DCL-23-008, Request Regarding Senior Reactor Operator License Application
| ML23073A032 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/22/2023 |
| From: | Petersen D Pacific Gas & Electric Co |
| To: | Andrea Veil Office of Nuclear Reactor Regulation |
| References | |
| DCL-23-008 | |
| Download: ML23073A032 (1) | |
Text
,,..,
m The Enclosure Contains Personally Identifiable Information - Withhold Under 10 CFR 2.390 When separated from the Enclosure, this cover letter is decontrolled.
Pacific Gas and Electric Campany"'
PG&E Letter DCL-23-008 Andrea Veil, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington,*DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Dennis B. Petersen Station Director Diablo Canyon Power Plant Mail code 104/5/502 P.O. Box 56 Avila Beach, CA 93424 805.545.4022 Dennis.Petersen@pge.com 10 CFR 55.11 10 CFR 55.47(a)(1)
Request Regarding Senior Reactor Operator Ucense Application
Dear Ms. Veil:
Pacific Gas and Electric Company (PG&E) intends to submit an application, in accordance with 10 CFR 55.31, for an individual to be licensed as a senior reactor operator (SRO) at Diablo Canyon Power Plant (DCPP), Units 1 and 2. This applicant was previously licensed as an SRO at DCPP. As a result, in accordance with 10 CFR 55.47, "Waiver of examination and test requirements;" PG&E intends to request a waiver of the written examination and operating test requirements.
10 CFR 55.47(a) provides that "the Commission may waive any or all of the requirements for a written examination and operating test" if it finds, among other things, that the applicant has "had extensive actual operating experience at a comparable facility, as determined by the Commission, within two years before the date of application" (10 CFR 55.47(a)(1 )).
It has been more than two years since this individual was licensed at DCPP.
Therefore, in support of the SRO license application submittal, and in accordance with 10 CFR 55.11, "Specific exemptions," PG&E requests a one-time exemption from the two-year eligibility requirement of 10 CFR 55.47(a)(1) for this SRO applicant. The enclosure to this letter provides the basis for the requested exemption.
The enclosure contains personal information. PG&E requests that the information contained in the enclosure be withheld from public disclosure, in accordance with 10 CFR 2.390(a)(6).
tJ/ O /) _3 A
member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek The Enclosure Contains Personally Identifiable Information - Withhold Under 10 CFR 2.390 When separated from the Enclosure, this cover letter is decontrolled.
/1/R.~
The Enclosure Contains Personally Identifiable Information -Withhold Under 10 CFR 2.390 When separated from the Enclosure, this cover letter is decontrolled.
Ms. Andrea Veil Page 2 PG&E Letter DCL-23-008 PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.
PG&E requests NRC staff approval of the requested exemption by June 15, 2023.
If the NRC requires additional information regarding this matter, please contact Mr. Justin Rogers, Director, Nuclear Training and Accreditation, at 805-545-3088.
Sincerely, Dennis 8. Petersen Station Director jmsp/4927 Enclosure cc:
Mahdi 0. Hayes, NRC Senior Resident Inspector Samson S. Lee, NRC Senior Project Manager Robert J. Lewis, NRC Acting Region IV Administrator Diablo Distribution A
member of the STARS Alliance"-
Callaway
- Diablo Cai:iyon
- Palo Verde
- Wolf Creek Date The Enclosure Contains Personally Identifiable Information - Withhold Under 10 CFR 2.390 When separated from the Enclosure, this cover letter is decontrolled.