Line 2: |
Line 2: |
| | number = ML20151X667 | | | number = ML20151X667 |
| | issue date = 08/31/1998 | | | issue date = 08/31/1998 |
| | title = Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With 980903 Ltr | | | title = Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With |
| | author name = Hildebrant D, Schwartz G | | | author name = Hildebrant D, Schwartz G |
| | author affiliation = COMMONWEALTH EDISON CO. | | | author affiliation = COMMONWEALTH EDISON CO. |
Line 11: |
Line 11: |
| | contact person = | | | contact person = |
| | document report number = BW-980044, NUDOCS 9809170206 | | | document report number = BW-980044, NUDOCS 9809170206 |
| | | title reference date = 09-03-1998 |
| | document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | | | document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT |
| | page count = 9 | | | page count = 9 |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARBW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With ML20195D3561998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With ML20155C2601998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2 ML20151X6671998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With ML20237A1091998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2 ML20236N7001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2 ML20249A5451998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2 ML20247L7591998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2 ML20216C6621998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2 ML20217Q1951998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Braidwood Generating Station,Units 1 & 2 ML20202C6431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Braidwood Generating Station,Units 1 & 2 ML20198J7091997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Braidwood Generating Station,Units 1 & 2 ML20202H6231997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Braidwood Generating Station,Units 1 & 2 ML20199D0781997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Braidwood Generating Station,Units 1 & 2 ML20217G1571997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Braidwood Generating Station,Units 1 & 2,covering Period 970901-970930 ML20216C2931997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Braidwood Generating Station,Units 1 & 2 ML20198F0321997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Braidwood Generating Station,Units 1 & 2 ML20140C6271997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Braidwood Generating Station,Units 1 & 2 ML20148B2411997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20137N9971997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20136B4371997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20138J9891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20133E1641996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20132B9511996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20134G8341996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20128K2631996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Braidwood Nuclear Power Station Units 1 & 2 ML20117K7451996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Braidwood Nuclear Power Station Unit 1 & 2 ML20116M6171996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Bs Nuclear Power Station,Units 1 & 2 ML20115B0731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Bs ML20117K4761996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Braidwood Nuclear Power Station Units 1 & 2 ML20117D6991996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Braidwood Nuclear Power Station Units 1 & 2 ML20101N8121996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Braidwood Nuclear Power Station,Units 1 & 2 ML20100Q7161996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Braidwood Units 1 & 2 ML20100Q7051996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Braidwood Unit 1 ML20097D4171996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Braidwood Nuclear Power Station ML20100Q7021995-12-31031 December 1995 Revised Monthly Operating Rept for Dec 1995 for Braidwood Unit 1 ML20096E6191995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Braidwood Nuclear Power Station Units 1 & 2 ML20095F0481995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Braidwood Nuclear Generating Station ML20094H1031995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Braidwood Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G9961999-10-14014 October 1999 SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A7441999-09-10010 September 1999 Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With ML20210R6421999-08-13013 August 1999 ISI Outage Rept for A2R07 ML20210U8111999-08-0404 August 1999 SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With ML20210K9861999-07-30030 July 1999 Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20216D3841999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function1999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20196A0721999-03-16016 March 1999 Cycle 8 COLR in ITS Format & W(Z) Function ML20207J4371999-03-0808 March 1999 ISI Outage Rept for A1R07 ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With ML20206U9011999-02-15015 February 1999 COLR for Braidwood Unit 2 Cycle 7. Page 1 0f 13 of Incoming Submittal Was Not Included BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20206U9081998-12-17017 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195D3561998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With ML20155B6711998-10-26026 October 1998 Safety Evaluation Accepting Requests for Relief Associated with Second 10-yr Interval ISI Program Plan ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154D4401998-10-0202 October 1998 Safety Evaluation Authorizing Second 10-yr Interval ISI Program Request for Relief 12R-30 for Plant,Units 1 & 2 ML20155C2601998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2 ML20195F5911998-09-11011 September 1998 Special Rept:On 980812,addl Unseated Wires Were Discovered. Cause Is Unknown at Present Time.Util Evaluated Number of Unseated/Ineffective Wires & Determined Effect on Containment Structural Integrity.Commitments,Encl ML20196B3711998-09-0808 September 1998 Cycle 8 Operating Limits Rept (Olr) ML20151X6671998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With ML20238F3281998-08-31031 August 1998 SER Approving Second 10-year Interval Inservice Insp Program Request for Relief 12R-14 for Braidwood Station,Units 1 & 2 ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237A1091998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2 ML20236N7001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2 ML20198A0151998-06-18018 June 1998 10CFR50.59 Summary Rept 960619 Through 980618, Vols I & Ii,Consisting of Descriptions & SE Summaries for Changes to Procedural UFSAR Changes,Tests & Experiments & FP Rept.Without Fp,Rept ML20249A5451998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2 ML20247F7711998-05-0808 May 1998 Special Rept:On 980403 & 980503 Seismic Monitoring Sys Was Declared Inoperable.Caused by 5-volt Power Supply & Regulator Card Failure.Imd & Sys Engineering Are Continuing to Identify & Resolve Problems So Sys Can Be Operable ML20247L7591998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2 ML20217K6331998-04-20020 April 1998 Safety Evaluation Accepting Methodology & Criteria Used in Generating Flaw Evaluation Charts for RPV of Braidwood IAW Section XI of ASME Code ML20216C6621998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2 1999-09-30
[Table view] |
Text
. .
Gimmonwealth liliv>n G>mpany liraidwmxt Generating Station i e
!!raceville, IL 6n 60"%I9 l TelHIbl5&28nt i
September 3,1998 I BW/980044 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 2055-0001
Subject:
Monthly Operating Report for August,1998 Braidwood Generating Station, Units 1 and 2 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Nos. 50-456 and 50-457 i
Ladies and Gentlemen: i l
l In accordance with Technical Specification 6.9.1.8, enclosed you will find the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Generating Station, Units I and 2, covering the period August 1,1998 through August 31,1998.
Please address any comments or questions regarding this matter to Don liildebrant at (815) 458-2801, extension 2173.
Very truly yours,
/ /
G. K. Schwartz Station Manager Braidwood Nuclear Station l
GKS/DCH/ law .
i 9909170206 980831 l PDR ADOCK 05000456
- R PDR Enclosures '
.e #
cc: C. J. Paperiello, Acting NRC Regional Administrator- Rill S. Bailey, Braidwood Project Manager - NRR , '
C. J. Phillips, Senior Resident inspector - Braidwood Dd /
T. J. Esper, IDNS Resident inspector - Braidwood Office of Nuclear Facility Safety - IDNS p:\corresp\zcstech\bw980044. doc A Unicom Comp.my
4.- ... _ . . _ . _ _ _ . ._ m .
i - ,: .
cc: INPO Records Center D. L. Farrar, Nuclear Regional Service Mgr.
D.J. Chrzanowski, Nuclear Licensing Admin.
D. R. Eggett, Nuclear Engineering Dept.
' T. Tulon, Site Vice President, Braidwood l- . D. M. Hoots, Unit i Operating Engineer i
M. Trusheim, Unit 2 Operating Engineer J. M. Bunecicky, Westinghouse .
. D. R. Seavers, A.N.I.
