ML20133L812: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20133L812
| number = ML20133L812
| issue date = 01/03/1997
| issue date = 01/03/1997
| title = Ack Receipt of 961211 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp of License SNM-1097 on 961204-08
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp of License SNM-1097 on 961204-08
| author name = Mallet B
| author name = Mallet B
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9701220142
| document report number = NUDOCS 9701220142
| title reference date = 12-11-1996
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2

Latest revision as of 22:32, 9 August 2022

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp of License SNM-1097 on 961204-08
ML20133L812
Person / Time
Site: 07001113
Issue date: 01/03/1997
From: Mallet B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kipp C
GENERAL ELECTRIC CO.
References
NUDOCS 9701220142
Download: ML20133L812 (2)


Text

. _ - - _

o January 3,1997 General Electric Company i ATTN: Mr. C. P. Kipp, General Manager GE Nuclear Energy Production l

j P. O. Box 780 Wilmington, NC 28402

SUBJECT:

RESTART OF LINE 3 CALCINER FOLLOWING CORRECTIVE ACTIONS

Dear Mr. Kipp:

This refers to your letter of December 11,1996, and the special NRC inspection associated with a failure of the Line 3 calciner tube which you discovered on and reported to the NRC on December 3,1996.

On December 4 through 8,1996, a special NRC team inspection was conducted at the Wilmington plant to review the cause(s) and your corrective actions. During that inspection, the team reviewed the circumstances surrounding the tube failure, developed an understanding ,

of the root cause, and verified the corrective actions that GE implemented to preclude i recurrence. In a telephone conversation on December 7,1996, following completion of the team's efforts, we discussed those corrective actions. You informed me that you had completed all the corrective actions and that you were confident that the line could be restarted safely. At that time, I stated that NRC had no objection to the resumption of operation using the line 3 calciner, in addition, I stated that GE did not need to discuss with the NRC the resumption of operation in the other lines if the corrective action implemented for line 3 were j simi!arly implemented for those lines.

If you have any questions concerning this letter, please call me at (404) 331-5514. We l appreciate your cooperation with us during the resolution of this incident.  :

Sincerely, (original signed by D. M. Collins)

Bruce S. Mallett, Director Division of Nuclear Materials Safety License No. SNM-1097 Docket No. 70-1113 Distribution (See Page 2)

O 9701220142 970103 PDR ADOCK 07001113 C PDR -

r%

1 I

GE NEP 2 cc: i Dr. Ralph Reda, Manager Fuels and Facility Licensing General Electric Company P. O. Box 780, Mail Code J26 Wilmington, NC 28402 i Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environment,  !

Health & Natural Resources P. O. Box 27687 I Raleigh, NC 27611-7687 Distribution w/enci:

E. McAlpine, Rll i G. Troup G. Shear, Rlli i C. Cain, RIV F. Wenslawski, RIV PUBLIC Distribution w/o encl:

License Fee Management Branch I

1 l

l l

i l

l l

[ m:=r l nrr?rr D ' ' BN#. P f ' %#

sitwATimE j hAME E Mr Alpine D(0111es DATT C1 /3 / 97 01 / / 97 01 / / 97 01 / / 97 01 / / 97 01 / / 97 j COPY? (@h NO YES NO YES NO YES NO YES NO VES NO OFFICIAL RECORD COPY DOCUMLNT NAME: G:\REPORIS\CALCINER.GE 1

I l

l 4