|
|
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:DISTRIBUTION CODE:AOOIDCOPIEBRECEIVED: | | {{#Wiki_filter:DISTRIBUTION CODE: AOOID COPIEB RECEIVED: LTR 5 CL TITLE: OR Submi t ta1: Cen era I Di str i b ut i on REQUL Y INFORMATION DISTRIBUTI SYSTEN (RIDS)ACCESSION NBR: 8608110179 DOC.DATE: 86/08/05 NOTARI ZED: YES DOCKET N FACIL: 50-387 Susquehanna Steam Electric Stationi Unit ii Pennsglva 05000387 50-388 Susquehanna Steam Electric Statloni Unl t 2i Pennsglva 05000388 AUTH.NANE AUTHOR AFFILIATION KEI SERi H.N.Pennsylvania Power 5 Light Co.RECIP.NANE RECIPIENT AFFILIATION ADENSANi E.BNR Prospect Directorate 3 |
| LTR5CLTITLE:ORSubmitta1:CeneraIDistributionREQULYINFORMATION DISTRIBUTI SYSTEN(RIDS)ACCESSION NBR:8608110179 DOC.DATE:86/08/05NOTARIZED:YESDOCKETNFACIL:50-387Susquehanna SteamElectricStationiUnitiiPennsglva 0500038750-388Susquehanna SteamElectricStatloniUnlt2iPennsglva 05000388AUTH.NANEAUTHORAFFILIATION KEISERiH.N.Pennsylvania Power5LightCo.RECIP.NANERECIPIENT AFFILIATION ADENSANiE.BNRProspectDirectorate 3
| |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Forwardsapplication PolPloposedAmends85Cc40toLicensesNPF-14~cNPF-22'espectively>
| | Forwards application Pol Ploposed Amends 85 Cc 40 to Licenses NPF-14~c NPF-22'espectively> |
| revisingTechSpecsfor~~badministrative purposes.
| | revising Tech Specs for~~b administrative purposes.Fee paid.~~~b IZE: 2 lQ)NOTES: icy NNSS/FCAF/PN. |
| Feepaid.~~~bIZE:2lQ)NOTES:icyNNSS/FCAF/PN.
| | LPDR 2cgs Transcripts. |
| LPDR2cgsTranscripts.
| | icg NNSS/FCAF/PN. |
| icgNNSS/FCAF/PN.
| | LPDR 2cgs Transcripts. |
| LPDR2cgsTranscripts.
| | 05000387 05000388 RECIPIENT ID CODE/NAt'lE BNR EB BNR FOB BNR PD3 PD 01 BNR PSB COPIES LTTR ENCL 1 1 1 5 5 1 REC IP l ENT ID CODE/MANE BNR EICSB BNR PD3 LA CAMPAQNONE BNR RSB COPIES LTTR ENCL 2 2 0 1 1 1 1 INTERNAL ACRS ELD/HDS4 09 04 6 h 0 1 ADN/LFNB NRR/GRAS RQNi 0 1 0 1 EXTERNAL: EC8cQ BRUSKE>8 NRC PDR 02 1 1 1 1 LPDR NSIC 03 05 2 2 1 1 NOTES: 3 3~C~~i66 TOTAL NUNBER OF COPIES REGUlRED: LTTR 32 ENCL 28 |
| 0500038705000388RECIPIENT IDCODE/NAt'lE BNREBBNRFOBBNRPD3PD01BNRPSBCOPIESLTTRENCL111551RECIPlENTIDCODE/MANE BNREICSBBNRPD3LACAMPAQNONE BNRRSBCOPIESLTTRENCL2201111INTERNALACRSELD/HDS409046h01ADN/LFNBNRR/GRASRQNi0101EXTERNAL:
| | >J ('j(M ('><<,~7 T M C A>>M>~f<<1FM Il">">,>.I'hl'I, j[~>>>j g c,'j.3~C," (>>.)'L'I':S'>'j">(';A q<<(I'!*<<>I>''(11I 1 ,(M,j<<.;,;.>,',('.>..j<<,''(5 14),-,.Fh>,(yj C'><<" (>>" 1'h(>f)0),",>~)>tr>><<>I(j (>M I.>r M>P>C yrf f>F, hg FII" h>'~>L'M>h)f>!M g1 RAG jl(ht W>I>tj>(>j',h lQ.>Q'<,)'" h,.'rj FI I ,i N, (i 3.",.>j<<'h;3 f>y~,' |
| EC8cQBRUSKE>8NRCPDR021111LPDRNSIC03052211NOTES:33~C~~i66TOTALNUNBEROFCOPIESREGUlRED:
| | Pennsylvania Power 8 Light Company Two North Ninth Street~Allentown, PA 18101~215 i 770.5151 Harold W.Keiser Vice President-Nuclear Operations 21 5/770-7502 AUG 0 5]986.Director of Nuclear Reactor Regulation Attention: |
| LTTR32ENCL28
| | Ms.E.Adensam, Project Director BWR Project Directorate No.3 Division of BWR Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENTS 85 TO LICENSE NO.NPF-14 AND 40 to LICENSE NO.NPF-22 PLA-2698 FILE R41-2 Docket Nos.50-387 50-388 |
| >J('j(M('><<,~7TMCA>>M>~f<<1FMIl">">,>.I'hl'I,j[~>>>jgc,'j.3~C,"(>>.)'L'I':S'>'j">(';Aq<<(I'!*<<>I>''(11I1,(M,j<<.;,;.>,',('.>..j<<,''(5 14),-,.Fh>,(yjC'><<"(>>"1'h(>f)0),",>~)>tr>><<>I(j(>MI.>rM>P>Cyrff>F,hgFII"h>'~>L'M>h)f>!Mg1RAGjl(htW>I>tj>(>j',hlQ.>Q'<,)'"h,.'rjFII,iN,(i3.",.>j<<'h;3 f>y~,' | |
| Pennsylvania Power8LightCompanyTwoNorthNinthStreet~Allentown, PA18101~215i770.5151HaroldW.KeiserVicePresident-Nuclear Operations 215/770-7502 AUG05]986.DirectorofNuclearReactorRegulation Attention: | |
| Ms.E.Adensam,ProjectDirectorBWRProjectDirectorate No.3DivisionofBWRLicensing U.S.NuclearRegulatory Commission Washington, D.C.20555SUSQUEHANNA STEAMELECTRICSTATIONPROPOSEDAMENDMENTS 85TOLICENSENO.NPF-14AND40toLICENSENO.NPF-22PLA-2698FILER41-2DocketNos.50-38750-388 | |
|
| |
|
| ==DearMs.Adensam:== | | ==Dear Ms.Adensam:== |
| Thepurposeofthisletteristoproposechangesofanadministrative naturetotheSusquehanna SESUnit1andUnit2Technical Specifications.
| | The purpose of this letter is to propose changes of an administrative nature to the Susquehanna SES Unit 1 and Unit 2 Technical Specifications. |
| Themarked-up changesand,NoSignificant HazardsConsiderations areprovidedasattachments tothisletter.Anyquestions onthismaterialshouldbedirectedtoMr.R.Sgarroat(215)770-7855.
| | The marked-up changes and, No Significant Hazards Considerations are provided as attachments to this letter.Any questions on this material should be directed to Mr.R.Sgarro at (215)770-7855.Pursuant to 10CFR170,'he appropriate fee is enclosed.'ery truly yours, H.W.Keiser Vice President-Nuclear Operations Attachments cc: M.J.Campagnone L.R.Plisco USNRC USNRC T.M.Gerusky, Director Bureau of Radiation Protection PA Dept.of Environmental Resources P.O.Box 2063 Harrisburg, PA 17120](<0 8608110179 860805~PDR*DOCK 05000387 P PDR k~,~'t A il 0)k~I k k Ak I, IA j tg NO SIGNIFICANT HAZARDS CONSIDERATIONS The ma)ority of the changes described below are obviously administrative in nature and therefore do not: 4 (1)involve a significant increase in the probability or consequences of an accident previously evaluated, (2)(3)create the possibility of a new or different kind of accident from any accident previously evaluated, nor 1 involve a significant reduction in a margin of safety.Where further clarification is required, it has been provided.UNIT ONE o Index: Various changes based upon the changes proposed herein as well as a review of the current document in its entirety.o p.1-1: Average Bundle Exposure and Average Planar Exposure have been grouped under"Average Exposure" so that both have reference numbers.o p.3/4 0-1: For consistency, ACTION should be in all capital letters;it is a defined term.0 p.3/4 0-2: Typographical error;"Specifications" is misspelled. |
| Pursuantto10CFR170,'he appropriate feeisenclosed.
| | I p.3/4 2-1: The asterisk was inadvertently omitted when a reference to Figure 3.2.1-3 was dropped in Amendment 57.The asterisk was present when the Amendment governing single loop operation (//56)was issued.o old p.3/4 2-2: Delete blank page.o old p.3/4 2-3: Renumber page due to deletion.o old p.3/4 2-4: Renumber page due to deletion.o old p.3/4 2-5: Renumber page due to deletion.o old p.3/4 2>>6: A 4.0.4 exemption is necessary to perform the subject surveillances. |
| 'erytrulyyours,H.W.KeiserVicePresident-Nuclear Operations Attachments cc:M.J.Campagnone L.R.PliscoUSNRCUSNRCT.M.Gerusky,DirectorBureauofRadiation Protection PADept.ofEnvironmental Resources P.O.Box2063Harrisburg, PA17120](<08608110179 860805~PDR*DOCK05000387PPDR k~,~'tAil0)k~IkkAkI,IAjtg NOSIGNIFICANT HAZARDSCONSIDERATIONS Thema)orityofthechangesdescribed belowareobviously administrative innatureandtherefore donot:4(1)involveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated, (2)(3)createthepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated, nor1involveasignificant reduction inamarginofsafety.Wherefurtherclarification isrequired, ithasbeenprovided. | | Such exemptions were provided for the affected Power Distribution Limit specifications via Amendment 29;this exemption, for MCPR, was inadvertently dropped when the MCPR specification was altered in support of the Cycle 2 reload (Amendment 45).(g o old p.3/4 2-7: Delete blank page.o old p.3/4 2-8: Renumber page due to deletions. |
| UNITONEoIndex:Variouschangesbaseduponthechangesproposedhereinaswellasareviewofthecurrentdocumentinitsentirety.
