{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 29, 2016 LICENSEE: Energy Northwest FACILITY: Columbia Generating Station  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 29, 2016 LICENSEE:
Energy Northwest FACILITY:
Columbia Generating Station  


==SUBJECT:==
==SUBJECT:==
SUMMARY OF SEPTEMBER 22, 2016, PUBLIC MEETING WITH ENERGY NORTHWEST TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST REGARDING CHANGE IN COMPLETION TIME FOR RESIDUAL HEAT REMOVAL PUMP A REPAIR FOR COLUMBIA GENERATING STATION (CAC NO. MF8302) On September 22, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Energy Northwest, the licensee for Columbia Generating Station, at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the licensee's upcoming license amendment request (LAR) regarding a change to the completion time for Residual Heat Removal (RHR) pump A repair. The meeting notice and agenda, dated September 7, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 16251A014. A list of attendees is provided in the Enclosure to this meeting summary. The licensee provided handouts (ADAMS Accession No. ML 16264A036) and its presentation included an outline of the change, the reason and precedents for the LAR, a description of the system's operation, and the technical evaluation and the approach for the upcoming LAR. The NRC staff commented to the licensee that the following elements should be contained in the pending LAR that:
 
SUMMARY OF SEPTEMBER 22, 2016, PUBLIC MEETING WITH ENERGY NORTHWEST TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST REGARDING CHANGE IN COMPLETION TIME FOR RESIDUAL HEAT REMOVAL PUMP A REPAIR FOR COLUMBIA GENERATING STATION (CAC NO. MF8302) On September 22, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Energy Northwest, the licensee for Columbia Generating  
: Station, at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
The purpose of the meeting was to discuss the licensee's upcoming license amendment request (LAR) regarding a change to the completion time for Residual Heat Removal (RHR) pump A repair. The meeting notice and agenda, dated September 7, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 16251A014.
A list of attendees is provided in the Enclosure to this meeting summary.
The licensee provided handouts (ADAMS Accession No. ML 16264A036) and its presentation included an outline of the change, the reason and precedents for the LAR, a description of the system's operation, and the technical evaluation and the approach for the upcoming LAR. The NRC staff commented to the licensee that the following elements should be contained in the pending LAR that:
* the proposed LAR Technical Specification text change should include a date and time that would bound the RHR pump A repair work,
* the proposed LAR Technical Specification text change should include a date and time that would bound the RHR pump A repair work,
* a comparison of the work description that would be needed for this pending LAR's RHR pump A repair versus the previously approved RHR pump B repair amendment approved in February 2015 (ADAMS Accession No. ML 15030A501 ),
* a comparison of the work description that would be needed for this pending LAR's RHR pump A repair versus the previously approved RHR pump B repair amendment approved in February 2015 (ADAMS Accession No. ML 15030A501  
* a comprehensive discussion and presentation of the risk assessment and technical adequacy of the probabilistic risk analysis (PRA) based on the precedent of Clinton's exigent license amendment request for a one-time extension of the shutdown service water Division 2 subsystem completion time (ADAMS Accession No. ML 15302A213), and
),
* a discussion why the fire PRA is adequate for this pending LAR. The licensee acknowledged the NRC staff's comments concerning the pending LAR content and thanked the staff for its discussion on the topic. One member of the public was in attendance, by phone. Public Meeting Feedback forms were not requested by the public, nor were any comments received. Docket No. 50-397  
* a comprehensive discussion and presentation of the risk assessment and technical adequacy of the probabilistic risk analysis (PRA) based on the precedent of Clinton's exigent license amendment request for a one-time extension of the shutdown service water Division 2 subsystem completion time (ADAMS Accession No. ML 15302A213),
and
* a discussion why the fire PRA is adequate for this pending LAR. The licensee acknowledged the NRC staff's comments concerning the pending LAR content and thanked the staff for its discussion on the topic. One member of the public was in attendance, by phone. Public Meeting Feedback forms were not requested by the public, nor were any comments received.
Docket No. 50-397
 
