ML17261A697: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REQUL*Y INFORMATION DISTR IBUTIO YSTEM (RIDS)ACCESSION NBR: 8712300222 DOC.DATE: 87/12/23 NOTARIZED:
{{#Wiki_filter:REQUL*     Y INFORMATION DISTR IBUTIO       YSTEM (RIDS)
NO DOCKET FACIL 50 244 Robert Emmet (irma Nuclear Pianti Unit 14 Rochester ('5000244 AUTH.NAME AUTHOR AFFILIATION KOBER.R.M.Rochester Gas h Electric Corp.REC IP.NAME RECIPIENT AFFILIATION STAHLEI C.NRC-No Detailed Affiliation Given  
ACCESSION NBR: 8712300222         DOC. DATE: 87/12/23     NOTARIZED: NO           DOCKET FACIL 50 244 Robert Emmet ( irma Nuclear Pianti Unit 14 Rochester             ('5000244 AUTH. NAME             AUTHOR AFFILIATION KOBER. R. M.           Rochester Gas h Electric Corp.
REC IP. NAME           RECIPIENT AFFILIATION STAHLEI C.             NRC No Detailed   Affiliation Given


==SUBJECT:==
==SUBJECT:==
Formards Rev 13 to"GA Program for Station Operation.
Formards Rev 13 to "GA Program for Station Operation. " Rev involves changes in util mgti engineering> station 8c electric transmission 5 distribution organizations.
" Rev involves changes in util mgti engineering>
PgaX DISTRIBUTION CODE: 80040 TITLE:  GA COPIES RECEIVED: LTR   + ENCL g     SIZE:
station 8c electric transmission 5 distribution organizations.
Topical ReportI Amendmenti or Correspondence (Docket/Utility Speci NOTES: License Exp date in accordance eith 10CFR2I 2. 109(9/19/72).               05000244 REC IP IENT       COPIES          REC IP IENT        COP IES ID CODE/NAME       LTTR ENCL      ID CODE/NAME        LTTR ENCL PD1-3 LA                 1     1   STAHLEI C               1     1 INTERNAL:             /LFMB         1     1   NRR/DLPG/GAB           2    2 RE('            01      2    2    RQNi     FILE           1    1 EXTERNAL: DMB/DSS                                LPDR                         1 NRC PDR                  1     1 TOTAL NUMBER OF COPIES REGUIRED: LTTR           11'NCL       11
PgaX DISTRIBUTION CODE: 80040 COPIES RECEIVED: LTR+ENCL g SIZE: TITLE: GA Topical ReportI Amendmenti or Correspondence (Docket/Utility Speci NOTES: License Exp date in accordance eith 10CFR2I 2.109(9/19/72).
 
05000244 REC IP IENT ID CODE/NAME PD1-3 LA COPIES LTTR ENCL 1 1 REC IP IENT ID CODE/NAME STAHLEI C COP IES LTTR ENCL 1 1 INTERNAL: RE('EXTERNAL: DMB/DSS NRC PDR/LFMB 01 1 1 2 2 1 1 NRR/DLPG/GAB RQNi FILE LPDR 2 2 1 1 1 TOTAL NUMBER OF COPIES REGUIRED: LTTR 11'NCL 11 0~M t~!s t.IIIE/tfflfiflffff tttllllitRlltl ttt lffffllff HC>L 41~Oa I k a ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.y.I4649.000~
0 ~ M t ~
ROGER W.KOBER wee RReeloeNT eLECTRIC PR OOVCTION TCI.ePIIONC IIRc*cooe TIe 546.2700 December 23, 1987 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Mr.Carl Stahle PHR Project Director No.1  
! s
 
HC>
t   .IIIE/tfflfiflffff                                                                                 L 41 ~ Oa I k a tttllllitRlltl tttlffffllff ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.y. I4649.000~
ROGER W. KOBER TCI.ePIIONC wee RReeloeNT eLECTRIC PR OOVCTION                                                                         IIRc* cooe TIe   546.2700 December 23, 1987 U.S. Nuclear Regulatory Commission Document                     Control Desk Attn: Mr. Carl Stahle PHR Project Director No. 1


==SUBJECT:==
==SUBJECT:==
Submittal of Quality Assurance Program R.E.Ginna Nuclear Power Plant Docket Number 50-244  
Submittal of Quality Assurance                     Program R.E. Ginna Nuclear Power Plant Docket Number 50-244