| | o old p.3/4 2-9: Renumber page due to deletions. |
| op.1-1:AverageBundleExposureandAveragePlanarExposurehavebeengroupedunder"AverageExposure" sothatbothhavereference numbers.op.3/40-1:Forconsistency, ACTIONshouldbeinallcapitalletters;itisadefinedterm.0p.3/40-2:Typographical error;"Specifications" ismisspelled.
| | o old p.3/4 2-10: Renumber page due to deletions. |
| Ip.3/42-1:Theasteriskwasinadvertently omittedwhenareference toFigure3.2.1-3wasdroppedinAmendment 57.TheasteriskwaspresentwhentheAmendment governing singleloopoperation
| | o old p.3/4 2-10a: Renumber page due to deletions.;- |
| (//56)wasissued.ooldp.3/42-2:Deleteblankpage.ooldp.3/42-3:Renumberpageduetodeletion. | |
| ooldp.3/42-4:Renumberpageduetodeletion.
| |
| ooldp.3/42-5:Renumberpageduetodeletion.
| |
| ooldp.3/42>>6:A4.0.4exemption isnecessary toperformthesubjectsurveillances.
| |
| Suchexemptions wereprovidedfortheaffectedPowerDistribution Limitspecifications viaAmendment 29;thisexemption, forMCPR,wasinadvertently droppedwhentheMCPRspecification wasalteredinsupportoftheCycle2reload(Amendment 45).(gooldp.3/42-7:Deleteblankpage.ooldp.3/42-8:Renumberpageduetodeletions.
| |
| ooldp.3/42-9:Renumberpageduetodeletions.
| |
| ooldp.3/42-10:Renumberpageduetodeletions.
| |
| ooldp.3/42-10a:Renumberpageduetodeletions.;-
| |
| 1 | | 1 |
| ' | | ' |
| ooldp.3/42-10b:Renumberpageduetodeletions.
| | o old p.3/4 2-10b: Renumber page due to deletions. |
| op.3/43-5:Note(i)hasbeenrevisedtoincorporate theasteriskratherthanrepeattheinformation providedinthefootnote.
| | o p.3/4 3-5: Note (i)has been revised to incorporate the asterisk rather than repeat the information provided in the footnote.The asterisk footnote was not deleted because it is already being used in Note (c).o p.3/4 3-11: I.The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated. |
| TheasteriskfootnotewasnotdeletedbecauseitisalreadybeingusedinNote(c).op.3/43-11:I.Theproposedchangedoesnotinvolveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated.
| | This change corrects a typographical error;the design has always contained one channel per trip system.Secondary containment is isolated by two common, divisionally redundant trip systems;there are two divisionally separate radiation monitors servicing the single Railroad Access Shaft Exhaust Duct.Therefore, secondary containment isolation on high radiation in this duct is a fully redundant safety function.Operation with one Railroad Access Shaft Exhaust Duct Radiation trip channel pertrip system is fully consistent with the requirements for secondary containment isolation capability following a LOCA or fuel handling accident.II.The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated; see I above.III.The proposed change does not involve a significant reduction in a margin of safety;see I above.o p.3/4 3-17: For trip function l.e, a typographical error has been corrected; this setpoint was approved by NRC in Amendment 58.For Trip Functions 2.c, d, and e, the footnote is being deleted since no changes were determined necessary as a result of the startup test program, and therefore the footnote no longer has any purpose.Also for 2.e, a typo in the setpoint units has been corrected. |
| Thischangecorrectsatypographical error;thedesignhasalwayscontained onechannelpertripsystem.Secondary containment isisolatedbytwocommon,divisionally redundant tripsystems;therearetwodivisionally separateradiation monitorsservicing thesingleRailroadAccessShaftExhaustDuct.Therefore, secondary containment isolation onhighradiation inthisductisafullyredundant safetyfunction.
| | For 3.a, a typo that occurred in Amendment 58 has been corrected. |
| Operation withoneRailroadAccessShaftExhaustDuctRadiation tripchannelpertripsystemisfullyconsistent withtherequirements forsecondary containment isolation capability following aLOCAorfuelhandlingaccident. | | o p.3/4 3-18: See discussion above pertaining to footnote.o p.3/4 3-19: See discussion above pertaining to footnote.o p.3/4 3-20: See discussion above pertaining to footnote.0p.3/4 3-98: The word"Continued" has been deleted since this Table consists of only one page.p.3/4 4-1c: The appropriate MAPLHGR Figure references have been provided in order to correct administrative errors in processing. |
| II.Theproposedchangedoesnotcreatethepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated; seeIabove.III.Theproposedchangedoesnotinvolveasignificant reduction inamarginofsafety;seeIabove.op.3/43-17:Fortripfunctionl.e,atypographical errorhasbeencorrected; thissetpointwasapprovedbyNRCinAmendment 58.ForTripFunctions 2.c,d,ande,thefootnoteisbeingdeletedsincenochangesweredetermined necessary asaresultofthestartuptestprogram,andtherefore thefootnotenolongerhasanypurpose.Alsofor2.e,atypointhesetpointunitshasbeencorrected. | | The current references reflect the original (April ll, 1985)Single Loop Operation (SLO)amendment submittal to NRC without taking into account the affects of the subsequent Cycle 3 reload submittal (January 16, 1986).Prior to the April 11th submittal, three Figures existed in the Unit 1 Tech Specs: Figure 3.2.1-1: GE 1.83%enriched, Figure 3.2.1-2: GE 2.33%enriched, and Figure 3.2.1-3: Exxon 2.72%enriched.When the SLO amendment was proposed, these Figures were not revised, but the GE 2.33%enriched Figure was used for the Exxon limit during SLO.Therefore, it was established that only the GE curves would be used in support of SLO.The Cycle 3 reload proposal was submitted prior to SLO being approved.That submittal left the Tech Specs with two MAPLHGR Figures: Figure 3.2.1-1: GE 2.33%enriched, and Figure 3.2.1-2: Exxon-all 8x8 fuel.This is where the appropriate changes were missed.The Tech Specs should have continued to reference the GE curve, Figure 3.2.1-1, for SLO.In part c.of the LCO, the Figure reference has been corrected due to a typographical error-it should be 3/4.1.1.1-1. |
| For3.a,atypothatoccurredinAmendment 58hasbeencorrected.
| | o p.3/4 5-1: This special test exception was renumbered due to the deletion of the current 3.10.5.p.3/4 6-10: This change is wholly administrative in nature;no technical changes have occurred.This footnote was originally proposed to clarify the requirements of 4.6.1.7 and ended up confusing them due to its dual meaning.It was added to ensure that where two elevations were listed (as in d;an asterisk exists on c because prior to Amendment 34, two elevations existed), both would not contribute to the minimum 3 values required.This is because those three are supposed to be representative of 3 of the 4 different areas being used for the average temperature calculation. |
| op.3/43-18:Seediscussion abovepertaining tofootnote.
| | If two had been used in the same area, it would skew the average toward the temperature'in that area.Unfortunately a more conservative interpretation leads one to believe that c and d~to ether are affected by the footnote and therefore, the measurements can only include one from a, one from b, and one from c and d together.In order to rectify these problems, a single area has been associated with each of the elevation categories and the footnote has been dropped.Accordingly,"elevations" has been replaced with"areas" in the text of 4.6.1.7.The areas listed are consistent with those currently listed in the associated procedure. |
| op.3/43-19:Seediscussion abovepertaining tofootnote.
| | o p.3/4 6-13: This requirement was inadvertently dropped by NRC when Amendment 36 was issued.It is being reinstated in its previous form. |
| op.3/43-20:Seediscussion abovepertaining tofootnote.
| |
| 0p.3/43-98:Theword"Continued" hasbeendeletedsincethisTableconsistsofonlyonepage.p.3/44-1c:Theappropriate MAPLHGRFigurereferences havebeenprovidedinordertocorrectadministrative errorsinprocessing. | |
| Thecurrentreferences reflecttheoriginal(Aprilll,1985)SingleLoopOperation (SLO)amendment submittal toNRCwithouttakingintoaccounttheaffectsofthesubsequent Cycle3reloadsubmittal (January16,1986).PriortotheApril11thsubmittal, threeFiguresexistedintheUnit1TechSpecs:Figure3.2.1-1:GE1.83%enriched, Figure3.2.1-2:GE2.33%enriched, andFigure3.2.1-3:Exxon2.72%enriched.
| |
| WhentheSLOamendment wasproposed, theseFigureswerenotrevised,buttheGE2.33%enrichedFigurewasusedfortheExxonlimitduringSLO.Therefore, itwasestablished thatonlytheGEcurveswouldbeusedinsupportofSLO.TheCycle3reloadproposalwassubmitted priortoSLObeingapproved.
| |
| Thatsubmittal lefttheTechSpecswithtwoMAPLHGRFigures:Figure3.2.1-1:GE2.33%enriched, andFigure3.2.1-2:Exxon-all8x8fuel.Thisiswheretheappropriate changesweremissed.TheTechSpecsshouldhavecontinued toreference theGEcurve,Figure3.2.1-1,forSLO.Inpartc.oftheLCO,theFigurereference hasbeencorrected duetoatypographical error-itshouldbe3/4.1.1.1-1.
| |
| op.3/45-1:Thisspecialtestexception wasrenumbered duetothedeletionofthecurrent3.10.5.p.3/46-10:Thischangeiswhollyadministrative innature;notechnical changeshaveoccurred.
