Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20211Q3367 September 1999Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic SnubbersHigh Radiation Area
ML20211H64725 August 1999Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433High Radiation Area
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Fire Protection Program
ML20211G13424 August 1999Proposed Tech Specs Replacement Pages,Incorporating Addl Info for Pending TS ChangeHigh Radiation Area
Offsite Dose Calculation Manual
ML20210Q5215 August 1999Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs
ML20210C60916 July 1999Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRMShutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
ML20195C8593 June 1999Proposed Tech Specs Incorporating Changes Which Reflect Limitations & Requirements Appropriate to Present Configuration of PlantHigh Radiation Area
Grab sample
Offsite Dose Calculation Manual
Time to boil
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Fire Protection Program
ML20206U10417 May 1999Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & LargerFuel cladding
ML20205R27519 April 1999Proposed Tech Specs,Reflecting Permanently Defueled Condition of UnitTime of Discovery
High Radiation Area
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Fire Protection Program
ML20205M0897 April 1999Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp
ML20204J15819 March 1999Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305Offsite Dose Calculation Manual
ML20204J41019 March 1999Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM
ML20204K09719 March 1999Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OLSafe Shutdown
Shutdown Margin
Safe Shutdown Earthquake
Operating Basis Earthquake
Code Reconciliation
Earthquake
ML20204F90317 March 1999Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed ChangesBoric Acid
Ultimate heat sink
ML20206K1125 March 1999Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature
ML20207H9555 March 1999Proposed Tech Specs Section 6.0 Re Administrative ControlsShutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
Fire Protection Program
ML20207E0322 March 1999Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump
ML20207D48226 February 1999Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4
ML20203E40511 February 1999Proposed Tech Specs Re DG Surveillance RequirementsOffsite Circuit
ML20210D21221 January 1999Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only
ML20199L28420 January 1999Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents
ML20199K48618 January 1999Proposed Tech Specs to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TSs to TRMOperating Basis Earthquake
Incorporated by reference
ML20199L45618 January 1999Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,IncludedBoric Acid
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Earthquake
ML20199L32718 January 1999Proposed Tech Specs 3.6.1.2, Containment Sys - Containment LeakageOperating Basis Earthquake
Design basis earthquake
Earthquake
ML20199L08018 January 1999Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in NatureShutdown Margin
ML20199L04318 January 1999Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys
ML20206P5124 January 1999Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump TestingBoric Acid
Power Operated Valves
ML20198K63631 December 1998Proposed Tech Specs Section 6.0, Administrative ControlsOffsite Dose Calculation Manual
Process Control Program
Fire Protection Program
ML20198P97528 December 1998Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes
ML20196H6304 December 1998Proposed Tech Specs Re Section 6.0, Administrative ControlsOffsite Dose Calculation Manual
ML20197G9834 December 1998Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier
ML20195D81010 November 1998Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS
ML20195D40410 November 1998Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of TimeShutdown Margin
ML20155G35630 October 1998Proposed Tech Specs Updating Pages for Amend 194 Re Seismic MonitorsGrab sample
Offsite Dose Calculation Manual
Time to boil
Annual Radiological Environmental Operating Report
ML20155G00630 October 1998Proposed Tech Specs Correcting Amend Number on Pages Not Changed by Amend 193Grab sample
Time to boil
ML20155F98530 October 1998Proposed Tech Specs Re Editorial Changes & Typographical CorrectionsOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML20155B03322 October 1998Proposed Tech Specs Changing TS 3.3.2.1, Instrumentation - ESFAS Instrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 FShutdown Margin
ML20154C04928 September 1998Proposed Tech Specs Revising FSAR Separation Requirement of Six Inches Which Is Applied to Redundant Vital Cables, Internal Wiring of Redundant Vital Circuits & Associated DevicesFire Barrier
ML20154A37028 September 1998Proposed Tech Specs Sections 3.3.2.1,3.4.6.2,3.4.8,3.6.2.1, 3.6.5.1,3.7.6.1 & 3.9.15,revising Info Re Revised MSLB Analyses & Revised Determinations of Radiological Consequences of MSLB & LOCABoric Acid
Shutdown Margin
Hydrostatic
Pressure Boundary Leakage
Power change
Coast down
ML20151V5019 September 1998Proposed Tech Spec Changing TS Definitions 1.24,1.27,1.31, 3.0.2,4.0.5,3.2.3,3.3.2.1,3.4.1.1,3.4.11 & Adding TS 3.0.6Offsite Dose Calculation Manual
Fuel cladding
ML20237C45613 August 1998Proposed Tech Specs Reflecting Limitations & Requirements Appropriate to Present Configuration of Plant
B17385, Proposed Tech Specs 6.9.1.8b,updating List of Documents Describing Analytical Methods Specified12 August 1998Proposed Tech Specs 6.9.1.8b,updating List of Documents Describing Analytical Methods SpecifiedShutdown Margin
B17341, Proposed Tech Specs Surveillance 4.4.5.3.a Re SG Tube Insp Interval6 August 1998Proposed Tech Specs Surveillance 4.4.5.3.a Re SG Tube Insp IntervalOperating Basis Earthquake
ML20236Y0834 August 1998Proposed Tech Specs Changing TS 3.7.1.3, Plant Sys - Condensate Storage Tank & Adding TS 3.7.1.7, Plant Sys - Atmospheric Steam Dump ValvesUltimate heat sink
ML20236W02030 July 1998Proposed Tech Specs Bases Section 3/4.6.1.1,clarifying Administrative Controls for RHR Isolation Valves When RHR Sys Is in Svc for Core Cooling
ML20236X25230 July 1998Proposed Tech Specs Bases 3/4.9.1,3/4.1.1.3,3/4.7.1.6, 3/4.7.7,3/4.5.4 & 3/4.3.3.10,resolving Miscellaneous Condition ReptsShutdown Margin
ML20236T26821 July 1998Proposed Tech Specs Re Reactor Protection & ESFs Trip SetpointsShutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Fuel cladding
ML20236T53017 July 1998Proposed Tech Specs Pages for TS Bases Section 3/4.4.9, Pressure/Temperature LimitsStroke time
ML20236T73317 July 1998Proposed Tech Specs Modifying DG Testing RequirementsSafe Shutdown
Reserve Station Service Transformer
Offsite Circuit
ML20249A28110 June 1998Proposed Tech Specs Re Post Accident Access to Vital Areas (Plar 3-98-6)
ML20249A3126 June 1998Proposed Tech Specs Re SLCRS Bypass Leakage (Plar 3-98-5)Safe Shutdown
Fire Barrier
Tornado Missile