| WAmeren Callaway Plant MISSOURI SECURITY-RELATED INFORMATION- WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 October 18, 2012 ULNRC-05921 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(p) | | WAmeren MISSOURI Callaway Plant SECURITY-RELATED INFORMATION-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 October 18, 2012 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen: |
| Ladies and Gentlemen:
| | ULNRC-05921 10 CFR 50.54(p) |
| DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO. | | DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO. |
| FACILITY OPERATING LICENSE NPF-30 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RE: CHANGES TO SECURITY PLAN (TAC NO. D91660) | | FACILITY OPERATING LICENSE NPF-30 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RE: CHANGES TO SECURITY PLAN (TAC NO. D91660) |
|
| |
|
| ==References:== | | ==References:== |
| Line 29: |
Line 29: |
| : 2) Letter to Mr. Adam Heflin, Union Electric Company, from Mr. Carl F. | | : 2) Letter to Mr. Adam Heflin, Union Electric Company, from Mr. Carl F. |
| Lyon, "Callaway Plant, Unit 1 -Request for Additional Information Re: | | Lyon, "Callaway Plant, Unit 1 -Request for Additional Information Re: |
| Changes to Security Plan (TAC No. D91660)," dated September 18, 2012 By letter dated August 3, 2012 (Reference 1), Union Electric (Ameren Missouri) submitted Physical Security Plan, Revision 10, for Callaway Plant, Unit 1 in accordance with 10 CFR 50.54(p). | | Changes to Security Plan (TAC No. D91660)," dated September 18, 2012 By {{letter dated|date=August 3, 2012|text=letter dated August 3, 2012}} (Reference 1), Union Electric (Ameren Missouri) submitted Physical Security Plan, Revision 10, for Callaway Plant, Unit 1 in accordance with 10 CFR 50.54(p). |
| Reference 2 transmitted a Request for Additional Information (RAI) from the NRC related to the Physical Security Plan revision in reference 1. | | Reference 2 transmitted a Request for Additional Information (RAI) from the NRC related to the Physical Security Plan revision in reference 1. |
| Enclosure to this letter contains sensitive information. | | Enclosure to this letter contains sensitive information. |
| Withhold from public disclosure under 10 CFR 2.390. | | Withhold from public disclosure under 10 CFR 2.390. |
| Upon removal of Enclosure, this letter is uncontrolled. | | Upon removal of Enclosure, this letter is uncontrolled. |
| SECURITY-RELATED INFORMATION- WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 | | SECURITY-RELATED INFORMATION-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 0 |
| .... ..... . .... .......... . .... . . . . . ... . ......... . . ...... . . ............... . 0 PO Box 620
| | 0 PO Box 620 Fulton, MD 65251 AmerenMissouri.com 0 |
| ...... ... .. . ............... ..... 0 .. ............... ... .. . .... . ....... ..... .
| | 0 |
| ******** * * ** ** ** * * * * * * * * * * * * *** * * * **** ****** ** ** * ** ** 0 .. ........... . . .... .
| |
| Fulton, MD 65251 AmerenMissouri.com | |
| ... .. ... . . ** * * * ** *** **** ** *** *** * **** * * * * ***** ** *** ** 0 . . .......... ..... . . .