| |
| Thisfootnotewasoriginally proposedtoclarifytherequirements of4.6.1.7andendedupconfusing themduetoitsdualmeaning.Itwasaddedtoensurethatwheretwoelevations werelisted(asind;anasteriskexistsoncbecausepriortoAmendment 34,twoelevations existed),
| |
| bothwouldnotcontribute totheminimum3valuesrequired.
| |
| Thisisbecausethosethreearesupposedtoberepresentative of3ofthe4different areasbeingusedfortheaveragetemperature calculation.
| |
| Iftwohadbeenusedinthesamearea,itwouldskewtheaveragetowardthetemperature'in thatarea.Unfortunately amoreconservative interpretation leadsonetobelievethatcandd~toetherareaffectedbythefootnoteandtherefore, themeasurements canonlyincludeonefroma,onefromb,andonefromcanddtogether.
| |
| Inordertorectifytheseproblems, asingleareahasbeenassociated witheachoftheelevation categories andthefootnotehasbeendropped.Accordingly, "elevations" hasbeenreplacedwith"areas"inthetextof4.6.1.7.Theareaslistedareconsistent withthosecurrently listedintheassociated procedure.
| |
| op.3/46-13:Thisrequirement wasinadvertently droppedbyNRCwhenAmendment 36wasissued.Itisbeingreinstated initspreviousform.
| |
|
| |
|
| op.3/46-31:Thewordinghasbeenchangedtobeconsistent withtherestofthesurveillance requirements inthissection.Notechnical changetotherequirement hasoccurred.
| | o p.3/4 6-31: The wording has been changed to be consistent with the rest of the surveillance requirements in this section.No technical change to the requirement has occurred.o p.3/4 6-35: The equal sign was inadvertently dropped by NRC when Amendment 35 was issued.It is being reinstated. |
| op.3/46-35:Theequalsignwasinadvertently droppedbyNRCwhenAmendment 35wasissued.Itisbeingreinstated.
| | o p.3/4 6-38: This specification was misnumbered when the Unit 1 Tech Specs were originally issued.It has been appropriately corrected. |
| op.3/46-38:Thisspecification wasmisnumbered whentheUnit1TechSpecswereoriginally issued.Ithasbeenappropriately corrected.
| | o p.3/4 6-39: See discussion above for renumbering. |
| op.3/46-39:Seediscussion aboveforrenumbering.
| | The reference to the Special Test Exception is being dropped because the exception is being deleted.o p.3/4 7-2: Typographical error;"a" should be"at".o p.3/4 7-4: Typographical error;footnote**was deleted in Amendment 1 to the Unit 1 Tech Specs.o p.3/4 7-22: Typographical error;the correct designations for the Halon systems begin with"1U" not"10".o p.3/4 8-8: Typographical error;the heading should be"UNIT 1 AND UNIT 2" p.3/4 8-9: The footnote has been changed to be consistent with similar footnotes in other specifications (e.g.3.6.5.1).What appear to be additional restrictions merely enforce as an LCO what is currently required by the ACTION statement. |
| Thereference totheSpecialTestException isbeingdroppedbecausetheexception isbeingdeleted.op.3/47-2:Typographical error;"a"shouldbe"at".op.3/47-4:Typographical error;footnote**wasdeletedinAmendment 1totheUnit1TechSpecs.op.3/47-22:Typographical error;thecorrectdesignations fortheHalonsystemsbeginwith"1U"not"10".op.3/48-8:Typographical error;theheadingshouldbe"UNIT1ANDUNIT2"p.3/48-9:Thefootnotehasbeenchangedtobeconsistent withsimilarfootnotes inotherspecifications (e.g.3.6.5.1).
| | o p.3/4 8-15: See discussion above.o p.3/4 8>>19: Typographical errors;the header should be"DISTRIBUTION-SHUTDOWN" and the reference to"continued" is being deleted since this is the first page of the specification. |
| Whatappeartobeadditional restrictions merelyenforceasanLCOwhatiscurrently requiredbytheACTIONstatement.
| | o p.3/4 8-33: The reference to"plant" has been changed to"unit" since plant can be construed as both units.Unit 2 Tech Specs appropriately control this equipment for Unit 2.o p.3/4 9-1: Footnote!3 is being deleted since this definition is already provided in Table 1.2.p.3/4 10-4: A reference to the single loop operation specification has been added, since a footnote on the APPLICABILITY of that specification references this special test exception. |
| op.3/48-15:Seediscussion above.op.3/48>>19:Typographical errors;theheadershouldbe"DISTRIBUTION-SHUTDOWN" andthereference to"continued" isbeingdeletedsincethisisthefirstpageofthespecification.
| | The exception is provided in the event that natural circulation testing is necessary during extended single loo o eration.P P o p.3/4 10-5: This specification only applies during the Startup Test Program, and is therefore being deleted. |
| op.3/48-33:Thereference to"plant"hasbeenchangedto"unit"sinceplantcanbeconstrued asbothunits.Unit2TechSpecsappropriately controlthisequipment forUnit2.op.3/49-1:Footnote!3isbeingdeletedsincethisdefinition isalreadyprovidedinTable1.2.p.3/410-4:Areference tothesingleloopoperation specification hasbeenadded,sinceafootnoteontheAPPLICABILITY ofthatspecification references thisspecialtestexception.
| | o old p.3/4 10-6: Specification and page renumbered due to deletion of Specification 3.10.5.o p.3/4 11-19: Typographical error;the word"one" should be inserted as shown on the mark-up.o p.3/4 11-20: Typographical error;"OPERABLE" is misspelled. |
| Theexception isprovidedintheeventthatnaturalcirculation testingisnecessary duringextendedsingleloooeration.PPop.3/410-5:Thisspecification onlyappliesduringtheStartupTestProgram,andistherefore beingdeleted.
| | o p.B 3/4 1-1: This change corrects the definition of R provided;it is consistent with the change made in proposed amendment 39 to License No.NPF-22 (see PLA-2661, dated June 19, 1986).o p.B 3/4 1-4: The additional information was simply extracted from page B 3/4 1-5, which is being deleted.o p.B 3/4 1-5: Delete;see discussion above.0 Generator E bldg., have been o p.5-4: See discussion above.p.B 3/4 10-1: Delete;the associated specification is being deleted.p.5-2: A new figure is being provided to reflect real estate transactions which have changed the PP6L property line.Other physical changes, such as the additions to the Training Center and the new Diesel added as well.o p.6-16: Typographical error;the correct word is"residual". |
| ooldp.3/410-6:Specification andpagerenumbered duetodeletionofSpecification 3.10.5.op.3/411-19:Typographical error;theword"one"shouldbeinsertedasshownonthemark-up.op.3/411-20:Typographical error;"OPERABLE" ismisspelled.
| | UNIT TWO o Index: Various changes based upon the changes proposed herein as well as a review of the current document in its entirety.o p.3/4 0-1: For consistency, ACTION should be in all capital letters;it is a defined term.o p.3/4 0-2: Typographical error;"Specifications" is misspelled. |
| op.B3/41-1:Thischangecorrectsthedefinition ofRprovided; itisconsistent withthechangemadeinproposedamendment 39toLicenseNo.NPF-22(seePLA-2661, datedJune19,1986).op.B3/41-4:Theadditional information wassimplyextracted frompageB3/41-5,whichisbeingdeleted.op.B3/41-5:Delete;seediscussion above.0Generator Ebldg.,havebeenop.5-4:Seediscussion above.p.B3/410-1:Delete;theassociated specification isbeingdeleted.p.5-2:Anewfigureisbeingprovidedtoreflectrealestatetransactions whichhavechangedthePP6Lpropertyline.Otherphysicalchanges,suchastheadditions totheTrainingCenterandthenewDieseladdedaswell.op.6-16:Typographical error;thecorrectwordis"residual".
| | o p.3/4 1-6: The deleted portion of this footnote is redundant to information already provided by Definition 1.7, CORE ALTERATION. |
| UNITTWOoIndex:Variouschangesbaseduponthechangesproposedhereinaswellasareviewofthecurrentdocumentinitsentirety.
| | o p.3/4 3-5: Note (i)has been revised to incorporate the asterisk rather than repeat the information provided in the footnote.The asterisk footnote was not deleted because it is already being used in Note (c).o p.3/4 3-11: I.The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated. |
| op.3/40-1:Forconsistency, ACTIONshouldbeinallcapitalletters;itisadefinedterm.op.3/40-2:Typographical error;"Specifications" ismisspelled.
| | This change corrects a typographical error;t'e design has always contained one channel per trip system.Secondary containment is isolated by two common, divisionally redundant trip systems;there are two divisionally separate radiation monitors servicing the single Railroad Access Shaft Exhaust Duct.Therefore, secondary containment isolation on high radiation in this duct is a fully redundant safety function.Operation with one Railroad Access Shaft Exhaust Duct Radiation trip channel per trip system is fully consistent with the requirements for secondary containment isolation capability following a LOCA or fuel handling accident.II.The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated; see I above.III.The proposed change does not involve a significant reduction in a margin of safety;see I above.o p.3/4 3-17: The footnote is being deleted since no changes were determined necessary as a result of the startup test program, and therefore the footnote no longer has any purpose.o p.3/4 3-18: See discussion above.o p.3/4 3-19: See discussion above.o p.3/4 3-20: See discussion above. |
| op.3/41-6:Thedeletedportionofthisfootnoteisredundant toinformation alreadyprovidedbyDefinition 1.7,COREALTERATION.
| | o p.3/4 3-53: Typographical error;footnote*~*should read"...eight or fewer ll o p.3/4 3-71: Typographical error;this footnote was erroneously attributed to a monitor which does not monitor secondary containment. |
| op.3/43-5:Note(i)hasbeenrevisedtoincorporate theasteriskratherthanrepeattheinformation providedinthefootnote.
