: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS/MTH-OFR.RPT/2/084 1.16  -  9
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS/MTH-OFR.RPT/2/084 1.16  -  9


1 Enclosure to Serial HNP-94-049 Sheet 2 of 4 CP4L CO                    PLANT PERFORMANCE DATA SYSTEM        ~          PAGE          1
1 Enclosure to Serial HNP-94-049 Sheet 2 of 4 CP4L CO                    PLANT PERFORMANCE DATA SYSTEM        ~          PAGE          1 RUN DATE RUN 06/02/94 TIME 15:08)51    'ARRIS APPENDIX B    AVERAGE DAILY POWER LEVEL UNIT 1 RPD39-000 DOCEET NO. 050-400 COMPLETED BY SHEILA ROGERS (919) 362"2573    'ELEPHONE 1994 DAY  AVG. DAILY PONER LEVEL        DAY    AVG. DAILY POMER LEVEL (WE-NET)                              (WE-NET)
                                            -
RUN DATE RUN 06/02/94 TIME 15:08)51    'ARRIS APPENDIX B    AVERAGE DAILY POWER LEVEL UNIT 1 RPD39-000 DOCEET NO. 050-400 COMPLETED BY SHEILA ROGERS (919) 362"2573    'ELEPHONE 1994 DAY  AVG. DAILY PONER LEVEL        DAY    AVG. DAILY POMER LEVEL (WE-NET)                              (WE-NET)
                           -12                    17              812
                           -12                    17              812
                           -22                  18              823
                           -22                  18              823

Latest revision as of 19:58, 3 February 2020

Monthly Operating Rept for May 1994 for Shearon Harris Nuclear Power Plant.W/940614 Ltr
ML18011A480
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/31/1994
From: Robinson W, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-94-049, HNP-94-49, NUDOCS 9406220003
Download: ML18011A480 (8)


Text

DI TRIBUTION DEMONS TION SYSTEM ACCELERATED "N.r REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9406220003 DOC.DATE: 9&~ NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina DOCKET g 05000400 AUTH. NAME AUTHOR AFFlLIATION ROGERS,S. Carolina Power 6 Light Co.