| |
|
| |
|
| ULNRC-05921 October 18, 2012 Page2 to this letter contains the response to the RAI. | | ULNRC-05921 October 18, 2012 Page2 to this letter contains the response to the RAI. |
| There are no commitments contained in this letter. | | There are no commitments contained in this letter. |
| If you have any questions with regard to the response to the RAJ, please contact Mr. Eric Olson at 573-676-8280. | | If you have any questions with regard to the response to the RAJ, please contact Mr. Eric Olson at 573-676-8280. |
| I declare under penalty of peljury that the forgoing is true and correct. | | I declare under penalty of peljury that the forgoing is true and correct. |
| Sincerely, l 0 ll <J. f 1 D\ 1.--- | | Sincerely, Executed on: |
| ~:~::'))
| | l 0 ll <J. f 1 D \\ 1.--- |
| Executed on:
| | ~:~::')) |
| Regulatory Affairs Manager CSP/nls | | Regulatory Affairs Manager CSP/nls |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Response to Request for Additional Information - Physical Security Plan, Revision 10 | | Response to Request for Additional Information - Physical Security Plan, Revision 10 |
|
| |
|
| ULNRC-05921 October 18, 2012 Page 3 cc: | | ULNRC-05921 October 18, 2012 Page 3 cc: |
| Line 58: |
Line 55: |
| Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Physical Security Inspector* | | Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Physical Security Inspector* |
| U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon* | | U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon* |
| Senior Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 | | Senior Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 |
|
| |
|
| ULNRC-05921 October 18, 2012 Page4 Index and send hardcopy to QA File Al60.0761 Hardcopy: | | ULNRC-05921 October 18, 2012 Page4 Index and send hardcopy to QA File Al60.0761 Hardcopy: |
Letter Sequence Response to RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
|
MONTHYEARULNRC-05830, Environmental Report; Operating License Renewal Stage Final, Chapter 3 Through Attachment D2011-12-15015 December 2011 Environmental Report; Operating License Renewal Stage Final, Chapter 3 Through Attachment D Project stage: Other ML1135403492011-12-15015 December 2011 Environmental Report; Operating License Renewal Stage Final, Cover Through Chapter 2 Project stage: Other ML1135303722011-12-15015 December 2011 Callaway, Unit 1, License Renewal Application Project stage: Request ML1135403542011-12-15015 December 2011 Environmental Report; Operating License Renewal Stage Final, Attachment E Through End Project stage: Other L-12-065, Submittal of Shield Building Root Cause Evaluation2012-02-27027 February 2012 Submittal of Shield Building Root Cause Evaluation Project stage: Request ML12056A0452012-03-12012 March 2012 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request ULNRC-05842, Response to Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2012-03-30030 March 2012 Response to Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ML12097A2162012-04-0505 April 2012 Firstenergy Notification of Filing Related to Proposed Shield Building Cracking Contention Project stage: Request ML12115A3722012-04-23023 April 2012 Attachment 1 - Declarations of Ruth Schaefer, Mary A. Mosley, Mark Haim, Carla T. Klein, and Patrick J. Wilson Project stage: Request ML12115A3712012-04-24024 April 2012 Missouri Coalition for the Environments Hearing Request and Petition to Intervene License Renewal Proceeding for Callaway Nuclear Power Plant Project stage: Other ML12115A3762012-04-24024 April 2012 Declaration of Arjun Makhijani in Support of Missouri Coalition for the Environments Hearing Request Regarding Callaway License Renewal Application Project stage: Other ML12125A1682012-05-0404 May 2012 Memorandum and Order (Initial Prehearing Order) Project stage: Request ML12138A0372012-05-14014 May 2012 FENOC-Davis-Besse Nuclear Power Station, Unit 1, Submittal of Contractor Root Cause Assessment Report-Section 1 Project stage: Request ML12142A3682012-05-21021 May 2012 NRC Staff'S Answer to Missouri Coalition for the Environment'S Hearing Request and Petition to Intervene Project stage: Request ML12142A1582012-05-21021 May 2012 Amerens Answer Opposing the Missouri Coalition for the Environments Hearing Request and Petition to