DCL-23-068, Nuclear Material Transaction Report for New Fuel

From kanterella
Jump to navigation Jump to search
Nuclear Material Transaction Report for New Fuel
ML23221A374
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/09/2023
From: Darrell Adams
Pacific Gas & Electric Co
To: Cettin J
Office of Nuclear Reactor Regulation, Document Control Desk
References
DCL-23-068
Download: ML23221A374 (1)


Text

m Pacific Gas and Electric Company*

Dallas L. Adams Manager, Program Engineering Diablo Canyon Power Plant Mail code 104/4/427 P.O. Box 56 Avila Beach, CA 93424 805.545.6182 Dallas.Adams@pge.com PG&E Letter DCL-23-068 John Cettin 10 CFR 74.15 NMMSS Program, NA-ESH-12 Germantown Building U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-1290 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Nuclear Material Transaction Report for New Fuel

Dear Mr. Cettin,

Pursuant to 10 CFR 74.15(a), the enclosure provides one file in a computer-readable format of the Nuclear Material Transaction Report for materials received on July 31, 2023. The file was prepared in accordance with NUREG/BR-0006, Revision 9, Instructions for Completing Nuclear Material Transaction Reports, dated August 2020, and Nuclear Materials Management and Safeguards System (NMMSS)

Report D-24, Personal Computer Data Input for Nuclear Regulatory Commission Licensees, dated August 2016.

If you have any questions regarding the enclosure, please contact Mr. Joseph Lee at (805) 545-3348.

Sincerely, Daniel Blount DOA for Dallas Adams Dallas L. Adams 08/09/2023 Date Enclosure cc: Mahdi O. Hayes, NRC Senior Resident Inspector Samson S. Lee, NRC Senior Project Manager John D. Monninger, NRC Region IV Administrator NRC Document Control Desk Diablo Distribution A m em b er o f t h e ST AR S Al l ia n ce C al l aw ay

  • D i ab l o C a nyo n
  • Pal o V er d e
  • Wol f C r e ek