ML19269E327: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 19: Line 19:
{{#Wiki_filter:NRC FORM 366                                                                                                                    U. S. NUCLEAR REGULATORY COMMISSION                  ~
{{#Wiki_filter:NRC FORM 366                                                                                                                    U. S. NUCLEAR REGULATORY COMMISSION                  ~
(7 77)
(7 77)
          ,
                       .                                                        LICENSEE EVENT REPORT CONTROL BLOCK: l l    l      l      l  l 6
                       .                                                        LICENSEE EVENT REPORT CONTROL BLOCK: l
* l    l      l      l  l 6
lh              (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 7 0    1 8 9 ll IL LICENSEE 10 lACODE        IDI2l@l0lo 14    tS 01      l010101- lololol@l41111 LICENSE NUMBER                25      26 11 Il l@l LICENSE TYPE J0 I
lh              (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 7 0    1 8 9 ll IL LICENSEE 10 lACODE        IDI2l@l0lo 14    tS 01      l010101- lololol@l41111 LICENSE NUMBER                25      26 11 Il l@l LICENSE TYPE J0 I
57 C A T bd l@
57 C A T bd l@
CCN'T
CCN'T 0    1 8
'
0    1 8
SO RCE      l6uL @ 610 l 5 l0DOCKET            0 10 NUYBE R l 2l 6 l 568 @l69015EVENT l 2 lDATE 1 l 7 l 9 l@l0 l 6REPORT 74      75 l1 14    l7 1980l@
SO RCE      l6uL @ 610 l 5 l0DOCKET            0 10 NUYBE R l 2l 6 l 568 @l69015EVENT l 2 lDATE 1 l 7 l 9 l@l0 l 6REPORT 74      75 l1 14    l7 1980l@
DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o    2 l A field Investigation of Unit Two Engineered Safeauard System (ESS) cable Dans found a    3            three cables that were not installed in accordance with cable tabulation drawings.                                                                          l 0    4        l These cables are the main feed cables for MCC 28-2 from Bus 28, an ESS I Bus.                                                                        The o    s            routing of these ESS I cables lie in ESS 11 cable pans that contain the main feed                                                                            l 0  6        l cables for ESS II MCC 29-2.                                  The loss of MCC 28-2 and MCC 29-2 would not affect a                                              1 0    7        l safe reactor shutdown or jeopardize the performance of ECCS.                                                                                                  l lo      8        l                                                                                                                                                                l 7          8 9                                                                                                                                                                03 SYSTEM              CAUSE            CAUSE                                                  COVP.          VALVE CODE              CODE          SLBCODE                COMPONENT CODE                SUBCCOE          SUSCODE 7
DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o    2 l A field Investigation of Unit Two Engineered Safeauard System (ESS) cable Dans found a    3            three cables that were not installed in accordance with cable tabulation drawings.                                                                          l 0    4        l These cables are the main feed cables for MCC 28-2 from Bus 28, an ESS I Bus.                                                                        The o    s            routing of these ESS I cables lie in ESS 11 cable pans that contain the main feed                                                                            l 0  6        l cables for ESS II MCC 29-2.                                  The loss of MCC 28-2 and MCC 29-2 would not affect a                                              1 0    7        l safe reactor shutdown or jeopardize the performance of ECCS.                                                                                                  l lo      8        l                                                                                                                                                                l 7          8 9                                                                                                                                                                03 SYSTEM              CAUSE            CAUSE                                                  COVP.          VALVE CODE              CODE          SLBCODE                COMPONENT CODE                SUBCCOE          SUSCODE 7
Line 42: Line 38:
44              47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i  o lThe cause of this event is an error in cable routino made durinn initial construction. l t  i      ! The corrective acM on will be to re-route the ESS Division I, main feed cables to                                                                              1 i  2      l MCC 28-2 dur r.g Llie November 1979 refueling cutage in accordance with the cable                                                                              l 3  3        l tabulation drawing.                                                                                                                                            l 1  4 7          8 9                                                                                                                                                                80 STA S              % POWER                    #  OTHER STATUS                ISCO RY                          OlSCOVERY DESCRIPTICN t  5        l El@ l 0 l 7 l8 lgl                                  NA l  lClgl        Inspection l
44              47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i  o lThe cause of this event is an error in cable routino made durinn initial construction. l t  i      ! The corrective acM on will be to re-route the ESS Division I, main feed cables to                                                                              1 i  2      l MCC 28-2 dur r.g Llie November 1979 refueling cutage in accordance with the cable                                                                              l 3  3        l tabulation drawing.                                                                                                                                            l 1  4 7          8 9                                                                                                                                                                80 STA S              % POWER                    #  OTHER STATUS                ISCO RY                          OlSCOVERY DESCRIPTICN t  5        l El@ l 0 l 7 l8 lgl                                  NA l  lClgl        Inspection l
ACTIVITY      CONTENT RELEASEO        F RELE ASE                  AMOUNT OF ACTWITY                                                    LOCATION OF RELEASE 1  6        [_Zj              Zl@l                    NA                                        l          NA                                                            l 7          8 9                10            it                                            44        45                                                                      30 PERSONNEL EXPOSU AES NUYB E R            TYPE        DESCRIPTION NA i    7
ACTIVITY      CONTENT RELEASEO        F RELE ASE                  AMOUNT OF ACTWITY                                                    LOCATION OF RELEASE 1  6        [_Zj              Zl@l                    NA                                        l          NA                                                            l 7          8 9                10            it                                            44        45                                                                      30 PERSONNEL EXPOSU AES NUYB E R            TYPE        DESCRIPTION NA i    7
                 ] 0 l 0 l 0l@l Z l@[                                                                                                                                          J
                 ] 0 l 0 l 0l@l Z l@[                                                                                                                                          J PERSONNEt mu' dies NUVBER              DESCRIPTION @
'          ' '                  ''                    ''                                                                                                                    *#
PERSONNEt mu' dies NUVBER              DESCRIPTION @
t  s.      l0 0l 0l@l                                NA                                                                                                                    l 7          8  9                11        12                                                                                                                                80 LOSS OF OR DAMAGE TO FACILITY                                                                                                          A      j TYPE        D E SCRt PTION NA y      Et 7
t  s.      l0 0l 0l@l                                NA                                                                                                                    l 7          8  9                11        12                                                                                                                                80 LOSS OF OR DAMAGE TO FACILITY                                                                                                          A      j TYPE        D E SCRt PTION NA y      Et 7
i  9 8 9 lZl@l      10 l
i  9 8 9 lZl@l      10 l
Line 50: Line 44:
[_N_jh DesCRiPTiO~@
[_N_jh DesCRiPTiO~@
NA                              7906270 A/7 '                                      l    lllllllll1l: l :.
NA                              7906270 A/7 '                                      l    lllllllll1l: l :.
                                                                                                                                                                                    '
7          g 3            to                                                                                                                68 69                          E3 ;
7          g 3            to                                                                                                                68 69                          E3 ;
NAVE OF DREPARER
NAVE OF DREPARER PHONE.        309-654-2241 m 171                    $
                                                                        *                "
PHONE.        309-654-2241 m 171                    $
 
