ML20067A941: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:498 Bigsili
                                                                                                      ~
              . Xerox Telecopier 7020 1-8-27-90 i 14: 25 i            8154503803' DOCKET NO.:        457 8.. OPERATING QATA REPORT UNITS  Bra        2
        ''                                                                        QATE: 02/09/90
                  -                                                  COMPILED 8Y: M. W. Peterson TELEPHONE:    (815)458-2801 ext. 2480 OPERATING STATUS
: 1. Reporting Period: January, 1990        Gross Hours: 744
: 2. Currently Authorized Power Level (MHt): 3411                                              I Design Electrical Rating (We-gross):          1175 (We-net):          1120                                            ,
Design  Electrical Max Dependable    Rating (MHe-gross):
Capacity                        1175 l
Max Dependable Capacity (MHe-net):              1120
: 3. Power level to which restricted (If Any): None
: 4. Reasons for restriction (If Any):    None IHIS MONTH YR TO DATE CUNULATIVE 74,4          744          1_131s
: 5. Report period Hours:
744,c        744          9879.3
: 6. Hours Reactor Critical:
0.0          0.0            0.0
: 7. RX Reserve Shutdown Hours:                _
: 8. Hours Generator on Line:                          744.o        744      3 04.8 OJL          0.0            0.0
: 9. Unit Reserve Shutdown Hours:
Gross Thermal Energy (HHH):                .l!t61079        l 1961079_      27802037 10.
Gross Elec. Energy (HHH):                  _ 666416            666416        9557804_
11.
Not Elec. Energy ( W H):                    _Ji38460_          638460    _ 9131435-        l
: 12.                                                                                              '
                                                                  " l 100                  100            87.3
: 13. Reactor Service Factor:
: 14. Reactor Availability Factor:                  /100              100              87.3 f    100            100              86.7
: 15. Unit Service Factor:                                                                        i 86.7    I
: 16. Unit Availability Factor:                          100        _100_.
: 17. Unit Capacity Factor (MDC net):                    76.6          76.6            72.1 Unit Capacity Factor-(DER net):                    76.6          76.6            72.1        l 18.
: 19. Unit Forced Outage Rate:                              0.0          0.0    _
4.5
: 20. Unit Forced Outage Hours:                  -
0.0          0.0    -
465.7 _
l 21.
Shutdowns      Scheduled Over IfShutdownatEndofReport'        Perk Nextpnthst-RefueMag-Outage-Httch.)
                                                                              ~**4                '                      '
: 22.                                                                                                  l
!                          Estimated Date of Startup:                                                                    j l
L l
l (49572/10)                                                                                        /      l L      [
9102000053 900209                                                                                u r          PDR    ADOCK 05000457 l
R _ _ ____          PDR J
 
DOCKET NO.: 50-457 -
D. tMIT SHUTDOMMS/ REDUCTIONS                                                                          UNIT: Braidwood 2  .
DATE: 02/0e/90,        ai COMPILED BY: M. M. Peterson    ;j TELEPHONE: (815)458-2901 ext. 2480        3 2
                                                                                                                              . u_
REPORT PERIOD: January, 1990                                                                                              G:
o illh0D' LER10SER SYSTEM COMP 0NEMT CAUSE & CORRECTIVE ACTION
_Eg_  IMIE JXE,E WOURS,    REASON
          /          , .                                                                                                        7
        / , /,'n pf@ /                                                                                                              ..
(                                                                                                                          @
                                                                                                                              .W eee&AAAAAAAAA4444
 
==SUMMARY==
METHOD                    SYSTEM & CDW m mT TYPE                        REASON                                                                                        _-
                                                                                                                                =-
A-Equipment Failure Maint or Test              1 - Method              Exhibit F & N F-Forced                                                          2 - Manual Scram        Instructions for Preparation of    g l.
5-Scheduled        C-Refueling                                                              Data Entry Sheet                  y D-Regulatory Restriction                        3 - Auto Scram 4 - Continued            Licensee Event Report E-Operator Training ti License Examination                              (LER) File (NUREG-0161)
F-Administration                                5 - Reduced Load G-Oper Error                                    9 - Other N-Other
                                                                                                                                ~!
E!
                                                                                                                                %I (4957z/12)
 
