{{#Wiki_filter:Osmmonw ealth litiw>n Company
  ,    ,, ,  , , liraidwcxl Generating Station Route oI, Ikix 8i liracesille, IL 60107-9619 Tel H15-158-2801 November 2,1998 BW/98-0061 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 2055-0001
 
==Subject:==
Monthly Operating Report for October,1998 Braidwood Generating Station, Units I and 2 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Nos. 50-456 and 50-457 Ladies and Gentlemen:
In accordance with Technical Specification 6.9.1.8, enclosed you will find the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Generating Station, Units I and 2, covering the period October 1,1998 through October 31,1998.
Please address any comments or questions regarding this matter to Don liildebrant at (815) 458-2801, extension 2173.
Very truly yours,
                              /<e              T G. K. Schwartz Station Manager Braidwood Nuclear Station GKS/DCil/ law I.
Enclosures
                                                                                                        -Qh cc:        C. J. Paperiello, Acting NRC Regional Administrator - Rill          /            l S. Bailey, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident Inspector - Braidwood IDNS Resident inspector- Braidwood Office of Nuclear Facility Safety - IDNS 9811100012 981031 PDR        ADOCK 05000456 =
R                              PDR ~
p5corresp\icstechibw980061.&w A l!nicom Company
 
BRAIDWOOD NUCLEAR GENERATING STATION UNIT 1 AND UNIT 2 l
i MONTHLY OPERATING REPORT                                                    l i
Comed NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 I
i I
p:\corresp\restech'bw980061. doc i
 
A. OPERATING DATA REPORT Docket No: 50-456 Unit: Braidwood 1 Date: 11/02/08 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 REPORTING PERIOD: October 1998
: 1) Design Electrical Rating (Mwe Net)                1120
: 2) Maximum Dependable Capacity (Mwe Net)            1100 Month    Year To Date        Cumulative
,      3) Hours Reactor Critical (Hours)                    0.0          5928.4          71,330.5
: 4) Hours Generator on Line (Hours)                    0.0          5928.0          70,470.4
: 5) Unit Reserve Shutdown Hours (Hours)                0.0                  0.0            0.0
: 6) Net Electrical Energy (Mwh)                          0        6,470,278        72,619,246 l                  Note:
Unit 1 entered the month in refueling outage A1R07. During this outage the Steam Generators will be replaced. Expected return to service on approximately 11/22/98.
l i
l l
 
D.      UNIT SHUTDOWNS Docket No.:  50 -456          :
Unit Braidwood 1 Date: 11/02/98 Completed by:  Don Hildebrant Telephone:    815-458-2801x2173 REPORT PERIOD:                            October 1998 h            Date                      Type            Duration Reason                    Method    Cause and Corrective Actions Hours                                                  and Comments 1      980905                        S                1368                            C  4      Continuation of scheduled refueling outage A1R07. This outage will also be used to rep' ace the Steam Generators.
 
==SUMMARY==
~
Unit 1 entered the month continuing refueling outage A1R07. During this outage the Steam Generators will be replaced.
Expected return to service on approximately 11/22/98.
i TYPE                                              REASON                                                                      METHOD F - Forced                                        A - Equipment Failure (explain)                                              1 - Manual S - Scheduled                                    B - Maintenance or Test                                                      2 - Manual Trip t Scram C - Refueling                                                                3 - Automatic Trip I Scram D -' Regulatory Restriction                                                  4 - Continuation E - Operator Training I Licensee Examination                                5 - Other (explain)
F - Administrative G - Operator Error (explain)
* H - Other (explain)                                                                                                                                                                      ;
_.        __u -.___m_    _ _ _ . _ _ _        _ _ _ _ _ _ _ _ _ _ - _ _      _  _2    _ _ _ _          _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ -                  __
 
C. SAFETYI RELIEF VALVE OPERATIONS Docket No.:  50 -456          :
Unit  Braidwood 1 Date: 11/02/98 Completed by:  Don Hildebrant Telephone:    815-458-2801x2173 Valves                                                                                                          No. & Type                                                                                                    Plant Date              Actuated                                                                                                            Actuation                                                                                                  Condition  Description of Event None L
i e
t
 
i A. OPERATING DATA REPORT                                                                                          l
;                                                                                  Docket No: 50-457.
Unit: Braidwood 2 Date: 11/02/98 Completed by: Don Hildebrant
                                                                                  - Telephone: 815-458-280lx2173 REPORTING PERIOD: October 1998 f                                                                                                                                  I
                - 1) Design Electrical Rating (Mwe Net)                1120
: 2) Maximum Dependable Capacity (Mwe Net)            1100 Month            Year To Date            Cumulative l
: 3) Hours Reactor Critical (Hours)                  745.0                  7,098.2              75,479.3
: 4) Hours Generator on Line (Hours)                  745.0                  7,090.4              75,029.5
: 5) Unit Reserve Shutdown Hours (Hours)                    0.0                    0.0                0.0
                ' 6) Net Electrical Energy (Mwh)                    858,616              8,018,520              77,891,346        )
i i
l t
 
D.      UNIT SHUTDOWNS Docket No.:        50-457                ?
Unit:        Braidwood 2 Date: 11/02/98 Completed by:        Don Hildebrant Telephone:          815-458-2801x2173 REPORT PERIOD:        October 1998 h        Date      Type    Duration Reason              Method Cause and Corrective Actions Hours                                  and Commens None
 