ROBXNSON,W.R. Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept ay 1994 for Shearon Harris Nuclear Power Plant.W 940614 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR l ENCL t SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 10 10 AEOD/DSP/TPAB 1 1

~~~I-~ 01 1

1 1

1 NRR/DRXL/RPEB RGN2 1

1 1

1 EXTERNAL: EGGG BRYCE, J. H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

0' Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant JUN 3 4 1994 File: HO-941044 Serial HNP-94-049 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO-; NPF-63 MONTHLY OPERATIONS REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Carolina Power A Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1994.

Sincerely, W. R. Robinson SGR:smh Enclosure c: Mr. S. D. Ebneter (NRC-RII)

Mr. N. B. Le (NRR)

Mr. J. E. Tedrow (NRC-SHNPP) 9406220003 940531 PDR ADOCK 05000400 R , PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362.6950 2003.> 6

Enclosure to Serial HNP-94-049 Sheet 1 of 4 CP!L CO PLANT PERFORMANCE DATA SYSTEM PACE RUN DATE 06/02/94 OPERATZNG DATA REPORT RPD36-000 RUN TIME 15s08s51 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAMEs HARRIS UNIT 1 NOTES
2. REPORTING PERZODs MAY 94
3. LICENSED THERMAL POWER (MWT): 277S
4. NAMEPLATE RATING (GROSS KK) s 950.9
5. DESIGN ELECTRICAL RATING (NET MWE) s 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE) s 920.0
7. MAX DEs>BNQABLN CAP>sCZTY (NET MQE) s 860.0
8. IF CHANCES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS s
9. POWER LEVEL TO WHICH RESTRICTED IP ANY (NET MWE) s,
10. REASONS FOR RESTRICTION ZF ANYs THIS YR TO CUMUL MONTH DATE ATZVE
11. HOURS IN REPORTZNC PERIOD 744.00 3623 00 F 62088.00
12. NUMBER OF HOURS REACTOR CRITICAL 508.87 2358 '0 50661.01 13 ~ REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS CENERATOR ON LIlK 467.58 2317. 13 50094.76 1S. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 16 ~ CROSS THERMAL ENERCY CEN. (MWH) 1134158. 04 6202358.10 133461012. 06
17. CROSS ELEC. ElKRCY CEN. (MWH) 372461. 00 2080982.00 44515203.00
18. NET ELEC. ENERGY CENERATED (MWH) 338177. 00 1926696,00 41460093. 00
19. UNIT SERVICE FACTOR 62.85 63.96 80.68
20. UNZ 'V > > ss'.I- FTY'FACTOR 62.85 63.96 80 '8
21. UNIT CAP. FACTOR (USING MDC NET) 52.85 61. 84 77 '5
22. UNIT CAP. FACTOR (USING DER NET) 50.50 59. 09 74.20
23. UNIT FORCED OUTAGE RATE .00 .00 3.19
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE> DATE, AND DURATION OF EACH) s
25. ZF SHUTDOWN AT END OP REPORT PERIOD, ESTIMATED DATE OF START UPs
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS/MTH-OFR.RPT/2/084 1.16 - 9

1 Enclosure to Serial HNP-94-049 Sheet 2 of 4 CP4L CO PLANT PERFORMANCE DATA SYSTEM ~ PAGE 1 RUN DATE RUN 06/02/94 TIME 15:08)51 'ARRIS APPENDIX B AVERAGE DAILY POWER LEVEL UNIT 1 RPD39-000 DOCEET NO. 050-400 COMPLETED BY SHEILA ROGERS (919) 362"2573 'ELEPHONE 1994 DAY AVG. DAILY PONER LEVEL DAY AVG. DAILY POMER LEVEL (WE-NET) (WE-NET)

-12 17 812

-22 18 823

-26 19 840 32 20 869

-34 21 873

-36 ~

22 867

-37 23 863

-38 24 855

-37 25 853 10 -37 26 852

-39 27 863 12 20 28 867 13 154 29 862 14 243 30 859 15 573 31 859 16 636 1.16 - 8 MIS/MTH-OPR.RPT/3/OS4

x CO UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.: 050400 I

O UNIT NAME: Harris y DATE: June I, 1994 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 0

CO REPORT MONTH: MAY 1994 NUMBER DATE DURATION REASON'ETHOD OF LICENSEE SYSTEM COMPONENT CAUSE A CORRECTIVE (HOURS) SHUTTING EVENT CODE 4 CODE 5 ACTION TO TYPE'40319 DOWN REPORT 0 PREVENT REACTORs RECURRENCE 94-007 276.42 N/A Zz ZZZZZZ Normal Refueling and Reactor Physics/Low Power testing required following Refueling Outage No. 5.

1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG4161)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5

~ cn lr1 CD G-Operational Error (Explain) Exhibit 1 - Same Source g ~, 0 H-Other (Explain)

CD

~

$ D 0 o Z~

~'p~

Corrective action to prevent recurrence as per the Licensee Event Report. 0 C)

~ gC UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.: 050400 UNIT NAME: Harris DATE: June I, 1994 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: MAY 1994 NUMBER DATE TYPE'URATION REASON METHOD OF LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE (HOURS) SHUTTING EVENT CODE 4 CODE 5 ACTION TO DOWN REPORT 4 PREVENT REACTORs RECURRENCE 94408 940512 0.0 N/A zz Physics and Tech Spec Surveillance testing required following Refueling Outage.

1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG4161)

~ cn CD Irl E-Operator Training & License Examination 5-Reduced Load A SO F-Administrative 6-Other 5 G-Operational Error (Explain)

H-Other (Explain)

Exhibit I - Same Source o Z~

0 Corrective action to prevent recurrence as per the Licensee Event Report. C)