| | This footnote does not exist for this monitor in the Unit 1 Tech Specs.o p.3/4 3-72: Typographical error;the redundant wording in ACTION 81 is being deleted.o p.3/4 3-78: Corrects to be consistent with Unit,1 Tech Specs for this common zone.This resolves an NRC inspector open item.o p.3/4 3-79: For Zone 0-27B, the minimum value is revised to be consistent with our philosophy that at least half of the detectors in a given Zone must be OPERABLE.This is consistent with Unit 1.For Zone 0-27C, the numbers are corrected for consistency with Unit 1 based on the associated design drawing.These changes resolve an NRC inspector open item.o p.3/4 4-1c: In part c.of the LCO, the Figure reference has been corrected due to a typographical error-it should be 3/4.1.1.1-1. |
| TheasteriskfootnotewasnotdeletedbecauseitisalreadybeingusedinNote(c).op.3/43-11:I.Theproposedchangedoesnotinvolveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated.
| | o p.3/4 4-3: Typographical error-the correct Specification is 3.4.1.1.1. |
| Thischangecorrectsatypographical error;t'edesignhasalwayscontained onechannelpertripsystem.Secondary containment isisolatedbytwocommon,divisionally redundant tripsystems;therearetwodivisionally separateradiation monitorsservicing thesingleRailroadAccessShaftExhaustDuct.Therefore, secondary containment isolation onhighradiation inthisductisafullyredundant safetyfunction.
| | o p.3/4 5-1: This special test exception was renumbered due to the deletion of the current 3.10.5.o p.3/4 6-10: This change is wholly administrative in nature;no technical changes have occurred.This footnote was originally proposed to clarify the requirements of 4.6.1.7 and ended up confusing them due to its dual meaning.It was added to ensure that where two elevations were listed (as in c and d)that they both would not contribute to the minimum 3 values required.This is because those three are supposed to be representative of 3 of the 4 different areas being used for the average temperature calculation. |
| Operation withoneRailroadAccessShaftExhaustDuctRadiation tripchannelpertripsystemisfullyconsistent withtherequirements forsecondary containment isolation capability following aLOCAorfuelhandlingaccident. | | If two had been used in the same area, it would skew the average toward the temperature in that area.Unfortunately a more conservative interpretation leads one to believe that c and d~to ether are affected by the footnote and therefore, the measurements can only include one from a, one from b, and one from c and d together.In order to rectify these problems, a single area has been associated with each of the elevation categories and the footnote has been dropped.Accordingly,"elevations" has been replaced with"areas" in the text of 4.6.1.7.The areas listed are consistent with those currently listed in the associated procedure. |
| II.Theproposedchangedoesnotcreatethepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated; seeIabove.III.Theproposedchangedoesnotinvolveasignificant reduction inamarginofsafety;seeIabove.op.3/43-17:Thefootnoteisbeingdeletedsincenochangesweredetermined necessary asaresultofthestartuptestprogram,andtherefore thefootnotenolongerhasanypurpose.op.3/43-18:Seediscussion above.op.3/43-19:Seediscussion above.op.3/43-20:Seediscussion above. | | p.3/4 6-31: Typographical error;footnote**should read,"...or Zone II and Zone III when p.3/4 6-41: The reference to the Special Test Exception is being dropped because the exception is being deleted.o p.3/4 7-2: Typographical error;"a" should be"at". |
| op.3/43-53:Typographical error;footnote*~*shouldread"...eightorfewerllop.3/43-71:Typographical error;thisfootnotewaserroneously attributed toamonitorwhichdoesnotmonitorsecondary containment.
| |
| ThisfootnotedoesnotexistforthismonitorintheUnit1TechSpecs.op.3/43-72:Typographical error;theredundant wordinginACTION81isbeingdeleted.op.3/43-78:Correctstobeconsistent withUnit,1TechSpecsforthiscommonzone.ThisresolvesanNRCinspector openitem.op.3/43-79:ForZone0-27B,theminimumvalueisrevisedtobeconsistent withourphilosophy thatatleasthalfofthedetectors inagivenZonemustbeOPERABLE.
| |
| Thisisconsistent withUnit1.ForZone0-27C,thenumbersarecorrected forconsistency withUnit1basedontheassociated designdrawing.ThesechangesresolveanNRCinspector openitem.op.3/44-1c:Inpartc.oftheLCO,theFigurereference hasbeencorrected duetoatypographical error-itshouldbe3/4.1.1.1-1.
| |
| op.3/44-3:Typographical error-thecorrectSpecification is3.4.1.1.1.
| |
| op.3/45-1:Thisspecialtestexception wasrenumbered duetothedeletionofthecurrent3.10.5.op.3/46-10:Thischangeiswhollyadministrative innature;notechnical changeshaveoccurred.
| |
| Thisfootnotewasoriginally proposedtoclarifytherequirements of4.6.1.7andendedupconfusing themduetoitsdualmeaning.Itwasaddedtoensurethatwheretwoelevations werelisted(asincandd)thattheybothwouldnotcontribute totheminimum3valuesrequired.
| |
| Thisisbecausethosethreearesupposedtoberepresentative of3ofthe4different areasbeingusedfortheaveragetemperature calculation.
| |
| Iftwohadbeenusedinthesamearea,itwouldskewtheaveragetowardthetemperature inthatarea.Unfortunately amoreconservative interpretation leadsonetobelievethatcandd~toetherareaffectedbythefootnoteandtherefore, themeasurements canonlyincludeonefroma,onefromb,andonefromcanddtogether.
| |
| Inordertorectifytheseproblems, asingleareahasbeenassociated witheachoftheelevation categories andthefootnotehasbeendropped.Accordingly, "elevations" hasbeenreplacedwith"areas"inthetextof4.6.1.7.Theareaslistedareconsistent withthosecurrently listedintheassociated procedure.
| |
| p.3/46-31:Typographical error;footnote**shouldread,"...orZoneIIandZoneIIIwhenp.3/46-41:Thereference totheSpecialTestException isbeingdroppedbecausetheexception isbeingdeleted.op.3/47-2:Typographical error;"a"shouldbe"at". | |
|
| |
|
| op.3/48-10:Thefootnotehasbeenchangedtobeconsistent withsimilarfootnotes inotherspecifications (e.g.3.6.5.1).
| | o p.3/4 8-10: The footnote has been changed to be consistent with similar footnotes in other specifications (e.g.3.6.5.1).What appear to be additional restrictions thereby enforce as an LCO what is currently required by the ACTION statement. |
| Whatappeartobeadditional restrictions therebyenforceasanLCOwhatiscurrently requiredbytheACTIONstatement.
| | o p.3/4 8-16: See discussion above.o p.3/4 8-35: The reference to"plant" has been changed to"unit" since plant can be construed as both'units. |
| op.3/48-16:Seediscussion above.op.3/48-35:Thereference to"plant"hasbeenchangedto"unit"sinceplantcanbeconstrued asboth'units.
| | Unit 1 Tech Specs appropriately control this equipment for Unit 1.o p.3/4 9-1: Footnote f/is being deleted since this definition is already provided in Table 1.2.I o p.3/4 10-4: A reference to the single loop operation specification has been added, since a footnote on the APPLICABILITY of that specification references this special test exception. |
| Unit1TechSpecsappropriately controlthisequipment forUnit1.op.3/49-1:Footnotef/isbeingdeletedsincethisdefinition isalreadyprovidedinTable1.2.Iop.3/410-4:Areference tothesingleloopoperation specification hasbeenadded,sinceafootnoteontheAPPLICABILITY ofthatspecification references thisspecialtestexception.
| | The exception is provided in the event that natural circulation testing is necessary during extended single loop operation. |
| Theexception isprovidedintheeventthatnaturalcirculation testingisnecessary duringextendedsingleloopoperation.
| | o p.3/4 10-5: This specification only applies during the Startup Test Program, and is therefore being deleted.o old p.3/4 10-6: Specification and page renumbered due to deletion of Specification 3.10.5.o p.3/4 11-20: Typographical error;"OPERABLE" is misspelled. |
| op.3/410-5:Thisspecification onlyappliesduringtheStartupTestProgram,andistherefore beingdeleted.ooldp.3/410-6:Specification andpagerenumbered duetodeletionofSpecification 3.10.5.op.3/411-20:Typographical error;"OPERABLE" ismisspelled.