                                            ~                                                ~ ~
erox 6lecopier 7020 1 2-27-90 i 14i25 'l          615t.563003*            492'01851512 C. AVERAGE DAILY UNIT NET MWER LEVEL LOG            00CKET NO.:    $0-457 UNIT:  Braidwood 2 DATE:  02/09/90 COMPILED BY:    H. N. Peterson TELEPHONE:    (815)458-2801 ext. 2480 MONTH: January, 1990
: 1.      _
1045                  17,                837
: 2.              1033                  18.                817                ,
: 3.              1023                  19,                819
: 4.              1011                  20.              __815
: 5.              1011                  21.                794                          !
988                22.                795                          I
: 6.                                                -
: 7.              J15                  23. .              786
: 8.                954                24,                779                          ;l
: 25.                740                          !
: 9.                942
: 10.                928                26,                735
: 11.                920                27.                712                          ,,
12,                913                28,                701 _                            ;
: 13.                Bal _              29.                688 14,                891                30.                670              -
: 15.                881                31.                657
: 16.                861 i
INSTRUCTIONS On this form list the e.verage daily unit power level in HWe-Net for each                  j day in the reporting month. Compute to tie nearest whole megawatt.                      !!
These figures will be used to plot a graph for each reporting month.                        I Note that when maximum dependable capacity is used for the net electrical rating of the unit there my be occasions when the daily average power                    :
        . level exceed; the 100% line (or the restricted power level line). In                  i such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
  /h2l4.nl2gpZW                  AgLk
                                  ~ ~c MI      ce&~}'
                                                      /
f" r/L. u.L      - as w                                        "    r"-
y                                        ~fd - y
 
                                                                      ' ~ ~ ~    ~
xerox Telecepter 702012-27-iOT14igf~i ' ~ ~ ~      61hhM05 +            39281h:#10 l l
: 1. Monthly Report for Braidwood Unit 2 A. Summarv of Ocaratina Erearience                                        f The unit entered the month of January at approximately 92%
power. The unit is in an extended coastdown as it                      l approaches the refueling outage. The unit continued power operation through the end of the month.
l l
I 1
l 1
                                                                                          )
I f
f l
(49572/9)}}

Latest revision as of 13:02, 6 September 2020

Revised Monthly Operating Rept & Average Daily Unit Net Power Level Log for Jan 1990 for Braidwood Nuclear Power Station,Unit 1
ML20067A941
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 12/31/1990
From: Peterson M
COMMONWEALTH EDISON CO.
To:
References
NUDOCS 9102080053
Download: ML20067A941 (4)


Text

498 Bigsili

~

. Xerox Telecopier 7020 1-8-27-90 i 14: 25 i 8154503803' DOCKET NO.: 457 8.. OPERATING QATA REPORT UNITS Bra 2

QATE: 02/09/90

- COMPILED 8Y: M. W. Peterson TELEPHONE: (815)458-2801 ext. 2480 OPERATING STATUS

1. Reporting Period: January, 1990 Gross Hours: 744
2. Currently Authorized Power Level (MHt): 3411 I Design Electrical Rating (We-gross): 1175 (We-net): 1120 ,

Design Electrical Max Dependable Rating (MHe-gross):

Capacity 1175 l

Max Dependable Capacity (MHe-net): 1120

3. Power level to which restricted (If Any): None
4. Reasons for restriction (If Any): None IHIS MONTH YR TO DATE CUNULATIVE 74,4 744 1_131s
5. Report period Hours:

744,c 744 9879.3

6. Hours Reactor Critical:

0.0 0.0 0.0

7. RX Reserve Shutdown Hours: _
8. Hours Generator on Line: 744.o 744 3 04.8 OJL 0.0 0.0
9. Unit Reserve Shutdown Hours:

Gross Thermal Energy (HHH): .l!t61079 l 1961079_ 27802037 10.

Gross Elec. Energy (HHH): _ 666416 666416 9557804_

11.

