05000265/LER-1979-011-03, /03L-0 on 790521:three Cables Not Installed in Accordance W/Drawings.Caused by Error in Cable Routing During Initial Const.Reroute of Cables Will Take Place During Nov 1979 Refueling Outage

From kanterella
(Redirected from ML19269E327)
Jump to navigation Jump to search
/03L-0 on 790521:three Cables Not Installed in Accordance W/Drawings.Caused by Error in Cable Routing During Initial Const.Reroute of Cables Will Take Place During Nov 1979 Refueling Outage
ML19269E327
Person / Time
Site: Quad Cities 
Issue date: 06/14/1979
From: Willemsen B
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19269E326 List:
References
LER-79-011-03L-03, LER-79-11-3L-3, NUDOCS 7906270217
Download: ML19269E327 (2)


LER-1979-011, /03L-0 on 790521:three Cables Not Installed in Accordance W/Drawings.Caused by Error in Cable Routing During Initial Const.Reroute of Cables Will Take Place During Nov 1979 Refueling Outage
Event date:
Report date:
2651979011R03 - NRC Website

text

NRC FORM 366 U. S. NUCLEAR REGULATORY COMMISSION

~

(7 77)

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 6 ll IL 10 lA IDI2l@l0lo 01 l010101-lololol@l41111 11 Il l@l I

l@

0 1

7 8 9 LICENSEE CODE 14 tS LICENSE NUMBER 25 26 LICENSE TYPE J0 57 C A T bd CCN'T 10 l 2l 6 l 5 @l 015 l 2 l 1 l 7 l 9 l@l0 l 6 l1 14 l7 19 l@

l L @ 0 l 5 l0 0

0 1

SO RCE 8

6u 61 DOCKET NUYBE R 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o

2 l A field Investigation of Unit Two Engineered Safeauard System (ESS) cable Dans found three cables that were not installed in accordance with cable tabulation drawings.

l a

3 l These cables are the main feed cables for MCC 28-2 from Bus 28, an ESS I Bus.

The 0

4 routing of these ESS I cables lie in ESS 11 cable pans that contain the main feed l

o s

l cables for ESS II MCC 29-2.

The loss of MCC 28-2 and MCC 29-2 would not affect a 1

0 6

l safe reactor shutdown or jeopardize the performance of ECCS.

l 0

7 lo 8

l l

03 7

8 9 SYSTEM

CAUSE

CAUSE COVP.

VALVE CODE CODE SLBCODE COMPONENT CODE SUBCCOE SUSCODE

! E } B l@

B l@ W@ lE lL lE lC 0 lN l@ lZl@ W @

o 9

7 8

9 10 11 12 13 18 19 23 SEQUE NTI AL OCCURRENCE REPORT REVISION LE R. AO EVENT GAR REPORT NO.

CODE TYPE N O.

@ RE,P l 7l ol l-l l0l1l1l l/l 0 13 l [Ll l-l0l 21 22 23 24 26 27 28 29 J0 31 J2 K N AC CN O PLANT tET HOURS S B IT FOR1 8.

SLPPLIE MAN F CTURER l F l@l F l@

l Z@

[ Z l@

l0l0l0 0l [Y l@

lN l@

l N l@

Z l9l9l91@

33 34 35 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i

o lThe cause of this event is an error in cable routino made durinn initial construction. l

! The corrective acM on will be to re-route the ESS Division I, main feed cables to 1

t i

l MCC 28-2 dur r.g Llie November 1979 refueling cutage in accordance with the cable l

i 2

3 3

l tabulation drawing.

l 1

4 7

8 9 80 STA S

% POWER OTHER STATUS ISCO RY OlSCOVERY DESCRIPTICN NA l

lClgl Inspection l

l El@ l 0 l 7 l8 lgl t

5 ACTIVITY CONTENT RELEASEO F RELE ASE AMOUNT OF ACTWITY LOCATION OF RELEASE NA l

NA l

[_Zj Zl@l 1

6 7

8 9 10 it 44 45 30 PERSONNEL EXPOSU AES NUYB E R TYPE

DESCRIPTION

] 0 l 0 l 0l@l Z l@[

NA J

i 7

PERSONNEt mu' dies DESCRIPTION @

NUVBER l0 0l 0l@l NA l

t s.

7 8 9 11 12 80 LOSS OF OR DAMAGE TO FACILITY A

j TYPE D E SCRt PTION y

Et lZl@l NA l

i 9

7 8 9 10 SO PLBLICITV DesCRiPTiO~@

7906270 A/7 '

NRC W Mm isSuEO

[_N_jh NA l

lllllllll1l: l :.

2 o

7 g 3 to 68 69 E3 ;

309-654-2241 m 171 NAVE OF DREPARER PHONE.

1.

LER NUMBER:

LER/R0 79-ll/03L 11.

LICENSEE NAME: Commonwealth Edison Company Quad-Cities Nuclear Power Station Ill. FACILITY NAME: Unit Two IV.

DOCKET NUMBER: 050-265 V.

EVENT DESCRIPTION

A field Investigation of Unit Two Engineered Safeguard System (ESS) cable pans found three safety-related cables that were not installed in accordance with the cable tabulation drawings. These cable numbers cre 21359, 21360, and 21361 and are the main feed cables for MCC 28-2 from Bus 28 and ESS I Bus.

The routing of these ESS I cables lie in ESS 11 cable pans that contain the main feed cables for ESS II HCC 29-2.

VI.

PROBA6LE CONSEQUENCES OF THE OCCURRENCE:

The consequences of this occurrence are minimal in that the loss of both MCC 28-2 and MCC 29-2 would not affect a safe reactor shutdown. Also, the loss of MCC 28-2 and MCC 29-2 would not jeopardize the performance of the reactor emergency core cooling systems.

Vll.

CAUSE

The cause of this event is an error in cable routing made during initial construction.

Vill. CORRECTIVE ACTION:

Under work request number 2822-79, the ESS Division I, main feed cables to MCC 28-2, will be re-routed during the November 1979 refueling outage in accordance with the cable tabulation drawing.

2134 043