{{#Wiki_filter:Pacific Gas and Electric Company-July 20, 2016 PG&E Letter DCL-16-073 Paula Gerfen Station Director Diablo Canyon Power Plant Mail code 104/5/502 P.O. Box 56 Avila Beach, CA 93424 805.545.4596 Internal:
{{#Wiki_filter:Pacific Gas and Electric Company -
691.4596 Fax: 545.4234 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 10 CFR Part 55 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo _Canyon Units 1 and 2 Response to NRC Regulatory Issue Summary 2016-09. Preparation and Scheduling of Operator Licensing Examinations Dear Commissioners and Staff: Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 2016-09, a completed NRC Form 536, "Operator Licensing Examination Data," is enclosed.
Paula Gerfen             Diablo Canyon Power Plant Station Director        Mail code 104/5/502 P.O. Box 56 Avila Beach, CA 93424 805.545.4596 Internal: 691.4596 Fax: 545.4234 July 20, 2016 PG&E Letter DCL-16-073 U.S. Nuclear Regulatory Commission                                         10 CFR Part 55 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo _Canyon Units 1 and 2 Response to NRC Regulatory Issue Summary 2016-09. Preparation and Scheduling of Operator Licensing Examinations
This completed form provides Proposed Examination and Preparation and Initial Operator License Examination data for years 2018 through 2021, and Proposed Generic Fundamentals Examination Schedule for years 2017 and 2018. Pacific Gas and Electric Company makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. If you have further questions, please contact Mr. Erik M. Werner, Operations Training Manager, at (805) 545-4617. Paula l:: n V bnsm/4540 Enclosure cc/enc: John M. Becerra, Simulator and Exam Support Supervisor Kriss M. Kennedy, NRC Region IV Administrator John P. Reynoso, Acting NRC Senior Resident Inspector Balwant K. Singal, NRR Senior Project Manager Erik M. Werner, Operations Training Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
 
==Dear Commissioners and Staff:==
 
Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 2016-09, a completed NRC Form 536, "Operator Licensing Examination Data," is enclosed. This completed form provides Proposed Examination and Preparation and Initial Operator License Examination data for years 2018 through 2021, and Proposed Generic Fundamentals Examination Schedule for years 2017 and 2018.
Pacific Gas and Electric Company makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.
If you have further questions, please contact Mr. Erik M. Werner, Operations Training Manager, at (805) 545-4617.
{t~
Paula l:: nV bnsm/4540 Enclosure cc/enc: John M. Becerra, Simulator and Exam Support Supervisor Kriss M. Kennedy, NRC Region IV Administrator John P. Reynoso, Acting NRC Senior Resident Inspector Balwant K. Singal, NRR Senior Project Manager Erik M. Werner, Operations Training Manager A member of the STARS   (Strategic Teaming and Resource     Sharing) Alliance Callaway
* Diablo Canyon
* Diablo Canyon
* Palo Verde
* Palo Verde
* Wolf Creek NRC Form 536, Enclosure PG&E Letter DCL-16-073 "Operator Licensing Examination Data" NRC FORM536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3150..0131 E XPIR E S: 10/31/2017 (01-2015)
* Wolf Creek
Estimated burden per response to comply with this voluntary infonnation collection request: 1 hour. This infonmation collection is used to plan budgets and resources for operator .. " OPERA TOR L I CENS I NG examinations. Send comments regarding burden estimate to the FOIA , Privacy , and lnfonnation  
 
.. 0 . . u: Collect i ons Branch (T-5 F53), U.S. Nuclear Regulatory Comm i ssion, Washington , DC EXAMINAT I ON DATA 20555-0001, or by internet e-mail to lnfocollects
Enclosure PG&E Letter DCL-16-073 NRC Form 536, "Operator Licensing Examination Data"
.Resource@nrc
 
