DCL-23-055, Nuclear Material Transaction Report for New Fuel
| ML23187A635 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/06/2023 |
| From: | Darrell Adams Pacific Gas & Electric Co |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| DCL-23-055 | |
| Download: ML23187A635 (1) | |
Text
Pacific Gas and Electric Company" PG&E Letter DCL-23-055 John Cettin NMMSS Program, NA-ESH-12 Germantown Building U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-1290 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Nuclear Material Transaction Report for New Fuel
Dear Mr. Cettin,
Dallas L. Adams Manager, Program Enyineering Diablo Canyon Power Plant Mall code 10414/427 P.O. Box 56 Avila Beach, CA 93424 805.545.6182 Dallas.Adams@pge.com 10 CFR 74.15 Pursuant to 10 CFR 74.15(a), the enclosure provides two files in a computer-readable format of the Nuclear Material Transaction Report for materials received on June 26th, 2023 and June 28th, 2023. The files were prepared in accordance with NUREG/BR-0006, Revision 9, "Instructions for Completing Nuclear Material Transaction Reports," dated August 2020, and Nuclear Materials Management and Safeguards System (NMMSS) Report 0-24, "Personal Computer Data Input for Nuclear Regulatory Commission Licensees," dated August 2016.
If you have any questions regarding the enclosure, please contact Mr. Joseph Lee at (805) 545-3348.
Sincerely, Dallas L. Adams 1-~-JDJ3 Enclosure cc:
Mahdi 0. Hayes, NRC Senior Resident Inspector Samson S. Lee, NRG Senior Project Manager Robert J. Lewis, NRG Acting Region IV Administrator NRC Document Control Desk Diablo Distribution A member of the STARS Alliance Call away
- Di ablo Ca nyon
- Palo Verde, Wolf Creek Date