==Dear Mr.,==
==Dear           Mr.,==
Stahle:
Stahle:
Zn accordance with 50.54 of 10 CFR Part 50, enclosed is Revision 13 to the Quality Assurance Program for Station Operation.
Zn accordance           with 50.54 of 10 CFR Part 50, enclosed is Revision                     13 to the Quality Assurance Program for Station Operation.
The revision involves changes in the RG&E management, Engineering, Ginna Station and Electric Transmission and Distribution organi-zations.The management organization reflects the revised corporate structure being implemented on January 1, 1988 in conjunction with the retirement of the Senior Vice President, General Services and the pending retirement of the Chairman of the Board and the President.
The revision involves changes in the RG&E management, Engineering, Ginna Station and Electric Transmission and Distribution organi-zations.
Responsibility for overall direction of quality assurance policy is assigned to the Senior Vice President, Production and Engineering.
The management organization reflects the revised corporate structure being implemented on January 1, 1988 in conjunction with the retirement of the Senior Vice President, General Services and the pending retirement of the Chairman of the Board and the President.                         Responsibility for overall direction of quality assurance                       policy is assigned to the Senior Vice President, Production and Engineering.                                   The other changes are relatively minor and include                       title changes.
The other changes are relatively minor and include title changes.Engineering changes include the deletion of the Vice President, Engineering and Construction as this position, having only responsibility for Nine Mile Point 2, will report to the Vice Chairman of the Board.Dividing Electrical Engineering into two groups, Electrical Engineering Design and Electrical Engi-neering Services, established a new discipline reporting to the Director of Engineering Services.Changes in the Ginna Station organization included the re-establishment of the lead Superintendent.
Engineering changes include the deletion of the Vice President, Engineering and Construction as this position, having only responsibility for Nine Mile Point 2, will report to the Vice Chairman of the Board. Dividing Electrical Engineering into two groups, Electrical Engineering Design and Electrical Engi-neering Services, established a new discipline reporting to the Director of Engineering Services.
The Superintendent, Ginna Production, becomes Superintendent, Ginna Station and will assume the additional responsibility for Ginna Support Services.Other Ginna Station changes include: aenvtt=tco eo,$4t',74 SSg 8712300222 871223''DR" ADDCW.O50OO2<4''
Changes in the Ginna Station organization included the re-establishment of the lead Superintendent.                                             The Superintendent, Ginna Production, becomes Superintendent, Ginna Station and will assume the additional responsibility for Ginna Support Services.
',.'.lpoa'.
Other Ginna Station changes include:
I!I a~b.C~d.e.Elimination of the Quality Control Inspection Supervisor and providing supervisory control for the QC technicians from the QC Engineers.
8712300222 ADDCW.O50OO2<4''
An expanded maintenance organization which is enhancing planning and scheduling activities and the performance of special projects.Establishment of a corrective action coordination function reporting to the Ginna Superintendent.
871223''DR"
This function is focusing on the Ginna corrective action backlog and fascillitating root cause analysis.Expansion of the training organization to include maintenance training, technical training, and various support services.Transfer of the computer systems group from the Ginna Technical Manager to an offsite organization.
                                                                                  ',
Elimination o f the Operational Assessment Engineer position in recognition that the duties are being performed by others.The Electric Transmission and Distribution organization reflects changes in the Electric Substations Department to more clearly illustrate the field service, engineering, administrative and shop functions.
aenvtt=tco eo,                                                              '.    .'.lpoa
Additionally, clarifications have been made to Sections 16 and 17 in response to NRC review comments on the previous'revision 12.The stop work authority for the Manager, Quality Assurance has been added to Section 16 and the responsibility for the maintenance of engineering records has been clarified.
$4t',74 SSg
 
I
  !
I
 
a~   Elimination of the Quality Control Inspection Supervisor and providing supervisory control for the QC technicians from the QC Engineers.
: b. An expanded maintenance organization which is enhancing planning and scheduling activities and the performance of special projects.
C ~  Establishment of a corrective action coordination function reporting to the Ginna Superintendent.     This function is focusing on the Ginna corrective action backlog and fascillitating root cause analysis.
: d. Expansion of the training organization to include maintenance training, technical training, and various support services.
: e. Transfer of the computer systems group from the Ginna Technical Manager to an offsite organization.
Elimination o f the Operational Assessment Engineer position in recognition that the duties are being performed by others.
The Electric Transmission     and Distribution organization reflects changes in the Electric Substations Department to more clearly illustrate the field service, engineering, administrative and shop functions.
Additionally, clarifications have been made to Sections 16 and 17 in response to NRC review comments on the previous'revision
: 12. The stop work authority for the Manager, Quality Assurance has been added to Section 16 and the responsibility for the maintenance of engineering records has been clarified.
These changes will not reduce the effectiveness of the Ginna Station Quality Assurance Program nor reduce any of our previous commitments.
These changes will not reduce the effectiveness of the Ginna Station Quality Assurance Program nor reduce any of our previous commitments.
V truly yours,>/A lJ~/Roger W.Kober , RWK/cern Enclosures xc: T.J.Polich, Senior Resident Inspector USNRC Region 1 I e}}
V     truly yours,
                                        >/A lJ~
Roger W.
                                                  /
Kober
,
RWK/cern Enclosures xc:   T.J. Polich, Senior Resident Inspector USNRC Region 1
 
I e}}

Revision as of 18:54, 29 October 2019

Forwards Rev 13 to QA Program for Station Operation. Rev Involves Changes in Util Mgt,Engineering,Station & Electric Transmission & Distribution Organizations
ML17261A697
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/23/1987
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To: Stahle C
NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17261A698 List:
References
NUDOCS 8712300222
Download: ML17261A697 (6)


Text

REQUL* Y INFORMATION DISTR IBUTIO YSTEM (RIDS)

ACCESSION NBR: 8712300222 DOC. DATE: 87/12/23 NOTARIZED: NO DOCKET FACIL 50 244 Robert Emmet ( irma Nuclear Pianti Unit 14 Rochester ('5000244 AUTH. NAME AUTHOR AFFILIATION KOBER. R. M. Rochester Gas h Electric Corp.