.gov , and to the Desk Officer , " .. ,.. ..... " Office of Information and Regulatory Affairs , NEOB-10202, (3 1 50-0131), Office of Management and Budget , Washington , DC 20503. If a means used to i mpose an infonmation collection does not display a currently valid OMB control number , the NRC may not conduct or sponsor , and a person i s not required to respond to , the infonmatio n collection.
NRC FORM536                                 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131                                         EXPIRES: 10/31/2017 (01-2015)
FAC I LITY NRC REGION Diablo Canyon Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2 018 CY2019 CY2020 CY 2 021 -------ESTIMATED NUMBER OF LICENSEE-PREPARED 01 01 01 01 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY 2 019 CY2020 CY 2 021 ------NUMBER OF REACTOR 9 10 10 8 OPERATORS NUMBER OF SENIOR REACTOR 7 6 6 8 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 1/22/2 018 01/1 4/2 019 01/13/2 0 2 0 01/11/20 2 1 ALTERNATE DATE 0 2/05/2018 01/2 8/2 019 0 2/03/2 0 2 0 *o11 2 51 2 o 2 1 c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2 017 CY 2 018 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 16 CANDIDATES NRC FORM 536 (01-2015)}}
                ,:,C...);J'P.R£GIJ~-"                                              Estimated burden per response to comply with this voluntary infonnation collection request: 1 hour. This infonmation collection is used to plan budgets and resources for operator
            ..-~~-
            ..
            ~    . . u:"             0 OPERATOR LICENSING examinations. Send comments regarding burden estimate to the FOIA, Privacy, and lnfonnation Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC
              ~                        ~
20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer,
                  " .. ,.. ..... "           EXAMINATION DATA
                ~"'        ~..      0~
Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an infonmation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonmation collection.
FACILITY                                                                                                                                    NRC REGION Diablo Canyon Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                                       CY 2018          CY2019                                 CY2020                               CY 2021
                                                                --               --                                       -                                   --
ESTIMATED NUMBER OF LICENSEE-PREPARED                                   01                 01                                     01                                   01 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                                   0                   0                                       0                                   0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                                       CY2018             CY 2019                                CY2020                                 CY 2021
                                                                -                 -                                       --                                 --
NUMBER OF REACTOR OPERATORS 9                 10                                     10                                   8 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 7                 6                                       6                                   8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                                      0                 0                                       0                                   0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0                 0                                       0                                   0 PROPOSED DATES PRIMARY DATE                               1/22/2018        01/1 4/2019                          01/13/2020                              01/11/202 1 ALTERNATE DATE                               02/05/2018         01/28/2019                            02/03/2020                            *o112512o21
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017                                                            CY 2018 PROPOSED NUMBER
                                                            --                                                                     --
MARCH       JUNE     SEPTEMBER DECEMBER             MARCH                   JUNE             SEPTEMBER DECEMBER ESTIMATED NUMBER OF                                                     16                                                                               16 CANDIDATES NRC FORM 536 (01 -2015)}}

Revision as of 17:31, 30 October 2019

Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations
ML16202A247
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/20/2016
From: Gerfen P
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-16-073, RIS-16-009
Download: ML16202A247 (3)


Text

Pacific Gas and Electric Company -

Paula Gerfen Diablo Canyon Power Plant Station Director Mail code 104/5/502 P.O. Box 56 Avila Beach, CA 93424 805.545.4596 Internal: 691.4596 Fax: 545.4234 July 20, 2016 PG&E Letter DCL-16-073 U.S. Nuclear Regulatory Commission 10 CFR Part 55 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo _Canyon Units 1 and 2 Response to NRC Regulatory Issue Summary 2016-09. Preparation and Scheduling of Operator Licensing Examinations

Dear Commissioners and Staff:

Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 2016-09, a completed NRC Form 536, "Operator Licensing Examination Data," is enclosed. This completed form provides Proposed Examination and Preparation and Initial Operator License Examination data for years 2018 through 2021, and Proposed Generic Fundamentals Examination Schedule for years 2017 and 2018.

Pacific Gas and Electric Company makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have further questions, please contact Mr. Erik M. Werner, Operations Training Manager, at (805) 545-4617.

{t~

Paula l:: nV bnsm/4540 Enclosure cc/enc: John M. Becerra, Simulator and Exam Support Supervisor Kriss M. Kennedy, NRC Region IV Administrator John P. Reynoso, Acting NRC Senior Resident Inspector Balwant K. Singal, NRR Senior Project Manager Erik M. Werner, Operations Training Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Enclosure PG&E Letter DCL-16-073 NRC Form 536, "Operator Licensing Examination Data"

NRC FORM536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 10/31/2017 (01-2015)

,:,C...);J'P.R£GIJ~-" Estimated burden per response to comply with this voluntary infonnation collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This infonmation collection is used to plan budgets and resources for operator

..-~~-

..

~ . . u:" 0 OPERATOR LICENSING examinations. Send comments regarding burden estimate to the FOIA, Privacy, and lnfonnation Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC

~ ~

20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer,

" .. ,.. ..... " EXAMINATION DATA

~"' ~.. 0~

Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an infonmation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonmation collection.

FACILITY NRC REGION Diablo Canyon Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2018 CY2019 CY2020 CY 2021

-- -- - --

ESTIMATED NUMBER OF LICENSEE-PREPARED 01 01 01 01 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY 2019 CY2020 CY 2021

- - -- --

NUMBER OF REACTOR OPERATORS 9 10 10 8 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 7 6 6 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1/22/2018 01/1 4/2019 01/13/2020 01/11/202 1 ALTERNATE DATE 02/05/2018 01/28/2019 02/03/2020 *o112512o21

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 2018 PROPOSED NUMBER

-- --

MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 16 CANDIDATES NRC FORM 536 (01 -2015)