{{#Wiki_filter:}} | {{#Wiki_filter:Osmmonw ealth litiw>n Company | ||
, ,, , , , liraidwcxl Generating Station Route oI, Ikix 8i liracesille, IL 60107-9619 Tel H15-158-2801 November 2,1998 BW/98-0061 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 2055-0001 | |||
==Subject:== | |||
Monthly Operating Report for October,1998 Braidwood Generating Station, Units I and 2 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Nos. 50-456 and 50-457 Ladies and Gentlemen: | |||
In accordance with Technical Specification 6.9.1.8, enclosed you will find the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Generating Station, Units I and 2, covering the period October 1,1998 through October 31,1998. | |||
Please address any comments or questions regarding this matter to Don liildebrant at (815) 458-2801, extension 2173. | |||
Very truly yours, | |||
/<e T G. K. Schwartz Station Manager Braidwood Nuclear Station GKS/DCil/ law I. | |||
Enclosures | |||
-Qh cc: C. J. Paperiello, Acting NRC Regional Administrator - Rill / l S. Bailey, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident Inspector - Braidwood IDNS Resident inspector- Braidwood Office of Nuclear Facility Safety - IDNS 9811100012 981031 PDR ADOCK 05000456 = | |||
R PDR ~ | |||
p5corresp\icstechibw980061.&w A l!nicom Company | |||
BRAIDWOOD NUCLEAR GENERATING STATION UNIT 1 AND UNIT 2 l | |||
i MONTHLY OPERATING REPORT l i | |||
Comed NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 I | |||
i I | |||
p:\corresp\restech'bw980061. doc i | |||
A. OPERATING DATA REPORT Docket No: 50-456 Unit: Braidwood 1 Date: 11/02/08 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 REPORTING PERIOD: October 1998 | |||
: 1) Design Electrical Rating (Mwe Net) 1120 | |||
: 2) Maximum Dependable Capacity (Mwe Net) 1100 Month Year To Date Cumulative | |||
, 3) Hours Reactor Critical (Hours) 0.0 5928.4 71,330.5 | |||
: 4) Hours Generator on Line (Hours) 0.0 5928.0 70,470.4 | |||
: 5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0 | |||
: 6) Net Electrical Energy (Mwh) 0 6,470,278 72,619,246 l Note: | |||
Unit 1 entered the month in refueling outage A1R07. During this outage the Steam Generators will be replaced. Expected return to service on approximately 11/22/98. | |||
l i | |||
l l | |||
D. UNIT SHUTDOWNS Docket No.: 50 -456 : | |||
Unit Braidwood 1 Date: 11/02/98 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 REPORT PERIOD: October 1998 h Date Type Duration Reason Method Cause and Corrective Actions Hours and Comments 1 980905 S 1368 C 4 Continuation of scheduled refueling outage A1R07. This outage will also be used to rep' ace the Steam Generators. | |||
==SUMMARY== | |||
~ | |||
Unit 1 entered the month continuing refueling outage A1R07. During this outage the Steam Generators will be replaced. | |||
Expected return to service on approximately 11/22/98. | |||
i TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip t Scram C - Refueling 3 - Automatic Trip I Scram D -' Regulatory Restriction 4 - Continuation E - Operator Training I Licensee Examination 5 - Other (explain) | |||
F - Administrative G - Operator Error (explain) | |||
* H - Other (explain) ; | |||
_. __u -.___m_ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _2 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ - __ | |||
C. SAFETYI RELIEF VALVE OPERATIONS Docket No.: 50 -456 : | |||
Unit Braidwood 1 Date: 11/02/98 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None L | |||
i e | |||
t | |||
i A. OPERATING DATA REPORT l | |||
; Docket No: 50-457. | |||
Unit: Braidwood 2 Date: 11/02/98 Completed by: Don Hildebrant | |||
- Telephone: 815-458-280lx2173 REPORTING PERIOD: October 1998 f I | |||
- 1) Design Electrical Rating (Mwe Net) 1120 | |||
: 2) Maximum Dependable Capacity (Mwe Net) 1100 Month Year To Date Cumulative l | |||
: 3) Hours Reactor Critical (Hours) 745.0 7,098.2 75,479.3 | |||
: 4) Hours Generator on Line (Hours) 745.0 7,090.4 75,029.5 | |||
: 5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0 | |||
' 6) Net Electrical Energy (Mwh) 858,616 8,018,520 77,891,346 ) | |||
i i | |||
l t | |||
D. UNIT SHUTDOWNS Docket No.: 50-457 ? | |||
Unit: Braidwood 2 Date: 11/02/98 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 REPORT PERIOD: October 1998 h Date Type Duration Reason Method Cause and Corrective Actions Hours and Commens None | |||
==SUMMARY== | |||
~ | |||
Unit 2 entered the month at 100% capability and operated routinely for the entire month. | |||
TYPE REASON METHOD F - Forced A -Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip 1 Scram C - Refueling 3 - Automatic Tripi Scram D - Regulatory Restriction 4 - Continuation E - Operator Training I Licensee Examination 5 - Other (explain) | |||
F - Administrative G - Operator Error (explain) | |||
H - Other (explain) | |||
A* | |||
C. SAFETYIRELIEF VALVE OPERATIONS Docket No.: 50-457 a Unit: Braidwood 2 Date: 11/02/98 Completed by: Don Hildebrant . | |||
Telephone: 815-458-2801x2173 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None | |||
'l 1 | |||
1 i | |||
- - _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ - _. _ .-__. . . - _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _}} |
Revision as of 18:41, 16 December 2020
ML20195D356 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 10/31/1998 |
From: | Hildebrant D, Schwartz G COMMONWEALTH EDISON CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
BW-98-0061, BW-98-61, NUDOCS 9811180012 | |
Download: ML20195D356 (8) | |
Text
Osmmonw ealth litiw>n Company
, ,, , , , liraidwcxl Generating Station Route oI, Ikix 8i liracesille, IL 60107-9619 Tel H15-158-2801 November 2,1998 BW/98-0061 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 2055-0001
Subject:
Monthly Operating Report for October,1998 Braidwood Generating Station, Units I and 2 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Nos. 50-456 and 50-457 Ladies and Gentlemen:
In accordance with Technical Specification 6.9.1.8, enclosed you will find the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Generating Station, Units I and 2, covering the period October 1,1998 through October 31,1998.