REC IP. NAME RECIPIENT AFFILIATION STAHLEI C. NRC No Detailed Affiliation Given

SUBJECT:

Formards Rev 13 to "GA Program for Station Operation. " Rev involves changes in util mgti engineering> station 8c electric transmission 5 distribution organizations.

PgaX DISTRIBUTION CODE: 80040 TITLE: GA COPIES RECEIVED: LTR + ENCL g SIZE:

Topical ReportI Amendmenti or Correspondence (Docket/Utility Speci NOTES: License Exp date in accordance eith 10CFR2I 2. 109(9/19/72). 05000244 REC IP IENT COPIES REC IP IENT COP IES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 1 1 STAHLEI C 1 1 INTERNAL: /LFMB 1 1 NRR/DLPG/GAB 2 2 RE(' 01 2 2 RQNi FILE 1 1 EXTERNAL: DMB/DSS LPDR 1 NRC PDR 1 1 TOTAL NUMBER OF COPIES REGUIRED: LTTR 11'NCL 11

0 ~ M t ~

! s

HC>

t .IIIE/tfflfiflffff L 41 ~ Oa I k a tttllllitRlltl tttlffffllff ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.y. I4649.000~

ROGER W. KOBER TCI.ePIIONC wee RReeloeNT eLECTRIC PR OOVCTION IIRc* cooe TIe 546.2700 December 23, 1987 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Mr. Carl Stahle PHR Project Director No. 1

SUBJECT:

Submittal of Quality Assurance Program R.E. Ginna Nuclear Power Plant Docket Number 50-244

Dear Mr.,

Stahle:

Zn accordance with 50.54 of 10 CFR Part 50, enclosed is Revision 13 to the Quality Assurance Program for Station Operation.

The revision involves changes in the RG&E management, Engineering, Ginna Station and Electric Transmission and Distribution organi-zations.

The management organization reflects the revised corporate structure being implemented on January 1, 1988 in conjunction with the retirement of the Senior Vice President, General Services and the pending retirement of the Chairman of the Board and the President. Responsibility for overall direction of quality assurance policy is assigned to the Senior Vice President, Production and Engineering. The other changes are relatively minor and include title changes.

Engineering changes include the deletion of the Vice President, Engineering and Construction as this position, having only responsibility for Nine Mile Point 2, will report to the Vice Chairman of the Board. Dividing Electrical Engineering into two groups, Electrical Engineering Design and Electrical Engi-neering Services, established a new discipline reporting to the Director of Engineering Services.

Changes in the Ginna Station organization included the re-establishment of the lead Superintendent. The Superintendent, Ginna Production, becomes Superintendent, Ginna Station and will assume the additional responsibility for Ginna Support Services.

Other Ginna Station changes include:

8712300222 ADDCW.O50OO2<4

871223DR"

',

aenvtt=tco eo, '. .'.lpoa

$4t',74 SSg

I

!

I

a~ Elimination of the Quality Control Inspection Supervisor and providing supervisory control for the QC technicians from the QC Engineers.

b. An expanded maintenance organization which is enhancing planning and scheduling activities and the performance of special projects.

C ~ Establishment of a corrective action coordination function reporting to the Ginna Superintendent. This function is focusing on the Ginna corrective action backlog and fascillitating root cause analysis.

d. Expansion of the training organization to include maintenance training, technical training, and various support services.
e. Transfer of the computer systems group from the Ginna Technical Manager to an offsite organization.

Elimination o f the Operational Assessment Engineer position in recognition that the duties are being performed by others.

The Electric Transmission and Distribution organization reflects changes in the Electric Substations Department to more clearly illustrate the field service, engineering, administrative and shop functions.

Additionally, clarifications have been made to Sections 16 and 17 in response to NRC review comments on the previous'revision

12. The stop work authority for the Manager, Quality Assurance has been added to Section 16 and the responsibility for the maintenance of engineering records has been clarified.

These changes will not reduce the effectiveness of the Ginna Station Quality Assurance Program nor reduce any of our previous commitments.

V truly yours,

>/A lJ~

Roger W.

/

Kober

,

RWK/cern Enclosures xc: T.J. Polich, Senior Resident Inspector USNRC Region 1

I e