Intervene Project stage: Request ML12165A1962012-06-13013 June 2012 Transcript of Union Electric Company Callaway Plant Unit 1 Oral Arguments, June 7, 2012. Pages 1-171 Project stage: Request ML12191A3592012-07-0909 July 2012 Intervenors Motion for Leave to File a New Contention Concerning Temporary Storage and Ultimate Disposal of Nuclear Waste at Callaway Nuclear Power Plant Project stage: Request RA-12-082, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (Revision 12)2012-07-13013 July 2012 Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (Revision 12) Project stage: Request ML12195A1172012-07-13013 July 2012 Notice (Notice of Need for More Time) Project stage: Request ML12199A3762012-07-17017 July 2012 Memorandum and Order (Ruling on Standing and Hearing Petition Contention Admissibility)- LBP-12-15 Project stage: Request ML12216A0872012-07-17017 July 2012 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Revision 14 Project stage: Request ML12205A5072012-07-23023 July 2012 Intervenors Fourth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking) Project stage: Request ML12206A6082012-07-24024 July 2012 Amerens Response to Request to Show Cause and Amerens Unopposed Motion for Extension Project stage: Request ML12206A4012012-07-24024 July 2012 Memorandum and Order (Request to Show Cause as to Why New Contention Motion Should Not Be Deemed Conceded/Unopposed) Project stage: Request ML12214A2642012-07-25025 July 2012 PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14 Project stage: Request CP-201200875, Report of Changes to the Physical Security Plan (Revision 7)2012-07-26026 July 2012 Report of Changes to the Physical Security Plan (Revision 7) Project stage: Request ML12209A1592012-07-27027 July 2012 NRC Staff'S Response to Request to Show Cause as to Why New Contention Motion Should Not Be Deemed Conceded/Unopposed Project stage: Request ML12216A1482012-08-0101 August 2012 7 to Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Plan Project stage: Request RBG-47269, Submittal of Revision 10 to the Security Plan, T&Q Plan and Safeguards Contingency Plan2012-08-0202 August 2012 Submittal of Revision 10 to the Security Plan, T&Q Plan and Safeguards Contingency Plan Project stage: Request ML12219A2272012-08-0202 August 2012 Duke Energy Physical Security Plan, Revision 18 Project stage: Request ML12219A2282012-08-0303 August 2012 Revision to the Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 9 Project stage: Request ULNRC-05889, Union Electric Co. Facility Operating License NPF-030 Physical Security Plan, Revision 102012-08-0303 August 2012 Union Electric Co. Facility Operating License NPF-030 Physical Security Plan, Revision 10 Project stage: Request ML12216A1192012-08-0303 August 2012 Order Granting Motion for Extension of Time to File an Answer Project stage: Request L-2012-305, 5 to the Physical Security Plan, Cover Letter2012-08-0303 August 2012 5 to the Physical Security Plan, Cover Letter Project stage: Request ML12219A2252012-08-0303 August 2012 Security Plan Change Revision 13 Project stage: Request ASLBP 12-919-06-LR-BD01, NRC Staff Answer to Missouri Coalition for the Environments Motion for Leave to File New Contention Concerning Temporary Storage and Ultimate Disposal of Nuclear Waste2012-08-0303 August 2012 NRC Staff Answer to Missouri Coalition for the Environments Motion for Leave to File New Contention Concerning Temporary Storage and Ultimate Disposal of Nuclear Waste Project stage: Request ML12221A3362012-08-0808 August 2012 Draft RAI on Revision to Security Plan Project stage: Draft RAI ML12229A2872012-08-13013 August 2012 Security Plan, Revision 9 to the Training and Qualification Plan, and Safeguards Contingency Plan Project stage: Request ML12237A0772012-08-23023 August 2012 Draft Request for Information Email - Related to Physical Security Plant (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 14 (TAC D91660) Project stage: Draft RAI ML12229A4332012-09-0606 September 2012 Request for Additional Information Regarding Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 12 (TAC No. D91660) Project stage: RAI ML12251A0472012-09-11011 September 2012 Request for Additional Information, Review of Physical Security Plan (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 14 (TAC D91660) Project