| | o p.B 3/4 10-1: Delete;the associated specification is being deleted.o p.5-2: A new figure is being provided to reflect real estate transactions which have changed the PPGL property line.Other physical changes, such as the addition to the Training Center and the new Diesel Generator"E" bldg., have been added as well.o p.5-4: See discussion above.o p.6-4: Typographical error;the noted reference to Unit 1 should be Unit 2.CONCLUSIONS Based on the above descriptions the proposed changes are editorial in nature and therefore have no adverse impact on the safe operation of Susquehanna Units 1 and 2.rrs/mse202550c}} |
| op.B3/410-1:Delete;theassociated specification isbeingdeleted.op.5-2:Anewfigureisbeingprovidedtoreflectrealestatetransactions whichhavechangedthePPGLpropertyline.Otherphysicalchanges,suchastheadditiontotheTrainingCenterandthenewDieselGenerator "E"bldg.,havebeenaddedaswell.op.5-4:Seediscussion above.op.6-4:Typographical error;thenotedreference toUnit1shouldbeUnit2.CONCLUSIONS Basedontheabovedescriptions theproposedchangesareeditorial innatureandtherefore havenoadverseimpactonthesafeoperation ofSusquehanna Units1and2.rrs/mse202550c}}
| |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant ML20207G5051999-06-0707 June 1999 Informs That NRC Office of NRR Reorganized Effective 990328.As Part of Reorganization,Divison of Licensing Project Management Created PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 ML17164A9891999-03-12012 March 1999 Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl ML18040A9691999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901999-02-18018 February 1999 Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML20203G5821999-02-17017 February 1999 Second Final Response to FOIA Request for Documents. Documents Listed in App C Being Released in Entirety. Documents Listed in App D Being Withheld in Part (Ref FOIA Exemption 5) ML20202F4761999-01-29029 January 1999 First Partial Response to FOIA Request for Documents.Records in App a Encl & Being Released in Entirety.App B Records Being Withheld in Part (Ref FOIA Exemption 7C) ML18040A9671999-01-29029 January 1999 Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 ML18040A9681999-01-29029 January 1999 Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 ML18040A9651999-01-12012 January 1999 Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18030A1021998-12-16016 December 1998 Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs ML18030A4331998-11-25025 November 1998 Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 ML20195J9101998-11-18018 November 1998 Forwards Notice of Withdrawal of Application for Amends to Facility Operating Licenses (Notice).Notice Has Been Filed with Ofc of Fr.Amends Would Have Revised TS to Eliminate HPCI Pump auto-transfer on High Suppression Pool Level ML20155F7201998-11-0303 November 1998 Final Response to FOIA Request for Documents.Documents Listed in App B Being Encl & Being Released in Entirety. Documents Listed in App C Being Withheld in Part (Ref Exemption 7C) ML18026A2941998-10-19019 October 1998 Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.211998-10-12012 October 1998 Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 ML18030A1001998-10-12012 October 1998 Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs ML18030A4321998-10-12012 October 1998 Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized ML18030A4311998-09-29029 September 1998 Forwards Rev 27 & 28 to SSES Emergency Plan ML20151W4951998-09-10010 September 1998 Informs That as Part of NRC Probabilistic Risk Assessment Implementation Plan,Commission Assigned Two Senior Reactor Analysts (Sras) to Each Regional Ofc.T Shedlosky & J Trapp Has Been Assigned SRAs for Region I IR 05000387/19980081998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change is Approved ML18030A0991998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved ML18026A4961998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations IR 05000387/19980031998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations ML20202F5501998-07-17017 July 1998 Responds to PP&L Corp Auditing Repts 739459-97,739459-1-97 & 739459-2-98 Re SSES Investigations Into Missed Alarm Tests ML20236P9451998-07-15015 July 1998 Forwards Emergency Response Data Sys Implementation Documents Including Data Point Library Updates for Oconee (Number 255),Dresden (Number 257) & Susquehanna (Number 258) ML18030A4291998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved TS of NUREG-1433.Implementation of Proposed Amend Is Predicted on NRC Issuance of Amends & Proposed to Not Exceed 90 Days from Date of Amend Issue ML18017A2181998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved Tech Specs of NUREG 1433.Implementation of Proposed Amend Is Predicated on NRC Issuance of Amends & Is Proposed to Not Exceed 90 Days from Date of Amend Issuance ML18026A2901998-06-0909 June 1998 Forwards Rev 26 to Emergency Plan IAW 10CFR50.54q.Summary of Changes Listed ML18026A2891998-05-22022 May 1998 Submits Withdrawal of Expedited Review/Approval of Tech Specs/Bases 3/4.3.7.11 & 3/4.11.2.6 & Response to Request for Addl Info Re Offgas Sys Mods ML18026A4941998-05-12012 May 1998 Responds to NRC Request to Resubmit Proposal to Change TS for Plant,Units 1 & 2,to Support Implementation of Improved TS & to Implement Provisions of GL 86-10 Re Relocation of Plant'S Fire Protection Program from TS to Another Document ML20202H1331998-04-16016 April 1998 Partially Deleted Ltr Re Concerns Raised to NRC Concerning PP&L Susquehanna Facility NUREG-0619, Informs That Staff Finds PP&L 980330 Request for Relief from Requirements of Section 4.3 of NUREG-0619,exams of Feedwater Nozzle Bore & Inner Radius for Another Operating Cycle to Be Acceptable1998-04-15015 April 1998 Informs That Staff Finds PP&L 980330 Request for Relief from Requirements of Section 4.3 of NUREG-0619,exams of Feedwater Nozzle Bore & Inner Radius for Another Operating Cycle to Be Acceptable ML20216B6811998-04-0101 April 1998 First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Being Released in Entirety ML17159A2341998-03-30030 March 1998 Forwards LER 97-007-01,per 10CFR50.73(a)(2)(i)(B).Revised LER Submitted to Modify Previous Position W/Regards to Entry Into TS 3.0.3 for Event PLA-4865, Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901998-03-11011 March 1998 Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML17159A1781998-03-0202 March 1998 Forwards Proposed Amends 203 & 161 to License NPF-14 & NPF-22,revising Tech Specs to Be Consistent w/NUREG-1433,rev 1, Std Tech Specs for GE Plants,Bwr 4. PLA-4856, Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl1998-03-0202 March 1998 Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl PLA-4854, Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 9802131998-02-27027 February 1998 Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 980213 ML20203M5071998-02-26026 February 1998 Final Response to FOIA Request for Documents.Records in App a Being Placed in PDR & Encl.Records in App B Partially Withheld (Ref FOIA Exemption 6) ML20203B5931998-02-23023 February 1998 Ack Receipt of & Wire in Amount of $55,000 in Payment for Civil Penatly Proposed by NRC Ltr . Corrective Actions Will Be Examined During Future Inspections 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 ML18040A9691999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML17164A9891999-03-12012 March 1999 Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901999-02-18018 February 1999 Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML18040A9681999-01-29029 January 1999 Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 ML18040A9671999-01-29029 January 1999 Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 ML18040A9651999-01-12012 January 1999 Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18030A1021998-12-16016 December 1998 Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs ML18030A4331998-11-25025 November 1998 Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 ML18026A2941998-10-19019 October 1998 Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage ML18030A4321998-10-12012 October 1998 Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized ML18030A1001998-10-12012 October 1998 Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.211998-10-12012 October 1998 Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 ML18030A4311998-09-29029 September 1998 Forwards Rev 27 & 28 to SSES Emergency Plan ML18030A0991998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved IR 05000387/19980081998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change is Approved ML18026A4961998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations IR 05000387/19980031998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations ML18017A2181998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved Tech Specs of NUREG 1433.Implementation of Proposed Amend Is Predicated on NRC Issuance of Amends & Is Proposed to Not Exceed 90 Days from Date of Amend Issuance ML18030A4291998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved TS of NUREG-1433.Implementation of Proposed Amend Is Predicted on NRC Issuance of Amends & Proposed to Not Exceed 90 Days from Date of Amend Issue ML18026A2901998-06-0909 June 1998 Forwards Rev 26 to Emergency Plan IAW 10CFR50.54q.Summary of Changes Listed ML18026A2891998-05-22022 May 1998 Submits Withdrawal of Expedited Review/Approval of Tech Specs/Bases 3/4.3.7.11 & 3/4.11.2.6 & Response to Request for Addl Info Re Offgas Sys Mods ML18026A4941998-05-12012 May 1998 Responds to NRC Request to Resubmit Proposal to Change TS for Plant,Units 1 & 2,to Support Implementation of Improved TS & to Implement Provisions of GL 86-10 Re Relocation of Plant'S Fire Protection Program from TS to Another Document ML17159A2341998-03-30030 March 1998 Forwards LER 97-007-01,per 10CFR50.73(a)(2)(i)(B).Revised LER Submitted to Modify Previous Position W/Regards to Entry Into TS 3.0.3 for Event