S. P. Focht, American Nuclear Insurers i
l i
l l
l l
l l
l 1
l I
l I
'a '4 1.
l
)
I
< l i
I l
I
- p:\corresp\zc, tech \bw980044. doc j i
. . ... . . . . _ . . _ _ . - . . . - , . _ _ _, _. _ . . _, . . - . , _ . . _ . _ , . . . - - . i
1 1
l I
l l
l BRAIDWOOD NUCLEAR GENERATING STATION I I
J l
UNIT 1 AND UNIT 2 1
I U
MONTHLY OPERATING REPORT l l
l i
Comed )
i l
NRC DOCKET NO. 050-456, LICENSE NO NPF-72 NRC DOCKF.T NO. 050-457, LICENSE NO. NPF-7'
!c l
i l
i l
E pAcorresp\zcstech\bw980N4. doc lL .- - ~ .. - . . _ . .- ,, .
I A. OPERATING DATA REPORT Docket No: 50-456 l Unit: Braidwood 1 i Date: 09/03/98 l Completed by: Don Hildebrant !
Telephone: 815-458-280lx2173 l l
REPORTING PERIOD: August 1998
- 1) Design Electrical Rating (Mwe Net) 1120
- 2) Maximum Dependable Capacity (Mwe Net) 1100 Month .3r To Date Cumulative 1
- 3) Hours Reactor Critical (Hours) 744.0 5832.0 71,234.1 !
- 4) Hours Generator on Line (Hours) 744.0 5832.0 70,374.4 I
- 5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0 I
- 6) Net Electrical Energy (Mwh) 687,679 6,404,650 72,553,618 !
Note:
Unit 1 entered the month in Coast Down due to fuel depletion. As a result, an i expected decline in generation occured for the entire month, l l
1 i
l l
I
D. UNIT SHUTDOWNS Docket No.: 50 -456' Unit Braidwood 1 Date: 09/03/98 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 .
REPORT PER!OD: August 1998 No. Date Type Duration Reason Method Cause and Corrective Actions Hours and Comments None
SUMMARY
Unit 1 entered the month in Coast Down due to fuel depletion. As a result, an expected decline in generation occured for the entire month.
TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training I Licensee Examination 5 - Other (explain)
F - Administrative G - Operator Error (explain)
H - Other (explain)
I
+
~
. C. SAFETY / RELIEF VALVE OPERATIONS Docket No.: 50 -456 Unit Braidwood 1 Date: 09/03/98 Completed by: Den Hildabrant Telephone: 815-458-2801x2173 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None .
1 l
b
j A. OPERATING DATA REPORT Docket No: 50457 l
Unit: Braidwood 2 Date: 09/03/08 l Completed by: Don Hildebrant
! Telephone: 815-458-280lx2173
- REPORTING PERIOD
- August 1998
- 1) Design Electrical Rating (Mwe Net) 1120
- 2) Maximum Dependable Capacity (Mwe Net) 1100 Month Year To Date Cumulative
- 3) Hours Reactor Critical (Hours) 744.0 5,633.2. 74,014.3
- 4) Hours Generator on Line (Hours) 744.0 5,625.4 73,564.5
- 5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0
- 6) Net Electrical Energy (Mwh) 832,664 6,339,129 76,211,955 l
l l
D. UNIT SHUTDOWNS Oc:Act No.: 50 -457 ,
Unit Braidwood 2 Date: 09/03/98 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 REPORT PERIOD: August 1998 h Date Type Duration Reason Method Cause and Corrective Actions Hours and Comments None
Unit 2 entered the month at 100% capability and operated routinely for the entire month.
TYPE REASON METHOD e F - Forced A - Equipment Failure (explain) 1 - Manual ,
S - Scheduled B - Maintenance or Test 2 - Manual Trip 1 Scram i C - Refueling 3 - Automatic Trip 1 Scram D - Regulatory Restriction 4 - Continuation E - Operator Training I Licensee Examination 5 - Other (explain) .
F - Administrative G - Operator Error (explain)
H - Other (explain)
+ +
p,
' C. SAFETYI RELIEF VALVE OPERATIONS Docket No.: 50 -457 Unit Braidwood 2 Date: 09/03/98 !
Completed by: Don Hildebrant Telephone: 815-458-2801x2173 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None I
f I
l l