{{#Wiki_filter:October 21, 2008 Mr. Timothy Vice President Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802-0967
{{#Wiki_filter:UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N ber 21, 2008


SUBJECT: ARKANSAS NUCLEAR ONE - NRC INSPECTION SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION REPORT 05000313/2008006 AND 05000368/2008006
==SUBJECT:==
ARKANSAS NUCLEAR ONE - NRC INSPECTION SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION REPORT 05000313/2008006 AND 05000368/2008006


==Dear Mr. Mitchell:==
==Dear Mr. Mitchell:==
On September 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a site-specific implementation of B.5.b, Phase 2 and 3, temporary instruction team inspection of your Arkansas Nuclear One, Units 1 and 2. The enclosed report documents the team's results, which were discussed on September 11, 2008, with you and other members of your staff.
On September 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a site-specific implementation of B.5.b, Phase 2 and 3, temporary instruction team inspection of your Arkansas Nuclear One, Units 1 and 2. The enclosed report documents the teams results, which were discussed on September 11, 2008, with you and other members of your staff.


The inspection examined activities conducted under your license as they relate to the implementation of B.5.b, Phase 2 and 3, mitigating strategies, your compliance with the Commission's rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. This report documents one NRC-identified finding of very low safety significance (Green). This finding was determined to involve a violation of NRC requirements. Because of the very low safety significance and because this violation was entered into your corrective action program, the NRC is treating this finding as a noncited violation, in accordance with Section VI.A.1 of the NRC's Enforcement Policy. If you contest this NONCITED VIOLATION, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Arkansas Nuclear One , Units 1 and 2, facility. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Entergy Operations, Inc. 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b, Phase 2 and 3, mitigating strategies, your compliance with the Commissions rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.
 
This report documents one NRC-identified finding of very low safety significance (Green). This finding was determined to involve a violation of NRC requirements. Because of the very low safety significance and because this violation was entered into your corrective action program, the NRC is treating this finding as a noncited violation, in accordance with Section VI.A.1 of the NRCs Enforcement Policy. If you contest this NONCITED VIOLATION, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Arkansas Nuclear One , Units 1 and 2, facility. Entergy Operations, Inc. 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
 
If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).


Sincerely,
Sincerely,
/RA/ Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Dockets: 50-313; 50-368 Licenses: DPR-51; NPF-6 Enclosure:
/RA/
Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Dockets: 50-313; 50-368 Licenses: DPR-51; NPF-6 Enclosure:
INSPECTION REPORT 05000313/2008006 AND 05000368/2008006 w/Attachment Supplemental Information cc w/enclosure:
INSPECTION REPORT 05000313/2008006 AND 05000368/2008006 w/Attachment Supplemental Information cc w/enclosure:
David E. Maxwell, Director Arkansas Department of Emergency Management Bldg. 9501 Camp Joseph T. Robinson North Little Rock, AR 72199  
David E. Maxwell, Director Arkansas Department of Emergency Management Bldg. 9501 Camp Joseph T. Robinson North Little Rock, AR 72199 cc w/o enclosure:
 
Senior Vice President Entergy Operations, Inc.
cc w/o enclosure: Senior Vice President Entergy Operations, Inc. P.O. Box 31995 Jackson, MS 39286-1995 Entergy Operations, Inc. 3 Senior Vice President & Chief Operating Office Entergy Operations, Inc P.O. Box 3199 Jackson, MS 39286-1995 Vice President, Oversight Entergy Operations, Inc P.O. Box 3199 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc Arkansas Nuclear On 1448 SR 33 Russellville, AR 72802


Associate General Counsel Entergy Nuclear Operation P.O. Box 3199 Jackson, MS 39286-1995 Senior Manager, Nuclear Safety & Licensing Entergy Operations, Inc P.O. Box 3199 Jackson, MS 39286-1995
P.O. Box 31995 Jackson, MS 39286-1995 Entergy Operations, Inc. 3 Senior Vice President
& Chief Operating Office Entergy Operations, Inc P.O. Box 3199 Jackson, MS 39286-1995 Vice President, Oversight Entergy Operations, Inc P.O. Box 3199 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc Arkansas Nuclear On 1448 SR 33 Russellville, AR 72802 Associate General Counsel Entergy Nuclear Operation P.O. Box 3199 Jackson, MS 39286-1995 Senior Manager, Nuclear Safety & Licensing Entergy Operations, Inc P.O. Box 3199 Jackson, MS 39286-1995
}}
}}

Latest revision as of 11:49, 14 November 2019

IR 05000313-08-006, IR 05000368-08-006, on 09/11/2008, Arkansas Nuclear One - NRC Inspection Site-Specific Implementation of B.5.b Phase 2 and 3 Mitigating Strategies Temporary Instruction Inspection
ML082970428
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/21/2008
From: Ryan Lantz
Operations Branch IV
To: Mitchell T
Entergy Operations
References
IR-08-006
Download: ML082970428 (3)


Text

UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N ber 21, 2008

SUBJECT:

ARKANSAS NUCLEAR ONE - NRC INSPECTION SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION REPORT 05000313/2008006 AND 05000368/2008006

Dear Mr. Mitchell:

On September 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a site-specific implementation of B.5.b, Phase 2 and 3, temporary instruction team inspection of your Arkansas Nuclear One, Units 1 and 2. The enclosed report documents the teams results, which were discussed on September 11, 2008, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to the implementation of B.5.b, Phase 2 and 3, mitigating strategies, your compliance with the Commissions rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.

This report documents one NRC-identified finding of very low safety significance (Green). This finding was determined to involve a violation of NRC requirements. Because of the very low safety significance and because this violation was entered into your corrective action program, the NRC is treating this finding as a noncited violation, in accordance with Section VI.A.1 of the NRCs Enforcement Policy. If you contest this NONCITED VIOLATION, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Arkansas Nuclear One , Units 1 and 2, facility. Entergy Operations, Inc. 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Dockets: 50-313; 50-368 Licenses: DPR-51; NPF-6 Enclosure:

INSPECTION REPORT 05000313/2008006 AND 05000368/2008006 w/Attachment Supplemental Information cc w/enclosure:

David E. Maxwell, Director Arkansas Department of Emergency Management Bldg. 9501 Camp Joseph T. Robinson North Little Rock, AR 72199 cc w/o enclosure:

Senior Vice President Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Entergy Operations, Inc. 3 Senior Vice President

& Chief Operating Office Entergy Operations, Inc P.O. Box 3199 Jackson, MS 39286-1995 Vice President, Oversight Entergy Operations, Inc P.O. Box 3199 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc Arkansas Nuclear On 1448 SR 33 Russellville, AR 72802 Associate General Counsel Entergy Nuclear Operation P.O. Box 3199 Jackson, MS 39286-1995 Senior Manager, Nuclear Safety & Licensing Entergy Operations, Inc P.O. Box 3199 Jackson, MS 39286-1995