PLA-4865, Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901998-03-11011 March 1998 Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 PLA-4856, Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl1998-03-0202 March 1998 Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl ML17159A1781998-03-0202 March 1998 Forwards Proposed Amends 203 & 161 to License NPF-14 & NPF-22,revising Tech Specs to Be Consistent w/NUREG-1433,rev 1, Std Tech Specs for GE Plants,Bwr 4. PLA-4854, Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 9802131998-02-27027 February 1998 Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 980213 ML20216B7031998-02-22022 February 1998 Partially Deleted Ltr Requesting Copy of OI Rept on Plant, Unit 2,case 1-96-039 PLA-4851, Provides Info That Was Requested by Cj Anderson on 980213 Re Former Util Employee Concern on Radwaste Control Room Offgas Panel Alarm Testing1998-02-18018 February 1998 Provides Info That Was Requested by Cj Anderson on 980213 Re Former Util Employee Concern on Radwaste Control Room Offgas Panel Alarm Testing ML20203M5791998-02-10010 February 1998 Enters Appeal Due to Lack of Response to FOIA Request 97-473 ML18030A0971998-02-0202 February 1998 Forwards Proprietary Response to RAI Re Proposed License Amend 209 to TS Supporting Cycle 11 Reload.Proprietary Info Withheld,Per 10CFR2.790 ML20203G6071998-01-26026 January 1998 Forwards Redacted Version of Pp&L,Inc Corporate Auditings Interim Rept 739459-97,dtd 971015 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept IR 05000387/19970031998-01-0606 January 1998 Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998 ML18030A4071998-01-0606 January 1998 Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998 ML18017A2931998-01-0606 January 1998 Provides Responses to Improved TS Section 3.8 Per 970324 NRC Rai.Schedule 980628 for Improved TS Implementation. Submittal of Revised Specifications Is Planned for Jan 1998 PLA-4828, Expresses Appreciation for Support Received by Former Project Manager C Poslusny1997-12-29029 December 1997 Expresses Appreciation for Support Received by Former Project Manager C Poslusny IR 05000387/19970041997-12-22022 December 1997 Resolves Commitments Made in Response to NOV Issued As Part of NRC Insp Repts 50-387/97-04 & 50-388/97-04 Dtd 970805. Proposed FSAR QA Program Description Changes,Reason for Changes & Basis Included for Approval ML18026A4901997-12-22022 December 1997 Resolves Commitments Made in Response to NOV Issued as Part of NRC Insp Repts 50-387/97-04 & 50-388/97-04 Dtd 970805. Proposed FSAR QA Program Description Changes,Reason for Changes & Basis Included for Approval ML20203M5741997-12-0505 December 1997 FOIA Request for Copy of Latest OI Rept on Susquehanna Ses Including All Exhibits & for Any Other Communication Between NRC & Susquehanna Ses/Pp&L PLA-4818, Forwards Redacted Version of Pp&L,Inc Corporate Auditings Rept 739459-1-97,dtd 971201 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept1997-12-0404 December 1997 Forwards Redacted Version of Pp&L,Inc Corporate Auditings Rept 739459-1-97,dtd 971201 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML18026A3941990-09-0101 September 1990 Requests Waiver of Compliance from Tech Spec 3.8.1.1 to Evaluate Increase in Action from 72 H to 15 Days Re Ac Sources Based on 900829 Borescopic Insp of Emergency Diesel Generator ML17157A2741990-08-0808 August 1990 Forwards Topical Rept PL-NF-90-001, Application of Reactor Analysis Methods for BWR Design & Analysis. IR 05000387/19900801990-08-0303 August 1990 Responds to Violations Noted in Insp Repts 50-387/90-80 & 50-388/90-80.Corrective Actions:Util Conducted Operator Training on How to Implement Eops If Suppression Chamber Pressure Not Available ML18030A0741990-08-0303 August 1990 Responds to Violations Noted in Insp Repts 50-387/90-80 & 50-388/90-80.Corrective Actions:Util Conducted Operator Training on How to Implement EOPs If Suppression Chamber Pressure Not Available ML18026A2351990-07-0202 July 1990 Forwards Application for Proposed Amend 132 to License NPF-14,revising Tech Spec to Support Cycle 6 Reload ML18030A0721990-06-19019 June 1990 Forwards Rev 1 to SEA-EE-183, Evaluation of Unit 1 Computer Class 1E - Non-Class 1E Interfaces & Rev 1 to SEA-EE-184, Evaluation of Unit 1 Annunciator Class 1E - Non-Class 1E Interfaces. ML18026A3931990-06-0707 June 1990 Requests NRC Approval to Install Mod at Plant Determined to Constitute Unreviewed Safety Question When Evaluated.Util Will Implement Administrative Controls to Ensure Larger Min Vol Met for Diesel E Prior to Tech Spec Change ML18030A3671990-05-14014 May 1990 Forwards Proprietary Conclusions of Investigation Re Two False Negative Analytical Results from Two Blind Spike Urine Samples.Investigation Satisfactorily Evaluated Samples. Encl Withheld (Ref 10CFR2.790) ML20043A2461990-05-11011 May 1990 Forwards Draft of Proposed Decommissioning Financial Assurance Plan,Per 10CFR50.33 & 50.75,for Review.Telcon Scheduled for 900515 to Discuss Comments ML18030A0711990-03-19019 March 1990 Responds to Questions Delineated in 900131 Ltr Re Diesel Generator Events That Occurred During Sept & Oct 1989.Draft Procedures for Proposed Intake Air Temp Test Program Transmitted to NRC on 900205.Revised Procedures Encl ML18017A1871990-02-15015 February 1990 Forwards Books 1 & 2 to, Unit 2 Third Refueling & Insp Outage;Outage Summary Rept. IR 05000387/19890331990-02-0505 February 1990 Responds to NRC 900105 Ltr Re Violations Noted in Insp Repts 50-387/89-33 & 50-388/89-31.Corrective Actions:Rhr Svc Water Pump 2P506B Remains in Inoperable Status Until Cause of Deviation Determined & Condition Corrected ML18030A0701990-02-0505 February 1990 Responds to NRC 900105 Ltr Re Violations Noted in Insp Repts 50-387/89-33 & 50-388/89-31.Corrective Actions:Rhr Svc Water Pump 2P506B Remains in Inoperable Status Until Cause of Deviation Determined & Condition Corrected ML18040A9601990-02-0202 February 1990 Forwards Schedules That Provide Details of Tasks Required to Complete Activities Re Diesel Generators & Advises of Plan to Have Spare Parts on Site in Timely Manner to Support Each Diesel Insp ML20006B4501990-01-25025 January 1990 Forwards Preliminary Scope & Schedule for Security Upgrade Project.Encl Withheld (Ref 10CFR73.21) ML17156B6031990-01-25025 January 1990 Forwards NPDES Discharge Monitoring Rept for Dec 1989 & State of Pa,Dept of Environ Resources Monthly Facility Rept Form (01-112).Noncompliances for Zinc on Cooling Tower Blowdown on 891228 & for Missed Sample Noted ML18040B2671990-01-0505 January 1990 Forwards Rev 0 to SEA-CW-037, Analysis of B & C 1989 Diesels Failure. Rept Details Util Analysis of Overpressurization Incidents Which Occurred in Sept & Oct 1989 of Diesel Generators ML18040B2651989-11-27027 November 1989 Forwards Response to Generic Ltr 89-21.Table of USIs for Which Technical Resolution Has Been Achieved Encl ML19325F1991989-11-0909 November 1989 Responds to Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs. Util Has Developed & Issued Procedure Which Includes Safeguards Contingency Planning Using Approach Noted in Generic Ltr ML19325D7411989-10-19019 October 1989 Forwards Application for Amends 126 & 77 to Licenses NPF-14 & NPF-22,respectively,requesting Emergency Temporary Relief from Certain Requirements of Tech Specs 3.2.2 on One Time Basis for Period of 3 Months ML19325C3771989-10-11011 October 1989 Forwards Change DD to Physical Security Plan.Change Withheld (Ref 10CFR73.21) ML18040B2581989-10-0202 October 1989 Forwards Final Response to Request for Addl Info Re Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Listed Items Included in Previous & Current Ref Responses ML18040A9441989-09-12012 September 1989 Responds to Remaining Questions Raised During NRC Insp of Training Programs.Training Procedure Re Technical Exam Bank Instrumentation & Control Training Exams.Health Physics Technicians Trained Re High Radiation Levels PLA-3251, Forwards Response to Regulatory Effectiveness Review Rept. Util Established Team to Evaluate Appropriate Scope for Planned Major Project to Upgrade Security.Scope of Project to Be Finalized & Approved in Nov 1989.Response Withheld1989-08-31031 August 1989 Forwards Response to Regulatory Effectiveness Review Rept. Util Established Team to Evaluate Appropriate Scope for Planned Major Project to Upgrade Security.Scope of Project to Be Finalized & Approved in Nov 1989.Response Withheld ML18040A9421989-08-22022 August 1989 Requests Concurrence W/Scheduling of 1990 Annual NRC Observed Emergency Preparedness Exercise at Plant on 900502. Concurrence Requested by 890930 ML18040B2531989-08-10010 August 1989 Discusses Insp of Operational Status of Emergency Preparedness Program.Susquehanna Review Committee 1987 & 1988 Emergency Plan Audits Encl W/Other Supporting Documentation ML20246A0191989-06-30030 June 1989 Submits Comments on Containment Performance Improvement Program (Cpi).Believes Program Will Be Generic Approach to Improving Containment Performance During Severe Accident PLA-3218, Submits Info Re Settlement Agreements for Discrimination Matters Arising Under Energy Reorganization Act of 1974. No Settlements Made Between Licensee & Any Employees in Section 210 Proceedings1989-06-27027 June 1989 Submits Info Re Settlement Agreements for Discrimination Matters Arising Under Energy Reorganization Act of 1974. No Settlements Made Between Licensee & Any Employees in Section 210 Proceedings ML18040B2501989-06-20020 June 1989 Forwards Summary Rept of Safety Evaluations Approved During 1988.Changes Include Backseating Control Box to Electrically Backset HV-202168 to Reduce Steam Leakage & Rerouting Condensate Supply Line to Main Condenser Keepfill PLA-3194, Forwards Change CC to Physical Security Plan.Change Withheld (Ref 10CFR73.21)1989-05-30030 May 1989 Forwards Change CC to Physical Security Plan.Change Withheld (Ref 10CFR73.21) ML18040A9301989-04-28028 April 1989 Responds to 890322 Request for Addl Info Re Plant Fire Protection Review Rept.Analysis of Circuits