  *
.
: 1. LER NUMBER:        LER/R0 79-ll/03L
: 1. LER NUMBER:        LER/R0 79-ll/03L
: 11. LICENSEE NAME: Commonwealth Edison Company Quad-Cities Nuclear Power Station Ill. FACILITY NAME: Unit Two IV. DOCKET NUMBER: 050-265 V. EVENT DESCRIPTION:
: 11. LICENSEE NAME: Commonwealth Edison Company Quad-Cities Nuclear Power Station Ill. FACILITY NAME: Unit Two IV. DOCKET NUMBER: 050-265 V. EVENT DESCRIPTION:

Latest revision as of 19:53, 1 February 2020

LER 79-011/03L-0 on 790521:three Cables Not Installed in Accordance W/Drawings.Caused by Error in Cable Routing During Initial Const.Reroute of Cables Will Take Place During Nov 1979 Refueling Outage
ML19269E327
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 06/14/1979
From: Willemsen B
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19269E326 List:
References
LER-79-011-03L-03, LER-79-11-3L-3, NUDOCS 7906270217
Download: ML19269E327 (2)


Text

NRC FORM 366 U. S. NUCLEAR REGULATORY COMMISSION ~

(7 77)

. LICENSEE EVENT REPORT CONTROL BLOCK: l l l l l l 6

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 7 0 1 8 9 ll IL LICENSEE 10 lACODE IDI2l@l0lo 14 tS 01 l010101- lololol@l41111 LICENSE NUMBER 25 26 11 Il l@l LICENSE TYPE J0 I

57 C A T bd l@

CCN'T 0 1 8

SO RCE l6uL @ 610 l 5 l0DOCKET 0 10 NUYBE R l 2l 6 l 568 @l69015EVENT l 2 lDATE 1 l 7 l 9 l@l0 l 6REPORT 74 75 l1 14 l7 1980l@

DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o 2 l A field Investigation of Unit Two Engineered Safeauard System (ESS) cable Dans found a 3 three cables that were not installed in accordance with cable tabulation drawings. l 0 4 l These cables are the main feed cables for MCC 28-2 from Bus 28, an ESS I Bus. The o s routing of these ESS I cables lie in ESS 11 cable pans that contain the main feed l 0 6 l cables for ESS II MCC 29-2. The loss of MCC 28-2 and MCC 29-2 would not affect a 1 0 7 l safe reactor shutdown or jeopardize the performance of ECCS. l lo 8 l l 7 8 9 03 SYSTEM CAUSE CAUSE COVP. VALVE CODE CODE SLBCODE COMPONENT CODE SUBCCOE SUSCODE 7

o 9 8

! E } B10 l@

9 11 B l@ W@ lE lL lE lC 0 lN l@ lZl@ W @

12 13 18 19 23

,,_ SEQUE NTI AL OCCURRENCE REPORT REVISION LE R. AO EVENT GAR REPORT NO. CODE TYPE '

N O.

@ RE,P, l 7l ol l-l l0l1l1l l/l 0 13 l [Ll l- l0l 21 22 23 24 26 27 28 29 J0 31 J2 K N AC CN O PLANT tET HOURS S B IT FOR1 8. SLPPLIE MAN F CTURER l33F l@l34F l@ l Z@

35

[36Z l@ l0l0l0 0l 31 40

[Y l@

41 lN 42 l@ l43N l@ Z l9l9l91@

44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i o lThe cause of this event is an error in cable routino made durinn initial construction. l t i  ! The corrective acM on will be to re-route the ESS Division I, main feed cables to 1 i 2 l MCC 28-2 dur r.g Llie November 1979 refueling cutage in accordance with the cable l 3 3 l tabulation drawing. l 1 4 7 8 9 80 STA S  % POWER # OTHER STATUS ISCO RY OlSCOVERY DESCRIPTICN t 5 l El@ l 0 l 7 l8 lgl NA l lClgl Inspection l

ACTIVITY CONTENT RELEASEO F RELE ASE AMOUNT OF ACTWITY LOCATION OF RELEASE 1 6 [_Zj Zl@l NA l NA l 7 8 9 10 it 44 45 30 PERSONNEL EXPOSU AES NUYB E R TYPE DESCRIPTION NA i 7

] 0 l 0 l 0l@l Z l@[ J PERSONNEt mu' dies NUVBER DESCRIPTION @

t s. l0 0l 0l@l NA l 7 8 9 11 12 80 LOSS OF OR DAMAGE TO FACILITY A j TYPE D E SCRt PTION NA y Et 7

i 9 8 9 lZl@l 10 l

SO PLBLICITV NRC W Mm 2 o isSuEO

[_N_jh DesCRiPTiO~@

NA 7906270 A/7 ' l lllllllll1l: l :.

7 g 3 to 68 69 E3 ;

NAVE OF DREPARER PHONE. 309-654-2241 m 171 $

1. LER NUMBER: LER/R0 79-ll/03L
11. LICENSEE NAME: Commonwealth Edison Company Quad-Cities Nuclear Power Station Ill. FACILITY NAME: Unit Two IV. DOCKET NUMBER: 050-265 V. EVENT DESCRIPTION:

A field Investigation of Unit Two Engineered Safeguard System (ESS) cable pans found three safety-related cables that were not installed in accordance with the cable tabulation drawings. These cable numbers cre 21359, 21360, and 21361 and are the main feed cables for MCC 28-2 from Bus 28 and ESS I Bus. The routing of these ESS I cables lie in ESS 11 cable pans that contain the main feed cables for ESS II HCC 29-2.

VI. PROBA6LE CONSEQUENCES OF THE OCCURRENCE:

The consequences of this occurrence are minimal in that the loss of both MCC 28-2 and MCC 29-2 would not affect a safe reactor shutdown. Also, the loss of MCC 28-2 and MCC 29-2 would not jeopardize the performance of the reactor emergency core cooling systems.

Vll. CAUSE:

The cause of this event is an error in cable routing made during initial construction.

Vill. CORRECTIVE ACTION:

Under work request number 2822-79, the ESS Division I, main feed cables to MCC 28-2, will be re-routed during the November 1979 refueling outage in accordance with the cable tabulation drawing.

2134 043