==Enclosure:==
 
List of Attendees cc w/encls:
Distribution via Listserv Klos,
* ct Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES SEPTEMBER
: 22. 2016 MEETING WITH ENERGY NORTHWEST COLUMBIA GENERATING STATION UPCOMING LICENSE AMENDMENT REQUEST REGARDING CHANGE IN COMPLETION TIME FOR RESIDUAL HEAT REMOVAL PUMP "A" REPAIR DOCKET NO. 50-397 John Klos U.S. Nuclear ReQulatorv Commission (NRC) Ahsan Sallman NRC Pete Snyder NRC Todd Hilsmeier NRC Sandra Herrick NRC Eric Oesterle NRC Don Gregoire Enerav Northwest (EN) Rick Garcia* EN Blake Smith EN Habib Shtaih EN Sandra Christianson*
EN Brian Berglin*
EN Mike 0. Kennedy*
EN Don Gregoire*
EN Rick Garcia* EN Dehn Heath* Member of public (Engineering Planning and Management (EPM}, Inc.} *participated via phone Enclosure  The licensee acknowledged the NRC staff's comments concerning the pending LAR content and thanked the staff for its discussion on the topic. One member of the public was in attendance, by phone. Public Meeting Feedback forms were not requested by the public, nor were any comments received.
Please direct any inquiries to me at 301-415-5136, or John.Klos@nrc.gov.
Docket No. 50-397  


==Enclosure:==
==Enclosure:==
List of Attendees cc w/encls: Distribution via Listserv Klos,
* ct Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES SEPTEMBER 22. 2016 MEETING WITH ENERGY NORTHWEST COLUMBIA GENERATING STATION UPCOMING LICENSE AMENDMENT REQUEST REGARDING CHANGE IN COMPLETION TIME FOR RESIDUAL HEAT REMOVAL PUMP "A" REPAIR DOCKET NO. 50-397 John Klos U.S. Nuclear ReQulatorv Commission (NRC) Ahsan Sallman NRC Pete Snyder NRC Todd Hilsmeier NRC Sandra Herrick NRC Eric Oesterle NRC Don Gregoire Enerav Northwest (EN) Rick Garcia* EN Blake Smith EN Habib Shtaih EN Sandra Christianson* EN Brian Berglin* EN Mike 0. Kennedy* EN Don Gregoire* EN Rick Garcia* EN Dehn Heath* Member of public (Engineering Planning and Management (EPM}, Inc.} *participated via phone Enclosure 


Notice: ML 16251 A014 Summary: ML 16266A371 Handouts: ML 16264A036 OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1/LA NRR/DORL/LPL4-1 /BC NRR/DORL/LPL4-1 /PM NAME JKlos JBurkhardt RPascarelli JKlos DATE 09/28/16 09/28/16 09/28/16 09/29/16}}
List of Attendees
/RA/ John Klos, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc w/encls:
Distribution via Listserv DISTRIBUTION:
PUBLIC LPL4-1 r/f RidsACRS_MailCTR Resource RidsNrrDorllpl4 1 Resource RidsNrrDraApla Resource RidsNrrDssSrxb Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMColumbia Resource RidsRgn4MailCenter Resource
: ASallman, NRR/DSS/SRXB EOesterle, NRR/DSS/SRXB
: PSynder, NRR/DSS/STSB THilsmeier, NRR/DRA/APLA
: SHerrick, NRR/DRA/APLA TWertz, NRR JBowen, EDO RIV ADAMS Accession No. Notice: ML 16251 A014 Summary:
ML 16266A371 Handouts:
ML 16264A036 OFFICE NRR/DORL/LPL4-1  
/PM NRR/DORL/LPL4-1/LA NRR/DORL/LPL4-1  
/BC NRR/DORL/LPL4-1  
/PM NAME JKlos JBurkhardt RPascarelli JKlos DATE 09/28/16 09/28/16 09/28/16 09/29/16 OFFICIAL RECORD COPY}}

Revision as of 03:55, 30 June 2018

09/22/2016 Summary of Public Meeting with Energy Northwest to Discuss Upcoming License Amendment Request Regarding Change in Completion Time for Residual Heat Removal Pump a Repair for Columbia Generating Station (CAC No. MF8302)
ML16266A371
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/29/2016
From: Klos J J
Plant Licensing Branch IV
To:
Energy Northwest
Klos L J
References
CAC MF8302
Download: ML16266A371 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 29, 2016 LICENSEE:

Energy Northwest FACILITY:

Columbia Generating Station

SUBJECT:

SUMMARY OF SEPTEMBER 22, 2016, PUBLIC MEETING WITH ENERGY NORTHWEST TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST REGARDING CHANGE IN COMPLETION TIME FOR RESIDUAL HEAT REMOVAL PUMP A REPAIR FOR COLUMBIA GENERATING STATION (CAC NO. MF8302) On September 22, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Energy Northwest, the licensee for Columbia Generating

Station, at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.