Not Elec. Energy ( W H): _Ji38460_ 638460 _ 9131435- l

12. '

" l 100 100 87.3

13. Reactor Service Factor:
14. Reactor Availability Factor: /100 100 87.3 f 100 100 86.7
15. Unit Service Factor: i 86.7 I
16. Unit Availability Factor: 100 _100_.
17. Unit Capacity Factor (MDC net): 76.6 76.6 72.1 Unit Capacity Factor-(DER net): 76.6 76.6 72.1 l 18.
19. Unit Forced Outage Rate: 0.0 0.0 _

4.5

20. Unit Forced Outage Hours: -

0.0 0.0 -

465.7 _

l 21.

Shutdowns Scheduled Over IfShutdownatEndofReport' Perk Nextpnthst-RefueMag-Outage-Httch.)

~**4 ' '

22. l

! Estimated Date of Startup: j l

L l

l (49572/10) / l L [

9102000053 900209 u r PDR ADOCK 05000457 l

R _ _ ____ PDR J

DOCKET NO.: 50-457 -

D. tMIT SHUTDOMMS/ REDUCTIONS UNIT: Braidwood 2 .

DATE: 02/0e/90, ai COMPILED BY: M. M. Peterson ;j TELEPHONE: (815)458-2901 ext. 2480 3 2

. u_

REPORT PERIOD: January, 1990 G:

o illh0D' LER10SER SYSTEM COMP 0NEMT CAUSE & CORRECTIVE ACTION

_Eg_ IMIE JXE,E WOURS, REASON

/ , . 7

/ , /,'n pf@ / ..

( @

.W eee&AAAAAAAAA4444

SUMMARY

METHOD SYSTEM & CDW m mT TYPE REASON _-

=-

A-Equipment Failure Maint or Test 1 - Method Exhibit F & N F-Forced 2 - Manual Scram Instructions for Preparation of g l.

5-Scheduled C-Refueling Data Entry Sheet y D-Regulatory Restriction 3 - Auto Scram 4 - Continued Licensee Event Report E-Operator Training ti License Examination (LER) File (NUREG-0161)

F-Administration 5 - Reduced Load G-Oper Error 9 - Other N-Other

~!

E!

%I (4957z/12)

~ ~ ~

erox 6lecopier 7020 1 2-27-90 i 14i25 'l 615t.563003* 492'01851512 C. AVERAGE DAILY UNIT NET MWER LEVEL LOG 00CKET NO.: $0-457 UNIT: Braidwood 2 DATE: 02/09/90 COMPILED BY: H. N. Peterson TELEPHONE: (815)458-2801 ext. 2480 MONTH: January, 1990

1. _

1045 17, 837

2. 1033 18. 817 ,
3. 1023 19, 819
4. 1011 20. __815
5. 1011 21. 794  !

988 22. 795 I

6. -
7. J15 23. . 786
8. 954 24, 779 ;l
25. 740  !
9. 942
10. 928 26, 735
11. 920 27. 712 ,,

12, 913 28, 701 _  ;

13. Bal _ 29. 688 14, 891 30. 670 -
15. 881 31. 657
16. 861 i

INSTRUCTIONS On this form list the e.verage daily unit power level in HWe-Net for each j day in the reporting month. Compute to tie nearest whole megawatt.  !!

These figures will be used to plot a graph for each reporting month. I Note that when maximum dependable capacity is used for the net electrical rating of the unit there my be occasions when the daily average power  :

. level exceed; the 100% line (or the restricted power level line). In i such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

/h2l4.nl2gpZW AgLk

~ ~c MI ce&~}'

/

f" r/L. u.L - as w " r"-

y ~fd - y

' ~ ~ ~ ~

xerox Telecepter 702012-27-iOT14igf~i ' ~ ~ ~ 61hhM05 + 39281h:#10 l l

1. Monthly Report for Braidwood Unit 2 A. Summarv of Ocaratina Erearience f The unit entered the month of January at approximately 92%

power. The unit is in an extended coastdown as it l approaches the refueling outage. The unit continued power operation through the end of the month.

l l

I 1

l 1

)

I f

f l

(49572/9)