Please address any comments or questions regarding this matter to Don liildebrant at (815) 458-2801, extension 2173.
Very truly yours,
/<e T G. K. Schwartz Station Manager Braidwood Nuclear Station GKS/DCil/ law I.
Enclosures
-Qh cc: C. J. Paperiello, Acting NRC Regional Administrator - Rill / l S. Bailey, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident Inspector - Braidwood IDNS Resident inspector- Braidwood Office of Nuclear Facility Safety - IDNS 9811100012 981031 PDR ADOCK 05000456 =
R PDR ~
p5corresp\icstechibw980061.&w A l!nicom Company
BRAIDWOOD NUCLEAR GENERATING STATION UNIT 1 AND UNIT 2 l
i MONTHLY OPERATING REPORT l i
Comed NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 I
i I
p:\corresp\restech'bw980061. doc i
A. OPERATING DATA REPORT Docket No: 50-456 Unit: Braidwood 1 Date: 11/02/08 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 REPORTING PERIOD: October 1998
- 1) Design Electrical Rating (Mwe Net) 1120
- 2) Maximum Dependable Capacity (Mwe Net) 1100 Month Year To Date Cumulative
, 3) Hours Reactor Critical (Hours) 0.0 5928.4 71,330.5
- 4) Hours Generator on Line (Hours) 0.0 5928.0 70,470.4
- 5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0
- 6) Net Electrical Energy (Mwh) 0 6,470,278 72,619,246 l Note:
Unit 1 entered the month in refueling outage A1R07. During this outage the Steam Generators will be replaced. Expected return to service on approximately 11/22/98.
l i
l l
D. UNIT SHUTDOWNS Docket No.: 50 -456 :
Unit Braidwood 1 Date: 11/02/98 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 REPORT PERIOD: October 1998 h Date Type Duration Reason Method Cause and Corrective Actions Hours and Comments 1 980905 S 1368 C 4 Continuation of scheduled refueling outage A1R07. This outage will also be used to rep' ace the Steam Generators.
SUMMARY
~
Unit 1 entered the month continuing refueling outage A1R07. During this outage the Steam Generators will be replaced.
Expected return to service on approximately 11/22/98.
i TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip t Scram C - Refueling 3 - Automatic Trip I Scram D -' Regulatory Restriction 4 - Continuation E - Operator Training I Licensee Examination 5 - Other (explain)
F - Administrative G - Operator Error (explain)
- H - Other (explain) ;
_. __u -.___m_ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _2 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ - __
C. SAFETYI RELIEF VALVE OPERATIONS Docket No.: 50 -456 :
Unit Braidwood 1 Date: 11/02/98 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None L
i e
t
i A. OPERATING DATA REPORT l
- Docket No
- 50-457.
Unit: Braidwood 2 Date: 11/02/98 Completed by: Don Hildebrant
- Telephone: 815-458-280lx2173 REPORTING PERIOD: October 1998 f I
- 1) Design Electrical Rating (Mwe Net) 1120
- 2) Maximum Dependable Capacity (Mwe Net) 1100 Month Year To Date Cumulative l
- 3) Hours Reactor Critical (Hours) 745.0 7,098.2 75,479.3
- 4) Hours Generator on Line (Hours) 745.0 7,090.4 75,029.5
- 5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0
' 6) Net Electrical Energy (Mwh) 858,616 8,018,520 77,891,346 )
i i
l t
D. UNIT SHUTDOWNS Docket No.: 50-457 ?
Unit: Braidwood 2 Date: 11/02/98 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 REPORT PERIOD: October 1998 h Date Type Duration Reason Method Cause and Corrective Actions Hours and Commens None
SUMMARY
~
Unit 2 entered the month at 100% capability and operated routinely for the entire month.
TYPE REASON METHOD F - Forced A -Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip 1 Scram C - Refueling 3 - Automatic Tripi Scram D - Regulatory Restriction 4 - Continuation E - Operator Training I Licensee Examination 5 - Other (explain)
F - Administrative G - Operator Error (explain)
H - Other (explain)
A*
C. SAFETYIRELIEF VALVE OPERATIONS Docket No.: 50-457 a Unit: Braidwood 2 Date: 11/02/98 Completed by: Don Hildebrant .
Telephone: 815-458-2801x2173 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None