The purpose of the meeting was to discuss the licensee's upcoming license amendment request (LAR) regarding a change to the completion time for Residual Heat Removal (RHR) pump A repair. The meeting notice and agenda, dated September 7, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 16251A014.

A list of attendees is provided in the Enclosure to this meeting summary.

The licensee provided handouts (ADAMS Accession No. ML 16264A036) and its presentation included an outline of the change, the reason and precedents for the LAR, a description of the system's operation, and the technical evaluation and the approach for the upcoming LAR. The NRC staff commented to the licensee that the following elements should be contained in the pending LAR that:

  • the proposed LAR Technical Specification text change should include a date and time that would bound the RHR pump A repair work,
  • a comparison of the work description that would be needed for this pending LAR's RHR pump A repair versus the previously approved RHR pump B repair amendment approved in February 2015 (ADAMS Accession No. ML 15030A501

),

  • a comprehensive discussion and presentation of the risk assessment and technical adequacy of the probabilistic risk analysis (PRA) based on the precedent of Clinton's exigent license amendment request for a one-time extension of the shutdown service water Division 2 subsystem completion time (ADAMS Accession No. ML 15302A213),

and

  • a discussion why the fire PRA is adequate for this pending LAR. The licensee acknowledged the NRC staff's comments concerning the pending LAR content and thanked the staff for its discussion on the topic. One member of the public was in attendance, by phone. Public Meeting Feedback forms were not requested by the public, nor were any comments received.

Docket No. 50-397

Enclosure:

List of Attendees cc w/encls:

Distribution via Listserv Klos,

  • ct Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES SEPTEMBER
22. 2016 MEETING WITH ENERGY NORTHWEST COLUMBIA GENERATING STATION UPCOMING LICENSE AMENDMENT REQUEST REGARDING CHANGE IN COMPLETION TIME FOR RESIDUAL HEAT REMOVAL PUMP "A" REPAIR DOCKET NO. 50-397 John Klos U.S. Nuclear ReQulatorv Commission (NRC) Ahsan Sallman NRC Pete Snyder NRC Todd Hilsmeier NRC Sandra Herrick NRC Eric Oesterle NRC Don Gregoire Enerav Northwest (EN) Rick Garcia* EN Blake Smith EN Habib Shtaih EN Sandra Christianson*

EN Brian Berglin*

EN Mike 0. Kennedy*

EN Don Gregoire*

EN Rick Garcia* EN Dehn Heath* Member of public (Engineering Planning and Management (EPM}, Inc.} *participated via phone Enclosure The licensee acknowledged the NRC staff's comments concerning the pending LAR content and thanked the staff for its discussion on the topic. One member of the public was in attendance, by phone. Public Meeting Feedback forms were not requested by the public, nor were any comments received.

Please direct any inquiries to me at 301-415-5136, or John.Klos@nrc.gov.

Docket No. 50-397

Enclosure:

List of Attendees

/RA/ John Klos, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc w/encls:

Distribution via Listserv DISTRIBUTION:

PUBLIC LPL4-1 r/f RidsACRS_MailCTR Resource RidsNrrDorllpl4 1 Resource RidsNrrDraApla Resource RidsNrrDssSrxb Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMColumbia Resource RidsRgn4MailCenter Resource

ASallman, NRR/DSS/SRXB EOesterle, NRR/DSS/SRXB
PSynder, NRR/DSS/STSB THilsmeier, NRR/DRA/APLA
SHerrick, NRR/DRA/APLA TWertz, NRR JBowen, EDO RIV ADAMS Accession No. Notice: ML 16251 A014 Summary:

ML 16266A371 Handouts:

ML 16264A036 OFFICE NRR/DORL/LPL4-1

/PM NRR/DORL/LPL4-1/LA NRR/DORL/LPL4-1

/BC NRR/DORL/LPL4-1

/PM NAME JKlos JBurkhardt RPascarelli JKlos DATE 09/28/16 09/28/16 09/28/16 09/29/16 OFFICIAL RECORD COPY