==SUMMARY==
~
Unit 2 entered the month at 100% capability and operated routinely for the entire month.
TYPE                          REASON                                                METHOD F - Forced                    A -Equipment Failure (explain)                        1 - Manual S - Scheduled                B - Maintenance or Test                                2 - Manual Trip 1 Scram C - Refueling                                          3 - Automatic Tripi Scram D - Regulatory Restriction                            4 - Continuation E - Operator Training I Licensee Examination          5 - Other (explain)
F - Administrative G - Operator Error (explain)
H - Other (explain)
 
A*
C. SAFETYIRELIEF VALVE OPERATIONS Docket No.:    50-457                a Unit:  Braidwood 2 Date: 11/02/98 Completed by:          Don Hildebrant    .
Telephone:    815-458-2801x2173 Valves                                        No. & Type                        Plant Date                Actuated                                        Actuation                    Condition                                                                          Description of Event None
                                                                                                                                                                                                                                                          'l 1
1 i
                                                        - - _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _          -    _. _      .-__. . . - _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _}}

Revision as of 18:41, 16 December 2020

Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With 981102 Ltr
ML20195D356
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/31/1998
From: Hildebrant D, Schwartz G
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BW-98-0061, BW-98-61, NUDOCS 9811180012
Download: ML20195D356 (8)


Text

Osmmonw ealth litiw>n Company

, ,, , , , liraidwcxl Generating Station Route oI, Ikix 8i liracesille, IL 60107-9619 Tel H15-158-2801 November 2,1998 BW/98-0061 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 2055-0001

Subject:

Monthly Operating Report for October,1998 Braidwood Generating Station, Units I and 2 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Nos. 50-456 and 50-457 Ladies and Gentlemen:

In accordance with Technical Specification 6.9.1.8, enclosed you will find the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Generating Station, Units I and 2, covering the period October 1,1998 through October 31,1998.

Please address any comments or questions regarding this matter to Don liildebrant at (815) 458-2801, extension 2173.

Very truly yours,

/<e T G. K. Schwartz Station Manager Braidwood Nuclear Station GKS/DCil/ law I.

Enclosures

-Qh cc: C. J. Paperiello, Acting NRC Regional Administrator - Rill / l S. Bailey, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident Inspector - Braidwood IDNS Resident inspector- Braidwood Office of Nuclear Facility Safety - IDNS 9811100012 981031 PDR ADOCK 05000456 =

R PDR ~

p5corresp\icstechibw980061.&w A l!nicom Company

BRAIDWOOD NUCLEAR GENERATING STATION UNIT 1 AND UNIT 2 l

i MONTHLY OPERATING REPORT l i

Comed NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 I

i I

p:\corresp\restech'bw980061. doc i

A. OPERATING DATA REPORT Docket No: 50-456 Unit: Braidwood 1 Date: 11/02/08 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 REPORTING PERIOD: October 1998

1) Design Electrical Rating (Mwe Net) 1120
2) Maximum Dependable Capacity (Mwe Net) 1100 Month Year To Date Cumulative

, 3) Hours Reactor Critical (Hours) 0.0 5928.4 71,330.5

4) Hours Generator on Line (Hours) 0.0 5928.0 70,470.4
5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0
6) Net Electrical Energy (Mwh) 0 6,470,278 72,619,246 l Note:

Unit 1 entered the month in refueling outage A1R07. During this outage the Steam Generators will be replaced. Expected return to service on approximately 11/22/98.

l i

l l

D. UNIT SHUTDOWNS Docket No.: 50 -456  :

Unit Braidwood 1 Date: 11/02/98 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 REPORT PERIOD: October 1998 h Date Type Duration Reason Method Cause and Corrective Actions Hours and Comments 1 980905 S 1368 C 4 Continuation of scheduled refueling outage A1R07. This outage will also be used to rep' ace the Steam Generators.

SUMMARY

~

Unit 1 entered the month continuing refueling outage A1R07. During this outage the Steam Generators will be replaced.

Expected return to service on approximately 11/22/98.

i TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip t Scram C - Refueling 3 - Automatic Trip I Scram D -' Regulatory Restriction 4 - Continuation E - Operator Training I Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

  • H - Other (explain)  ;

_. __u -.___m_ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _2 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ - __

C. SAFETYI RELIEF VALVE OPERATIONS Docket No.: 50 -456  :

Unit Braidwood 1 Date: 11/02/98 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None L

i e

t

i A. OPERATING DATA REPORT l

Docket No
50-457.

Unit: Braidwood 2 Date: 11/02/98 Completed by: Don Hildebrant

- Telephone: 815-458-280lx2173 REPORTING PERIOD: October 1998 f I

- 1) Design Electrical Rating (Mwe Net) 1120

2) Maximum Dependable Capacity (Mwe Net) 1100 Month Year To Date Cumulative l
3) Hours Reactor Critical (Hours) 745.0 7,098.2 75,479.3
4) Hours Generator on Line (Hours) 745.0 7,090.4 75,029.5
5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0

' 6) Net Electrical Energy (Mwh) 858,616 8,018,520 77,891,346 )

i i

l t

D. UNIT SHUTDOWNS Docket No.: 50-457  ?

Unit: Braidwood 2 Date: 11/02/98 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 REPORT PERIOD: October 1998 h Date Type Duration Reason Method Cause and Corrective Actions Hours and Commens None

SUMMARY

~

Unit 2 entered the month at 100% capability and operated routinely for the entire month.

TYPE REASON METHOD F - Forced A -Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip 1 Scram C - Refueling 3 - Automatic Tripi Scram D - Regulatory Restriction 4 - Continuation E - Operator Training I Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

A*

C. SAFETYIRELIEF VALVE OPERATIONS Docket No.: 50-457 a Unit: Braidwood 2 Date: 11/02/98 Completed by: Don Hildebrant .