ULNRC-05889, Union Electric Co. Facility Operating License NPF-030 Physical Security Plan, Revision 10

From kanterella
(Redirected from ULNRC-05889)
Jump to navigation Jump to search

Union Electric Co. Facility Operating License NPF-030 Physical Security Plan, Revision 10
ML12221A190
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/03/2012
From: Graessle L
Ameren Missouri
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-05889
Download: ML12221A190 (4)


Text

v"Ameren Callaway Plant MISSOURI Certified mail number: 7007 2560 0002 1864 8158 August 3, 2012 ULNRC-05889 U.S, Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(p)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 PHYSICAL SECURITY PLAN. REVISION 10 Pursuant to the requirements of 10 CFR 50.54(p), Union Electric Company furnishes four copies of Revision 10 of the Callaway Plant Physical Security Plan. Distribution of these documents is outlined on the attachment. Changes incorporated into this revision are consistent with 10 CFR 50.54(p) and do not decrease the effectiveness of the security program.

This revision incorporates the following changes:

1. Editorial changes and changes to Sections 11.1, 11.5, 14.4.1, 14.4.2, 14.4.5, 21.13, 21.14.,

Appendix A, and Appendix B - Table 1 (Critical Task Matrix) in accordance with Revision 7 to NEI 03-12, Security Plan Template.

2. Changes to Section 14.4.4 due to Revision 7to NEI 03-12, Security Plan Template and Security Frequently Asked Question (SFAQ) 12-06 and its effect on Protected Area re-entry for armed security officers.
3. Changes to Appendix B - Section 3.1 due to Revision 7 to NEI 03-12, Security Plan Template and SFAQ 12-04 and its effect on the critical task matrix for qualification of security force personnel.
4. Changes to Appendix C - Section 2.2 due to Revision 7 to NEI 03-12, Security Plan Template and SFAQ 12-04 and the requirement to add "Attempted or Confirmed Cyber Attack" to the Safeguards Contingency Events. $ Db I The enclosed document contains Safeguards Information within the scope of 10 CFR 73.21.

Removal of enclosures declassifies this document.

...................... PO Box 620 Fulton, MO 65251 AmerenMissouri.com

ULNRC-05889 August 3, 2012 Page 2 This letter does not contain new commitments.

If you have any questions regarding these documents, please contact E. C. Olson at (573) 676-8280.

Sincerely, Luke H. Graessle Director, Operations Support ECO/nls Enclosure (1 original and 3 copies)

The enclosed document contains Safeguards Information within the scope of 10 CFR 73.21.

Removal of enclosures declassifies this document.

ULNRC-05889 August 3, 2012 Page 3 cc: Mr., Elmo E. Collins (2 copies)

Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Physical Security Inspector U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 The following are sent without attachments:

Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-8G14 Washington, DC 20555-2738 The enclosed document contains Safeguards Information within the scope of 10 CFR 73.21.

Removal of enclosures declassifies this document.

ULNRC-05889 August 3, 2012 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Security Plan ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle E. C. Olson S. A. Maglio R. Holmes-Bobo NSRB Secretary T. B. Elwood Mr. Bill Muilenburg (WCNOC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (PG&E)

Mr. Mike Murray (STPNOC)

Ms. Linda Conklin (SCE)

Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission The enclosed document contains Safeguards Information within the scope of 10 CFR 73.21.

Removal of enclosures declassifies this document.