Having Potential for Being Impacted by Fire Resulting in Multiple High Impedence Faults Will Be Completed by Last Quarter 1989 ML18040B2441989-04-14014 April 1989 Forwards Application for Amends to Licenses NPF-14 & NPF-22, Resulting from Mods Performed to Essential Svc Water Sys,Per 10CFR50,App R,Consisting of Proposed Amends 23 & 70 PLA-3173, Forwards Change Bb to Physical Security Plan.Encl Withheld (Ref 10CFR73.21)1989-03-22022 March 1989 Forwards Change Bb to Physical Security Plan.Encl Withheld (Ref 10CFR73.21) ML18040A9271989-03-10010 March 1989 Forwards Rev 6 to ISI-T-100.0 for Unit 1 & Rev 3 to ISI-T-200.0 for Unit 2 Pump & Valve Inservice Insp Testing Program. ML18040A9261989-03-0707 March 1989 Discusses Util Position Re Completion & Implementation of NRC Requested Actions Specified in Suppl 1 to NRC Bulletin 88-007, Power Oscillations in Bwrs. ML17156B0131989-02-0202 February 1989 Forwards Proprietary Rept & Affidavit Supporting Proposed Amend 119 to License NPF-14 ML17156A9771988-12-15015 December 1988 Forwards Rev 11 to Susquehanna Units 1 & 2 Emergency Plan ML18040B2331988-11-22022 November 1988 Forwards Listed Addl Info Re Plant Fire Protection Review rept.W/16 Oversize Drawings ML17156A9211988-11-0909 November 1988 Forwards Proprietary GE Rept, Tech Spec Improvement Analysis for Reactor Protection Sys for Susquehanna Steam Electric Station,Units 1 & 2. Rept Withheld (Ref 10CFR2.790) ML18040A9111988-09-15015 September 1988 Informs That Mods Re Fire Barrier Upgrades,Hvac Fan Switches,Ct Secondaries & Raceway Wrapping Completed Except as Listed ML18040A9101988-08-10010 August 1988 Forwards Application for Amend to License NPF-14,extending Operation During Cycle 4 W/One Circulation Loop Out of Svc. Fee Paid ML18040B2221988-08-10010 August 1988 Responds to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Staff Position on Matls, Water Chemistry,Crack Evaluation & Repair Criteria & Insp Schedules Among Topics Addressed.Flaw Evaluations Encl ML18040B2201988-07-27027 July 1988 Forwards Comments to Each Specific SALP Category,Per 880707 Meeting W/Nrc.Presentations from Meeting Also Encl ML18040A9061988-07-21021 July 1988 Forwards GE Rept, Susquehanna Unit 1 CRD Housing Cap Screw Corrosion. Rept Completes Action on Item ML18040A9031988-07-19019 July 1988 Forwards Approved Version of Topical Rept PL-NF-87-001-A, Qualification of Steady State Core Physics Methods for BWR Design & Analysis, Per 880428 Ltr ML18040A9041988-07-19019 July 1988 Forwards Rev 39 to Updated FSAR for Susquehanna Steam Electric Station Units 1 & 2 Per 10CFR50.71 ML18040B2131988-06-24024 June 1988 Forwards 1987 Annual Rept for Allegheny Electric Cooperative,Inc ML18040A9021988-06-15015 June 1988 Provides Revised Response to NRC 871130 Ltr Re Violations Noted in Insp Repts 50-387/87-19 & 50-388/87-19.Corrective Actions:Incumbent Will Be Removed from Emergency Plan Position of Radiation Protection Coordinator PLA-3028, Responds to Suppl 1 to Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. No Revs to Design Review for Original Bulletin Required as Result of Suppl1988-05-31031 May 1988 Responds to Suppl 1 to Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. No Revs to Design Review for Original Bulletin Required as Result of Suppl ML18040A8691988-04-0606 April 1988 Forwards Application for Proposed Amends 110 & 61 to Licenses NPF-14 & NPF-22,respectively,revising Tech Specs Re Radiation Monitoring Instrumentation.Fee Paid 1990-09-01
[Table view] |
Text
DISTRIBUTION CODE: AOOID COPIEB RECEIVED: LTR 5 CL TITLE: OR Submi t ta1: Cen era I Di str i b ut i on REQUL Y INFORMATION DISTRIBUTI SYSTEN (RIDS)ACCESSION NBR: 8608110179 DOC.DATE: 86/08/05 NOTARI ZED: YES DOCKET N FACIL: 50-387 Susquehanna Steam Electric Stationi Unit ii Pennsglva 05000387 50-388 Susquehanna Steam Electric Statloni Unl t 2i Pennsglva 05000388 AUTH.NANE AUTHOR AFFILIATION KEI SERi H.N.Pennsylvania Power 5 Light Co.RECIP.NANE RECIPIENT AFFILIATION ADENSANi E.BNR Prospect Directorate 3
SUBJECT:
Forwards application Pol Ploposed Amends 85 Cc 40 to Licenses NPF-14~c NPF-22'espectively>
revising Tech Specs for~~b administrative purposes.Fee paid.~~~b IZE: 2 lQ)NOTES: icy NNSS/FCAF/PN.
LPDR 2cgs Transcripts.
icg NNSS/FCAF/PN.
LPDR 2cgs Transcripts.
05000387 05000388 RECIPIENT ID CODE/NAt'lE BNR EB BNR FOB BNR PD3 PD 01 BNR PSB COPIES LTTR ENCL 1 1 1 5 5 1 REC IP l ENT ID CODE/MANE BNR EICSB BNR PD3 LA CAMPAQNONE BNR RSB COPIES LTTR ENCL 2 2 0 1 1 1 1 INTERNAL ACRS ELD/HDS4 09 04 6 h 0 1 ADN/LFNB NRR/GRAS RQNi 0 1 0 1 EXTERNAL: EC8cQ BRUSKE>8 NRC PDR 02 1 1 1 1 LPDR NSIC 03 05 2 2 1 1 NOTES: 3 3~C~~i66 TOTAL NUNBER OF COPIES REGUlRED: LTTR 32 ENCL 28
>J ('j(M ('><<,~7 T M C A>>M>~f<<1FM Il">">,>.I'hl'I, j[~>>>j g c,'j.3~C," (>>.)'L'I':S'>'j">(';A q<<(I'!*<<>I>(11I 1 ,(M,j<<.;,;.>,',('.>..j<<,(5 14),-,.Fh>,(yj C'><<" (>>" 1'h(>f)0),",>~)>tr>><<>I(j (>M I.>r M>P>C yrf f>F, hg FII" h>'~>L'M>h)f>!M g1 RAG jl(ht W>I>tj>(>j',h lQ.>Q'<,)'" h,.'rj FI I ,i N, (i 3.",.>j<<'h;3 f>y~,'
Pennsylvania Power 8 Light Company Two North Ninth Street~Allentown, PA 18101~215 i 770.5151 Harold W.Keiser Vice President-Nuclear Operations 21 5/770-7502 AUG 0 5]986.Director of Nuclear Reactor Regulation Attention:
Ms.E.Adensam, Project Director BWR Project Directorate No.3 Division of BWR Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENTS 85 TO LICENSE NO.NPF-14 AND 40 to LICENSE NO.NPF-22 PLA-2698 FILE R41-2 Docket Nos.50-387 50-388
Dear Ms.Adensam:
The purpose of this letter is to propose changes of an administrative nature to the Susquehanna SES Unit 1 and Unit 2 Technical Specifications.
The marked-up changes and, No Significant Hazards Considerations are provided as attachments to this letter.Any questions on this material should be directed to Mr.R.Sgarro at (215)770-7855.Pursuant to 10CFR170,'he appropriate fee is enclosed.'ery truly yours, H.W.Keiser Vice President-Nuclear Operations Attachments cc: M.J.Campagnone L.R.Plisco USNRC USNRC T.M.Gerusky, Director Bureau of Radiation Protection PA Dept.of Environmental Resources P.O.Box 2063 Harrisburg, PA 17120](<0 8608110179 860805~PDR*DOCK 05000387 P PDR k~,~'t A il 0)k~I k k Ak I, IA j tg NO SIGNIFICANT HAZARDS CONSIDERATIONS The ma)ority of the changes described below are obviously administrative in nature and therefore do not: 4 (1)involve a significant increase in the probability or consequences of an accident previously evaluated, (2)(3)create the possibility of a new or different kind of accident from any accident previously evaluated, nor 1 involve a significant reduction in a margin of safety.Where further clarification is required, it has been provided.UNIT ONE o Index: Various changes based upon the changes proposed herein as well as a review of the current document in its entirety.o p.1-1: Average Bundle Exposure and Average Planar Exposure have been grouped under"Average Exposure" so that both have reference numbers.o p.3/4 0-1: For consistency, ACTION should be in all capital letters;it is a defined term.0 p.3/4 0-2: Typographical error;"Specifications" is misspelled.
I p.3/4 2-1: The asterisk was inadvertently omitted when a reference to Figure 3.2.1-3 was dropped in Amendment 57.The asterisk was present when the Amendment governing single loop operation (//56)was issued.o old p.3/4 2-2: Delete blank page.o old p.3/4 2-3: Renumber page due to deletion.o old p.3/4 2-4: Renumber page due to deletion.o old p.3/4 2-5: Renumber page due to deletion.o old p.3/4 2>>6: A 4.0.4 exemption is necessary to perform the subject surveillances.
Such exemptions were provided for the affected Power Distribution Limit specifications via Amendment 29;this exemption, for MCPR, was inadvertently dropped when the MCPR specification was altered in support of the Cycle 2 reload (Amendment 45).(g o old p.3/4 2-7: Delete blank page.o old p.3/4 2-8: Renumber page due to deletions.
o old p.3/4 2-9: Renumber page due to deletions.
o old p.3/4 2-10: Renumber page due to deletions.
o old p.3/4 2-10a: Renumber page due to deletions.;-
1
'
o old p.3/4 2-10b: Renumber page due to deletions.
o p.3/4 3-5: Note (i)has been revised to incorporate the asterisk rather than repeat the information provided in the footnote.The asterisk footnote was not deleted because it is already being used in Note (c).o p.3/4 3-11: I.The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
This change corrects a typographical error;the design has always contained one channel per trip system.Secondary containment is isolated by two common, divisionally redundant trip systems;there are two divisionally separate radiation monitors servicing the single Railroad Access Shaft Exhaust Duct.Therefore, secondary containment isolation on high radiation in this duct is a fully redundant safety function.Operation with one Railroad Access Shaft Exhaust Duct Radiation trip channel pertrip system is fully consistent with the requirements for secondary containment isolation capability following a LOCA or fuel handling accident.II.The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated; see I above.III.The proposed change does not involve a significant reduction in a margin of safety;see I above.o p.3/4 3-17: For trip function l.e, a typographical error has been corrected; this setpoint was approved by NRC in Amendment 58.For Trip Functions 2.c, d, and e, the footnote is being deleted since no changes were determined necessary as a result of the startup test program, and therefore the footnote no longer has any purpose.Also for 2.e, a typo in the setpoint units has been corrected.
For 3.a, a typo that occurred in Amendment 58 has been corrected.
o p.3/4 3-18: See discussion above pertaining to footnote.o p.3/4 3-19: See discussion above pertaining to footnote.o p.3/4 3-20: See discussion above pertaining to footnote.0p.3/4 3-98: The word"Continued" has been deleted since this Table consists of only one page.p.3/4 4-1c: The appropriate MAPLHGR Figure references have been provided in order to correct administrative errors in processing.