stage: RAI ML12255A0742012-09-18018 September 2012 Request for Additional Information, Changes to Callaway Physical Security Plan (TAC No. D91660) Project stage: RAI 2CAN101202, Cycle 23, Core Operating Limits Report2012-10-0404 October 2012 Cycle 23, Core Operating Limits Report Project stage: Request ML12286A3362012-10-0404 October 2012 (ANO) Units 1 and 2, Revision 14 of the ANO Security Plan Project stage: Request ML12284A0182012-10-0505 October 2012 NRR E-mail Capture - (D91660) Request for Additional Information (RAI) Draft Questions Corporate Security Plans Submitted 7/30/2012 Project stage: Draft RAI ULNRC-05921, Response to Request for Additional Information Regarding Changes to Security Plan (TAC No. D91660)2012-10-18018 October 2012 Response to Request for Additional Information Regarding Changes to Security Plan (TAC No. D91660) Project stage: Response to RAI ML12296A0102012-10-19019 October 2012 NRR E-mail Capture - D91660 - Dominion Physical Security Plan - Request for Additional Information - This Message Is Publically Available and non-sensitive Project stage: RAI ML12296A9302012-10-23023 October 2012 Enclosudraft Request for Additional Information Project stage: RAI ML12305A0432012-10-29029 October 2012 Email Security-Related Request for Additional Information, Review of Revision 10 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (TAC D91660) Project stage: RAI ML12305A0192012-10-30030 October 2012 NRR E-mail Capture - FW: D91660 - NextEra Energy Duane Arnold Physical Security Plan - RAI - This Message Is Publically Available and non-sensitive Project stage: RAI 2012-06-13
[Table View] |
Text
~'t-.
WAmeren MISSOURI Callaway Plant SECURITY-RELATED INFORMATION-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 October 18, 2012 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
ULNRC-05921 10 CFR 50.54(p)
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RE: CHANGES TO SECURITY PLAN (TAC NO. D91660)
References:
- 1) Ameren Missouri Letter ULNRC-05889, "Physical Security Plan, Revision 10," dated August 3, 2012
- 2) Letter to Mr. Adam Heflin, Union Electric Company, from Mr. Carl F.
Lyon, "Callaway Plant, Unit 1 -Request for Additional Information Re:
Changes to Security Plan (TAC No. D91660)," dated September 18, 2012 By letter dated August 3, 2012 (Reference 1), Union Electric (Ameren Missouri) submitted Physical Security Plan, Revision 10, for Callaway Plant, Unit 1 in accordance with 10 CFR 50.54(p).
Reference 2 transmitted a Request for Additional Information (RAI) from the NRC related to the Physical Security Plan revision in reference 1.
Enclosure to this letter contains sensitive information.
Withhold from public disclosure under 10 CFR 2.390.
Upon removal of Enclosure, this letter is uncontrolled.
SECURITY-RELATED INFORMATION-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 0
0 PO Box 620 Fulton, MD 65251 AmerenMissouri.com 0
0
ULNRC-05921 October 18, 2012 Page2 to this letter contains the response to the RAI.
There are no commitments contained in this letter.
If you have any questions with regard to the response to the RAJ, please contact Mr. Eric Olson at 573-676-8280.
I declare under penalty of peljury that the forgoing is true and correct.
Sincerely, Executed on:
l 0 ll <J. f 1 D \\ 1.---
~:~::'))
Regulatory Affairs Manager CSP/nls
Enclosure:
Response to Request for Additional Information - Physical Security Plan, Revision 10
ULNRC-05921 October 18, 2012 Page 3 cc:
(copy without Enclosure except as noted with asterisk*)
Mr. Elmo E. Collins*
Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Physical Security Inspector*
U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon*
Senior Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738
ULNRC-05921 October 18, 2012 Page4 Index and send hardcopy to QA File Al60.0761 Hardcopy:
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
(electronic copy without Enclosure except as noted with asterisk*)
A. C. Heflin F. M. Diya C. 0. Reasoner III L. H. Graessle E. C. Olson*
S. A. Maglio T. B. Elwood K. R. Weith*
C. S. Petzel*
R. Holmes-Bobo NSRB Secretary Mr. Bill Muilenburg (WCNOC)
Mr. Tim Hope (Luminant Power)
Mr. Ron Barnes (APS)
Mr. Tom Baldwin (PG&E)
Mr. Mike Murray (STPNOC)
Ms. Linda Conklin (SCE)
Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)