained (RNO)actions.The TAOM or designee shall detail the scenario and the validation method to be used on the Validation Scenario sheet, ATTACHMENT 3A.For changes made as a result of simulator training feedback when using the procedures, the TAOM or designee shall consult the appropriate simulator instructor for scenario details.Validation Performance:

NOTE: For changes to procedures as a result of simulator training feedback, the TAOM or designee shall ensure that ,the validation performance has been conducted and.documented in accordance with steps 3.4.3.1 through 3.4.3.8.For both simulator or walk through methods, the validation scenario shall be performed by the minimum control room complement of 3 licensed operators, with at least one being an SRO, and an STA.The Validation Coordinator shall be either a SRO or a simulator instructor with SRO equivalent plant certification.

The Validation Coordinator is normally the TAOM or designee.Using the Validation Scenario Sheet, the Validation Coordinator shall brief the validation team in all the necessary initial conditions, systems and/or, entry conditions to begin the validation.

At no time shall the details of the scenario be made known to the validation team.The Validation Coordinator shall direct the entire scenario performance, including any information necessary for operator decision making.Included.shall be determination when the scenario has progressed sufficiently to effect termination.

The validation team will respond to the data available to them (simulator or walk through)and perform the actions of the procedure.

The Validation Coordinator and simulator instructor shall observe the actions of the crew and assess their performance.

The Validation Coordinator may terminate the scenario when the scenario objective has been accomplished.

16 I 4 3.4.3.7 3.4.3.8~~3.4'.=3.9 Immediately following conclusion.of the scenario, the Validation Coordinator shall debrief the validation team using-the applicable guidance contained in ATTACHMENT 3B, validation criteria',.

The Validation Coordinator shall complete a Validation Performance Sheet, ATTACHMENT

.3C', and record any comments for further evaluation/resolution.

The TAOMor designee shall be responsible for resolution of comments prior to submittal of the change for final processing.

Major changes as a result of comments shall require verification and revalidation.

e The walk through (tabletop) validation method shall be conducted in a manner similar to'.;the simulator (steps...3.4.3.1 through..3.4.3."8)

'except that no actual control manipulation will take place.,However, the process used, time required arid any necessary tools shall be factored into the.task(s).required, for validity.Documentation shall be'ompleted per ATTACHMENT 3C.Details pertaining to Verification were discussed.

in Concern 14.to its f commitme R~es ense Upon completing the development of the EOPs in 1985, all licensed individuals were given classroom training on the EOPs.When the installation of the new plant specific simulator was completed, the simulator was utilized to train all licensed.personnel on all EOPs,."'inally,-ongoing EOP train'ing j.s provided in the Regual'ification Program.As a part~of~the-Licensed.Operat;or" Initial Training Program, each license candidate receives training on every EOP.This consists of'lassroom tiaining reinforced by simulator exercises.

r Concern 17-Ya It is crucial that all operators be trained on all aspects of e'ach EOP.so that.all-operators-are prepared to execute each EOP ullest extent.The training program should include.a-nt to train, all operators on all EOPsss Concern 18 The EOP training program description should include a commitment to formal,EOP training (,or retraining) on the simulator when the simulator'is finished, and plans for this training.This description should indicate the ,'use of:,,'wide variety of scenarios; including multiple failures, to fully exercise the EOPs on the simulator and thus expose the operators to a wide variety of EOP uses.

~i R~es onse Formal EOP simulator training was conducted for all licensed individuals when the simulator was ready for training.1n addition, the operators receive EOP training on the simulator each year as part of the Licensed Operator Requalification Program.This training includes scenarios which exercise all EOPs.The lessons are written to allow the instructor the flexibility to exercise many different paths through the procedures.

This training also includes scenarios with multiple failures.Concern 19 The EOP training program should include the method to be used to train operators in areas where the simulator does not react like the plant and in parts of the EOPs that cannot be run on the simulator.

~Res ense All EOPs can be fully exercised on the simulator.

There are no discrepancies between the simulator and the plant which prevent the use of the EOPs.Concern 20 The EOP training program description should indicate how the operators are to be: evaluated during classroom instruction, tabletop discussions, replicate control room walkthroughs, and future simulator exercises.

~Res onse The operators are evaluated in.training in accordance with training department procedures.

A written exam is used for classroom training, a formal oral exam is used for control room walkthroughs, and an operational exam is used.for simulator training.These exams are modeled after NRC licensing ezams.Tabletop discussions are not used as a primary training tool.18 b

Figure 2 STATUS TREE PRIORITY INDENTIF ICATION Color Line Code Symbol Code Status/Response Red The critical safety function is under extreme challen e;immediate operator action is required.Orange r e a r Yellow~~~~~The critical safety function is under severe chaiien e;prompt operator action is required.The critical safety function conditon is off-normal.Operator action may be taken.Green The critical safety function is satisfied.

No operator action is needed.

,4<g I A-503.1:19 FIGURE 3 CONTROL ROOM EOP/AP BINDER ARRANGEMENT (TRI-FOLD BINDER)ATTACHMENTS II II II EOP FOLD OVER PAGES II I II FOLD OUT PAGES I II

SUMMARY

ATTACHMENT II-EOP II II II-coversheet II-purpose/entry conditions/symptoms//

-immediate/

II subsequent action II II II II B1-FOLD BINDER AP FOLD OVER PAGES Attachment II II o AP o Il II-coversheet II-purpose/entry conditions/symptom

-immediate/

subsequent actions II II I

Number: Title: Revision Nunber: PIGURE 1 0 lW Number: Title: Revision Nader: A.PURPOSE-This procedure provides.~~~~~~~~~~t~~~t~~~~~~~~~B.ENTRY CONDITIONS/SYMPTOMS l.ENTRY CONDITIONS

-This procedure is entered from>a~b.d.2.SYMPTOMS-The symptoms of...'Procedure Title)...are;a~b.co FIGURE 2

Number: Title: Revision Nurber: STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED Imperitive Action-RESULT Alternate Command a.Sequential Substep-RESULT a.Alternate Command o Nonsequential substep-RESULT o Alternate Command NOTE: o The following are typical examples of operator action steps;1 Verify Reactor Trip: Trip reactor manually.o Reactor Trip Breakers-OPEN o Neutron flux-DECREASING Check if all RCPs should be Stopped: a.SI pumps-AT LEAST ONE RUNNING a.GO TO Step 2*********************k**********************************************************

CAUTION ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY IF CST LEVEL DECREASES TO LESS THAN 19.5 FEET.**************k*****************************************************************

Check Intact S/G Levels: a.Narrow range level-GREATER THAN (LATER)a.Maintain total feed flow low greater than (Later)FIGURE 3 I 1

Nwher: Ti tie: Revision Number: FOLDOUT PAGE 1.Include any information needed by the operator throughout the procedure.

~~~~~~~~~~~~~2~~~~~~~~~~~~~~~~~~~~~3~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~4 FIGURE 5 O