| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS
| page count = 4
| page count = 4
| project = TAC:59489
| stage = Other
}}
}}



Latest revision as of 18:23, 14 December 2021

Proposed Revs to Tech Spec Section 6.5 Re Fire Protection & Loss Prevention Program Audits & Clarification of Term Outside Firm for Performance of Outside Audits
ML20134D324
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 08/31/1985
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20134D301 List:
References
TAC-59489, NUDOCS 8508190185
Download: ML20134D324 (4)


Text

r:

Docket Nos. 50-213 50-245 50-336 ATTACHMENT HADDAM NECK PLANT MILLSTONE NUCLEAR POWER STATION, UNIT NOS.1 AND 2 PROPOSED REVISION TO TECHNICAL SPECIFICATIONS o

8508190185 850812 PDR P ADOCK 05000213 pg August,1985

ADMINISTR ATIVE CONTROLS AUDITS 4

6.5.2.8 Audits of facility activities shall be performed under the cognizance of the NRB. These audits shall encompass:

a. The conformance of facility operation to all provisions contained within the Technical Specifications and applicable l license conditions at least once per year.
b. The performance, training and qualifications of the entire facility staff at least once per year.
c. The results of ' all actions taken to correct deficiencies occurring in facility equipment, structures, systems or method of operation that affect nuclear safety at least once per six months.
d. The performance of all activities required by the Quality Assurance Program to mee.t the criteria of Appendix "B",

10 CFR 50, at least once per two years.

e. The Facility Emergency Plan and implementing procedures at least once per two years,
f. The Facility Security P!an and implementing procedures at least once per two years.
g. Any other area of facility operation considered appropriate by the NRB or the Senior Vice President-Nuclear Engineering and Operations.
h. The Facility Fire Protection Program and implementing procedures at least once per two years.
1. An inspection and audit of the fire protection and loss prevention program shall be performed at least once per 12 months utilizing either qualified of fsite licensee personnel or a quallfled outside independent consultant.

AUTHORITY 6.5.2.9 The NRB shall report to and advise the Senior Vice President-Nuclear Engineering and Operations on those areas of responsibility specified in Section 6.5.2.7 and 6.5.2.8. Meeting minutes may be used for this purpose.

HADDAM NECK 6-11 n

L

ADMINISTR ATIVE CONTROLS MEETING FREQUENCY 6.5.4.4 The SNRB shall meet at least once per calendar year.

QUORUM 6.5.4.5 A quorum of SNRB shall consist of the Chairman or his designated alternate and four SNRE members. No more than a minority of the quorum shall have line responsibility for operation of the Station.

REVIEW 6.5.4.6 The SNRB shall review:

a. Proposed changes in Section 6.0 of these Technical Specifications or-Licenses common to all units.
b. Any indication of an unanticipated deficiency in some aspect of design or operation of safety related structures, systems or components common to all Units.
c. Reports and meeting minutes of the SORC.

AUDITS 6.5.4.7 Audits of site activities shall be performed under the cognizance of the SNRB. These audits shall encompass:

a. The performance of activities required by the Quality Assurance Program to meet the criteria of Appendix "B",10CFR50, at least once per 24 months.
b. The Site Emergency Plan and implementing procedures at least once per 24 months.*
c. The Site Security Plan and implementing procedures at least once per 24 months.*
d. The Fire Protection Program and implementing procedures at least once per 24 months.
e. An inspection and audit of the fire protection and loss prevention program shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or a qualified outside independent consultant.

Annual audits of the Emergency Plan and the Security Plan are also performed to satisfy the additional requirements of 10 CFR 50.54(t) and 10 CFR 73.40(d), respectively These annual audits may be used to satisfy the requirements contained in the Technical Specifications.

1 MILLSTONE UNIT 1 6-14

,,- i ADMINISTR ATIVE CONTROLS s

REVIEW

' 6.5.4.6 - The SNRB shall review:

a. Proposed changes in Section 6.0 of these. Technical Specifications br Licenses common to all units.
b. Any ' indication of an unanticipated -deficiency in some aspect of design + or operation of safetyarelated structures, systems or

.,. components common to all Units.,

c.- Reports and meeting minutes of the SORC.

AUDITS 6.5.4.7 ' Audits of site activities shall be performed under the cognizance of the SNRB. These audits shall encompass: 4

-a. The performance of activities required by the -Quality Assurance Program to meet the criteria of Appendix "B",10CFR50, at least once per 24 months. ,

b. The Site Emergency Plan and implementing procedures at least once per 24 months.*
c. The Site Security Plan and implementing procedures at least once per.

. 24 months.* ,

, d. The-Fire Protection Program and implementing procedures at least 9 .

once per 24 months. ,

r e. . An inspection and audit ofithe fire protection and loss prevention program shall be performed at least once per 12 months utilizing either qualified offsite' licensee personnel or a qualified outside '

independent consultant.

respectively. These annual audits may be used to satisfy the requirements contained in the Technical Specifications.

i f