DCL-23-066, Nuclear Material Transaction Report for New Fuel

From kanterella
Jump to navigation Jump to search
Nuclear Material Transaction Report for New Fuel
ML23215A242
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/03/2023
From: Darrell Adams
Pacific Gas & Electric Co
To: Cettin J
Document Control Desk, Office of Nuclear Reactor Regulation, US Dept of Energy, Nuclear Material Mgmt & Safeguards System
References
PG&E Letter DCL-23-066
Download: ML23215A242 (1)


Text

II Pscilic Gas and Elec1tic Company"'

DaHas L. Adams Manager, Program Diablo Canyon Power Plant Mail code 104141427 P.O. Box 56 Engineering Avila Beach, CA 93424 805.545.6182 Dallas.Adams@pge.com PG&E Letter DCL-23-066 John Cettin 10 CFR 74.15 NMMSS Program, NA-ESH-12 Germantown Building U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-1290 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Nuclear Material Transaction Report for New Fuel

Dear Mr. Cettin,

Pursuant to 10 CFR 74.15(a), the enclosure provides two files in a computer-readable format of the Nuclear Material Transaction Report for materials received on July 24, 2023 and July 26, 2023. The files were prepared in accordance with NUREG/BR-0006, Revision 9, "Instructions for Completing Nuclear Material Transaction Reports," dated August 2020, and Nuclear Materials Management and Safeguards System (NMMSS) Report D-24, "Personal Computer Data Input for Nuclear Regulatory Commission Licensees," dated August 2016.

If you have any questions regarding the enclosure, please contact Mr. Joseph Lee at (805) 545-3348.

Dallas L. Adams Date Enclosure cc: Mahdi 0. Hayes, NRC Senior Resident Inspector Samson S. Lee, NRC Senior Project Manager John D. Monninger, NRC Region IV Administrator NRC Document Control Desk Diablo Distribution A member of the STARS Allian ce Callaway

  • Diablo Canyon
  • Palo Verd e
  • Wolf Cr eek