The current references reflect the original (April ll, 1985)Single Loop Operation (SLO)amendment submittal to NRC without taking into account the affects of the subsequent Cycle 3 reload submittal (January 16, 1986).Prior to the April 11th submittal, three Figures existed in the Unit 1 Tech Specs: Figure 3.2.1-1: GE 1.83%enriched, Figure 3.2.1-2: GE 2.33%enriched, and Figure 3.2.1-3: Exxon 2.72%enriched.When the SLO amendment was proposed, these Figures were not revised, but the GE 2.33%enriched Figure was used for the Exxon limit during SLO.Therefore, it was established that only the GE curves would be used in support of SLO.The Cycle 3 reload proposal was submitted prior to SLO being approved.That submittal left the Tech Specs with two MAPLHGR Figures: Figure 3.2.1-1: GE 2.33%enriched, and Figure 3.2.1-2: Exxon-all 8x8 fuel.This is where the appropriate changes were missed.The Tech Specs should have continued to reference the GE curve, Figure 3.2.1-1, for SLO.In part c.of the LCO, the Figure reference has been corrected due to a typographical error-it should be 3/4.1.1.1-1.
o p.3/4 5-1: This special test exception was renumbered due to the deletion of the current 3.10.5.p.3/4 6-10: This change is wholly administrative in nature;no technical changes have occurred.This footnote was originally proposed to clarify the requirements of 4.6.1.7 and ended up confusing them due to its dual meaning.It was added to ensure that where two elevations were listed (as in d;an asterisk exists on c because prior to Amendment 34, two elevations existed), both would not contribute to the minimum 3 values required.This is because those three are supposed to be representative of 3 of the 4 different areas being used for the average temperature calculation.
If two had been used in the same area, it would skew the average toward the temperature'in that area.Unfortunately a more conservative interpretation leads one to believe that c and d~to ether are affected by the footnote and therefore, the measurements can only include one from a, one from b, and one from c and d together.In order to rectify these problems, a single area has been associated with each of the elevation categories and the footnote has been dropped.Accordingly,"elevations" has been replaced with"areas" in the text of 4.6.1.7.The areas listed are consistent with those currently listed in the associated procedure.
o p.3/4 6-13: This requirement was inadvertently dropped by NRC when Amendment 36 was issued.It is being reinstated in its previous form.
o p.3/4 6-31: The wording has been changed to be consistent with the rest of the surveillance requirements in this section.No technical change to the requirement has occurred.o p.3/4 6-35: The equal sign was inadvertently dropped by NRC when Amendment 35 was issued.It is being reinstated.
o p.3/4 6-38: This specification was misnumbered when the Unit 1 Tech Specs were originally issued.It has been appropriately corrected.
o p.3/4 6-39: See discussion above for renumbering.
The reference to the Special Test Exception is being dropped because the exception is being deleted.o p.3/4 7-2: Typographical error;"a" should be"at".o p.3/4 7-4: Typographical error;footnote**was deleted in Amendment 1 to the Unit 1 Tech Specs.o p.3/4 7-22: Typographical error;the correct designations for the Halon systems begin with"1U" not"10".o p.3/4 8-8: Typographical error;the heading should be"UNIT 1 AND UNIT 2" p.3/4 8-9: The footnote has been changed to be consistent with similar footnotes in other specifications (e.g.3.6.5.1).What appear to be additional restrictions merely enforce as an LCO what is currently required by the ACTION statement.
o p.3/4 8-15: See discussion above.o p.3/4 8>>19: Typographical errors;the header should be"DISTRIBUTION-SHUTDOWN" and the reference to"continued" is being deleted since this is the first page of the specification.
o p.3/4 8-33: The reference to"plant" has been changed to"unit" since plant can be construed as both units.Unit 2 Tech Specs appropriately control this equipment for Unit 2.o p.3/4 9-1: Footnote!3 is being deleted since this definition is already provided in Table 1.2.p.3/4 10-4: A reference to the single loop operation specification has been added, since a footnote on the APPLICABILITY of that specification references this special test exception.
The exception is provided in the event that natural circulation testing is necessary during extended single loo o eration.P P o p.3/4 10-5: This specification only applies during the Startup Test Program, and is therefore being deleted.
o old p.3/4 10-6: Specification and page renumbered due to deletion of Specification 3.10.5.o p.3/4 11-19: Typographical error;the word"one" should be inserted as shown on the mark-up.o p.3/4 11-20: Typographical error;"OPERABLE" is misspelled.
o p.B 3/4 1-1: This change corrects the definition of R provided;it is consistent with the change made in proposed amendment 39 to License No.NPF-22 (see PLA-2661, dated June 19, 1986).o p.B 3/4 1-4: The additional information was simply extracted from page B 3/4 1-5, which is being deleted.o p.B 3/4 1-5: Delete;see discussion above.0 Generator E bldg., have been o p.5-4: See discussion above.p.B 3/4 10-1: Delete;the associated specification is being deleted.p.5-2: A new figure is being provided to reflect real estate transactions which have changed the PP6L property line.Other physical changes, such as the additions to the Training Center and the new Diesel added as well.o p.6-16: Typographical error;the correct word is"residual".
UNIT TWO o Index: Various changes based upon the changes proposed herein as well as a review of the current document in its entirety.o p.3/4 0-1: For consistency, ACTION should be in all capital letters;it is a defined term.o p.3/4 0-2: Typographical error;"Specifications" is misspelled.
o p.3/4 1-6: The deleted portion of this footnote is redundant to information already provided by Definition 1.7, CORE ALTERATION.
o p.3/4 3-5: Note (i)has been revised to incorporate the asterisk rather than repeat the information provided in the footnote.The asterisk footnote was not deleted because it is already being used in Note (c).o p.3/4 3-11: I.The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
This change corrects a typographical error;t'e design has always contained one channel per trip system.Secondary containment is isolated by two common, divisionally redundant trip systems;there are two divisionally separate radiation monitors servicing the single Railroad Access Shaft Exhaust Duct.Therefore, secondary containment isolation on high radiation in this duct is a fully redundant safety function.Operation with one Railroad Access Shaft Exhaust Duct Radiation trip channel per trip system is fully consistent with the requirements for secondary containment isolation capability following a LOCA or fuel handling accident.II.The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated; see I above.III.The proposed change does not involve a significant reduction in a margin of safety;see I above.o p.3/4 3-17: The footnote is being deleted since no changes were determined necessary as a result of the startup test program, and therefore the footnote no longer has any purpose.o p.3/4 3-18: See discussion above.o p.3/4 3-19: See discussion above.o p.3/4 3-20: See discussion above.
o p.3/4 3-53: Typographical error;footnote*~*should read"...eight or fewer ll o p.3/4 3-71: Typographical error;this footnote was erroneously attributed to a monitor which does not monitor secondary containment.
This footnote does not exist for this monitor in the Unit 1 Tech Specs.o p.3/4 3-72: Typographical error;the redundant wording in ACTION 81 is being deleted.o p.3/4 3-78: Corrects to be consistent with Unit,1 Tech Specs for this common zone.This resolves an NRC inspector open item.o p.3/4 3-79: For Zone 0-27B, the minimum value is revised to be consistent with our philosophy that at least half of the detectors in a given Zone must be OPERABLE.This is consistent with Unit 1.For Zone 0-27C, the numbers are corrected for consistency with Unit 1 based on the associated design drawing.These changes resolve an NRC inspector open item.o p.3/4 4-1c: In part c.of the LCO, the Figure reference has been corrected due to a typographical error-it should be 3/4.1.1.1-1.
o p.3/4 4-3: Typographical error-the correct Specification is 3.4.1.1.1.
o p.3/4 5-1: This special test exception was renumbered due to the deletion of the current 3.10.5.o p.3/4 6-10: This change is wholly administrative in nature;no technical changes have occurred.This footnote was originally proposed to clarify the requirements of 4.6.1.7 and ended up confusing them due to its dual meaning.It was added to ensure that where two elevations were listed (as in c and d)that they both would not contribute to the minimum 3 values required.This is because those three are supposed to be representative of 3 of the 4 different areas being used for the average temperature calculation.
If two had been used in the same area, it would skew the average toward the temperature in that area.Unfortunately a more conservative interpretation leads one to believe that c and d~to ether are affected by the footnote and therefore, the measurements can only include one from a, one from b, and one from c and d together.In order to rectify these problems, a single area has been associated with each of the elevation categories and the footnote has been dropped.Accordingly,"elevations" has been replaced with"areas" in the text of 4.6.1.7.The areas listed are consistent with those currently listed in the associated procedure.
p.3/4 6-31: Typographical error;footnote**should read,"...or Zone II and Zone III when p.3/4 6-41: The reference to the Special Test Exception is being dropped because the exception is being deleted.o p.3/4 7-2: Typographical error;"a" should be"at".
o p.3/4 8-10: The footnote has been changed to be consistent with similar footnotes in other specifications (e.g.3.6.5.1).What appear to be additional restrictions thereby enforce as an LCO what is currently required by the ACTION statement.
o p.3/4 8-16: See discussion above.o p.3/4 8-35: The reference to"plant" has been changed to"unit" since plant can be construed as both'units.
Unit 1 Tech Specs appropriately control this equipment for Unit 1.o p.3/4 9-1: Footnote f/is being deleted since this definition is already provided in Table 1.2.I o p.3/4 10-4: A reference to the single loop operation specification has been added, since a footnote on the APPLICABILITY of that specification references this special test exception.
The exception is provided in the event that natural circulation testing is necessary during extended single loop operation.
o p.3/4 10-5: This specification only applies during the Startup Test Program, and is therefore being deleted.o old p.3/4 10-6: Specification and page renumbered due to deletion of Specification 3.10.5.o p.3/4 11-20: Typographical error;"OPERABLE" is misspelled.
o p.B 3/4 10-1: Delete;the associated specification is being deleted.o p.5-2: A new figure is being provided to reflect real estate transactions which have changed the PPGL property line.Other physical changes, such as the addition to the Training Center and the new Diesel Generator"E" bldg., have been added as well.o p.5-4: See discussion above.o p.6-4: Typographical error;the noted reference to Unit 1 should be Unit 2.CONCLUSIONS Based on the above descriptions the proposed changes are editorial in nature and therefore have no adverse impact on the safe operation of Susquehanna Units 1 and 2.rrs/mse202550c